MONTHYEARML20071B4701983-02-22022 February 1983 Proposed Revs to Tech Spec Re Anticipatory Reactor Trip Sys,Boration Sys Temp & Corrections to Typographical Errors in Administrative Section Project stage: Other ML20071B4681983-02-22022 February 1983 Forwards Proposed Tech Spec Changes Re Anticipatory Reactor Trip Sys,Boration Sys Temp & Corrections to Typographical Errors in Administration Section Project stage: Other ML20078M6201983-10-11011 October 1983 Proposed Tech Spec Sections 4.1.2.1,4.1.2.2,3.1.2.8 & 3.1.2.9 Re Time for Temp Verification During & After Transport of Demineralized Water & Low Boron Concentration Liquid Project stage: Other ML20078M5981983-10-11011 October 1983 Application for Amend to License NPF-3,changing Tech Spec Sections 4.1.2.1,4.1.2.2,3.1.2.8 & 3.1.2.9 to Extend Time for Temp Verification During & After Transport of Demineralized Water & Low Boron Concentration Liquid Project stage: Request ML20078M5621983-10-11011 October 1983 Forwards Application for Amend to License NPF-3,changing Tech Spec Sections 4.1.2.1,4.1.2.2,3.1.2.8 & 3.1.2.9 to Extend Time for Temp Verification During & After Transport of Demineralized Water & Liquids W/Low Boron Concentration Project stage: Request ML20078J5251983-10-11011 October 1983 Proposed Tech Specs Extending Temp Verification Time During & After Transport of Demineralized Water & Low Boron Concentration of Liquids of Less than 5,000 Ppm Boron Project stage: Other 1983-10-11
[Table View] |
Proposed Tech Specs Extending Temp Verification Time During & After Transport of Demineralized Water & Low Boron Concentration of Liquids of Less than 5,000 Ppm BoronML20078J525 |
Person / Time |
---|
Site: |
Davis Besse |
---|
Issue date: |
10/11/1983 |
---|
From: |
TOLEDO EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20078J524 |
List: |
---|
References |
---|
TAC-51388, NUDOCS 8310170503 |
Download: ML20078J525 (4) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20216E6111999-09-0707 September 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210H0731999-07-28028 July 1999 Proposed Tech Specs 3/4.7.5.1, Ultimate Heat Sink, Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4311999-07-27027 July 1999 Proposed Tech Specs,Changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G4801999-07-26026 July 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210G9161999-07-26026 July 1999 Proposed Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5391999-07-26026 July 1999 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B for Type B & C Containment Leakage Rate Testing ML20195F9351999-06-10010 June 1999 Proposed Tech Specs,Revising TS 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.6.5.1, Crevs ML20207E7941999-05-21021 May 1999 Proposed Tech Specs Allowing Use of Expanded Spent Fuel Storage Capability ML20205E5031999-03-19019 March 1999 Proposed Tech Specs Withdrawing Proposed New Action B, Previously Submitted in 981027 Application ML20204F1821999-03-0909 March 1999 Proposed Tech Specs,Adopting Changes in Frequency & Scope of Volumetric & Surface Exams Justified by W TR WCAP-14535A ML20155E3231998-10-28028 October 1998 Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155E4971998-10-28028 October 1998 Proposed Tech Specs 4.0.2 Re Applicability of 25% Surveillance Interval Extension Allowance ML20155D7791998-10-27027 October 1998 Proposed Tech Specs Relocating TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155E0721998-10-27027 October 1998 Proposed Tech Specs Revising 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation,To Provide Potential Reduction in Spurious Trip Rate for Potential Cost Savings in Excess of $50,000 ML20155D8521998-10-27027 October 1998 Proposed Tech Specs Revising SRs 4.8.2.3.2.d,4.8.2.3.2.e, 4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20151W2991998-09-0808 September 1998 Proposed Tech Specs Revising Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20151W3071998-09-0808 September 1998 Proposed Tech Specs Permitting Use of Framatome Cogema Fuels M5 Advanced Alloy for Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20217P8351998-04-24024 April 1998 Proposed Tech Specs Clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20217P8811998-04-24024 April 1998 Proposed Tech Specs 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases Relocating Tables of Response Time Limits to Plant USAR Technical Requirements Manual ML20217C4881998-03-20020 March 1998 Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG ML20217N4471998-02-27027 February 1998 Proposed Tech Specs Pages Provided to Modify Proposed New Action 3.7.6.1.b to Make More Consistent w/NUREG-1431 ML20203L1111998-02-26026 February 1998 Proposed Tech Specs Pages Re Amend to License NPF-3 Involving Incorporation of New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2621997-12-23023 December 1997 Proposed Tech Specs Pages Re Changes to TS Definition 1.2, TS 3/4/9.5 & New TS 3.0.6 & Associated Bases.Ts Index Rev to Reflect Change to TS 3/4.9.5,included ML20197J5971997-12-23023 December 1997 Proposed Tech Specs Pages,Revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217R2821997-08-26026 August 1997 Proposed Tech Specs,Clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2871997-08-26026 August 1997 Proposed Tech Specs,Modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5981997-07-29029 July 1997 Proposed Tech Specs 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating ML20141F1101997-06-24024 June 1997 Proposed Tech Specs,Deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138C3261997-04-18018 April 1997 Proposed Tech Specs 3/4.7.6 Revising Limiting Condition for Operation to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20138A6891997-04-18018 April 1997 Proposed Tech Specs 3/4.5.3.2.1 & 3/4.5.2 Modifying Presently Specified 18-month Surveillance Frequencies to New Specified Frequencies of Once Each 24-months ML20138M1281997-02-14014 February 1997 Proposed Tech Specs 3.5.2 Re Emergency Core Cooling Systems & 4.5.2.f Re Surveillance Requirements ML20134L0561997-02-13013 February 1997 Proposed Tech Specs Re Changes Made Concerning Decay Heat Removal Sys Valve ML20134D7621997-01-30030 January 1997 Proposed Tech Specs Revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134F1811997-01-30030 January 1997 Proposed Tech Specs Re Possession & Use of SNM as Reactor Fuel ML20134B0591997-01-20020 January 1997 Proposed Tech Specs 3/4.5.3 Re ECCS Subsystems ML20132B7031996-12-11011 December 1996 Proposed Tech Specs Revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle for License NPF-3 ML20134F1891996-10-28028 October 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Systems ML20117P5311996-09-17017 September 1996 Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8531996-09-12012 September 1996 Proposed Tech Specs Re Reactivity Control Systems & Emergency Core Cooling Systems ML20117M2201996-09-0404 September 1996 Proposed Tech Specs 6.2.3,removing Specific Overtime Limits & Working Hours ML20116K2631996-08-0707 August 1996 Proposed Tech Specs Re Definitions,Applicability Bases, Containment Spray Sys & Containment Isolation Valve for Conversion to 24 Month Fuel Cycle ML20117K1911996-05-28028 May 1996 Proposed Tech Specs 3/4.3.1.1 - RPS Instrumentation & TS 3/4.3.2.3 - Anticipatory RTS Instrumentation Increasing Trip Device Test Interval ML20101M1921996-03-29029 March 1996 Proposed Tech Specs 3/4.6.4.4 - HPS,3/4.6.5.1 - Shield Building Evs & 3.4.7.6.1 - CREVS Re Changing Surveillance Requirements for Charcoal Filter Lab Testing to Revise Methodology Used to Determine Operability in ESF AHUs ML20101C6961996-03-0606 March 1996 Proposed Tech Specs,Allowing Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408 ML20100E0101996-02-0505 February 1996 Proposed TS 3/4.3.2.1,Table 3.3-3,safety Features Actuation Sys Instrumentation,Reflecting Design & Actuation Logic of Plant Sequencers & Essential Bus Undervoltage Relays ML20095F5891995-12-12012 December 1995 Proposed Tech Specs Re Containment Sys ML20094D0611995-10-31031 October 1995 Proposed TS Page 6-18,deleting TS 6.9.2.d, Seismic Event Analysis ML20098C5181995-10-0202 October 1995 Proposed Tech Specs,Revising TS Section 5.0,design Features & Adopting Improved STS for B&W Plants Format & Content ML20098C4111995-09-29029 September 1995 Proposed TS 3/4.1.2.8 Re Reactivity Control Sys - Borated Water Sources - Shutdown TS 3/4.1.2.8 Re Reactivity Control Sys - Operating & TS 3/4.5.1 Re ECCS - Core Flooding Tanks ML20098C1121995-09-29029 September 1995 Proposed TS 3.4.3 & Associated Bases,Modifying Lift Setting of Pressurizer Code Safety Valves to Greater than or Equal to 2,575 Psig,Corresponding to Lift Setting Tolerance of +3% of Nominal Lift Pressure 1999-09-07
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20216E6111999-09-0707 September 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210H0731999-07-28028 July 1999 Proposed Tech Specs 3/4.7.5.1, Ultimate Heat Sink, Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4311999-07-27027 July 1999 Proposed Tech Specs,Changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G4801999-07-26026 July 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210G9161999-07-26026 July 1999 Proposed Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5391999-07-26026 July 1999 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B for Type B & C Containment Leakage Rate Testing ML20195F9351999-06-10010 June 1999 Proposed Tech Specs,Revising TS 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.6.5.1, Crevs ML20207E7941999-05-21021 May 1999 Proposed Tech Specs Allowing Use of Expanded Spent Fuel Storage Capability ML20205E5031999-03-19019 March 1999 Proposed Tech Specs Withdrawing Proposed New Action B, Previously Submitted in 981027 Application ML20204F1821999-03-0909 March 1999 Proposed Tech Specs,Adopting Changes in Frequency & Scope of Volumetric & Surface Exams Justified by W TR WCAP-14535A ML20155E4971998-10-28028 October 1998 Proposed Tech Specs 4.0.2 Re Applicability of 25% Surveillance Interval Extension Allowance ML20197G5521998-10-28028 October 1998 Rev 8 to Dbnps,Unit 1 Technical Requirements Manual ML20155E3231998-10-28028 October 1998 Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155D7791998-10-27027 October 1998 Proposed Tech Specs Relocating TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155D8521998-10-27027 October 1998 Proposed Tech Specs Revising SRs 4.8.2.3.2.d,4.8.2.3.2.e, 4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20155E0721998-10-27027 October 1998 Proposed Tech Specs Revising 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation,To Provide Potential Reduction in Spurious Trip Rate for Potential Cost Savings in Excess of $50,000 ML20151W3071998-09-0808 September 1998 Proposed Tech Specs Permitting Use of Framatome Cogema Fuels M5 Advanced Alloy for Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20151W2991998-09-0808 September 1998 Proposed Tech Specs Revising Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20206D2721998-08-28028 August 1998 Rev 11,change 1 to Odcm ML20217P8351998-04-24024 April 1998 Proposed Tech Specs Clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20217P8811998-04-24024 April 1998 Proposed Tech Specs 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases Relocating Tables of Response Time Limits to Plant USAR Technical Requirements Manual ML20217C4881998-03-20020 March 1998 Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG ML20217N4471998-02-27027 February 1998 Proposed Tech Specs Pages Provided to Modify Proposed New Action 3.7.6.1.b to Make More Consistent w/NUREG-1431 ML20203L1111998-02-26026 February 1998 Proposed Tech Specs Pages Re Amend to License NPF-3 Involving Incorporation of New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2621997-12-23023 December 1997 Proposed Tech Specs Pages Re Changes to TS Definition 1.2, TS 3/4/9.5 & New TS 3.0.6 & Associated Bases.Ts Index Rev to Reflect Change to TS 3/4.9.5,included ML20197J5971997-12-23023 December 1997 Proposed Tech Specs Pages,Revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217M5601997-09-0505 September 1997 Rev 11.0 to Davis-Besse Odcm ML20217R2821997-08-26026 August 1997 Proposed Tech Specs,Clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2871997-08-26026 August 1997 Proposed Tech Specs,Modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5981997-07-29029 July 1997 Proposed Tech Specs 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating ML20141F1101997-06-24024 June 1997 Proposed Tech Specs,Deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138C3261997-04-18018 April 1997 Proposed Tech Specs 3/4.7.6 Revising Limiting Condition for Operation to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20138A6891997-04-18018 April 1997 Proposed Tech Specs 3/4.5.3.2.1 & 3/4.5.2 Modifying Presently Specified 18-month Surveillance Frequencies to New Specified Frequencies of Once Each 24-months ML20140D9481997-04-0909 April 1997 ODCM, Rev 10 ML20138M1281997-02-14014 February 1997 Proposed Tech Specs 3.5.2 Re Emergency Core Cooling Systems & 4.5.2.f Re Surveillance Requirements ML20134L0561997-02-13013 February 1997 Proposed Tech Specs Re Changes Made Concerning Decay Heat Removal Sys Valve ML20134F1811997-01-30030 January 1997 Proposed Tech Specs Re Possession & Use of SNM as Reactor Fuel ML20134D7621997-01-30030 January 1997 Proposed Tech Specs Revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134B0591997-01-20020 January 1997 Proposed Tech Specs 3/4.5.3 Re ECCS Subsystems ML20132B7031996-12-11011 December 1996 Proposed Tech Specs Revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle for License NPF-3 ML20134F1891996-10-28028 October 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Systems ML20117P5311996-09-17017 September 1996 Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8531996-09-12012 September 1996 Proposed Tech Specs Re Reactivity Control Systems & Emergency Core Cooling Systems ML20117M2201996-09-0404 September 1996 Proposed Tech Specs 6.2.3,removing Specific Overtime Limits & Working Hours ML20116K2631996-08-0707 August 1996 Proposed Tech Specs Re Definitions,Applicability Bases, Containment Spray Sys & Containment Isolation Valve for Conversion to 24 Month Fuel Cycle ML20117K1911996-05-28028 May 1996 Proposed Tech Specs 3/4.3.1.1 - RPS Instrumentation & TS 3/4.3.2.3 - Anticipatory RTS Instrumentation Increasing Trip Device Test Interval ML20101M1921996-03-29029 March 1996 Proposed Tech Specs 3/4.6.4.4 - HPS,3/4.6.5.1 - Shield Building Evs & 3.4.7.6.1 - CREVS Re Changing Surveillance Requirements for Charcoal Filter Lab Testing to Revise Methodology Used to Determine Operability in ESF AHUs ML20101C6961996-03-0606 March 1996 Proposed Tech Specs,Allowing Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408 ML20100E0101996-02-0505 February 1996 Proposed TS 3/4.3.2.1,Table 3.3-3,safety Features Actuation Sys Instrumentation,Reflecting Design & Actuation Logic of Plant Sequencers & Essential Bus Undervoltage Relays ML20107C3101995-12-21021 December 1995 Rev 9 to Odcm 1999-09-07
[Table view] |
Text
_
J(
REACTIVITY CONTROLS SYSTEMS ,
L OW PATHS - OPERATING 1,IMITING C0!!DITION FOR OPERATION 3.1.2.2 Each of the following boron injection flow paths shall be OPERABLE: . ,
- a. A flow path from the concentrated boric acid stor;ge system via a boric acid pump aad makeup or oecay heat esmoval (DHR) pump to the Reactor Coolant System, and -
- b. A flow path from the borated water storage tank via makeup or DHR pump to the Reactor Coolant System. ..
]
APPLICABILITY: MODES 1, 2, 3 and 4'. ,
ACTION:
D
,. a. With the flow path from the concentrated boric acid storage j system inoperable, restore the inoperable flow path to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY and l
~
borated to a SHUTDOWN MARGIN equivalent to 1% th/k at 200'F l.
within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore the flow path to OPERABLE
& status within the next 7 , days or be in COLD SHUTDOWN within the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. _ :
- b. With the flow path from the barated water storage tank in- !'
operable, restore the flow path to OPERABLE status within one hour or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTCOWN witnin the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
il
'SURVIELLANCE REOUIREMENTS !!
l 4.1.2.2 Eacn of the above required flow paths shall be camonsmtad OPERABLE: '
6)
. a. At least once per 7 days by verifying that the pipe tempera- , [
tura of the heat traced portion of the flow path from the '
concentrated boric acid storage system is > 105'F. ,, .q
'o (l) IF THE 7 bay VERmicATi$ FAL.I.5 bVPJNG TRANSFERS oF MArJa. uF WATER cR DlL*JTE Bogod 5o1.0T109.5 (Pt LJiD s,cuRac co peeprRApoR .
f' oF LESS TH E. VERIFicATio p PERIOD M Ay B F, THAN UP To 5000g HouffmB[RS Ey.Te.WbED AFTER. THE ADDiMod oF tp.We BoRoM SolvTsou H A's Be.ep SToPP@ Fort A PER i o.D oF ATLeA.sr DAVIS-BESSE, UNIT 1 **
3/4 1 7 '
8310170503 831011 - 3 PDR ADOCK 05000306 l P PDR
(
) -
n
[ _E a3 -% .a . MrW2.p , .O t 2 a a fvtyeetMtg
. ~
. . r' .
lREACTIVITYCONTROLSYSTEMS 3/A.1.2 BORATION SYSTEMS - .
FLOW PATHS - SHU'DOWN LIMITING CONDITION FOR OPERATION _
3.1. 2.1 At least one of the following boron injection flow paths shall be OPERA 8LE.
- a. A flow path from the concentrated boric acid storage system !
via a boric acid pump and a makeup or decay heat removal (DHR) pump to the Reactor Coolant System, if only the boric, acid storage system in Specification 3.1.2.8a is OPERABLE, or
- b. A flow path from the borated water storage tank via a makaup cr DHR pump to the Reactor Coolant System if only'tne borated I water storage tank in Specification 3.1.2.Sb is OPEM5LE. ;
. APPLICABILITY: P.0 DES 5'and 6.
ACTION: }
With none of the above flow paths OPERABLE, suspenc all operations
. involving CORE ALTERATIONS or positive racctivity changes until at least );
one injection path is restored to OPERASLE status. ,
SURVEILLANCE REOUIREMENTS 4.1. 2.1 At least one of the above required. flow paths shall be demon-strated OPERABLE:
0 At lesst once per 7 days)by verifying that the pipe tempera-
- a. l ture of the heat traced portion of tne flow path is > 105'F when a flow path from the concentrated boric acid storage i system is used, and ,
- b. At least once per 31 days by verifying that each valve (manual, power opsrated or automatic) in the flow path that is not ,
locked, sealed or othemise secured in position is in its correct position. !1 (y IF Tl* 7 BAY veRIFleATielv FAu..s DURif)G TRAV5FERA 0F MAkevP lo W ATER, oR. ItLUTE ( % l20 p m L N Tio 9 5 Cf:LulD SouRas cropaspTgA&g l.
OF LeSs THA4 s.ooo grn8), THE V'sR.II:1eATio9 PER.IoD M AY ,
6E EXTen-)be!D UP TO ElGHT Hougs AFTER THE ADDlTiod ,
~
oF BNUTe Bogop CoLuTiep HAS bet 9 SToP ped FoR A PERT o)
OF ATLEAST 8 Hoo RS.
DA IS-EESSE, UNIT 1 , 3/416' .
..l REiCTIVITY CO,NTROL SYSTEMS -
BORATED WATER SOURCES - SHUTOOWN l
4 LIMITING CONDITION FOR OPERATION 3.1.2.8 As a minimum, one of the following borated water sources shall be OPERABLE:
- a. 1 A boric acid addition system :. d .=;;i;.d S :t t{;;i 7 with:
- 1. A minimum contained bo, rated water volume in accordance
, with Figure 3.1-1,
- 2. Between 7875 and 13,125 ppm of boron, and :
- 3. A minimum solution temperature of 10S*F. )o
- b. The borated water storage tank (BWST) with:
- 1. A minimum contained borated water volume of 70,700
. gallons,
- 2. A minimum boron concentration of 1800 ppm, and
- 3. A minimum solution temperature of 35'F.
i l APPLICABILITY: MODES 5 and 6.
ACTION:
With no borated water sources OPERABLE, su: pend all operations involving CORE ALTERATION or positive reactivity changes until at least one borated water source is restored to OPERABLE status. i ll it SURVEILLANCE REQUIREMENTS __
il
.4 4.1.2.8 The above reouired borated water source shall be demonstrated h OPERABLE: ;!
- a. At least once per 7 days by: "
- 1. Verifying the boron concentration of the water,
- 2. Verifying the contained borated water volume of the -
source, and ':
DAVIS-BESSE, UNIT 1 3/4 1-14
- l. .
l l
s
.m , n =r- m : n r m . m . - m z.y - - - z; m m v'-- ~
' J '
REACTIVITY CONTROL SYSTEMS BORATED WATER SOURCES - OPERATING LIMITING CONDITION FOR OPERATION 3.1.2.9 Each of the following borated water sources shall be OPERABLE:
- a. The boric acid addition system :nd :::::b 0d .',;;; '.. .;;r,9 with: -
l 1. A minimum contained borated water volume in accordance :
lO i
with Figure 3.1-1, C
, 2. Between 7875 and 13,125 ppen of baron, and l 3. A minimum solution temperature of 105'F. '
- b. The borated water storage tank (BWST) with:
- 1. A contained borated water volume of between 482,778 and 550.000 gallons,
, 2. Between 1800 and 2200 ppm of bcron, and
, 3. A minimum solution temperature of 35'F.
APPLICABILITY: MODES 1, 2, 3 and 4. j ACTION:
- a. With the boric acid addition system inoperable, restore the storage system to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at '
least HOT STANDBY and borated to a SHUTDOWN MARGIN equivalent to 1:; ak/k at 200*F within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore the boric acid addition system to OPERABLE status within the next 7 days or be in COLD SHUTOOWN within the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. '
- i i b. With the borated water storage tank inoperable, restore the
' tank to OPERABLE status within one hour or be-in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. - -
f
. b
- j e
DAVIS-BESSE, UNIT 1 3/4 1-17 Amendment No. 36 w , - -