ML20080R707

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Nov 1983
ML20080R707
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 11/30/1983
From: Fuller C
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20080R690 List:
References
NUDOCS 8402280383
Download: ML20080R707 (1)


Text

_- - _ _ _ _ _ _ _ - _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ .

TSP-3 i

Attechsent-35 Issue 2 orERATI"G DATA REPORT DOCKET NO. 50-267 DATE December 12, 1983 COMPI.ETED sf Chuck Fuller TELEPHONE (303) 785-2224 OPERATING STATUS NOTES

1. Unic Nome: - Fort St. Vrain
2. : Reporting Period '831101'thru 831130

- 3.- ' Licensed Thermal Power '(Wt): - 842

4. , Nameplate Rating (Gross We): - 342
5. _ Design Electrical Rating (Net We): 330
6. Maximum Dependable Capacity (Gross We): 342
7. Mart == Dependable Capacity (Net We): 330
8. 'If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report Give Reasons:

None

9. Power Level To Which Restricted ' If Any (Net We): 231
10. Reasons for Restrictions,. If Anyt . Restriction to 70% pending resolution of contractual matters.

This Month Year to Data cumulative

- 11. ~ Hours in Reporting Period 720 8.016' 38.737

12. Number of Hours Reactor Wes Critical' 666.0 5.377.0 25.123.7 1 13. Reactor Baserve Shutdown Hours 0.0 0.0 0.0
14. nours Generator on-Line 553.0 3,957.1 17,131.6

~

- 15. Unic Reserve Shutdown nours - 0.0 0.0 0.0

16. I Gross Thermal Energy Generated (WR) 314,465.8 2,183.434.1 9,124,419.5*

.,.? 17. l Gross Electrical Energy Generated (WR). 100,999 696,083 3.022.987 g# ~

18. ~ Net Electrical Energy Generated (Wu) 93,334 626,197 2.749,307

' { '.19. i Unit Service Factor 76.8 49.4 44.2 a 20. Unit Availability Factor 76.8 49.4 44.2 i21. ! Unit Capacity Factor (Usit5 MDC Net) 39.3 23.7 21.5 39.3 23.7

. 22.'LUnitCapacityFactor(UsingDERNet). -21.5 l 123. cnit' rorced outage Rate 0.0 49.2 40.3 24.' - Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Refueling 1-15-84 j through 4-13-84, 2,160 hours0.00185 days <br />0.0444 hours <br />2.645503e-4 weeks <br />6.088e-5 months <br />.

'1'

"#' 25. If Shut Down at End of Report Period. Estimated Date of Startup: N/A

\. .

26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIM., CRITICALITY N/A N/A _ _ _ _

INITIAL ELECTRICITY N/A N/A co mERCIAL OPERATION N/A N/A

- _ _ _ _ - _ _ _ _ - _ _ _ _ _ - _ - _ - _ _ _ _ _ _ _ - _ _ _ _ - __ __-____- _ _ _ -