- IR 05000528/1985018 (← links)
- IR 05000529/1985025 (← links)
- PNO-V-85-050, on 850726,while Preparing to Cool Down from 55-day Hot Functional Test Run,Alarm Received That Breaker Control Switch Operated W/O Authorization from Remote to Local Position.Cause Under Investigation (← links)
- PNO-V-85-059, updating PNO-V-85-058:on 850912,reactor Trip & Safety Injection Occurred.Caused by Open Atmospheric Dump Valve,Open Main Steam Line Low Point Drain Valves & Use of Auxiliary Feedwater Pump (← links)
- PNO-V-85-048, on 850724,licensee Determined That Plant Outage of Greater than 7 Days Expected to Repair Main Condenser. Caused by Damage to Two Condenser Tubes & Heater Drain Tank Inlet Shroud Due to Broken Condenser Baffle (← links)
- IR 05000528/1985019 (← links)
- IR 05000429/2006002 (← links)
- ML20129G307 (← links)
- PNO-V-85-041, on 850708,during Preoperational Hot Functional Test,Auxiliary Spray,Atmospheric Dump & Other Valves Manipulated from Location Other than Control Room.Probably Caused by Manipulation from Remote Shutdown Panel (← links)
- PNO-V-85-043, on 850711,unidentified RCS Leakage of Approx 1.30 Gpm Discovered.Unusual Event Declared & Licensee Prepared to Shut Down Reactor.Search for Source of Leakage Continuing.Resident Inspectors Following Licensee Actions (← links)
- PNO-V-85-027, updates PNS-V-85-02 Re Arrest of Six Licensee & Contractor Employees for Offsite Drug Sales.On 850515,13 Addl Employees Suspended Pending Investigation.Course of Action Expected by 850520 (← links)
- IR 05000528/1992031 (← links)
- ML20128C267 (← links)
- IR 05000528/1992041 (← links)
- IR 05000530/1985016 (← links)
- IR 05000529/1985014 (← links)
- ML20127K858 (← links)
- ML20127K840 (← links)
- IR 05000528/1992038 (← links)
- ML20127B096 (← links)
- ML20127A146 (← links)
- ML20126J355 (← links)
- IR 05000528/1992034 (← links)
- ML20126E024 (← links)
- IR 05000528/1992036 (← links)
- ML20126B903 (← links)
- IR 05000528/1992035 (← links)
- IR 05000528/1992032 (← links)
- ML20125C626 (← links)
- PNO-V-89-017, on 890315,Palo Verde Unit 2 Initiated Voluntary Shutdown Due to Failures of Adv to Operate at Units 1 & 3.Unit 2 Will Remains in Mode 3 Until Advs Are Demonstrated to Be Operable (← links)
- IR 05000522/2006005 (← links)
- ML20132D542 (← links)
- ML20132D538 (← links)
- IR 05000528/1986001 (← links)
- ML20151M682 (← links)
- IR 05000528/1988020 (← links)
- IR 05000528/1984014 (← links)
- ML20151H737 (← links)
- PNO-V-88-015, on 880221,safety Injection & Containment Isolation Actuation Signals Received Due to Low Pressurizer Pressure Signal.Caused by Incorrect Bypass of Pressurizer Low Pressure Protection When Unit Entered Mode 5 (← links)
- PNO-V-93-016, on 930828,plant Restarted After Refueling Outage That Proceeded Tube Rupture Event on 930314.Cause of Tube Rupture Was Due to Intergranular Attack.Unit 3 Operating at 100% Power (← links)
- IR 05000528/1998013 (← links)
- ML20196D639 (← links)
- IR 05000528/1987044 (← links)
- PNO-V-86-030, on 860527,all Four Channels of Reactor Coolant Low Flow Reactor Trip Protection Declared Inoperable While Unit 1 at 100% Power & Unit 2 at 10E-3% Power.Caused by Misset Rate & Step Channels of Low Flow Trip (← links)
- ML20195C188 (← links)
- ML20195C181 (← links)
- ML20155K183 (← links)
- IR 05000528/1986014 (← links)
- IR 05000528/1985036 (← links)
- ML20155G133 (← links)