|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML17355A3921999-07-27027 July 1999 Proposed Tech Specs 3.8.1.1,3.4.3 & 3.5.2,extending AOT for Inoperable EDG from 72 Hours to 7 Days on one-time Basis ML17355A3041999-04-26026 April 1999 Proposed Tech Specs Deleting Obsolete Part of License Condition 3.L & Incorporating Administrative Changes to TS Index,Ts 3/4.1.2.5 & TS 3/4.7.6 ML17355A2491999-03-0808 March 1999 Proposed Tech Specs Section 6.0,deleting Certain Requirements That Are Adequately Controlled by Existing Regulations,Other than 10CFR50.36 & TS ML17355A2411999-02-24024 February 1999 Proposed Tech Specs Page 3/4 7-15,removing Restrictions on Location at Which Temp of UHS May Be Monitored ML17354B1641998-10-27027 October 1998 Proposed Tech Specs Pages Re Amends to Licenses DPR-31 & DPR-41,to Incorporate Specific Staff Qualifications for Multi-Discipline Supervisor Position Into TS ML17354A8381998-03-12012 March 1998 Proposed Tech Specs Deleting License Conditions 3.I,3.K,3.H & 4 & Incorporating Recent Organization Change in TS 6.5.1.2 & 6.5.3.1.a ML17354A7801998-02-0202 February 1998 Proposed Tech Specs Re Diesel Fuel Storage Sys ML17354A7621998-01-0909 January 1998 Proposed Tech Specs Sections 5.3.1 & 6.9.1.7,,allowing Implementation of Zirlo Fuel Rod Cladding ML17354A7321997-12-0404 December 1997 Proposed Tech Specs Section 6.9.1.7, COLR, Clarifying References 4 & 6 by Adding Best Estimate LOCA to COLR & Documenting re-analysis Performed as Result of Revs to Large Break LOCA Methodology ML17354A6161997-08-27027 August 1997 Proposed Tech Specs Page 6.2,allowing Use of 12 Hour Shifts for Nominal 40 (36 to 48) Hour Week ML17354A4771997-04-24024 April 1997 Proposed Tech Specs Page 6-22 Re Large Break Loss of Coolant re-analysis ML17354A4221997-02-24024 February 1997 Proposed Tech Specs 6.9.1.7 Re COLR & Large Break Loss of Coolant Accident re-analysis ML17354A3741996-12-17017 December 1996 Proposed Tech Specs,Modifying TSs to Change SR for TS 4.4.10 Re Reactor Coolant Pump Flywheel Insp ML17354A3521996-11-22022 November 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Sources & 3/4.8.1 Re AC Sources Operating Limiting Condition for Operation ML17354A2871996-10-0303 October 1996 Proposed Tech Specs Revising TS to Allow Deferral for One Cycle of Reactor Coolant Pump Flywheel Ultrasonic Exams Required by Reg Guide 1.14 ML17353A7991996-07-17017 July 1996 Proposed Tech Specs,Revising TSs to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Intervals Determined by performance-based Criteria ML17353A7111996-05-28028 May 1996 Proposed Tech Specs Section 6.0, Administrative Controls. ML18008A0451996-05-10010 May 1996 Proposed Tech Specs Re Various Administrative Improvements ML17353A6781996-05-0909 May 1996 Proposed Tech Specs Re SBLOCA re-analysis ML17353A6521996-04-23023 April 1996 Proposed Tech Specs Re Accumulator Water Level & Pressure Channnel,Per NRC GL 93-05 ML17353A6581996-04-19019 April 1996 Proposed Tech Specs,Revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl & Incorporating Administrative Clarifications & Corrections ML17353A6171996-03-21021 March 1996 Proposed Tech Specs,Revising TS Such That Requirements for Radiological Effluent Controls Relocated to Offsite Dose Calculation Manual or Process Control Program ML17353A6091996-03-20020 March 1996 Proposed TS 3/4.5.1,reflecting Removal of SRs & Operability Requirements for ECCS SI Accumulators That Concern Water Level & Pressure Channels ML17353A6001996-03-0505 March 1996 Proposed TS Sections 4.4.3.3 & 4.5.2,reducing Frequency of Surveillances & Insps in Accordance W/Gl 93-05,Items 6.6 & 7.5 ML17353A5031995-12-18018 December 1995 Proposed Tech Specs,Increasing Allowed Rated Thermal Power from 2,200 Mwt to 2,300 Mwt ML17353A4541995-11-22022 November 1995 Proposed Tech Specs Re Administrative Controls & Reviews ML17353A4511995-11-22022 November 1995 Proposed Tech Specs Pages 3/4 8-2 & 3/4 8-3 Re Edgs,Per GLs 93-05 & 94-01 ML17353A3971995-10-0404 October 1995 Proposed Tech Specs,Modifying TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/Esfas,Tables 4.3-1 & 4.3-2 SR for Rps/Nis/Esfas & Bases 3/4.3.1 & 3/4.3.2 for Rps/Nis/Esfas Instrumentations ML17353A3831995-09-28028 September 1995 Proposed Tech Specs,Implementing Revised Thermal Design Procedure & SG Water Level low-low Setpoint ML17353A3531995-09-11011 September 1995 Proposed Tech Specs Re Edgs,Change to Testing Requirements, Per GLs 93-05 & 94-01 ML17353A2831995-07-26026 July 1995 Proposed Tech Specs 4.1.3.1.2,4.6.5.1,4.4.6.2.2,4.10.1.2 & Table 4.3-3 to Reduce Frequency of Testing,Per GL 93-05 ML17353A2801995-07-26026 July 1995 Proposed Tech Specs,Modifying TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/Esfas Instrumentation,Tables 4.3-1 & 4.3-2 SRs for Rps/Nis/Esfas Instrumentation & Bases 3/4.3.1 & 3/4.3.2 for Rps/Nis/Esfas Instrumentation ML17353A2761995-07-26026 July 1995 Proposed Tech Specs,Adding to Approved COLR Analysis Methodology Used for SBLOCA Analysis in Anticipation of Thermal Uprate to 2,300 Mwt for Both Units & Increasing Current Margin to Calculated PCT ML17353A2731995-07-26026 July 1995 Proposed Tech Specs,Revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl,Incorporating Administrative Clarifications & Corrections & Correcting Typos ML17353A2701995-07-26026 July 1995 Proposed Tech Specs Re Rod Misalignment Requirement for Movable Control Assemblies ML17353A2671995-07-26026 July 1995 Proposed Tech Specs for Nuclear Instrumentation Sys Adjustments Based on Calorimetric Measurements at Reduced Power Levels ML17353A2401995-06-19019 June 1995 Proposed Tech Specs Re TS SR 4.8.1.1.2.g.7 ML17352B1841995-05-23023 May 1995 Proposed Tech Specs Re Use of Changed Setpoint Presentation Format for RPS & ESFAS Instrumentation ML20083R1291995-05-0505 May 1995 Proposed Tech Specs Re Implementation of Revised Thermal Design Procedure & SG Water Level low-low Setpoint ML17352B0881995-03-30030 March 1995 Proposed Tech Specs SR 4.8.1.1.2.g.7,allowing Separation of 5-minute hot-start Test from 24-h EDG Test Run,Deleting Associated Footnote & Adding New TS SR 4.8.1.1.2.g.14 & Associated Footnote for Performance of Subj 5-minute Test ML17352B0041995-01-17017 January 1995 Proposed Tech Specs 6.9.1.7, COLR, Including Ref to Topical Rept NF-TR-95-01 Re Implementation of FPL Nuclear Physics Methodology for Calculations of COLR Parameters ML17352A8341994-10-20020 October 1994 Proposed TS 3/4.7.1.1 & Associated Bases,Addressing Max Allowable Reactor Thermal Power Operation W/Inoperable MSSVs ML17352A8281994-10-20020 October 1994 Proposed Tech Specs 4.8.1.1.2e & 4.8.1.1.2f,addressing EDG Fuel Oil Testing & TS 3.8.1.1,addressing Required Action in Event Diesel Fuel Oil Does Not Meet Diesel Fuel Oil Testing Program Limits ML17352A8311994-10-20020 October 1994 Proposed Tech Specs 3/4.4.9.1,reflecting Removal of Schedule for Withdrawal of Rv Matl Specimens ML17352A8381994-10-20020 October 1994 Proposed Tech Specs,Allowing Containment Personnel Airlock Doors to Be Opened During Core Alterations & Movement of Irradiated Fuel in Containment,Provided Certain Conditions Met ML17352A7321994-07-19019 July 1994 Proposed TS 3/4.7.1 & Associated Bases Addressing Operation at Reduced Power Levels W/Inoperable Main Steam Safety Valves ML17352A7291994-07-19019 July 1994 Proposed Tech Specs 4.8.1.1.2e & 4.8.2.2.2f Re EDG Fuel Oil Testing Program ML17352A7241994-07-19019 July 1994 Proposed Tech Specs Adding Rod Bank Insertion Limits & K(Z) Curves to COLR ML17352A5471994-04-19019 April 1994 Proposed TS 4.0.5a Re ISI & Testing Programs ML17352A5441994-04-19019 April 1994 Proposed Tech Specs Changing Containment Spray Sys Surveillance Requirements 1999-07-27
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17355A3921999-07-27027 July 1999 Proposed Tech Specs 3.8.1.1,3.4.3 & 3.5.2,extending AOT for Inoperable EDG from 72 Hours to 7 Days on one-time Basis ML17355A3581999-06-28028 June 1999 Cycle 18 Startup Rept. with 990628 Ltr ML17355A3041999-04-26026 April 1999 Proposed Tech Specs Deleting Obsolete Part of License Condition 3.L & Incorporating Administrative Changes to TS Index,Ts 3/4.1.2.5 & TS 3/4.7.6 ML17355A2491999-03-0808 March 1999 Proposed Tech Specs Section 6.0,deleting Certain Requirements That Are Adequately Controlled by Existing Regulations,Other than 10CFR50.36 & TS ML17355A2411999-02-24024 February 1999 Proposed Tech Specs Page 3/4 7-15,removing Restrictions on Location at Which Temp of UHS May Be Monitored ML17355A2011999-01-25025 January 1999 Cycle 17 Startup Rept. with 990125 Ltr ML17354B1641998-10-27027 October 1998 Proposed Tech Specs Pages Re Amends to Licenses DPR-31 & DPR-41,to Incorporate Specific Staff Qualifications for Multi-Discipline Supervisor Position Into TS ML20197C9661998-08-27027 August 1998 Rev 15 to Security Training & Qualification Plan ML17354A9471998-04-27027 April 1998 Rev 2 to Turkey Point Nuclear Plant Recovery Plan. ML17354A8381998-03-12012 March 1998 Proposed Tech Specs Deleting License Conditions 3.I,3.K,3.H & 4 & Incorporating Recent Organization Change in TS 6.5.1.2 & 6.5.3.1.a ML17354A7801998-02-0202 February 1998 Proposed Tech Specs Re Diesel Fuel Storage Sys ML17355A2711998-01-30030 January 1998 Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point Plant,Units 3 & 4. ML17354A7621998-01-0909 January 1998 Proposed Tech Specs Sections 5.3.1 & 6.9.1.7,,allowing Implementation of Zirlo Fuel Rod Cladding ML17354A7321997-12-0404 December 1997 Proposed Tech Specs Section 6.9.1.7, COLR, Clarifying References 4 & 6 by Adding Best Estimate LOCA to COLR & Documenting re-analysis Performed as Result of Revs to Large Break LOCA Methodology ML17354A6161997-08-27027 August 1997 Proposed Tech Specs Page 6.2,allowing Use of 12 Hour Shifts for Nominal 40 (36 to 48) Hour Week ML17354A4971997-05-0101 May 1997 Rev 1 to Turkey Point Nuclear Plant Recovery Plan. ML17354A4771997-04-24024 April 1997 Proposed Tech Specs Page 6-22 Re Large Break Loss of Coolant re-analysis ML17354A4221997-02-24024 February 1997 Proposed Tech Specs 6.9.1.7 Re COLR & Large Break Loss of Coolant Accident re-analysis ML17354A3741996-12-17017 December 1996 Proposed Tech Specs,Modifying TSs to Change SR for TS 4.4.10 Re Reactor Coolant Pump Flywheel Insp ML17354A3521996-11-22022 November 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Sources & 3/4.8.1 Re AC Sources Operating Limiting Condition for Operation ML17354A2871996-10-0303 October 1996 Proposed Tech Specs Revising TS to Allow Deferral for One Cycle of Reactor Coolant Pump Flywheel Ultrasonic Exams Required by Reg Guide 1.14 ML17353A7991996-07-17017 July 1996 Proposed Tech Specs,Revising TSs to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Intervals Determined by performance-based Criteria ML17353A7111996-05-28028 May 1996 Proposed Tech Specs Section 6.0, Administrative Controls. ML18008A0451996-05-10010 May 1996 Proposed Tech Specs Re Various Administrative Improvements ML17353A6781996-05-0909 May 1996 Proposed Tech Specs Re SBLOCA re-analysis ML17353A6521996-04-23023 April 1996 Proposed Tech Specs Re Accumulator Water Level & Pressure Channnel,Per NRC GL 93-05 ML17353A6581996-04-19019 April 1996 Proposed Tech Specs,Revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl & Incorporating Administrative Clarifications & Corrections ML17353A6171996-03-21021 March 1996 Proposed Tech Specs,Revising TS Such That Requirements for Radiological Effluent Controls Relocated to Offsite Dose Calculation Manual or Process Control Program ML17353A6091996-03-20020 March 1996 Proposed TS 3/4.5.1,reflecting Removal of SRs & Operability Requirements for ECCS SI Accumulators That Concern Water Level & Pressure Channels ML17353A6001996-03-0505 March 1996 Proposed TS Sections 4.4.3.3 & 4.5.2,reducing Frequency of Surveillances & Insps in Accordance W/Gl 93-05,Items 6.6 & 7.5 ML17353A5801996-02-29029 February 1996 Plant Procedures & Training Matl Provided for Preparation of Licensing Exams for Reactor Operator Group Xvi & Senior Reactor Operator Upgrade. ML17353A6191996-02-15015 February 1996 Offsite Dose Calculation Manual for Gaseous & Liquid Effluents from Turkey Point Plant Units 3 & 4. ML17353A7631996-02-0808 February 1996 Conduct of Operations. ML17353A5031995-12-18018 December 1995 Proposed Tech Specs,Increasing Allowed Rated Thermal Power from 2,200 Mwt to 2,300 Mwt ML17353A4541995-11-22022 November 1995 Proposed Tech Specs Re Administrative Controls & Reviews ML17353A4511995-11-22022 November 1995 Proposed Tech Specs Pages 3/4 8-2 & 3/4 8-3 Re Edgs,Per GLs 93-05 & 94-01 ML17353A3971995-10-0404 October 1995 Proposed Tech Specs,Modifying TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/Esfas,Tables 4.3-1 & 4.3-2 SR for Rps/Nis/Esfas & Bases 3/4.3.1 & 3/4.3.2 for Rps/Nis/Esfas Instrumentations ML17353A3831995-09-28028 September 1995 Proposed Tech Specs,Implementing Revised Thermal Design Procedure & SG Water Level low-low Setpoint ML17353A3531995-09-11011 September 1995 Proposed Tech Specs Re Edgs,Change to Testing Requirements, Per GLs 93-05 & 94-01 ML17353A7641995-08-23023 August 1995 Emergency & Off-normal Operating Procedure Usage. ML17353A2831995-07-26026 July 1995 Proposed Tech Specs 4.1.3.1.2,4.6.5.1,4.4.6.2.2,4.10.1.2 & Table 4.3-3 to Reduce Frequency of Testing,Per GL 93-05 ML17353A2801995-07-26026 July 1995 Proposed Tech Specs,Modifying TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/Esfas Instrumentation,Tables 4.3-1 & 4.3-2 SRs for Rps/Nis/Esfas Instrumentation & Bases 3/4.3.1 & 3/4.3.2 for Rps/Nis/Esfas Instrumentation ML17353A2761995-07-26026 July 1995 Proposed Tech Specs,Adding to Approved COLR Analysis Methodology Used for SBLOCA Analysis in Anticipation of Thermal Uprate to 2,300 Mwt for Both Units & Increasing Current Margin to Calculated PCT ML17353A2731995-07-26026 July 1995 Proposed Tech Specs,Revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl,Incorporating Administrative Clarifications & Corrections & Correcting Typos ML17353A2701995-07-26026 July 1995 Proposed Tech Specs Re Rod Misalignment Requirement for Movable Control Assemblies ML17353A2671995-07-26026 July 1995 Proposed Tech Specs for Nuclear Instrumentation Sys Adjustments Based on Calorimetric Measurements at Reduced Power Levels ML17353A2401995-06-19019 June 1995 Proposed Tech Specs Re TS SR 4.8.1.1.2.g.7 ML17352B1841995-05-23023 May 1995 Proposed Tech Specs Re Use of Changed Setpoint Presentation Format for RPS & ESFAS Instrumentation ML20083R1291995-05-0505 May 1995 Proposed Tech Specs Re Implementation of Revised Thermal Design Procedure & SG Water Level low-low Setpoint ML17352B0881995-03-30030 March 1995 Proposed Tech Specs SR 4.8.1.1.2.g.7,allowing Separation of 5-minute hot-start Test from 24-h EDG Test Run,Deleting Associated Footnote & Adding New TS SR 4.8.1.1.2.g.14 & Associated Footnote for Performance of Subj 5-minute Test 1999-07-27
[Table view] |
Text
ATTACHMENT 3 PROPOSED TECHNICAL SPECIFICATIONS Marked-up Technical Specifications Pages, 5-1 B 3/4 6-1 B 3/4 6-2'9306020384'30521 PDR ADOCK 05000250 ,.P,, PDR
,pp ll
5.0 DESIGN
FEATURES 5.1 SITE EXCLUSION AREA 5.1.1 The Exclusion Area shall be as shown in Figure 5.1-1.LOW POPULATION ZONE 5.1.2 The Low Population Zone shall be as shown in Figure 5.1-1.MAP DEFINING UNRESTRICTED AREAS AND SITE BOUNDARY FOR RADIOACTIVE GASEOUS AND L U FLU N 5.1.3 Information regarding radioactive gaseous and liquid effluents, which.will allow identification of structures and release points shall be as shown'n Figure 5.1-2.Definition of UNRESTRICTED AREAS within the SITE BOUNDARY that are accessible to MEMBERS OF THE PUBLIC, shall be as shown in Figure 5, 1-1.5.2 CONTAINMENT CONFIGURATION 5.2.1 The con'tainment building is a steel-lined, reinforced concrete building of cylindrical shape, with a dome roof and having the following design features: a.Nominal inside diameter=116 feet.b.Nominal inside height=170.6 feet.c.Minimum thickness of concrete walls=3.75 feet.d.Minimum thickness of concrete roof=3.25 feet.e.Minimum thickness of concrete floor pad=10.5 feet.f.Nominal thickness of steel liner=0.25 inches.g.Nominal net free volume=1 550 000 cubic feet.DESIGN PRESSURE AND TEMPERATURE des)'5.2.2 The c'nt buildi maximums, n ernal pressure o tainment building is also str vacuum of 2.5 psig.is designed and shall be maintained for a psig and a temperature of 283'F.The con-urally designed to withstand an internal TURKEY POINT-UNITS 3 8 4 5-1 AMENDMENT NOS.137 AND 132 t t k'~A 3/4.6 CONTAINMENT SYSTEMS BASES 3/4.6.1 PRIMARY CONTAINMENT 3/4.6.1.1 CONTAINMENT INTEGRITY Primary CONTAINMENT INTEGRITY ensures that the release of radioactive materials from the containment atmosphere will be restricted to those leakage paths and associated leak rates assumed in the safety analyses.This restric-tion, in conjunction with the leakage rate limitation, will limit the SITE BOUNDARY radiation doses to within the dose guideline values of 10 CFR Part 100 during accident conditions.
3/4.6.1.2 CONTAINMENT LEAKAGE The limitations on containment leakage rates ensure that the total containment leakage volume will not exceed the value assumed in the safety analyses at the peak accident pressure;P.As an added conservatism, the measured overall integrated leakage rate is further limited to less than or equal to 0.75 L during performance of the periodic test to account for a possible degradation of the containment leakage barriers between leakage tests.The surveillance testing for measuring leakage rates is consistent with the requirements of Appendix J of 10 CFR Part 50.3/4.6.l.3 CONTAINMENT AIR LOCKS The limitations on closure and leak rate for the containment air locks are required to meet the restrictions on CONTAINMENT INTEGRITY and containment leak rate.Surveillance testing of the air lock seals provides assurance that the overall air lock leakage will not become excessive due to seal damage during the intervals between air lock leakage tests.In order to meet the ACTION requirement to lock the OPERABLE air lock door closed, the air lock door inter-lock may provide the required locking.In addition, the outer air lock door is secured under administrative controls.3/4.6.1.4 INTERNAL PRESSURE The limitations on containment internal pressure ensure that: (1)the containment structure is prevented from exceeding its design negative pressure differential of 2.5 psig with respect to the outside atmosphere, d (2)the containment peak pressure does not exceed the desi n ressure of~sig during LOCA co e.a.t cm(a.R Pc v-The maxim m~pea pressure a LOCA event is 49.9 psig assuming an initial co ainment pressure of 0.3 p5sg.An initial positive pressure of as much as si would result in a maximum containment pressure that is less than desig pressure and is consistent with the safety analyses.TURKEY POINT-UNITS 3 8(4 B 3/4 6"1 AMENDMENT NOS.137AND132 V I r>>~ye%Eg't A'0 (..-)(-ro'".>:.,">jg qi.>>s~~a W m~-<<m~w~iP ISO~~g" I~Q3 4~-.>>spado~)A CONTAINMENT SYSTEMS BASES 3/4.6.1.5 AIR TEMPERATURE The limitations on containment average air temperature ensure that the design limits for a LOCA are not exceeded, and that the environmental qualifica-
'ion of equipment is not impacted.If temperatures exceed 120 F, but remain below 125'F for up to 336 hours0.00389 days <br />0.0933 hours <br />5.555556e-4 weeks <br />1.27848e-4 months <br /> during a calendar year, no action is required.If the 336-hour limit is approached, an evaluation may be performed to extend the limit if some of the hours have been spent at less than l25'F.Measurements shall be made at all listed locations, whether by fixed or portable instruments, prior to determining the average air temperature.
3/4.6.1.6 CONTAINMENT STRUCTURAL INTEGRITY~~~~++~'P~4 This limitation ensures that the ructural integrity of the containment will be maintained comparable to original design standards for the life of the facility.Structural int>ty is required to ensure that the containment will'ithstand the maximum ressure of 49.9 psig in the event of a LOCA.The measurement of containment endon lift"off force, the tensile tests of the tendon wires or strands, the visual examination of tendons, anchor ages and exposed interior and exterior surfaces of the containment, and the Type A leakage test are sufficient to demonstrate this capability.
Some containment tendons are inaccessible at one end due to interferences and safety considerations.
These tendons, if selected for examination, will be exempted from the full surveillance requirements, and will be subjected only to lift-off testing at the accessible end.Due to tendon configuration, lift-off values may differ considerably at the two ends.Therefore, when only one end is accessible, it is considered that up to a 4X tolerance from the predicted lower limit is acceptable.
The required Special Reports from any engineering evaluation of contain-ment abnormalities shall include a description of the tendon condition, the condition of the concrete (especially at tendon anchorages), the inspection procedures, the tolerances on cracking, the results of the engineering evaluation, and the corrective actions taken.3/4.6.1.7 CONTAINMENT VENTILATION SYSTEM The containment purge supply and exhaust isolation valves are required to be closed during a LOCA.When not purging, power to the purge valve actuators will be removed{sealed closed)to pr event inadvertent opening of these values.Maintaining these valves sealed closed during plant operation ensures that excessive quantities of radioactive materials will not be released via the Containment Purge System.Leakage integrity tests with a maximum allowable leakage rate for contain-ment purge supply and exhaust supply valves will provide early indication of TURKEY POINT-UNITS 3 8 4 8 3/4 6"2 AMENDMENT NOS.137AHD 132 I~i"~.4/~J ari>~W"A ATTACHMENT 4 CORRECTED TECHNICAL SPECIFICATIONS PAGES 5-1 B 3/4 6-1 B 3/4 6-2 iP'
5.0 DESIGN
FEATURES 5.1 SITE EXCLUSION AREA 5.1.1 The Exclusion Area shall be as shown in Figure 5.1-1.LOW POPULATION ZONE 5.1.2 The Low Population Zone shall be as shown in Figure 5.1-1.MAP DEFINING UNRESTRICTED AREAS AND SITE BOUNDARY FOR RADIOACTIVE GASEOUS AND LI UID EFFLUENTS 5.1.3 Information regarding radioactive gaseous and liquid effluents, which will allow identification of structures and release points shall be as shown in Figure 5.1-2~Definition of UNRESTRICTED AREAS within the SITE BOUNDARY that are accessible to MEMBERS OF THE PUBLIC, shall"be as shown in Figure 5.1-1.5.2 CONTAINMENT CONFIGURATION 5.2.1 The containment building is a steel-lined, reinforced concrete building of cylindri.cal shape, with a dome roof and having the following design features: a~b.Ca d.e.g, Nominal inside diameter 116 feet.Nominal inside height 170.6 feet.Minimum thickness of concrete walls 3.75 feet.Minimum thickness of concrete roof 3.25 feet.Mini.mum thickness of concrete floor pad 10.5 feet.Nominal thickness of steel liner 0.25 inches.Nominal net free volume 1 550 000 cubic feet.DESIGN PRESSURE AND TEMPERATURE 5,2.2 The containment building is designed and shall be maintained for a maximum design internal pressure of 55 psig and a temperature of 283'F.The containment building is also structurally designed to withstand an i.nternal vacuum of 2.5 psig.TURKEY POINT-UNITS 3&4 AMENDMENT NOS.AND
~'I;g1~
3 4.6 CONTAINMENT SYSTEMS BASES~34.6.1 PRYMARY CONTAINMENT 3 4.6.1.1 CONTAINMENT INTEGRITY Primary CONTAINMENT INTEGRITY ensures that the release of radioactive materials from the containment atmosphere will be restricted to those leakage paths and associated leak rates assumed in the safety analyses.This restric-tion, in conjunction with the leakage rate limitation, will limit the SITE BOUNDARY radiation doses to within the dose guideline values of 10 CFR Part 100 during accident conditions.
3 4.6.1.2 CONTAINMENT LEAKAGE The limitations on containment leakage rates ensure that the total containment leakage volume will not exceed the value assumed in the safety analyses at the peak accident pressure, P~.As an added conservatism, the measured overall integrated leakage rate is further limited to less than or equal to OA75 L~during performance of the periodic test to account for possible degradation of the containment leakage barriers between leakage tests.The surveillance testing for measuring leakage rates is consistent with the requirements of Appendix J of 10 CFR Part 50.3 4.6.1.3 CONTAINMENT AIR LOCKS The limitations on closure and leak rate for the containment air locks are required to meet the restrictions on CONTAINMENT INTEGRITY and containment leak rate.Surveillance testing of the air lock seals provides assurance that the overall air lock leakage will not become excessive due to seal damage during the intervals between air lock leakage tests~In order to meet the ACTION requirement to lock the OPERABLE air lock door closed, the air lock door interlock may provide the required locking.In addition, the outer air lock door is secured under administrative controls.3 4.6.1.4 INTERNAL PRESSURE The limitations on containment internal pressure ensure that: (1)the containment structure is prevented from exceeding its design negative pressure differential of 2.5 psig with respect to the outside atmosphere, and (2)the containment peak pressure does not exceed the design pressure of 55 psig during LOCA conditions.
The maximum analyzed peak pressure calculated for a LOCA event is 49.9 psig assuming an initial containment pressure of 0.3 psig.An initial positive pressure of as much as 3 psi would result in a maximum containment pressure that is less than design pressure and is consistent with the safety analyses.TURKEY POINT-UNITS 3&4 B 3/4 6-1 AMENDMENT NOS.AND k
CONTAINMENT SYSTEMS BASES 3 4.6.1.5 AIR TEMPERATURE The limitations on containment average aiz temperature ensure that the design limits for a LOCA are not exceeded, and that the environmental qualification of equipment is not impacted.If temperatures exceed 120 F, but remain below 125 F for up to 336 hours0.00389 days <br />0.0933 hours <br />5.555556e-4 weeks <br />1.27848e-4 months <br /> during a calendar year, no action is required.If the 336-hour limit is approached, an evaluation may be performed to extend the limit if some of the hours have been spent at less than 125'F.Measurements shall be made at all listed locations, whether by fixed or portable instruments, prior to determining the average air temperature.
3 4.6.1.6 CONTAINMENT STRUCTURAL INTEGRITY This limitation ensures that the structural integrity of the containment ,will be maintained comparable to the original design standards for the life of the facility.Structural integrity is required to ensure that the containment will withstand the maximum analyzed peak pressure of 49.9 psig in the event of a LOCA.The measurement of containment tendon lift-off force, the tensile tests of the tendon wires or strands, the visual examination of tendons, anchorages and exposed interior and exterior surfaces of the containment, and the Type A leakage test are sufficient to demonstrate this capability.
Some containment tendons are inaccessible at one end due to interferences and safety considerations.
These tendons, if selected for examination, will be exempted from the full surveillance requirements, and will be subjected only to lift-off testing at the accessible end.Due to tendon configuration, lift-off values may differ considerably at the two ends.Therefore, when only one end is accessible, it is considered that up to a 4%tolerance from the predicted lower limit is acceptable.
The required Special Reports from any engineering evaluation of contain-ment abnormalities shall include a description of the tendon condition, the condition of the concrete (especially at tendon anchorages), the inspection procedures, the tolerances on cracking, the results of the engineering evaluation, and the corrective actions taken.3 4.6.1.7 CONTA1NMENT VENTILATION SYSTEM The containment purge supply and exhaust isolation valves are required to be closed during a LOCA.When not purging, power to the purge valve actuators will be removed (sealed'losed) to prevent inadvertent opening of these values.Maintaining these valves sealed closed during plant operation ensures that excessive quantities of radioactive materials will not be released via the Containment Purge System..Leakage integrity tests with a maximum allowable leakage rate for containment purge supply and exhaust supply valves will provide early indication of TURKEY POINT-UNITS 3&4 B 3/4 6-2 AMENDMENT NOS.AND n x, P l J e 1 1t'