ML23354A246 | 20 December 2023 | Cracking Assessment for Framatome RSG Channel Head Assembly | Hydrostatic Finite Element Analysis Aging Management License Renewal Earthquake |
ML23215A199 | 31 August 2023 | ANP-4012NP, Callaway, Unit 1, Rod Ejection Accident Analysis Revision 2, August 2023 | Affidavit |
ML23299A198 | 16 June 2023 | Enclosure 2: Callaway RR Tech Report Containment Post-Tensioning System Inservice Inspection Technical Report Basis for Proposed Extension of Examination Interval, Revision 0 | Incorporated by reference License Renewal Pandemic COVID-19 Fuel cladding |
ML23150A189 | 18 May 2023 | EIP-ZZ-00245 Addendum H, Revision 004, Security Coordinator Checklist for the Alternate Tsc/Osa Assembly Area | |
ML23110A071 | 6 April 2023 | Procedure Review Form (PRF) for EIP-ZZ-A0066, Revision 28, RERP Training Program | Temporary Modification Cyber Security Fire Protection Program Grace period |
ML23052A049 | 14 February 2023 | Enclosure 7 - Holtec International Report HI-2230125, Revision 0, Supplemental Criticality Safety Analysis of SFP for Callaway Nuclear Generating Station, Revision 0, Dated February 14, 2023 | |
ML22349A640 | 15 December 2022 | Enclosure 14 - Schedule 14C Information for Union Electric Company March 2022 | Incorporated by reference Coronavirus |
ML22349A627 | 15 December 2022 | Enclosure 3 - 2022 Proxy Statement of Ameren Corporation | Cyber Security Incorporated by reference Pandemic COVID-19 |
ML22349A635 | 15 December 2022 | Enclosure 10 - 10-Q Filed 06/30/2022 | Pandemic Coronavirus Power change |
ML22349A632 | 15 December 2022 | Enclosure 8 - 10-K Filed 02/23/2022 | |
ML22349A636 | 15 December 2022 | Enclosure 11 - 10-Q Filed 09/30/2022 | Pandemic Coronavirus Power change |
ML22349A634 | 15 December 2022 | Enclosure 9 - 10-Q Filed 03/31/2022 | Pandemic Coronavirus Power change |
ML22327A224 | 23 November 2022 | Enclosure 1: Callaway Plant - Report Period: 10 CFR 50.59 and 10 CFR 72.48 Summary Report June 16, 2021 to November 23, 2022 | |
ML22335A501 | 16 November 2022 | Enclosure 3: ANP-4012NP, Revision 1, Callaway Rod Ejection Accident Analysis | Affidavit |
ML22318A190 | 14 November 2022 | Enclosure 2 - Pressurized Water Reactor Owners Group Letter, OG-22-187, Subject: PWR Owners Group Mode 4 LOCA Analysis for Westinghouse NSSS Plants | |
ML22299A235 | 21 October 2022 | HI-2220020, Revision 2, Non Proprietary Version of Criticality Safety Analysis of SFP for Callaway Nuclear Generating Station | Internal Flooding Fuel cladding |
ML22285A124 | 12 October 2022 | Attachment 7 to Enclosure 1: ANP-3943NP, Callaway Small Break LOCA Analysis with Gaia Fuel Design, Revision 1, Dated October 2022 | Loop seal Hydrostatic Affidavit |
ML22285A123 | 12 October 2022 | Attachment 6 to Enclosure 1: ANP-3944NP, Callaway Realistic Large Break LOCA Analysis with Gaia Fuel Design, Revision 1, Dated October 2022 | Boric Acid Affidavit |
ML22285A122 | 12 October 2022 | Attachment 5 to Enclosure 1: ANP-3947NP, Callaway Unit 1 License Amendment Request Inputs for Use of Framatome Fuel, Revision 3, Dated October 2022 | Safe Shutdown Shutdown Margin Anticipated operational occurrence Safe Shutdown Earthquake Operating Basis Earthquake Earthquake Fuel cladding Affidavit |
ML22285A125 | 12 October 2022 | Attachment 8 to Enclosure 1: ANP-3969NP, Callaway Non-LOCA Summary Report, Revision 2, Dated October 2022 | Boric Acid Shutdown Margin Stroke time Fuel cladding Coast down Affidavit |
ML22181B141 | 30 June 2022 | Enclosure 4 - Replacement for Enclosure 4, Information Supporting Justification of Excluding Sources of Risk Not Addressed by the PRA Models, of ULNRC-06688 | Safe Shutdown High winds Internal Flooding Probabilistic Risk Assessment Large early release frequency Earthquake Turbine Missile |
ML22181B140 | 30 June 2022 | Enclosure 1 - Replacement for Enclosure 1, List of Revised Required Actions to Corresponding PRA Functions, of ULNRC-06688 | Safe Shutdown High winds Ultimate heat sink Mission time Stroke time Anticipated operational occurrence Probabilistic Risk Assessment Offsite Circuit |
ML22181B136 | 30 June 2022 | Attachment 6 - Replacement for Attachment 6, Description and Assessment Specific to TSTF-439, of ULNRC-06688 | Offsite Circuit |
ML22153A185 | 2 June 2022 | Attachment 8 - Non-Proprietary Version of Non-LOCA Summary Report | Boric Acid Shutdown Margin Stroke time Fuel cladding Coast down |
ML22153A183 | 2 June 2022 | Attachment 7 - Non-Proprietary Version of SBLOCA Summary Report | Loop seal Hydrostatic |
ML22153A182 | 2 June 2022 | Attachment 6 - Non-Proprietary Version of Rlbloca Summary Report | Boric Acid |
ML22027A808 | 27 January 2022 | Enclosure 3: Callaway, Unit 1, Methodology for a Risk-Informed Approach to Address Generic Letter 2004-02 | Boric Acid Reactor Vessel Water Level Non-Destructive Examination Mission time Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Operating Basis Earthquake Finite Element Analysis FLEX Foreign Material Exclusion Large early release frequency Exemption Request Fuel cladding |
ML21272A170 | 28 September 2021 | Enclosure 2 - Full Scope Implementation of Alternative Source Term Evaluation of Proposed Changes (Redacted) | Safe Shutdown Boric Acid Anticipated operational occurrence Deep Dose Equivalent Fuel cladding Unidentified leakage |
ULNRC-06683, Enclosure 3: Callaway, Unit 1, Amendment Request Regarding Risk-Informed Approach to Closure of Generic Safety Issue 191 - CAL Roverd Results Baseline (Non-Isolable Breaks) | 23 August 2021 | Enclosure 3: Callaway, Unit 1, Amendment Request Regarding Risk-Informed Approach to Closure of Generic Safety Issue 191 - CAL Roverd Results Baseline (Non-Isolable Breaks) | |
ML21237A138 | 23 August 2021 | Enclosure 2: Callaway, Unit 1, Amendment Request Regarding Risk-Informed Approach to Closure of Generic Safety Issue 191 - CAL Roverd Results Baseline (Critical Breaks) | |
ML21237A137 | 23 August 2021 | Enclosure 1: Callaway, Unit 1, Amendment Request Regarding Risk-Informed Approach to Closure of Generic Safety Issue 191 - Baseline Weld Input | |
ULNRC-06526, Methodology for a Risk-Informed Approach to Address Generic Letter 2004-02 | 22 July 2021 | Methodology for a Risk-Informed Approach to Address Generic Letter 2004-02 | Boric Acid Reactor Vessel Water Level Non-Destructive Examination Mission time Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Operating Basis Earthquake Finite Element Analysis FLEX Foreign Material Exclusion Large early release frequency Exemption Request Fuel cladding |
ULNRC-06660, Cycle 24 Commitment Change Summary Report | 22 June 2021 | Cycle 24 Commitment Change Summary Report | |
ML21090A188 | 31 March 2021 | Enclosure 3 - Callaway Methodology for a Risk-Informed Approach to Address Generic Letter 2004-02 | Boric Acid Reactor Vessel Water Level Non-Destructive Examination Mission time Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Operating Basis Earthquake Finite Element Analysis FLEX Foreign Material Exclusion Large early release frequency Exemption Request Fuel cladding |
ML21090A250 | 31 March 2021 | Attachment 1 - Changes to the Westinghouse ECCS Evaluation Model and PCT Penalty Assessments | |
ML20178A673 | 26 June 2020 | Attachment 3 - Callaway Unit 1, Steam Generator Operational Assessment to Support Deferral of Planned Inspections from 1R24 to 1R25, Revision 1 (Redacted) | Foreign Material Exclusion Pandemic COVID-19 EVT-1 |
ML20178A671 | 26 June 2020 | Attachment 1 - Discussion of Change | Safe Shutdown Anticipated operational occurrence Surveillance Frequency Control Program Foreign Material Exclusion Coronavirus COVID-19 EVT-1 |
ULNRC-06571, 10 CFR 50.46 Annual Report, ECCS Evaluation Model Revisions | 31 March 2020 | 10 CFR 50.46 Annual Report, ECCS Evaluation Model Revisions | |
ML20070R121 | 10 March 2020 | Technical Specification Page Markup | |
ML20070R114 | 10 March 2020 | Description and Assessment of the Proposed Change | Safe Shutdown |
ULNRC-06534, RERP Appendix J, Revision 005 Callaway Plant On-Shift Staffing Analysis Report | 26 September 2019 | RERP Appendix J, Revision 005 Callaway Plant On-Shift Staffing Analysis Report | Safe Shutdown Boric Acid Ultimate heat sink NFPA 805 FLEX |
ML19024A474 | 23 January 2019 | Attachment 4 - FSAR Technical Requirements I 6.7.13 | |
ML18208A168 | 19 June 2018 | Revised Site Addendum Item - Chapter 10, Steam and Power Conversion System | |
ML18208A167 | 19 June 2018 | Revised Site Addendum Item - Chapter 9.0, Auxiliary Systems | Safe Shutdown High winds Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Operating Basis Earthquake Tornado Missile Protection |
ML18208A166 | 19 June 2018 | Revised Site Addendum Item - Chapter 9.0, Figures | |
ML18208A165 | 19 June 2018 | Revised Site Addendum Item - Chapter 8.0, Electric Power | |
ML18208A164 | 19 June 2018 | Revised Site Addendum Item - Chapter 8.0, Figures | |
ML18208A163 | 19 June 2018 | Revised Site Addendum Item - Chapter 4.0, Reactor | |
ML18208A162 | 19 June 2018 | Revised Site Addendum Item - Chapter 3.0, Design of Structures, Components, Equipment and Systems | Ultimate heat sink Offsite Dose Calculation Manual Tornado Missile Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Finite Element Analysis Tornado Generated Missile Tornado Missile Protection Process Control Program Earthquake Turbine Missile |
ML18208A161 | 19 June 2018 | Revised Site Addendum Item - Chapter 3.0, Figures |