{{#Wiki_filter:PROCEDURE REVIEW FORM (PRF) 1.0 | {{#Wiki_filter:PROCEDURE REVIEW FORM (PRF) 1.0 Initiation Initiator: John Bassford Date: 03/14/2023 Procedure Dept: EP Document#: EIP-ZZ-A0066 New Rev.# 028 (3 digits required) | ||
==Title:== | ==Title:== | ||
RERP | RERP Training Program Level of Use: Continuous Reference [g!Information Multiple NIA 2.0 Reason for Change/Description of Change (List commitments, CRs, eB Change Requests, OERs, Plant Mods etc. and record numbers here.) | ||
See "Summary of Changes for EIP-ZZ-A0066 Rev. 028" document. CR 202301165-001 Continued: D 3.0. Document Disposition 0Temp Change | See "Summary of Changes for EIP-ZZ-A0066 Rev. 028" document. CR 202301165-001 | ||
N/A | |||
Continued: D 3.0. Document Disposition 0Temp Change 0New Document Major Revision [g!Minor Revision 0Cancellation Administrative Correction N/A Deot. Head or Designated Aoorover reouired for Administrative Corrections (Signature/PIN/Date)-no other signatures reauired 4.0 Interim Approval (Temp. Change Only) Temp. Change#: Expiration Date: | |||
N/A N/A Cognizant Supervisor (Signature/PIN/Date) SRO (Signature/PIN/Date) | |||
==5.0 Comments== | ==5.0 Comments== | ||
N/A | N/A | ||
APPLICABILITY DETERMINATION Address the questions below for all aspects of the activity. If the answer is YES for any portion of the activity, apply the identified procedures to that portion of the activity. Note that it is not unusual to have more than one process apply to a given activity. Refer to Section 4 of the 10 CFR 50.59 Resource Manual (RM) and the instructions on pages 5-6 for additional guidance. | Continued: D 6.0 Reviews and Signatures (NOT required for Administrative Corrections) | ||
I. Activity/Document Number: EIP-ZZ-A0066 | Reviews Renuired Dent PIN,.,........__ SiRnature ~ Date CA0139 Attached Preparer EP 76380 ~.,[_./~ -,£// 3-/5-:23 NIA r I Technical Review cP.7~'.5 80 (\\'l _o ' '~ V/V 3-1~~~~ 0Yes !ZI No Technical Review E? I 'f.56'B t1 -----=-/ '-- -__,,,/, ~ J ~ - ~ - I <:.- 7"-eJ :z. "?, 0Yes !Z!No Add'l Review 0Yes 0No - | ||
that has been previously approved by the NRC or for which a | Add'l Review 0Yes No Additional Reviews (See Attached CA0J 39 forms). Number of additional CA0139s: | ||
(See Section 4.2 of the RM.) | |||
Validation I Tvne Coordinator - PIN I SiRnature Date CA0139 Attached I I 0Yes 0No | |||
50.59 Review !ZICA2510 0CA2511 0CA2512 / ONIA (perAPA-ZZ-00143) | |||
Screener Initial I PIN Reviewer Initial I PIN (Dept. Head or Designated Approver) Is a Change Management Plan required? OYes [8JNo (IF YES, attach CA2773 or CA2774) | |||
Is a Cross-Disciplinary review required? OYes [g!No 7.0 Approval (Either approval must be qualified as PAT/APVR or PATIGAPR in QualMaster) | |||
!ZI Senior Director Nuclear Operations Approval (per APA-ZZ-00101) [gl ORC is required in accordance with APA-ZZ-00091 r.FJ lr:artment Head Final Review and Approval ~ooting: 2195 | |||
*~1 D} f: £..,,t f337 L 3/z:;/4073 l lllf'lilv{}P I tf?J11.. -4l n.. l :z3 | |||
,, "._....... Dept. Head or Designated Approver I 1 Senior Director Nuclear Operat~n s I (Signature/PIN/Date) (Signature/PIN/Date) | |||
Note: Page 2 provides instructions to comple te this form and may be discarded | |||
Al90.0001, 2, 5, 35 -A210.0062, 65, 69; MI90.000I Page 1 of 2 CA0033 APA-ZZ-00101 Rev. 002 APPLICABILITY DETERMINATION | |||
Address the questions below for all aspects of the activity. If the answer is YES for any portion of the activity, apply the identified procedures to that portion of the activity. Note that it is not unusual to have more than one process apply to a given activity. Refer to Section 4 of the 10 CFR 50.59 Resource Manual (RM) and the instructions on pages 5-6 for additional guidance. | |||
I. Activity/Document Number: EIP-ZZ-A0066 - --------- --- ---- - ----Revision Number: 028 | |||
Tit I e: REP Training Program Brief Description of activity (what is being changed and why): | |||
!See "Summary of Changes for EIP-ZZ-A0066 Rev. 028" document | |||
IfYES, no further 50.59 (or 72.48) review beyond this Applicability II. Does the proposed activity fall within the scope of an activity Determination (AD) is required, but that has been previously approved by the NRC or for which a Response complete the remainder of this form. | |||
50.59/72.48 Screen or evaluation has already been performed? Identify the applicable 50.59/72.48 (See Section 4.2 of the RM.) ~NO YES Evaluation Log No., License Amendment No., or applicable document number. | |||
Document# | Document# | ||
III. Does the proposed activity involve a change to the: | III. Does the proposed activity involve a change to the : Response See Section 4.2.1 of the RM. | ||
: l. Technical Specifications or the Renewed Operating | : l. Technical Specifications or the Renewed Operating ~NO YES If YES, process per APA-ZZ-00108 License? (See 10 CFR 50.90.) and FDP-ZZ-00103. | ||
IfYES, process per APA-ZZ-00108 | |||
IfYES, process per APA-ZZ-00108 | : 2. Quality Assurance Plan? (See 10 CFR 50.54(a).) ~NO YES and GDP-ZZ-00600 and related facility or procedure change programs. | ||
: 2. Quality Assurance Plan? (See 10 CFR 50.54(a).) | |||
IfYES, process per APA-ZZ-00108 | IfYES, process per APA-ZZ-00108 | ||
: 3. Security Plan which also includes the Cyber Security Plan? | : 3. Security Plan which also includes the Cyber Security Plan? ~NO YES and SDP-ZZ-00030 for Security (See 10 CFR 50.54(p).) Plan and related facility or procedure change programs. | ||
: 4. Radiological Emergency Response Plan (RERP) or Emergency Action Levels (EALS)? (See 10 CFR 50.54(q).) | : 4. Radiological Emergency Response Plan (RERP) or Emergency Action Levels (EALS)? (See 10 CFR 50.54(q).) | ||
Note: If your proposed change alters a RERP If YES, process per APA-ZZ-00108 implementing procedure [any EIP-ZZ-XXXX:], equipment ~NO YES and KDP-ZZ-00400 for RERP and identified as important to emergency response [refer to related facility or procedure change KDP-ZZ-00013), or could alter response time, staffing, or programs. | |||
KDP-ZZ-00013), or could alter response time, staffing, or other items covered in the 16 Planning Standards or in Appendix E to Part 50.47(b) [refer to KDP-ZZ-00400), | other items covered in the 16 Planning Standards or in Appendix E to Part 50.47(b) [refer to KDP-ZZ-00400), | ||
answer this Question YES. | answer this Question YES. | ||
APPLICABILITY DETERMINATION (Continued) | APA-ZZ-00143 Page 1 CA2510 A170.0010 Rev. 005 APPLICABILITY DETERMINATION (Continued) | ||
IfYES, process APA-ZZ-00356 for ASME code compliance and related facility or procedure change programs. | IfYES, process APA-ZZ-00356 for ASME code compliance and related facility or procedure change programs. | ||
: 5. 1ST Program Plan? (See 10 CFR 50.55a(f).) | : 5. 1ST Program Plan? (See 10 CFR 50.55a(f).) ~NO YES | ||
: 6. ISi Program Plan? (See 10 CFR 50.55a(g).) | |||
: 7. Fire Protection Program? (See Operating License Condition 2.C(5).) | If YES, process per EDP-ZZ-01003 for ASME code compliance and re la ted facility or procedure change programs. | ||
: 8. Storage Cask Certificate of Compliance (CoC), including | : 6. ISi Program Plan? (See 10 CFR 50.55a(g).) ~NO YES | ||
See FP Screening questions in EDP- | |||
: 7. Fire Protection Program? (See Operating License ZZ-04044. If any of the screening Condition 2.C(5).) ~NO YES questions are answered YES, a Fire Protection review is needed in accordance with EDP-ZZ-04044. | |||
: 8. Storage Cask Certificate of Compliance (CoC), including IF YES, then contact Regulatory appendices? (See 10 CFR 72.244.) ~NO YES Affairs/Licensing to determine next ste ps. | |||
: 9. Does the proposed activity impact other programs (e.g., | : 9. Does the proposed activity impact other programs (e.g., | ||
the ODCM) that are controlled by regulations, the Operating License (including Orders and License | the ODCM) that are controlled by regulations, the If YES, indicate the applicable Operating License (including Orders and License ~NO YES program in Brief Description Conditions) or the Technical Specifications? (See Section Section. | ||
4.2.1 of the RM.) | 4.2.1 of the RM.) | ||
IV. Does the | |||
: 1. Maintenance which restores SSCs to their original (as designed) condition? (See 10 CFR 50.65(a)(4).) | IV. Does the prop osed act iv ity involve : Response See Section 4.2.2 of the RM | ||
: 1. Maintenance which restores SSCs to their original (as designed) condition? (See 10 CFR 50.65(a)(4).) If YES, process change per | |||
~NO YES APA-ZZ-00101 for procedure Note: If the maintenance is on ISFSI or cask-related items, changes or APA-ZZ-00320/330/340 the Maintenance Rule does NOT apply, and the activity is for Maintenance activities. | |||
subject to a 10 CFR 72.48 Screen on a CA3145. | subject to a 10 CFR 72.48 Screen on a CA3145. | ||
IfYES, process per APA-ZZ-00101 for procedure changes or | |||
: 2. A temporary alteration (to procedures or the facility) | IfYES, process per APA-ZZ-00101 for procedure changes or | ||
MDP-ZZ-FS00l for Freeze Seals. | : 2. A temporary alteration (to procedures or the facility) APA-ZZ-00605 for facility changes supporting maintenance (TASM) that will be in effect ~NO YES or Procedurally Controlled during at-power operations for 90 days or less? Temporary Modifications or MDP-ZZ-FS00l for Freeze Seals. | ||
Evaluate risk using APA-ZZ-00315, Appendix A. | Evaluate risk using APA-ZZ-00315, Appendix A. | ||
APPLICABILITY DETERMINATION (Continued) | APA-ZZ-00143 Page 2 CA2510 A170.0010 Rev.005 APPLICABILITY DETERMINATION (Continued) | ||
V . Does the proposed activity involve a chan~e to the: | |||
: 1. FSAR ~ NO | V. Does the proposed activity involve a chan~e to the : Response See Section 4.2.3 of the RM | ||
column at right. | : 1. FSAR ~ NO O YES Process the FSAR change per APA-ZZ-00108 and FDP-ZZ-00103 If the above response is NO, check NIA in the Response for revising License Documents. | ||
Note: | column at right. Note: | ||
If the above response is YES, does the proposed activity A NO response in the Response involve an FSAR change that may be excluded from the NO | If the above response is YES, does the proposed activity A NO response in the Response involve an FSAR change that may be excluded from the NO YES column at left means that the requirement to perform a 50.59 Screen/Evaluation by FSAR/TS Bases change is one that NEI 96-07 or NEI 98-03? (Provide a YES or NO response to ~N IA requires further 50.59 review (i.e., is this question in the Response column at right.) not excludable from further review). | ||
not excludable from further review). | |||
Note: In lieu of the exclusion criteria of RM Section 4.2.3, a A YES response means that the YES response may also be provided if the FSAR change FSAR does NOT require further requires no further 50.59 review based on a YES response to 50.59 review. | Note: In lieu of the exclusion criteria of RM Section 4.2.3, a A YES response means that the YES response may also be provided if the FSAR change FSAR does NOT require further requires no further 50.59 review based on a YES response to 50.59 review. | ||
the question in Section II of this Applicability Determination form.) | the question in Section II of this Applicability Determination form.) | ||
: 2. Technical Specification Bases? ~ NO D YES Process the TS Bases change per APA-ZZ-00108 and FDP-ZZ-00103 If the above response is NO, check NI A in the Response for revising License Documents. | |||
: 2. Technical Specification Bases? ~ NO | column at right. Note: | ||
column at right. | If the above response is YES, does the proposed activity A NO response in the Response involve a TS Bases change comparable to that which may be column at left means that the TS excluded from the requirement to perform a 50.59 D NO D YES Bases change is one that requires Screen/Evaluation by NEI 96-07 or NEI 98-03 (as described further 50.59 review (i.e., is not for an FSAR change)? (Provide a YES or NO response to this ~ NIA excludable from further review). | ||
Note: | |||
If the above response is YES, does the proposed activity A NO response in the Response involve a TS Bases change comparable to that which may be column at left means that the TS excluded from the requirement to perform a 50.59 Screen/Evaluation by NEI 96-07 or NEI 98-03 (as described | |||
question in the Response column at right.) | question in the Response column at right.) | ||
Note: In lieu of the exclusion criteria of RM Section 4.2.3, a A YES response means that the TS YES response may also be provided if the TS Bases change Bases Change does NOT require requires no further 50.59 review based on a YES response to further 50.59 review. | |||
requires no further 50.59 review based on a YES response to the question in Section II of this Applicability Determination form.) | the question in Section II of this Applicability Determination form.) | ||
VI. Does the _Qroposed activity involve a change to: | VI. Does the _Qroposed activity involve a change to: Response See Section 4.2.4 I 4.2.6 of the RM. | ||
I. Managerial or administrative procedures, controls, or activities (including software used only for the implementation of administrative procedures, controls, or | I. Managerial or administrative procedures, controls, or activities (including software used only for the implementation of administrative procedures, controls, or "71 NO YES IfYES, process per APA-ZZ-00101 l.:'.::,J or APA-ZZ-00109. | ||
activities) governing the conduct of facility operations (subject to the control of 10CFR50, Appendix B)? | activities) governing the conduct of facility operations (subject to the control of 10CFR50, Appendix B) ? | ||
: 2. Regulatory commitment not covered by another regulation | : 2. Regulatory commitment not covered by another regulation "71 NO YES If YES, process per based change process ? (See NEI 99-04.) l.:'.::,J APA-ZZ-00540. | ||
If YES, perform a 72.48 Screen per APA-ZZ-00143 unless the change is | If YES, perform a 72.48 Screen per APA-ZZ-00143 unless the change is Does the proposed activity potentially affect the design, completely covered by the response VII. operation, or maintenance of the ISFSI facility as described in to Section II. | ||
VII. | the dry cask storage FSAR or the 72.212 Report? (See FDP ~NO YES ZZ-00105 and Attachment 1 of APA-ZZ-00143.) Note: | ||
operation, or maintenance of the ISFSI facility as described in the dry cask storage FSAR or the 72.212 Report? (See FDP | |||
Editorial or administrative changes are excluded from the requirement to perform a 72.48 Review. | Editorial or administrative changes are excluded from the requirement to perform a 72.48 Review. | ||
APPLICABILITY DETERMINATION (Continued) | APA-ZZ-00143 Page 3 CA2510 Al 70.0010 Rev.005 APPLICABILITY DETERMINATION (Continued) | ||
VIII. Justification/explanation for Response(s) (as needed): | VIII. Justification/explanation for Response(s) (as needed): | ||
No justification/ explanation necessary for the responses given above. | No justification/ explanation necessary for the responses given above. | ||
IX. | |||
IX. | |||
== Conclusion:== | == Conclusion:== | ||
IZ! All aspects of the activity are controlled by one or more of the procedures above, therefore a 50.59 Screen is not required. | |||
D A portion of the activity is not controlled by one or more of the procedures above, therefore a 50.59 Screen lli required. | |||
X. Signoffs: ~ | |||
Qualified Preparer: ~/ _r;;d/7:::1/40 ~ Date: '3 / I.S /~~ --- --- | |||
(Print ame ) ~ /)iv (~n /P~ | |||
Qualified Reviewer: &-r2m1> P, ICA-LK!,,H r,tsk<<f) P, ~ e:s7 I Date: _1_/Z.3 I.£flZ3 (Print name) (Sign/PIN) | |||
Ensure that once signed, this record is loaded into EB with the Activity/Document Number listed above or submit this form to either the Regulatory Affairs clerk or another member of Administration in accordance with APA-ZZ-00220. | Ensure that once signed, this record is loaded into EB with the Activity/Document Number listed above or submit this form to either the Regulatory Affairs clerk or another member of Administration in accordance with APA-ZZ-00220. | ||
50.54(q) Screening Form Document#, Rev#, & | APA-ZZ-00143 Page4 CA2510 A170.0010 Rev. 005 50.54( q) Screening Form | ||
Document#, Rev#, & | |||
==Title:== | ==Title:== | ||
EIP-ZZ-A0066, Rev. 028, RERP Training Program EP Tracking#: | EIP-ZZ-A0066, Rev. 028, RERP Training Program EP Tracking#: _ 2_0_2_3_00_9 ___ _ ___ _ | ||
Activity Description and | Activity Description and | ||
==References:== | ==References:== | ||
See "Summary of Changes for EIP-ZZ-A0066 Rev. 028" document. CR 202301165-001 | |||
Activity Scope: YES NO Does this activity revise the Radiological Emergency Response Plan (RERP) or Implementing Procedures?........................ IZI D Change Type: YES NO Is this activity editorial or typographical?......................................................................................................................................................... D IZI Previously Approved Change: YES NO Is this activity being processed to conform to a previously approved activity?.................................................................................. D IZI If YES, what is the previously approved activity? | |||
Planning Standard Determination: | Planning Standard Determination: | ||
Is this activity associated with any of the 50.47(b) Planning Standards or Part 50 Appendix E: | Is this activity associated with any of the 50.47(b) Planning Standards or Part 50 Appendix E : YES NO 50.47(b)(l) - Assignment of Responsibility (Organization Control)?.................................................................................. D !ZI 50.47(b)(2) - Onsite Emergency Organization?........................................................................................................................... D IZI 50.47(b)(3) - Emergency Response Support and Resources?............,..................................................................................... D IZI 50.47(b)(4) - Emergency Classification System?........................................................................................................................ D IZ! | ||
50.47(b)(5) - Notification Methods and Procedures? ........................................................................ ............ ............................. D | 50.47(b)(5) - Notification Methods and Procedures?................................................................................................................. D i:gj 50.47(b)(6) - Emergency Communications?................................................................................................................................. D IZ! | ||
50.47(b)(7) - Public Education and Information? ........................................................................................................................ D | 50.47(b)(7) - Public Education and Information?........................................................................................................................ D !ZI 50.47(b)(8) - Emergency Facility and Equipment?.................................................................................................................... D !ZI 50.47(b)(9) - Accident Assessment?................................................................................................................................................ D !ZI 50.47(b)(10) - Protective Response?............... D IZI 50.47(b)(l 1) - Radiological Exposure Control?........................................................................................................................... D IZ! | ||
50.47(b)(12) - Medical and Public Health Support? ................................................................................................................... D | 50.47(b)(12) - Medical and Public Health Support?................................................................................................................... D IZ! | ||
50.47(b)(13) - Recovery Planning and Post Accident Operations? ....................................................................................... D | 50.47(b)(13) - Recovery Planning and Post Accident Operations?....................................................................................... D IZI 50.47(b)(14) - Drills and Exercises?................................................................................................................................................. D !ZI 50.47(b)(15) - Emergency Responder Training?...........................................................................................,............................. i:gj D 50.47(b)(16) - Emergency Plan Maintenance?............................................................................................................................. D !ZI Part 50 Appendix E?.............................................................................................................................................................................. D !ZI Commitment Impact Determination: YES NO Is this activity associated with a Site Specific EP Commitment?............................................................................................................ D !ZI If"Yes", record the Commitment number: | ||
Explanation of Determination: (Enter an explanation to each determination-answer that needs clarification.) | Explanation of Determination: (Enter an explanation to each determination-answer that needs clarification.) | ||
Callaway Energy Center's Training Department is replacing the "Training Application", which is the current "Learning Management System (LMS)", with a comparable program identified as "Vision Learning Station (VLS)". References to the Training Application are being removed from EIP-ZZ-A0066, RERP Training Program, and replaced with the new identifier, "Learning Management System". These changes are administrative in nature and do not impact the RERP Training Program or the qualification process for ERO members. Thus, this revision does not rise to the level of requiring a full evaluation. | Callaway Energy Center's Training Department is replacing the "Training Application", which is the current "Learning Management System (LMS)", with a comparable program identified as "Vision Learning Station (VLS)". References to the Training Application are being removed from EIP-ZZ-A0066, RERP Training Program, and replaced with the new identifier, "Learning Management System". These changes are administrative in nature and do not impact the RERP Training Program or the qualification process for ERO members. Thus, this revision does not rise to the level of requiring a full evaluation. | ||
50.54(q) | File# A210.0038 Page 1 of2 CA1523 KDP-ZZ-00400 Rev. 001 50.54(q)ScreeningForm ScreeningEvaluationResults: | ||
Basedontheresultsoftheinformationabove,cantheactivitybeimplementedwithoutperformingaYESNO full50.54(ajEffectivenessEvaluation?XiEEl Review/Approval:ç. | |||
Preparer (Sign/PIN) | Preparer(Sign/PIN) 79Date_________ | ||
:- -%Fv7L ) £ | pLrer7t4bL gaIt tflL<flt>I?4;?SfLW4(ioichtiaCo Reviewer(Sign/PIN)C1(viiDateI? | ||
Ii1e # A210. | :- -%Fv7L)£IIflU!qualifiedFmerguzc & Coordinator EmergencyPreparednessManager($igWP):IDate:% | ||
Ii1e#A210.0038Page2of2CAl523 KDP-ZZ-00400Rev.001 | |||
==SUMMARY== | ==SUMMARY== | ||
OF CHANGES FOR EIP-ZZ-A0066, REV. 028 | OF CHANGES FOR EIP-ZZ-A0066, REV. 028 | ||
Page(s) Section or Description Step Number | |||
4 3.4.3 Changed "Training Application" to "Leaming Management System (LMS)" due to retirement of the Training Application. CR 202301165-001 | |||
6 5.2.1 Changed "Training Application" to "Leaming Management System (LMS)" due to retirement of the Training Application. CR 202301165-001 | |||
6 5.2.3 Changed "Training Application" to "Leaming Management System (LMS)" due to retirement of the Training Application. CR 202301165-001 | |||
8 NOTE Deleted "An adverse condition CAR is generated by the Training Application when Emergency Response Personnel lapse required RERP continuing training" as Training Application is being retired and replaced with "Evaluate a qualification lapse in accordance with AP A-ZZ-00925 APPA." CR 202301165-001 | |||
8 5.4.1 Changed "Training Application" to "Leaming Management System (LMS)" due to retirement of the Training Application. CR 202301165-001 | |||
8 5.4.1 Deleted "(12 months,+/- 3 a month grace period)" from step 5.4.1 following "annual basis" to read "The required continuing training for an assigned position should be completed on an annual basis, unless otherwise noted in the Leaming Management System (LMS) as Training Application is being retired. CR 202301165-001 | |||
10 6.1.3 Deleted reference to Training Application DTI-030 as Training Application is being retired. CR 202301165-001}} |
Revision as of 19:35, 14 November 2024
ML23110A071 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 04/06/2023 |
From: | Bassford J Ameren Missouri |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML23110A069 | List: |
References | |
EIP-ZZ-A0066, Rev. 28 | |
Download: ML23110A071 (1) | |
Text
PROCEDURE REVIEW FORM (PRF) 1.0 Initiation Initiator: John Bassford Date: 03/14/2023 Procedure Dept: EP Document#: EIP-ZZ-A0066 New Rev.# 028 (3 digits required)
Title:
RERP Training Program Level of Use: Continuous Reference [g!Information Multiple NIA 2.0 Reason for Change/Description of Change (List commitments, CRs, eB Change Requests, OERs, Plant Mods etc. and record numbers here.)
See "Summary of Changes for EIP-ZZ-A0066 Rev. 028" document. CR 202301165-001
Continued: D 3.0. Document Disposition 0Temp Change 0New Document Major Revision [g!Minor Revision 0Cancellation Administrative Correction N/A Deot. Head or Designated Aoorover reouired for Administrative Corrections (Signature/PIN/Date)-no other signatures reauired 4.0 Interim Approval (Temp. Change Only) Temp. Change#: Expiration Date:
N/A N/A Cognizant Supervisor (Signature/PIN/Date) SRO (Signature/PIN/Date)
5.0 Comments
N/A
Continued: D 6.0 Reviews and Signatures (NOT required for Administrative Corrections)
Reviews Renuired Dent PIN,.,........__ SiRnature ~ Date CA0139 Attached Preparer EP 76380 ~.,[_./~ -,£// 3-/5-:23 NIA r I Technical Review cP.7~'.5 80 (\\'l _o ' '~ V/V 3-1~~~~ 0Yes !ZI No Technical Review E? I 'f.56'B t1 -----=-/ '-- -__,,,/, ~ J ~ - ~ - I <:.- 7"-eJ :z. "?, 0Yes !Z!No Add'l Review 0Yes 0No -
Add'l Review 0Yes No Additional Reviews (See Attached CA0J 39 forms). Number of additional CA0139s:
Validation I Tvne Coordinator - PIN I SiRnature Date CA0139 Attached I I 0Yes 0No
50.59 Review !ZICA2510 0CA2511 0CA2512 / ONIA (perAPA-ZZ-00143)
Screener Initial I PIN Reviewer Initial I PIN (Dept. Head or Designated Approver) Is a Change Management Plan required? OYes [8JNo (IF YES, attach CA2773 or CA2774)
Is a Cross-Disciplinary review required? OYes [g!No 7.0 Approval (Either approval must be qualified as PAT/APVR or PATIGAPR in QualMaster)
!ZI Senior Director Nuclear Operations Approval (per APA-ZZ-00101) [gl ORC is required in accordance with APA-ZZ-00091 r.FJ lr:artment Head Final Review and Approval ~ooting: 2195
- ~1 D} f: £..,,t f337 L 3/z:;/4073 l lllf'lilv{}P I tf?J11.. -4l n.. l :z3
,, "._....... Dept. Head or Designated Approver I 1 Senior Director Nuclear Operat~n s I (Signature/PIN/Date) (Signature/PIN/Date)
Note: Page 2 provides instructions to comple te this form and may be discarded
Al90.0001, 2, 5, 35 -A210.0062, 65, 69; MI90.000I Page 1 of 2 CA0033 APA-ZZ-00101 Rev. 002 APPLICABILITY DETERMINATION
Address the questions below for all aspects of the activity. If the answer is YES for any portion of the activity, apply the identified procedures to that portion of the activity. Note that it is not unusual to have more than one process apply to a given activity. Refer to Section 4 of the 10 CFR 50.59 Resource Manual (RM) and the instructions on pages 5-6 for additional guidance.
I. Activity/Document Number: EIP-ZZ-A0066 - --------- --- ---- - ----Revision Number: 028
Tit I e: REP Training Program Brief Description of activity (what is being changed and why):
!See "Summary of Changes for EIP-ZZ-A0066 Rev. 028" document
IfYES, no further 50.59 (or 72.48) review beyond this Applicability II. Does the proposed activity fall within the scope of an activity Determination (AD) is required, but that has been previously approved by the NRC or for which a Response complete the remainder of this form.
50.59/72.48 Screen or evaluation has already been performed? Identify the applicable 50.59/72.48 (See Section 4.2 of the RM.) ~NO YES Evaluation Log No., License Amendment No., or applicable document number.
Document#
III. Does the proposed activity involve a change to the : Response See Section 4.2.1 of the RM.
- l. Technical Specifications or the Renewed Operating ~NO YES If YES, process per APA-ZZ-00108 License? (See 10 CFR 50.90.) and FDP-ZZ-00103.
IfYES, process per APA-ZZ-00108
- 2. Quality Assurance Plan? (See 10 CFR 50.54(a).) ~NO YES and GDP-ZZ-00600 and related facility or procedure change programs.
IfYES, process per APA-ZZ-00108
- 3. Security Plan which also includes the Cyber Security Plan? ~NO YES and SDP-ZZ-00030 for Security (See 10 CFR 50.54(p).) Plan and related facility or procedure change programs.
- 4. Radiological Emergency Response Plan (RERP) or Emergency Action Levels (EALS)? (See 10 CFR 50.54(q).)
Note: If your proposed change alters a RERP If YES, process per APA-ZZ-00108 implementing procedure [any EIP-ZZ-XXXX:], equipment ~NO YES and KDP-ZZ-00400 for RERP and identified as important to emergency response [refer to related facility or procedure change KDP-ZZ-00013), or could alter response time, staffing, or programs.
other items covered in the 16 Planning Standards or in Appendix E to Part 50.47(b) [refer to KDP-ZZ-00400),
answer this Question YES.
APA-ZZ-00143 Page 1 CA2510 A170.0010 Rev. 005 APPLICABILITY DETERMINATION (Continued)
IfYES, process APA-ZZ-00356 for ASME code compliance and related facility or procedure change programs.
- 5. 1ST Program Plan? (See 10 CFR 50.55a(f).) ~NO YES
If YES, process per EDP-ZZ-01003 for ASME code compliance and re la ted facility or procedure change programs.
- 6. ISi Program Plan? (See 10 CFR 50.55a(g).) ~NO YES
See FP Screening questions in EDP-
- 7. Fire Protection Program? (See Operating License ZZ-04044. If any of the screening Condition 2.C(5).) ~NO YES questions are answered YES, a Fire Protection review is needed in accordance with EDP-ZZ-04044.
- 8. Storage Cask Certificate of Compliance (CoC), including IF YES, then contact Regulatory appendices? (See 10 CFR 72.244.) ~NO YES Affairs/Licensing to determine next ste ps.
- 9. Does the proposed activity impact other programs (e.g.,
the ODCM) that are controlled by regulations, the If YES, indicate the applicable Operating License (including Orders and License ~NO YES program in Brief Description Conditions) or the Technical Specifications? (See Section Section.
4.2.1 of the RM.)
IV. Does the prop osed act iv ity involve : Response See Section 4.2.2 of the RM
- 1. Maintenance which restores SSCs to their original (as designed) condition? (See 10 CFR 50.65(a)(4).) If YES, process change per
~NO YES APA-ZZ-00101 for procedure Note: If the maintenance is on ISFSI or cask-related items, changes or APA-ZZ-00320/330/340 the Maintenance Rule does NOT apply, and the activity is for Maintenance activities.
subject to a 10 CFR 72.48 Screen on a CA3145.
IfYES, process per APA-ZZ-00101 for procedure changes or
- 2. A temporary alteration (to procedures or the facility) APA-ZZ-00605 for facility changes supporting maintenance (TASM) that will be in effect ~NO YES or Procedurally Controlled during at-power operations for 90 days or less? Temporary Modifications or MDP-ZZ-FS00l for Freeze Seals.
Evaluate risk using APA-ZZ-00315, Appendix A.
APA-ZZ-00143 Page 2 CA2510 A170.0010 Rev.005 APPLICABILITY DETERMINATION (Continued)
V. Does the proposed activity involve a chan~e to the : Response See Section 4.2.3 of the RM
- 1. FSAR ~ NO O YES Process the FSAR change per APA-ZZ-00108 and FDP-ZZ-00103 If the above response is NO, check NIA in the Response for revising License Documents.
column at right. Note:
If the above response is YES, does the proposed activity A NO response in the Response involve an FSAR change that may be excluded from the NO YES column at left means that the requirement to perform a 50.59 Screen/Evaluation by FSAR/TS Bases change is one that NEI 96-07 or NEI 98-03? (Provide a YES or NO response to ~N IA requires further 50.59 review (i.e., is this question in the Response column at right.) not excludable from further review).
Note: In lieu of the exclusion criteria of RM Section 4.2.3, a A YES response means that the YES response may also be provided if the FSAR change FSAR does NOT require further requires no further 50.59 review based on a YES response to 50.59 review.
the question in Section II of this Applicability Determination form.)
- 2. Technical Specification Bases? ~ NO D YES Process the TS Bases change per APA-ZZ-00108 and FDP-ZZ-00103 If the above response is NO, check NI A in the Response for revising License Documents.
column at right. Note:
If the above response is YES, does the proposed activity A NO response in the Response involve a TS Bases change comparable to that which may be column at left means that the TS excluded from the requirement to perform a 50.59 D NO D YES Bases change is one that requires Screen/Evaluation by NEI 96-07 or NEI 98-03 (as described further 50.59 review (i.e., is not for an FSAR change)? (Provide a YES or NO response to this ~ NIA excludable from further review).
question in the Response column at right.)
Note: In lieu of the exclusion criteria of RM Section 4.2.3, a A YES response means that the TS YES response may also be provided if the TS Bases change Bases Change does NOT require requires no further 50.59 review based on a YES response to further 50.59 review.
the question in Section II of this Applicability Determination form.)
VI. Does the _Qroposed activity involve a change to: Response See Section 4.2.4 I 4.2.6 of the RM.
I. Managerial or administrative procedures, controls, or activities (including software used only for the implementation of administrative procedures, controls, or "71 NO YES IfYES, process per APA-ZZ-00101 l.:'.::,J or APA-ZZ-00109.
activities) governing the conduct of facility operations (subject to the control of 10CFR50, Appendix B) ?
- 2. Regulatory commitment not covered by another regulation "71 NO YES If YES, process per based change process ? (See NEI 99-04.) l.:'.::,J APA-ZZ-00540.
If YES, perform a 72.48 Screen per APA-ZZ-00143 unless the change is Does the proposed activity potentially affect the design, completely covered by the response VII. operation, or maintenance of the ISFSI facility as described in to Section II.
the dry cask storage FSAR or the 72.212 Report? (See FDP ~NO YES ZZ-00105 and Attachment 1 of APA-ZZ-00143.) Note:
Editorial or administrative changes are excluded from the requirement to perform a 72.48 Review.
APA-ZZ-00143 Page 3 CA2510 Al 70.0010 Rev.005 APPLICABILITY DETERMINATION (Continued)
VIII. Justification/explanation for Response(s) (as needed):
No justification/ explanation necessary for the responses given above.
IX.
Conclusion:
IZ! All aspects of the activity are controlled by one or more of the procedures above, therefore a 50.59 Screen is not required.
D A portion of the activity is not controlled by one or more of the procedures above, therefore a 50.59 Screen lli required.
X. Signoffs: ~
Qualified Preparer: ~/ _r;;d/7:::1/40 ~ Date: '3 / I.S /~~ --- ---
(Print ame ) ~ /)iv (~n /P~
Qualified Reviewer: &-r2m1> P, ICA-LK!,,H r,tsk<<f) P, ~ e:s7 I Date: _1_/Z.3 I.£flZ3 (Print name) (Sign/PIN)
Ensure that once signed, this record is loaded into EB with the Activity/Document Number listed above or submit this form to either the Regulatory Affairs clerk or another member of Administration in accordance with APA-ZZ-00220.
APA-ZZ-00143 Page4 CA2510 A170.0010 Rev. 005 50.54( q) Screening Form
Document#, Rev#, &
Title:
EIP-ZZ-A0066, Rev. 028, RERP Training Program EP Tracking#: _ 2_0_2_3_00_9 ___ _ ___ _
Activity Description and
References:
See "Summary of Changes for EIP-ZZ-A0066 Rev. 028" document. CR 202301165-001
Activity Scope: YES NO Does this activity revise the Radiological Emergency Response Plan (RERP) or Implementing Procedures?........................ IZI D Change Type: YES NO Is this activity editorial or typographical?......................................................................................................................................................... D IZI Previously Approved Change: YES NO Is this activity being processed to conform to a previously approved activity?.................................................................................. D IZI If YES, what is the previously approved activity?
Planning Standard Determination:
Is this activity associated with any of the 50.47(b) Planning Standards or Part 50 Appendix E : YES NO 50.47(b)(l) - Assignment of Responsibility (Organization Control)?.................................................................................. D !ZI 50.47(b)(2) - Onsite Emergency Organization?........................................................................................................................... D IZI 50.47(b)(3) - Emergency Response Support and Resources?............,..................................................................................... D IZI 50.47(b)(4) - Emergency Classification System?........................................................................................................................ D IZ!
50.47(b)(5) - Notification Methods and Procedures?................................................................................................................. D i:gj 50.47(b)(6) - Emergency Communications?................................................................................................................................. D IZ!
50.47(b)(7) - Public Education and Information?........................................................................................................................ D !ZI 50.47(b)(8) - Emergency Facility and Equipment?.................................................................................................................... D !ZI 50.47(b)(9) - Accident Assessment?................................................................................................................................................ D !ZI 50.47(b)(10) - Protective Response?............... D IZI 50.47(b)(l 1) - Radiological Exposure Control?........................................................................................................................... D IZ!
50.47(b)(12) - Medical and Public Health Support?................................................................................................................... D IZ!
50.47(b)(13) - Recovery Planning and Post Accident Operations?....................................................................................... D IZI 50.47(b)(14) - Drills and Exercises?................................................................................................................................................. D !ZI 50.47(b)(15) - Emergency Responder Training?...........................................................................................,............................. i:gj D 50.47(b)(16) - Emergency Plan Maintenance?............................................................................................................................. D !ZI Part 50 Appendix E?.............................................................................................................................................................................. D !ZI Commitment Impact Determination: YES NO Is this activity associated with a Site Specific EP Commitment?............................................................................................................ D !ZI If"Yes", record the Commitment number:
Explanation of Determination: (Enter an explanation to each determination-answer that needs clarification.)
Callaway Energy Center's Training Department is replacing the "Training Application", which is the current "Learning Management System (LMS)", with a comparable program identified as "Vision Learning Station (VLS)". References to the Training Application are being removed from EIP-ZZ-A0066, RERP Training Program, and replaced with the new identifier, "Learning Management System". These changes are administrative in nature and do not impact the RERP Training Program or the qualification process for ERO members. Thus, this revision does not rise to the level of requiring a full evaluation.
File# A210.0038 Page 1 of2 CA1523 KDP-ZZ-00400 Rev. 001 50.54(q)ScreeningForm ScreeningEvaluationResults:
Basedontheresultsoftheinformationabove,cantheactivitybeimplementedwithoutperformingaYESNO full50.54(ajEffectivenessEvaluation?XiEEl Review/Approval:ç.
Preparer(Sign/PIN) 79Date_________
pLrer7t4bL gaIt tflL<flt>I?4;?SfLW4(ioichtiaCo Reviewer(Sign/PIN)C1(viiDateI?
- - -%Fv7L)£IIflU!qualifiedFmerguzc & Coordinator EmergencyPreparednessManager($igWP):IDate:%
Ii1e#A210.0038Page2of2CAl523 KDP-ZZ-00400Rev.001
SUMMARY
OF CHANGES FOR EIP-ZZ-A0066, REV. 028
Page(s) Section or Description Step Number
4 3.4.3 Changed "Training Application" to "Leaming Management System (LMS)" due to retirement of the Training Application. CR 202301165-001
6 5.2.1 Changed "Training Application" to "Leaming Management System (LMS)" due to retirement of the Training Application. CR 202301165-001
6 5.2.3 Changed "Training Application" to "Leaming Management System (LMS)" due to retirement of the Training Application. CR 202301165-001
8 NOTE Deleted "An adverse condition CAR is generated by the Training Application when Emergency Response Personnel lapse required RERP continuing training" as Training Application is being retired and replaced with "Evaluate a qualification lapse in accordance with AP A-ZZ-00925 APPA." CR 202301165-001
8 5.4.1 Changed "Training Application" to "Leaming Management System (LMS)" due to retirement of the Training Application. CR 202301165-001
8 5.4.1 Deleted "(12 months,+/- 3 a month grace period)" from step 5.4.1 following "annual basis" to read "The required continuing training for an assigned position should be completed on an annual basis, unless otherwise noted in the Leaming Management System (LMS) as Training Application is being retired. CR 202301165-001
10 6.1.3 Deleted reference to Training Application DTI-030 as Training Application is being retired. CR 202301165-001