MONTHYEARML24351A0262024-12-10010 December 2024 Duke Energy Fleet - Alternative Request for ASME Code Case N-572 ML24303A3142024-10-25025 October 2024 Notification of Shearon Harris Nuclear Power Plant FEI and Information Request ML24227A9572024-08-14014 August 2024 LRA - Requests for Additional Information - Set 1 (Email to Applicant) ML24187A0262024-07-0303 July 2024 NRR E-mail Capture - Change in Review Schedule - Harris Risk-Informed Process for Evaluations Exemption (L-2024-LLE-0004) ML24179A1292024-06-24024 June 2024 Acceptance Review for LAR to Revise TS to Adopt TSTF-234-A, Revision 1 ML24113A2522024-04-22022 April 2024 NRR E-mail Capture - Audit Plan - Shearon Harris Nuclear Power Plant, Unit 1 - RIPE Exemption 10 CFR 50.55a(h)(2) (L-2024-LLE-0004) ML24101A0522024-04-10010 April 2024 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - ITS Alignments LAR (L-2023-LLA-0078) ML24101A0542024-04-10010 April 2024 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-23-0244 - Extend CT for Accumulators - CLIIP (L-2024-LLA-0032) ML24145A1732024-02-26026 February 2024 002 Radiation Safety Baseline Inspection Information Request ML24025A1592024-01-25025 January 2024 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - Rvi AMP and Inspection Plan (L-2023-LLL-0016) ML23177A1992023-06-26026 June 2023 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-23-0005 - LAR to Align Certain TSs with ISTS (L-2023-LLA-0078) ML23172A0132023-06-20020 June 2023 Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23153A1892023-06-0202 June 2023 Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23124A1212023-05-0404 May 2023 Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23082A0432023-03-23023 March 2023 002 Radiation Safety Baseline Inspection Information Request Final ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23065A0942023-03-0606 March 2023 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-22-0081 - LAR to Address Administrative Changes to the Operating License and Technical Specifications (L-2023-LLA-0020) ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML22237A1632022-08-25025 August 2022 004 Radiation Safety Baseline Inspection Information Request ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22108A0182022-04-15015 April 2022 NRR E-mail Capture - Accepted for Review - Duke Energy Relief Request for Harris Nuclear Plant Inservice Testing Program Plan - Fourth Ten-Year Interval to Extend Type C Test to 75 Months ML22083A0702022-03-24024 March 2022 NRR E-mail Capture - Catawba Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, and McGuire Nuclear Station, Units 1 and 2 - Acceptance Review for TSTF-569 LAR ML22083A0282022-03-23023 March 2022 Email Snsb Safety Evaluation for Harris LAR to Revise Reactor Protection System TS ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21361A0122021-12-23023 December 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21288A0802021-10-15015 October 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-21-0213 - Remove Limitations to Perform Certain SRs During Shutdown (L-2021-LLA-0167) ML21295A0372021-10-0505 October 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Adopt TSTF-577 Revised Frequencies for Steam Generator Tube Inspections ML21252A0112021-08-30030 August 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1- RA-21-0191 - Revised TS Related to Reactor Trip System Instrumentation (L-2021-LLA-0149) ML21189A0282021-07-0101 July 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-21-0112 - Revise TS to Reflect Development of TRM (L-2021-LLA-0108) ML21172A2432021-06-21021 June 2021 NRR E-mail Capture - Request for Additional Information - Harris RA-20-0252 - LAR to Remove Extraneous Requirements from OL and TS (L-2021-LLA-0027) ML21106A0112021-04-15015 April 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-21-0052 - Revise Containment Spray Nozzle Surveillance Frequency (L-2021-LLA-0058) ML21084A2492021-03-24024 March 2021 Notification of Inspection and Request for Information ML21084A2512021-03-22022 March 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-20-0252 - LAR to Remove Extraneous Content and Requirements from the OL and TS (L-2021-LLA-0027) ML21039A6382021-02-0808 February 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1-RA-20-0311 - 10 CFR 50.69 Categorization Process to Reflect an Alternative Seismic Approach (L-2021-LLA-0003) ML21036A1142021-02-0505 February 2021 NRR E-mail Capture - Request for Additional Information - Harris - Relief Request RA-20-0312 - SW Pinhole Leak (L-2020-LLR-0143) ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21033A8452021-02-0202 February 2021 NRR E-mail Capture - State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revision Minimum RCS Flow Rate and Update COLR References ML21033B1062021-02-0202 February 2021 NRR E-mail Capture - (External_Sender) (External) State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revision Minimum RCS Flow Rate and Update COLR References ML21032A0492021-02-0101 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet RA-20-0263 - Use of Later ASME B&Pv, XI for Repair - Replacement (L-2020-LLR-0124) ML21025A2922021-01-25025 January 2021 NRR E-mail Capture - (External_Sender) State Notification of Amendment to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System ML21007A3722021-01-0707 January 2021 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-19-0352 - Proposed Alternative for Reactor Vessel Close Stud Examinations (L-2020-LLR-0156) ML21006A4302021-01-0606 January 2021 Acceptance Review - Duke Fleet RA-20-0207 Request to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML21006A4042021-01-0606 January 2021 NRR E-mail Capture - State Notification of Amendment to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System ML20345A3052020-12-10010 December 2020 NRR E-mail Capture - (External_Sender) (External) State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3.3.3.6 and TS 3.9.2 2024-08-14
[Table view] |
Text
Attached please find HNP-06-067, FAQs Requesting Additional Guidance or Clarification Regarding Transition to NFPA 805 "Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants." If a hard copy is desired or if I can be of further assistance please contact Kelli Voelsing (VNET 751-3057).
<<HNP-06-067.pdf>>
Kelli Voelsing Senior Engineering and Technical Support Specialist Licensing and Regulatory Affairs Harris Nuclear Plant 919-362-3057 Kelli.Voelsing@pgnmail.com
Mail Envelope Properties (4450D76A.BE3 : 15 : 11235)
Subject:
HNP-06-067, FAQs for NFPA 805 Creation Date Thu, Apr 27, 2006 10:21 AM From: "Voelsing, Kelli" <Kelli.Voelsing@pgnmail.com>
Created By: Kelli.Voelsing@pgnmail.com Recipients nrc.gov TWGWPO02.HQGWDO01 SDW1 (Sunil Weerakkody) nrc.gov TWGWPO01.HQGWDO01 CPP (Chandu Patel)
PWL (Paul Lain) pgnmail.com Jeffery.Ertman CC (Jeffery Ertman) ken.heffner CC (Ken Heffner) mike.franklin CC (Mike Franklin) Alan.Holder CC (Alan Holder) michael.fletcher CC (Michael Fletcher) robert.steele (Bob Steele) eric.mccartney (Eric McCartney) michael.janus (Michael Janus) scotty.hinnant (Scotty Hinnant) paul.fulford (Paul Fulford) dave.conley (Dave Conley) george.attarian (George Attarian) NRC.Resident (HNP NRC Resident) exchsmtp.cplc.com HNPLicRegProg CC (HNP Lic Reg Prog) duke-energy.com dwhenneke CC htbarret CC msn.com andy_ratchford CC haifire.com ekleinsorg CC nei.org btj am Post Office Route TWGWPO02.HQGWDO01 nrc.gov TWGWPO01.HQGWDO01 nrc.gov pgnmail.com exchsmtp.cplc.com duke-energy.com msn.com haifire.com nei.org Files Size Date & Time MESSAGE 518 Thursday, April 27, 2006 10:21 AM TEXT.htm 1340 HNP-06-067.pdf 1979274 Mime.822 2713613 Options Expiration Date:
None Priority:
Standard ReplyRequested:
No Return Notification:
None Concealed
Subject:
No Security:
Standard :
Progress Energy APR 2 7 2006 Mr. Sunil D. Weerakkody, Fire Protection Branch Chief US. Nuclear Regulatory Commission One White Flint North 1 1555 Rockville Pike Rockville, Maryland 20852-2738 Serial: HNP-06-067 10 CFR 50.48 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 FREQUENTLY ASKED QUESTIONS (FAQS), REQUESTING ADDITIONAL "PERFORMANCE BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS" GUIDANCE OR CLARIFICATION REGARDING TRANSITION TO NFPA-805
Dear Mr. Weerakkody:
Attached please find the first of a series of Frequently Asked Questions (FAQs), requesting additional guidance or clarification regarding Transition to NFPA-805 "Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants." The questions are submitted in the format discussed during the March 27-30,2006 Pilot Plant status meeting in Raleigh, North Carolina with representatives of Progress Energy, Duke Energy and the NRC Staff. The FAQs represent a portion of the "Parking Lot" Issues identified during that meeting. It should be noted these FAQs are not intended to be used for recommending changes to NFPA-805.
They are only intended to be used for clarification of or changes to NE1 04-02, "Guidance For Implementing A Risk-Informed, Performance-Based Fire Protection Program Under 10 CFR 50.48(c)." Our understanding is that once approved, FAQs will be considered to be an extension of NE1 04-02 and will be incorporated at the next revision of that document. Please review the attached FAQs, and advise on the acceptability of the proposed solutions. The guidance and clarifications sought are necessary to support further implementation of the NFPA-805 transition process for our pilot and fleet plants. Progress Energy Carolinas, Inc. Hairis Nuclear Plant P 0 Box165 New Hill, NC 27562 H N P-06-067 Page 2 Please refer any question regarding this submittal to Mr. Dave Corlett at (919) 362- 3137. Sincerely, Supervisor - Licensing/Regulatory Programs DHC/khv Attachments:
- 1. FAQ 06-0001
- 2. FAQ 06-0002 3. FAQ 06-0003 C: Mr. R. A. Musser, NRC Sr. Resident Inspector Mr. C. P. Patel, NRC Project Manager Dr. W. D. Travers, NRC Regional Administrator Mr. P. W. Lain, Fire Protection Branch Mr. A. Marion, NE1 Mr. B. T. Jamar, NE1 bc: Mr. G. E. Attarian Mr. H. T. Barnett Mr. D. T. Conley Mr. S. D. Ebneter Mr. D. G. Eisenhut Mr. J. Ertman Mr. D. M. Franklin Mr. J. P. Fulford Mr. D. W. Henneke Mr. C. S. Hinnant Mr. A. Holder HNP-06-067 Page 3 Mr. K. Heffner Mr. E. D. Hux Mr. M. T. Janus Ms. E. K. Kleinsorg Mr. R. D. Martin Mr. E. A. McCartney Mr. H. J. Miller Mr. A. Ratchford Mr. R. A. Steele Licensing Files (2 copies) Nuclear Records Attachment 1 to SERIAL: HNP-06-067 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 FREQUENTLY ASKED QUESTIONS (FAQS), REQUESTING ADDITIONAL "PERFORMANCE BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS" DOCKET NO. 50-400/LICENSE NO. NPF-63 GUIDANCE OR CLARIFICATION REGARDING TRANSITION TO NFPA-805 NFPA-805 Transition Pilot Plant FAQ 06-0001 Page AI-1 of 4 MA priate, provide proposed rewo 2 af4
Figure f c Fim A endix R, 4 of4 to SERIAL: HNP-06-067 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 FREQUENTLY ASKED QUESTIONS (FAQS), REQUESTING ADDITIONAL "PERFORMANCE BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS" DOCKET NO. 50-400/LICENSE NO. NPF-63 GUIDANCE OR CLARIFICATION REGARDING TRANSITION TO NFPA-805 NFPA-805 Transition Pilot Plant FAQ 06-0002 Page A2-1 of 9 2 af
A i- n FQ~ ll ___.__.....
_.......... , 1 I ..- ....... ~ ..... "-..--*--"--""-, r--- IM-us(oHs RISK CVALLUATION SGMMARY ._____. , . ._____....
.. . . ._...__......
_... _-_- mrmnw r mFmEw*s 1 List applicable references.
Include sufficient identifying detail to facii itate independent review
- c. 1 Revision 2i 3-2
- 6. I 1-3 I Revision 21 1-4 Appendix I - Plant Change Evaluation - Form PieeLIwIlJARv RISK SG- 1 1 Y afany fire scenarios
- b. r C* for d. any fi scenarios Revision 21 ta to SERIAL: HNP-06-067 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 FREQUENTLY ASKED QUESTIONS (FAQS), REQUESTING ADDITIONAL "PERFORMANCE BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS" DOCKET NO. 50-400/LICENSE NO. NPF-63 GUIDANCE OR CLARIFICATION REGARDING TRANSITION TO NFPA-805 NFPA-805 Transition Pilot Plant FAQ 06-0003 Page A4-I of 5 sed New ly in ude ph number, and lirre 2of5
- b. C' us d. aritrios