ML21361A275: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-301                        Transient and Event Checklist                      Form ES-301-5 Facility: Byron                      Date of Exam: 09/27/21        Operating Test No.: 2021-301 A          E                                  Scenarios (Crew A)
{{#Wiki_filter:}}
P          V 5              2                  3          3 (Crew C)      T    M P          E O    I L        N CREW POSITION CREW POSITION CREW POSITION CREW POSITION T    N I        T S    A    B    S    A    B      S      A    B  S    A      B          I C                                                                                  A R    T    O    R    T    O      R      T    O  R    T      O          M A          T                                                                      L O    C    P    O    C    P      O      C    P  O    C      P          U N          Y M(*)
T        P E                                                                          R    I  U RO          RX  5              2                          1                          3    1  1  0 NOR 1              1                                                    2    1  1  1 SRO-I1 I/C 2, 4          3, 4,                      2,3                        9    4  4  2 SRO-U                          5, 7, 9
MAJ 6              8                          5                          3    2  2  1 TS  2, 3          5, 6                                                  4    0  2  2 RO-1        RX      5                    2                                  1      3    1  1  0 SRO-I      NOR      1                    1                                  1      3    1  1  1 I/C      2, 4                  5, 7,                              4      6    4  4  2 SRO-U                                      9 MAJ      6                    8                                  5      3    2  2  1 TS                                                                      0    0  2  2 RO-7        RX            5          2                        1                    3    1  1  0 SRO-I      NOR                                                1                    1    1  1  1 I/C          2, 8      3, 4                      4                    5    4  4  2 SRO-U MAJ          6          8                        5                    3    2  2  1 TS                                                                      0    0  2  2 RO          RX                                                                      0    1  1  0 NOR                                                                      0    1  1  1 SRO-I I/C                                                                      0    4  4  2 SRO-U      MAJ                                                                      0    2  2  1 TS                                                                      0    0  2  2
 
ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
 
ES-301                        Transient and Event Checklist                        Form ES-301-5 Facility: Byron                      Date of Exam: 09/27/21            Operating Test No.: 2021-301 A          E                                  Scenarios (Crew B)
P          V 5              2                  3                  4        T      M P          E O      I L        N CREW POSITION CREW POSITION CREW POSITION CREW POSITION T      N I        T S    A    B    S    A    B      S      A    B    S      A    B          I C                                                                                    A R    T    O    R    T    O      R      T    O    R      T    O          M A          T                                                                        L O    C    P    O    C    P      O      C    P    O      C    P          U N          Y M(*)
T        P E                                                                            R    I  U RO          RX                2                  1                        6          3    1  1  0 NOR                1                  1                                    2    1  1  1 SRO-I2 I/C                3, 4,              2, 3,                    2, 7      10    4  4  2 SRO-U                          5, 7,              4 9
MAJ                8                  5                        8          3    2  2  1 TS                5, 6              4                                    3    0  2  2 RX  5                                        1          6                  3    1  1  0 RO          NOR 1                                                  1                  2    1  1  1 SRO-I4      I/C 2, 4                                    2, 3      2, 3,              9    4  4  2 4, 5, SRO-U                                                              7 MAJ 6                                        5          8                  3    2  2  1 TS  2, 3                                                1, 4, 7            5    0  2  2 RO-2        RX      5                    2                  1                      3    1  1  0 SRO-I      NOR      1                    1                  1                      3    1  1  1 I/C      2, 4                  5, 7,              4                      6    4  4  2 SRO-U                                      9 MAJ      6                    8                  5                      3    2  2  1 TS                                                                        0    0  2  2 RO-5        RX            5          2                                          6    3    1  1  0 SRO-I      NOR                                                                  1    1    1  1  1 I/C          2, 8      3, 4                                        3, 4, 7    4  4  2 SRO-U                                                                            5 MAJ          6          8                                          8    3    2  2  1 TS                                                                        0    0  2  2
 
ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
 
ES-301                        Transient and Event Checklist                        Form ES-301-5 Facility: Byron                      Date of Exam: 09/27/21            Operating Test No.: 2021-301 A          E                                Scenarios (Crew C)
P          V 5              3                  4            3 (Crew A)      T      M P          E O      I L        N CREW POSITION CREW POSITION CREW POSITION CREW POSITION T      N I        T S    A    B    S    A    B    S      A    B    S    A      B          I C                                                                                    A R    T    O    R    T    O    R      T    O    R      T    O          M A          T                                                                        L O    C    P    O    C    P    O      C    P    O    C      P          U N          Y M(*)
T        P E                                                                            R    I  U RO          RX  5                                      6          1                  3    1  1  0 NOR 1                                                  1                  2    1  1  1 SRO-I3 I/C 2, 4                                    2, 7        2, 3,              7    4  4  2 SRO-U                                                              4 MAJ 6                                      8          5                  3    2  2  1 TS  2, 3                                                4                  3    0  2  2 RX      5        1                6                                    3    1  1  0 RO          NOR      1        1                1                                    3    1  1  1 SRO-I5      I/C      2, 4      2, 3,            2, 3,                                10    4  4  2 4                4, 5, SRO-U                                            7 MAJ      6        5                8                                    3    2  2  1 TS                  4                1,4,7                                4    0  2  2 RO-3        RX            5          1                        6                        3    1  1  0 SRO-I      NOR                                              1                        1    1  1  1 I/C          2, 8      2, 3                    3, 4,                    7    4  4  2 SRO-U                                                        5 MAJ          6          5                        8                        3    2  2  1 TS                                                                        0    0  2  2 RO          RX                                                                        0    1  1  0 NOR                                                                        0    1  1  1 SRO-I I/C                                                                        0    4  4  2 SRO-U      MAJ                                                                        0    2  2  1 TS                                                                        0    0  2  2
 
ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
 
ES-301                          Transient and Event Checklist                      Form ES-301-5 Facility: Byron                        Date of Exam: 09/27/21        Operating Test No.: 2021 -301 A          E                                    Scenarios (Crew D)
P          V 2                4                                            T      M P          E O      I L        N CREW POSITION CREW POSITION CREW POSITION CREW POSITION T      N I        T S    A    B    S    A    B      S    A    B  S    A      B            I C                                                                                  A R    T    O    R    T    O      R    T    O  R    T    O            M A          T                                                                        L O    C    P    O    C    P      O    C    P  O    C      P          U N          Y M(*)
T        P E                                                                            R    I  U RO          RX  2                6                                                    2    1    1  0 NOR 1                1                                                    2    1    1  1 SRO-I I/C 3, 4,            2, 3,                                                9    4    4  2 SRO-U-1        5, 7,            5, 7 9
MAJ 8                8                                                    2    2    2  1 TS  5, 6            1,4,7                                                5    0    2  2 RX        2                      6                                        2    1    1  0 RO-4 NOR                              1                                        1    1    1  1 SRO-I      I/C      3, 4                  3, 4,                                    5    4    4  2 5
SRO-U MAJ      8                      8                                        2    2    2  1 TS                                                                        0    0    2  2 RO-6        RX            2          6                                              2    1    1  0 SRO-I      NOR            1                                                          1    1    1  1 I/C            5, 7,      2, 7                                          5    4    4  2 SRO-U                      9 MAJ            8          8                                              2    2    2  1 TS                                                                        0    0    2  2 RO          RX                                                                              1    1  0 NOR                                                                            1    1  1 SRO-I I/C                                                                            4    4  2 SRO-U      MAJ                                                                            2    2  1 TS                                                                              0    2  2
 
ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.}}

Revision as of 12:50, 16 January 2022

ES-301-5
ML21361A275
Person / Time
Site: Byron  Constellation icon.png
Issue date: 10/28/2021
From: Gregory Roach
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co LLC, Exelon Generation Co
Roach G
Shared Package
ML21055A846 List:
References
Download: ML21361A275 (8)


Text