ML20080R707

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Nov 1983
ML20080R707
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 11/30/1983
From: Fuller C
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20080R690 List:
References
NUDOCS 8402280383
Download: ML20080R707 (1)


Text

_-

TSP-3 i

Attechsent-35 Issue 2 orERATI"G DATA REPORT DOCKET NO.

50-267 DATE December 12, 1983 COMPI.ETED sf Chuck Fuller TELEPHONE (303) 785-2224 OPERATING STATUS NOTES 1.

Unic Nome: -

Fort St. Vrain

2. : Reporting Period

'831101'thru 831130

- 3.- ' Licensed Thermal Power '(Wt): -

842

4., Nameplate Rating (Gross We): -

342

5. _ Design Electrical Rating (Net We):

330 6.

Maximum Dependable Capacity (Gross We):

342 7.

Mart== Dependable Capacity (Net We):

330

8. 'If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report Give Reasons:

None 9.

Power Level To Which Restricted ' If Any (Net We):

231

10. Reasons for Restrictions,. If Anyt.

Restriction to 70% pending resolution of contractual matters.

This Month Year to Data cumulative

- 11. ~ Hours in Reporting Period 720 8.016' 38.737

12. Number of Hours Reactor Wes Critical' 666.0 5.377.0 25.123.7 1 13. Reactor Baserve Shutdown Hours 0.0 0.0 0.0
14. nours Generator on-Line 553.0 3,957.1 17,131.6

- 15. Unic Reserve Shutdown nours -

0.0 0.0 0.0

~

16. I Gross Thermal Energy Generated (WR) 314,465.8 2,183.434.1 9,124,419.5*

.,.?

17. l Gross Electrical Energy Generated (WR).

100,999 696,083 3.022.987 g# ~

18. ~ Net Electrical Energy Generated (Wu) 93,334 626,197 2.749,307

' {

'.19. i Unit Service Factor 76.8 49.4 44.2 20.

Unit Availability Factor 76.8 49.4 44.2 a

i21. ! Unit Capacity Factor (Usit5 MDC Net) 39.3 23.7 21.5 22.'LUnitCapacityFactor(UsingDERNet).

39.3 23.7

-21.5 l

123. cnit' rorced outage Rate 0.0 49.2 40.3 24.' - Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Refueling 1-15-84 through 4-13-84, 2,160 hours0.00185 days <br />0.0444 hours <br />2.645503e-4 weeks <br />6.088e-5 months <br />.

j

'1' 25.

If Shut Down at End of Report Period. Estimated Date of Startup:

N/A

\\.

Forecast Achieved

26. Units In Test Status (Prior to Commercial Operation):

INITIM., CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A co mERCIAL OPERATION N/A N/A

-