Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18017A861 | 16 November 1998 | Rev 0 to Harris Fuel Pool Heatup Calculation. | Time to boil Coatings Nondestructive Examination Process Control Program Stress corrosion cracking Systematic Assessment of Licensee Performance Commercial Grade Fire Protection Program |
ML18017A860 | 10 November 1998 | Rev 0 to Spent Fuel Pools C & D Activation Project Thermal- Hydraulic Analysis. | Safe Shutdown Boric Acid Ultimate heat sink Power Uprate |
ML18016A710 | 3 November 1998 | Rev 0 to Calculation SIC-98-108, Evaluation of Limiting Flaws for Structural Adequacy in Lower Canopy Seal Repairs at Shearon Harris Nuclear Plant. | Weld Overlay Stress corrosion cracking |
ML18016A505 | 11 August 1998 | Rev 3 to Calculation HNP-M/FHB-1002, Temp Increase in Charcoal Beds W/O Bleed Flow. | |
ML18016A319 | 21 November 1994 | Rev 0 to CP&L Harris Ipee: HCLPF Capacity Calculations for 1X-SAB CST Tank & 1X-SN RWST Tank. | Earthquake |
ML18011A695 | 1 June 1994 | Rev 0 to HNP-I/INST-1045, Steam Generator Narrow Range Level:Low,Low-Low & High-High Setpoints. | |
ML18022A906 | 12 October 1992 | Rev 0 to Calculation SI-45, Max RCS Pressure for Csip Min Flow. W/Three Oversize Drawings | |
ML18010A855 | 12 October 1992 | Rev 3 to Calculation CS-0021, Mechanical Analysis & Calculations for 1CS-746 Charging Pump a to Refueling Water Storage Tank Isolation Valve. Calculation Applicable to GL 89-10 | Stroke time |
ML18010A833 | 9 October 1992 | Rev 2 to Calculation CS-0021, Mechanical Analysis & Calculations for 1CS-746 Charging Pump a to Refueling Water Storage Tank Isolation Valve. Info Applicable to GL 89-10 | Stroke time |
ML18010A834 | 9 October 1992 | Rev 2 to Calculation CS-0022, Mechanical Analysis & Calculations for 1CS-752 Charging Pump C RWST Isolation Valve. Info Applicable to GL 89-10 | Stroke time |
ML18010A835 | 9 October 1992 | Rev 2 to Calculation CS-0023, Mechanical Analysis & Calculations for 1CS-753 Charging Pump C to RWST Isolation Valve.Calculation Applicable to GL 89-10.W/two Oversize Drawings | Stroke time |
ML18010A831 | 8 October 1992 | Rev 2 to Calculation CS-0020, Mechanical Analysis & Calculations for 1CS-745 Charging Pump a to RWST Isolation Valve. Info Applicable to GL 89-10 | Stroke time |
ML18010A856 | 8 October 1992 | Rev 3 to CS-0022, Mechanical Analysis & Calculations for 1CS-752 Charging Pump C to Refueling Water Storage Tank Isolation Valve. Calculation Applicable to GL 89-10 | Stroke time |
ML18010A851 | 5 October 1992 | Rev 5 to Calculation SC-N-062, RCS Wide Range Pressure Loop 3 P-402. | Safe Shutdown Fire Barrier Emergency Lighting |
ML18010A853 | 5 October 1992 | Rev 4 to Calculation SC-N-061, RCS Wide Range Pressure Loop 1 P-403. | |
ML18022A905 | 24 September 1992 | Rev 0 to Calculation SI-0044, Alternate Miniflow Orifice Strainer. | Post Accident Monitoring |
ML20079M990 | 11 November 1991 | Responses to NUMARC Aquatic Resources Survey & Questionnaire to Support Part 51 Rule Change Socioeconomic & Waste Mgt Questions | Biofouling Scaffolding |
ML20079M950 | 11 November 1991 | Responses to NUMARC Aquatic Resources Survey & Questionnaire to Support Part 51 Rule Change Socioeconomic & Waste Mgt Questions | Accidental discharge Scaffolding |
ML20212M868 | 24 November 1986 | Incomplete,Unexecuted SECY-86-352 Re Util Request for Exemption from Requirement for full-scale Emergency Preparedness Exercise within 1-yr Prior to OL Receipt. Petitioners Requested Hearing & Submitted Briefs | Exemption Request |
ML20207H463 | 10 November 1986 | Package of near-term OL Status Sheets for Facility & Narrative Presented to Commission Staff | Safe Shutdown Ultimate heat sink Fire Barrier Hydrostatic Fire Protection Program |
ML20207S234 | 9 September 1986 | Affirmation Response Sheet Approving SECY-86-257, Request for Stay & Review of Appeal Board Decision in Shearon Harris Proceeding | |
ML20207S232 | 8 September 1986 | Affirmation Response Sheet Disapproving SECY-86-254, Request for Hearing on Shearon Harris Exemption Request. Author Does Not Believe in Beginning Rulemaking to Change Requirement to 2-yr Rather than 1-yr Requirement | Exemption Request |
ML20207S226 | 8 September 1986 | Affirmation Response Sheet Partly Approving SECY-86-252, Commission Review of Shearon Harris Appeal Board on Environ Issues. Author Agrees W/Ofc of General Counsel Recommendation But Sees No Reason to Begin Rulemaking | |
ML18016A939 | 2 October 1980 | ASME QA Audit of Shnpp Construction, Conducted on 800915- 18 & 22 | Hydrostatic Nondestructive Examination Liquid penetrant |
ML18017A605 | 6 July 1979 | Notifies of Discovery of Improper Welds on Engineered Embedment Plates Supplied by Dubose Steel.All Embedments Have Unique Number on Plates.Will Sample Other Vendor Plates | |
ML18016A940 | 3 April 1979 | ASME QA Audit of Shnpp Construction, Conducted on 790319- 23 | |
ML19283B794 | 3 November 1978 | on 781103,A-E Notified Util That Concrete Placement Drawings for Containment Liner Erection Do Not Contain Details Which Require Use of 3/8 X 1 Foam Strip to Be Installed on Top of 5 Vertical Liner Backing Ring | |
ML19282C224 | 31 October 1978 | Potential Conceptual Design Requirement:Approx 1500 Gallons of Water Have Neen Pumped from 4 Sumps in Containment Since 781004.Unknown Whether Accumulation Is Ground Water or from Concrete Curing.If reportable,30-day Rept Will Follow | |
ML18016A942 | 28 March 1978 | QA Audit of Southwest Fabricating & Welding Co,Inc, Conducted on 790314-16 | Hydrostatic Liquid penetrant |
ML18016A941 | 14 April 1977 | QA Audit at Southwest Fabricating & Welding Co,Inc, Conducted on 770322-24 | Hydrostatic Nondestructive Examination |