Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18017A86116 November 1998Rev 0 to Harris Fuel Pool Heatup Calculation.Time to boil
Coatings
Nondestructive Examination
Process Control Program
Stress corrosion cracking
Systematic Assessment of Licensee Performance
Commercial Grade
Fire Protection Program
ML18017A86010 November 1998Rev 0 to Spent Fuel Pools C & D Activation Project Thermal- Hydraulic Analysis.Safe Shutdown
Boric Acid
Ultimate heat sink
Power Uprate
ML18016A7103 November 1998Rev 0 to Calculation SIC-98-108, Evaluation of Limiting Flaws for Structural Adequacy in Lower Canopy Seal Repairs at Shearon Harris Nuclear Plant.Weld Overlay
Stress corrosion cracking
ML18016A50511 August 1998Rev 3 to Calculation HNP-M/FHB-1002, Temp Increase in Charcoal Beds W/O Bleed Flow.
ML18016A31921 November 1994Rev 0 to CP&L Harris Ipee: HCLPF Capacity Calculations for 1X-SAB CST Tank & 1X-SN RWST Tank.Earthquake
ML18011A6951 June 1994Rev 0 to HNP-I/INST-1045, Steam Generator Narrow Range Level:Low,Low-Low & High-High Setpoints.
ML18022A90612 October 1992Rev 0 to Calculation SI-45, Max RCS Pressure for Csip Min Flow. W/Three Oversize Drawings
ML18010A85512 October 1992Rev 3 to Calculation CS-0021, Mechanical Analysis & Calculations for 1CS-746 Charging Pump a to Refueling Water Storage Tank Isolation Valve. Calculation Applicable to GL 89-10Stroke time
ML18010A8339 October 1992Rev 2 to Calculation CS-0021, Mechanical Analysis & Calculations for 1CS-746 Charging Pump a to Refueling Water Storage Tank Isolation Valve. Info Applicable to GL 89-10Stroke time
ML18010A8349 October 1992Rev 2 to Calculation CS-0022, Mechanical Analysis & Calculations for 1CS-752 Charging Pump C RWST Isolation Valve. Info Applicable to GL 89-10Stroke time
ML18010A8359 October 1992Rev 2 to Calculation CS-0023, Mechanical Analysis & Calculations for 1CS-753 Charging Pump C to RWST Isolation Valve.Calculation Applicable to GL 89-10.W/two Oversize DrawingsStroke time
ML18010A8318 October 1992Rev 2 to Calculation CS-0020, Mechanical Analysis & Calculations for 1CS-745 Charging Pump a to RWST Isolation Valve. Info Applicable to GL 89-10Stroke time
ML18010A8568 October 1992Rev 3 to CS-0022, Mechanical Analysis & Calculations for 1CS-752 Charging Pump C to Refueling Water Storage Tank Isolation Valve. Calculation Applicable to GL 89-10Stroke time
ML18010A8515 October 1992Rev 5 to Calculation SC-N-062, RCS Wide Range Pressure Loop 3 P-402.Safe Shutdown
Fire Barrier
Emergency Lighting
ML18010A8535 October 1992Rev 4 to Calculation SC-N-061, RCS Wide Range Pressure Loop 1 P-403.
ML18022A90524 September 1992Rev 0 to Calculation SI-0044, Alternate Miniflow Orifice Strainer.Post Accident Monitoring
ML20079M99011 November 1991Responses to NUMARC Aquatic Resources Survey & Questionnaire to Support Part 51 Rule Change Socioeconomic & Waste Mgt QuestionsBiofouling
Scaffolding
ML20079M95011 November 1991Responses to NUMARC Aquatic Resources Survey & Questionnaire to Support Part 51 Rule Change Socioeconomic & Waste Mgt QuestionsAccidental discharge
Scaffolding
ML20212M86824 November 1986Incomplete,Unexecuted SECY-86-352 Re Util Request for Exemption from Requirement for full-scale Emergency Preparedness Exercise within 1-yr Prior to OL Receipt. Petitioners Requested Hearing & Submitted BriefsExemption Request
ML20207H46310 November 1986Package of near-term OL Status Sheets for Facility & Narrative Presented to Commission StaffSafe Shutdown
Ultimate heat sink
Fire Barrier
Hydrostatic
Fire Protection Program
ML20207S2349 September 1986Affirmation Response Sheet Approving SECY-86-257, Request for Stay & Review of Appeal Board Decision in Shearon Harris Proceeding
ML20207S2328 September 1986Affirmation Response Sheet Disapproving SECY-86-254, Request for Hearing on Shearon Harris Exemption Request. Author Does Not Believe in Beginning Rulemaking to Change Requirement to 2-yr Rather than 1-yr RequirementExemption Request
ML20207S2268 September 1986Affirmation Response Sheet Partly Approving SECY-86-252, Commission Review of Shearon Harris Appeal Board on Environ Issues. Author Agrees W/Ofc of General Counsel Recommendation But Sees No Reason to Begin Rulemaking
ML18016A9392 October 1980ASME QA Audit of Shnpp Construction, Conducted on 800915- 18 & 22Hydrostatic
Nondestructive Examination
Liquid penetrant
ML18017A6056 July 1979Notifies of Discovery of Improper Welds on Engineered Embedment Plates Supplied by Dubose Steel.All Embedments Have Unique Number on Plates.Will Sample Other Vendor Plates
ML18016A9403 April 1979ASME QA Audit of Shnpp Construction, Conducted on 790319- 23
ML19283B7943 November 1978on 781103,A-E Notified Util That Concrete Placement Drawings for Containment Liner Erection Do Not Contain Details Which Require Use of 3/8 X 1 Foam Strip to Be Installed on Top of 5 Vertical Liner Backing Ring
ML19282C22431 October 1978Potential Conceptual Design Requirement:Approx 1500 Gallons of Water Have Neen Pumped from 4 Sumps in Containment Since 781004.Unknown Whether Accumulation Is Ground Water or from Concrete Curing.If reportable,30-day Rept Will Follow
ML18016A94228 March 1978QA Audit of Southwest Fabricating & Welding Co,Inc, Conducted on 790314-16Hydrostatic
Liquid penetrant
ML18016A94114 April 1977QA Audit at Southwest Fabricating & Welding Co,Inc, Conducted on 770322-24Hydrostatic
Nondestructive Examination