ML15152A400: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 15: Line 15:
| page count = 5
| page count = 5
}}
}}
=Text=
{{#Wiki_filter:Xcel Energy" 2015 
,3. §:(Check all that apply) 0 D (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines) 2015 -002 -00 1 2015 -002 -00}}

Revision as of 07:54, 11 June 2018

LER 15-002-00 for Prairie Island Nuclear Generating Plant, Regarding 21 Feedwater Pump Lockout, Unit 2 Reactor Trip Due to Pressure Switch Failure
ML15152A400
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 06/01/2015
From: Davison K
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-PI-15-050 LER 15-002-00
Download: ML15152A400 (5)


Text

Xcel Energy" 2015

,3. §:(Check all that apply) 0 D (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines) 2015 -002 -00 1 2015 -002 -00