ML20234C041: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 20: Line 20:


=Text=
=Text=
{{#Wiki_filter:, ~ . - -
{{#Wiki_filter:l
l
, ~. - -
                                      .                      (                                                      _(
(
_(
q NAY 2 g fj@
q NAY 2 g fj@
Docket No.                                                                                         1 50-205
Docket No.
* I Pacific Gas and Electric Company 21s$ Market Street San Francisco 6, California                                                               1 Attention: Mr. Richard H. Peterson ii General Counsel Ih     i                         Gentlemen It is requested that you submit as an amendment to your application -
50-205 I
Pacific Gas and Electric Company 21s$ Market Street San Francisco 6, California 1
Attention: Mr. Richard H. Peterson ii General Counsel Ih i
Gentlemen It is requested that you submit as an amendment to your application -
for construction permit for h Bodega Bay Reactor h following infomation for consideration in connection with our review of your application:
for construction permit for h Bodega Bay Reactor h following infomation for consideration in connection with our review of your application:
: 1. Will the plant be designed to acconnodate any relative                       I linear displacements or rotations? If so, please specify
1.
              '                                        the relative linear displacements and rotations for which the plant. will be designed and state the relative dis-
Will the plant be designed to acconnodate any relative linear displacements or rotations? If so, please specify the relative linear displacements and rotations for which the plant. will be designed and state the relative dis-
        ,4lm                                         placements which would be tolerablee
,4lm placements which would be tolerablee a.
: a. Under the react 6r building.
Under the react 6r building.
: b. Between the reactor building and the turbine generator                   l structure.
b.
Between the reactor building and the turbine generator l
structure.
i.
i.
: c. Between various portions of the condenser cooling water system.
Between various portions of the condenser cooling water c.
l l
system.
Describe the measures which would be taken to protect plant electrical power distribution systems, control and instra-mentation systems, and emergency cooling water supply lines from damage due to permanent relative displacements within-
Describe the measures which would be taken to protect plant l
                                                      % plant area.
electrical power distribution systems, control and instra-mentation systems, and emergency cooling water supply lines from damage due to permanent relative displacements within-
: 2. ht ground motions are to be used for dynamic design?
% plant area.
Specifically, state the ground motion spectre of ===4===
2.
ht ground motions are to be used for dynamic design?
Specifically, state the ground motion spectre of===4===
acceleration, velocity, and displacement. State precisely h design stress levels to be'used in connection with h oe cround motiana.
acceleration, velocity, and displacement. State precisely h design stress levels to be'used in connection with h oe cround motiana.
              ~
>~
g                   0FTICE >
g 0FTICE >
                              $URNAME >
$URNAME >
DATE>                         . - . -
DATE>
Furm ABO-818 (Rev. F43)                                   e. s. sovsmasset marine emcs ae-e27en-a i
Furm ABO-818 (Rev. F43)
            !'        B709210153 851217                                                                                           '
: e. s. sovsmasset marine emcs ae-e27en-a B709210153 851217
j' PDR FOIA                             '
'i j'
FIRESTO85-665 PDR
PDR FOIA FIRESTO85-665 PDR
_.n._._.____.,__._,                                               ._ -              . - ~ ~       - - -        -
_.n._._.____.,__._,
                                                                                                                          =   -
. - ~ ~
                                                                                                                                .~
=
.~


y                                                                                                                     .    ..
y s:,.
s: , .                                           -                              '                                    '
g
g     ,
.(.'
      'O
(
                                                          .(.'                                         (
'O
              .          . o.
. o.
4 Pacific Gas and Electric Company                                                             3. ht danping factors will be applied to'various typical' structures and components?
4 Pacific Gas and Electric Company 3.
ht danping factors will be applied to'various typical' structures and components?
: h. -Upon what basis is the western limit of the San Andreas fault none established as shown in your Hazards Sunsanry.
: h. -Upon what basis is the western limit of the San Andreas fault none established as shown in your Hazards Sunsanry.
Report? .
Report?.
                                    - We request also that you furnish us with Additional copies (50 copies if available) ofa (1) the report by Clark E. McHuron referred to
- We request also that you furnish us with Additional copies (50 copies if available) ofa (1) the report by Clark E. McHuron referred to on page 13, Appendix IV of your Hasards Sussnary Report, and (3) reports.
        '                            on page 13, Appendix IV of your Hasards Sussnary Report, and (3) reports .                                     ,
by Dames and Moore as follousa (a) mReport of Seismic Survey, Proposed
by Dames and Moore as follousa (a) mReport of Seismic Survey, Proposed                                         -1 Nuclear Power Plant, Bodega Bay, California", Private report prepared                                             l for the Pacific Gas and Mioctric Company by John F.'Stickel, Jr. and                                             i Robert T. Lawson (January 25, 1960) (Haferred to on page 13, Appendix IV of the Rasards Sassary Report); (b) " Final Report, Preliminary Soils Investigation and Seismic Survey, Proposed Nuclear _ Power Plant,-
-1 Nuclear Power Plant, Bodega Bay, California", Private report prepared l
Bodega (December    Bay, 2, California",(for   the Pacific Gas 1960)g and c) " Foundation               and Electric Investigation,         Company.
for the Pacific Gas and Mioctric Company by John F.'Stickel, Jr. and i
Bodega     Boy-                       .!
Robert T. Lawson (January 25, 1960) (Haferred to on page 13, Appendix IV of the Rasards Sassary Report); (b) " Final Report, Preliminary Soils Investigation and Seismic Survey, Proposed Nuclear _ Power Plant,-
Atomic Park Unit No.1, Bodega Bay, California" for the Pacific / Gas and Electric Company (April 30, 1962)                                                                                 '
Bodega Bay, California",(for the Pacific Gas and Electric Company.
l Sincerely yours, (signed) R. b*'r;t'i'-
(December 2, 1960)g and c) " Foundation Investigation, Bodega Boy-Atomic Park Unit No.1, Bodega Bay, California" for the Pacific / Gas and Electric Company (April 30, 1962) l Sincerely yours, (signed) R. b*'r;t'i'-
3 Robert Lowenstein, Director Division of Licensing and Regulation l                                       ffffVbU                         '
3 Robert Lowenstein, Director Division of Licensing and Regulation l
l -.
ffffVbU l -.
g       pec               An 1
g pec An 1
l i
l i
i 3                                                             m omer,     DL6R    _        [L6tf           DieCB
i 3
m
: omer,
[L6tf DieCB
__OM C -
__OM C -
i m ,,          RilB
DL6R RilB
:bh           so f     RLo   nstein         '/                   ,
:bh so f RLo nstein
                                %      5/24/63             5/24/63       5/24/63           /"fhg j               rorm u r sis <n.v. m                             .. :  .-n         i.-.m -.       '
'/
                                                                                                                                                . N-e.
i m,,
        -.,~,,,,g,     ..-.-.__    ym-,y,m,.3,_._,,-.-.-r....__.-y....                .            .      .
5/24/63 5/24/63 5/24/63
                                                                                                                  . , , . , - - _ , . , m . .a a}}
/"fhg j
rorm u r sis <n.v. m
.-n i.-.m -.
. N-e.
a
-.,~,,,,g, ym-,y,m,.3,_._,,-.-.-r....__.-y....
.,,., - - _,., m..a
.}}

Latest revision as of 06:58, 3 December 2024

Requests Submittal of Listed Info as Amend to Application for Bodega Bay Reactor,Including Info Re Relative Linear Displacements or Rotations & Ground Motions Used for Dynamic Design
ML20234C041
Person / Time
Site: 05000000, Bodega Bay
Issue date: 05/24/1963
From: Lowenstein R
US ATOMIC ENERGY COMMISSION (AEC)
To: Peterson R
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML20234A767 List: ... further results
References
FOIA-85-665 NUDOCS 8709210153
Download: ML20234C041 (2)


Text

l

, ~. - -

(

_(

q NAY 2 g fj@

Docket No.

50-205 I

Pacific Gas and Electric Company 21s$ Market Street San Francisco 6, California 1

Attention: Mr. Richard H. Peterson ii General Counsel Ih i

Gentlemen It is requested that you submit as an amendment to your application -

for construction permit for h Bodega Bay Reactor h following infomation for consideration in connection with our review of your application:

1.

Will the plant be designed to acconnodate any relative linear displacements or rotations? If so, please specify the relative linear displacements and rotations for which the plant. will be designed and state the relative dis-

,4lm placements which would be tolerablee a.

Under the react 6r building.

b.

Between the reactor building and the turbine generator l

structure.

i.

Between various portions of the condenser cooling water c.

system.

Describe the measures which would be taken to protect plant l

electrical power distribution systems, control and instra-mentation systems, and emergency cooling water supply lines from damage due to permanent relative displacements within-

% plant area.

2.

ht ground motions are to be used for dynamic design?

Specifically, state the ground motion spectre of===4===

acceleration, velocity, and displacement. State precisely h design stress levels to be'used in connection with h oe cround motiana.

>~

g 0FTICE >

$URNAME >

DATE>

Furm ABO-818 (Rev. F43)

e. s. sovsmasset marine emcs ae-e27en-a B709210153 851217

'i j'

PDR FOIA FIRESTO85-665 PDR

_.n._._.____.,__._,

. - ~ ~

=

.~

y s:,.

g

.(.'

(

'O

. o.

4 Pacific Gas and Electric Company 3.

ht danping factors will be applied to'various typical' structures and components?

h. -Upon what basis is the western limit of the San Andreas fault none established as shown in your Hazards Sunsanry.

Report?.

- We request also that you furnish us with Additional copies (50 copies if available) ofa (1) the report by Clark E. McHuron referred to on page 13, Appendix IV of your Hasards Sussnary Report, and (3) reports.

by Dames and Moore as follousa (a) mReport of Seismic Survey, Proposed

-1 Nuclear Power Plant, Bodega Bay, California", Private report prepared l

for the Pacific Gas and Mioctric Company by John F.'Stickel, Jr. and i

Robert T. Lawson (January 25, 1960) (Haferred to on page 13, Appendix IV of the Rasards Sassary Report); (b) " Final Report, Preliminary Soils Investigation and Seismic Survey, Proposed Nuclear _ Power Plant,-

Bodega Bay, California",(for the Pacific Gas and Electric Company.

(December 2, 1960)g and c) " Foundation Investigation, Bodega Boy-Atomic Park Unit No.1, Bodega Bay, California" for the Pacific / Gas and Electric Company (April 30, 1962) l Sincerely yours, (signed) R. b*'r;t'i'-

3 Robert Lowenstein, Director Division of Licensing and Regulation l

ffffVbU l -.

g pec An 1

l i

i 3

m

omer,

[L6tf DieCB

__OM C -

DL6R RilB

bh so f RLo nstein

'/

i m,,

5/24/63 5/24/63 5/24/63

/"fhg j

rorm u r sis <n.v. m

.-n i.-.m -.

. N-e.

a

-.,~,,,,g, ym-,y,m,.3,_._,,-.-.-r....__.-y....

.,,., - - _,., m..a

.