ML20080R722
| ML20080R722 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 01/31/1984 |
| From: | Fuller C PUBLIC SERVICE CO. OF COLORADO |
| To: | |
| Shared Package | |
| ML20080R690 | List: |
| References | |
| NUDOCS 8402280389 | |
| Download: ML20080R722 (1) | |
Text
7-TSP-3 J '-
t Atttchment-38 i
Issue 2 Psy l of 1
. OPERATING DATA REPORT DOCKET NO.
50-267 DATE February 6. 1984 C(HPLETED BT Chuck Fuller TELEPHONE (303) 785-2224 OPERATING STATUS NOTES 1.
Unit Names Fort St. Vrain 2.
Reporting Period 840101 thru 840131 3.
Licensed Thermal Power (Wt):
842 4.
Nameplate Rating (Crosa We):
342 Design Electrical Rating (Net We):
330 6.
Maximum Dependable Capacity (Cross We):
342 7.
Maximus Dependable Capacity (Net We):
330 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Cive Reasons:
None 9.
Power Level To Which Restricted, If Any (Net We):
231 10.
Reasons for Restrictions, If Any:.
Restriction to 70% pendinn resolution of contractual matters.
This Month Tear to Date Cumulative
- 11. Hours in Reporting Period 744.0 744.0 40.77s.0
~
- 12. Number of Hours Reactor Was Critical 468.0 468.0 26.295.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14.
Hours Generator On-Line 446.6 446.6 18.249.8
- 15. Unit Reserve Shutdown : lours 0.0 0.0 0.0
- 16. Cross Thermsl Energy Generated (WH) 240,818.8 240,818.8 9,762,136.4
'p
- 17. Cross Electrical Energy Generated (WH) 77,412 77,412 3,230,862
- E
- 18. Net Electrical Energy Generated (W R) 71,302 71,302 2,942,832 g
- 19. Unit Service Factor 60.0 60.0 45.4
- 20. Unic Availability Factor 60.0 60.0 45.4 n-g
- 21. Unit Capacity Factor (Using MDC Net) 29.0 29.0 22.2
- 22. Unit Capacity Factor (Using DER Net) 29.0 29.0 22.2
_l
- 23. Unit Forced Outage Rate 1.5 1.5 38.9 24.
Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration of Each):
Refuelinn 2-1-84 through 4-18-84, at 2130 hours0.0247 days <br />0.592 hours <br />0.00352 weeks <br />8.10465e-4 months <br />, 1869.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.
25.
If Shut Down at End of Report Period Estimated Date of Startup:
4-19-84
- 26. Units In Test Status (Prior to Cormercial Operation):
Forecas t Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
_ _ _ _ - _ _ _ - _ _ _ _ _