|
|
Line 13: |
Line 13: |
| | document type = E-Mail | | | document type = E-Mail |
| | page count = 1 | | | page count = 1 |
| | | project = TAC:ME8992 |
| | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:From:Wilkins, LynneaTo:"McCutchen, Edward L."Subject:Acceptance of Cooper LAR To Revise the Fuel Handling Accident (ME8992)Date:Wednesday, August 08, 2012 5:34:00 PMEd, By letter dated June 25, 2012 (Agencywide Documents Access and Management System(ADAMS) Accession No. ML121850025), Nebraska Public Power District (NPPD)requested an amendment to the Facility Operating License for the Cooper Nuclear Station(CNS). The proposed amendment would revise the CNS Updated Safety Analysis Report(USAR) to reflect changes to the Fuel Handling Accident (FHA) dose calculation. |
| | Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), anamendment to the license (including the technical specifications) must fully describe thechanges requested, and following as far as applicable, the form prescribed for originalapplications. Section 50.34 of 10 CFR addresses the content of technical informationrequired. This section stipulates that the submittal address the design and operatingcharacteristics, unusual or novel design features, and principal safety considerations. |
| | The NRC staff has reviewed your application and concluded that it does provide technicalinformation in sufficient detail to enable the staff to proceed with its detailed technicalreview and make an independent assessment regarding the acceptability of the proposedamendment in terms of regulatory requirements and the protection of public health andsafety and the environment. If additional information is needed for the staff to complete itstechnical review, you will be advised by separate correspondence. |
| | If you have any questions, please contact me at (301) 415-1377. Lynnea Wilkins, Project ManagerFort Calhoun Station, Unit 1Plant Licensing Branch IVDivision of Operating Reactor Licensing Office of Nuclear Reactor RegulationUS Nuclear Regulatory CommissionPhone: 301-415-1377 |
| }} | | }} |
Revision as of 11:57, 28 March 2018
Letter Sequence Acceptance Review |
---|
|
|
|
|
---|
Category:E-Mail
MONTHYEARML24157A0122024-06-0404 June 2024 NRR E-mail Capture - Cooper - Acceptance Review - License Amendment Request (LAR) to Revise TS Table 3.3.2.1-1 Minimum Critical Power Ratio (MCPR) ML24094A2462024-04-0303 April 2024 NRR E-mail Capture - Cooper Nuclear Station - RAI Emergency LAR Turbine Stop Valve Limit Switch TS 3.3.1.1 ML24081A0372024-03-21021 March 2024 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of LAR to Modify Allowable Value for HPCI Low Flow ML24124A0592024-02-22022 February 2024 May 2024 Emergency Preparedness Exercise Inspection - Request for Information ML24032A2382024-02-0101 February 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML24010A1172024-01-10010 January 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML23352A2472023-12-18018 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Drywell Head Inspection RAI Issuance ML23339A0892023-12-0505 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of CLIIP LAR to Adopt TSTF-374 ML23318A5252023-11-0909 November 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Audit Agenda and Questions ML23257A2192023-09-14014 September 2023 NRR E-mail Capture - Cooper - Final RAI LAR to Adopt TSTF-551, Revision 3 ML23207A1742023-07-26026 July 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RC3-02 Drywell Head Bolting ISI ML23153A1062023-06-0202 June 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-551 ML23150A2492023-05-26026 May 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-580 ML22192A0502022-07-0808 July 2022 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-554 ML22228A2572022-05-12012 May 2022 11 CNS-2022-06 Public Documents ML22055B1512022-02-22022 February 2022 CNS EP Exercise Inspection May 2022 RFI ML22010A2632022-01-10010 January 2022 NRR E-mail Capture - Cooper - Final RAI Relief Request RR5-01 Revision 1 ML21321A3742021-11-10010 November 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RI5-02 Revision 3 ML21258A2632021-09-15015 September 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RS-01 ML21253A0312021-09-0909 September 2021 Email 9-9-2021 - Request for Information - In-Office Inspection of Recent Cooper E-Plan Changes ML21232A2102021-08-20020 August 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request Exception to Primary Containment Leakage Rate Program Requirement ML21203A3072021-07-21021 July 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RI5-02 Revision 3 ML21202A1372021-07-20020 July 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RR5-01 Revision 1 ML21165A0062021-06-11011 June 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-582 ML21109A2222021-04-15015 April 2021 Email with RFI Document for CNS PIR 2021012 ML21089A1682021-03-30030 March 2021 Email 3-30-2021-RFI for CNS EP Exercise Inspection (Week of 5-24-2021) ML20315A3922020-11-10010 November 2020 Email 11-10-2020 - Cooper EP Prog Insp RFI ML20260H4812020-09-0909 September 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Request to Use a Provision of a Later Edition of the ASME B&PV Code Section XI, Relief Request RR5-04 (L-2020-LLR-0123) ML20203M3692020-07-21021 July 2020 NRR E-mail Capture - Cooper - Final RAI License Amendment Request for Approval of EAL Scheme Change (EPID L-LLA-2020-0028) ML20175A5692020-06-22022 June 2020 (6-22-20 FEMA Hq Email) Cooper EP Biennial Exercise Exemption Request ML20139A0222020-05-15015 May 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-529 ML20126G4242020-05-0505 May 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-566, ML20098G0872020-04-0707 April 2020 CNS Req RFI for NRC In-Office Inspection of Eplan EAL Changes ML20071G3522020-03-11011 March 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance of Requested Licensing Action LAR to Adopt EAL Scheme Pursuant to NEI 99-01, Rev. 6 ML19269C1662019-09-26026 September 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of LAR for Exception from Certain Leak Testing Interval Requirements of the Primary Containment Leakage Rate Testing Program (L-2019-LLA-0179) ML19218A3732019-08-0505 August 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Requests RP5-02 and RI5-02 Rev. 2 (EPID Nos. L-2019-LLR-0063 and -0064) ML19200A0442019-07-19019 July 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-564, Revision 2 ML19210D4342019-07-11011 July 2019 Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 ML19190A3042019-07-0808 July 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-447, Revision 1 ML19190A0432019-06-28028 June 2019 Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19256D3372019-06-21021 June 2019 (050-00298) MC&A Wishlist 2019-405 ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19092A4812019-04-0202 April 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3 ML18311A3192018-11-0606 November 2018 NRR E-mail Capture - Cooper Nuclear Station - Verbal Authorization of Relief Request PR5-02 ML18311A1862018-11-0505 November 2018 Email (11-5-18) RR RFI Responses for Review ML18198A5412018-07-17017 July 2018 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1 ML18166A1882018-06-14014 June 2018 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Revise TS Safety Limit Minimum Critical Power Ratio ML18171A1612018-06-12012 June 2018 NRR E-mail Capture - (External_Sender) TSTF-542 Implementation Change Request NRC-2017-0218, NRR E-mail Capture - (External Sender) Opportunity to Review and Comment on NRC Information Collection (10 CFR Part 73) - Response2018-05-0909 May 2018 NRR E-mail Capture - (External_Sender) Opportunity to Review and Comment on NRC Information Collection (10 CFR Part 73) - Response ML18241A3822018-03-23023 March 2018 CNS Email to Beaulieu, George, Kumana: Response to CNS Fan Coil Unit Questions 2024-06-04
[Table view] |
Text
From:Wilkins, LynneaTo:"McCutchen, Edward L."Subject:Acceptance of Cooper LAR To Revise the Fuel Handling Accident (ME8992)Date:Wednesday, August 08, 2012 5:34:00 PMEd, By letter dated June 25, 2012 (Agencywide Documents Access and Management System(ADAMS) Accession No. ML121850025), Nebraska Public Power District (NPPD)requested an amendment to the Facility Operating License for the Cooper Nuclear Station(CNS). The proposed amendment would revise the CNS Updated Safety Analysis Report(USAR) to reflect changes to the Fuel Handling Accident (FHA) dose calculation.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), anamendment to the license (including the technical specifications) must fully describe thechanges requested, and following as far as applicable, the form prescribed for originalapplications. Section 50.34 of 10 CFR addresses the content of technical informationrequired. This section stipulates that the submittal address the design and operatingcharacteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technicalinformation in sufficient detail to enable the staff to proceed with its detailed technicalreview and make an independent assessment regarding the acceptability of the proposedamendment in terms of regulatory requirements and the protection of public health andsafety and the environment. If additional information is needed for the staff to complete itstechnical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1377. Lynnea Wilkins, Project ManagerFort Calhoun Station, Unit 1Plant Licensing Branch IVDivision of Operating Reactor Licensing Office of Nuclear Reactor RegulationUS Nuclear Regulatory CommissionPhone: 301-415-1377