ML14203A614: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML14203A614
| number = ML14203A614
| issue date = 07/18/2014
| issue date = 07/18/2014
| title = Request for Additional Information - LAR 231 (TAC MF4392 and MF4393)
| title = NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TAC MF4392 and MF4393)
| author name = Klett A
| author name = Klett A
| author affiliation = NRC/NRR/DORL
| author affiliation = NRC/NRR/DORL

Revision as of 06:12, 5 December 2019

NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TAC MF4392 and MF4393)
ML14203A614
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/18/2014
From: Audrey Klett
Division of Operating Reactor Licensing
To: Tomonto R
Florida Power & Light Co
References
MF4392, MF4393
Download: ML14203A614 (2)


Text

NRR-PMDAPEm Resource From: Klett, Audrey Sent: Friday, July 18, 2014 1:23 PM To: Tomonto, Bob (Bob.Tomonto@fpl.com); Czaya, Paul (Paul.Czaya@fpl.com)

Cc: 'Hanek, Olga' (Olga.Hanek@fpl.com)

Subject:

Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TAC MF4392 and MF4393)

Follow Up Flag: Follow up Flag Status: Flagged Bob, Paul, By letter dated July 10, 2014, as supplemented by letter dated July 17, 2014, Florida Power & Light Company (the licensee) submitted a license amendment request for the Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point). The licensee requested revisions to the Turkey Point Technical Specifications (TSs),

Section 3/4.7.4, Ultimate Heat Sink.

The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided by the licensee and determined that it needs additional information to complete the review. The NRC staffs request for additional information (RAI) is as follows.

RAI 1

Title 10 of the Code of Federal Regulations (10 CFR), Paragraph 50.36(a) requires each applicant for a license to include proposed TSs as well as a summary statement of the bases or reasons for such specifications.

Please provide a copy of the TS Bases associated with the proposed TSs.

RAI 2

Paragraph 50.36(c)(3) of 10 CFR states that Surveillance Requirements (SRs) assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits and that the limiting conditions for operation [LCOs] will be met. The proposed frequency for the new SR 4.7.4.b is at least once per 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> when water temperature exceeds 100°F [degrees Fahrenheit]. Please provide a justification for the 6-hour frequency that demonstrates that the frequency assures that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the LCO will be met.

RAI 3

The text referring to the water temperature limit is inconsistent between the LCO 3.7.4 statement and SRs 4.7.4.a and b. The LCO statement uses the text less than or equal to 104°F, whereas SR 4.7.4.a uses the text its limit, and SR 4.7.4.b uses the text the limit. Surveillance requirements assure that the LCO will be met. Therefore, please propose new text referring to the water temperature limit in the SRs that is consistent with the LCO text.

Audrey Klett Project Manager NRR/DORL/LPLII-2 301-415-0489 1

Hearing Identifier: NRR_PMDA Email Number: 1440 Mail Envelope Properties (Audrey.Klett@nrc.gov20140718132300)

Subject:

Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TAC MF4392 and MF4393)

Sent Date: 7/18/2014 1:23:24 PM Received Date: 7/18/2014 1:23:00 PM From: Klett, Audrey Created By: Audrey.Klett@nrc.gov Recipients:

"'Hanek, Olga' (Olga.Hanek@fpl.com)" <Olga.Hanek@fpl.com>

Tracking Status: None "Tomonto, Bob (Bob.Tomonto@fpl.com)" <Bob.Tomonto@fpl.com>

Tracking Status: None "Czaya, Paul (Paul.Czaya@fpl.com)" <Paul.Czaya@fpl.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2210 7/18/2014 1:23:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: Follow up