==Dear Mr. Smith:==
==Dear Mr. Smith:==
On February 4, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Pilgrim Nuclear Power Station. The inspection covered one or more of the key attributes of the Security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on February 8, 2011, with Mr. Dave Burke and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. No findings of significance were identified.
On February 4, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Pilgrim Nuclear Power Station. The inspection covered one or more of the key attributes of the Security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on February 8, 2011, with Mr. Dave Burke and other members of your staff.
 
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
 
No findings of significance were identified.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
Line 33: Line 37:


Sincerely,/RA/
Sincerely,/RA/
Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No.: 50-293 License No.: DPR-35 Nonpublic  
Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No.: 50-293  
 
License No.: DPR-35 Nonpublic  


===Enclosure:===
===Enclosure:===
Line 39: Line 45:


===w/Attachments:===
===w/Attachments:===
Supplemental Information, Table of Security Personnel, Exercise One, and Exercise Two cc w/encl: D. Burke, Pilgrim Nuclear Power Station
Supplemental Information, Table of Security Personnel, Exercise One, and Exercise Two cc w/encl: D. Burke, Pilgrim Nuclear Power Station  
 
ML110740235 OFFICE NSIR/DSO/SPEB NSIR/DSO SRI/RI RI NSIR/DSO/SPEB NAME A. Letourneau J. Curry S. Kennedy C. Johnson DATE 3/8/11 3/14/11 3/4/11 3/10/11 3/24/11
}}
}}

Revision as of 23:20, 8 August 2018

Pilgrim Nuclear Power Station FOF Inspection Report 05000293-11-202 - Cover Letter
ML110740235
Person / Time
Site: Pilgrim
Issue date: 03/24/2011
From: Johnson R C
NRC/NSIR/DSO/DDSO/SPEB
To: Rich Smith
Entergy Nuclear Operations
References
IR-11-202
Download: ML110740235 (2)


Text

March 24, 2011

Mr. Robert Smith, Vice President Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508

SUBJECT: PILGRIM NUCLEAR POWER STATION - NRC SECURITY INSPECTION REPORT 05000293/2011202

Dear Mr. Smith:

On February 4, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Pilgrim Nuclear Power Station. The inspection covered one or more of the key attributes of the Security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on February 8, 2011, with Mr. Dave Burke and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

In accordance with 10 CFR Paragraph 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1). Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,/RA/

Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No.: 50-293

License No.: DPR-35 Nonpublic

Enclosure:

Inspection Report 05000293/2011202

w/Attachments:

Supplemental Information, Table of Security Personnel, Exercise One, and Exercise Two cc w/encl: D. Burke, Pilgrim Nuclear Power Station

ML110740235 OFFICE NSIR/DSO/SPEB NSIR/DSO SRI/RI RI NSIR/DSO/SPEB NAME A. Letourneau J. Curry S. Kennedy C. Johnson DATE 3/8/11 3/14/11 3/4/11 3/10/11 3/24/11