Pages that link to "ML20247C148"
Jump to navigation
Jump to search
The following pages link to ML20247C148:
Displayed 50 items.
- ML20149J475 (← links)
- ML20149J462 (← links)
- PNO-V-88-001, on 880108,reactor Trip/Turbine Trip Occurred & Plant Shutdown for Greater than 48 H.Caused by Dirty Contact in Cable Connection to pre-amplifier.Containment Leakage Also Discovered.Manway Cover Bolts Torqued (← links)
- ML20195H210 (← links)
- ML20195D439 (← links)
- PNO-V-88-057, on 880916,while Verifying Pressure Transmitter PT-458,bistables Tripped.Caused by Technician Error & Exceeding Shutdown by More than 48 H.Problems Encountered During Reactor Startup Listed (← links)
- ML20202C211 (← links)
- ML20199F036 (← links)
- ML20199F029 (← links)
- PNO-V-86-033, on 860616,reactor Taken Critical.Caused by Physics Testing.Reactor Will Be Returned to Power on 860618. Problems W/Reactor Control Sys Thermal Expansion & Control Room Ventilation Sys Resolved (← links)
- ML20199D751 (← links)
- PNO-V-84-010, on 840218,reactor Trip Safety Injection Occurred,When Replacement of Fuse During Isolation Valve Surveillance Test Caused Voltage Drop on Preferred Instrument Bus.State of or Notified (← links)
- ML20198N346 (← links)
- ML20198H775 (← links)
- ML20198D476 (← links)
- ML20198A160 (← links)
- ML20206F514 (← links)
- PNO-V-86-051, on 860805,safety Injection Occurred When Steam Line Pressure Transmitter Failed While Surveillance Being Performed on Second Steam Line Pressure Transmitter.All Sys Responded as Designed.Plant in Mode 3 Condition (← links)
- ML20204E737 (← links)
- PNO-V-86-026, during 1985 Refueling Outage,Determined Hydraulic Snubbers Could Have Failed During Seismic Event & Unusual Movement of Pressurizer Surge Line Observed.Caused by Lockup of Snubbers.Snubbers Rebuilt (← links)
- ML20203N955 (← links)
- ML20203N643 (← links)
- ML20203N641 (← links)
- PNO-V-86-054, on 860821,State of Wa Informed NRC of 860813 Suspension of Util Permit,Based on 860806 Shipment to Us Ecology.Shipment Contained 30 Gallons of Untreated Liquid in Shipping Cask (← links)
- ML20203L761 (← links)
- PNO-V-92-004, on 920225,Trojan Power Plant Entered Mode 2 After Extended Outage.Plant Currently Critical at Less than 1 Percent Power & Licensee Conducting Low Power Physics Testing.Tests Expected to Be Completed by 920227 (← links)
- PNO-V-86-017, on 860411,merchant Ship in Columbia River Veered Into Shore Near Plant,Damaging 30 Ft of Outfall Pipe. Svc Water Flow Uninterrupted.Plant Operating at 73% Power. Repairs Considered for Apr 1986 Refueling Outage (← links)
- PNO-V-91-002, on 910303,Trojan Declared an Unsual Event & Initiated Plant Shutdown Due to Inability to Meet Requirements of TS 3.8.2.1,which Requires That Four 120 Volts AC Preferred Instrument Busses Be Operable (← links)
- ML20207K325 (← links)
- ML20207D354 (← links)
- ML20207B242 (← links)
- ML20207B233 (← links)
- ML20206T499 (← links)
- PNO-V-88-060, on 881113,turbine Trip/Reactor Trip on hi-hi Steam Generator Level Occurred.Caused by Faulty Controller for Feedwater Regulation Valve on Steam Generator B.Licensee Developing Actions to Address Problems (← links)
- PNO-V-86-058, on 860901,controlled Shutdown Conducted Due to Condenser Tube Leakage.Blown Out Plugged Condenser Tube Found.Startup on Hold Due to Cleaning of Steam Generators W/ Chemical Impurities (← links)
- ML20214Q611 (← links)
- PNO-V-87-037, on 870512,fatigue Fracture Occurred on 1-inch Safety Injection Fill Line on Accumulator Tank a & 2,000 Gallons of 2,000 Ppm Borated Water Drained Onto Containment Floor.By 870514,two Addl Accumulator Tanks Found W/Cracks (← links)
- PNO-V-87-038, on 870513,female Air Lock Operator Received Injury to Neck While Opening Air Lock Door to Transfer Matl from Containment.Operator Transported Offsite for Medical Attention.No Serious Injuries or Contamination Found (← links)
- ML20214D635 (← links)
- PNO-V-86-077, on 861107 & 10,green & Yellow Wires Attached to Primer Cord Discovered at Excavation Site.Army Explosive Ordnance Detachment Removed Wire & Primer Cord.Util Studying Effects If Charge Detonated (← links)
- PNO-V-87-031, on 870417,licensee Reported Potential Foot Exposure of Plant Worker Exceeding 18.75 Rem Limit.Caused by Dispersal of Irradiated Fuel Fragments.Work Stopped in Containment Bldg.Investigation Initiated (← links)
- ML20212H851 (← links)
- PNO-V-90-010, on 900320,facility Entered TS 3.0.3 After Engineering Organization Determined Main Steam Flow Trip Setpoints Were Incorrect & Nonconservative.Plant Shutdown Began IAW TSs (← links)
- PNO-V-90-011, on 900919,Vice President Nuclear DW Cockfield Announced Resignation After Being in Position Since March 1987.TD Walt Will Serve as Vice President-Nuclear Until Licensee Identify Replacement (← links)
- ML20244A936 (← links)
- ML20244A798 (← links)
- ML20238C773 (← links)
- ML20238C769 (← links)
- PNO-V-87-057, on 870824,Oregon State Agreement Program Director,R Paris,Informed NRC That State Employee Union Voted to Strike on 870913.If Settlement Not Reached Prior to Walk Out,Managers Will Handle Radioactive Matls Program (← links)
- ML20237J110 (← links)