ML080870395

From kanterella
Revision as of 14:12, 12 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
IR 05000315-08-003 and 05000316-08-003, on 05/12/2008, D.C. Cook Nuclear Power Plant, TI-166 Request for Information NRC Inspection of Temporary Instruction 2515-166
ML080870395
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/26/2008
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Rencheck M
Indiana Michigan Power Co
References
IR-08-003
Download: ML080870395 (5)


See also: IR 05000315/2008003

Text

March 26, 2008

Mr. Michael W. Rencheck Senior Vice President and

Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 SUBJECT: D.C. COOK NUCLEAR POWER PLANT REQUEST FOR INFORMATION NRC INSPECTION OF TEMPORARY INSTRUCTION 2515/166 05000315/2008003(DRS); 05000316/2008003(DRS) Dear Mr. Rencheck: On May 12, 2008, the NRC will begin an inspection at the D.C. Cook Nuclear Power Plant. One inspector will perform this 1-week inspection in accordance with NRC Temporary Instruction (TI) 2525/166, "Pressurized Water Reactor Containment Sump Blockage." This inspection focuses on commitments made by D.C. Cook Nuclear Power Plant in response to Generic Letter (GL) 2004-02, "Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors (PWRs)." In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These

documents have been divided into two groups. The first group of documents are required prior to the inspection to ensure that the inspector is adequately prepared. This information should be provided to the Regional Office no later than April 28, 2008. The second group of requested documents contains additional items that the inspector will review, or need access to, during the inspection, and should be available by the first day of the

on-site inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. The inspector for this inspection is Caroline E. Acosta Acevedo. If there are any questions about the inspection or the material requested, please contact the inspector at (630) 829-9718 or via

e-mail at caroline.acosta@nrc.gov.

M. Rencheck -2-

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely,

/RA/ Ann Marie Stone, Chief Engineering Branch 2

Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 Enclosure: Temporary Instruction (TI) 2525/166 Document Request cc w/encl: M. Peifer, Site Vice President J. Gebbie, Plant Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality - Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police T. Strong, Chief, State Liaison Officer, State of Michigan

M. Rencheck -2-

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 Enclosure: Temporary Instruction (TI) 2525/166 Document Request cc w/encl: M. Peifer, Site Vice President J. Gebbie, Plant Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality - Waste and Hazardous Materials Division Emergency Management Division

MI Department of State Police T. Strong, Chief, State Liaison Officer, State of Michigan DISTRIBUTION:

TEB RidsNrrDirsIrib

MAS KGO JKH3 BJK1 CAA1

DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov

DOCUMENT NAME: G:\DRS\Work in Progress\Ltr. 03__08 DCCOOK TI166 RFI CEA.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl; "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME CAcosta: ls AMStone DATE 03/25/08 03/26/08 OFFICIAL RECORD COPY

INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION

1 Enclosure Inspection Report: 05000315/2008003(DRS); 0500316/2008003(DRS) Inspection Dates: May 12, 2008 - May 16, 2008 Inspection Procedures: TI 2525/166, "Pressurized Water Reactor Containment Sump Blockage" IP 71111.02, "Changes, Tests, or Experiments" (reference) IP 71111.17, "Permanent Plant Modifications" (reference) Inspector: Caroline E Acosta Acevedo, Reactor Engineer (630) 829-9718 (caroline.acosta@nrc.gov) I. Information Requested for Our In-office Preparation Week

The following information is requested by April 28, 2008, or sooner, to facilitate inspection preparation. If you have any questions regarding this information, please call the inspector as soon as possible. (Please provide the information electronically in "pdf" files, Excel, or other searchable formats, preferably on CDROM. The CDROM should contain descriptive names to facilitate ease of use.) 1. A list of all correspondences to/from the site related to GL 2004-02. This list should include the addressor, addressee, subject matter, and date of correspondence. 2. A list of modifications, procedure changes or other commitments made in response to GL 2004-02 as documented in the Item I responses. (For the purpose of this inspection, modifications include permanent plant changes, design changes, set point changes, equivalency evaluations, suitability analyses, and commercial grade dedications.) 3. Name(s) and phone numbers for the regulatory and technical contacts. II. Information Requested to be Available on First Day of Inspection (May 12, 2008)

1. Copies of the modifications and procedure changes made in response to GL 2004-02 or committed to in the documents from Item I. Modification documents should include a design description, records showing date of completion and 10 CFR 50.59 applicability determination, screening, or evaluation. 2. Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the inspector will likely be requesting these documents

during the inspections. Examples of supporting documents are:

INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION

2 Enclosure a. Drawings supporting the modifications; b. Calculations related to the modifications;

c. Procedures affected by the modifications; and d. UFSAR change papers generated due to a 10 CFR 50.59 evaluation. 3. List of related calculation changes that have been issued for use. 4. List of any related corrective action documents (open and closed). 5. Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and UFSAR updates. 6. Copy of the UFSAR change log (or a synopsis of changes). This should include all of the changes made to the UFSAR that were incorporated in the last 10 CFR 50.71(e)(4) submittal and any approved changes to the current UFSAR. If you have questions regarding the information requested, please contact the lead inspector.