- ML20247B665 (← links)
- ML20246C400 (← links)
- IR 05000254/1987025 (← links)
- IR 05000272/1987026 (← links)
- ML20236L147 (← links)
- ML20236J677 (← links)
- IR 05000272/1987027 (← links)
- ML20236F331 (← links)
- ML20236F309 (← links)
- PNO-I-87-099, on 871023,licensee Notified Region I of Addl Uncertainties in Onsite Electrical Distribution Sys Design W/Potential for Breaker Coordination Problems.Unit Shutdown Commenced on 871023.Analysis Underway (← links)
- PNO-I-87-059, on 870626,operators Received High Vibration Alarm on Bearing 6 of Low Pressure Turbine 22.Bearing Vibration Increased & High Pitched Noise Discovered.Licensee Elected to Remove Unit from Svc (← links)
- PNO-I-87-060, on 870703,unit Removed from Svc to Make Repairs to Low Pressure Turbines 21 & 22.Unit Being Maintained in Hot Shutdown.Licensee Expects to Complete Turbine Gasket Repairs within 14 Days (← links)
- ML20216J870 (← links)
- ML20216J775 (← links)
- PNO-I-87-075A, on 870812,visual Insp Identified No Significant Corrosion of Reactor Vessel Studs After Finding Leak on 870807.Further Insp of Degraded Vessel Components Will Be Formalized After Cleaning Affected Areas (← links)
- IR 05000272/1986022 (← links)
- IR 05000272/1986025 (← links)
- IR 05000272/1986033 (← links)
- IR 05000272/1987001 (← links)
- IR 05000311/1987003 (← links)
- IR 05000311/1986026 (← links)
- PNO-I-86-073, on 860911,Unit 2 Tripped from 75% Power.Caused by Loss of Reactor Coolant Pumps 22 & 23 Due to Deenergization of Two Nonvital Buses.Unit Entered Cold Shutdown on 860913.Repair Completion Expected by 860920 (← links)
- PNO-I-87-038, on 870429,licensee Learned That Control Room Operator Tested Positive for Use of Controlled Substance. Employee Will Be Terminated.Individual Acceptance Into Rehabilitation Program Under Consideration (← links)
- ML20209H609 (← links)
- ML20202D097 (← links)
- PNO-I-93-060, on 931102,fire Reported in 230 Volt Lighting Transformer in Turbine Bldg.Caused by Loose Electrical Connection.State of Nj Has Been Notified (← links)
- PNO-I-93-068, on 931203,ALCO Emergency Diesel Generator Cylinder Cracking Discovered.Health Physics Technician Noticed Coolant Leaking from Number 3 Cylinder Sleeve on Right Bank of Cylinders (3R) (← links)
- IR 05000272/1982012 (← links)
- ML20054F114 (← links)
- PNO-I-83-052, on 830520,plant Went Critical for First Time Since 830225.Reactor Startup & Required Reactor Trip Breaker Testing Completed within 24 H.Power Ascension to 100% Expected Over Next Several Days (← links)
- PNO-I-83-049, all Licensee Commitments Required for Restart Completed.Actions to Assess & Mitigate Svc Water Biofouling in Support of Plant Heatup Anticipated to Occur on 830518 Completed (← links)