ML061800324: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:M M EmI Holtec Center, 555 Lincoln Drive West, Marlton, NJ 08053 H O LT E C Telephone (856) 797-0900 INTERNATIONAL Fax (856) 797-0909 June 23, 2006 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
{{#Wiki_filter:M       M EmI                           Holtec Center, 555 Lincoln Drive West, Marlton, NJ 08053 H     O LT E C INTERNATIONAL Telephone (856) 797-0900 Fax (856) 797-0909 June 23, 2006 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001


==Reference:==
==Reference:==
: 1. USNRC Docket No. 72-1014 (HI-STORM 100)2. Holtec Project 5014 3. Holtec Letter 5014587, dated February 18, 2006 4. Holtec Letter 5014595, dated April 30, 2006  
: 1. USNRC Docket No. 72-1014 (HI-STORM 100)
: 2. Holtec Project 5014
: 3. Holtec Letter 5014587, dated February 18, 2006
: 4. Holtec Letter 5014595, dated April 30, 2006


==Subject:==
==Subject:==
Submittal of License Amendment Request #5 to HI-STORM 100 CoC  
Submittal of License Amendment Request #5 to HI-STORM 100 CoC


==Dear Sir:==
==Dear Sir:==
We are pleased to submit a request to amend the Certificate of Compliance for the HI-STORM 100 System (CoC 72-1014).
 
This amendment request enhances the HI-STORM 100 System by adding site specific options for Indian Point Unit 1. Specifically, the HI-STORM lOOS Version B, MPC-32, and HI-TRAC I OOD have been shortened to accommodate site specific restrictions.
We are pleased to submit a request to amend the Certificate of Compliance for the HI-STORM 100 System (CoC 72-1014). This amendment request enhances the HI-STORM 100 System by adding site specific options for Indian Point Unit 1. Specifically, the HI-STORM lOOS Version B, MPC-32, and HI-TRAC IOOD have been shortened to accommodate site specific restrictions. A summary of the proposed changes, with detailed references to both the CoC and the HI-STORM 100 System FSAR, is attached. Given the client's need to move the fuel assemblies into dry cask storage and the small number of proposed changes in this license amendment request, we request an expedited review by the SFPO. It is our hope that the review and approval process for this focused amendment could be completed by March 2007.
A summary of the proposed changes, with detailed references to both the CoC and the HI-STORM 100 System FSAR, is attached.
We note that license amendment requests #3 and #4 to the HI-STORM CoC (References 3 and 4) are currently undergoing review by the SFPO. We have ensured that the changes requested in amendment #5 do not rely upon the changes requested in amendments #3 or #4. It should, therefore, be possible for the SFPO to review these amendment requests independently and in parallel.
Given the client's need to move the fuel assemblies into dry cask storage and the small number of proposed changes in this license amendment request, we request an expedited review by the SFPO. It is our hope that the review and approval process for this focused amendment could be completed by March 2007.We note that license amendment requests #3 and #4 to the HI-STORM CoC (References 3 and 4) are currently undergoing review by the SFPO. We have ensured that the changes requested in amendment  
Both the proposed CoC sections and the proposed revised FSAR sections are based on the latest official revisions of these documents (CoC Amendment 2 and FSAR Revision 4) and not on the proposed changed documents for amendments #3 or #4.
#5 do not rely upon the changes requested in amendments  
The following attachments are provided in electronic (Adobe PDF) format on the CD-ROM that accompanies this letter:
#3 or #4. It should, therefore, be possible for the SFPO to review these amendment requests independently and in parallel.Both the proposed CoC sections and the proposed revised FSAR sections are based on the latest official revisions of these documents (CoC Amendment 2 and FSAR Revision 4) and not on the proposed changed documents for amendments  
Document ID: 5014600 H VY)55oI
#3 or #4.The following attachments are provided in electronic (Adobe PDF) format on the CD-ROM that accompanies this letter: Document ID: 5014600 H VY)55oI MEuNM HOLTEC INTERNATIONAL Holtec Center, 555 Lincoln Drive West, Marlton, NJ 08053 Telephone (856) 797-0900 Fax (856) 797-0909 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Document ID 5014600 Page 2 of 2 Attachment 1: Summary of Proposed Changes Attachment 2: Proposed CoC Sections in Markup Format -Deletions are shown in strikeout and insertions are shown in italics. Only changed portions of the CoC are included.Attachment 3: Proposed Revised FSAR Sections -Deletions are shown in strikeout and insertions are shown in italics. Only changed portions of the FSAR are included.
 
Information on the Indian Point Unit 1 specific enhancements are compiled in supplements to each chapter, each numbered as xx.II where xx is the chapter that is supplemented.
MEuNM HOLTEC Holtec Center, 555 Lincoln Drive West, Marlton, NJ 08053 Telephone (856) 797-0900 INTERNATIONAL                                                                  Fax (856) 797-0909 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Document ID 5014600 Page 2 of 2 : Summary of Proposed Changes : Proposed CoC Sections in Markup Format - Deletions are shown in strikeout and insertions are shown in italics. Only changed portions of the CoC are included. : Proposed Revised FSAR Sections - Deletions are shown in strikeout and insertions are shown in italics. Only changed portions of the FSAR are included. Information on the Indian Point Unit 1 specific enhancements are compiled in supplements to each chapter, each numbered as xx.II where xx is the chapter that is supplemented.
We appreciate the SFPO's attention to this application.
We appreciate the SFPO's attention to this application.
Sincerely, Everett Redmond II, Ph.D.Project Manager, LAR 1014-5 cc: Mr. Christopher Regan, NRC Approved: Stefan Anton, Dr.-Ing.Licensing Manager}}
Sincerely,                                     Approved:
Everett Redmond II, Ph.D.                       Stefan Anton, Dr.-Ing.
Project Manager, LAR 1014-5                     Licensing Manager cc:     Mr. Christopher Regan, NRC}}

Latest revision as of 17:52, 23 November 2019

Holtec International - Submittal of License Amendment Request #5 to HI-STORM 100 CoC
ML061800324
Person / Time
Site: Indian Point, Holtec  Entergy icon.png
Issue date: 06/23/2006
From: Anton S, Redmond E
Holtec
To:
Document Control Desk, NRC/FSME
References
+sunsimjr=200609, 5014600
Download: ML061800324 (2)


Text

M M EmI Holtec Center, 555 Lincoln Drive West, Marlton, NJ 08053 H O LT E C INTERNATIONAL Telephone (856) 797-0900 Fax (856) 797-0909 June 23, 2006 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Reference:

1. USNRC Docket No. 72-1014 (HI-STORM 100)
2. Holtec Project 5014
3. Holtec Letter 5014587, dated February 18, 2006
4. Holtec Letter 5014595, dated April 30, 2006

Subject:

Submittal of License Amendment Request #5 to HI-STORM 100 CoC

Dear Sir:

We are pleased to submit a request to amend the Certificate of Compliance for the HI-STORM 100 System (CoC 72-1014). This amendment request enhances the HI-STORM 100 System by adding site specific options for Indian Point Unit 1. Specifically, the HI-STORM lOOS Version B, MPC-32, and HI-TRAC IOOD have been shortened to accommodate site specific restrictions. A summary of the proposed changes, with detailed references to both the CoC and the HI-STORM 100 System FSAR, is attached. Given the client's need to move the fuel assemblies into dry cask storage and the small number of proposed changes in this license amendment request, we request an expedited review by the SFPO. It is our hope that the review and approval process for this focused amendment could be completed by March 2007.

We note that license amendment requests #3 and #4 to the HI-STORM CoC (References 3 and 4) are currently undergoing review by the SFPO. We have ensured that the changes requested in amendment #5 do not rely upon the changes requested in amendments #3 or #4. It should, therefore, be possible for the SFPO to review these amendment requests independently and in parallel.

Both the proposed CoC sections and the proposed revised FSAR sections are based on the latest official revisions of these documents (CoC Amendment 2 and FSAR Revision 4) and not on the proposed changed documents for amendments #3 or #4.

The following attachments are provided in electronic (Adobe PDF) format on the CD-ROM that accompanies this letter:

Document ID: 5014600 H VY)55oI

MEuNM HOLTEC Holtec Center, 555 Lincoln Drive West, Marlton, NJ 08053 Telephone (856) 797-0900 INTERNATIONAL Fax (856) 797-0909 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Document ID 5014600 Page 2 of 2 : Summary of Proposed Changes : Proposed CoC Sections in Markup Format - Deletions are shown in strikeout and insertions are shown in italics. Only changed portions of the CoC are included. : Proposed Revised FSAR Sections - Deletions are shown in strikeout and insertions are shown in italics. Only changed portions of the FSAR are included. Information on the Indian Point Unit 1 specific enhancements are compiled in supplements to each chapter, each numbered as xx.II where xx is the chapter that is supplemented.

We appreciate the SFPO's attention to this application.

Sincerely, Approved:

Everett Redmond II, Ph.D. Stefan Anton, Dr.-Ing.

Project Manager, LAR 1014-5 Licensing Manager cc: Mr. Christopher Regan, NRC