|
|
Line 21: |
Line 21: |
| Tel 205.992.5131 February 12, 1998 SOUTHERN COMFANY Energy to Serve hur u~orld'' | | Tel 205.992.5131 February 12, 1998 SOUTHERN COMFANY Energy to Serve hur u~orld'' |
| Docket Nos.: 50-348 10 CFR 50.90 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Contr01 Desk Washington, DC 20555 Joseph M. Farley Nuclear Plant Technical Specifications Change Request Pressure Temperature Limits Reoort Ladies and Gentlemen: | | Docket Nos.: 50-348 10 CFR 50.90 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Contr01 Desk Washington, DC 20555 Joseph M. Farley Nuclear Plant Technical Specifications Change Request Pressure Temperature Limits Reoort Ladies and Gentlemen: |
| By letter dated July 23,1997, Southern Nuclear Operating Company (SNC) submitted a Technical Specifications (TS) change request associated with the relocation of the reactor coolant system (RCS) pressure-temperature (P-T) limits from the TS to the Pressure Temperature Limits Report (PTLR) in accordance with the guidance provided in Generic Letter (GL) 96-03, | | By {{letter dated|date=July 23, 1997|text=letter dated July 23,1997}}, Southern Nuclear Operating Company (SNC) submitted a Technical Specifications (TS) change request associated with the relocation of the reactor coolant system (RCS) pressure-temperature (P-T) limits from the TS to the Pressure Temperature Limits Report (PTLR) in accordance with the guidance provided in Generic Letter (GL) 96-03, |
| " Relocation of the Pressure Temperature Limit Curves and Low Temperature Overpressure Protection System Limits." By letter dated November 14,1997, the NRC issued a Request for Information (RAI) requesting clarification of the methodology used associated with the Farley Nuclear Plant (FNP) TS amendment request. SNC responded to the NRC RAI by letter dated December 18,1997. | | " Relocation of the Pressure Temperature Limit Curves and Low Temperature Overpressure Protection System Limits." By {{letter dated|date=November 14, 1997|text=letter dated November 14,1997}}, the NRC issued a Request for Information (RAI) requesting clarification of the methodology used associated with the Farley Nuclear Plant (FNP) TS amendment request. SNC responded to the NRC RAI by {{letter dated|date=December 18, 1997|text=letter dated December 18,1997}}. |
| Recently, additional questions have been asked by the NRC Staffin several conference calls. | | Recently, additional questions have been asked by the NRC Staffin several conference calls. |
| Enclosure I provides the NRC StafTquestions and SNC responses. Enclosure 2 provides the revised technical specification pages. These changes must be incorporated with the technical specification pages forwarded by the December 18,1997 submittal. In accordance with the requirements of 10 CFR 50.92, Enclosure 3 provides a significant hazards evaluation for the technical specification changes. Enclosure 4 provides a revision to the PTLR methodology submitted in the December 18,1997 letter. This revision incorporates the latest NRC Staff requirements. The revised PTLRs for FNP Unit I and Unit 2 will be provided to the NRC Staff following approval of the PTLR Tec hnical Specifications change. | | Enclosure I provides the NRC StafTquestions and SNC responses. Enclosure 2 provides the revised technical specification pages. These changes must be incorporated with the technical specification pages forwarded by the December 18,1997 submittal. In accordance with the requirements of 10 CFR 50.92, Enclosure 3 provides a significant hazards evaluation for the technical specification changes. Enclosure 4 provides a revision to the PTLR methodology submitted in the {{letter dated|date=December 18, 1997|text=December 18,1997 letter}}. This revision incorporates the latest NRC Staff requirements. The revised PTLRs for FNP Unit I and Unit 2 will be provided to the NRC Staff following approval of the PTLR Tec hnical Specifications change. |
| SNC has determined that the proposed changes will not significantly increase the amount of any efIluent which may be released ofTsite and that there is no significant increase in individual or cumulative occupational radiation exposure. A copy of these proposed changes is being sent to the Alabama State Designee in accordance with 10 CFR 50.91 (b)(1). | | SNC has determined that the proposed changes will not significantly increase the amount of any efIluent which may be released ofTsite and that there is no significant increase in individual or cumulative occupational radiation exposure. A copy of these proposed changes is being sent to the Alabama State Designee in accordance with 10 CFR 50.91 (b)(1). |
| ;\p_a 9802200061 980212 ' | | ;\p_a 9802200061 980212 ' |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARL-99-035, Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld1999-10-18018 October 1999 Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld ML20217G0801999-10-0707 October 1999 Informs That on 990930,staff Conducted mid-cycle PPR of Farley & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Will Conduct Regional Insps Associated with SG Removal & Installation ML20217P0661999-10-0606 October 1999 Requests Withholding of Proprietary Rept NSD-SAE-ESI-99-389, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217B1891999-10-0404 October 1999 Submits Clarification Re Development of Basis for Determining Limiting Internal Pressure Loads Re Review of NRC SE for Cycle 16 Extension Request.Util Intends to Use Guidelines When Evaluating SG Tube Structural Integrity ML20212J8391999-09-30030 September 1999 Forwards RAI Re Request for Amends to Ts.Addl Info Needed to Complete Review to Verify That Proposed TS Are Consistent with & Validate Design Basis Analysis.Request Discussed with H Mahan on 990930.Info Needed within 10 Days of This Ltr ML20212J8801999-09-30030 September 1999 Discusses GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps. Util 980731,990607 & 03 Ltrs Provided Requested Info in Subj Gl.Nrc Considers Subj GL to Be Closed for Unit 1 L-99-032, Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 21999-09-23023 September 1999 Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 2 L-99-034, Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 21999-09-23023 September 1999 Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 2 ML20212F8861999-09-23023 September 1999 Forwards Revised Relief Request Number 32 for NRC Approval. Approval Requested by 991231 to Support Activities to Be Performed During Unit 1 Refueling Outage Scheduled for Spring of 2000 ML20212E7031999-09-23023 September 1999 Responds to GL 98-01, Year 2000 Readiness of Computer Sys at Npps. Util Requested to Submit Plans & Schedules for Resolving Y2K-related Issues ML20212F1111999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals ML20212C2351999-09-16016 September 1999 Submits Corrected Info Concerning Snoc Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20212D0101999-09-15015 September 1999 Informs That Submittal of clean-typed Copy of ITS & ITS Bases Will Be Delayed.Delay Due to Need for Resolution of Two Issues Raised by NRC staff.Clean-typed Copy of ITS Will Be Submitted within 4 Wks Following Resolution of Issues ML20212C4641999-09-13013 September 1999 Forwards Info Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams L-99-031, Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed1999-09-13013 September 1999 Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed ML20212C8041999-09-10010 September 1999 Responds to to D Rathbun Requesting Review of J Sherman Re Y2K Compliance.Latest NRC Status Rept on Y2K Activities Encl ML20212D4581999-09-10010 September 1999 Responds to to D Rathbun,Requesting Review of J Sherman Expressing Concerns That Plant & Other Nuclear Plants Not Yet Y2K Compliant ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N8041999-09-0808 September 1999 Informs That on 990930 NRC Issued GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Condition, to Holders of Nuclear Plant Operating Licenses ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20212C0071999-09-0202 September 1999 Forwards Insp Repts 50-348/99-05 & 50-364/99-05 on 990627- 0807.No Violations Noted.Licensee Conduct of Activities at Farley Plant Facilities Generally Characterized by safety-conscious Operations & Sound Engineering ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211K2131999-08-31031 August 1999 Informs That Snoc Has Conducted Review of Reactor Vessel Integrity Database,Version 2 (RVID2) & Conclude That Latest Data Submitted for Farley Units Has Not Been Incorporated Into RVID2 ML20211K4101999-08-31031 August 1999 Resubmits Relief Requests Q1P16-RR-V-5 & Q2P16-RR-V-5 That Seek to Group V661 Valves from Each Unit Into Sample Disassembly & Insp Group,Per 990525 Telcon with NRC L-99-030, Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS1999-08-30030 August 1999 Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS ML20211G6851999-08-26026 August 1999 Informs That During Insp,Technical Issues Associated with Design,Installation & fire-resistive Performance of Kaowool Raceway fire-barriers Installed at Farley Nuclear Plant Were Identified L-99-029, Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 07271999-08-19019 August 1999 Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 0727 ML20211B9431999-08-17017 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 990101-990630,IAW 10CFR26.71(d).Rept Covers Employees at Jm Farley Nuclear Plant & Southern Nuclear Corporate Headquarters ML20211B9211999-08-17017 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-348/99-09 & 50-364/99-09.Corrective Actions:Security Response Plan Was Revised to Address Vulnerabilities Identified During NRC Insp ML20210R5101999-08-12012 August 1999 Forwards Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16 Only,Based on risk- Informed Approach for Evaluation of SG Tube Structural Integrity,As Result of Staff Comments ML20212C8141999-08-0909 August 1999 Forwards Correspondence Received from Jm Sherman.Requests Review of Info Re Established Policies & Procedures ML20210T2021999-08-0606 August 1999 Forwards Draft SE Accepting Licensee Proposed Conversion of Plant,Units 1 & 2 Current TSs to Its.Its Based on Listed Documents ML20210Q4641999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr to La Reyes,As Listed,With List of Individuals to Take exam,30 Days Before Exam Date ML20210J8341999-07-30030 July 1999 Forwards Second Request for Addl Info Re Util 990430 Amend Request to Allow Util to Operate Unit 1,for Cycle 16 Based on risk-informed Probability of SG Tube Rupture & Nominal accident-induced primary-to-second Leakage ML20210G4901999-07-30030 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, Issued 990603.Ltr Contains NRC License Commitment to Utilize ASTM D3803-1989 with Efficiency Acceptance Criteria Utilizing Safety Factor of 2 L-99-028, Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines1999-07-30030 July 1999 Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines L-99-027, Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.51999-07-27027 July 1999 Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.5 ML20210G8181999-07-26026 July 1999 Forwards Insp Repts 50-348/99-04 & 50-364/99-04 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation IR 05000348/19990091999-07-23023 July 1999 Discusses Insp Repts 50-348/99-09 & 50-364/99-09 on 990308- 10 & Forwards Notice of Violation Re Failure to Intercept Adversary During Drills,Contrary to 10CFR73 & Physical Security Plan Requirements ML20210E4071999-07-22022 July 1999 Responds to NRC 990702 RAI Re Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described in NEI 97-06, SG Program Guidelines L-99-026, Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments1999-07-19019 July 1999 Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments L-99-264, Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 20011999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20209H4721999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20196J6191999-07-0202 July 1999 Forwards Final Dam Audit Rept of 981008 of Category 1 Cooling Water Storage Pond Dam.Requests Response within 120 Days of Date of Ltr 05000364/LER-1999-001, Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed1999-07-0202 July 1999 Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed ML20196J7471999-07-0202 July 1999 Forwards RAI Re Cycle 16 Extension Request.Response Requested within 30 Days of Date of Ltr ML20196J5781999-07-0202 July 1999 Forwards RAI Re 981201 & s Requesting Amend to TS Associated with Replacing Existing Westinghouse Model 51 SG with Westinghouse Model 54F Generators.Respond within 30 Days of Ltr Date ML20196J6571999-07-0202 July 1999 Discusses Closure to TAC MA0543 & MA0544 Re GL 92-01 Rev 1, Suppl 1,RV Structural Integrity.Nrc Has Revised Rvid & Releasing It as Rvid,Version 2 as Result of Review of Responses ML20196J3591999-06-30030 June 1999 Forwards SE of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARL-99-035, Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld1999-10-18018 October 1999 Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld ML20217P0661999-10-0606 October 1999 Requests Withholding of Proprietary Rept NSD-SAE-ESI-99-389, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217B1891999-10-0404 October 1999 Submits Clarification Re Development of Basis for Determining Limiting Internal Pressure Loads Re Review of NRC SE for Cycle 16 Extension Request.Util Intends to Use Guidelines When Evaluating SG Tube Structural Integrity L-99-034, Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 21999-09-23023 September 1999 Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 2 L-99-032, Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 21999-09-23023 September 1999 Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 2 ML20212F8861999-09-23023 September 1999 Forwards Revised Relief Request Number 32 for NRC Approval. Approval Requested by 991231 to Support Activities to Be Performed During Unit 1 Refueling Outage Scheduled for Spring of 2000 ML20212C2351999-09-16016 September 1999 Submits Corrected Info Concerning Snoc Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20212D0101999-09-15015 September 1999 Informs That Submittal of clean-typed Copy of ITS & ITS Bases Will Be Delayed.Delay Due to Need for Resolution of Two Issues Raised by NRC staff.Clean-typed Copy of ITS Will Be Submitted within 4 Wks Following Resolution of Issues L-99-031, Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed1999-09-13013 September 1999 Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed ML20212C4641999-09-13013 September 1999 Forwards Info Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211K2131999-08-31031 August 1999 Informs That Snoc Has Conducted Review of Reactor Vessel Integrity Database,Version 2 (RVID2) & Conclude That Latest Data Submitted for Farley Units Has Not Been Incorporated Into RVID2 ML20211K4101999-08-31031 August 1999 Resubmits Relief Requests Q1P16-RR-V-5 & Q2P16-RR-V-5 That Seek to Group V661 Valves from Each Unit Into Sample Disassembly & Insp Group,Per 990525 Telcon with NRC L-99-030, Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS1999-08-30030 August 1999 Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS L-99-029, Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 07271999-08-19019 August 1999 Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 0727 ML20211B9431999-08-17017 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 990101-990630,IAW 10CFR26.71(d).Rept Covers Employees at Jm Farley Nuclear Plant & Southern Nuclear Corporate Headquarters ML20211B9211999-08-17017 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-348/99-09 & 50-364/99-09.Corrective Actions:Security Response Plan Was Revised to Address Vulnerabilities Identified During NRC Insp ML20210R5101999-08-12012 August 1999 Forwards Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16 Only,Based on risk- Informed Approach for Evaluation of SG Tube Structural Integrity,As Result of Staff Comments ML20212C8141999-08-0909 August 1999 Forwards Correspondence Received from Jm Sherman.Requests Review of Info Re Established Policies & Procedures ML20210G4901999-07-30030 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, Issued 990603.Ltr Contains NRC License Commitment to Utilize ASTM D3803-1989 with Efficiency Acceptance Criteria Utilizing Safety Factor of 2 L-99-028, Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines1999-07-30030 July 1999 Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines L-99-027, Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.51999-07-27027 July 1999 Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.5 ML20210E4071999-07-22022 July 1999 Responds to NRC 990702 RAI Re Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described in NEI 97-06, SG Program Guidelines L-99-026, Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments1999-07-19019 July 1999 Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments L-99-264, Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 20011999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20209H4721999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 05000364/LER-1999-001, Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed1999-07-0202 July 1999 Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed L-99-024, Responds to NRC RAI Re Conversion to ITS for Chapters 3.4, 3.5,3.6,3.7,3.9 & 5.0,per 990419-20 Meetings with NRC1999-06-30030 June 1999 Responds to NRC RAI Re Conversion to ITS for Chapters 3.4, 3.5,3.6,3.7,3.9 & 5.0,per 990419-20 Meetings with NRC L-99-025, Forwards Rev 2 to Jfnp Security plan,FNP-0-M-99,IAW 10CFR50.4(b)(4).Attachment 1 Contains Summary of Changes & Amended Security Plan Pages.Encl Withheld from Public Disclosure Per 10CFR73.211999-06-30030 June 1999 Forwards Rev 2 to Jfnp Security plan,FNP-0-M-99,IAW 10CFR50.4(b)(4).Attachment 1 Contains Summary of Changes & Amended Security Plan Pages.Encl Withheld from Public Disclosure Per 10CFR73.21 ML20196J8631999-06-30030 June 1999 Submits Correction to Errors Contained in to NRC Re TS Changes Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation.Errors Do Not Require Rev of SA L-99-249, Submits Correction to Errors Contained in to NRC Re TS Changes Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation.Errors Do Not Require Rev of SA1999-06-30030 June 1999 Submits Correction to Errors Contained in to NRC Re TS Changes Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation.Errors Do Not Require Rev of SA L-99-224, Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments1999-06-0707 June 1999 Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments ML20195F1731999-06-0707 June 1999 Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld L-99-217, Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld1999-06-0707 June 1999 Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld L-99-225, Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants1999-06-0707 June 1999 Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants ML20195F0621999-06-0707 June 1999 Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments ML20195E9581999-06-0707 June 1999 Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants ML20195C6941999-05-28028 May 1999 Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program L-99-021, Forwards Response to RAI Re Conversion to ITSs for Chapter 3.3.Attachment II Includes Proposed Revs to Previously Submitted LAR Re Rais,Grouped by RAI number.Clean-typed Copies of Affected ITS Pages Not Included1999-05-28028 May 1999 Forwards Response to RAI Re Conversion to ITSs for Chapter 3.3.Attachment II Includes Proposed Revs to Previously Submitted LAR Re Rais,Grouped by RAI number.Clean-typed Copies of Affected ITS Pages Not Included L-99-203, Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program1999-05-28028 May 1999 Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program ML20195F2101999-05-24024 May 1999 Requests That Farley Nuclear Plant Proprietary Responses to NRC RAI Re W WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs, Be Withheld from Public Disclosure Per 10CFR2.790 L-99-180, Forwards Responses to NRC RAI Questions for Chapter 3.8 of Ts.Proposed Revs to TS Previously Submitted with LAR Related to RAI1999-04-30030 April 1999 Forwards Responses to NRC RAI Questions for Chapter 3.8 of Ts.Proposed Revs to TS Previously Submitted with LAR Related to RAI ML20206F4321999-04-30030 April 1999 Forwards Responses to NRC RAI Questions for Chapter 3.8 of Ts.Proposed Revs to TS Previously Submitted with LAR Related to RAI L-99-017, Forwards Responses to NRC RAI Questions for Chapters 3.1, 3.2,3.5,3.7 & 3.9 of Ts.Attached Pages Include Proposed Revs Previously Submitted LAR to Rais,Grouped by Chapters & RAI Numbers1999-04-30030 April 1999 Forwards Responses to NRC RAI Questions for Chapters 3.1, 3.2,3.5,3.7 & 3.9 of Ts.Attached Pages Include Proposed Revs Previously Submitted LAR to Rais,Grouped by Chapters & RAI Numbers ML20206C8021999-04-26026 April 1999 Forwards 1998 Annual Rept, for Alabama Power Co.Encls Contain Financial Statements for 1998,unaudited Financial Statements for Quarter Ending 990331 & Cash Flow Projections for 990101-991231 05000348/LER-1998-007, Forwards SG-99-04-001, Farley-1:Final Cycle 16 Freespan ODSCC Operational Assessment, as Committed to in Licensee & LER 98-007-00.Util Is Revising Plant Administrative SG Operating Leakage Requirements as Listed1999-04-23023 April 1999 Forwards SG-99-04-001, Farley-1:Final Cycle 16 Freespan ODSCC Operational Assessment, as Committed to in Licensee & LER 98-007-00.Util Is Revising Plant Administrative SG Operating Leakage Requirements as Listed L-99-015, Forwards Rev 1 to Jfnp Security plan,FNP-O-M-99,resulting from Implementation of Biometrics Sys.Changes Incorporate Changes Previously Submitted to NRC as Rev 28 by Licensee .Encl Withheld,Per 10CFR73.211999-04-21021 April 1999 Forwards Rev 1 to Jfnp Security plan,FNP-O-M-99,resulting from Implementation of Biometrics Sys.Changes Incorporate Changes Previously Submitted to NRC as Rev 28 by Licensee .Encl Withheld,Per 10CFR73.21 ML20206B4391999-04-21021 April 1999 Forwards Corrected ITS Markup Pages to Replace Pages in 981201 License Amend Requests for SG Replacement L-99-172, Forwards FNP Annual Radioactive Effluent Release Rept for 1998, IAW TSs Sections 6.9.1.8 & 6.9.1.9.Changes to ODCM Revs 16,17 & 18 Are Encl,Iaw TS Section 6.14.21999-04-21021 April 1999 Forwards FNP Annual Radioactive Effluent Release Rept for 1998, IAW TSs Sections 6.9.1.8 & 6.9.1.9.Changes to ODCM Revs 16,17 & 18 Are Encl,Iaw TS Section 6.14.2 ML20205S9501999-04-21021 April 1999 Forwards FNP Annual Radioactive Effluent Release Rept for 1998, IAW TSs Sections 6.9.1.8 & 6.9.1.9.Changes to ODCM Revs 16,17 & 18 Are Encl,Iaw TS Section 6.14.2 ML20205R0431999-04-13013 April 1999 Forwards Correction to 960212 GL 95-07 180 Day Response. Level 3 Evaluation for Pressure Locking Utilized Analytical Models.Encl Page Has Been Amended to Correct Error 1999-09-23
[Table view] |
Text
_ _ --- ___-- - _ - _ _ - _
e Dave Mor:y Southern Nucle:r Vice Presioent Operatino CompaIy a Farley Project RO. Box 1295 Birmingham. Alabama 35201 l
Tel 205.992.5131 February 12, 1998 SOUTHERN COMFANY Energy to Serve hur u~orld
Docket Nos.: 50-348 10 CFR 50.90 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Contr01 Desk Washington, DC 20555 Joseph M. Farley Nuclear Plant Technical Specifications Change Request Pressure Temperature Limits Reoort Ladies and Gentlemen:
By letter dated July 23,1997, Southern Nuclear Operating Company (SNC) submitted a Technical Specifications (TS) change request associated with the relocation of the reactor coolant system (RCS) pressure-temperature (P-T) limits from the TS to the Pressure Temperature Limits Report (PTLR) in accordance with the guidance provided in Generic Letter (GL) 96-03,
" Relocation of the Pressure Temperature Limit Curves and Low Temperature Overpressure Protection System Limits." By letter dated November 14,1997, the NRC issued a Request for Information (RAI) requesting clarification of the methodology used associated with the Farley Nuclear Plant (FNP) TS amendment request. SNC responded to the NRC RAI by letter dated December 18,1997.
Recently, additional questions have been asked by the NRC Staffin several conference calls.
Enclosure I provides the NRC StafTquestions and SNC responses. Enclosure 2 provides the revised technical specification pages. These changes must be incorporated with the technical specification pages forwarded by the December 18,1997 submittal. In accordance with the requirements of 10 CFR 50.92, Enclosure 3 provides a significant hazards evaluation for the technical specification changes. Enclosure 4 provides a revision to the PTLR methodology submitted in the December 18,1997 letter. This revision incorporates the latest NRC Staff requirements. The revised PTLRs for FNP Unit I and Unit 2 will be provided to the NRC Staff following approval of the PTLR Tec hnical Specifications change.
SNC has determined that the proposed changes will not significantly increase the amount of any efIluent which may be released ofTsite and that there is no significant increase in individual or cumulative occupational radiation exposure. A copy of these proposed changes is being sent to the Alabama State Designee in accordance with 10 CFR 50.91 (b)(1).
- \p_a 9802200061 980212 '
, PDR ADOCK 05000348 P PDR. ll........
ll lf lllllll fll (
lL U. S. Nuclear Regulatory Commission Page 2
. If you have any questions, please advise.
Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY h Mh2*[
Dave Morey 4
Sworn to wut:.ubscribed bef re me this A2 - dayof N W 1998 Yd '
b_ W Y Notary Public V My Commission Expires: th '- e /,80/'
L TWS/ REM /maf:LTOPTS. DOC
Enclosures:
- 1. Res >onse to NRC Request for Additional Information Concerning the PTLR Tecinical Specification Amendment
- 2. Revised Technical Specification Pages
- 3. Significant Hazards Evaluation
- 4. Revised PTLR Methodology ,
cc:- Mr. L. A. Reyes, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager Mr. T. M. Ross, Plant Sr. Resident inspector Dr. D. E. Williamson, State Department of Public Health
Enclosure 1 Response to NRC Rec; nest for Additional Information Concerning the PTLR Technical Specification Amendment s
f
Response to NRC Request for AdditionalInformation Concerning the PTLR Technical Specification Amendment
- 1. The analysis assumes that the residual heat removal suction relief valves (RHRRV) open at the Technical Specification (TS) setpoint plus 10% for valve accumulation (450 psi + 45 psi
= 495 psi). The submittalindicates that the surveillance procedures use 445 psii 5 psi, which is lower than the TS required value. Please describe why it is acceptable to add the assumed setpoint drift to the surveillance procedure value rather than the TS value.
Additionally, if the AShE code allows i3% tolerance, why is 15 psi used?
SNC Response: TS 3.4.10.3 states, "At least one of the following overpressure protection syctems shall be OPERABLE:
- a. Two RHR relief valves with:
- 1. A lift setting ofless than or equal to 450 psig, and
- 2. The associated RHR relief valve isolation valves open; or
- b. The Reactor Coolant System (RCS) depressurized with an RCS vent of greater than or equal to 2.85 square inches."
Accordingly, an RHRRV setpoint greater than 450 psig is unacceptable. An RHRRV setpoint less than 450 psig is consistent with the TS and provides greater protection of the RCS in the unlikely event of a low temperature overpressure transient.
Following SNC's original PTLR submittal dated August 20,1997, the calibration procedure for the RHRRVs was revised to reflect a setpoint of 436 psig with a tolerance ofi 13 psi (
3 %), consistent with the AShE Code for Class II valves. Addition of the setpoint tolerance ofi 13 psi to the 436 psig value assures that the setpoint for the RHRRVs remains less than or equal to 450 psig as required by TS 3.4.10.3.
- 2. The P/T limit curves include an adjustment to include the static and dynamic head associated with the operation of the reactor coolant pumps (RCPs). Only one RCP is assumed to be operating below 110 F and three RCPs are assumed above 110*F. Do the TSs prohibit operating with more than one RCP below 110 F? If not, why? Additionally, please verify that the values chosen for the static and dynamic head include the effects of the running RHR pumps.
SNC Response: The technical specification pages are being revised to limit the operation of more than one reactor coolant pump below 110 F. The revised technical specification pages are included in Enclosure 2. Additionally, the corrections to the P/T limits associated
Enclosure 1 Page 2 Response to NRC RAI Concerning the PTLR Technical Specification Amendment with the operation of the reactor coolant pumps include the static and dynamic efTects of the two operating RHR pumps.
- 3. Is there any possibility that pressurizati on could occur below 70 F, where the P/T limits and setpoi.as are calculated, if the temperature instrumentation drift or uncertainty is considered? The submittal indicates that no additional margin for instrumentation uncenainty is needed for the enable temperature because there is 8 F margin. Please state the temperature instmment uncertainty, the technique used to derive the instrument uncertainty, and verify that it is less than 8 F.
SNC Response: Based on use of wide range cold leg temperature, the indicated temperature uncertainty is i21'F while cooling down. At cold conditions less than 100'F, prior to RCP startup, the best indicator of RCS vessel temperature is the RHR heat exchanger discharge temperature. This indicated temperature uncertainty is 110'F or less.
These uncertainties were developed using the Westinghouse cetpoint uncertainty methodology for Protection Systems which is consistent with IS A 67.04, employs a square root sum of the squares (SRSS) approach, and reflects Farley specific equipment and calibration practices. This methodology has been previously employed for other projects for the Farley Nuclear Plants, such as RTD Bypass Elimination, Sterm Generator Level Tap Relocation, and VANTAGE 5 Fuel Upgrade, which have been approved by the NRC Staff.
Incorporation of the 21'F temperature uncertainty into the temperature at which the RHR relief valves must be operable results in a change in the applicability statement of Technical Specification 3.4.10.3 to require the RHR relief valves to be operable when one cf the RCS cold leg temperatures is less than 325 F. The revised technical specification pages are included in Enclosure 2. The revised Significant Hazards Evaluation is provided in Enclosure 3.
Incorporation of the 10 F temperature uncertainty into the minimum boltup temperature results in a proposed minimum boltup temperature of 75 F (the original minimum boltup temperature included a 5 F margin).
- 4. The methodology submitted indicates that,"if the projected RCS pressure exceeds the Appendix G allowable pressure for the corresponding temperature, changes to the RHRRV characteristics, e.g., may be required" and that these changes may require NRC approval (emphasis added). Although there are a number of ways that could be used to resolve the issue, the methodology must clearly state that if the projected RCS pressure exceeds the l
Enclosure 1 Page 3 Response to NRC RAI Concerning the PTLR Technical Specification Amendment Appendix G allowable pressure using the methodology presented and referenced in the TS that the issue must or shall be resolved with NRC review and approval.
SNC Response: The methodology has been revised to incorporate the requested change.
The methodology, with the changes marked, is provided in Enclosure 4.
- 5. Generic Letter 96-03 includes an LCO that requires the accumulatorn to be isolated when the accumulator pressure is greater than or equal to the maximum RCS pressure for existing cold leg temperature allowed in the PTLR. The proposed changes to the technical specifications do not include this LCO.
SNC Response: During conversations with the NRC staff, a questiot. was raised regarding failure of SNC to include a TS that requires the accumulator = to be isolated from the RCS during low temperature operation to preclude inadvertent injection of an accumulator into a water-solid RCS By NRC Safety Evaluation Report dated July 31,1979, the NRC found FNP's commitment to isolate the accumulators with power removed from the isolation -
valves whenever the plant is on RHR cooling to be an acceptable means for precluding the inadvertent injection. The model Technical Specifications included in GL 96-03 were based on the Improved Standard Technical Specifications which have not been implemented for FNP. The requirement to isolate the accumulators when the accumulator pressure is greater than or equal to the maximum RCS pressure for the cold leg temperature allowed in the PTLR will be incorporated in the FNP Technical Specifications upon implementation of the Improved Standard Technical Specifications.
. _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ _ .