|
---|
Category:E-Mail
MONTHYEARML24282A7042024-10-0808 October 2024 NRR E-mail Capture - Acceptance Reviews of Relief Requests Associated with the Fifth Inservice Inspection Interval at Byron and Braidwood Stations ML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24180A0042024-06-28028 June 2024 NRR E-mail Capture - Acceptance Review for Braidwood and Byron - Request for Exemption from 10 CFR 50.46 and Appendix K (L-2024-LLE-0019) ML24180A0032024-06-28028 June 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment for Transition to Framatome Gaia Fuel (L-2024-LLA-0072) ML24176A0182024-06-20020 June 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment to Remove Extraneous Detail Related to Beacon ML24170A3912024-06-18018 June 2024 NRR E-mail Capture - Revision of Estimated Hours to Complete Review of Byron/Braidwood Amendment to Revise TS 3.7.15, 3.7.16, and 4.3.1 (L-2023-LLA-0136) ML24141A2452024-05-20020 May 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment to Delete Technical Specification 5.6.5.b.5 (L-2024-LLA-0055) ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24053A3382024-02-22022 February 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML24030A0022024-01-30030 January 2024 NRR E-mail Capture - NRC Acceptance Review for Braidwood Station, Units 1 and 2, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators ML24039A0412024-01-30030 January 2024 NRR E-mail Capture - Request for Additional Information Regarding Braidwood Request for Alternative (I4R-18) ML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference ML23321A2012023-11-17017 November 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23304A0222023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Braidwood 1 & 2 - Exemption from Security Rule (L-2023-LLE-0030) ML23187A0092023-07-0606 July 2023 NRR E-mail Capture - NRC Acceptance Review of Byron and Braidwood Request to Adopt TSTF-370 ML23103A4692023-04-12012 April 2023 NRR E-mail Capture - NRC Acceptance Review of Braidwood Request for Amendment to Revise TS 3.7.9 ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22189A0602022-07-0707 July 2022 NRR E-mail Capture - Draft RAI for Byron/Braidwood TSTF-501 ML22136A2722022-05-16016 May 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron Adoption of TSTF-501 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22116A0242022-04-25025 April 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246 ML22105A0722022-04-15015 April 2022 NRR E-mail Capture - Braidwood/Byron Verbal Authorization for Proposed Alternative I4R-15/I4R-21 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22091A0842022-02-24024 February 2022 NRR E-mail Capture - Braidwood and Byron - Withdrawal of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML23089A0172022-01-0505 January 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood - Proposed Alternative for Examinations of Categories B-B, B-D, and C-A SG Welds and Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21272A1492021-09-29029 September 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron - Proposed Alternative for Examinations of Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0172021-09-0303 September 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood - License Amendment to Revise Technical Specification 3.7.9, Ultimate Heat Sink ML21252A0042021-08-26026 August 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood/Byron/Clinton - Adoption of TSTF-273, Safety Function Determination Program Clarifications ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21154A0162021-06-0202 June 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood - Proposed Alternative for Exam of Pzr Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Shell Welds ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21123A2442021-05-0303 May 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood/Byron/Ginna - Application to Address the Issues Identified in Westinghouse Documents NSAL-09-5 and NSAL-15-1 (L-2021-LLA-0066) 2024-09-06
[Table view] Category:Note to File incl Telcon Record
MONTHYEARML22300A0842022-11-10010 November 2022 Pressure and Temperature Limits Report (Ptlr), Revision 8 ML14197A0732014-07-14014 July 2014 Updated (July 14, 2014) Talking Points for Public Teleconference ML14149A1412014-06-0505 June 2014 Summary of Telephone Conference Call Held on May 21, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 29, Pertaining to the Byron Station and Br ML14094A2752014-05-19019 May 2014 Summary of Telephone Conference Call Held on March 19, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 18, Pertaining to the Byron Station and ML14092A3562014-04-15015 April 2014 Summary of Telephone Conference Call Held on March 31, 2014 Between the U.S. NRC and Exelon Generation Company, LLC, Concerning Requests for Additional Information Pertaining to the Braidwood Station, License Renewal Application ML0619502662006-02-0909 February 2006 E-mail from Habighorst to Boland, Summary of the Call Earlier Today 2022-11-10
[Table view] Category:Verbal Comm
MONTHYEARML22300A0842022-11-10010 November 2022 Pressure and Temperature Limits Report (Ptlr), Revision 8 ML14197A0732014-07-14014 July 2014 Updated (July 14, 2014) Talking Points for Public Teleconference ML14149A1412014-06-0505 June 2014 Summary of Telephone Conference Call Held on May 21, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 29, Pertaining to the Byron Station and Br ML14094A2752014-05-19019 May 2014 Summary of Telephone Conference Call Held on March 19, 2014, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Concerning Draft Request for Additional Information, Set 18, Pertaining to the Byron Station and ML14092A3562014-04-15015 April 2014 Summary of Telephone Conference Call Held on March 31, 2014 Between the U.S. NRC and Exelon Generation Company, LLC, Concerning Requests for Additional Information Pertaining to the Braidwood Station, License Renewal Application ML0619502662006-02-0909 February 2006 E-mail from Habighorst to Boland, Summary of the Call Earlier Today 2022-11-10
[Table view] |
Text
To: Anne Boland; Richard Skokowski; Roland Lickus; Stephen Klementowicz; Steven Orth; Timothy Frye; Vicki Block Date: 2/9/06 3:13PM
Subject:
Summary of the call earlier today The attachment provides a quick summary of the call today ....please comment on ....Thanks for everyone s participation...if I have missed anyone on the call please advise LI CC: Raeann Shane; Undine Shoop
_j to
ý tA Ax7 Inform atio i,in [,--n ' ",,c was de iezed in accordance with the Freedom of Information Act, exemptions -
EOIA- , &-/Z -
- _I. LVJ aI I CUlyIVIL LMI I' LIntZM % r- kaLL .OUIVII~MflI Dr-I VVrMI'J vi'ri-., %-,i Arr- /Ain)I o i HI-%rrivit~ivit~tM.W 'age i-age"-
CONFERENCE CALL
SUMMARY
BETWEEN NRC STAFF AND STAFF MEMBERS FROM REPRESENTATIVE WELLER AND SENATOR OBAMA TOPIC: BRAIDWOOD TRITIUM Date: February 9, 2006 Time: 1:00 - 1:40 p.m.
Participants NRC Attendees from Region Ill, NRR, OCA, and TRPS.
Representative Weller Staff Members:
Eric Gray Alan Timmille Kris Kennedy Senator Obama Staff Member Todd Atkinson NRC Presentation Deputy DRS director provided the discuss of the Braidwood tritium migration. The discussion provided a general overview, licensee actions to-date, and NRC actions.
Overview 0 This is the third briefing of congressional staff members since late November S The NRC continues to monitor the migration of tritium from the site S Results thus far do not indicate a health and safety problem 0 Licensee has not used this release path since late November, 2005 Exelon Actions to-date 9 Exelon recently provided a commitment letter to not release through this pathway until discussions occur with NRC and the Illinois Department of Environmental Protection
- Exelon continues to characterize the release, fully quantify the affective areas due to this migration
- Five major areas are being explored by Exelon
+ Area near vacuum breaker number 4. This vacuum breaker is located in the Forest preserve. No drinking water wells exist in the preserve. The monitoring well installed by Exelon recently recorded tritium between 25,000 - 30,000 pci/L (greater than the EPA limit).
Exelon continues to install additional monitoring wells for characterization
- Area near vacuum breaker number 7. Vacuum breaker 7 is approximately 2 miles from the Kanakee River. A recent monitoring well identified tritium at a concentration of 3,000 pci/L.
I ,VI,Ia,Iu,, II0,- , rl.,%nr-,'d,.,- JMLLO-!
OUIVI"VIMT l DZZ VV 'J-r-'JIIN b I AN' M'J)U bI t.t"- MMb*,-*.Wpa Page; Vacuum breakers 2 and 3 (original issues in late November and early December). The two vacuum breakers are near the owner controlled area and within 2,500 feet of this boundary. Over 100 monitoring wells have been installed by Exelon in this area. Exelon has reached out to 28 residence to sample their well. Thus far 20 have responded in the affirmative. One public drinking well had positive indication of tritium (1,500 pci/L).
A number of monitoring wells have had concentrations as high as 200,000 pci/L
+ Vacuum Breaker 1 and near the turbine building. Vacuum breaker 1 is located on-site. Small concentrations of tritium have been identified (3,000 pci/L). Near the turbine building the licensee has identified trace amounts just greater than background.
- Exelon actions are to continue to perform historical reviews to characterize the root cause of this migration.
- External communications initiated by Exelon. Two meetings with local citizens, IEPA, and Will County Health have taken place to describe to local citizens the impact and actions going forward. On January 26, 2006, Exelon sent out approximately 2500
-2600 letters to local residents informing them of the on-going reviews and conditions.
NRC Actions On-going inspections with the on-site resident supplemented with a regional inspector.
The inspections have focused on monitoring of Exelon's characterization of the tritium migration
- Starting the week of February 13 two specialist inspectors will be on-site to review both the licensee's historical actions and our actions in the past Inspection report was issued on February 6 that describe the "facts as we know them" as of December 31, 2005. The inspection report left an open inspection item.
Congressional Staff Questions
- 1. Senator Obama's staff asked about the following:
- Why is this continuing to be a problem for this site? -,
- Why has the tritium concentrations "spiked" to 30,000 pci/L?
- How long will this investigation take and what are the consequence ?
After a brief response to the above questions, the staff member stated... Expect to have questions from his senator during the oversight hearings (Early March, 2006)hv-,
concerning Braidwood.
(Note: Office of Congressional Affairs will make contact with the Senator's staff member "/
to acquire clarification and extent of concerns) ell
- 2. Congressman Weller's staff question
- How close is the monitoring well in the forest preserve to a residential location?
NRC responded about 900 feet.
Overall, the Congressman's staff was appreciative of the NRC's briefing.
,L-,v -L.im1 I.L.II VIIL J-,,V I-I vv*- l- %*o,- in,-r I I'* .1 Mr(-r IV Ir_'IVoc-no.vptU. .- 'age; BACKGROUND INFORMATION On February 8, 2006, the Region III staff attended a contentious and heated public meeting at the Village of Godley, Illinois to discuss tritium contamination in the groundwater. The meeting was widely attended, including members of Illinois EPA, media, local/state/federal officials, and anti-nuclear activists.
On January 26, 2006, the licensee conducted a meeting with residents living near the facility to discuss the status of characterizing the tritium contamination, financial remedies, and re-mediation plans. Residents expressed concerns related to potential health effects, property values, and delay in identifying and communicating the leaks in 1998 and 2000.
On January 25, 2006, the licensee's preliminary root cause investigation determined that there were 19 other blowdown line leaks since 1996, including a major leak in 1996. The licensee sampled a well in the Will County Forest Preserve and received an initial count of 24, 846 pCi/liter of tritium and the recount was at 24, 531 pCi/L. The report was provided to local Joliet newspaper and other sources.
On January 25, 2006 UCS and others initiated a 2.206 petition concerning leaks at power plants and radioisotopes found within on-site monitoring wells.
On January 23, 2006, Regional staff attended an Exelon briefing of the Illinois EPA regarding the Tritium contamination.
On January.J8, 2006, a conference call was held between Region Ill, STP, OGC and NRR. to discuss theL "On December 20, 2005 members of the Region III staff participated in a meeting between the Illinois EPA and the licensee.
On December 16, 2005, the State of Illinois Environmental Protection Agency issued the licensee a Violation Notice for contaminating the groundwater.
On December 9, 2005, the licensee reported measurable levels of tritium in offsite ground water monitoring wells that were installed over the last two weeks. During subsequent monitoring tritium was identified above background at one residential location. The licensee continues to monitor and to develop options for re-mediation, with Region III inspection oversight. The
~nduyiii~i-LAi~nrlamr-dz UALL OUMMINt-iY bt I Vvtt.N I'JIHLU 1AtI-~ ANU 6 1AFF MLzME3EHS.Wpd Pagez licensee continues to attribute the contamination to leaks from its circulating blow down line that occurred in 1998 and 2000. Along with circulating water, the licensee uses that line for liquid radioactive discharges from the plant. While the investigation is ongoing, the licensee has suspended all discharges through that line for approximately 18 days.