|
---|
Category:Letter
MONTHYEARULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 IR 05000483/20230042024-01-19019 January 2024 Integrated Inspection Report 05000483/2023004 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML24011A1492024-01-11011 January 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information (05000483/2024011) ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ML23346A0392023-12-14014 December 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Relief from Requirements of ASME Code, Section Xl, Examination and Testing Unbonded Post-Tensioning System ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification 05000483/LER-2023-001, Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications2023-11-29029 November 2023 Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) IR 05000483/20230102023-11-15015 November 2023 NRC License Renewal Phase 1 Inspection Report 05000483 2023010 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23297A2502023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - Letter IR 05000483/20240122023-10-24024 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000483/2024012) ML23293A2652023-10-24024 October 2023 3rd Quarter 2023 Integrated Inspection Report ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23270B9662023-09-27027 September 2023 10 CFR 50.55a(z)(I) Request for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23261C3852023-09-25025 September 2023 Safety Evaluation for Operating Quality Assurance Manual Revision 36A ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) IR 05000483/20234012023-09-13013 September 2023 NRC Security Baseline Inspection Report 05000483/2023401 ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20230052023-08-23023 August 2023 Updated Inspection Plan for Callaway Nuclear Power Plant, Unit 1 (Report 05000483/2023005) - Mid Cycle Letter 2023 ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications IR 05000483/20230022023-07-10010 July 2023 Integrated Inspection Report 05000483/2023002 ML23174A1272023-06-23023 June 2023 Cw FFD Document Request List 2023 ML23171A9942023-06-22022 June 2023 Acceptance of Request for Approval of Operating Quality Assurance Manual Revision 36a ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) IR 05000483/20230112023-06-15015 June 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011 ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ML23158A1462023-06-13013 June 2023 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000483/2023010) ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ML23093A0952023-05-10010 May 2023 Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ML23129A7942023-05-0909 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) ML23122A3172023-05-0808 May 2023 Review of the Spring 2022 Steam Generator Tube Inservice Inspections ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure 2024-01-29
[Table view] Category:License-Operator
MONTHYEARIR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23319A3902023-09-20020 September 2023 11-CW-2023-09 Public Forms ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20223012022-04-12012 April 2022 NRC Examination Report 05000483/2022301 ML22081A1292022-02-23023 February 2022 CW-2022-02-Post Exam Comments ML22105A0022022-02-23023 February 2022 CW-2022-02-Public Forms ML21067A5392021-03-0808 March 2021 Notification of NRC Initial Operator Licensing Examination 05000483/2022301 ML20276A1522020-09-0909 September 2020 1-CW-2020-08 Draft Outlines ML20276A1532020-09-0909 September 2020 2-CW-2020-08 Draft Outline Comments ML20276A1552020-09-0909 September 2020 4-CW-2020-08 Written Exam Comments Final 8-25-2020 ML20276A1542020-09-0909 September 2020 3-CW-2020-08 Draft Written Exam ML20276A1582020-09-0909 September 2020 7-CW-2020-08 Outlines Final ML20276A1562020-09-0909 September 2020 5-CW-2020-08 Draft Operating Test ML20276A1572020-09-0909 September 2020 6-CW-2020-08 Operating Test Comments - Final BC Comments.Pdf ML20276A1592020-09-0909 September 2020 8-CW-2020-08 Written Exam Final ML20276A1602020-09-0909 September 2020 9-CW-2020-08 Operating Test - Final ML20276A1362020-09-0909 September 2020 10-CW-2020-08 Post-Exam Comments ML20276A1372020-09-0909 September 2020 11-CW-2020-08 Public Forms ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18143B4542018-04-25025 April 2018 Operator Licensing Examination Data ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17270A1662017-09-20020 September 2017 2017-09-DRAFT Op Test Comments ES-301-7 ML17270A1672017-09-20020 September 2017 2017-09-DRAFT Op Test ML17270A1682017-09-20020 September 2017 2017-09-DRAFT Outline Comments ML17270A1692017-09-20020 September 2017 2017-09-DRAFT Outlines ML17270A1702017-09-20020 September 2017 2017-09-Draft Written Exam Comments ES-401-9 ML17270A1712017-09-20020 September 2017 2017-09-DRAFT Written Exam ML17270A1722017-09-20020 September 2017 2017-09-FINAL Op Test ML17270A1732017-09-20020 September 2017 2017-09-FINAL Outlines ML17270A1742017-09-20020 September 2017 2017-09-Final Written Exam ML17270A1752017-09-20020 September 2017 2017-09-Post Exam Comments ML17296A0262017-09-20020 September 2017 2017-09-Public Forms ML17118A1822017-04-17017 April 2017 Submittal of NRC Form 536 Operator Licensing Examination Data ML17058A0822017-02-27027 February 2017 Notification of NRC Initial Operator Licensing Examination 05000483/2017301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16196A2392016-06-28028 June 2016 Submittal of Operator Licensing Examination Data ML16158A4692016-06-0101 June 2016 2016-06 Final Outlines ML16179A1772016-06-0101 June 2016 2016-06 Public Forms ML16158A4782016-06-0101 June 2016 2016-06 Post-Examination Analysis and Comments ML16158A4752016-06-0101 June 2016 2016-06 Final Operating Test ML16158A4632016-06-0101 June 2016 2016-06 Draft Operating Test Comments ML16158A4612016-06-0101 June 2016 2016-06 Draft Operating Test ML16158A4602016-06-0101 June 2016 2016-06 Draft Written Examination Comments ML16158A4532016-06-0101 June 2016 2016-06 Draft Outline Comments ML16158A4572016-06-0101 June 2016 2016-06 Draft Written Examination ML16158A4492016-06-0101 June 2016 2016-06 Draft Outlines ML16139A3282016-05-18018 May 2016 NRC Initial Operator Licensing Examination Approval 05000483/2016301 ML16089A0712016-03-29029 March 2016 Generic Fundamentals Examination Results for March 9, 2016 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 2023-09-20
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23319A3902023-09-20020 September 2023 11-CW-2023-09 Public Forms ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20223012022-04-12012 April 2022 NRC Examination Report 05000483/2022301 ML22081A1292022-02-23023 February 2022 CW-2022-02-Post Exam Comments ML22105A0022022-02-23023 February 2022 CW-2022-02-Public Forms ML20276A1522020-09-0909 September 2020 1-CW-2020-08 Draft Outlines ML20276A1532020-09-0909 September 2020 2-CW-2020-08 Draft Outline Comments ML20276A1552020-09-0909 September 2020 4-CW-2020-08 Written Exam Comments Final 8-25-2020 ML20276A1542020-09-0909 September 2020 3-CW-2020-08 Draft Written Exam ML20276A1582020-09-0909 September 2020 7-CW-2020-08 Outlines Final ML20276A1562020-09-0909 September 2020 5-CW-2020-08 Draft Operating Test ML20276A1572020-09-0909 September 2020 6-CW-2020-08 Operating Test Comments - Final BC Comments.Pdf ML20276A1592020-09-0909 September 2020 8-CW-2020-08 Written Exam Final ML20276A1602020-09-0909 September 2020 9-CW-2020-08 Operating Test - Final ML20276A1362020-09-0909 September 2020 10-CW-2020-08 Post-Exam Comments ML20276A1372020-09-0909 September 2020 11-CW-2020-08 Public Forms ML18143B4542018-04-25025 April 2018 Operator Licensing Examination Data ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17270A1662017-09-20020 September 2017 2017-09-DRAFT Op Test Comments ES-301-7 ML17270A1672017-09-20020 September 2017 2017-09-DRAFT Op Test ML17270A1682017-09-20020 September 2017 2017-09-DRAFT Outline Comments ML17270A1692017-09-20020 September 2017 2017-09-DRAFT Outlines ML17270A1702017-09-20020 September 2017 2017-09-Draft Written Exam Comments ES-401-9 ML17270A1712017-09-20020 September 2017 2017-09-DRAFT Written Exam ML17270A1722017-09-20020 September 2017 2017-09-FINAL Op Test ML17270A1732017-09-20020 September 2017 2017-09-FINAL Outlines ML17270A1742017-09-20020 September 2017 2017-09-Final Written Exam ML17270A1752017-09-20020 September 2017 2017-09-Post Exam Comments ML17296A0262017-09-20020 September 2017 2017-09-Public Forms ML17118A1822017-04-17017 April 2017 Submittal of NRC Form 536 Operator Licensing Examination Data ML17058A0822017-02-27027 February 2017 Notification of NRC Initial Operator Licensing Examination 05000483/2017301 ML16196A2392016-06-28028 June 2016 Submittal of Operator Licensing Examination Data ML16158A4492016-06-0101 June 2016 2016-06 Draft Outlines ML16158A4532016-06-0101 June 2016 2016-06 Draft Outline Comments ML16158A4572016-06-0101 June 2016 2016-06 Draft Written Examination ML16158A4602016-06-0101 June 2016 2016-06 Draft Written Examination Comments ML16158A4612016-06-0101 June 2016 2016-06 Draft Operating Test ML16158A4632016-06-0101 June 2016 2016-06 Draft Operating Test Comments ML16158A4692016-06-0101 June 2016 2016-06 Final Outlines ML16158A4752016-06-0101 June 2016 2016-06 Final Operating Test ML16158A4782016-06-0101 June 2016 2016-06 Post-Examination Analysis and Comments ML16179A1772016-06-0101 June 2016 2016-06 Public Forms ML16139A3282016-05-18018 May 2016 NRC Initial Operator Licensing Examination Approval 05000483/2016301 ML16089A0712016-03-29029 March 2016 Generic Fundamentals Examination Results for March 9, 2016 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15140A1262015-05-18018 May 2015 2015-05-FINAL Written Exam ML15146A0482015-05-18018 May 2015 2015-05-Public Forms ML15140A2892015-05-18018 May 2015 2015-05-Draft Written Exam Comments Rev 1 2023-09-20
[Table view] |
See also: IR 05000483/2017301
Text
February 27, 2017
Mr. Fadi Diya, Senior Vice President
and Chief Nuclear Officer
Ameren Missouri
Callaway Plant
P.O. 620 Fulton, MO 65251
SUBJECT: CALLAWAY PLANT, UNIT 1 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000483/2017301
Dear Mr. Diya:
In a telephone conversation on December 19, 2016, between Mr. John Kirkland, Senior
Operations Engineer, and Mr. Phillip Swan, Operations Supervisor, arrangements were made
for the administration of operator licensing examinat
ions at your Callaway Plant, Unit 1, during the week of September 11, 2017.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 11, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The Nuclear Regulatory Commission (NRC) Region IV Office will discuss
with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outlines by June 21, 2017. The written examination outline was provided to your staff on January 4, 2017. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by July 19, 2017. Pursuant to Title 10, Section 55.40(b)(3), of the
Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examinations and tests before they are
submitted to the NRC for review and approval. All materials shall be complete and ready-to-
use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Delays in
receiving the required materials, or the submittal of inadequate or incomplete materials, may
cause the examinations to be cancelled or rescheduled. In addition, your support for on-site
validation of the examinations is required during the week of August 14, 2017.
To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make
the simulation facility available on the dates noted above. In accordance with ES-302, your staff
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511
F. Diya 2 should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests along with any video and audio
recordings of the dynamic operating tests until the NRC takes its licensing action on all of the applications and any adjudicatory actions on any hearing demands are complete. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while
the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management
and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination date (if able). Mr. Kirkland should be contacted to determine the method for submission of the
waiver and/or excusal requests. Preliminary reactor operator and senior reactor operator
license applications (OMB approval number 3150-0090) and medical certifications
(OMB approval number 3150-0024) should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary. Final signed applications certifying that
all training has been completed and requesting any waivers or excusals, as applicable, should
be submitted at least 14 days before the first examination date.
Although the minimum guidelines for receiving waiver or excusal requests is 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early in the process as possible (see the 60-day guideline, above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding. Submittals addressing waivers and/or excusals should be in writing (i.e., on NRC Form 398, or
as directed when Mr. Kirkland is contacted to determine the method for submission). The NRC's final decision on whether to grant a waiver or excusal will be documented on the final (not preliminary) NRC Form 398 submitted for the applicant and will not be provided until the
final application is submitted to the NRC.
Paperwork Reduction Act Statement
This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved
by the Office of Management
and Budget, approval number 3150-0018.
The burden to the public for these voluntary information collections is estimated to average 2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the
information collection. You may submit comments on any aspect of the information collection,
including suggestions for reducing the burden, to the FOIA, Privacy and Information Collections
Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to INFOCOLLECTS.RESOURCE@NRC.GO
V; and to the Desk Officer, Office of
Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
Public Protection Notification
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.
F. Diya 3 In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available
electronically for public inspection in the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. Mr. Swan has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Kirkland at 817-200-1771,
or myself at 817-200-1159.
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket No. 50-483
License No. NPF-30
ML17058A082 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: JCK Yes No Publicly Available Sensitive OFFICE SOE:OB C:OB NAME JKirkland VGaddy SIGNATURE /RA/ /RA/ DATE 2/24/17 2/27/17