ML20080R694

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Oct 1983
ML20080R694
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 10/31/1983
From: Fuller C
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20080R690 List:
References
NUDOCS 8402280379
Download: ML20080R694 (1)


Text

- _ - _ _ _ _ _ - . _ _ - _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _

TSP-3

~*

  • Atttchment-3B Icaum 2 oPERATInc mTA RgPour DocEET NO. 50-267 DATg November 4, 1983

" COMPLETED BT Chuck Fuller TELEra0xE (303) 785-2224

. OPERATING STATUS NOTES

1. Unit Names Fort St. Vrain
2. Reporting Period: 831001 thru 831031

, 3. Licensed Thermal Power Geit): 842

- 4. Nameplate Rating (Cross We): 342

5. Design Electrical Rating Olet We): 330 342

~

6. Hawi== Dependable Capacity (Cross We):

~

7.~ Maximus Dependable Capacity (Not We): 330

8. If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons

None'

9. Power Level To Which Restricted If Any (Net We): . 231
10. Reasons for Restrictions, If Any: Restriction to 70% pending resolution of contractual matters.

This Month Year to Date Ciumulative 2 11. Hours in Reporting Period 745 7.296 38,017

12. Number of Hours Reactor was critica1 683.0 4,711.0 24,457.7 13.- Reactor Reserve Shutdown Hours 0.0 0.0 0.0

.14. Hours Generator on-Line 682.9 :3,404.1 16,578.6

15. Unit Reserve Shutdown Hours '0.0 0.0 0.0 _
16. - Cross Thermal Energy Generated (WH) 387,910.3 1,868,968.3 '8,658,393.7 117.' Cross Electrical Energy Generated (WB) 135,325 595,084 2,921,388

'-%yh,F 18. Net Electrical Energy Generated (WM) 127,011 532,863 2,655,973

19. Unit Service Factor 91.7 46.7 43.6

. .20. Unit Availability Factor 91'.7 46.7 43.6 1

21. Unit Capacity Pactor (using MDC Net) 51.7 22.1 21.2
      • * ****7 #'* * * (#'1"8 "'" "* * ) ' *
  • l O' g
23. Unic Porced'outas. Rate 0.2 52.9 41.0

' 24. Shutdowns Scheduled Over Next 6 lenths (Type. Date, and Du- --' - --h): Surveillance testing L. 11-1-83-thru 11-5-83. 107 hour0.00124 days <br />0.0297 hours <br />1.76918e-4 weeks <br />4.07135e-5 months <br />s: Refueling, 2-1-84 thru 4-30-84, 2159 hours0.025 days <br />0.6 hours <br />0.00357 weeks <br />8.214995e-4 months <br />.

' 2 5.' If . Shut Down at End of Report Period. Estimated Date of Startup: 11-5-83

26. :. Units In Test Status (Prior to Commercial Operation): Forecas t Achieved INITIAL CRITICALITT N/A N/A INITIAL ELECTRICITT N/A N/A

~ COMMERCIAL OPERATION N/A N/A

_ _ _ . . _n