ML20080R707
| ML20080R707 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 11/30/1983 |
| From: | Fuller C PUBLIC SERVICE CO. OF COLORADO |
| To: | |
| Shared Package | |
| ML20080R690 | List: |
| References | |
| NUDOCS 8402280383 | |
| Download: ML20080R707 (1) | |
Text
_-
TSP-3 i
Attechsent-35 Issue 2 orERATI"G DATA REPORT DOCKET NO.
50-267 DATE December 12, 1983 COMPI.ETED sf Chuck Fuller TELEPHONE (303) 785-2224 OPERATING STATUS NOTES 1.
Unic Nome: -
Fort St. Vrain
- 2. : Reporting Period
'831101'thru 831130
- 3.- ' Licensed Thermal Power '(Wt): -
842
- 4., Nameplate Rating (Gross We): -
342
- 5. _ Design Electrical Rating (Net We):
330 6.
Maximum Dependable Capacity (Gross We):
342 7.
Mart== Dependable Capacity (Net We):
330
- 8. 'If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report Give Reasons:
None 9.
Power Level To Which Restricted ' If Any (Net We):
231
- 10. Reasons for Restrictions,. If Anyt.
Restriction to 70% pending resolution of contractual matters.
This Month Year to Data cumulative
- 11. ~ Hours in Reporting Period 720 8.016' 38.737
- 12. Number of Hours Reactor Wes Critical' 666.0 5.377.0 25.123.7 1 13. Reactor Baserve Shutdown Hours 0.0 0.0 0.0
- 14. nours Generator on-Line 553.0 3,957.1 17,131.6
- 15. Unic Reserve Shutdown nours -
0.0 0.0 0.0
~
- 16. I Gross Thermal Energy Generated (WR) 314,465.8 2,183.434.1 9,124,419.5*
.,.?
- 17. l Gross Electrical Energy Generated (WR).
100,999 696,083 3.022.987 g# ~
- 18. ~ Net Electrical Energy Generated (Wu) 93,334 626,197 2.749,307
' {
'.19. i Unit Service Factor 76.8 49.4 44.2 20.
Unit Availability Factor 76.8 49.4 44.2 a
i21. ! Unit Capacity Factor (Usit5 MDC Net) 39.3 23.7 21.5 22.'LUnitCapacityFactor(UsingDERNet).
39.3 23.7
-21.5 l
123. cnit' rorced outage Rate 0.0 49.2 40.3 24.' - Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Refueling 1-15-84 through 4-13-84, 2,160 hours0.00185 days <br />0.0444 hours <br />2.645503e-4 weeks <br />6.088e-5 months <br />.
j
'1' 25.
If Shut Down at End of Report Period. Estimated Date of Startup:
N/A
\\.
Forecast Achieved
- 26. Units In Test Status (Prior to Commercial Operation):
INITIM., CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A co mERCIAL OPERATION N/A N/A
-