Pages that link to "IR 05000315/1986021"
Jump to navigation
Jump to search
The following pages link to IR 05000315/1986021:
Displayed 38 items.
- IR 05000315/1986030 (← links)
- ML20214F818 (← links)
- ML20214A326 (← links)
- PNO-III-86-130, on 861105,during QA Audit of Contractor, Access Badges Removed Due to Inadequacies W/Screening Program.Employees Not Permitted to Return Until Screening Performed by Independent Organization (← links)
- IR 05000315/1986043 (← links)
- IR 05000315/1986041 (← links)
- IR 05000315/1987006 (← links)
- IR 05000315/1987005 (← links)
- PNO-III-86-072, on 860722,reactor Tripped While Operating at 90% Power.Caused by Workman Error While Attempting to Calibr Stator Cooling Water Pressure Switches.Util Will Proceed to Cold Shutdown for Repairs & Perform Snubber Surveillances (← links)
- ML20249B900 (← links)
- ML20249B306 (← links)
- ML20248L083 (← links)
- IR 05000315/1998011 (← links)
- ML20236W949 (← links)
- PNO-III-87-100, on 870723,unusual Event Declared When Contractor Employee Wearing Slightly Contaminated Clothing Taken to Local Hosp.When Clothing Removed,Surveys of Individual & Hosp Showed No Contamination (← links)
- ML20235W242 (← links)
- PNO-III-87-098, on 870714,undervoltage on Reactor Coolant Pump Bus Occurred.Caused by Tripping of Unit from 80% Power Due to Voltage Variation.Licensee Decided to Shut Down Unit to Repair Minor Leaks in Reactor Cooling Sys (← links)
- ML20235E268 (← links)
- IR 05000315/1987042 (← links)
- IR 05000315/1999027 (← links)
- ML20216J707 (← links)
- PNO-III-87-113A, updates Util Evaluation of Defective & Incorrectly Installed Bolts in Facility Containment Access Area.Caused by Use of Improper Cutting & Welding Procedure. Evaluation Continuing (← links)
- IR 05000315/1986032 (← links)
- IR 05000315/1986039 (← links)
- IR 05000315/1986040 (← links)
- IR 05000315/1986024 (← links)
- IR 05000315/1987003 (← links)
- ML20211J528 (← links)
- ML20210E260 (← links)
- PNO-III-85-093B, on 851029,reactor Trip Breaker & Associated Undervoltage Trip Actuating Device Failed.Breaker Mods Expected to Be Completed on 851105.Elements of Confirmatory Action Ltr Met Except for Cause of Device Failure (← links)
- PNO-III-85-093C, on 851106,licensee Submitted Request for Restart Concurrence,Per 851030 Confirmatory Action Ltr.Insp & Testing of Reactor Trip Breakers Completed.Failed Breakers Shipped to Vendors for Testing & Evaluation (← links)
- PNO-III-82-073, on 820731,unit Shut Down After Tube Leak Rate of 0.17 Gpm Determined in Steam Generator 2.Licensee Estimates Unit Will Be Down for Several Days for Testing & Leak Location Activities (← links)
- PNO-III-82-076, on 820804,fuel Assembly Became Wedged in Device Used to Move Assemblies from Vertical to Horizontal Position for Movement Through Fuel Transfer Canal.Caused by Tilting Device in Horizontal Position Instead of Vertical (← links)
- IR 05000315/1993023 (← links)
- IR 05000315/1982011 (← links)
- IR 05000315/1982005 (← links)
- IR 05000315/1982010 (← links)
- IR 05000315/1982009 (← links)