{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KlNG OF PRUSSIA, PA 19406-1415 May 13, 2011 Mr. Paul Freeman Site Vice President, North Region Seabrook Nuclear Power Plant NextEra Energy Seabrook, LLC c/o Mr. MichaelO'Keefe P.O. Box 300 Seabrook, NH 03874
[[Issue date::May 13, 2011]]


Mr. Paul FreemanSite Vice President, North RegionSeabrook Nuclear Power PlantNextEra Energy Seabrook, LLCc/o Mr. MichaelO'KeefeP.O. Box 300Seabrook, NH 03874
SUBJECT: SEABROOK STATION UNIT NO. 1 - NRC TEMPORARY INSTRUCTION 2515t 183 INSPECTION REPORT 05000443/201 1 009


SUBJECT: SEABROOK STATION UNIT NO. 1 - NRC TEMPORARY INSTRUCTION2515t 183 INSPECTION REPORT 05000443/201 1 009
==Dear Mr. Freeman:==
On April 22,2011, the U.S. Nuclear Regulatory Commission (NR_C_) completed an inspection at Seabi-ook Station, Unit No. 1 using Temlorarylnstruction
?5151183, "Followup to the Fukushima Daiichi Nuclear statioi Fuel'Damige Event." The enclosed inspection report documents the inspection results which were discussed on April22,2011 , with you and other members of your staff.The objective of this inspection was to promptly assess the capabilities of Seabrook Station to responb to extraordinary consequences similar to those that have recently occurred at the Japanese Fukushima Daiichi Nuclear Station. The results from this inspection, along with the results from this inspection performed at other operating commercial nuclear plants in the united states will be used to evaluate the United statei nuclear industry's readiness to safely respond to similar events. These results will also help the NRC to determine if additional regulatory actions are warranted.


==Dear Mr. Freeman:==
All of the potential issues and observations identified by this inspection are contained in this report. The NRC's Reactor Oversight Process willfurther evaluate any issues to determine if they are regulatory findings or viola-iions.
On April 22,2011, the U.S. Nuclear Regulatory Commission (NR_C_) completed an inspection atSeabi-ook Station, Unit No. 1 using Temlorarylnstruction ?5151183, "Followup to theFukushima Daiichi Nuclear statioi Fuel'Damige Event." The enclosed inspection reportdocuments the inspection results which were discussed on April22,2011 , with you and othermembers of your staff.The objective of this inspection was to promptly assess the capabilities of Seabrook Station toresponb to extraordinary consequences similar to those that have recently occurred at theJapanese Fukushima Daiichi Nuclear Station. The results from this inspection, along with theresults from this inspection performed at other operating commercial nuclear plants in theunited states will be used to evaluate the United statei nuclear industry's readiness to safelyrespond to similar events. These results will also help the NRC to determine if additionalregulatory actions are warranted.All of the potential issues and observations identified by this inspection are contained in thisreport. The NRC's Reactor Oversight Process willfurther evaluate any issues to determine ifthey are regulatory findings or viola-iions. Any resulting findings or violations will be documentedOy ine NnC in a sbparate report. You are not required to respond to this letter' In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letterand its enclosure will be made available electronically for public inspection in the NRCPublic Document Room or from the Publicly Available Records (PARS) component ofNRC's Agencyvvide Documents Access and Management Systen (ADAMS), accessible from theNRC Web site at http:/iwww.nrc.qov/readinq-rm/adams.html (the Public Electronic ReadingRoom).
 
Any resulting findings or violations will be documented Oy ine NnC in a sbparate report. You are not required to respond to this letter' In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencyvvide Documents Access and Management Systen (ADAMS), accessible from the NRC Web site at http:/iwww.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).


Sincerely,._j$c^r"".1----*.1Lawrence T. Doerflein, ChiefEngineering Branch 2Division of Reactor SafetyDocket No.: 50-443License No.: NPF-86
Sincerely,._j$c^r"".1----*.1 Lawrence T. Doerflein, Chief Engineering Branch 2 Division of Reactor Safety Docket No.: 50-443 License No.: NPF-86  


===Enclosure:===
===Enclosure:===
Inspection Report No. 0500044312011009cc Mencl: Distribution via ListServ
Inspection Report No. 0500044312011009 cc Mencl: Distribution via ListServ
}}
}}

Revision as of 06:09, 8 August 2018

IR 05000443/2011009; 04/18/2011 - 04/22/2011; Seabrook Station, Unit No. 1; Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event
ML111300174
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 05/13/2011
From: Doerflein L T
Engineering Region 1 Branch 2
To: Freeman P
NextEra Energy Seabrook
Shared Package
ML111300168 List:
References
IR-11-009
Download: ML111300174 (24)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KlNG OF PRUSSIA, PA 19406-1415 May 13, 2011 Mr. Paul Freeman Site Vice President, North Region Seabrook Nuclear Power Plant NextEra Energy Seabrook, LLC c/o Mr. MichaelO'Keefe P.O. Box 300 Seabrook, NH 03874

SUBJECT: SEABROOK STATION UNIT NO. 1 - NRC TEMPORARY INSTRUCTION 2515t 183 INSPECTION REPORT 05000443/201 1 009

Dear Mr. Freeman:

On April 22,2011, the U.S. Nuclear Regulatory Commission (NR_C_) completed an inspection at Seabi-ook Station, Unit No. 1 using Temlorarylnstruction

?5151183, "Followup to the Fukushima Daiichi Nuclear statioi Fuel'Damige Event." The enclosed inspection report documents the inspection results which were discussed on April22,2011 , with you and other members of your staff.The objective of this inspection was to promptly assess the capabilities of Seabrook Station to responb to extraordinary consequences similar to those that have recently occurred at the Japanese Fukushima Daiichi Nuclear Station. The results from this inspection, along with the results from this inspection performed at other operating commercial nuclear plants in the united states will be used to evaluate the United statei nuclear industry's readiness to safely respond to similar events. These results will also help the NRC to determine if additional regulatory actions are warranted.

All of the potential issues and observations identified by this inspection are contained in this report. The NRC's Reactor Oversight Process willfurther evaluate any issues to determine if they are regulatory findings or viola-iions.

Any resulting findings or violations will be documented Oy ine NnC in a sbparate report. You are not required to respond to this letter' In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencyvvide Documents Access and Management Systen (ADAMS), accessible from the NRC Web site at http:/iwww.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).

Sincerely,._j$c^r"".1----*.1 Lawrence T. Doerflein, Chief Engineering Branch 2 Division of Reactor Safety Docket No.: 50-443 License No.: NPF-86

Enclosure:

Inspection Report No. 0500044312011009 cc Mencl: Distribution via ListServ