ML20080R711
| ML20080R711 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 12/31/1983 |
| From: | Fuller C PUBLIC SERVICE CO. OF COLORADO |
| To: | |
| Shared Package | |
| ML20080R690 | List: |
| References | |
| NUDOCS 8402280385 | |
| Download: ML20080R711 (1) | |
Text
_ - _ _
TSP-3 Attcchmeat-3B e
t*
Iccue 2
" 1
'1 50-267 OPEaATING DATA REPORT DOCKET NO.
DATE January 10, 1984 COMPI,ETED BY Chuck Fuller TELErnoNE (303) 785-2224 OPERATING STATUS NOTES
' Fort St. Vrain 1.
Unic mese:
831201 thru'831231 2.
saportins Period:
3.
Licensed Therusi Power (Wt):
'842
- 4.
Nameplate Rating (_ Gross We):
342
' 5.
Design Electrical Rating (Net We):
330
' 6.
Nad== Dependable Copacity (Grosa We):
342 7.
Nad== Dependable Capacity (Net We):
330
- 8. - If Changes Occur in Capacity Ratings (Iteas Number 3 Through 7) Since Last Report, Give Reasons:
}one
'9.
Power Level To Which Restricted,-If Any (Net We):
231
- 10. mensons for nestrictions, If Any:
Restriction to 70% pending resolution of contractual matters.
This Month Tear to Date Cumulative
- 11. : nours in neportins Period 744 8.760 39.481
- 12. Number of Hours Beactor Was Critical '
703.6 6,080.6 25,827.3
- 13. -Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. nours cenerator on-Line 671.6 4,628.7 17,803.2
- 15. - Unic Reserve Shutdown Hours 0.0 0.0 0.0
- 16. cross Thermal Enersy cenerated (WR) 396,898.1 2.580.332.2 9.521.317.6
- 17. ; Cross Electrical Energy Generated (WH) 130.463 826.546
'3.153.450
- 18. Net Electrical Energy Generated (WH) 122,223 748.420 2.871.530 kg a
E3 119.
Unit Service Factor 90.3 52.8 45.1 a.-
- 20. Unit Availability Factor 90.3 52.8 45.1
. 21..-Unit capacity Tactor (Using MDC Net) 49.8 25.9 22.0
- 22. - Unit Capacity Factor (Using DER Net) 49.8 25.9 22.0
^
- g
- 23. Unit Forced Outage Rate 9.7 45.7 39.5 4
- 24. Shutdowns Scheduled Over Next 6 Honths (Type. Date, and Duration of Each):
Refueling 1-20-84
~
b through 4-18-84, 2,160 horrs.
3. 25. If Shut Down at End of Report Period. Estimated Date of Startup:
N/A i
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved IxITIAL CRITICALITY N/A N/A INITIAL ELECTRICITr N/A N/A
' COMMERCIAL OPERATION N/A N/A n