Revised Monthly Operating Rept for Jan 1984
ML20080R722
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 01/31/1984
From: Fuller C
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20080R690 List:
References
NUDOCS 8402280389
Download: ML20080R722 (1)


Text

7-TSP-3 J '-

t Atttchment-38 i

Issue 2 Psy l of 1

. OPERATING DATA REPORT DOCKET NO.

50-267 DATE February 6. 1984 C(HPLETED BT Chuck Fuller TELEPHONE (303) 785-2224 OPERATING STATUS NOTES 1.

Unit Names Fort St. Vrain 2.

Reporting Period 840101 thru 840131 3.

Licensed Thermal Power (Wt):

842 4.

Nameplate Rating (Crosa We):

342 Design Electrical Rating (Net We):

330 6.

Maximum Dependable Capacity (Cross We):

342 7.

Maximus Dependable Capacity (Net We):

330 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Cive Reasons:

None 9.

Power Level To Which Restricted, If Any (Net We):

231 10.

Reasons for Restrictions, If Any:.

Restriction to 70% pendinn resolution of contractual matters.

This Month Tear to Date Cumulative

11. Hours in Reporting Period 744.0 744.0 40.77s.0

~

12. Number of Hours Reactor Was Critical 468.0 468.0 26.295.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14.

Hours Generator On-Line 446.6 446.6 18.249.8

15. Unit Reserve Shutdown : lours 0.0 0.0 0.0
16. Cross Thermsl Energy Generated (WH) 240,818.8 240,818.8 9,762,136.4

'p

17. Cross Electrical Energy Generated (WH) 77,412 77,412 3,230,862
  • E
18. Net Electrical Energy Generated (W R) 71,302 71,302 2,942,832 g
19. Unit Service Factor 60.0 60.0 45.4
20. Unic Availability Factor 60.0 60.0 45.4 n-g
21. Unit Capacity Factor (Using MDC Net) 29.0 29.0 22.2
22. Unit Capacity Factor (Using DER Net) 29.0 29.0 22.2

_l

23. Unit Forced Outage Rate 1.5 1.5 38.9 24.

Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration of Each):

Refuelinn 2-1-84 through 4-18-84, at 2130 hours0.0247 days <br />0.592 hours <br />0.00352 weeks <br />8.10465e-4 months <br />, 1869.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

25.

If Shut Down at End of Report Period Estimated Date of Startup:

4-19-84

26. Units In Test Status (Prior to Cormercial Operation):

Forecas t Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

_ _ _ _ - _ _ _ - _ _ _ _ _