* Atttchment-3B Icaum 2 oPERATInc mTA RgPour DocEET NO. 50-267 DATg November 4, 1983 | |||
" COMPLETED BT Chuck Fuller TELEra0xE (303) 785-2224 | |||
. OPERATING STATUS NOTES | |||
: 1. Unit Names Fort St. Vrain | |||
:: 2. Reporting Period: 831001 thru 831031 | |||
, 3. Licensed Thermal Power Geit): 842 | |||
- 4. Nameplate Rating (Cross We): 342 | |||
: 5. Design Electrical Rating Olet We): 330 342 | |||
~ | |||
: 6. Hawi== Dependable Capacity (Cross We): | |||
~ | |||
7.~ Maximus Dependable Capacity (Not We): 330 | |||
; 8. If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: | |||
None' | |||
: 9. Power Level To Which Restricted If Any (Net We): . 231 | |||
: 10. Reasons for Restrictions, If Any: Restriction to 70% pending resolution of contractual matters. | |||
This Month Year to Date Ciumulative 2 11. Hours in Reporting Period 745 7.296 38,017 | |||
: 12. Number of Hours Reactor was critica1 683.0 4,711.0 24,457.7 13.- Reactor Reserve Shutdown Hours 0.0 0.0 0.0 | |||
.14. Hours Generator on-Line 682.9 :3,404.1 16,578.6 | |||
: 15. Unit Reserve Shutdown Hours '0.0 0.0 0.0 _ | |||
: 16. - Cross Thermal Energy Generated (WH) 387,910.3 1,868,968.3 '8,658,393.7 117.' Cross Electrical Energy Generated (WB) 135,325 595,084 2,921,388 | |||
'-%yh,F 18. Net Electrical Energy Generated (WM) 127,011 532,863 2,655,973 | |||
: 19. Unit Service Factor 91.7 46.7 43.6 | |||
. .20. Unit Availability Factor 91'.7 46.7 43.6 1 | |||
: 21. Unit Capacity Pactor (using MDC Net) 51.7 22.1 21.2 | |||
*** * ''****7 #'* * * (#'1"8 "'" "* * ) ' * | |||
* l O' g | |||
: 23. Unic Porced'outas. Rate 0.2 52.9 41.0 | |||
' 24. Shutdowns Scheduled Over Next 6 lenths (Type. Date, and Du- --' - --h): Surveillance testing L. 11-1-83-thru 11-5-83. 107 hours: Refueling, 2-1-84 thru 4-30-84, 2159 hours. | |||
' 2 5.' If . Shut Down at End of Report Period. Estimated Date of Startup: 11-5-83 | |||
: 26. :. Units In Test Status (Prior to Commercial Operation): Forecas t Achieved INITIAL CRITICALITT N/A N/A INITIAL ELECTRICITT N/A N/A | |||
~ COMMERCIAL OPERATION N/A N/A | |||
_ _ _ . . _n}} |
Latest revision as of 08:25, 14 May 2020
ML20080R694 | |
Person / Time | |
---|---|
Site: | Fort Saint Vrain |
Issue date: | 10/31/1983 |
From: | Fuller C PUBLIC SERVICE CO. OF COLORADO |
To: | |
Shared Package | |
ML20080R690 | List: |
References | |
NUDOCS 8402280379 | |
Download: ML20080R694 (1) | |
Text
- _ - _ _ _ _ _ - . _ _ - _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _
TSP-3
~*
- Atttchment-3B Icaum 2 oPERATInc mTA RgPour DocEET NO. 50-267 DATg November 4, 1983
" COMPLETED BT Chuck Fuller TELEra0xE (303) 785-2224
. OPERATING STATUS NOTES
- 1. Unit Names Fort St. Vrain
- 2. Reporting Period: 831001 thru 831031
, 3. Licensed Thermal Power Geit): 842
- 4. Nameplate Rating (Cross We): 342
- 5. Design Electrical Rating Olet We): 330 342
~
- 6. Hawi== Dependable Capacity (Cross We):
~
7.~ Maximus Dependable Capacity (Not We): 330
- 8. If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons
None'
- 9. Power Level To Which Restricted If Any (Net We): . 231
- 10. Reasons for Restrictions, If Any: Restriction to 70% pending resolution of contractual matters.
This Month Year to Date Ciumulative 2 11. Hours in Reporting Period 745 7.296 38,017
- 12. Number of Hours Reactor was critica1 683.0 4,711.0 24,457.7 13.- Reactor Reserve Shutdown Hours 0.0 0.0 0.0
.14. Hours Generator on-Line 682.9 :3,404.1 16,578.6
- 15. Unit Reserve Shutdown Hours '0.0 0.0 0.0 _
- 16. - Cross Thermal Energy Generated (WH) 387,910.3 1,868,968.3 '8,658,393.7 117.' Cross Electrical Energy Generated (WB) 135,325 595,084 2,921,388
'-%yh,F 18. Net Electrical Energy Generated (WM) 127,011 532,863 2,655,973
- 19. Unit Service Factor 91.7 46.7 43.6
. .20. Unit Availability Factor 91'.7 46.7 43.6 1
- 21. Unit Capacity Pactor (using MDC Net) 51.7 22.1 21.2
- * ****7 #'* * * (#'1"8 "'" "* * ) ' *
- l O' g
- 23. Unic Porced'outas. Rate 0.2 52.9 41.0
' 24. Shutdowns Scheduled Over Next 6 lenths (Type. Date, and Du- --' - --h): Surveillance testing L. 11-1-83-thru 11-5-83. 107 hour0.00124 days <br />0.0297 hours <br />1.76918e-4 weeks <br />4.07135e-5 months <br />s: Refueling, 2-1-84 thru 4-30-84, 2159 hours0.025 days <br />0.6 hours <br />0.00357 weeks <br />8.214995e-4 months <br />.
' 2 5.' If . Shut Down at End of Report Period. Estimated Date of Startup: 11-5-83
- 26. :. Units In Test Status (Prior to Commercial Operation): Forecas t Achieved INITIAL CRITICALITT N/A N/A INITIAL ELECTRICITT N/A N/A
~ COMMERCIAL OPERATION N/A N/A
_ _ _ . . _n