{{#Wiki_filter:SDM 3.1.1 3.1  REACTIVITY CONTROLSYSTEMS 3.1.1  SHUTDOWNMARGIN (SDM)
LCO 3.1.1          SDM shall    be within  the limits    provided    in the COLR.
APPLICABILITY:      MODE2 with keff < 1.0, MODES3, 4, and 5.
ACTIONS CONDITION                        REQUIRED ACTION                  COMPLETIONTIME A. SDM not within    limit.      A.1        Initiate  boration  to      15 minutes restore  SDM to within limit.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                      FREQUENCY SR 3.1.1.1      Verify SDM is within      the limits    provided    in    24 hours the COLR HBRSEP Unit  No. 2                          3.1-1                            Amendment No. 176
 
Core Reactivity 3.1.2 3.1  REACTIVITY CONTROLSYSTEMS 3.1.2    Core Reactivity LCO 3.1.2            The measured core reactivity      shall  be within  + 1% Ak/k of predicted  values.
APPLICABILITY:        MODES1 and 2.
ACTIONS CONDITION                    REQUIRED ACTION                  COMPLETIONTIME A. Measured core                A.1    Re-evaluate      core        72 hours reactivity    not within            design and safety limit.                              analysis,    and determine that the reactor core is acceptable      for continued operation.
A.2    Establish    appropriate      72 hours operating restrictions      and SRs.
B. Required Action and          B.l    Be in MODE3.                  6 hours associated    Completion Time not met.
HBRSEP Unit    No. 2                    3.1-2                            Amendment No. 176
 
Core Reactivity 3.1.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                              FREQUENCY SR 3.1.2.1      ________________I_ NOTE--------------------
The predicted            reactivity          values may be adjusted (normalized)                to correspond to the measured core reactivity                    prior to exceeding a fuel burnup of 60 effective                      full power days (EFPD) after each fuel loading.
Verify measured core reactivity                      is within  Once prior to
                  + 1% Ak/k of predicted                  values.                entering              MODE 1 after each refueling AND
                                                                                    -m-w-    NOTE------
Only required after 60 EFPD
                                                                                    -~~-----~~---~~
31 EFPD thereafter HBRSEP Unit  No. 2                                  3.1-3                        Amendment No. 176
 
MTC 3.1.3 n
3.1    REACTIVITY CONTROLSYSTEMS 3.1.3    Moderator  Temperature  Coefficient        (MTC)
LCO 3.1.3            The MTC shall be maintained within the limits        specified in the COLR. The maximum upper limit shall be = +5.0 pcm/"F at less than 50% RTP or 0.0 pcm/"F at 50% RTP and above.
APPLICABILITY:      MODE 1 and MODE2 with keff = 1.0 for the upper MTC limit, MODES1, 2, and 3 for the lower MTC limit.
ACTIONS CONDITION                      REQUIRED ACTION              COMPLETIONTIME A. MTC not within    upper    A.1        Establish                  24 hours administrative withdrawal    limits for control    banks to maintain MTC within limit.
B. Required Action and          B.l        Be in MODE2 with          6 hours associated    Completion                k eff < 1.0.
Time of Condition      A not met.
C. MTC not within    lower    C.1        Be in MODE4.              12 hours limit.
HBRSEP Unit    No. 2                        3.1-4                        Amendment No. 176
 
MTC 3.1.3 n
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                            FREQUENCY SR 3.1.3.1      Verify    MTC is within        upper limit.                    Once prior to entering  MODE 1 after each refueling SR 3.1.3.2      --      ~~~~~~~~~~~~~~      NOTES-------------------
: 1. Not required to be performed until 7 effective        full power days (EFPD) after reaching the equivalent                      of an equilibrium        RTP all rods out (AR0) boron concentration              of 300 ppm.
: 2.      If the MTC is more negative than the 300 ppm Surveillance                limit      (not LCO limit)      specified      in the COLR, SR 3.1.3.2      shall be repeated once per 14 EFPD during the remainder of the fuel cycle.
: 3.      SR 3.1.3.2      need not be repeated if the MTC measured at the equivalent                      of equilibrium        RTP-AR0 boron concentration        of = 60 ppm is less negative than the 60 ppm Surveillance limit    specified      in the COLR.
Verify    MTC is within        lower        limit.              Once each cycle HBRSEP Unit  No. 2                              3.1-5                            Amendment No. 176
 
Rod Group Alignment    Limits 3.1.4 3.1    REACTIVITY CONTROLSYSTEMS 3.1.4    Rod Group Alignment      Limits LCO 3.1.4            All  shutdown    and control        rods shall    be OPERABLE.
AND Individual      indicated      rod positions      shall  be as follows:
: a. For bank demand positions              > 200 steps, each rod shall        be within 15 inches of its bank demand position,                  and
: b. For bank demand positions              < 200 steps, each rod shall be within 7.5 inches of the average of the individual                    rod positions        in the bank.
APPLICABILITY:      MODES1 and 2.
ACTIONS
* CONDITION                            REQUIRED ACTION                  COMPLETIONTIME A. One or more rod(s)              A.l.l      Verify SDM is within            1 hour inoperable.                                  the limits      provided in the COLR.
OR 1 hour A.1.2        Initiate    boration    to restore    SDM to within limit.
AND A.2        Be in MODE3.                    6 hours (continued)
HBRSEP Unit    No. 2                              3.1-6                            Amendment No. 176
 
Rod Group Alignment    Limits 3.1.4 ACTIONS (continued)
CONDITION            REQUIRED ACTION                COMPLETIONTIME B. One rod not within B.l        Restore rod to within          1 hour alignment limits.            alignment limits.
or B.2.1.1    Verify SDM is within          1 hour the limits    provided in the COLR.
OR B.2.1.2    Initiate    boration  to    1 hour restore    SDM to within limit.
AND B.2.2    Reduce THERMAL POWER          2 hours to < 70% RTP.
AND B.2.3    Verify SDM is within          Once per the limits      provided      12 hours in the COLR.
AND B.2.4    Perform    SR 3.2.1.1.        72 hours AND B.2.5    Perform    SR 3.2.2.1.        72 hours AND B.2.6    Re-evaluate      safety      5 days analyses and confirm results    remain valid for duration      of operation      under these conditions.
(continued)
HBRSEP Unit  No. 2              3.1-7                          Amendment No. 176
 
Rod Group Alignment      Limits 3.1.4 ACTIONS (continued)
CONDITION                        REQUIRED ACTION                COMPLETIONTIME C. Required Action and          c.1        Be in MODE3.                  6 hours associated  Completion Time of Condition    B not met.
D. More than one rod not        D.l.l      Verify SDM is within          1 hour within alignment                        the limits    provided limit.                                  in the COLR.
Or 1 hour D.1.2      Initiate  boration    to restore required      SDM to within limit.
AND 6 hours D.2        Be in MODE3.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                      FREQUENCY SR 3.1.4.1      Verify individual      rod positions    within            12 hours alignment limit.
AND Once within 4 hours and every 4 hours thereafter      when the rod position deviation monitor is inoperable (continued)
HBRSEP Unit  No. 2                        3.1-8                          Amendment No. 176
 
Rod Group Alignment    Limits 3.1.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                        FREQUENCY I
SR 3.1.4.2    Verify rod freedom of movement                              92 days (trippability)        by moving each rod not fully inserted      in the core > 10 steps in either direction.
SR 3.1.4.3    Verify rod drop time of each rod, from the                  Prior to fully withdrawn position,            is < 1.8 seconds      reactor from the beginning of decay of stationary                  criticality gripper coil voltage to dashpot entry,                      after each with:                                                      removal of the reactor head
                              > 540&deg;F;    and
: b.      All    reactor  coolant  pumps operating.
HBRSEP Unit No. 2                            3.1-9                      Amendment No. 176
 
Shutdown Bank Insertion          Limits 3.1.5 3.1    REACTIVITY CONTROLSYSTEMS 3.1.5    Shutdown Bank Insertion          Limits LCO 3.1.5            Each shutdown bank shall              be within    insertion        limits specified    in the COLR.
APPLICABILITY:        MODE 1, MODE2 with      any control        bank not fully        inserted.
                                                          ----NOTE----------------------------
This LCO is not applicable              while performing          SR 3.1.4.2.
ACTIONS CONDITION                            REQUIRED ACTION                        COMPLETIONTIME A. One or both shutdown            A.l.l        Verify SDM is within                  1 hour banks not within                              the limits      provided limits.                                      in the COLR.
OR 1 hour A.1.2        Initiate      boration      to restore    SDM to within limit.
AND 2 hours A.2          Restore shutdown banks to within limits.
B. Required Action and              B.l          Be in MODE3.                          6 hours associated    Completion Time not met.
HBRSEP Unit    No. 2                            3.140                                  Amendment No. 176
 
Shutdown Bank Insertion Limits 3.1.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE                              FREQUENCY SR 3.1.5.1    Verify each shutdown bank is within  the      12 hours limits specified  in the COLR.
HBRSEP Unit No. 2                    3.141                    Amendment No. 176
 
Control    Bank Insertion          Limits 3.1.6 3.1    REACTIVITY CONTROLSYSTEMS 3.1.6    Control  Bank Insertion      Limits LCO 3.1.6            Control  banks shall be within the insertion,                      sequence,      and overlap  limits      specified      in the COLR.
APPLICABILITY:      MODE 1, MODE2 with      keff > 1.0.
mm-s----------        NOTE----------------------------
This LCO is not applicable              while performing        SR 3.1.4.2.
ACTIONS CONDITION                            REQUIRED ACTION                      COMPLETIONTIME A. Control bank insertion          A.l.l        Verify SDM is within                1 hour limits  not met.                            the limits      provided in the COLR.
OR A.1.2        Initiate      boration    to        1 hour restore    SDM to within limit.
AND A.2          Restore    control                1 hour bank(s)    to within limits.
(continued)
HBRSEP Unit    No. 2                            3.1-12                                Amendment No. 176
 
Control    Bank Insertion      Limits 3.1.6 ACTIONS (continued>
CONDITION                      REQUIRED ACTION                    COMPLETIONTIME B. Control bank sequence        B.l.l      Verify SDM is within              1 hour or overlap limits    not              the limits      provided met.                                    in the COLR.
OR 1 hour B.1.2      Initiate    boration    to restore    SDM to within limit.
2 hours B.2      Restore control        bank sequence and overlap to within      limits.
C. Required Action and          c.1      Be in MODE3.                      6 hours associated  Completion Time not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                            FREQUENCY SR 3.1.6.1      Verify estimated critical        control    bank          Within 4 hours position  is within the limits        specified      in    prior to the COLR.                                                    achieving criticality (continued)
HBRSEP Unit  No. 2                      3.1-13                              Amendment No. 176
 
Control Bank Insertion  Limits 3.1.6 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                FREQUENCY SR 3.1.6.2      Verify    each control  bank insertion  is        12 hours within    the limits  specified  in the COLR.
AND Once within 4 hours and every 4 hours thereafter  when the rod insertion  limit monitor is inoperable SR 3.1.6.3      Verify sequence and overlap limits                  12 hours specified    in the COLR are met for control banks not fully withdrawn from the core.
HBRSEP Unit  No. 2                        3.1-14                    Amendment No. 176
 
Rod Position      Indication 3.1.7 3.1      REACTIVITY CONTROLSYSTEMS 3.1.7      Rod Position      Indication LCO 3.1.7                The Analog Rod Position          Indication      (ARPI) System and the Demand Position      Indication      System shall be OPERABLE.
APPLICABILITY:            MODES1 and 2.
ACTIONS
_-_________________________________                --NOTE-------------------------------------
Separate Condition          entry is allowed for each inoperable                    rod position      indicator per group and each demand position                indicator      per bank.            '
CONDITION                            REQUIRED ACTION                        COMPLETIONTIME A.      One ARPI per group inoperable    for one or        A.1        Verify the position                    Once per 8 hours more groups.                                  of the rods with inoperable    position indicators    by using movable incore detectors*.
OR A.2        Reduce THERMAL POWER                  8 hours to < 50% RTP.
B. One or more rods with            B.l        Verify the position                  4 hours inoperable    position                      of the rods with indicators    have been                      inoperable    position moved in excess of                            indicators    by using 24 steps in one                              movable incore direction    since the                      detectors.
last determination        of the rod's position.              OR (continued)
  *During Cycle 22, the position        of Control Rod H-10, Shutdown Bank B. can be determined by verifying    gripper coil parameters of the Control Rod Drive Mechanism have not changed state, until    the repair of the indication      system for this rod is completed.
HBRSEP Unit        No. 2                            3.1-15                                  Amendment No. 197
 
Rod Position    Indication 3.1.7 ACTIONS CONDITION                  REQUIRED ACTION                        COMPLETIONTIME B.  (continued)              B.2        Reduce THERMAL POWER                  8 hours to < 50% RTP.
C. One demand position      C.l.l      Verify by                            Once per indicator    per bank              administrative                means  8 hours inoperable    for one or            all ARPIs for the more banks.                        affected            banks are OPERABLE.
AND C.1.2      --------NOTE---------
Only required to be met for bank positions              < 200 steps.
Verify the position                    Once per of each rod in the                    8 hours affected              bank(s) is within 7.5 inches of the average of the individual              rod positions              in the affected              bank(s).
(continued)
HBRSEP Unit    No. 2                  3.146                                    Amendment No. 176
 
Rod Position  Indication 3.1.7 ACTIONS CONDITION                REQUIRED ACTION            COMPLETIONTIME C.  (continued)            c.1.3    ~~        NOTE----
Only required to be met for bank positions  > 200 steps.
Verify the position        Once per of each rod in the        8 hours affected  bank(s) is within 15 inches of the bank demand position.
OR c.2    Reduce THERMAL POWER      8 hours to < 50% RTP.
D. Required Action and      D.1    Be in MODE3.              6 hours associated    Completion Time not met.
HBRSEP Unit    No. 2                3.147                      Amendment No. 176
 
Rod Position    Indication 3.1.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                    FREQUENCY SR 3.1.7.1      -------------------NOTE-------------------
Only required to be met for bank positions
                  > 200 steps.
Perform CHANNEL CHECK by comparing analog                                      12 hours rod position              indication                and bank demand position            indication.
Once within 4 hours following
                                                                                                  > 6 inches of rod motion when rod position deviation monitor is inoperable SR 3.1.7.2      ----~~--~~~--~I~~--                NOTE-------------------
Only required                to be met for bank positions
                < 200 steps.
Verify each ARPI is within 7.5 inches of                                        31 days the average of the individual                                  ARPIs in the associated              bank after moving each full length RCCA bank > 19 steps and returning the banks to their original                                  positions.
SR 3.1.7.3      -------------------NOTE-------------------
Only required to be met for bank positions
                > 200 steps.
Verify each ARPI is within                                  15 inches of the  31 days associated              bank demand position                        after moving each full length RCCA bank
                > 19 steps and returning                                  the banks to their original            positions.
(continued)
HBRSEP Unit  No. 2                                    3.1-18                                  Amendment No. 176
 
Rod Position    Indication 3.1.7 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                FREQUENCY SR 3.1.7.4      Perform CHANNEL CALIBRATION of the ARPI        18 months System.
HBRSEP Unit  No. 2                    3.149                    Amendment No. 176
 
PHYSICS TESTS Exceptions-MODE            2 3.1.8 3.1    REACTIVITY CONTROLSYSTEMS 3.1.8    PHYSICS TESTS Exceptions-MODE          2 LCO 3.1.8            During    the performance      of PHYSICS TESTS, the requirements            of LCO 3.1.3,    "Moderator Temperature Coefficient              (MTC)":
LCO 3.1.4,    "Rod Group Alignment Limits":
LCO 3.1.5,    "Shutdown Bank Insertion          Limits";
LCO 3.1.6,    "Control    Bank Insertion      Limits":    and LCO 3.4.2,    "RCS Minimum Temperature for Criticality" may be suspended,      provided:
: a. RCS lowest    loop average temperature            is > 530&deg;F;
: b. SDM is within    the limits    provided    in the COLR: and, C. THERMAL POWERis < 5% RTP APPLICABILITY:      MODE2 during      PHYSICS TESTS.
ACTIONS CONDITION                        REQUIRED ACTION                    COMPLETIONTIME A. SDM not within    limit.      A.1        Initiate    boration    to      15 minutes restore  SDM to within limit.
AND A.2        Suspend PHYSICS TESTS            1 hour exceptions.
B. THERMAL POWERnot              B.l        Open reactor    trip            Immediate1y within limit.                            breakers.
(continued)
HBRSEP Unit    No. 2                        3.1-20                              Amendment No. 176
 
PHYSICS TESTS Exceptions-MODE        2 3.1.8 ACTIONS (continued)
CONDITION                      REQUIRED ACTION              COMPLETIONTIME I
C. RCS lowest loop              c.1      Restore RCS lowest          15 minutes average temperature                    loop average not within limit.                      temperature  to within limit.
D. Required Action and          D.l      Be in MODE3.                15 minutes associated  Completion Time of Condition    C not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                      FREQUENCY SR 3.1.8.1      Perform a CHANNEL OPERATIONAL TEST on power          Within 7 days range and intermediate      range channels per        prior to SR 3.3.1.7,  SR 3.3.1.8,    and Table 3.3.1-1.      initiation  of PHYSICS TESTS SR 3.1.8.2      Verify the RCS lowest loop average                    30 minutes temperature  is > 53OOF.
SR 3.1.8.3      Verify  THERMAL POWERis < 5% RTP.                    30 minutes SR 3.1.8.4      Verify SDM is within      the limits  provided    in  24 hours the COLR.
HBRSEP Unit  No. 2                      3.1-21                        Amendment No. 176}}

Latest revision as of 01:39, 25 March 2020

Informational Copy of Operating License & Appendices. Technical Specification Pages 3.1-1 Through 3.1-21 for Amendment 176
ML040570694
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/18/2004
From:
Progress Energy Carolinas
To:
Office of Nuclear Reactor Regulation
References
Download: ML040570694 (21)


Text

SDM 3.1.1 3.1 REACTIVITY CONTROLSYSTEMS 3.1.1 SHUTDOWNMARGIN (SDM)

LCO 3.1.1 SDM shall be within the limits provided in the COLR.

APPLICABILITY: MODE2 with keff < 1.0, MODES3, 4, and 5.

ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. SDM not within limit. A.1 Initiate boration to 15 minutes restore SDM to within limit.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.1.1 Verify SDM is within the limits provided in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the COLR HBRSEP Unit No. 2 3.1-1 Amendment No. 176

Core Reactivity 3.1.2 3.1 REACTIVITY CONTROLSYSTEMS 3.1.2 Core Reactivity LCO 3.1.2 The measured core reactivity shall be within + 1% Ak/k of predicted values.

APPLICABILITY: MODES1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. Measured core A.1 Re-evaluate core 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> reactivity not within design and safety limit. analysis, and determine that the reactor core is acceptable for continued operation.

A.2 Establish appropriate 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> operating restrictions and SRs.

B. Required Action and B.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

HBRSEP Unit No. 2 3.1-2 Amendment No. 176

Core Reactivity 3.1.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.2.1 ________________I_ NOTE--------------------

The predicted reactivity values may be adjusted (normalized) to correspond to the measured core reactivity prior to exceeding a fuel burnup of 60 effective full power days (EFPD) after each fuel loading.

Verify measured core reactivity is within Once prior to

+ 1% Ak/k of predicted values. entering MODE 1 after each refueling AND

-m-w- NOTE------

Only required after 60 EFPD

-~~-----~~---~~

31 EFPD thereafter HBRSEP Unit No. 2 3.1-3 Amendment No. 176

MTC 3.1.3 n

3.1 REACTIVITY CONTROLSYSTEMS 3.1.3 Moderator Temperature Coefficient (MTC)

LCO 3.1.3 The MTC shall be maintained within the limits specified in the COLR. The maximum upper limit shall be = +5.0 pcm/"F at less than 50% RTP or 0.0 pcm/"F at 50% RTP and above.

APPLICABILITY: MODE 1 and MODE2 with keff = 1.0 for the upper MTC limit, MODES1, 2, and 3 for the lower MTC limit.

ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. MTC not within upper A.1 Establish 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> administrative withdrawal limits for control banks to maintain MTC within limit.

B. Required Action and B.l Be in MODE2 with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion k eff < 1.0.

Time of Condition A not met.

C. MTC not within lower C.1 Be in MODE4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> limit.

HBRSEP Unit No. 2 3.1-4 Amendment No. 176

MTC 3.1.3 n

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.3.1 Verify MTC is within upper limit. Once prior to entering MODE 1 after each refueling SR 3.1.3.2 -- ~~~~~~~~~~~~~~ NOTES-------------------

1. Not required to be performed until 7 effective full power days (EFPD) after reaching the equivalent of an equilibrium RTP all rods out (AR0) boron concentration of 300 ppm.
2. If the MTC is more negative than the 300 ppm Surveillance limit (not LCO limit) specified in the COLR, SR 3.1.3.2 shall be repeated once per 14 EFPD during the remainder of the fuel cycle.
3. SR 3.1.3.2 need not be repeated if the MTC measured at the equivalent of equilibrium RTP-AR0 boron concentration of = 60 ppm is less negative than the 60 ppm Surveillance limit specified in the COLR.

Verify MTC is within lower limit. Once each cycle HBRSEP Unit No. 2 3.1-5 Amendment No. 176

Rod Group Alignment Limits 3.1.4 3.1 REACTIVITY CONTROLSYSTEMS 3.1.4 Rod Group Alignment Limits LCO 3.1.4 All shutdown and control rods shall be OPERABLE.

AND Individual indicated rod positions shall be as follows:

a. For bank demand positions > 200 steps, each rod shall be within 15 inches of its bank demand position, and
b. For bank demand positions < 200 steps, each rod shall be within 7.5 inches of the average of the individual rod positions in the bank.

APPLICABILITY: MODES1 and 2.

ACTIONS

  • CONDITION REQUIRED ACTION COMPLETIONTIME A. One or more rod(s) A.l.l Verify SDM is within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. the limits provided in the COLR.

OR 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> A.1.2 Initiate boration to restore SDM to within limit.

AND A.2 Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> (continued)

HBRSEP Unit No. 2 3.1-6 Amendment No. 176

Rod Group Alignment Limits 3.1.4 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETIONTIME B. One rod not within B.l Restore rod to within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> alignment limits. alignment limits.

or B.2.1.1 Verify SDM is within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> the limits provided in the COLR.

OR B.2.1.2 Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SDM to within limit.

AND B.2.2 Reduce THERMAL POWER 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to < 70% RTP.

AND B.2.3 Verify SDM is within Once per the limits provided 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in the COLR.

AND B.2.4 Perform SR 3.2.1.1. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND B.2.5 Perform SR 3.2.2.1. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND B.2.6 Re-evaluate safety 5 days analyses and confirm results remain valid for duration of operation under these conditions.

(continued)

HBRSEP Unit No. 2 3.1-7 Amendment No. 176

Rod Group Alignment Limits 3.1.4 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETIONTIME C. Required Action and c.1 Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition B not met.

D. More than one rod not D.l.l Verify SDM is within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> within alignment the limits provided limit. in the COLR.

Or 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> D.1.2 Initiate boration to restore required SDM to within limit.

AND 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> D.2 Be in MODE3.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.4.1 Verify individual rod positions within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> alignment limit.

AND Once within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> thereafter when the rod position deviation monitor is inoperable (continued)

HBRSEP Unit No. 2 3.1-8 Amendment No. 176

Rod Group Alignment Limits 3.1.4 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY I

SR 3.1.4.2 Verify rod freedom of movement 92 days (trippability) by moving each rod not fully inserted in the core > 10 steps in either direction.

SR 3.1.4.3 Verify rod drop time of each rod, from the Prior to fully withdrawn position, is < 1.8 seconds reactor from the beginning of decay of stationary criticality gripper coil voltage to dashpot entry, after each with: removal of the reactor head

> 540°F; and

b. All reactor coolant pumps operating.

HBRSEP Unit No. 2 3.1-9 Amendment No. 176

Shutdown Bank Insertion Limits 3.1.5 3.1 REACTIVITY CONTROLSYSTEMS 3.1.5 Shutdown Bank Insertion Limits LCO 3.1.5 Each shutdown bank shall be within insertion limits specified in the COLR.

APPLICABILITY: MODE 1, MODE2 with any control bank not fully inserted.


NOTE----------------------------

This LCO is not applicable while performing SR 3.1.4.2.

ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. One or both shutdown A.l.l Verify SDM is within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> banks not within the limits provided limits. in the COLR.

OR 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> A.1.2 Initiate boration to restore SDM to within limit.

AND 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> A.2 Restore shutdown banks to within limits.

B. Required Action and B.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

HBRSEP Unit No. 2 3.140 Amendment No. 176

Shutdown Bank Insertion Limits 3.1.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.5.1 Verify each shutdown bank is within the 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> limits specified in the COLR.

HBRSEP Unit No. 2 3.141 Amendment No. 176

Control Bank Insertion Limits 3.1.6 3.1 REACTIVITY CONTROLSYSTEMS 3.1.6 Control Bank Insertion Limits LCO 3.1.6 Control banks shall be within the insertion, sequence, and overlap limits specified in the COLR.

APPLICABILITY: MODE 1, MODE2 with keff > 1.0.

mm-s---------- NOTE----------------------------

This LCO is not applicable while performing SR 3.1.4.2.

ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. Control bank insertion A.l.l Verify SDM is within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> limits not met. the limits provided in the COLR.

OR A.1.2 Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SDM to within limit.

AND A.2 Restore control 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> bank(s) to within limits.

(continued)

HBRSEP Unit No. 2 3.1-12 Amendment No. 176

Control Bank Insertion Limits 3.1.6 ACTIONS (continued>

CONDITION REQUIRED ACTION COMPLETIONTIME B. Control bank sequence B.l.l Verify SDM is within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or overlap limits not the limits provided met. in the COLR.

OR 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> B.1.2 Initiate boration to restore SDM to within limit.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> B.2 Restore control bank sequence and overlap to within limits.

C. Required Action and c.1 Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.6.1 Verify estimated critical control bank Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> position is within the limits specified in prior to the COLR. achieving criticality (continued)

HBRSEP Unit No. 2 3.1-13 Amendment No. 176

Control Bank Insertion Limits 3.1.6 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.1.6.2 Verify each control bank insertion is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> within the limits specified in the COLR.

AND Once within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> thereafter when the rod insertion limit monitor is inoperable SR 3.1.6.3 Verify sequence and overlap limits 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> specified in the COLR are met for control banks not fully withdrawn from the core.

HBRSEP Unit No. 2 3.1-14 Amendment No. 176

Rod Position Indication 3.1.7 3.1 REACTIVITY CONTROLSYSTEMS 3.1.7 Rod Position Indication LCO 3.1.7 The Analog Rod Position Indication (ARPI) System and the Demand Position Indication System shall be OPERABLE.

APPLICABILITY: MODES1 and 2.

ACTIONS

_-_________________________________ --NOTE-------------------------------------

Separate Condition entry is allowed for each inoperable rod position indicator per group and each demand position indicator per bank. '

CONDITION REQUIRED ACTION COMPLETIONTIME A. One ARPI per group inoperable for one or A.1 Verify the position Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> more groups. of the rods with inoperable position indicators by using movable incore detectors*.

OR A.2 Reduce THERMAL POWER 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to < 50% RTP.

B. One or more rods with B.l Verify the position 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> inoperable position of the rods with indicators have been inoperable position moved in excess of indicators by using 24 steps in one movable incore direction since the detectors.

last determination of the rod's position. OR (continued)

  • During Cycle 22, the position of Control Rod H-10, Shutdown Bank B. can be determined by verifying gripper coil parameters of the Control Rod Drive Mechanism have not changed state, until the repair of the indication system for this rod is completed.

HBRSEP Unit No. 2 3.1-15 Amendment No. 197

Rod Position Indication 3.1.7 ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME B. (continued) B.2 Reduce THERMAL POWER 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to < 50% RTP.

C. One demand position C.l.l Verify by Once per indicator per bank administrative means 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> inoperable for one or all ARPIs for the more banks. affected banks are OPERABLE.

AND C.1.2 --------NOTE---------

Only required to be met for bank positions < 200 steps.

Verify the position Once per of each rod in the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> affected bank(s) is within 7.5 inches of the average of the individual rod positions in the affected bank(s).

(continued)

HBRSEP Unit No. 2 3.146 Amendment No. 176

Rod Position Indication 3.1.7 ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME C. (continued) c.1.3 ~~ NOTE----

Only required to be met for bank positions > 200 steps.

Verify the position Once per of each rod in the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> affected bank(s) is within 15 inches of the bank demand position.

OR c.2 Reduce THERMAL POWER 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to < 50% RTP.

D. Required Action and D.1 Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

HBRSEP Unit No. 2 3.147 Amendment No. 176

Rod Position Indication 3.1.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.7.1 -------------------NOTE-------------------

Only required to be met for bank positions

> 200 steps.

Perform CHANNEL CHECK by comparing analog 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> rod position indication and bank demand position indication.

Once within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> following

> 6 inches of rod motion when rod position deviation monitor is inoperable SR 3.1.7.2 ----~~--~~~--~I~~-- NOTE-------------------

Only required to be met for bank positions

< 200 steps.

Verify each ARPI is within 7.5 inches of 31 days the average of the individual ARPIs in the associated bank after moving each full length RCCA bank > 19 steps and returning the banks to their original positions.

SR 3.1.7.3 -------------------NOTE-------------------

Only required to be met for bank positions

> 200 steps.

Verify each ARPI is within 15 inches of the 31 days associated bank demand position after moving each full length RCCA bank

> 19 steps and returning the banks to their original positions.

(continued)

HBRSEP Unit No. 2 3.1-18 Amendment No. 176

Rod Position Indication 3.1.7 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.1.7.4 Perform CHANNEL CALIBRATION of the ARPI 18 months System.

HBRSEP Unit No. 2 3.149 Amendment No. 176

PHYSICS TESTS Exceptions-MODE 2 3.1.8 3.1 REACTIVITY CONTROLSYSTEMS 3.1.8 PHYSICS TESTS Exceptions-MODE 2 LCO 3.1.8 During the performance of PHYSICS TESTS, the requirements of LCO 3.1.3, "Moderator Temperature Coefficient (MTC)":

LCO 3.1.4, "Rod Group Alignment Limits":

LCO 3.1.5, "Shutdown Bank Insertion Limits";

LCO 3.1.6, "Control Bank Insertion Limits": and LCO 3.4.2, "RCS Minimum Temperature for Criticality" may be suspended, provided:

a. RCS lowest loop average temperature is > 530°F;
b. SDM is within the limits provided in the COLR: and, C. THERMAL POWERis < 5% RTP APPLICABILITY: MODE2 during PHYSICS TESTS.

ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. SDM not within limit. A.1 Initiate boration to 15 minutes restore SDM to within limit.

AND A.2 Suspend PHYSICS TESTS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> exceptions.

B. THERMAL POWERnot B.l Open reactor trip Immediate1y within limit. breakers.

(continued)

HBRSEP Unit No. 2 3.1-20 Amendment No. 176

PHYSICS TESTS Exceptions-MODE 2 3.1.8 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETIONTIME I

C. RCS lowest loop c.1 Restore RCS lowest 15 minutes average temperature loop average not within limit. temperature to within limit.

D. Required Action and D.l Be in MODE3. 15 minutes associated Completion Time of Condition C not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.8.1 Perform a CHANNEL OPERATIONAL TEST on power Within 7 days range and intermediate range channels per prior to SR 3.3.1.7, SR 3.3.1.8, and Table 3.3.1-1. initiation of PHYSICS TESTS SR 3.1.8.2 Verify the RCS lowest loop average 30 minutes temperature is > 53OOF.

SR 3.1.8.3 Verify THERMAL POWERis < 5% RTP. 30 minutes SR 3.1.8.4 Verify SDM is within the limits provided in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the COLR.