ML18016A939

From kanterella
Revision as of 04:37, 22 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
ASME QA Audit of Shnpp Construction, Conducted on 800915- 18 & 22
ML18016A939
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/02/1980
From: Bissette L, Hall A, Sean Mcmanus
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18016A936 List:
References
QAA-170-4, NUDOCS 9905050218
Download: ML18016A939 (132)


Text

{{#Wiki_filter:if l Ik,", II I

                                                                                                                                      ,'I"hl h

form ale g~h Caroline Power n Light Company hhkl@l& apl Company Correrpondence October 2, 1980 FILE: QAA/170-4 MEMORANDUM TO: Messrs. Sherwood H. Smith, Jr. IJ

                                                         ~~oner 9

h E. E. Utley il -PM': S. McManus I "l'.

SUBJECT:

ASME Quality Assurance Audit of 4JI

                  \                      SHNPP Construction I'h During the period September 15-18, 22, 1980, a Corporate Quality Assurance Program Audit was conducted at the SHNPP Construction Site. This was conducted by Messrs. A. E. Hall (Lead Auditor), L. W. Bissette, I. A. Johnson, and F. W.                                L
                                                                                                                                              'lkg Taylor of the Corporate Nuclear Safety & Quality Assurance Audit Section. The purpose of this audit was to evaluate the SHNPP ASME Quality Assurance Program                                            I Q

nnd to verify compliance with the implementing procedures. i

                           'Ihe attached     audit report oumnarizes the results of the audit. The completed                      e              r  lJI.,

checklist, which was used as a guide in conducting this audit, is maintained 9 in the CNS&QAA Section files. it I ,If , ',k As required by Audit Procedure QAAP-1, io the responsibility of the Manager-Engineering & Construction Quality Assurance to review and investigate the A I-I P audit findings; to determine and schedule appropriate corrective action, Ipl ','ki including action to prevent recurrence; nnd to respond in writing within thirty days after receipt of this report, giving results of the review nnd I I investigation and describing corrective action taken to resolve the findings identified in this report. In addition, provide nse as requested for Concerns Numbers 5 and 6. LWB/nohTC/tcm I Attachment n cc: Messrs. H. R. Banks (w/a) P. W. Howe (w/a) I jl I'ir N. J. Chinngi (w/a) R. L. Mnyton, Jr. (w/a) 'I I JI Ik A. B. Cutter (w/a) M. A. McDuffie (w/a) I} T. S. Ellemnn (w/a) R. M. Parsons (w/a) hi I G. L. Forehand (v/n) S. D. Smith (w/a) j J. G. Hammond w/a I ", TO: Mr. S. McManus

                                                                                                                                                   ,I I I                    FROM:      J. A. Jones The attached audit report, QAA/170-4, hao been reviewed and io returned for placement in the CNS&QAA files with the f loving comments.

l, 'JI",

                                                                                                                                             ,e      u I

IIVJ rl9050502i8 990430 050004001 PDR ADQCK I, ) I, P PDR 4, 9 Il

      /
       ~ ~

5'

      ~

'l4

    '

155J t '5

AUDIT REPORT Activity Audited: SHNPP ASME Construction Audit Report No.: QAA/170-4 Date: September 15-18 & 22, 1980 Auditors: A. E. Hall Lead Auditor L. W. Bissette I. A. Johnson F. W. Taylor Persons Contacted: I I*II R. M. Parsons, Site Manager I I*II A. M. Lucas, Senior Resident Engineer S. Hinnant, Resident Engineer Electrical E. E. Willett, Principal Engineer Mechanical

  • R. Hanford, Principal Engineer Welding I I*II G. L. Forehand, Principal QA Specialist
  • P, W. Howe, Vice President Technical Services Department
  • N. J. Chiangi, Manager - Engineering & Construction QA Section I I PI I W. D. Goodman, Daniels Pro)act Manager R. H. McMillan, Daniels Assistant to Construction Manager G. M. Simpson, Principal Constxuction Inspection Specialist V. Safaxian, Welding Senior QA Specialist D. C. Wnitehcad, Receiving Senior QA Specialist F. Sheikh, Pro)act Engineer - Welding R. Patterson, Construction Engineer T. Harrington, Director of Purchasing J. S. Clements, Document Contxol Supervisor L. Denson, Materials Supervisor C, Osman, Pro)act QA Specialist T. Lcc, Senior QA Records Specialist G. White, Senior Engineer E. Harris, Prospect Engineer L. Liles, Technical Assistant II R. Jones, General Foreman J. Bradford, Pipe Fitter Foreman G. Thompson, Construction Inspection Specialist G. Daniels, QA Technician I
  • Attended Poataudit Meeting
    • Attended Preaudit Meeting

"*" Attended Preaudit and Postaudit Meetings

It-1 h tt C h h

t. j
                                          ~
                                                                               ~
                                                                                         ~ ~

I ~

                                                                                                ~
                                                                                                ~   ~
                                                                                                        ~
                                                                                                             ~
                                                                                                               ~    ~ ~  ~
                                                                                                                             ~
                                                                                                                                ~
                                                                                                                                       ~
                                                                                                                                        ~
                                                                                                                                                    ~
                                                                                                                                                      ~
                                                                                                                                                        ~
                                                                                                                                                                ~
                                                                                                                                                                   ~
                                                                                                                                                                     ~
                                                                                                                                                                                    ~
                                                                                                                                                                                       ~ ~~
                                                                                                                                                                                            ~
                                                                                                                                                                                              ~
                                                                                                                                                                                               ~ )     ~
                                                                                                                                                                                                            ~
                                                                                                                                                                                                                                ~
                                                                                                                                                                                                                                     ~
                                                                                                                                                                                                                                      ~I~~
                                                                                                                                                                                                                                           ~~ ~
                                                                                                                                                                                                                                                  ~
                                                                                                                                                                                                                                                    ~~
                                                                                                                                                                                                                                                    ~~      ~
                                                                                                                                                                                                                                                                ~ ~I~
                                                                                                                                                                                                                                                                         ~
                                                                                                                                                                                                                                                                                  ~ ~
                                                                                                                                                                                                                                                                                    ~
                                                                                                                                                                                                                                                                                       ~
                                                                                                                                                                                                                                                                                        ~
                                                                                                                                                                                                                                                                                            ~
                                                                                                                                                                                                                                                                                                ~
                                                                                                                                                                                                                                                                                                   !   !
                                                                                                                                                                                                                                                                                                         ~          0
                                                                                                                                                                                                                                                                                                                     ~
                                                                                                                                                                                                                                                                                                                       ~
                                                                                                                                                                                                                                                                                                                         ~
                                                                                                                                                                                                                                                                                                                             ~

I

                                                                                                                                                                                                                                                                                                                                            )
                                                                                                                                                                                                                                                                       ~
                                                                                                                                                                                     ~
                                                                                                                                                                                                                                                                   ~
                                ~I                                                                                                                                                                 ~
                                                                                                                                                                                                                                  ~           ~                                                            ~ ~~ ~                             ~

t~~ ~

                                                       ~
                                                                     ~ ~                   ~      ~                                    ~  4     J         ~   ~
                                                                                                                                                                               ~ ~~
                                                                                                                                                                                                          ~
                                                                                                                                                                                                                       ~~

I~ ~ ~>>

                                                                                                                                                                                                                                                          ~              ~ ~
                                                                                                                                                                                                                                                                             ~
                                                                                                                                                                                                                                                                               ~~     ~           ~
                                                                                                                                                                                                                                                                                                                                                    !

h

                                                                                                                                                                                                                                         ~
                                                                                                                                                                                                                                                                                                                                          ~
                                            ~
                                                                           ~
                                                                                                    ~ ~     ~
                                                                                                                                     ~        4   ~           ~
                                                                                                                                                                          ~i~               ~      ~~           ~~

a ~

                                                                                                                                                                                                                      ~ ~I~         ~                                                                                      ~
                                                                                                                                                                                                                                                                                                                               ~
                                                                                                                                                                                                                                                                                                                                    ~~ ~
                                                                                                                                                                                                                                                                                                                                         ~       ~
                                                  ~
                                                                                            ~                    <<         ~                              ~ ~~i
                                                                                                                                                                      ~                               I~~     ~                                               ~  ~    ~                 ~
                                                                                                                                                                                                                                                                                          ~
                                                                                                                                                                                                                                                                                              ~
                                                                                                                                                                                                                                                                                                    ~~         ~  ~                            ~
                                    ~
                                        ~       ~   ~
                                                      ~    ~
                                                               ~

4

                                                                         ~
                                                                             ~
                                                                                 ~
                                                                                   ~~                             >>            ~ ~ ~
                                                                                                                                                                  ~~
                                                                                                                                                                        !                 ~                   ~
                                                                                                                                                                                                                            ~          ~    ~
                                                                                                                                                                                                                                                                                                                                                  !
                                    ~       !            ~
                                                             ~     ~

n: e

                                                                                                                                                                                                                                                                                                                                             )

SCOPE; The audit was conducted in accordance with CP4L's Quality Assurance Audit Procedure, QAAP-1, "Procedure for Corporate and ASME QA Audits." The purpose of this audit was to review and evaluate sclccted portions of the CPAL ASME QA Program, Site QA Program/Procedures, and verify site compliance with implementing procedures. Areas/activities audited include: (1) Training .44(fj and Qualification; (2) Design Control; (3) Procurement Control; (4) Document c Control; (5) Receiving Inspection; (6) Handling - Cleaning and Storage; (7) Hydrostatic Tests; (8) Welding Material Control; (9) Construction I LL II Welding; (10) Inspection and Tests; (11) Nondestructive Examination; t (12) Inspection and Test Equipment Control; (13) Code Data Reports and jt Nameplate Stamping; and (14) Housekeeping During Construction Phase. Within these areas the audit consisted of discussions with personnel, J examination of records and procedures, audit team walk-through housekeeping inspection of construction site, and witness of work in progress. R ttafaRY: Within the scope of this audit, the ASME Quality Assurance Program was tf $ considered to be adequate. Two of the seven findings identified in this report are related to the ASME Program, and one of the nine concerns is t related to the ASME Program. The remaining findings and concerns are -t,,(, )-':t f-t)c'7 against general construction activities. ) The inspection tour of storage and construction areas for compliance with 'P;. );L,Q the housekeeping requirements of ANSI-N45.2.3 indicated the storage areas 'tfft to be relatively clean except for one smaller building having a rather dirty floor. The construction areas continued to have vrapping materials in numerous locations and the fabrication shops contained a variety of trash including safety cans filled with flammable material. The electrical 4 storage sheds had heavy equipment, and materials stored overhead in an j t'4 4

              ~

t unsafe manner. As was reported in Audit QAA/170-3, there were no findings reported; therefore, no corrective actions wore required to be verified in this audit. 't j

  .4,                                                        Personnel contacted during this audit were cooperative and found to bo knovledgcablc in their areas of responsibility.                                                                                                                                                                                                                                                                   t'jl'
                                                                                                                                                                                                                                                                                                                                                                    .3   4',

Findin s and Corrective Action: During the audit the following items vere identified as nonconforming findings. (, vill f 4 These items require corrective action and formal response. c, 4

                                                                                                                                                                                                                                                                                                                                                             't
                                                                                                                                                                                                                                                                                                                                                              't (tea i: trait(a aafj                                             iiticatiea
                                   ~Re uireaeat:                                                                                                                                                                                                                                                                                                        fc J Jft ASNT-TC-lA (1975                                 Edition), Paragraph 8.5. 2.c, specifi.es that for the practical examination (nondestructive examination personnel qualifications), ten different checkpoints requiring understanding of teat variables and procedural requirements should be included in the practical examination.                                                                                                       In addition, Paragraph 9.6.1.f specifics that tho practical examination should describe the practical test ob)cct.                                                                                                                                                                                                                                       f't J

f

                                                                                                                                                                                                                                                                                                                                                      . f.

4 ) R

                                                                                                                                            )                                 R tl BR.~M'ttLJ a"tet               utt!Jt 449,              ~~ttcM<%                R     'R~wWP                   ~~jft  ~4$                     te~        i
                                                                                                                                                                                                                                                                                 "-'a~A             J~+at'uut                     '"au& '                  4 4"
                        >gg I

I J4 C J; pl

   ~ .h
      '
                            '
    '

h P IC I 1 1 J hi $ 4 4 t

Nonconformance: The qualification records for Norman C. Westgage, RT Level II (Daniel) practical examination record did not include ten checkpoints as required and did not describe the test object that was tested. These record nonconformances existed when the CP&L NDE Level III Examiner reviewed the record and certiEied this individual as RT Level II on 8/8/80. The auditors determined the record files for five other Lovel II personnel did meet the requirements of ASNT-TC-1A. Acknowlcd ement and Res onse: The Manager - Engineering & Construction QA stated Daniels (Greenville Office) will be contacted and requested to forward missing documents which are on file. Procurement Control

   'ite Item 2:
        ~Re ultunent:

QA Procedure CQA-24, Rev. 0 (7/7/80) Procurement Control, Paragraph 7.1 requires when a vendor is disqualified/removed from Approved Suppliers List, an evaluation will be performed by the cognizant QA Specialist. The evaluation shall be documented and shall indicate if the disqualification affects orders in fabrication and any orders previously received on site.

   .,I Ie Nonconformance:

'r' The auditor determined this requi.rement of the Site QA Procedure was not being rj ~ implemented by Site QA. Acknowled ement and Res onse: The Si.te Principal QA Specialist implemented corrective action for the vendors removed from the Approved Suppliers List in the last six months and gave the auditor written action to prevent recurrence of this nonconformance in the future. This action was reviewed by the auditor during this audit and is closed in this audit report. Further response is not rcquircd. Item 3: Document Control

       ~Re  utteueut:

ASME Code Section III, NA-4133.6 Document Control, requires "measures that shall assure that documents, including changes, are reviewed for adequacy..." NonconEormance: The auditor determined that a portion of the text of Paragraph 1.3, 10CPR21 requirements, of Site Specification 036, Revisions 1, 2, 3, and 4 which was in the original issue of the document, was inadvertently deleted in Revisions 1, 2, 3, and 4 due to typing error. This discrepancy went undetected throughout the CP&L Site construction and QA organizations. This document was a requirement on eight out of seventeen purchase orders Eor ASME Code items reviewed by the auditor.

k'~~

        "r A
     $  a
    'E V
                   ~  Iv' PV g

~I lJ 4 4 '

     %p g~

A,~ 1~6

  'I
       $

1'~ 1 %c k~ I~ T q 4

                               'Q              4 Acknowled cment and Ree once:

Site management is to issue a memorandum to all site personnel responsible with document issue and revision. This memo is to bring this nonconformance to site personnel's attention and their responsibilities as to how to rcvicw a procedure/revision.

  ~ite I iremant:

Procedure WP-112, "Control of Materials and Equipment That May Bc Harmful To Stainless Steel," requires materials that are purchased for a function that will require them to come in contact with stainless steel shall not contain more than 1000 PPM leachable halogenated compounds (including chlorides). A certificate of compliance to the above must be provided by the suppliez or sampled and tested upon receipt of the material. Nonconformance: There are no suppliers'ertification or sample test results on halogen content for the acetone being used on the site for cleaning purposes. Acknowled emcnt and Ree onse: The Senior Resident Engineer stated this item would be reviewed with Engineering and cozrective action response would be forwarded. Item 5: Receivin Ine ection Warehouse storage procedure PGD-002, "Material Maintenance Requirements During Storage for Shcaron Harris Nuclear Power Plant," requires polyethylene used in contact with safety related, seismic 1, or stainless steel equipment not to be in cxccee of 55 PPM for total leachable halogens in pigmented sheeting. Procedure WP-112, "Control of Materials and Equipmcnt That May Be Harmful To Stain'es Steel," requires that materials that are purchased for a function that will require them to come in contact with stainless steel shall not contain more than 1000 PPM halogenated compounds which are leachable. NPPED Memorandum 801022, dated 5/22/80 from L. I. Loflin to T. H. Wyllie, indicates that protective covers must not exceed 1000 PPM for total halogen and sulfur, and 200 PPM for lcachablc halogen. Nonconformance: The fire retardant vinyl received 6/4/80 has manufacturer's certification which states the total lcachable halogenated compounds including chlorides are lese than 1000 PPM. Tnie material is being used tn cover safety related and stainless steel equipment even though there is a conflict between the three documents prescribing leachable halogen limits. Acknowled emcnt and Res once: 'Ihe Site Senior Resident Engineer stated this item would be followed up with Engineering, and then they would respond with corrective action.

1 i'

4 I j '\' f/"I) Item 6: Weldin Material Control S l.'f f", I 'I 'dg I Procedure MP-03, Revision 9, dated September 5, 1980, Paragraphs 3.11 and 3.12 require the Welding Issue Room Attendant to daily check the welding rod holding I u'.

                                                                                                                       ,I  ')I ovens and to randomly check the welding rod heated portable caddies for their proper operation at the specified temperatures.         The procedure requires the above   '    II V checks to be recorded on Exhibit 2, Revision 6, dated August 1980.                                             s Nonconformance:                                                                              ; c The records examined showed that Revision 4, not Revision 6, of Exhibit 2 has been used to record the daily checks of oven temperatures in        all  three issue rooms to date. Revision 4 of Exhibit 2 did not have a format that provided a designated space for the data results of checking the heated portable caddies.           There have been no records made of the issue room attendant's checking of the heated portable caddies since September 5, 1980 when the new requirement became effective.

Revision 6 of Procedure HP-03, which was issued December 7, 1979, revised Exhibit 2 which made it Revision for 5~ There is no record of Revision 5 of Exhibit 2 having been used recording oven temperatures by the issue room attendants since that datce u V'Ig yQ Acknowled cment and Res onse: Senior Resident Enginccr stated that the removal of Revision 4 of Exhibit 2

 '   The from the welding issue rooms has been accomplished and Revision 6 of Exhibit 2 is now required to be used for the recording of data on the ovens and portable caddies.
                                                                                                                  '    f) (,

Item 7: Nondestructive Examination ) For welding repairs to Code Class 3 base material, the CP&L ASME QA Manual requires the QA Welding Inspector to prepare a sketch of the repaired area as required by thc Code showing location and size of the prepared cavity, the welding material I identifications, thc welding procedure, and a report of the results of examinations. a For veld repairs requiring radiography, ASME Code Section requires a sketch showing location and size of the prepared cavity. III, Paragraph ND-2539 Fi

                                                                                                                             )'

Nonconformance: I II uu A radiograph identified as SW-2Rl, Drawing 4-SW-8/2165 was reviewed during this I audit. A note on the Radiographic Facamfnation Report indicated the area examined to bc a pipe wall repair. The sketch of the repaired area and the repair weld data I rcport could not be located during the audit. Only the film and the request for radiography were available for review. I Acknowlcd ement and Res onse: (ul The Manager - Engineering 6 Construction QA stated work on thc pipe spool modifica- f( 1f tion was not yet complete. Although the actual base material repair was complctcd, the required paperwork was not yct submitted for incorporation in the final package. Cri,

                                                                                                                     'n
                                                                                                   "( JI I

1 qk C, P I

 ~  '

4 4 P t

                      ~            ~                                                                                       ~    i '
             ~   ~                        ~         ~                                                             ~     ~     I       1
                                                                                                                                            '                                         1             ~         ~                          I
  ~   ~                                               ~  ~     ~                             ~      ~                                                 ~ 1
                                                                                  ~          ~                                   ~      ~                                          ~  Il I        ~     ~                ~   i       I
                                                                                                                    ~      I    ~                       ~      ~   ~         ~ I                                     ~       I       I I                         \                                                  ~  ti      ~   '      ll                                               ~    ~
                              ~           ~                                       I              'I           '         ~                                                  ~  ~       H
                         ~I I   ~                                                                                                                                                                   ~    ~    '
                                      ~            I    1    ~,      ~                                        I           ~     ~  '      ~ ~
                         ~            ~
                                                                                                                                                         ~
                                                                                                                                                             ~                     I   ~                                         ~   ~          ~
    ~           I                                                                    I  ~             ~                            ~  I     H
    ~    I          ~
                             '                                   I       '           ~  <
                            ~           ~                                       I    ~                                                                                                                             ~                   '      ~   ~

I~ lt ~ tl ~ ' I I ~ Il

                    ~            I      ~      I                                 ~   ~                                    ~        ~                                                                                      ~      ~         ~
                                                                           ~ It     ~                                                                 ~      ~       ~     I     I     ~
                                             ~    ~
                                                                             ~  I          I                    '            ~                                   I       ~                           'I H ~         ~           ~    ~                                                          ~          ~       ~         ~                                                ~ I I                                       ~ I          1        ~            I    ~

tl ~ ~ ~ ~ I ~ ~ ~ t ~ ~ I ~ ~ ~ ~ ~ ~ ' I ~ ~ t ~ ~ H ~ ' ~ I ~ ~

                                                                                                                                                                                                                               '
                                                                                       ~   s          ~                                                                    ~       ~                  I   ~
           ~   IIII             ~   ~                                        1  ~
                                                                                       '              ~             I     '        ~                                                                             ~ Il It I                                                                                                 ~       ~         ~      '        ~         I       ~  t                                          ~   ~
                       ~                                                                                                                                                                                                                                   I ii1         s        ~      it        ~  I I                 ~   I            ~                        ~  I         I     I                                  ~ I n  ~            I      ~          ~                          I                      I              ~     ~       ~        ~  II                            ~      '                   It tn   ~                                                                             I  ~  I    ~

I ~ ~ ~ ~ ~ I~ ~ ~ ~ ~ ~ ~ I ~

                                                                                                         ~
                                                                                                             '                                                        t            tl  ~
                                                                                                                                                                                           '    ~     ~     n                               I I                   I       I                       ~       ~                   I          I   I             I
                                                                                                                    ~        I I
                                                                                                                                          ~ ~ 'll
                                                                                                                                                  ~

I

                                                                                                                                                    'l~    ~
                                                                                                                                                             ~
                                                                                                                                                               '
                                                                                                                                                               ~ I
                                                                                                                                                                   ~     ~

I ~

A

      +

4

 't E%

k,

 'k I

a

      ~ l1

1

  ,0 fl
     )

7

       ;   Concern 6:

Containment spray piping and spent fuel piping was inspected according to Proce-dure CQC-10, "Cleanness Control of Fluid Systems and Components," and released on "Conditional Release" because the external surfaces of the pipe had not been cleaned in accordance with Procedure WP-113, "Cleaning 6 Cleanliness Maintenance of ASME Section III Piping Systems. " It is of concern that Procedure WP-113 was inadequate by not containing requirements for external pipe cleaning, and spent fuel piping is embedded in concrete and cannot be cleaned. The Senior Resident Engineer stated this item would be evaluated. Concern 7: The review of radiographs for weld FW-5 in line 2SI14-253-SA1, drawing 1SI1/2165-G-151 casclosed only three penetrameters. They are located in the two upper quadrants and on the dividing line between the two lower quadrants. Paragraph 9.5.4.3, NDEP-101, Revision 3, requires four penetrameters, one in each quadrant. The auditor is concerned that Procedure NDEP-101 is not in compliance with the ASME Code Section V, which requires three penetramcters be used. Concern 8: The type of dye penetrant identified on a total of 10 Liquid Penetrant Reports was SKI-HF/S. NDEP-201, Revision 2, Paragraph 6.4.a requires Magnaflux Type SKL-HP/S. The auditor verified by contacting the area Magnaflux representative that no penetrant identified "s SKI was manufactured by Magnaflux. Since several inspectors were involved with preparation of these reports, the auditor is concerned that in some cases the type of penetrant used is apparently not being verified to be the type required. Concern 9: Procedure CQA-22, Paragraph G.l requires the QA Inspector to monitor the activities in the weld material issue rooms for compliance with Procedures MP-01, MP-02, and HP-03, one of thc items to be checked is the Qualified Welders List. It is of concern that thc Checklist, Exhibit 1, completed September 16, 1980, shows thc Qualified Welders List to be dated 9/19/80 which is not thc date of issue of the list that was in effect at that time. Thc issue date of the list, which was shown as Revision 1, wns 9/10/80. It is also of concern that the checklist did not show that the inspector had noted that Revision 1 was bc used by the weld material issue room attendants. Submitted By: '.Oi Approved By IM. ger Corporate Nuclear Safety 6

                                                      ~r QA Audit Section if           u

k

                                                                                    )

ACTIVITY SHNPP Construction Site/ASME Construction AUDIT PROCEDURE QAAP-1 REPORT NO. AA/170-4 DATE Se tember 15-19 1980 UALITY ASSURANCE AUDIT CHECK LIST AUDIT ASME Audit at SHNPP Construction Site rTOR A. E. Hall AUDITOR(S~ L. W. Bissette I. A. Johnson P. W. Taylor CHARACTERISTICS 1.0 The meetin was attended b site ersonnel listed in the 1.0 Preaudit Meetin (7:30 a.m., 9-15-80) audit re ort. The areas scheduled to be covered durin the audit vere identified. The auditor's res onsibilities as well as the site ersonnel assi nments were established. It vas agreed to conduct a dail de-briefin of each da s activities at 3:45 PM between the auditors and site mana e-ment personnel to discuss nonconformances, concerns, and 2.0 Trainin and uglification ore>>ents. The ostaudit meetin was tentativelv scheduled r September 18, 1980, in the afternoon. 2~1 Nondestructive Examination Personnel Qualifications>> verify by review 2.1.1 Yes, verified by review of NDE qualification record files of records the following: picked at random for six 6 Level II, and two 2 Level JII personne Personnel performing NDE operations have current visual examinations to meet Jaeger Number l. Page 1 of 38

                                        .0
 'P t

C A

REPORT CHARACTERISTICS COMMENTS 2.1.2 Yes, verified by review of HDE records in 2.1.1; however, 2.1.2 CP&L has records on file for NDE per- the following noncon ormance was discovered. A Daniel sonnel vhich meet the qualification employee, H.C. Westgate s record ile or Radiograph'c requirements of SHT-TC-lA-1975. exaninat on recor . s pract ca exam nat on oes not neet t e requ rements o paragrap s . . .c an of ASNT-TC-lA 1975 Edition . The ractical examination 2.1.3 The certification of Level III NDE does not include ten chech oints that are related to the personnel has been by examination for candidates roficienc or understandin of test re uire-technical competence as required by nents. Nor did this record describe the test iece ASME Code NB-5521. that vas tested. In addition, this ais'sin data vas not discovered. CP&L's Level III for RT and this Level III RT exaniner certified rhis Daniel ea lo ee for RT Level II on Au ust 8. 1980. The auditor verified this Daniel 2.2 Does CP&L have personnel records which en lo ee has not erforned an RT because of still bein support implenentation of Procedure in the site orientation pro ran. This nonconformance TP-25 in document control? is listed in the audit report as Finding Itea l. 2.1.3 Yes verified b review of NDE ualification record iles for tvo Level III CP&L ersonnel, C. Osman and E. Betz. 2 3 Does CP&L have personnel records which support implementation of Frocedure 2.2 Yes verified by review of training records tor Procedure MP-11 in QA records system? TP-25 in document control. The following comment is or audit follow-up on future audits, for a nev employee s orientation it is difficult to deteraine ron recor the exact revision of document that vas reviewed. verified b reviev of MP-11 records na nta ne Desi n Control (AP-IX-15) 2.3 Yes the disci line veldin engineering o ice an t e I-y records in document control. 3~1 Review the DCN Implementation Log, verify it is being maintained. 3.1 This lo vas reviewed; it lists the DCHs an v en t ey are closed out. 3.1.1 Selected folloving DCNs ron log: - ap eaente 3.1-1 Select DCN's fron the Implementation Log 9 3 80 er DCN. DCH had been inp emente an c ose . and verify if log and DCN agree on 530-197 open. DCH vas st active. - open. implementation status. DCN had been closed and was reo ened 3 28 79. It was not listed on o en DCN Re ort. Sec question 3.2 550-589 in lenented 7 29 80 er DCN. DCW had been close 560-063 void er DCN 6 2 80 'CN had been nar e Page 2 of 38

4

 'V

REPORT CHAlUCTERISTICS CO%ANTS 3.1.1 -0 3, Revis on , implemented 1 0 per DCN. cont, DCN had been c ose . - 1 open. DCN was sti active. Page 2a oE 3S

REPORT CHARACTERISTICS COKKHTS L 3.2 Procedure AP-I - vi

              ';s                                                             "information onl " re or o I        3.2  Verify the Document Control Supervisor              over 30 da s old as re u is preparing a report biweekly for each             En ineer. He has not re uested        v  si Area Engineer vhich lists FCR's and                 Document control is maintainin        a curren     co DCN's over 30 days old which have not been closed out.

status. It was noted that reo e ed D N on the list. As reo ene DCNs ma o ~II~'he Document Control Sucervisor is avin

    > c     7 3.3  Verify comments vere indicated  on  report  3.3     Counts    were on the     last list  issued    8 15 80.

c by Area Engineer. 3.4 Selected items that had been im lemented under

       -j, <<c DCN  530-223 re uired Ber er Pa         rso     a C-1-286-1<<CT-14-38 to be revised. Drawin ha Select actions indicated taken by revised. The other DCNs 550-589. 560-063 650-403 and 3.4                                      DCN 650-130 re uired work to be done accordin to DCN and and  verify they were accomplished.                 drawin s to be revised later. Work in field was not verified.

4.1 Yes verified b review of site urchase orders for 4.2 & seventeen PO s in 4.7. Procurement Control 4.3 4.0 4.1 Are the proper designated QA Specialist or the Specialist's designee reviewing site purchase requisitions and purchase orders? (Ref. CQA-24, 4.2) I 4 Is the review of the purchase requisi-A tions properly documented'

 <<
               / <<

4.3 Are the proper gA requirements included on the purchase requisitions? Page 3 of 38

C I l 'I 'I

4 I:0 I I IX

                                                       ~
                                                                '             ~      ~                                                                                                          ~ ~           ~         ~
                                                                                 ~        ~   ~
     ~   ~ '             '             ~                  ~
                                                                '                       ~   ~                                ~     ~                             ~     I                                  ~      ~                             ~
                                                                                                                                                                                                                                                          '
         ~  ~   ~     '         ~
                                                                                                                                                                                                                 ~ ~           1     ~                ~         ~
                  ~                 ~      ~ ~                  5   ~

I ~ ~ ~ ~ ~ ~ ~

                                                                                                                                                                                                                                                                  '
                                                                                                                         ~         '                                       ~       ~        ~      ~
                                                                                                                             ~ ~
                                                    'I        ~                                                              ~      1      '          ~                                     ~   ~                         ~          ~
      ~     ~ ~                 ~ ~          ~      ~                                                      ~     ~                                                                                                                 ~     t     '          ~     ~
                                                                                                                 ~ ~                   ~       '                             ~ ~      ~         ~
                                                                                                                                                                                            ~ I ~         ~             ~  ~
                                                                                                ~ '                . ~                                                                                    ~      ~
                                                ~       ~               ~ ~ :     o'        ~         ~  ~                                                ~      ~   ~       ~  k   ~               ~     ~          ~
                                                              ~     ~       k  ~                                                           il      ~                                    I                     ~  ~
                   ~   ~     ~      ~         ~
                                                                                                                                               'I       k    ~     [   ~                                                                                  ~ ~
                                                                                                         ~     ~
                                                                                                                                                                                                                                ~     ~               ~         ~
                                                                                                                                                                                        ~
                                                                                                                                                                                                 '               ~

k ' ~ ~ ~

                                                  ~         '     ~   ~
                                                                                                                                                                                                                                                                      ~
             ~
                    '             ~                                                                                           ~     ~
                                                                                                                                                                                                                                                                    ~
                                                                                                                                                                                    ~ ~                    ~         ~                   ~       ~ I I:        ~
                                                                                                                                                                              ~ ~                          ~ ~

I~ ~ I ~ ~

       ~  ~                                                                           k                                                                 ~    ~
                                                                                                                                            ~       ~      I
                                                                                                                                                               '         '      ~                                 ~  ~

1 ~ ~

                                                                                                       ~     '                                   I         o                                               ~   ~
                                                                                                                                                                                 ~  ~                                                                       ~ ~

I~ k ~ ~

                                                                                                                                     ~                                                                             ~  4
                           ~  k    ~ ~                                                                                         ~
                                                                                                    ~       ~             ~         ~            ~
                                                                                                                                                                                                                             ~   ~           ~          ~
                                                                                                                                                                                          ~           I     ~                          ~   ~       k
                                                                                                                       ~   '             '                                                                                                 ~        ~

4 r

         ~   ~     3   ~
         ~ \   ~
       ~ ~     ~         ~ ~ C
   ~ ~

J I o ~ ~ ~ ~

li I CI

     '

I tR

REPOBT CRQtACTERISTICS CO?0KNTS 4.10 & Yes verified b review of files in 4.7 above. 4.11 4.10 Do the requisitions for ASME Code items contain the requirements that it shall 4.12 Yes vendor documents are sent to site disci line en i eer be manufactured/supplied to CP&L approved Vendor's +L program? (Ref. who coordinates review and a roval of vendor documents. AP-XII-1, 4.1.2,5j>~~ 4.13 Yes verified b auditors reviewin warehou w files of site PO(s) and Ebasco PO(s . The auditors 'erned a few files do not contain all the PO chan e ordor all su lements, such as PO H-27369 and Ebasco PO s 435018 4.11 Has the Site Nanager approved and 435092. This a ears in the audit re ort as Concern requisitions? {Raf. AP-XII-l, 4.7) Yes, issued by attachment of Procedure AP-XIII<<03 as 4.12 Are vendor documents requiring reviev Exhibit 5 by document control. and approval by CP&L, receivinp, the .1 .1 Yes, see .1 above. proper reviev and approval? (Ref. AP-XII-l, 4.9) 4.13 Are procurement documents being filed as required by Procedure AP-XIII-1, by the warehouse unit? Has the resident engineer unit compiled a list of known items/materials which are sub)ect to a defined shelf life expiration'? (Ref. AP-XIII-3, 4.1.1) 4.14.1 Is this list controlled and distributed by document control'? (Ref. AP-XIII-3, 4.2) Page 5 of 3g 1 U

0 l

C ( 4.7 REPORT . i +i . ( t'>>P 0 QQ04CTERISTICS COUNTS Yes verified b revie~ of A Vault record files for receivin ins ection and vendor documents for PO s listed

4. 15 Has QA performed the necessary receiving in 4.5.

inspection and review of Vendors QA docunentation as required2 (Ref. 5.1 Yes verified b review of A document control lo s in A AP-XIII-3, 4.6) record vault for C A C and C I s rocedures manuals. e Yes however ara ra h 7.2 of Procedure COAM "Envision 4 9-9-80 states the " A rocedure deviation notice is not C ermitted for the A rocedures that re uire the desi er s S a roval. g Document Control 5.3 Yes verified b review of the A deviation notice lo 5.1 Is a document control log being properly records in A office. maintained for holders of CQA/CQC procedures/manuals? (Ref. CQA-2, 8.3) .4 The su erseded A documents are rubber stan ed with wording, "For Information Onl

   '

5.2 Are procedure deviations approved by the designer where the designer is 4r required to approve the procedure and its revisions7 (Ref. CQA-2, 6.4.1, 7.0, and 8.1.3) Is a QA deviation notice log being maintained as required7 (Ref. CQA-2, 7.4.1) 5.4 How are docunents marked to indicate that they are now a working document, when they are to be retained as a historical issue? (Ref. CQA-2, 10.2) Page 6 of 38

N h l I

~ ~

                                                                                                   ~   ~                 ~   I              ~ ~     '        ~    ~      ~
                                                                                                                                                                           . I;
             ~  ~     '              ~ \    ~            ~    ~ .
                                                                                                   ~   ~
                                                                                                   ~   ~                     ~  ~                            ~  ~
                              ~  .      %W,,J              ~            ~ ~
         ~
             '              ~
                                                                                                   ~   ~                     l  ~                         ~ ~
                                                                                ~  ~   '     ~                                      ~ ~
                                                                                                           ~ ~   ~                              ~   ~ ':     4~            ~: '
                                                                                                                                                  ~ ~   '    '      ~

l ~ o ~: I ' ~

                                                              ~     I                                              ~   ~          I   ~ ~                               ~  ~

4 I ~ ~ ' ~

                          ~       '   ~     ~     S
                                                                                         ~                                                                            ~
                                         '                                    ~  '   ~     l         ~   ~     ~
                            ~                     ~        ~              ~ ~
                                                                                           ~   ~                                                                        ~  ~
                                                                                                                              ~ ~   ~ '                           ~   ~
                                                                                                           ~         I     ~          ~ \                           ~      ~  ~
                                                                                       ~   '     ~ ~                                                  ~     ~

I ~ ~ ~ I ~ ~ ~ i~ ~ ~ I.: ~

                               ~      '            1 ~ ~   ~      0     ~
           ~      ~ ~   S          I      '        ~   ~ll
                                             ~ ll  ~
                                                                                                                                                                                 ~ ~
       ~p k y

I V n A

REPORT

                     .M     QAA/170-4 o

CHARACTERISTICS COMMENTS

                                                                                                                                                               ~  ~4'
5. 10 Verify by record review that FCR/PW(s) control.

are being properly processed, signed, 4 and distributed. (Ref. AP-IX-5) 6.1 This document is roduced dail wo i C ur ose is to inform various individuals a what items have been received. Co ies ar mornin after item is received. i ggC',0 " 6.2 Yes a ersonnel list identifies the warehouse 6.0 Re" eivin Ins ection and their classification. Exam lesof receivin e o are Material Control Technician and Warehouse R C.. AP-XIII&2 6.3 Selected the follovin urchase orders: 435018 6.1 Verify that a Daily Dock Report is 435116 435234 435174 435018 435092 435116 4 2 4 prepared. and 435174. ~j, 6,3.1 Documents do identif the PO number and the vendors. 6.2 Have Material Receiving personnel been 6.3.2 Co ies of urchase orders vere in the folder however there designated by the Materials Supervisor' vas no assurance that all C 0 of the PO were in the file or that the C 0 for the item received vas in the acka e.

         =*'-'
                   *'.3            Select received items and verify the folloving:

6.4 This is in the audit re ort as art of Concern 82. Looked at ri in used in varehouse. It is maintained in locked boxes and controlled b Millvriht. The ri in is color-coded to indicate ins ection. All ri in looked 6.3.1 Documentation identifies vendor and at was ade uate. 0 purchase order number. 6.3.2 Copy of purchase order is maintained by warehouse.

                                                                                                                                                                /

6.4 Inspect rigging used by varehouse unit

              '; J                  and         it verify is not frayed, worn or                                                                                        '4 -"
                                                                                                                                                         ~C" m A~

otherwise deteriorated. w1~ gf Page 8 of 38 0-

          "e g

6

      'gb
 ; <)

REPORT Qh+170-4 CHARACTERISTICS COHMEHTS 6.5 Yes memorandum dated 4 30/80 from L. Denson i 6.5 Have personnel been authorized to ersonnel authorized to o erato material a d I operate equipment assigned to warehouse for warehouse o erations. unit? 6.6 Yes Procedure AP-XIII-03 Exhibit 5. Revision 2 8/79 "Shelf Life for Plant Material In Mare

                             ~AP-XIEI't                      6.6.1   Yes    this is either  b bein      on manufacturer~            o in  b   warehouse   ersonnel on a label. This was          c.r   fi 6.6       Has   the Resident Engineer provided                 as to bein done.

written instructions for providing warehouse personnel guidance in 6.6.2 Yes, items are stored so older items are in front and on determining materials which have lower shelves of warehouse. This is verified b nonthl defined shelf life7 ins ections. A notification is issued five workin da s rior to ex iration date of the item. This was verified. 6.6.3 The Shelf Life Data Re ort is made for each batch of each 6.F 1 Are materials with shelf life clearly purchase order. It identifies date received and ex iration marked7 date. This was verified (exam le PO 435172, batch 9085 . 6.7.1 The followin urchase orders were selected: 6.6.2 Are they stored to facilitate issuing 0 at 3-8-3-18, 1 07 at 12-8-4, 435031 at 3-C6-23, on first in, first out basis2 032 at 3-C -20, and 162065 at 12-C-7. Has the Materials Supervisor established a monthly inspection program for materials with defined shelf life7 6.7 Review the Equipment Maintenance Log and verify the following: 6.7.1 Log indicates description and location oi item. 1 Page 9 of 38 I A

I, 4;

   'lt                4
                    ~,a~

l I l I l a ipse, I 1M

REPORT - 9). QAA/170% CHARACTERISTICS COMMENTS 6.7.2 Log indicates maintenance required, calibration required and individual tenance re uirements indicated and an attac ed ma perforning maintenance initials instruction sheet. The workin co v of the nainte a o logo is indicated b the individual vho erforms the nai tena startin in October 80. It is to be attached to ori ina when e ui ment is turned over to construction 6.8 Does the MaterM. Capqrvisor or his designee conduct periodic in-storage inspections or required maintenance? fv {on required maintenance) a AP-XIII-07 PGD-002 is was verified b r view of lo . The are actuallv 6.9 Are the Maintenance Log Porms signed c ed dail but o 1 recorded weekly. by discipline engineer7 eviewed h fol owi i ms a d t eir au es all i dicated o s '62 4 1 14 and 200 0 6.10 Are items with nitrogen pressure checked veekly7 i was verified review of lo for follovin items: or V ~ . Head a 0118 Reactor Ve 2. 1 t e vessel a d t e head have desiccant exce t for o rol w ich is checked eve months. e instructio s re uired the anel to be ins ected 6.10.1 Verify items vith gauge have at least and afrer 6 months make evaluation to determine if unit 1 psig indicated. i deterioratin . Desiccant was laced in unit rior to 6 no ths and evaluation vas not made. Evaluation was made and maintenance ersonnel were told durin audit to remove desiccant.

6. 11 Are items vith desiccant checkedmonthly
6. 12 Yes reviewed records for the followin POs: 162082 162086 and 435008. Date of recei t and first me ,erin indicated on maintenance lo 6.12 Are rotors {5 hp and up) meggered vithin 28 days of receipt7 NOTE: A Mestin house letter to E. Pelton dated 9 3 80 stated strokin and reasin of motor-o crated valves should be discontinued. Mere concerned that grease could ct in the motor and that valve vas being actuated dry.

Maintenance ersonnel (Harr Caster stated he also stoppe this maintenance on Ebasco urchased motor-operated valves. Page 10 of 38 f a p

                                                                                            !

P,' l h ~ gh

REPORT

                       !UhL CHARACTERISTICS                                     COMHENTS e  a  no   ocuuente   nstructions to do this. The disci line (cont.      eng neer   stated he  oruarded instructions on Ebesco valves, ut apparent y t ey  di not get to Caster. This is in the au t report as Concern      4.
                 
 '~c:W>>" <<>

Q-'> x C p D

                                                                                                                          .*0 c

(~~ t ~-'

                                                                                                                             -.  ~
                                                                                                                       ~

mc <<~

                                                                                                                       'jQ
                                                                                                                            -Alga, Page   10a    of   38
                                      .  '

PC-A 1

I l

  <r,

I ~ I

                                                                                                                                            ~    g
                                                                                                                                                    '      ' ~
                                                      ~     ~       I
     ~ ~
                 ~     ~
                                                                                       ~ ~

o 'I ~ ~ I

                                                                                            ~             ~          ~
                                                                                                                           ~

I

                                                                         ~   I                                 ~
                                                                                                                       '       ~ ~ I
         ~ ~                 ~ ~   ~ ~            t ~
                                                                         ~       ~                                       ~ ~     ~      '          I I I

~ ~ ~ ~ ' ~ ~ ~

                                                                             ~
                                                                                                 ~    ~
                 ~ ~   f rI  ~ \           ~ t  ~
                                   ~ ~
                                                                                                                                              ~    ~
                                                                       ~   '       ~ ~   '              ~      ~                 r ~

r ~ ~ ~ ~ ~ ~ '

                                                                                                               ~       ~   ~
                                                                                                                             '       ~    ~ ~
   ~   ~               ~ 1 ~
                                                              ~ ~              ~   ~           ~  ~   ~   ~    ~ ~
                                                                                                        ~   4                      ~
                                                                                                                                          '   I r        4
   ~   ~                 ~   r~              II     ~
                                                                  ~  ~                              ~        t     ~

I ~ ~

                             ~   ~
                                   '
         ~   ~

d I L. 4 l A

                                                                  ~ ~ '        ~   ~ ~
                                                                                       '       ~   N '     4   ~     ~ ~ ~    ~
     ~ ~ ~       ~                  ~   n 1 ~                                                                                           '
                                                                                               ~

C 1 ~ ~

                                                                                                                                                  ~ ~
                                                                      ~      ~                                                                  ~   ~

~ ~ ~ ~ ~ C

                                                                           '
                                                                  ~ ~            ~                                 ~   C I              I ~
                                                                                                             ~   '           ~    ~   ~     ~
                                                                          ~      '     '   ~                               ~ ~
              ~      ~
         ~     '
                                                                                                       ~   ~
                                                            ~ ~ ~                            ~   '     1 '       ~ ~

I Il I ~ ' I ~

                                                                                                                                            ~   '
                                                                ~     I   e
              ~    <<   I           ~    I     '   ~:  ~
                           ~   ~
              ~  ~   ~
                                 ~ ~          ~ ~   '   ' ~
   ~ j        ~              I '      \   ~ ~     ~
 ~   ~    1 ~

REPORT HO. QAA/170-4 QUGVSTERISTICS COKRHTS 7.5.3 Reviewed A-3 forms R-529 (3/7/80 Maintenance of Motor 7.5.3 Fora QA-3 indicates maintenance is Control Valves R-518 2/22/80) - Maintenance of Motor Control performed. Valves R-615 5/14/80 Maintenance on RHR Pum Motor R-690 8/15/80 Maintenance on Hoist of Brid e Crane R-654 6/ll/80 Maintenance on Safet In ection Pua s and R-607 (5 12 80 and R-711 (8 28 80) - Maintenance Surveillance

                          +CC~XG;- ~.                               vhich is to be erfoxaed uarterl b schedule.

7.6 Select completed Cleanliness Inspection 7.6 Ins ection of Containment S ra (386'lev.) Cl-286-1-CT-3-3 Check Lists (Fora QA-10) and verify vas for visual ins ection of internal onl . The were the following: conditional acce ted. DDR 368 dated 2 21 80 on cleanin and cleanliness maintenance of safet -related i in s stems Form was correctly documented7 states lines spent fuel and containment spra had not been cleaned in accordance with MP-113. The audit report covers this area as Concern 6 since the procedure was not adequate to cover cleaning of the pipe external and t e spent tue 7.6.2 Documentation on cleaning agent indi- i in is now embedded in concrete. cates it is acceptable. ora vas correct y ocuaente 7.6.1 The QA-10 7.6.2 Acetone is used to clean pipe. roce ure - requ res 7.6. 3 If check list indicates unsatisfactory, certification of com liance or test results of materials verify hold tag has been issued. at will come in contact with stainless steel. There vas o evidence of such documents for acetone bean used. This e audit re ort as Findin 04. 7.6.4 On items vhere check list indicates Hold Ta 444 issued b DDR-368 on ISO-1-SF-2 Service Mater 8 conditional acceptance, verify iten Pi e outside not cleaned it has been installed in concrete).

                                                                                              'DR-368 on IS0-1-SP-4.

is tagged accordingly. a so Hold Ta 449 b 7 6.4 Items on conditional release are containment s ra and the are insralled in done and could not be reached for verification. The Conditional Release Lo indicated Conditional Release Ta s'04 throu h 026 are assi ned 8.0 H drostatic Tests to s ool ieces of this s stem for clean inside only.

                           +CC-22                         8.1        Reviewed      A-26   for 3-SM-14    si  ned b    Loving on 10   31 79, e       2       a d  I-SW-132  si  ned b 8.1        Reviev Hydrostatic Test Records                                         2 (Form QA-26) and verify    it  is signed by QA Specialist.

Page 13 of 38

ee (no 5 >'h .dtt."-'g REPORT e CHARACTERISTICS COMMENTS 8.1.1 Yes 3-SW-14 - Lowest Com onent 198.75 si tested a 188 si 3"SM-15 Lowest Comnonent 198.75 si teated at 8.1.1 Is test pressure less than maximum 188 si and 1-SF-132 - Lowest Con onent 198.75 si ~~d permissible pressure of lowest at 188 si. component? ~. 8.2 For tests identified in uestion B.ll au es CP6L 06 and t. a'.

                                             '- ~

tv CP6L 87 were used and their ran e of 0-300 ran e. i ww>> within 8.2 Verify pressureage used had a range of not less than 1 1/2 times nor more 8,3 Yes verified b review of records for H dro of S stem than four times the test pressure. identified in uestion 8.11. 3-SM-14 J. A. Kremcr A rs and HacSorle ANI 3-SM-15 Daniels~A and Given AlK and 1-SF-132 Kremer A and Given ANI. eav MP-115 8.3.1 Yes, 3-SW-14 test erformed 10 30 79 and ua e calibrated 10 29 79, 3-SW-15 erformed 12 28 79, and ua e calibrated 8.3 Are tests witnessed by ANI, and Inspector? E6C QA 12 28 79, and 1-SF-132 erformed calibrated ll 5 79. ll 8 79 and ua e

       ~'h
  ~t.

8.4 Yes, 3-SM-14, Service Water from Yard 4-SW-3-2 throu 4-SW-3-9, 3"SM"15, Service Water from Yard 4-SM>>4-2 8.3.1 Mas pressure gauge calibrated2 throu h 4-SM-4-9,'nd 1-SF-132, Spent Fuel 3-SF-12-171-SB 1 and 4. 8.4 Are pressure boundaries defined? the ins ectors have been monitorin material issuance ehesh iists vere evsmieed for the same cried. It va~sot d that the ins ectors have been showin the date of e iration of the alified Weldin List which is ublished everv two weeks instead of showin the date the list was ublished. 9.0 Meldin Haterial Control In addition the check list for 9/16/80 shows no record v of the ualified Welders List as bein Revision 1 which 9.1 Does the Material Control gA Specialist was dated 9/10/80. This is written in the audit re ort monitor material issuance activitics7 as Concern P9. (CJA-B, para. 4.2) vrs t'o'e I ttd to Page 3 4 of 38 0 e

p REPORT QAA/170-4 CEGUKTERISTICS COHHEHTS 9.2 Do the Material Control QC Inspectors Ill fo io o r u nake reports of conditions found when performing inspections'? (CQA-S, para. 4.3) 9.3 Four ins ectors, Robin G oves David Holler Barbara Hove and Malt Le et, werc ualified as shovn b tlnir certifications. 9.3 Are the material Control QC Inspectors Reported items found durin ins ections vere written u trained and qualified in accordance vith on RIRs or DDRs and data shoved the nonconformances to Procedure CQA-12 (CQAW, para. 5.0) have been resolved.

9. .1 The reports and nonconfornances have been revieved b the QA Specialist.

9.4 Are actions initiated to correct unsatis factory conditions found by the QC 9. .2 The items required to be erforaed were examined and re orted Inspectors2 (CQA-8, para. 6.1) on except or Item 1.1 of the in-house record fora callin or a rev ev o the material re uisition foras to assure that they vere corn letel filled out. For the months of June, July, and August 1980, this data vas not vritten on 9.4 ' Are the unsatisfacotry conditions shown t e - ouse orm nor was it recorded on the QA-3 forn. on a Quality Control Pield Report, Porm QA-3, and forwarded to the QA Specialist Dur ng t e au t, t e in-house forn vas revised to nake it morc spec c a out enter ng data required by the procedure. (CQA-S, para. 6.1) s was a co~nt ssue to uring one o t e dai y e r e ngs. extra proce ure as een wr tten y A Rece v ng to G.z Do the Quality Control Field Reports, cover t e s e ie inspect ons per ormed. Records show Fora QA-3, show verification of those t at t ese nspect ons are being per orme when requ re items required in Procedure CQA-S, para. 6.12 9' Do the Quality Control Field Reports, Porn QA-3, shov that reviews required by Procedure CQA-8, paragraph 6.2 have been perforned2 Page 1$ of 38

I1 C 4 g 'R ll,~

               '

U Y II l 4 I

      - f

REPORT i: (2UQRCTERISTICS CORKRZS 9.6 Weldin materials are 9.6 Is the material issue area arranged so two ke s availab as to minimize unauthorized access to

     ~l storage areas?       (AP-XIII-S, para. 3.2)    9.7     Ten rework  re uisi io i                                                                          found to contain the rework s ate 9.7   Are   QA Hold   it~    ~      for rework on requisitions that clcinrly indicate the item is to be reworked and QA approval 9.8 si ature.

The list of authorized maintained. erso is noted on the requisition2 (AP-XIII-S, 9.9 A roximatel 100 re uisi io w r am gc 5 para. 3.4) to be si ed correctlv. 9.10 A roximatel 100 re uisitions were exami ed - a a ualified warehouseman had si ned the documents. a list of individuals authorized to Cw~ 9.8 Is sign the warehouse requisition (for 9-ll The ermanent e ui ment re uisitio s are fi receipt of material) maintained7 re uired. (AP-XIII-S, para. 3.5) 9.9 Are the requisitions for material signed in the proper space by an authorized individual7 (AP-XIII-S, para. 4.2) r Has the warehouseman signed the warehous requisition in the Received space? (AP-XIII-8, para. 4.5) 9.11 Have the warehouse requisitions used for

  • permanent plant equipment been forwarded to the warehouse office for filing in ti the "Master" Numerical Rile folder of the purchase order on which the item D

was purchased7 (AP-XIII-8, para. 4,6.1) Page 16 of 38

V' lt r ') 'oq

REPORT QLhRACTERISTICS COMMENTS 9.12 Materials are stored on warehouse shelves or on allcts. 9.12 Are all welding materials stored in dry No material was found on the floor. storage areas on devices to keep the material from being in direct contact wit 9.13 The materials used for field weldin are stored in the the floor7 (MP-3, para. 3.4) issue roons. The naterial used for welder trainin and weldia rocedure ualifications are kent in the Meldin School lockers. 9.13 Is all of the weld material requisitions 9.14 Yes. gC from the warehouse release storage area stored in a Meld Material Issue Roon7 9.15 Those items not used are returned to the Material Issue (MP-3, para. 3.6.1 and 3..6.5) Roon and noted on the material re uisition. 9.16 The rocedure re ulrc-ents are bein erforned.

9. 14 Is the Veld Haterial Issue Roon under 9.16.1 All bakin of weldin electrodes, includin rebakin . has the direct supervision of the Discipline been erforned as re uired b the rocedure. Rebaked Engineer Metallurgy/Melding or his electrodes are di ed in red aint on their bare ends.

designee'? (HP-3, para. 3.6.5) The rebaked electrodes are issued onl on non- work 9.15 Are all unused backing rings issued for field use returned to the Meld Haterial Issue Room at the end of each shift of work7 (MP-3, para. 3.6.5) I

        >.16    Are the E7018 low hydrogen electrodes being handled as required in Procedure MP-3, paragraph 3.9'7 x

9.16.1 Are the 300 series and Inconel materials being rebaked at 375 - 425 P. for one a hour7 (MP-3, para. 3.11) Page 17 of 38

1,

    , 5

'y.r

A 4 < I I

                                                                                                                               ~   l
                                                                                                                                                                    ~   ~
                                                ~       ~
                                                                                                                                 ~   ~         ~   ~
                      ~   ~
                                                                                  ~   ~
                                                                                                             ~ '
                                                                                                             ~ ~ V                                   'l   l     ~
                                                                                                                             ~ ~     ~   '       ~
                                                                                                                                                        ~   ~                       ~ ~
                                                                                                   ~ ~                                                                        ~     '
                                ~ ~   It                                 ~  ~
                                                                                                                               ~       ~         ~   ~

l ~ t ~ ~ ~

            ~ ~           ~ ~
                                '        '         ~           ~  l l                                    ~ ~   ~                                                      l   '
         ~     ~                                               I      ~

l ~

                                                                                                                    ~
                                                                                                                          '        ~         ~       ~
                                                                                                                                               ~ 4
                                                                                           ~   ~
                                                                                                           ~   ~      N I~ ~ ~
                                                                                           ~ ~   ~                 II       I'                          ~     ~ ~   ~   ~   ~
                                                                                                                                                                          '
               ~
                  '                           ~     ~
                                                             '                           ~     ~                          ~    ~                                  ~
                                                                                                             ~ ~                     ~ ~
                                          ~      l
                                                                                                   ~   ~
                                                                                                                                       ~ ~     ~   ~    ~ ~
                                                                                                                                                                              ~ ~ e I  ~                       ~
                                    '
                                                    '                                                                   I          ~         l
                  ',
                                            ~
                                                                          ~     ~
                                                                                         ~     ~   ~                                                    ~   '
                ~            ~
                                                                                                         ~ ~
          ~       ~     ~                     ~       I         ~      ~
             ~      ~

I ~ ~ l ~ I

                              ~
                                    '            ~                I

REPOKf CKQtACTERISTICS COIQKHTS 9.20.1 All four of the re uirements were checked at issue rooms 9.20'.1 Does the Meld Haterial Issue Room 1 2 and 3. The attendants are corn letin the assi ed Attendant perform the functions tasks. required by Procedure MP-3, paragraph 4.92 10.1 The drawin s which are marked u b the Hechanical En ineer are checked a ainst the modification re uirements for accurse . The DCNs or FCRs are also checked for accurac The Mech. A S ecialist has si ned the Fabrication Modifi-cation Records which have been enerated to date. He also si ns Pi e Bendin Records when re uired. Construction Meldin 10.1.1 A fabrication acka e is made u of the marked-u drawin s, On receipt of the Pipe Spool Fabrication, the F M Record, the ori inal NPP-1 data report, a hand-Hodification Records (F/M) does the written su lement NPP-1 data re ort having the top 70X Mechanical QA Specialist or his designee corn leted, and co ies of the Material Hill Test Reports verify that the proposed fabrication Certificates of Com liance. This fabrication package is or modification is in accordance with then sent to the Melding QA Specialist. approved drawing, Design Change Notice, Field Change Request or other design 10.2 The Meldin A Specialist has obtained the ANI s approva documents and does he sign the F/H and si nature on the attached MDR in the pac age. e (and Pipe Bending Record, if applicable) ANI also shows required hold points on the DR. A holds the package until the wel ng requ re e as een ng (CQA-18, para. 5.1.2) completed and the R)R requirements sat s ie . T e comp ete acka e then goes back to the Mechanica QA pec a st. Five ackages in QA records were mon tore an . oun to 10.1.1 In addition to the requirements of 10.1 be complete with the required s gnatures. above, does he compile a fabrication package, identified with the spool identification number, including the items listed in Procedure CQA-18, paragraph 5.1.52 10.2 Does the Melding QA Specialist or his designee forward the fabrication package (see 10.1.1 above) to the ANI for review and signature which indicates the ANI's acceptance of the proposed modificationf (CQA-18, para. 5.2. 1) Page 19 of

l t V v)jV

yWp REPORT

                                                                                                                                                    ,
                                                                                                                                                      ~a'j"'Pj CHARACTERISTICS                                                      COMMITS 10.3          com   leted ac a e wi 10.3    Does  the Mechanical QA Specialist                 is  se   t  to Pete Cook who t es a final NPP- S Q

and submits the form with the acka e for he Pr submit the completed Porm NPP-1 to the A S ecialist's si ature and assi Principal QA Specialist for assignment ~nt of Natio Bo rd of the approprfqto,Cadge "N" type symbol Serial numbers as re uired. g,r and the Natio~~>~~<'serial number 10.3.1 five in (see CQA-14 aalu%>~~+) (CQA-18, The acka es A R cor 7 Y re uired. para. 5.3.2) 10.3.2 Yes all five com leted fabricatio a k g in A Records. Does the Principal QA Specialist 10.4 A records show the ins ection of CBI work bei do forward the completed code form to the recentl on a tsu-week basis due to the lack of wor ANI for review and certification2 ~+ C~W ~~ CBI durin June Jul and Au ust. (CQA-18, para. 5.4) 10.4.1 A records show monthl surveillance of the re orts drawin s and s ecifications. contractors'ecords 10.3.2 %hen the code form is properly certified is the fabrication package properly marked and filed in QA Records' c (CQA-18, para 5.6) Do he QA Inspectors mcnitor the r activities on a weekly basis listed in C Procedure CQA-20, paragraph 6.22

  • 10.4.1 Do the QA Inspectors review randomly selected and specifically selected records, on a monthly basis, to verify compliance with drawings, specifications and procedures the activities listed in Procedure CQA-20, paragraph 6.3.27 Page ~2 of 38

tl

          '4l a

r F ~ f I p,

                'Op
              '

J I I

                  ~   '"

N

'8 I kl ~ I I

                                                                                                                                        ~
                                                                                                                                              '         ~    ~ ~  ~

ls. s ~ I ' ~ ~ ~

                                                                                                                  '
                                                                        ~       I                            ~              ~     ~ ~ ~ ~
                                           ~         ~
                                                                                                    ~ ~                     s   ~ ~           ~ I ~          S ~
               ~    ~                                         ~   I       ~     ~   ~
                  ~
                    '           ~    s   ~ ~     s   S
                                                          '   ~   ~ ~
                                                                                                    ~ ~                             ~ ~                          ~    s       ~    ~      ~
                          ~ ~        ~   s                            s I        +      ~      s     ~

I ~ I ~ ~ ~ ~ ~ ' ~

                                                                                                ~ ~          ~        ~

I ' ~ s ~ ~ ~ ~ ~ ss ~

                                                                                              ~ ~                                       ~  sssl       '      ~      ~ I
          ~
            '
                                                 ~ ~

I

                                                       ~
                                                              '
                                                                ~   ~
                                                                      ..~ ~

s I ~ ~ ~ Sl s ~ ~ ~ ~ s I ~ ~ ~

                                                                                                                          ~   ~                                         I            ~ '
            ~ ~
                                                                                                                        ~       I                 ~ I ~                       ~ ~

I ~ ~ ~ ~ s ~ ~ ~ I

                                           ~   s
                      ~   ~   ~ ~    s
            ~
                '         ~     ~
                                   '             '      ~             I           ~
                                                                                    '
                      ~   ~                            s      ~           I     sl I           ~ s
                                                   ~   ~                          ~     ~
                        ~   ~          ~
                                                 '                  ~   ~   ~ ~
          ~ ~                            ~  '                         s     I     '     ~
                                                                    ~             ~
      ~   ~

4 7 I Il g cr \ P~ y

 ~: ~

~ I I

                                                                                                                                    ~ H  r                   ~ ~     ~
                                                                                                                  ~  ~
                                                                           ~    ~

I '

                    ~
                      ~      ~            I'
                                                        ~  ~      ~
                                                                       '        .. o
                                                                                                           ~ or ~         ~   I                      ~   ~ ~

5

                                                                                                                                                               ~
                                                                                                                                                                 ~   '
                                                                                                                            ~ '
                                                                                          ~     ~   ~
                                                                                                      '           ~             ~      ~
                                   ~    ~ 5
                                               '                    ~ H ~     '     ~
                             ~     ~         ~       '       5    ~               ~           ~ 5                           ~   ~ '        ~     ~
                           ~
                               '          ~        .       I                                                      '                                    o   ~   ~   ~ ' '
                                                                                                                ~               ~
                                                                                        ~     ~                      ~
                                                                                                                          '
                                                                                        ~   ~                                   ~   ~    o ~ ~                           ~  ~
                                                                                                                            ~ ~
                ~   ~                                ~

I'

                                                             ~                            ~   '                   ~      ', H I'
                                                                                                                                  '        ~   ~
                                                                                                                                                                          '
                                                                                               ',
                                        ~
                                   ~      ~                            5                                   ~ H  ~         ~
                                                                                          ~       ~               ~    ~

Io ~

                                                                                                                                                   ~   5 5
                ~   ~  '         ~    '        '                    ~       ' 5                                                 ~    ~
                         ~       ~                                                                      ~5 ~       ~   ~
                                     ~  ~                  ~    ~             ~                               ~ ~

I'

                                                                  ~      ~
              ~   ~
         ~  ~     ~                        r     5        I' I'          ~
       ~ ~
                                                     ~5 ~     '      ~

t A J,II k t

                                                                           ~ ~
                       ~      ~      ~    '     ~    ~
 ~ ~   ~                                                   I i                           ~   I
                                                                           ~   ~     ~ ~   ~
             ~   I     ~ I    I  ~       ~  ~        ~

4 ~ I ~ ' I I ' ~ ~ ~

                                                  ~      ~                                       ~
                                                                                                   '
               ~ ~       ~  <<                 ~ ~

I I ~ ~ ~ ~ ~ ~

                                                                   ~   ~ ~   ~
                                                ~      ~
                                                ~
                                                   '
           ~       ~
                                       ~ '        ~
   ~     '                               ~
                                            '          ~

I ' ~ ~ ~ ~ ~

E 1:1 ~ >xi I I5

                                                                                      ~       ~ ~   ~   I     ~
                                                                                                                  ~

I ~ I ~ I '. ~ I ~ ~ ~ I f ~ ~ I

                               ~
                                       '
                                                                                  ~         ~                                                                  ~
                                                                                                                                                                 '

I'

                                                                                                                          ~   I Lf     ~
                                                                                          ~   ~                                     ~    ~
                                                                                                                ~ ~             ~   ~                  ~ ~     f I ~
                             ~ ~     '                               f  ~
       ~     ~            r  ~     ~ I
                                                                                ~ ~                                          ~      ~      ~   ~ ~                    ~ 'I
                                                                                ~   f   ~ ~                                                          ~ ~
                                                                                          ~   ~           ~     ~                                            ~ ~                ~
                      '                          -
           ~    .   ~                      ~ I ~         ~   ~   ~ ~
                                                                                                                                                               ~     I'
                                                 ~         ~
                                                                              ~   . ~     I     ~
                  '     '          .
           ~                     ~     ~       ~
                                                                                ~   ~                                                ~ ~   ~   f ~ '

g ~ ~ ' ~ ~

                                                                                                  ~   ~     ~   ~ ~
                                                         ~     ~
                                                   ~     '
                                                 ~ ~       ~
         ~    ~
             ~ ~                               ~     $
                                                       '
                                               ~ ~ '
                                                 ~     '             I'

REPOM

       /A@170-4 CHARACTERISTICS                                                       COMMENTS 11.1.1    He would but no occurrence     of ll.l.l     When   the Construction Inspector detects discrepancy on a pressure retaining noted.

a boundary, does he report this to the 11.2 Marked-u co ies are bein used o id Principal Specialist. (TP-24, lines the ins ector has examined. r v gA 5 -9 13641556-2 4 ver exam para. 3.5) 11.3 The Safet Su erintendent vas unavare of 'o'. ' for his erformance in Procedure TP-24. H do> maintain have a dail meetin vith the Weldin and Constru io Does the Construction Inspector Su ervisors to discuss roblems of safet for e a marked-up copy of the Fbasco piping work. draving indicating the lines he has inspected? (TP-24, para. 4.4) 11.4 The re uirement for uarterl reviews has been del ted as a result of the findin in Audit AA/81-13 when Procedure TP-28 was revised. The re uirements in TP-24 are in rocess of bein deleted likewise. U..3 Has the Safety Superintendent ensured that adequate warnings and safety notices appropriate to the activity are posted? (TP-24, para. 4.7) 11.4 Has the Construction Inspector made quarterly reviews of the Equipment Maintenance Log and quarterly checks of equipment installed and documented these checks by initialling the "maintenance performed" section of the Equipment Maintenance Logg (TP-24, para. 4.9)

12. 0 Nondestructive Examination (IX)
12. 1 Radiographic Examination (NDEP-101, Rev. 3)

Page 25 of 38

   -A

~qp +Km

REPORT CHA1VLCTERISTICS COMMENTS 12.1.1 The followin velds were selected for review: 12.1.1 Select welds examined with radiography and verify the following: SW-2 Rl Line 3SW-8-165-SB4 Dw . 4-SW-8: Ctmt. S ra FW-199R1 Dw . 1CT9 Line 2CT6-62-SB-1; Ctmt. S ra 12.1.1.1 Personnel who performed radiography vere FW-187 Dw . 1CT8, Line 2CT8-15-SPl; Ctmt S ra FW-199, qualified in accordance with NDEP-10. Dw . 1CT9 Line 2CT6-62-SBl; Ctmt. S ra FW-156, Dv . 1CT3 Line 2CT4-59-SAl; Ctmt. S ra FW-34A Dv . 1CTll, Line 2CT-12-39Al Safet In ection FW-5, Dw . 1SI1, Line 2SI14-253-SAl. 12.1.1.2 Pentremeters used are in accordance vith paragraph 6.5. 12.1.1.1 Radio ra hers involved with the above welds: B. Baty, D. Jacobs, A. M ers, J. Toomer, V. Phun , M. Ferretti, and P. West were verified to be ualified. Identification and marking are in accor- 12.1.1.2 Penetrameters used on the above welds were in accordance dance vith paragraph 8. with ara ra h 6.5, A concern with the number use v en examinin one weld is discussed in quest on . . . o this checklist. 12.1.1.4 Radiographic technique is in accordance 12.1.1.3 Identification and marking vere as requ re with paragraph 9. 12.1.1.4 Radio raphic technique use or a we s except atety In ection FW-5, Dwg. 1SI1, Line SIl - was accepta e. Three penetrameters as allove y A ME Co e ecr. on 12.1.1.5 Exposure technique is in accordance i of four as re uired b NDEP-101 were used. This with paragraph 10. o o is included in the audit re ort as Concern 07. techni ue used was acce table and in accordance a a ra h 10. Personnel vho interpret radiographs are qualified in accordance vith NDEP-10, Inter reters: P. West E. Bets V. Phun , J. Toomer, and B Bat were verified to be ualified.

                                                             .1.7  Examinations were re orted on the forms re uired b 12.1.1.7  Radiographic examinations are reported                    ara ra h 14.

as required by paragraph 14. Page 26 of 38

I 'I

    'I 1

V AI

REPORT LO. AA 170% ClQQUETERISTICS COMMENTS

12. l. 1.8 Have a formal ALARA program and imple- Safet Manual has been revised to include references to menting procedure been developed? the re uirements.

12.2.1 The follovin items examined b PT were selected: 12.2 Liquid Penetrant Egestion (NDEP-201, Ctnt. Liner S ra Dw . FW-866 Dv . 2165-G-103' ent SK-AG-0152 Main Steam FW-286' h.l Pool 2165-&067 Rev. 2) Main Stean FW-283, Dv . 1-M-30 Ctmt. S ra SW-2&-3 Dv . 1CT3; Main Steam FW-287, Dv . A3-261-MS-177'ain 12.2.1 Select items examined by liquid pene- Stean FW-282, Dv . A3-261-MS-65 and Fuel Pool Liner trant examination and verify the Dv . ALFAB 596-SHl. following: 12.2.1.1 Personnel vho performed the PT are 12.2.1.1 Personnel vho erforned the PT: D. Jacobs, P. West, V. Phun , B. Bat vere verified to be ualified. qualified in accordance vith NDEP-10. 12.2.1.2 Materials indicated on the PT re orts vere in accordance

                                                                   ~

with re uirements, except SKI t e dye penetrant was are in accordance recorded on ten of the reports revieved. The auditor Materials used for 12.2.1.2 with paragraph 6 '. PT verified b contacting the area Ma naflux Re resentative that no dye penetrant identified as type SKI vas manufactured by Magnaflux. The correct designation is SKL. This con t on is included in the audit report as Concern 12.2.1.3 Area of examination is as required by 12.2.1.3 Review of the ro orts identified in Iten 12.2.1 indicated paragraph 8.0. 12.2.1.4 that the PT examinations vere erformed in accordance and with NDEP-201. 12.2.1.5 2.2.1.4 Preparation of surfaces to be examined is in accordance vith paragraph 9. 12.2.1.5 Application of penetrant is in accor-dance with paragraph 10 and 11. Page 27 of 38

C g f 4w ta hid

   ~
     >

I f

REPORT CH QtACTERISTICS COMMBiTS 12.2.1.6 Drying of surfaces after removal of 12.2.1.7 indicated that the PT examinations were erformed excess penetrant is in accordance with 12.2.1.8 in accordance with NDEP-201. paragraph 12. 12.2.1.9 12.2.1.10 The re orts reviewed were on the correct form and did contain the re uired information. 12.2.1.7 Application of deve1opor is in accor- 12.2.1.11 Personnel who erformed the tests inta rated dance with paragraph 13. the results the were verified to be ualified; the are identified in Item 12.2.1.1 above.

~2.2.1.8   Interpretation of indications is in         12.2.1.12    No  examinations involvin non-standard     tern  eratures accordance with paragraph 14 and 15.                     have been made.

12.2.1.9 Cleaning after examination is in accordance with paragraph 16. 12.2.1.10 Reporting is in accordance with para-graph 19.

   .2.1.11 Personnel   who  interpret PT are qualified in  accordance with NDEP-10.

12.2.1.12 Qualification of procedures for non-standard temperatures is in accordance with Attachment A. Page 28 of 38

Il ~ ~ I '

           ~
           ~
           ~
              ~
                ~

I

                ~
                  ~
                      ~

I

                         ~

I 'I I I I I

                                                        ~     I
                                                                ~   ~         ~ ~
                                                                                        ~ ~
                                                                                                                ~ ~

I ~

                                                                      ~   ~ '

~ ~ ~ ~

                                            ~   ~ 0   ~         ~   I
                                                                        ~ ~       ~
                                                                                                              '
       ~   ~        I          ~ O,N'                                                             ~     ~ I
       ~ ~

I I ~ ~ ~ ~ ~ ~ ~ ~ Il I ~ ~ W ~ ~ ~ '

                                    ~   ~

I ~ ~ ~

       ~     ~                    ~   ~

C

    *

'I

                                                       ~ ~                        ~   ~
                                       ~   ~ ~

I ~ I

                                                     ~ ~

[ e . ~ ~ 'll 11' I

                                                                  ~ ~I
                                                                                              ~   ~ ~
                          ~ 4 ~
              ~     4     ~
                                                         ~ ~ tl          ~    ~
    ~
      ~   s
                  ~

I A'

                          ~
                                                                ~      ~   ~,       ~       ~   ~   I I I ~                        ~   I       ~ ~
~ ~             ~     ~       ~              ~ ~
    ~   ~                                  ~ ~
                                 ~   ~
                              ~    ~

I~ ~ ~

I

 'c 0

4 y PS h"

REPORT CHARACTERISTICS COK9ÃZS 12.3.1.8 Inter reters were veri ie as qua i e; t ey are 12.3.1.8 Personnel who interpret MT are qualified identified in Item 12.3.1.2 above. as required by NDEP-10. 12.4 ho UT has been nerformed on Code items. 12.4 Ultrasonic Examination (NDEP-402, Rev. 0) 12.4.1 Select velds examined with UT and verify the following:

 -2.4.1.1 Personnel who performed the examination are qualified as required by paragraph 4 12.4.1.2  Equipment used  is in  accordance  vith paragraph 5.

12.4.1.3 Technique used is in accordance with paragraph 6. Calibration of the test system is in accordance vith paragraph 7. 12.4.1.5 Examination is in accordance with paragraph 8. 12.4.1.6 Examinations are reported as required by paragraph 14. Page 30 of 38

C I

3 7 ~ REPORT 5 +' MO. QAAI170-4 CHARACTERISTICS COMMENTS The MacBeth TD-504 Densitometer in the Film V. --, 13.0 Ins ection and Test ui ment Viewin Room CPAL 804556A vas serviced and cali-t-

                ~,                     Control XII                                               brated b Chieffe Electronics Southeast November 12 1979.

13.1 Calibration of Pilm Densitometers MacBeth TD-504 CP6L 801172A has been out of service ((g1-101.1, Rev. 2) since 5-21-80.

13. 1.1 Are the following calibrated in accor- 13.1.1.2 The X-Rite Com an Model 201 CPAL 804550A is bein 1

dance with paragraph 3.17 used at another site. C

                              , .1.1.1
                                ~ ~    MacBeth TD-504 Densitometer.                 13.1.2       Yes   tests are  erformed  dail with   the calibration stri  .

J 13.1.3 Ycs a lo of the weekl corn arisons is maintained 13.1.1.2 X-Rite Company Model 201 Densitometer for CPSL 804556A. 13.2.1 Certifications for the enetrameters obtained b P.O. H26407 vere revieved. 13.1.2 Are periodic tests performed with the ( density calibration strip as required

     *p 4            j                 by paragraph 3.1.97 1

( 1 13.1.3 Is comparison of the reference and A vorking strips made each week as required by paragraph 3.2.32 Q 13.2 Field Calibration Check of Radiographic Penetrameters (QCI-101.2, Rev. 0) 13.2. 1 Verify penetrameters are purchased with certifications of calibration traceable to NBS. (Para. 4.1) C Page 32 of 38 V

t t A f 0 7 p 'a

REPORT CHARACTERISTICS CO%ANTS 13.2.2 Yes numbers 13.2. 2 Are penetrameters identified with a enetrameters numbered 165-174 have o traceable nu~ber and entered in a log issued. bookl (Para. 4.2) 13.2.3 The annual check was verified b reviev of h o in which the checks vere recorded. 13.2-3 Verify penetra"etero ara checked for 13.2.4.1 Yes use of the 4 items was verified thickness and essential hold size on 13.2.4 ' with ersonnel res onsible for the an a e an annual basis. (Para. 4.3) 13.2.4.3 13.2.4.4 13.2.5 Gau e blocks used are obtained from Rober H 8 13.2.4 Are the folloving used to make the Calibration S cialis . e ra a e o annual check: (Para. 4.4) are the lates with test holes provided wi 3 Kwik Chek devices CP6L 804548A 80454 A an 13.2.4. 1 Outside micrometer 804546A. e ho e sizes in hose es . 1~at were certified whe .he Rwik C k d vi s w . urchased. 13.2.4.2 Quick check hole gauge 13.2.4.3 Calibrated gauge blocks

  .2.4.4
  ~   ~   ~   Calibrated traceable hole gauge 13.2.5        Verify the traceable hole gauges and gauge blocks are calibrated annually.

(Para'.5) Page 33 of 38

P gt

I- 7w.&'-'~..O~ z, kp

                  ~~+>

REPOQX IU QQQVLCTERISTICS COMMEHTS checks st least eve Welding Equipment Control (NP-9, Rev. 5 months was verified b checkin the followin weldin machines: W-118 W-488 W-82 W-121 W-159 W-377 W 37-6 W 467 -W 37-6 W-455 W-456 II 23-0 W 40-0 II 34-9 e@~i+~gg> 13.3.1 Verify that operational checks are performed on weldiqg machines at inter- 3-347. vals not to exc (Para. 3.8) ee months. 13.3.2 Yes all the machines identified above. 'a ed Wf exce t W-82. This machine was re orteB~to'* 74k@gjj~g

+~$6'@~~>,+~'4 13.3.3 Yes M/E receives co ies of maintenance re orts and
                           ~ 3 2 Are machines tagged to indicate per-                   maintains a lo of weldin e ui ment.

formance of operational checks' (Para. 3.2) 13.3.4 Yes this was verified b review of maintenance records for the followin e ui ment: Miller Rectifiers W-361 and W-143 Hobart Rectifier W-313 Miller Gasoline Generator W-73 Lincoln Rectifier 13.3.3 Does M/E maintain an up-to>>date record W-237A Westin house Grid W-250 and Hobart Rectifier of operational checks7 (Para. 3.2) W-301. 13.3.5 Yes co ies of these re orts are maintained b M ED 13.3.4 Are machines requiring repair tagged 13.3.6 Yes co ies of the maintenance re orts are maintained and removed from service7 (Para. 3,3) in Document Control.

                                                                                        *Machine W-82 had been taken out of service and was w 3~5 Is  a Welding Machine Maintenance  Report awaitin repair.                                            OS~ 6P prepared for machines   requiring repair7 (Para. 3.3) 13.3.6  Are records of welding machine opera-tional checks maintained in Document Control7 (Para. 3.9) 4 5*~+~<<d0 Page   34 of  38

/

     ~,;
  <
     ~V
 -
      $

4'

REPORT . D). QAA/170-4 QDBACIERISTICS COHHEHTS 14 Onl seven orifice lates and 1 modification to a 14.0 Code Data Re orts and Name late 8 ool iece have been stem ed. These items are Stem in XVII not considered to be t ical exam les of items to be stem ed therefore re orts and stem in will

14. 1 Application and Control of "N" be audited as soon as more t ical items are Stamps (CQA-14, Rev. 0).-~++~7g stem ed.

14.1.1 Verify the .atcajs

                          ".H"        are stored in    a locked drawer or cabinet.      (Para.

5.1.2) 14.1.2 Verify that documentation required to sbov compliance with the Code is on site prior to application of the "H" stamps. (Para. 5.2) 14.1.3 Do nameplates contain the information required by paragraph 6.17 14.1. 4 Verify application of appropriate "N" type symbols is in accordance with paragraph 6.2.

14. 1.5 Is preparation of Code data reports in accordance with paragraph 6.32 14.1.6 Is an "N" stamp log maintained as required by paragraph 6.47 Page 35 of 38

h h

 ~ '

EFFORT QIAItACTERISTICS COHMENTS 14.1 ~ 7 Are Code data reports certified by the ANI prior to application of "N" 7.3) stamps'Para. 14.1.8 Are locations o&g~~A nameplates indicated on thm appropriate isometric drawfng7 (Para. 7.4.3) 14.2 Assignment and Control of National Board Serial Numbers (CQA-15, Rev. 0) 14.2.1 Are numbers assigned in accordance with paragraph 5.12 14.2.2 Is placement of numbers as required by paragraph 5.22 4.2.3

   ~   ~  Are numbers recorded in a log as required by paragraph 6.17 14.2.4   Are Code data forms submitted in accordance with paragraph 6.37 Page 36 of 3S

'I r REPORT CHARACTERISTICS CORGKZS 15 Yes verified b review of documented recor s f 14.3 Preparation and Submittal of ASME 15.1.1 housekee in ins ections. Code Data Reports (C+-16, Rev. 0) 14.3. 1 Are reports prepared for fabrication or modification of,--q~>>fh+ aubassemblies as required by pm'<~~~. ~~'l. l? Are reports prepared for piping system Q 1302 I or subsystem installation as required by paragraph 6.2? 14-3.3 Are reports prepared for the nuclear power plant unit as required by para-graph 6.3? 15.0 Housekee in Are gA Inspection personnel performing the walk-through inspections assigned them and are they alert to the specific requirements listed in Procedure CQA-3, paragraphs 7.3 and 7.4? V

                                                                                                                          ]

15.1.1 Are the records created by the gA Inspectors in 15.1 above reviewed for ~W compliance by the Principal QA Specialist or his designee? (CgA-3, A' paragraph 7.5) 7 C Page 37 of 38 F.

I,

 '~ 4 I

r

REPORT CHARACTERISTICS COUNTS 15.2 No this ia not e n 15.2 Are documented reports of housekeeping 15.3 concerned that Procedure AP-VII-06 are re h inspections in the warehouse and is an error in the wa it is stated. The refer n material storage areas being completed to Procedure AP-IX-02 robabl should be for by the Materials Supervisorl (AP-VII-6, control and distribution of Housekee in re .o paragraph 3.4) This a ears in the audit re ort as Co 15.4 Yes the zones are listed on a char b 'o a .a res onsible suocrintendent res onsible o s i Is housekeeping in the Document Control ins ector and A Ins ec or. Area being done as required in Proce-dure AP-IX-22 (AP-VII, para. 3.5) 15 4.1 Yes verified b review of ousekee i Is records. 16.0 M ins 15.4 Are Superintendents designated as Site A Mana eaent and the auditors were conducted responsible for the housekeeping zones at the end of each audit da to re ort and discuss as listed in Appendices A through E an nonconformances concerns and co~eats observed of Procedure AP-VII-6, paragraph 3.67 b the auditors. The ostaudit aeetin was held at the conclusion of the scheduled audit to resent and discuss the 15.4.1 Are the above designated Superintendents nonconformance and concerns which were to be included maintaining the specified housekeeping in the audit report. Site mana eaent personnel at conditions in their assigned the ostaudit meetin indicated that they understood areas, designated by drawing areas'These the items resented and their responses were iven c k SS/K-G-5008, are to be inspected for to all items presented. Attendees o the postaudit cleanliness) (AP-VII-6, para. 4.3) meetin axe listed in the audit rcport. 4' 16.0 Postaudit Meetin I 4 Page 38 of 38

1 1 b

       \

'I C

          'P

r ( ',,

                                                                                       ,nh.'!h
                                                                                         'y+'h'  o h  (h4 r oem 244                                 QgwIl,                                  .t    ie h) hI'h.h l.
                                                                                               'i
                                                                                               -

Cerollnrs Power a Llglsl Compony Cnmpeny Correspondence March 5, 1981 J

                                                                                                             '~ph Pile:     QAA/170-4 h,        h
                                                                                    -" l o MEMORANDUM TO:        Mr. S. McManus
                                                                                                        )'h FROM:    A. E. Hall j~

SUBJECT:

Resolution of Audit Pindingo, QAA/170-4 ASME Audit of SHNPP Construction hh The corrective actions taken to resolve Finding Items 1, 2, 3, 4, 5, 6, and 7 vere audited during Audit QAA/170-5, and these findings have been satisfactorily resolved by those audits. In addition, the response to Concern Noo. 5 and 6 were audited during Audit QAA/170-5. This response to Concern No. 5 satisfactorily resolved this concern. The response to Concern No. 6 is still open as unresolved and is being carried forward as Concern No. 1 in Audit Report QAP/170-5. (;hi h Summary: Finding Items 1, 2, 3, 4, 5, 6, and 7 plus Concern No. 5 are closed by report and audit. Concern No. 6 is now Concern No. 1 in Audit Report QAA/170-5. This audit is hereby closed. hh h 1 Concurrence: 1(c~ S. McManus Mana ,O'" v t

                                                                                                      " '(:
                                                                                                        , (
                                                                                        ".r h Corporate Nuc ear      Sa      y &                           (gh c, fl Quality Assurance Audit                                     ~

ii AH/vcH1 cc: Mr. N. J. Chiangi Mr. R. M. Parsons I Dr. T. S. Elleman Mr. S. D. Smith Mr. G. L. Forehand Mr. T. H. Wyllie i Mr. P. W. Hove O p"',,~i f~ e

                                                                                            'g O,

tf) e I o

7 t'I g<' 1I

     ,J A

g, Vt

                   'V4 Wig
              ~      II   ~                                                                                                                   I          I   I     ~     ~

IX ~ ' ~

                                  ~       ~       '                                      ~    ~

I I ' ~ ~

                                                             ~ ~

I~ ' ~ I H ~

                                                       ~ ~

4 I ~ 0 H ~ ~ ~

                'I ~          ~
            ~ t                                                                                                         ~ ~       ~                            ~ ~
                                                                             ~            I                               ~   '        ~             ~ ~
     ~ ~                                                                            ~       ~                                                                          ~     '
                      ~     '   H            ~ ~                                                          ~ ~  ~                          ~        ~                 I ~
                                                                                                       ~       ~      ~       ~ H ~             ~          ~               ~   ~
       ~  I                                                    H             I  ~ ~                    ~  I    ~   ~

~ \ I ~ H H I

                                    ~ tp I                                                         ~ ~    '
                                                           ~        ~ ~   ~

HH ~ I I ~ ~ ' ~ ~ ~

                                ~      ~     ~           ~ ~                 ~        ~                        ~ ~        'I            ~ ~                          ~  I  ~    ~
                      ~ ~              ~       ~                II  ~         ~

H I ~

                                    ~  ~                                                                   I     ~  ~

I H I ~

                                        ~  ~    ~
                                    ~      I                            I  ~

kg C, p ~ Jg t II t

          <<t 1

I

loim 2aa F145 gg 4~ Caroana Power 8 Light Company ro PEG l9pi) DECEIVED, 5 CP.g (a CHSg,gAA Company Correapondence g'-"a" s> ~,~ Docembor '12, 1980

                                                                                        'ile:

SH A-2/2 QA-1995 MB/ORANDUM TO: Mr. S. McManus FROM: N. J. Chiangi

SUBJECT:

Follow-Up Response to Corporato Audit QAA/170-4 Tho Corporate Audit Report QAA/170-4 for audit of the Harris Project ASME activities during Septembor 15-18, 22, 1980, listed six (6) findings and two (2) concerns roquiring formal response. Based on our previous response (reference letter QA-1917 dated October 31, 1980) and tho attached, with the exception of Concern f36, it is considorod that corrective action for each of the items is satisfactory and tho items should be closed. Corroctive action for Concern 86 is incomplete. Please lot mo know if you nood any additional information. Gt.F/lm A t tachment ceo Mrs Ro M. Parsons (w/a) Mr. P. H. Howe (w/a) N'. S. D. Smith (w/a) Mr. T. H. Myllie (w/a) Mr. G. t . Forehand (w/a)

I yr il' 4 l',p, 'L I V n

  • I pg L~

o t,

e ~ ~t QUALITY ASSURANCE AUDIT QAA/JQ4 I

                                                                                                                                                        'I Follow-Up Response  to Find1nga                                                                  (t I

C ll Finding 83: R I:I. 1 ASME Code Section III, NA-4133.6 Document Control, requires "measures that shall RR assure that documents, including changes, are r eviewod for adequacy..."  ;.,igr-'.:.,; The auditor dotermined that a portion of the text of Paragraph 1.3, 10CFR21 requirements, of Site Spocification 036, Revisions 1, 2, 3, and 4 which wao in RIIR the or1ginal issue of the document, was inadvertently deleted in Revisions 1, 2r 3, and 4 duo to typing error. This discrepancy went undetected throughout the <<1 CPAL Site construction and QA organizations. This document was a requirement on eight out of seventeen purchase orders for ASME Code items reviewed by the auditor. 1, Corrective Action: Ill

  'Rl      R'"~       IRI     The Senior Resident Engineer generated and distributed a memorandum (refer ence 1

I j nemorandum MS-7687 dated September 18, 1980) to all supervisors alerting them to the particular problem and the general responsibilities involved. Site Specification 036 was revised on November 28, 1980 incorporating the missing paragraphs. A change order wao written to purchase order numbers 28261 and 28910 to iosuo and 11 1' 1",1 impose the requirements of rev1sion 6 to Site Specification 036 on the vendors. l.l t ~FKRRIRin RR4: II Cj Procedure WP-112, "Control of Mater1als and Equipment That May Be Harmful To Stainless Steel," requires naterials that are purchased for a function that will require them to come in contact with stainless steel shall not; contain moro than A certificate I Ill, I 1000-PPM leachable halogenated compounds (including chlorides), of compliance to Cho above must be pr'ovided by the supplier or sampled and tested upon receipt of the matorial. I There are no suppliers'ertification or sample test results on halogen content Q't 'NR.',, 'j, for the acetone being used on the site for cleaning purposes. Prt, Corrective Action:

              "t

((iR A represorrtative sample of acetone in use on t;he sito wao sent to the CPAL , 1-'I, RR laboratory for analysis and tho results woro completed on November 3, 1980. The lab results of tho sample indicato 0.1 PPM of total leachable halogen com-pounds (including chlorides) which is consider'ably leos than the 1000 PPM

                                                                                                                                            'RR
           ,"  i allowed in procedure WP-112.
                                                                                                                                                 ',l
       'i

'Rg .< RRItfll When lots and/or batches of acetone are procured in the future moro awareness p will be applied in assuring that a cer tificate of complianco is obtained from Rr the supplier or the material is sampled and tested upon receipt. R~' I 'I R. (R RXR', '; 1

                                                                                                                               't'R     ~

r (41 r I\ I (F ( ASME Quality Asouro, ~Audit QAA/170-4 '( Follow-Up Response .Qindings 't Pago Two

                                                                                                                                              'Fl
                                ~F(nd(tt   55:

War'chouse st;orage procedure PGD-002, "Material Maintenance Requirements During Storago for Shearon Harris Nuclear Power Plant," requires polyethyleno used in contact with safety related, seismic 1, or stainless steel equipment not to be in excess of 55 PPM for total leachablo halogens in pigmented sheeting. Pr'- 5'i(."5(d"~ ceduro WP-112, "Control of Materials and Equ1pment They May Be Harmful to t r Stainless Steel," requires that materials that are purchased for a function (t((F'I Fr -,*h( that will require them to come in contact with stainless steel shall not contain <<,(':g','0,

                                                                                                                                                          'P 5 more than 1000       PPM  halogenated compounds which are leachable. NPPED Memorandum                              h 801022, dated 5/22/80 fr om L.        I. Loflin to T. H. Wyllie, indicates that protective        i,l ri t '(

t covers must not oxceod 1000 PPM for total halogen and sulfur, and 200 PPM for leachable halogen. The f1re retardant vinyl received 6/4/80 has manufacturer's certification which states the total leachable halogenated compounds including chlorides are less than I'( 1000 PPM. This material is being used to cover safety related and stainless t stool equipment even though thero is a conflict bet;ween the three documents .I prescribing leachablo halogen limits. h Corrective Action: ".(", 5 C: Q rt revised on October 7, 1980, to reflect correct levels I htW, Work procedure WP-112 was of acceptable limits of halogens. Procedure gener ated document; PGD-002 was ( revised on October 30, 1980, and halogen limit criteria hao been eliminated from h this document. PGD-002 now references halogen limit criteria back to procedure ~ t

                                                                                                                                                  ',

E WP-1)2. I

                              ~Find(n     57:                                                                                                 (I, For welding repairs to Code Class 3 base material, tho CPAL ASME QA Manual requires

( I I 1(t tr the QA Welding Inspector to pt'epare a sketch of the repaired area as required by r h(t the Code showing location and sizo of the preparod cavity, the welding material 1'" identifications, tho weld1ng procedure, and a report of the results of examinations. I For weld repairs requiring radiography, ASME Code Section III, Paragraph ND-2539 requires a sketch showing location and size of the prepared cavity. I (.,5," Ih A radiograph identified as SW-2R1, Drawing 4-SW-8/2165 wao reviewed dur ing this 'g I~ audit. A noto on the Radiographic Examination Report ind1cated the area examined to be a pipe wall repair . The sketch of the repaired area and the repair weld

.i I r

(t data roport rould not bo located during the audit. Only the film and the request for radiogr+hy wero available for roview. r'I lh Corrective Action:

                 'i,
                       't As   stated in the      initial formal    response  investigation of the problem  was revealed:

Ir I h, (1) The repair was incorrectly identified as a repair to shop C, t wold 2. In actuality, the repair was a base metal repair ~hr on piece number 4-SW-8-5(l) adjacent to shop weld 2. (t, I' 5 o jl I I"

                                                                                                                                       .I I*.         (1i('
                /~
                '4 I

t

      'I l y (V

I,( J C'l 4 I V, I 4 V h qt 1; ~A p % l

                 ~ 'V g
             ,t Cg
                                                                                                                        'I,,                        Ef ASME Quality Assur.    ~   Audi,t QAA/170-4 Follow-Vp Response Q<<indings                                                                      I*

Pago Three

                                                                                                                    <<y, IQ
                                                                                                                        >>(rh VU (2)  The dofect was discovered visually by        craft personnel.

n The area in quostion was excavatod by grinding without ,* notifying QA; thus no DDR was written at that time. '1'. I 'I>> (3) The repair MDR was procossed and the repair was completed without the necessary "skotch" of the excavated area. QA (E I I

                                                                                                                                           'I failed to note this problem and a DDR was not issued as required.

The repair MDR has been corrocted by identifying the repair ed area as a base metal repair to piece number 4-SM-8-5(1). A "skotch" of the repair area has been prepared from the radiographic "skin" issued by tho QA NDE group and was inserted in the repair package. The excavat1on depth of the area repaired was determined in an 1nterview with the welder who actually performed the ,VI,, 1 I repair (reference memorandum from F. Shaikh to V. Safarian dated 12/3/80). Craft personnel have been instructed to coordinate repair work with QA per-

     ',E(,(,

sonnel to adequately ensure ovaluation and documentation of work prior to any future repair work anticipated to be done (reference memorandum from D. Timberlake to D. Turner dated 12/9/60, sub)oct is DDR-483). QA personnel have beon instructed to check DDR and/or NCR files upon receiving a IV NDE Request or Repair MDR to ensure that base metal defects and/or damage are h properly identified, documented and controlled (reference memorandum from

                                                                                                                    *I V. Safarian to QA Melding per'sonnel dated 12/10/80).

Deficiency and Disposition Report number DDR-483 was issued to facilitate resolution f of the audit identified nonconforming condition. The sub)ect DDR was closed on December 10, 1980, based on the aforementioned completed action. v I I (hr>>E I Concern P5: I NPPED Memorandum 79462, dated 3/12/79, indicates that for duct tape that Mestinghouso reconnnends chlor1de content of tapo not to exceed 15 PPH. NPPED 4'II I '>>

    .(('E recommends that duct tape purchased with actual chloride content of 20.9 PPM                                   'l,'g I*

bo used, NPPED Memor andum 801022, dated 5/29/80, states higher halogen content can bo used if tape res1due is removed prior to startup (heating up of equipment). Procedure MP-12 revis1on number 3 is in review and approval cycle; this revision jr will roquire all tape rosidue to bo removed prior to operation heat-up. ( lt is of concern that stainless steel pipe that has been embedded may not have I', I*

           .r    ~

tape residuo removed in areas that are covored over with concrete. f~ Corrective Action: I) III NPPED has evaluated the potential effects of leaving tape residue on stainless steel pipo which is embedded (NPPED memorandum 801320, dated December 12, 1980$ . I I (, 'I Plant design criteria restrict piping embedded in concrete to a maximum of 150 F ,I.* I operating temperature. This temperature is well below conditions which would f% I cause concern relatod to failuro of piping from tho effects of contaminates I on the external surface. >>>>,I I

                                                                                                                         '    'U (Y  ',l.

U I(II e U>>I(I 1 - U I',f U Il I I

   \  I
       '4
   '

I IP i Il f

       ",ii
                       ,

4 I h '+ 41 I

                                                                                                                                  >I ASME Quality Assurr  o Audit QAA/170-4 Follow-Up Hosponso~,   indings Page Four 4

y Irl I

                                                                                                                                       >4'I  4 Concorn d6:

Containmont spray piping and spent fuol piping was inspected according to Procedure CQC-10, "Cleannoss Control of Fluid Systems and Components," and 1 released on "Conditional Holoase" because tho oxtornal surfaces of the pipe ~,.'k~, ',- s' 14 rl I had not been cloaned in accordance with Proceduro MP-113, "Cleaning 5 Closn-liness Maintenance of ASME Section XXX Piping Systems." a 4 p,:. 'h.r, .4 4, rl Xt is of concorn that Procedure WF-113 was inadoquate by not containing re-quirements for external pipo cloaning, and spent fuel piping is embedded in I.I concrete and cannot be cleaned. r Corrective Action: The piping in question was released on a Cleanness Conditional Accept because Iihh ) ar no exterior cleannoss criteria was addresse<~n liF-113. Tho "conditional ~ IE

                                                                                                                           -'

release: was used as a vehicle to flag the potontial problem without stopping 4 4 work associatod with tho piping. WF-113 is being revised to include a statement to address piping exterior cleanness requirements as well as other QA concerns. "( '4i', when this procedure revision is approved and issued, the "conditional release" will be closed. Anticipated date for completion of the above action is ,,j

   ~

January 16, 1981.

            '44 4
                   'I rr>

Ir' e 4 h 1 4>'4, hl I

                                                                                                             ,J II 441
 ',(r, 4                                                                                                                     I'4 II        41
                                                                                                               ,->  rr, rg
                                                                                                                 .I

'Ar 4'If I

                                                                                                                          ,>a
                      ,I
                      ,I
 'r 4 il e

Csrollnss power a Light Comprsny Company Correspondence November 6, 1980 FILE: QAA/170-4 MEMORANDUM TO: Mr. S. McManus FROM: A. E. Hall

SUBJECT:

Resolution of Audit Findings, QAA/170-4 ASME QA Audit of SHNPP Construction

REFERENCE:

E&CQA Letter QA-1917 & Attachments, Dated October 31, 1980 The referenced letter QA-1917, dated October 31, 1980, copy attached with the E&CQA response to Audit QAA/170-4 has been evaluated with the following results. The responses for finding Items 1 and 6 are considered as action taken to resolve theoe items and these finding items are hereby closed by report. The remaining responses to Finding Items 3, 4, 5, and 7 are not sufficient to close these items, due to the response action being incomplete or unacceptable as discussed below. memorandum MS-7687, dated September 18, 1980 ao record of this action taken. When we are notified the date that thc opecification is corrected and redistributed, we will close this item by report. completion of action stated. In addition, the response does not state what prevcntativc action is being taken to preclude a recurrence of this nonconformance. The closing of this item is delayed until preventative action response is received. because it does not state a target date for completion. When we notified the action is complete and the date, we will close this item by report. neceooary to complete DDR-483 is open or closed, nor if the DDR-483 condition io acceptable to the ANI. The preventative action reoponoe does not state how it is to be accomplished, a target date for completion, or if this action is to be documented. The closing of this item is delayed until additional response is received. The above evaluations of corrective actionresponse outlines additional response requested. It is requested this additional response be supplied by thc Manager-Enginccring & Construction Quality Assurance to close these finding itemo.

I Vj. t ' IL 4

        'X
         $t i

l Mr, S, McManus November 6, 1980 <<:A'r"- tt. The corrective action rcsponsc to thc audit report concerns 85 and N6 does not indicate if these responses are engineering technical evaluations as requested by the QAA/170-4 Audit Report. The response for concern 86 raises additional unanswered questions. fd',' .;ig"! Why was this piping released on a "conditional release" based on NP-113, when this procedure did not have external cleanliness requirements'ow r 2~ was this conditional release resolved? At present these two concerns will remain unresolved, until additional rcsponsl is received. t

                        ~Suaaaa:     Finding Itasn               1 6 6  ara nisse by report; Finding Iten I uas previously closed by report and audit, and Pinding Items 3, 46 5, and 7 remain open. In addition, Concerns 85 and P6 remain unresolved.

yg r t ALH/t cmH2 ,'4 yvrP ', cc: Mr. N. J. Chiangi Mr. R* M. Parsons Dr. Ts S. E13.eman Mr. S. D. Smith a, Mr. G. L. Porehand Mr. T. H. Wyllie Mr. P. M. Howe p r f t 't r Concur .rr I I' t n'rf S. McManus - Manager

                                                                                                                                         't' Corporate Nuclear Safety 6 Quality Assurance Audit t
                                                                                                                                      'd
                                                                                                                                             '< ff ls*                                                                                                                                                   jr 0

r <<gr u rrtr ft'r -

      ,r 4                                                                                                                    ;r* fy
   't'         '    ri                                                                                                                           t'ff r

tr s r

                                                                                                                                                       -'tl t                                                                                                                                 ln J'
          ;1 0

II dt tp

                                                                                                                                                       "'I oj f

t u I ~ 2 I r I y 2 t s t

t P pg

        '{                                                                                                                                           1{

n ,I II,',I

            >>II                                                                                                                             n   .,

0 I lg ro<>>>>I 2aa C&%II ~g3~6'6@~ I>> { Carol(no Powor a Ltghl Company LI gOV1980 p gECElVE5 .~ Company Corras pondonce C P. & d CNSAgl%

                                                                                                                           ~.d October 3'I, 1980                           Z;:<"                                      . I'
     '>>

File: SH A-2/2 QA-1917 1h I MEMORANDUM TO: Mr. S. McManus FROM: N. J. Chiangi V>>I I'he

SUBJECT:

ASME Corporate Audit QAA/170-4 Corporate Audit Roport QAA/170-4 activities during September for audit of 15 18a 22r 1980r findings and two (2) concerns requiring formal response. Tho attached describos the action taken or being taken to resolve the reported findings. the Harris proJect listed six (6) L L) 0 { I Based on tno attached, corroctivo action for findings 1 and 6; and

 'I                       concorns         5 and 6 is considered satisfactory and those items should be                                     h>>,

closed. { I intonded correctivo action for findirgs 3, 4, 5 and 7 is con- {{{h sidered satisfactory and should be adequate for closing thoso items {I

  .I{                     when complete.                                                                                             '-,      fg'I>>).

i I,'he I if you need K Please let me know additional informat;ion. Ih p o>>.

     ,{ I I. I I'

{ {I>> 1 Q {I 'i>>r>>LI IK

                                                                                                                                     -'- 9,>>       I   ~C          '

I" 0LF/lm At;tachment cc: Mr. P. H. Howo (w/a) Mr. R. M. Parsons (w/a) Mr. S. D. Smith (w/a) Mr. T. H. Myllie (w/a) Mr. G. L. Forehand (w/a) >>p

                                                                                                                                                         '-"I
           ~

K'i{ 5K hh

                                                                                                                                      >>              {

. L Ka>> K t r ' l' K r

      <~r) t 4

)'i d

t

'                 't QUALITY ASSURANCE AUDIT QAAI   ~'4 Response   to Findings
      ~Fdndln  dl:

ASNT-TC-lA (1975 Edition), Paragraph 8.5,2.c, specifies that for the practical examination (nondestructive examination personnel qualifications), ten different checkpoints requiring under standing o('.test variables and procedural requirements should be included in the practical examination. In additiond Paragr'aph 9.6.l.f specifies that the practical examination should describe the pr actical test object. The quali.ication records for Norman C. Westgate, RT Level II (Daniel) practical examination record did not include ten checkpoints as required and did not describe the test object that was tested. These record nonconformances existed when the CPAL NDE Level III Examiner reviewed the record and certified this individual as RT Level II on 8/8/80. The auditors determined the record files for five other Level II personnel did meet the requirements of ASNT-TC-1A. Corrective Action: '3 The identified practical examination for Norman Westgate was determined to be deficient insofar as the record did not include ten checkpoints or describe the object that was tested. Mr. Westgate was reexamined by a CPAL Level III Radiographer, completing the deficient portion of the practical examination. A new certification was issued on October 3, 1980, and the grade point average was readjusted accordingly. It should be noted that Mr. Westgate was not the radiographer of record on any production radiography prior to issue of the new certification. In the future, more emphasis will be exercised in reviewing qualification packages for new NDE contract personnel. Finding 82: Item closed in audit report.

    ~Fdndln   dl:

ASME Code Section III, NA<<4133.6 Docun:ent Control, requires "measures that shall assure that documents, including changes, are reviewed for adequacy..." The auditor determined that a portion of the text of Paragraph 1.3, 10CFR21 requirements, of Site Specification 036, Revisions 1, 2, 3, and 4 which was in the original issue of the document, was inadvertently deleted in Revisions 1, 2F 3, and 4 due to typing error'. This discrepancy went undetected throughout the CPAL Site construction and QA organizations. This document was a requirement on eight out of rroventeen purchase orders for ASME Code items reviewed by the auditor. Corrective Action: The Senior Resident Engineer generated and distributed a memorandum (MS-7687 dated September 18, 1980) to all supervisors alerting them to the particular problem and the general responsibilities involved. Site Specification 036 is anticipated to be revised to incorporate the missing paragraphs by wolomher 16, lq80. This revised site specification will beincorporated into outstanding purchase orders written against Site Specification 036.. '

                                                                                                   .<,
                      ~ +   ~  tiffs drag 0

l' I r L

   ~l h   t'

~ > lg 4"

      ~

1l p U ( 0 l S

             '

44 VV'/ 0 ASME aUALITY ASSURANCE AUDIT QAA/170-4 Response to Findin8~ h Page Two e ' F4~ed 4II II 4: ei I I Procedure WP-112, "Control of Materials and Equipment That May Be Harmful To Stainless Steel," requires materials that are purchased for a function that will require them to come in contact with stainless steel shall not contain more than 1000 PPM leachable halogenated compounds (including chlorides) ~ A certificate of compliance to the above must be provided by the supplier or sampled and tested . I upon receipt of the material. There are no suppliers'ertification or sample test results on halogen content for the acetone being used on the site for cleaning purposes. I

                                                                                                                                         ', eg Corrective Action:                                                                                     I
                         '

sample of acetone in use on the site has been sent to the CPAL laboratory for

                           ~5 A

analysis. Once the halogen content. has been determined PPCD and NPPED will nake a determination of acceptability. Corrective and preventative action will '0

                              , be formulated based on results of the laboratory Itesting.                                         ]l)            e
                                                                                                                                                                  '1 ee                              , I Finding fl5:                                                                                                          I, Warehouse storage procedure PGD-002, "Material Mainterance Requirements During Storage for Shearon Harris Nuclear Power Plant," requires polyethylene used in contact with safety related, seismic 1, or'tainless steel equipment not to be in                       r'414           .

excess of 55 PPM for total leachable halogens in pigmented sheeting. Procedure WP-112, "Control of Materials and Equipment Thay May Be Harmful To Stainless Steel," requires that materials that are purchased for a function that will require them to come in contact with stainless steel shall not contain more than 1000 PPM e'r

                                                                                                                                                               '.

halogcnated compounds which are leachable. NPPED Memorandum 801022, dated lid I 4I (t 5/22/80 from L. I. Loflin to T. H. Wyllie, indicates that protective covers must I Iel not exceed 1000 YPM for total halogen and sulfur, and 200 PPM for leachable halogen. lg'I The fire retardant vinyl received 6/4/80 has manufacturer's certification which =' states the total leachable halogenated compounds including chlorides are less than 1000 PPM, This material ia being used to cover safety related and stainless teel equipment even though there is a conflict between the three documents prescribing leachable halogen limits. 11, I, L Corrective Action:

                                                                                                                                       "rgb",

Work procedure WP-112 is in process of being revised to reflect correct levels of V I acceptable limits of halogens. Procedure generated document PGD-002 is being reissued to reference halogen limits established in WP-112. This action, once complete, should eliminate further conflict on the prescribed leachable halogen I I

                    ~ ')

limits. 1 I- f4 hd M V 4 ~. Q, w'I 4,e'+~ 4II te 1 rLe I I, el V L4 Vl I

                                                                                                                                                             'e I         I 1
     'hd "1
   .

14

  • 4'I

E

   \

g1 T <

           , ll,
       ~pl
     ~ "X'

ASME QUALITY ASSURA

                          '"+    AUDIT QAA/170 4 Response    to Finding Three             ,'age
 ~FEndEII   il6:

Procedure lF-03E Revision 9, dated September 5, 1980, Paragraphs 3.11 and 3.12 require the Molding Issue Room Attendant to daily check the welding rod holding ovens to randomly check the welding rod heated portable caddies for their proper operation at the specified temperatures. The procedure requires the above checks to be recorded on Exhibit 2, Revision 6, dated August 1980. The records examined showed that Revision 4, not Revision 6, of Exhibit 2 has been used to record the daily checks of oven temperatures in all three issue r ooms to date. Revision 4 of Exhibit 2 did not have a format that provided a desi~ated space for the data results of checking the heated portable caddies. There have been no records made of the issue room attendant's checking of the heated portable caddies since September 5, 1980 when the new requirement became effective. Revision 6 of Procedure MP-03, which was issued December 7, 1979, revised Exhibit 2 which made it Revision for

5. There is no record of Revision 5 of Exhibit 2 having been used recording oven temperatures by the issue room attendants since that date.

Corrective Action: Corrective Action has been taken and all temperature recordings that were recorded on revision 4 have been transferred and recorded on revision 5 back to effective date of December 7, 1979, with a statement and date attached to each sheet indicating it was transferred from revision 4. All temperature recordings that were required an revision 6 have also been transferred from revision 4 to revision 6 back to effective date of September 5, 1980. A statement and date was attached to each sheet showing the change. Metallurgy/Welding Unit personnel have been cautioned about failing to destroy superceded and absolete forms. Measures were taken to ensure that all forms now in use are in compliance with the latest applicable procedures. FEECEntJ JJE: For welding repairs to Code Class 3 base materxal, the CP&L ASME QA Manual requires the QA Welding Inspector to prepare a sketch of the repaired area as required by the Code showing location and size of the prepared cavity, the welding material identifications, the welding procedure, and a report of the results of examinations. For weld repairs requir ing r adiography, ASME Code Section requires a sketch showing location and size of the prepared III, Paragraph ND-2539 cavity. A radiograph identified as SW-2R1, Drawing 4-SW-8/2165 was reviewed during this audit. A note on t'h e Radiographic Examination Report indicated the area examined to be a pipe wall repair. The sketch of the repaired area and the repair weld data report could not be located during the audit. Only the film and the request for raciography were available for review.

/ i

 ~.

wf J k A l]C Qr 1 Pl l vt ( )4 Wl '

                   '1 E

I 6 P 4 k, ig 3'

t1 ASME QVALXTY ASSVRP"'CE AUDIT Response to Page Four Findi Corrective Action: QAA/170-4 t t JJI

                                                                                                                     . J
                                                                                                                           ) dr(

l'll I

                                                                                                                                            ,.

JJ l Investigation of the problem revealed: J (1) The repair wao incorrectly indentified as a repair to shop weld 2. d In actuality, the repair was a base metal repair on piece number 4-SW-8-5(l) adjacent to shop weld 2. (2) The defect was discovered visually by craft personnel. The area in quest;ion was excavated by grinding without notifying QA; thus no DDR was written at this time. (3) The repair WDR was processed and the repair was completed without the necessary "sketch" of the excavated area. QA failed to note this problem and a DDR was not issued as required. The repair WDR has been corrected by identifying the repaired area as a ( base metal repair to piece number 4-SW-8-5(l). A "sketch" of the repaired l. 'J,: li. area has been prepared from the radiographic "skin"t issued by the QA NDE group. This sketch shows all dimensions with KIre exception of the depth of the excavated area. DDR-483 has been issued to facilitate resolution lk) of the nonconforming condition.~~ed~- 0%6

                                                                     >>r
                   '4Individuals responoible for the review and issue of Repair WDR's have been                               r
                    ; alerted to the errors exemplified by this incident and have been instructed
  .0                  to ensure the required sketches of the excavations have been made prior to
                   -release for repairs. They have also been instructed to insert the DDR number in the Instructions section of Repair WDR's issued for base metal repairs.
                   'ield     welding personnel have been instructed to coordinate with OA prior to
                     ~ny weld repairs.
 ,)         d I.                                                                                                         ,(r
  • 0 Concern l)5:

( NPPED Memorandum 79462, dated 3/12/79, indicateo that for duct tape that l ld ( Westinghouse r ecoomrends chloride content of tape not to exceed 15 PPM. NPPED it 'i recommends that duct tape purchased with actual chloride cont:ent of 20.9 PPM be il used. NPPED Memorandum 801022, dated 5/29/80, states higher halogen content ' t can be used if tape residue is removed prior to startuo (heating up of equipment). Procedure WP-12 revision number 3 io in review and approval cycle; this revision will require all tape residue to be removed prior to operation heat-up. Zt is of concern that stainleos steel pipe that has been embedded may not have tape residue removed in areas that are covered over with concrete. r r' l

                                                                                                                      "" r (J

g Pfi

                                                                                                                 ",. ri

lk+l l 0 h) h b k ly y I 9 1 4 S (

     'I l

ASME QUALITY ASSURANCE AUDIT QAA/170-4 Responso to Ffndfn~~ Pago Five Corrective Action: NPPED has stated that there is no problem if tape residues were Sot removed from embedded pipo as operating temperatures will not exceed 200 F. This is well below the critical temperature where halogens could produce doleterfous consequences. Concern 86: Containment spray piping and spent fuol piping was inspected according to Proce-dure CQC-10, "Cleanness Control of Fluid Systems and Compononts," and released on "Conditional Release" bocause tho external surfaces of the pipe had not been cleaned fn accordanco with Procedure WP-113, "Cleaning 4 Cleanliness lhintenanco of AS~K Section III Piping Systems." It fs of concern that Procedure WP-113 was inadequate by not containing requirements for external pipe cleaning, and spent fuel piping is embedded fn concrete and cannot be cleaned. Corrective Action: Work procedure WP-113 does not have any external cleanliness requirements. There fs no known requirement for any external cleanliness contained fn any of CP4L commitments. The only on-site requirement fs the removal of items on the surface of stainless steel to a visual level of cleanliness (reference WP-112).

                                                               ~ ~-

Ci.1 > ~ ~l q,(~ q )Jl ie'v 'JJ -~ C 20% GJ' I J C'&jan 4 q

                                                                                ~  ~

I

 ~e
  'I

form 244 g~p, Carolina Power 5 Light Compr)ny Company Corrcrpondenco October 2, 1980 FILE: QAA/170-4 MEMORANDUM TO: Mr. S. McManus FROM: A. E. Hall

SUBJECT:

ASME Quality Assurance Audit of SHNPP Construction

REFERENCE:

Letter SH A-2/2, dated September 18, 1980 The referenced letter SH A-2/2, dated September 18, 1980, with E&C QA response to Audit QAA/170-4, Finding Item No. 2 has been evaluated and verified as corrected during the audit. The response for Finding Item No. 2 is considered as action to resolve this item and is hereby closed by repor t /audit . Summary: Finding Item No. 2 is closed by report/audit. Finding Items 1, 3, 4, 5, 6, and 7 remain open. AEH:pn Attachment cc: Mr. N. J. Chiangi Mr. R. M. Parsons Mr. G. L. Forehand Mr. Sheldon D. Smith Mr. P. W. Howe Mr. T. H. Wyllie CONCURR

                             . Mc   nus   -   nager Cor porat  Nuclear Sa fety &

Quality Assurance Audit

Wr I 'f ff'it If ~ I I 'n t Ig Pg

( 4 C4)4

                                                                                                                  ,"-:,                        C H         '4
                                                                                                                   ,.o" ~                        <<'

O. 4 4')4t rncm 244 Carotlno Power a Ltght Compony P( o9 P, 0. Box 101, New Hill, N. C, 27562 4jL'QS'4, Company Correaponrhnor File: SH A-2/2 (170-4) September 18, 1980

                                                                                                                             ~4
                                                                                                                      ,,4 4 MEMORANDUM TO:      Mr. A. Hall,  Lead   Auditor                                  q ~44'>p444                         n FROM:    G. L. Forehand

SUBJECT:

Evaluations Related to Disqualified Vendors

                                                                                                                  -,n', '>>

Q 4, Cm 4 44 To prevent failure to perform evaluations as required by procedure CQA-24, ParaEraph 7.1, the E&C QA Vendor Surveillance Unit will notify the site 4 i, QA Unit by memorandum of vendors removed from the Approved Suppliers List and the reason for removal.

,,'4  4,
             ~                                                                                                   'n-,-
                                                                                                                            'I 4

C'-

   .(f,      .-"p         4 GLF: jp 4

cc: Mr. N. J. ChianEi 49 r4) (1 Mr. D. A. McGaw

 >'          4'!

Mr, D. C. Whitehead 4 4 JL 4 '4.f j 4'4'i, 4

                                                                                                                       *
  • C r 4 44 ya,

(

                                                                                                                    ,C

( j

                                                                                                                 ..n (k

C 4 r4,

r,.

Cl 4 I r 4 .4>r4.. 4

hi J r " l I ,h>>,

,I  s 1

1 I 0

                                                               ~
                                                            ~
                                                ~   ~
   ~ ~              ~   ~
       ~ ~     ~
 ~ ~
                                          ~ ~               ~    ~    ~ t           0 ~ ~ '     ~ ~
 ~ '                     t      ~                                ~    4   '                         ~  ~

t ~ ~ ~ ~ ~ ~ ~ '

     ~   ~

~ ~ ~ ~

 ~     ~
                                                                                                     ~   '

I~ ~ ~ ~ ~ ~ ~ ~

                                    ~   ~                      ~   1 ~~       ~      ~
                                                                                            ~ ~
             ~   ~     ~ ~    ~   ~   ~

0 II e

    'I

BY OAm POWCR Pl ANT CONSTRUCT SHEETS OF ~ EH[ID. BY SUBJECT DATE F LL} fLt: Er ~- QOHPUTATI N CHKCT DEPT. EaBAA DAO.IEBO

            $7picA7i m7 Cl f            gg<i"5'ik>

CFFCcv

                                                                    ~

I

                                                                        )
 'A'DEC      Q't~~

f8%. f/< c<.8 AVPlp +OlrEC J AEPfg H-ZHX,5$ MPtf.CP CCRC,l 4) to Serial: HNP-99-069 Representative Quality Assurance Audits of the Site Construction Program

k, I,

     '4 p u ll 0

lI II ~ Sk form 244 Carolina Power 8 l.loni Company I Company Covospondonco February 21, 1979, kr J File: QAA/170-1 MEMORANDUM TO: Mr, S. D. Smith FROM: S. McManus

SUBJECT:

Quality Assurance Audit of ASME Quality Assurance at SHNPP Construction Site I It is current'ly planned to conduct a Quality Assurance Audit of ASME Quality

   'I            111 Assurance at SHNPP Construction Site on March 19-23, 1979. This audit will be conducted in accordance with Quality Assurance Audit Procedure QAAP-1, I,
                                             "Procedure for Quality Assurance Audit as Required by CPbL Corporate QA Program" and the CPbL ASME QA Manual. The attached audit agenda/plan defines
    'Ik. r                               the scope and primary areas of the audit. The lead auditor will be Mr. A. E.

k II Hall. l. The Manager' Engineering b Construction Quality Assurance should regard this memorandum and attached audit agenda/plan as official notification of- the audit. If there are any questions concerning this audit, please contact me. A ic'W SM:AEH:jwjWl

                                                                                                                /I "v,

Attachment k cc: Messrs. N. J. Chiangi (w/a) G. L. Forehand (w/a) I B. Kincaid (w/a)

                                          ~

R. M. Parsons (w/a) I M. F. Thompson. Jr, (w/a) k T. {{, Wyllie (w/a)

                         !'I
'I f,    I,,           I         I
                               " !kkr,'w,
                                                ~ .

{ 'r C k

tg II

AUDZT AGCNDA PLAN Activity: Quality Assurance Audit of ASME Quality Assurance at SHNPP Construction Site Audit Schedule Date: March 19-23, 1979 Auditors: A. E. Hall - Lead Auditor L. W. Disscttc F. W. Taylor I. A. Johnson Requirements: (1) CP&L ASME QA Manual (2) ASME Code (3) SHNPP PSAR Applicable Document's: (1) E&C Qh Manual of Procedures (2) SHNPP Construction Procedures (3) SHNPP Specifications Agenda: 1.0 Preaudit Meeting (8:15 a.m., 3/19/79) 2.0 ASME/Document Control. 3.0 Site Procurement - ASME Items 4.0 Receiving Inspection ASME Items 5,0 Process Control 6.0 Welding Control 7.0 Heat Treating 8.0 Calibration of Equipment b Tools/ASME 9.0 Znspection b Test (Welding b Hydro) 10.0 Nondestructive Testing 11.0 ASME QA Records 12.0 Containmcnt Construction (ACI-359) 13.0 Post Audit Meeting Audit Report No.: QAA/170-1 QAA Procedure No.: QAAP-1}}