Monthly Operating Rept for Nov 1990 for Fort St Vrain Unit 1
ML20065R033
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 11/30/1990
From: Block M, Fuller C
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
P-90365, NUDOCS 9012180165
Download: ML20065R033 (8)


Text

- - -- - _ . - . - -. . - .

Public Service C (h Company of Colorado '

P.o. Box B40 Denver, Co 80201 0840 16805 WCR 19 1/2, Platteville, Colorado 80651 December 14, 1990 Fort St. Vrain Unit No. 1 P-90365 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Docket No. 50-267

SUBJECT:

NOVEMBER, 1990, MONTHLY DEFUELING OPERATIONS REPORT

REFERENCE:

Facility Operating License Number DPR-34

Dear Sirs:

Enclosed, please find the Monthly Defueling Operations report for the y month of November, 1990, submitted per the requirements of Fort St. .

Vrain Technical Specification AC 7.5.1. '

If you have any questions, please contact Mr. M. H. Holnies at (303) 480-6960.

Sincerely,

  • %ile Charles H. Fuller Manager, Nuclear Production Fort St. Vrain Nuclear Generating Station CHF:DLW/bh Enclosure l

l cc: Regional Administrator, Region IV i

ATTN: Mr. G. L. Constable, Chief Technical Support Section Division of Reactor Prcjects Mr. J. B. Baird

I Site Resident Inspector Fort St. Vrain 9012180165 901130 ji i PDR ADOCK 05000267 g7 R PDR ,Dv

'- i N 5 l

l t

i t

I PUBLIC SERVICE COMPANY OF COLORADO- i FORT ST, VRAIN NUCLEAR GENERATING STATION l

t

[

9 9

MONTHLY DEFUELING~0PERATIONS REPORT -

. NO, 202 t

November,.1990 f

i I

t 6

i 9

i l

i

. . , - . . . - , - , . . , . - - , , , .~.,..-n. , . - - . . , - , - ~ . - . ,,, . . - . . , ..n,,,..,,,,,,,,--,-,.

. J b .

i 1

This report contains the highlights of the Fort St. Vrain, Unit-No. 1, activities operated under the provisions of the . Nuclear-Regulatory Commission Operating License No. DPR-34. This report is for the month of November, 1990' .  ;

1.0 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE AND MAJOR SAFETY  ;

RELATEFRANTENAfiCl The reactor remained shutdown the entire month of November, 1990, following Public Service Company of Colorado's decision to end nuclear operation at Fort St. Vrain.

Preparations for shipping spent fuel are proceeding.

t On November 7, 1990, the Annual Fort St. Vrain Radiological >

Emergency Response Exercise was conducted. The exercise was - ,

successful. '

2.0 SINGLE RELEASES OF RADIOACTIVITY OR RADIATION EXPOSURE IN EXCESS OF 10% OF THE ALLOVABLE ANNUAL _yALUE None a 3.0 INDICATION OF FAILED FUEL RESULTING FROM IRRADIATED -FUEL EXAMINATIONS I None .

4,0 MONTHLY OPERATING DATA REPORT Attached l

- - - - - , ,,e- -v-e ,av .- , ,,-1 g ,.---,,,y , v--- ,

. m,.m ,

l' I g I

4 l

I

PERATING DATA REPORT. DOCKET NO. 50-267' CATE. -nocomher to: 1QQn:

COMPLETED BY M. L. Block-TELEPHONE (303) 620-1180 _ , _ .

OPERA'"G 5*ML'S NOTES-

1. Unit Name: Fort St. Vrnin. I'ni t No. 1
2. Reporting Period: 901101 throuah 901130
. Licensea Thennal Power (MWt): 842 4 hameplate Rating (Gross-MWe): ~ 342  ?

5, Oesign Electrical Rating (Net MWe): 330

6. Maximum Cepencable Capacity (Gross MWe): 342 ,
7. Maximum Decencable Capacity (Net MWe): 330
e.  :' Changes Occur in Capacity Ratings (items humoer 3 Througn 7) Since Last Report, Give Reasons:

Nonc r.

9. Fo er Level To Which Restricted, If Any (het MWe): 0.0
10. Reasons for Restrictions, If Any: Fort St. Vrnin cenned nucione enevntion ' nn Aucune 90 10A0

\

This Month Year To Date Cumulative l'. rours In Reporting Period 720 8.016 100.105-

12. Numoer Of Hours Reactor Was Critical N/A N/A 60 %7K _7-
13. Reactor Reserve Shutdown Hours N/A N/A N/A' 14 nours Generator On-Line N/A N/A 27.777,4-
15. Lnit Reserve Shutdown Hours N/A N/A N/A
16. Gross inermal Energy Generated (MWH) N/A- N/A' 14.450.651.2
17. Gross Electrical Energy Generated (MWH) N/A N/A 4.R16_R14.0 i 18. Net Electrical Energy Generated (MWH) i -1.519 -19.594 4.253.410
19. Unit Service Factor 'N/A N/A N/A
20. Unit Availability Factor N / A -- 'N/A ,._ N/A
21. Unit Caoacity Factor (Using MDC Net) N/A N/t N/A_
22. Unit Capacity Factor (Using DER Net) N/A- N/A- N /A
23. Unit Forced Outage Rate y /A. y/A M/A 24 Snutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Eacn): Fort St. Vrain ceased nurinnr nnorntinn nn Aucunt 29.'1989.
25. 'f Shut Oown At End Of Report Period, Estimated Date Of Startup: N/A i

-26. Units !n Test Status (Prior To Comercial Operation): Forecast. Achieved' INITIAL' CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l.

_ _ _ _ .- ~ _ . . - - . . - . __ _ . _ . . . . _ _ _ _ _ _ - - _ _ _ - - - _ . _

AVERAGE DAILY UNIT P0tfER LEVEL ,

~

Docket No. 50-267 .

1 Unit Fort St. Vrain Unit No. 1 Date December 14,-1990 Completed By M. L. Block Telephone (303) 620-1180 '

Month NOVEMBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i (MWe-Net) (MWe-Net) 1 0.0 17 0.0 l 2 0.0 18 0.0 3 0.0 19 0.0

[

4 0.0 20 0.0 .

5 0.0 21 0.0 i 6 0.0 22 0.0' '

7 0.0 23 0.0 8 0.0 24 0.0 1

9 0.0 25 0.0  :

10 0.0 26 0.0 11 0.0 27 0.0 ,

12 0.0 28 0.0 .

13 0.0 29 0.0 >

14 0.0 30 0.0 15 0.0 31 N/A 16 0.0 Nuclear Operations at Fort St. Vrain were terminated on August 29, 1989.

l l

i

4 e4 a .w+_J-e $'/4-,4,.4

- .waJ,w- -4J.4#JJJ A - .6.W A. J- ,..s__a,A. ='--a.irw. s .#, #_ - - ~ _ - ., - , , , - - - - , - - - _ , , , _ - , - -, w._-__,, -

-=-,.,M%

O 4

6 t

-1 i

- - - - - -- ---- l

..I e

O

$ i C

+3 0- i

+

ON ,4 D{ -l-.

O =e

.l l m; .I co.

c .c. O Cs **  : A e y%

e

.A Nb l Di Z CC

.. 6 q 5" s e ci Cl ci -O  %

A @ l @w 4 0l E' . W M

O 6w N d Gl I < D I

O}i O 6 U Qli 3

.r)

W >t

.N *I O. E! >E ee w C

> w

+ w 6.) .. g Q o - j' O %A

  • C Z UC =m E < O =3 .* C E O zO 't >

= .O, c xw m. **

W W **' h.s O% @

.s; - w O a.

O 2 i 6ed ==

07 A

Q w

3 Z

> 02 ZJ L N

0 O

<>w m +-

0e

~ -

M G. y&

= .s m; < E<

2 O .O.

O . - --- - - ----.

- s.

W D . E O CN hw D z (

C - O N Aw 2 5 9 E Of E! O O' w

w; cy --.U.Q I

[ EY E w wi w e > -w <

Ci 0C N O Z' > Oi 2 Z

4 -.M.Oi - - -

m Z =

g =  %

2 C O Z < l

~4 E w N O a K

D X 6.

O 4

w  ;-

Z g  % a 3, lC C i z

!O - z}

10 O

.;=EU l - O 'I <

b' = g 6 ,8 O

M 4

w 6

M O

O.

~ O

< N C P.

3 O

b h e e.a - e 18

e. e i

O 'O" o

O O* t Z m CO y e,. e e, e-'ry -

erw , wu,- +i- .e- e- y su y e e ' g- p. r- e v r r -y

REFUELING INFORMATION l l l Name of Facility l l 1. i Fort St._yrain Unit No. 1 l l I I I l 2. Scheduled date for next l None, nc further refueling at l ,

l refueling shutdown, i FSV is expected. l 1 l l l 3. Scheduled date for restirt l N/A i l following refueling. l l I I I l 4. Will refueling or resumptior. ofl N/A l l operation thereafter require s _l l l technical specification change l l l or other license amendment? I l l l l-l If answer is yes, what, in l l

l general, will the.se be? l l l l l l If answer is no, has the reload l l l fuel design and core configura-l l l tion been reviewed by your l l l Plant Safety Review Committee l N/A l l to determine whether any unre- l l l viewed safety questions are l l l associated with the core reloadj l l (Reference 10 CFR Section l 1 l 50.59)? l l 1 l I l If no such review has taken l N/A l l place, when is it scheduled? l l l l l l S. Scheduled date(s) for submit- l l l ting proposed licensing action 1 ---------------- l l and supporting ir. formation. l l l l l l 6. Important licensing considera- l l l tions associated with~ refuel- l ing, e.g., new or different 3

t l l -l l fuel design or supplier, unre- l ---------------- j l viewed design or performance l l l analysis methods, significant l l i

i changes in fuel design, new l l l operating procedures. I l l l l l'

l 7. The number of fuel assemblies I l l (a) in the core and (b) in the l a) 1024 HTGR fuel elements l l spent fuel storage pool. I b) 458 spent fuel elements l l

l

  • - w *-w st-- -v--- * -- a we w r ve r e, y- r S-w

7 REFUELING INFORMATION (CONTINUED)

I i -l l 8. The present licensed spent fuell l l pool storage capacity and the l l l size of any increase in l Capacity is limited in size to l l licensed storage capacity that l about one-third of core .

l l has been requested or is l (approximately 500 HTGR elements).l 1 planned, in number of fuel l No change is planned. l l assemblies. 1 (

l I I l 9. The projected date of the last i No further' refueling is l l refueling that can.be dis- l anticipated at Fort St. Vrain.

  • l l charged to the spent fuel pool l. l l assuming the present licensed l {-

l capacity. 1 l Under Agreements AT(04-3)-633 and DE-SC07-791001370 between Public-Service Company of Colorado, General Atomic Company, and 00E, spent fuel discharged during the defueling process will be stored by DOE at the Idaho Chemical Processing Plant. The storage capacity i s presently sized to accommodate eight fuel segments. It is estimated that the eighth fuel segment will be discharged in 1991. Discussions concerning the disposition of ninth fuel segment are in progress with DOE. Nuclear Operations at Fort St. Vrain were terminated August'29, 1989.