ML20080R694

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Oct 1983
ML20080R694
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 10/31/1983
From: Fuller C
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20080R690 List:
References
NUDOCS 8402280379
Download: ML20080R694 (1)


Text

- _ - _ _ _ _ _ -. _ _ - _ _ _ _ _ _ _ _ _ _

TSP-3 Atttchment-3B

~*

Icaum 2 oPERATInc mTA RgPour DocEET NO.

50-267 DATg November 4, 1983

" COMPLETED BT Chuck Fuller TELEra0xE (303) 785-2224 OPERATING STATUS NOTES 1.

Unit Names Fort St. Vrain

2.

Reporting Period:

831001 thru 831031 3.

Licensed Thermal Power Geit):

842

- 4.

Nameplate Rating (Cross We):

342 5.

Design Electrical Rating Olet We):

330 6.

Hawi== Dependable Capacity (Cross We):

342

~

7.~

Maximus Dependable Capacity (Not We):

330

~

8.

If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

None' 9.

Power Level To Which Restricted If Any (Net We):.

231

10. Reasons for Restrictions, If Any:

Restriction to 70% pending resolution of contractual matters.

This Month Year to Date Ciumulative 2 11. Hours in Reporting Period 745 7.296 38,017

12. Number of Hours Reactor was critica1 683.0 4,711.0 24,457.7 13.- Reactor Reserve Shutdown Hours 0.0 0.0 0.0

.14.

Hours Generator on-Line 682.9

3,404.1 16,578.6
15. Unit Reserve Shutdown Hours

'0.0 0.0 0.0 _

16. - Cross Thermal Energy Generated (WH) 387,910.3 1,868,968.3

'8,658,393.7 117.'

Cross Electrical Energy Generated (WB) 135,325 595,084 2,921,388

' h,F

18. Net Electrical Energy Generated (WM) 127,011 532,863 2,655,973

-%y

19. Unit Service Factor 91.7 46.7 43.6

..20.

Unit Availability Factor 91'.7 46.7 43.6

21. Unit Capacity Pactor (using MDC Net) 51.7 22.1 21.2 1
  • ****7 #'* * * (#'1"8 "'" "* * ) '

l O

23. Unic Porced'outas. Rate 0.2 52.9 41.0 g

' 24. Shutdowns Scheduled Over Next 6 lenths (Type. Date, and Du- --' -

--h):

Surveillance testing L.

11-1-83-thru 11-5-83. 107 hour0.00124 days <br />0.0297 hours <br />1.76918e-4 weeks <br />4.07135e-5 months <br />s: Refueling, 2-1-84 thru 4-30-84, 2159 hours0.025 days <br />0.6 hours <br />0.00357 weeks <br />8.214995e-4 months <br />.

' 2 5.'

If. Shut Down at End of Report Period. Estimated Date of Startup:

11-5-83

26. :. Units In Test Status (Prior to Commercial Operation):

Forecas t Achieved INITIAL CRITICALITT N/A N/A INITIAL ELECTRICITT N/A N/A

~ COMMERCIAL OPERATION N/A N/A

_n