ML13086A481: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Vaidya, BhalchandraFrom: Sally Moore [sallymoore8l@hotmail.com]Sent: Wednesday, March 27, 2013 8:01 AMTo: Vaidya, BhalchandraSubject: In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkDear Mr. Borchardt:I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant..The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident.* In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk.* The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe..Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system..The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.1  
{{#Wiki_filter:Vaidya, BhalchandraFrom: Sally Moore [sallymoore8l@hotmail.com]Sent: Wednesday, March 27, 2013 8:01 AMTo: Vaidya, Bhalchandra
-It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youSally Moore15/321 Beaconsfield ParadeSt Kilda, ot 31822 Vaidya, BhalchandraFrom: Chris Pan Launois [Panmail@aol.com]Sent: Tuesday, March 26, 2013 10:42 PMTo: Vaidya, BhalchandraSubject: In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkDear Mr. Borchardt:I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident.* In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk..The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.* Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.* The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.1  
 
-It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youChris Pan Launoiswww.thePan.com131 W. 85th. St.131 W. 85th. St.New York, NY 100242 Vaidya, BhalchandraFrom: Barrie Stebbings [barriemom@aol.com]Sent: Tuesday, March 26, 2013 4:52 PMTo: Vaidya, BhalchandraSubject: In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkDear Mr. Borchardt:I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident.* In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk.* The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.* Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.* The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.1  
==Subject:==
-It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youBarrie StebbingsP 0 Box 449Stinson Beach, CA 949702 Vaidya, BhalchandraFrom: Jeffrey Akard [onlyart@optonline.net]Sent: Tuesday, March 26, 2013 4:08 PMTo: Vaidya, BhalchandraSubject: In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkDear Mr. Borchardt:I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident.* In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk.* The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe..Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.1
In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
* It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youJeffrey AkardJeffrey AkardPost Office Box 2008Post Office Box 2008, East Hampton, NY 11937 East Hampton, NY 119372 Vaidya, BhalchandraFrom: Kim Fortin [fortinkim@gmail.com]Sent: Tuesday, March 26, 2013 2:58 PMTo: Vaidya, BhalchandraSubject: In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkDear Mr. Borchardt:I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant..The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident.* In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk.* The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.* Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.* The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.I  
 
-It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youKim Fortin601 Ridgewood Ave., Apt. 107Minneapolis, MN 554032 Vaidya, BhalchandraFrom: Leslie Johnson [leslie.aclu@gmail.com]Sent: Monday, March 25, 2013 3:11 PMTo: Vaidya, BhalchandraSubject: In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkDear Mr. Borchardt:I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident.* In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk.* The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe..Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.* The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.1  
==Dear Mr. Borchardt:==
-It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youLeslie Johnsonworld citizenPO Box 7655Chico, CA 959272 Vaidya, BhalchandraFrom: Carol Cox [ctcox@cox.net]Sent: Monday, March 25, 2013 12:02 PMTo: Vaidya, BhalchandraSubject: In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkDear Mr. Borchardt:I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident..In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk.* The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe..Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.* The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.1  
I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant..The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident.* In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk.* The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe..Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system..The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.1  
-It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youCarol Cox8 Bel Plains DriveFredericksburg, VA 224052 Vaidya, BhalchandraFrom: anne mathot [apmathot@hotmail.com]Sent: Monday, March 25, 2013 11:00 AMTo: Vaidya, BhalchandraSubject: In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkDear Mr. Borchardt:I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant..The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident.* In deciding not to install such a vent, the.FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk.* The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.* Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.* The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.1  
-It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youSally Moore15/321 Beaconsfield ParadeSt Kilda, ot 31822 Vaidya, BhalchandraFrom: Chris Pan Launois [Panmail@aol.com]Sent: Tuesday, March 26, 2013 10:42 PMTo: Vaidya, Bhalchandra
 
==Subject:==
In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
 
==Dear Mr. Borchardt:==
I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident.* In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk..The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.* Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.* The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.1  
-It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youChris Pan Launoiswww.thePan.com131 W. 85th. St.131 W. 85th. St.New York, NY 100242 Vaidya, BhalchandraFrom: Barrie Stebbings [barriemom@aol.com]Sent: Tuesday, March 26, 2013 4:52 PMTo: Vaidya, Bhalchandra
 
==Subject:==
In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
 
==Dear Mr. Borchardt:==
I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident.* In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk.* The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.* Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.* The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.1  
-It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youBarrie StebbingsP 0 Box 449Stinson Beach, CA 949702 Vaidya, BhalchandraFrom: Jeffrey Akard [onlyart@optonline.net]Sent: Tuesday, March 26, 2013 4:08 PMTo: Vaidya, Bhalchandra
 
==Subject:==
In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
 
==Dear Mr. Borchardt:==
I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident.* In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk.* The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe..Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.1
* It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youJeffrey AkardJeffrey AkardPost Office Box 2008Post Office Box 2008, East Hampton, NY 11937 East Hampton, NY 119372 Vaidya, BhalchandraFrom: Kim Fortin [fortinkim@gmail.com]Sent: Tuesday, March 26, 2013 2:58 PMTo: Vaidya, Bhalchandra
 
==Subject:==
In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
 
==Dear Mr. Borchardt:==
I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant..The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident.* In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk.* The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.* Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.* The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.I  
-It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youKim Fortin601 Ridgewood Ave., Apt. 107Minneapolis, MN 554032 Vaidya, BhalchandraFrom: Leslie Johnson [leslie.aclu@gmail.com]Sent: Monday, March 25, 2013 3:11 PMTo: Vaidya, Bhalchandra
 
==Subject:==
In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
 
==Dear Mr. Borchardt:==
I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident.* In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk.* The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe..Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.* The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.1  
-It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youLeslie Johnsonworld citizenPO Box 7655Chico, CA 959272 Vaidya, BhalchandraFrom: Carol Cox [ctcox@cox.net]Sent: Monday, March 25, 2013 12:02 PMTo: Vaidya, Bhalchandra
 
==Subject:==
In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
 
==Dear Mr. Borchardt:==
I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident..In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk.* The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe..Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.* The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.1  
-It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youCarol Cox8 Bel Plains DriveFredericksburg, VA 224052 Vaidya, BhalchandraFrom: anne mathot [apmathot@hotmail.com]Sent: Monday, March 25, 2013 11:00 AMTo: Vaidya, Bhalchandra
 
==Subject:==
In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
 
==Dear Mr. Borchardt:==
I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant..The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident.* In deciding not to install such a vent, the.FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk.* The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.* Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.* The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.1  
-It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youanne mathotLambyhaieOttignies, NY 134212  
-It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youanne mathotLambyhaieOttignies, NY 134212  
}}
}}

Revision as of 12:12, 5 April 2018

James A. FitzPatrick Nuclear Power Plant, ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Sally Moore, Et Al
ML13086A481
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/27/2013
From: Cox C, Fortin K, Johnson L, Launois C P, Mathot A, Scott Moore, Akard J, Stebbings B
- No Known Affiliation
To: Borchardt R W, Bhalchandra Vaidya
NRC/EDO, Office of Nuclear Reactor Regulation
References
2.206, G20120172, OEDO-2012-0147, TAC ME8189
Download: ML13086A481 (16)


Text

Vaidya, BhalchandraFrom: Sally Moore [sallymoore8l@hotmail.com]Sent: Wednesday, March 27, 2013 8:01 AMTo: Vaidya, Bhalchandra

Subject:

In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant..The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident.* In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk.* The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe..Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system..The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.1

-It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youSally Moore15/321 Beaconsfield ParadeSt Kilda, ot 31822 Vaidya, BhalchandraFrom: Chris Pan Launois [Panmail@aol.com]Sent: Tuesday, March 26, 2013 10:42 PMTo: Vaidya, Bhalchandra

Subject:

In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident.* In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk..The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.* Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.* The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.1

-It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youChris Pan Launoiswww.thePan.com131 W. 85th. St.131 W. 85th. St.New York, NY 100242 Vaidya, BhalchandraFrom: Barrie Stebbings [barriemom@aol.com]Sent: Tuesday, March 26, 2013 4:52 PMTo: Vaidya, Bhalchandra

Subject:

In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident.* In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk.* The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.* Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.* The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.1

-It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youBarrie StebbingsP 0 Box 449Stinson Beach, CA 949702 Vaidya, BhalchandraFrom: Jeffrey Akard [onlyart@optonline.net]Sent: Tuesday, March 26, 2013 4:08 PMTo: Vaidya, Bhalchandra

Subject:

In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident.* In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk.* The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe..Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.1

  • It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youJeffrey AkardJeffrey AkardPost Office Box 2008Post Office Box 2008, East Hampton, NY 11937 East Hampton, NY 119372 Vaidya, BhalchandraFrom: Kim Fortin [fortinkim@gmail.com]Sent: Tuesday, March 26, 2013 2:58 PMTo: Vaidya, Bhalchandra

Subject:

In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant..The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident.* In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk.* The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.* Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.* The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.I

-It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youKim Fortin601 Ridgewood Ave., Apt. 107Minneapolis, MN 554032 Vaidya, BhalchandraFrom: Leslie Johnson [leslie.aclu@gmail.com]Sent: Monday, March 25, 2013 3:11 PMTo: Vaidya, Bhalchandra

Subject:

In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident.* In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk.* The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe..Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.* The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.1

-It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youLeslie Johnsonworld citizenPO Box 7655Chico, CA 959272 Vaidya, BhalchandraFrom: Carol Cox [ctcox@cox.net]Sent: Monday, March 25, 2013 12:02 PMTo: Vaidya, Bhalchandra

Subject:

In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident..In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk.* The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe..Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.* The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.1

-It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youCarol Cox8 Bel Plains DriveFredericksburg, VA 224052 Vaidya, BhalchandraFrom: anne mathot [apmathot@hotmail.com]Sent: Monday, March 25, 2013 11:00 AMTo: Vaidya, Bhalchandra

Subject:

In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New YorkMr. James BorchardtExecutive Director for OperationsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001VIA email to Bhalchandra K. Vaidya, NRC Petition ManagerIn the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergencyenforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant..The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct TorusVent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"venting system that is not fully hardened against a severe accident.* In deciding not to install such a vent, the.FitzPatrick operator and the NRC relied upon assumptions that nowplace public health and safety at an undue risk.* The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequencesposed by the current FitzPatrick severe accident venting plan, since the plan was approved on theassumptions that venting would prevent containment failure, and that there are "no likely" ignition sourcesalong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.* Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in thatcurrent procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergencyenforcement actions are approved by the NRC:1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plantand the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas TreatmentSystem building, blowing off the double doors to release a radiological accident to the outside environment atground level. The public must be afforded due process to address the unacceptable risks to public health andsafety posed by the FitzPatrick severe accident plan.2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.* The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existingcontainment venting and specifically address non-conservative assumptions behind the cost-benefit analysisused to justify not installing a fully hardened vent system.1

-It should also include a reassessment of the assumption of "no likely ignition points" during emergency ventingthat would otherwise present catastrophic consequences associated with the detonation of hydrogen gas andthe release of radioactivity generated during a severe accident.I wish the NRC to process my request using the 2.206 process, and I understand that under this process, thecontents of this message and my identity will be made public.The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay,will keep me informed about the developments of the petition and the opportunity to participate in a publicmeeting with the NRC Petition Review Board.Thank youanne mathotLambyhaieOttignies, NY 134212