ML20080R694
| ML20080R694 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 10/31/1983 |
| From: | Fuller C PUBLIC SERVICE CO. OF COLORADO |
| To: | |
| Shared Package | |
| ML20080R690 | List: |
| References | |
| NUDOCS 8402280379 | |
| Download: ML20080R694 (1) | |
Text
- _ - _ _ _ _ _ -. _ _ - _ _ _ _ _ _ _ _ _ _
TSP-3 Atttchment-3B
~*
Icaum 2 oPERATInc mTA RgPour DocEET NO.
50-267 DATg November 4, 1983
" COMPLETED BT Chuck Fuller TELEra0xE (303) 785-2224 OPERATING STATUS NOTES 1.
Unit Names Fort St. Vrain
- 2.
Reporting Period:
831001 thru 831031 3.
Licensed Thermal Power Geit):
842
- 4.
Nameplate Rating (Cross We):
342 5.
Design Electrical Rating Olet We):
330 6.
Hawi== Dependable Capacity (Cross We):
342
~
7.~
Maximus Dependable Capacity (Not We):
330
~
- 8.
If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
None' 9.
Power Level To Which Restricted If Any (Net We):.
231
- 10. Reasons for Restrictions, If Any:
Restriction to 70% pending resolution of contractual matters.
This Month Year to Date Ciumulative 2 11. Hours in Reporting Period 745 7.296 38,017
- 12. Number of Hours Reactor was critica1 683.0 4,711.0 24,457.7 13.- Reactor Reserve Shutdown Hours 0.0 0.0 0.0
.14.
Hours Generator on-Line 682.9
- 3,404.1 16,578.6
- 15. Unit Reserve Shutdown Hours
'0.0 0.0 0.0 _
- 16. - Cross Thermal Energy Generated (WH) 387,910.3 1,868,968.3
'8,658,393.7 117.'
Cross Electrical Energy Generated (WB) 135,325 595,084 2,921,388
' h,F
- 18. Net Electrical Energy Generated (WM) 127,011 532,863 2,655,973
-%y
- 19. Unit Service Factor 91.7 46.7 43.6
..20.
Unit Availability Factor 91'.7 46.7 43.6
- 21. Unit Capacity Pactor (using MDC Net) 51.7 22.1 21.2 1
- ****7 #'* * * (#'1"8 "'" "* * ) '
l O
- 23. Unic Porced'outas. Rate 0.2 52.9 41.0 g
' 24. Shutdowns Scheduled Over Next 6 lenths (Type. Date, and Du- --' -
--h):
Surveillance testing L.
11-1-83-thru 11-5-83. 107 hour0.00124 days <br />0.0297 hours <br />1.76918e-4 weeks <br />4.07135e-5 months <br />s: Refueling, 2-1-84 thru 4-30-84, 2159 hours0.025 days <br />0.6 hours <br />0.00357 weeks <br />8.214995e-4 months <br />.
' 2 5.'
If. Shut Down at End of Report Period. Estimated Date of Startup:
11-5-83
- 26. :. Units In Test Status (Prior to Commercial Operation):
Forecas t Achieved INITIAL CRITICALITT N/A N/A INITIAL ELECTRICITT N/A N/A
~ COMMERCIAL OPERATION N/A N/A
_n