ML20080R711

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Dec 1983
ML20080R711
Person / Time
Site: Fort Saint Vrain 
Issue date: 12/31/1983
From: Fuller C
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20080R690 List:
References
NUDOCS 8402280385
Download: ML20080R711 (1)


Text

_ - _ _

TSP-3 Attcchmeat-3B e

t*

Iccue 2

" 1

'1 50-267 OPEaATING DATA REPORT DOCKET NO.

DATE January 10, 1984 COMPI,ETED BY Chuck Fuller TELErnoNE (303) 785-2224 OPERATING STATUS NOTES

' Fort St. Vrain 1.

Unic mese:

831201 thru'831231 2.

saportins Period:

3.

Licensed Therusi Power (Wt):

'842

4.

Nameplate Rating (_ Gross We):

342

' 5.

Design Electrical Rating (Net We):

330

' 6.

Nad== Dependable Copacity (Grosa We):

342 7.

Nad== Dependable Capacity (Net We):

330

8. - If Changes Occur in Capacity Ratings (Iteas Number 3 Through 7) Since Last Report, Give Reasons:

}one

'9.

Power Level To Which Restricted,-If Any (Net We):

231

10. mensons for nestrictions, If Any:

Restriction to 70% pending resolution of contractual matters.

This Month Tear to Date Cumulative

11. : nours in neportins Period 744 8.760 39.481
12. Number of Hours Beactor Was Critical '

703.6 6,080.6 25,827.3

13. -Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. nours cenerator on-Line 671.6 4,628.7 17,803.2
15. - Unic Reserve Shutdown Hours 0.0 0.0 0.0
16. cross Thermal Enersy cenerated (WR) 396,898.1 2.580.332.2 9.521.317.6
17. ; Cross Electrical Energy Generated (WH) 130.463 826.546

'3.153.450

18. Net Electrical Energy Generated (WH) 122,223 748.420 2.871.530 kg a

E3 119.

Unit Service Factor 90.3 52.8 45.1 a.-

20. Unit Availability Factor 90.3 52.8 45.1

. 21..-Unit capacity Tactor (Using MDC Net) 49.8 25.9 22.0

22. - Unit Capacity Factor (Using DER Net) 49.8 25.9 22.0

^

g

- 23. Unit Forced Outage Rate 9.7 45.7 39.5 4

24. Shutdowns Scheduled Over Next 6 Honths (Type. Date, and Duration of Each):

Refueling 1-20-84

~

b through 4-18-84, 2,160 horrs.

3. 25. If Shut Down at End of Report Period. Estimated Date of Startup:

N/A i

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved IxITIAL CRITICALITY N/A N/A INITIAL ELECTRICITr N/A N/A

' COMMERCIAL OPERATION N/A N/A n