ML20080R711

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Dec 1983
ML20080R711
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 12/31/1983
From: Fuller C
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20080R690 List:
References
NUDOCS 8402280385
Download: ML20080R711 (1)


Text

_ - _ _ .

TSP-3 e t*

Attcchmeat-3B Iccue 2

" 1 '1 OPEaATING DATA REPORT DOCKET NO. 50-267 DATE January 10, 1984 COMPI,ETED BY Chuck Fuller TELErnoNE (303) 785-2224 OPERATING STATUS NOTES

1. Unic mese: ' Fort St. Vrain
2. saportins Period: 831201 thru'831231
3. Licensed Therusi Power (Wt): '842
4. Nameplate Rating (_ Gross We)
342

' 5. Design Electrical Rating (Net We): 330

' 6. Nad== Dependable Copacity (Grosa We): 342

7. Nad== Dependable Capacity (Net We): 330
8. - If Changes Occur in Capacity Ratings (Iteas Number 3 Through 7) Since Last Report, Give Reasons:

}one

'9. Power Level To Which Restricted,-If Any (Net We): 231

10. mensons for nestrictions, If Any: Restriction to 70% pending resolution of contractual matters.

This Month Tear to Date Cumulative

11. : nours in neportins Period 744 8.760 39.481
12. Number of Hours Beactor Was Critical ' 703.6 6,080.6 25,827.3
13. -Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. nours cenerator on-Line 671.6 4,628.7 17,803.2
15. - Unic Reserve Shutdown Hours 0.0 0.0 0.0
16. cross Thermal Enersy cenerated (WR) 396,898.1 2.580.332.2 9.521.317.6
17. ; Cross Electrical Energy Generated (WH) 130.463 826.546 '3.153.450
18. Net Electrical Energy Generated (WH) 122,223 748.420 2.871.530 kg a E3 119. Unit Service Factor 90.3 52.8 45.1 a.-
20. Unit Availability Factor 90.3 52.8 45.1

. 21. .-Unit capacity Tactor (Using MDC Net) 49.8 25.9 22.0

g 22. - Unit Capacity Factor (Using DER Net)

^

49.8 25.9 22.0

- 23. Unit Forced Outage Rate 9.7 45.7 39.5

~

4 24. Shutdowns Scheduled Over Next 6 Honths (Type. Date, and Duration of Each): Refueling 1-20-84 b through 4-18-84, 2,160 horrs.

3 . 25. If Shut Down at End of Report Period. Estimated Date of Startup:

N/A i

26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved IxITIAL CRITICALITY N/A N/A INITIAL ELECTRICITr N/A N/A

' COMMERCIAL OPERATION N/A N/A

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ -. _ _ _ _ _ _ _ . _ .- n