Category:ARCHIVE RECORDS
MONTHYEARML18017A8611998-11-16016 November 1998 Rev 0 to Harris Fuel Pool Heatup Calculation. ML18017A8601998-11-10010 November 1998 Rev 0 to Spent Fuel Pools C & D Activation Project Thermal- Hydraulic Analysis. ML18016A7101998-11-0303 November 1998 Rev 0 to Calculation SIC-98-108, Evaluation of Limiting Flaws for Structural Adequacy in Lower Canopy Seal Repairs at Shearon Harris Nuclear Plant. ML18016A5051998-08-11011 August 1998 Rev 3 to Calculation HNP-M/FHB-1002, Temp Increase in Charcoal Beds W/O Bleed Flow. ML18016A3191994-11-21021 November 1994 Rev 0 to CP&L Harris Ipee: HCLPF Capacity Calculations for 1X-SAB CST Tank & 1X-SN RWST Tank. ML18011A6951994-06-0101 June 1994 Rev 0 to HNP-I/INST-1045, Steam Generator Narrow Range Level:Low,Low-Low & High-High Setpoints. ML18022A9061992-10-12012 October 1992 Rev 0 to Calculation SI-45, Max RCS Pressure for Csip Min Flow. W/Three Oversize Drawings ML18010A8551992-10-12012 October 1992 Rev 3 to Calculation CS-0021, Mechanical Analysis & Calculations for 1CS-746 Charging Pump a to Refueling Water Storage Tank Isolation Valve. Calculation Applicable to GL 89-10 ML18010A8331992-10-0909 October 1992 Rev 2 to Calculation CS-0021, Mechanical Analysis & Calculations for 1CS-746 Charging Pump a to Refueling Water Storage Tank Isolation Valve. Info Applicable to GL 89-10 ML18010A8341992-10-0909 October 1992 Rev 2 to Calculation CS-0022, Mechanical Analysis & Calculations for 1CS-752 Charging Pump C RWST Isolation Valve. Info Applicable to GL 89-10 ML18010A8351992-10-0909 October 1992 Rev 2 to Calculation CS-0023, Mechanical Analysis & Calculations for 1CS-753 Charging Pump C to RWST Isolation Valve.Calculation Applicable to GL 89-10.W/two Oversize Drawings ML18010A8311992-10-0808 October 1992 Rev 2 to Calculation CS-0020, Mechanical Analysis & Calculations for 1CS-745 Charging Pump a to RWST Isolation Valve. Info Applicable to GL 89-10 ML18010A8561992-10-0808 October 1992 Rev 3 to CS-0022, Mechanical Analysis & Calculations for 1CS-752 Charging Pump C to Refueling Water Storage Tank Isolation Valve. Calculation Applicable to GL 89-10 ML18010A8511992-10-0505 October 1992 Rev 5 to Calculation SC-N-062, RCS Wide Range Pressure Loop 3 P-402. ML18010A8531992-10-0505 October 1992 Rev 4 to Calculation SC-N-061, RCS Wide Range Pressure Loop 1 P-403. ML18022A9051992-09-24024 September 1992 Rev 0 to Calculation SI-0044, Alternate Miniflow Orifice Strainer. ML20079M9901991-11-11011 November 1991 Responses to NUMARC Aquatic Resources Survey & Questionnaire to Support Part 51 Rule Change Socioeconomic & Waste Mgt Questions ML20079M9501991-11-11011 November 1991 Responses to NUMARC Aquatic Resources Survey & Questionnaire to Support Part 51 Rule Change Socioeconomic & Waste Mgt Questions ML20212M8681986-11-24024 November 1986 Incomplete,Unexecuted SECY-86-352 Re Util Request for Exemption from Requirement for full-scale Emergency Preparedness Exercise within 1-yr Prior to OL Receipt. Petitioners Requested Hearing & Submitted Briefs ML20207H4631986-11-10010 November 1986 Package of near-term OL Status Sheets for Facility & Narrative Presented to Commission Staff ML20207S2341986-09-0909 September 1986 Affirmation Response Sheet Approving SECY-86-257, Request for Stay & Review of Appeal Board Decision in Shearon Harris Proceeding ML20207S2321986-09-0808 September 1986 Affirmation Response Sheet Disapproving SECY-86-254, Request for Hearing on Shearon Harris Exemption Request. Author Does Not Believe in Beginning Rulemaking to Change Requirement to 2-yr Rather than 1-yr Requirement ML20207S2261986-09-0808 September 1986 Affirmation Response Sheet Partly Approving SECY-86-252, Commission Review of Shearon Harris Appeal Board on Environ Issues. Author Agrees W/Ofc of General Counsel Recommendation But Sees No Reason to Begin Rulemaking ML18016A9391980-10-0202 October 1980 ASME QA Audit of Shnpp Construction, Conducted on 800915- 18 & 22 ML18017A6051979-07-0606 July 1979 Notifies of Discovery of Improper Welds on Engineered Embedment Plates Supplied by Dubose Steel.All Embedments Have Unique Number on Plates.Will Sample Other Vendor Plates ML18016A9401979-04-0303 April 1979 ASME QA Audit of Shnpp Construction, Conducted on 790319- 23 ML19283B7941978-11-0303 November 1978 on 781103,A-E Notified Util That Concrete Placement Drawings for Containment Liner Erection Do Not Contain Details Which Require Use of 3/8 X 1 Foam Strip to Be Installed on Top of 5 Vertical Liner Backing Ring ML19282C2241978-10-31031 October 1978 Potential Conceptual Design Requirement:Approx 1500 Gallons of Water Have Neen Pumped from 4 Sumps in Containment Since 781004.Unknown Whether Accumulation Is Ground Water or from Concrete Curing.If reportable,30-day Rept Will Follow ML18016A9421978-03-28028 March 1978 QA Audit of Southwest Fabricating & Welding Co,Inc, Conducted on 790314-16 ML18016A9411977-04-14014 April 1977 QA Audit at Southwest Fabricating & Welding Co,Inc, Conducted on 770322-24 1998-08-11
[Table view] Category:PACKAGE OF NONCODED MATERIAL
MONTHYEARML20079M9901991-11-11011 November 1991 Responses to NUMARC Aquatic Resources Survey & Questionnaire to Support Part 51 Rule Change Socioeconomic & Waste Mgt Questions ML20079M9501991-11-11011 November 1991 Responses to NUMARC Aquatic Resources Survey & Questionnaire to Support Part 51 Rule Change Socioeconomic & Waste Mgt Questions ML20212M8681986-11-24024 November 1986 Incomplete,Unexecuted SECY-86-352 Re Util Request for Exemption from Requirement for full-scale Emergency Preparedness Exercise within 1-yr Prior to OL Receipt. Petitioners Requested Hearing & Submitted Briefs ML20207H4631986-11-10010 November 1986 Package of near-term OL Status Sheets for Facility & Narrative Presented to Commission Staff 1991-11-11
[Table view] |
Text
_ _.__ . . . _ _ _ . . _ . _ _ _ _ _ _ _ _ . _ _ . . _ _ _ _ . _ ..__ . _ _ _ _ _ _
~
- s' l f* "*4 ,
< o E
E ADJUDICATORY ISSUE .
Ncvember 24, 1986 (Affirmation)
, SECY-86-352 For: The Commission From: William C. Parler General Counsel ,
Subject:
REQUEST FOR HEARING ON SHEARON HARRIS EXEMPTION REQUEST Prior History: SECY-86-254 Discussion: Applicant Carolina Power & Light (CP&L) requested an exemption from the requirement in NRC regulations for a full-scale emergency preparedness exercise within one year of receipt of an operating license. Wells Eddleman, an intervenor in the Shearon Harris operating license proceeding, and the Coalition for Alternatives to Shearon Harris (CASE) requested a hearing pn that exemption request.
On September 12, 1986, the commission asked the ,
parties to brief whether there are any material issues of fact regarding whether the standards
. for grant of an exemption are met. Eddleman and I
CASH (" petitioners") submitted a joint brief.
They argued that there are material issues of fact. The NRC staff and CPEL filed opposition briefs.
4 W
CONTACT:
l ,,
Rick Levi, OGC
' :. -.s 4-3224
, .2:.
- , I.h *,
c.kq. ( ..
nasy!.
i 1Ei.1 h'ih
'"l
, 0703120237 B70310 l l @ptfyN0 9 1 PDR '
q ., ..
~ . .
i.. .
l
, o as ' tr William C. Parler General Counsel
Attachment:
Draft Order Commissioners' comments or consent should be provided directly to SECY by c.o.b. Monday, December 1, 1986.
This paper is tentatively scheduled for affirmation at an open meeting during the week of December 1, 1986. Please refer to the appropriate weekly Commission schedule, when published, for a specific date and time.
DISTRIBUTION:
Commissioners OGC (H Street) '
SECY s
'.