IR 05000331-07-404(DRS), on 04/16/2007 - 04/20/2007; Duane Arnold Energy Center; Routine Security Baseline Inspection - Cover Letter
ML071550265
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 05/30/2007
From: Eric Duncan
Plant Support Branch II
To: Vanmiddlesworth G
Nuclear Management Co
References
IR-07-404
Download: ML071550265 (6)


Text

Enclosure Contains Safeguards Information. Upon separation, this page is decontrolled. May 30, 2007Mr. Gary Van MiddlesworthVice-President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785SUBJECT:DUANE ARNOLD ENERGY CENTERNRC SECURITY BASELINE INSPECTION REPORT 05000331/2007404(DRS)

Dear Mr. Middlesworth:

On April 20, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a securitybaseline inspection at your Duane Arnold Energy Center. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on April 20 with Mr. J. Bjorseth and other members of your staff.The inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.This report documents 4 findings of very low security significance (i.e., Green as determined bythe Physical Protection Significance Determination Process). The deficiencies were promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left site. The findings were all licensee-identified.EXEMPT FROM PUBLIC DISCLOSUREMay be exempt from public release under the Freedom ofInformation Act (5 U.S.C. 552)Exemption number: 5 Nuclear Regulatory Commission review required before publicrelease.G. Hansen, RIII/DRS/PSB Name and organization of person making determination.

Date of determination: 05/04/2007 G. Van Middlesworth-2-NRC is treating these violations as non-cited violations (NCVs) consistent with Section VI.A.1 ofthe NRC Enforcement Policy because of the very low security significance of the violations and because they are entered into your corrective action program. If you contest these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington, DC 20555-001; with copies to the Regional Administrator Region III; the Director,Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 2005-0001; and the NRC Resident Inspector at the Duane Arnold Energy Center.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room). However, because of the security-related concerns contained in theenclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.Should you have any questions concerning this inspection, we will be pleased to discuss themwith you.

Sincerely,

/RA by Ryan Alexander Acting for/Eric R. Duncan, ChiefPlant Support Branch Division of Reactor SafetyDocket No. 50-331License No. DPR-49Enclosure: Inspection Report 05000331/2007404(DRS) w/Attachment: Supplemental Information ( )DISTRIBUTION

See next pageEnclosure Contains Safeguards Information. Uponseparation, this page is decontrolled. G. Van Middlesworth-2-NRC is treating these violations as non-cited violations (NCVs) consistent with Section VI.A.1 ofthe NRC Enforcement Policy because of the very low security significance of the violations and because they are entered into your corrective action program. If you contest these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington, DC 20555-001; with copies to the Regional Administrator Region III; the Director,Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 2005-0001; and the NRC Resident Inspector at the Duane Arnold Energy Center.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room). However, because of the security-related concerns contained in theenclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.Should you have any questions concerning this inspection, we will be pleased to discuss themwith you.

Sincerely,

/RA by Ryan Alexander Acting for/Eric R. Duncan, ChiefPlant Support Branch Division of Reactor SafetyDocket No. 50-331License No. DPR-49Enclosure: Inspection Report 05000331/2007404(DRS) w/Attachment: Supplemental Information ( )DISTRIBUTION

See next pageDOCUMENT NAME: C:\FileNet\ML071550265.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIIRIIIRIIINAMEGHansen:coKRiemer for BBurgessJMaynen for DFunkRAlexander forEDuncanDATE5/30/075/30/075/30/075/30/07OFFICIAL RECORD COPYEnclosure Contains Safeguards Information. Uponseparation, this page is decontrolled. Enclosure Contains Safeguards Information. Upon separation, this page is decontrolled.Letter to Gary Van Middlesworth from Eric Duncan dated May 30, 2007.SUBJECT:DUANE ARNOLD ENERGY CENTERNRC SECURITY BASELINE INSPECTION REPORT 05000331/2007404(DRS)cc w/encl ( )
D. Riffle, NSIR/DSO/DDSOM. Layton, NSIR/DSP/MTWSB State Liaison Officer, State of Iowacc w/o encl ( )
J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security Enclosure Contains Safeguards Information. Upon separation, this page is decontrolled.Letter to Gary Van Middlesworth from Eric Duncan dated May 30, 2007.SUBJECT:DUANE ARNOLD ENERGY CENTERNRC SECURITY BASELINE INSPECTION REPORT 05000331/2007404(DRS)cc w/encl ( )
D. Riffle, NSIR/DSO/DDSOM. Layton, NSIR/DSP/MTWSB State Liaison Officer, State of Iowacc w/o encl ( )
J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chief Radiological Emergency Preparedness Section, Dept. Of Homeland SecurityDISTRIBUTION w/o encl ( )
TEBDWS RidsNrrDirsIrib GEG KGO GLS SRI Duane Arnold

CAA1 LSL (electronic IR's only)

C. Pederson, DRS (hard copy - IR's only)