| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I475 ALLENDALE ROADKING OF PRUSSIA, PENNSYLVANIA 19406-1415 April 11, 2007Docket No. 05000213License No. DPR-61 Mr. Wayne A. NortonPresident and Chief Executive Officer Connecticut Yankee Atomic Power Company 362 Injun Hollow Road East Hampton, CT 06424-3099SUBJECT:INSPECTION 05000213/2006003, CONNECTICUT YANKEE ATOMIC POWERCOMPANY, EAST HAMPTON, CONNECTICUT SITE | | {{#Wiki_filter:UNITED STATES ril 11, 2007 |
| | |
| | ==SUBJECT:== |
| | INSPECTION 05000213/2006003, CONNECTICUT YANKEE ATOMIC POWER COMPANY, EAST HAMPTON, CONNECTICUT SITE |
|
| |
|
| ==Dear Mr. Norton:== | | ==Dear Mr. Norton:== |
| On March 30, 2007, the United States Nuclear Regulatory Commission completed anannounced inspection at your Haddam Neck facility. The enclosed report (Enclosure 1) | | On March 30, 2007, the United States Nuclear Regulatory Commission completed an announced inspection at your Haddam Neck facility. The enclosed report (Enclosure 1) |
| documents the inspection results which were discussed with Mr. G. van Noordennen and other members of your staff on April 3, 2007. The inspection examined your decommissioning activities as they relate to safety andcompliance with the Commission's rules and regulations. The inspector reviewed selected procedures and records, interviewed personnel, and observed activities. The report also includes two survey reports (Enclosures 2 and 3) conducted by the Oak Ridge Institute for Science and Education (ORISE). With respect to these inspection areas, we noted that you maintained effective programs for decommissioning the site and for the safe storage of spent fuel. Based on the results of this inspection, no violations were identified. | | documents the inspection results which were discussed with Mr. G. van Noordennen and other members of your staff on April 3, 2007. |
| | |
| | The inspection examined your decommissioning activities as they relate to safety and compliance with the Commissions rules and regulations. The inspector reviewed selected procedures and records, interviewed personnel, and observed activities. The report also includes two survey reports (Enclosures 2 and 3) conducted by the Oak Ridge Institute for Science and Education (ORISE). With respect to these inspection areas, we noted that you maintained effective programs for decommissioning the site and for the safe storage of spent fuel. |
| | |
| | Based on the results of this inspection, no violations were identified. |
|
| |
|
| In accordance with Section 2.390 of the NRC's "Rules and Practices," Part 2, Title 10, Code ofFederal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Room (PDR) and will be accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. No reply to this letter is required. Your cooperationwith us is appreciated. | | In accordance with Section 2.390 of the NRCs Rules and Practices, Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Room (PDR) and will be accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. No reply to this letter is required. Your cooperation with us is appreciated. |
|
| |
|
| Sincerely, | | Sincerely, |
| /RA/Samuel Hansell, ChiefDecommissioning Branch Division of Nuclear Materials Safety W. Norton2Enclosure:1.NRC Region I Inspection Report No. 05000213/2006003 2.Confirmatory Survey Results for the East Mountain Side at the Connecticut YankeeHaddam Neck Plant, Haddam, Connecticut, dated July 18, 2006 [ADAMS Accession Number ML070320448]3.Confirmatory Survey Results for Survey Units 9304, 9527, and 9530 at the ConnecticutYankee Haddam Neck Plant, Haddam, Connecticut, dated September 25, 2006, which are enclosed [ADAMS Accession Number ML070320450]cc w/encls:T. Smith, Executive Director of Business Operations G. van Noordennen, Director, Nuclear Safety/Regulatory Affairs C. Pizzella, Treasurer J. Fay, General Council R. Capstick, Communications Manager R. Bassilakis, Citizens Awareness Network J. Brooks, CT Attorney T. Bondi, Town of Haddam E. Woollacott, NEAC H. Curley, Chair, SFAC State of Connecticut | | /RA/ |
| | Samuel Hansell, Chief Decommissioning Branch Division of Nuclear Materials Safety Enclosure: |
| | 1. NRC Region I Inspection Report No. 05000213/2006003 2. Confirmatory Survey Results for the East Mountain Side at the Connecticut Yankee Haddam Neck Plant, Haddam, Connecticut, dated July 18, 2006 [ADAMS Accession Number ML070320448] |
| | 3. Confirmatory Survey Results for Survey Units 9304, 9527, and 9530 at the Connecticut Yankee Haddam Neck Plant, Haddam, Connecticut, dated September 25, 2006, which are enclosed [ADAMS Accession Number ML070320450] |
| | cc w/encls: |
| | T. Smith, Executive Director of Business Operations G. van Noordennen, Director, Nuclear Safety/Regulatory Affairs C. Pizzella, Treasurer J. Fay, General Council R. Capstick, Communications Manager R. Bassilakis, Citizens Awareness Network J. Brooks, CT Attorney T. Bondi, Town of Haddam E. Woollacott, NEAC H. Curley, Chair, SFAC State of Connecticut |
|
| |
|
| =EXECUTIVE SUMMARY= | | =EXECUTIVE SUMMARY= |
| Connecticut Yankee Atomic Power CompanyNRC Inspection Report No. 05000213/2006003This integrated inspection includes aspects of decommissioning activities regardingdismantlement and decommissioning of the facility, and storage of spent fuel. The report covers announced safety inspections conducted by one regional inspector. The report includes evaluations of your decommissioning activities related to organization, management oversight, the surveillance program, the corrective action program, the decommissioning performance and final status survey programs, the radiation protection program, and the solid radioactive waste treatment and transportation programs. The report also includes two Oak Ridge Institute for Science and Education (ORISE) Reports regarding two confirmatory inspections conducted inApril and August 2006. | | Connecticut Yankee Atomic Power Company |
|
| |
|
| Organization, Management Oversight, Surveillances, and Corrective ActionThe licensee's organization was adequate to support ongoing decommissioning activities. Management oversight was effective for the activities conducted. The licensee maintained an adequate surveillance and corrective action program to identify and resolve issues.Status of Decommissioning Performance and Inspection of Final Status SurveysThe licensee conducted decommissioning activities in accordance with the approved LicenseTermination Plan requirements, and adequately implemented sampling and survey procedures and protocols to support the final status survey program.Radiation Protection ProgramThe licensee maintained an effective radiation protection program, including the surveyinstrument calibration program and the contamination control program.Radioactive Waste Treatment and Transportation ProgramsThe licensee effectively implemented the solid radioactive waste management andtransportation programs.
| | NRC Inspection Report No. 05000213/2006003 This integrated inspection includes aspects of decommissioning activities regarding dismantlement and decommissioning of the facility, and storage of spent fuel. The report covers announced safety inspections conducted by one regional inspector. The report includes evaluations of your decommissioning activities related to organization, management oversight, the surveillance program, the corrective action program, the decommissioning performance and final status survey programs, the radiation protection program, and the solid radioactive waste treatment and transportation programs. The report also includes two Oak Ridge Institute for Science and Education (ORISE) Reports regarding two confirmatory inspections conducted in April and August 2006. |
|
| |
|
| Enclosure
| | Organization, Management Oversight, Surveillances, and Corrective Action The licensees organization was adequate to support ongoing decommissioning activities. |
| | |
| | Management oversight was effective for the activities conducted. The licensee maintained an adequate surveillance and corrective action program to identify and resolve issues. |
| | |
| | Status of Decommissioning Performance and Inspection of Final Status Surveys The licensee conducted decommissioning activities in accordance with the approved License Termination Plan requirements, and adequately implemented sampling and survey procedures and protocols to support the final status survey program. |
| | |
| | Radiation Protection Program The licensee maintained an effective radiation protection program, including the survey instrument calibration program and the contamination control program. |
| | |
| | Radioactive Waste Treatment and Transportation Programs The licensee effectively implemented the solid radioactive waste management and transportation programs. |
| | |
| | ii |
|
| |
|
| =REPORT DETAILS= | | =REPORT DETAILS= |
|
| |
|
| ===1. Organization, Management Oversight, Surveillances, and Corrective Action Programa.Inspection Scope Inspection Procedures (IPs) 36801 and 40801The inspector reviewed the decommissioning organization changes since September2006 to determine the effectiveness of the Connecticut Yankee (CY) management=== | | ===1. Organization, Management Oversight, Surveillances, and Corrective Action Program=== |
| | |
| | ====a. Inspection Scope==== |
| | Inspection Procedures (IPs) 36801 and 40801 The inspector reviewed the decommissioning organization changes since September 2006 to determine the effectiveness of the Connecticut Yankee (CY) management oversight of overall decommissioning and plant support activities. The inspector assessed the effectiveness of management oversight through discussions with CY managers and staff regarding organization changes and observations of managers and staff in the field and during staff meetings. |
| | |
| | The inspector evaluated three Quality Surveillance Reports (QSRs) and five Condition Reports (CRs) from October through December 2006 to determine the licensees ability to identify, resolve, and prevent the recurrence of conditions that could degrade the safety or quality of decommissioning activities. The inspector reviewed the QSRs for the following activities: trans-loading concrete rubble at the Worcester, MA facility; Radiation Protection Release Program of equipment, material, and vehicles; and guidance for preparing Final Status Survey Release Records. The inspector reviewed CRs for issues related to the following: the final status survey program, the radiation protection program, and the radioactive waste and transportation of radioactive materials programs. |
| | |
| | ====b. Observations and Findings==== |
| | No findings of significance were identified. |
| | |
| | The inspector noted a reduction of approximately 100 management and staff positions since the last inspection. The reductions were proportional to the decrease in decommissioning activities. The inspector also noted that managers continued to be directly involved in the implementation of decommissioning activities. The managers conducted site tours and verification checks in the field, making themselves accessible to the staff for oversight support. The surveillance activities performed by the licensee were sufficiently detailed and thorough to identify areas of declining performance. A review of selected CRs indicated that the licensee continued to maintain a program for reporting potential safety issues. The licensee generated CRs when deficiencies were noted. The CRs were entered into the Corrective Action Program to be dispositioned and corrected. The inspector determined that the CR issues did not impact safety and were corrected. |
| | |
| | ====c. Conclusions==== |
| | The licensees organization was adequate to support ongoing decommissioning activities. Management oversight was effective for the activities conducted. The licensee maintained an adequate surveillance and corrective action program to identify and resolve issues. |
| | |
| | ===2. Status of Decommissioning Performance and Inspection of Final Status Surveys=== |
| | |
| | ====a. Inspection Scope==== |
| | IPs 71801 and 83801 The inspector evaluated the status of decommissioning activities and the final status survey (FSS) program to verify that the licensee was conducting decommissioning activities in accordance with the License Termination Plan (LTP). The inspector conducted site tours and discussed the decommissioning project status and the final status survey activity schedule. The inspector observed the licensee collect four soil samples from Survey Unit (SU) 9512-0000. The inspector reviewed the associated FSS Plan and Radiation Protection Manual (RPM) procedure, Collection of Sample Media for FSS, (RPM 5.1-3) to assess sampling technique and methodology and verify appropriate use and calibration of survey instrumentation. The inspector followed-up with the Spent Fuel Building basement fill dose model calculation discussion and the two confirmatory inspections conducted by ORISE in April and August 2006. |
| | |
| | ====b. Observations and Findings==== |
| | No findings of significance were identified. |
|
| |
|
| oversight of overall decommissioning and plant support activities. The inspector assessed the effectiveness of management oversight through discussions with CY managers and staff regarding organization changes and observations of managers and staff in the field and during staff meetings.The inspector evaluated three Quality Surveillance Reports (QSRs) and five ConditionReports (CRs) from October through December 2006 to determine the licensee's ability to identify, resolve, and prevent the recurrence of conditions that could degrade the safety or quality of decommissioning activities. The inspector reviewed the QSRs for the following activities: trans-loading concrete rubble at the Worcester, MA facility; Radiation Protection Release Program of equipment, material, and vehicles; and guidance for preparing Final Status Survey Release Records. The inspector reviewed CRs for issues related to the following: the final status survey program, the radiation protection program, and the radioactive waste and transportation of radioactive materials programs.b.Observations and FindingsNo findings of significance were identified.
| | Decommissioning activities were conducted in accordance with the LTP. The inspector noted that the FSS Plan and RPM 5.1-3 procedure were adequate but contained limited guidance to ensure reproducible representative soil samples consistent with industry practices. The licensee initiated corrective actions to improve the FSS Plan and sample procedure. This issue will be reviewed during a subsequent inspection. The inspector determined through interviews and observations that the technicians were knowledgeable in the use of the survey instruments and the sampling procedures. The technicians were using appropriate and calibrated survey instruments. |
|
| |
|
| The inspector noted a reduction of approximately 100 management and staff positionssince the last inspection. The reductions were proportional to the decrease in decommissioning activities. The inspector also noted that managers continued to be directly involved in the implementation of decommissioning activities. The managers conducted site tours and verification checks in the field, making themselves accessible to the staff for oversight support. The surveillance activities performed by the licensee were sufficiently detailed and thorough to identify areas of declining performance. A review of selected CRs indicated that the licensee continued to maintain a program for reporting potential safety issues. The licensee generated CRs when deficiencies were noted. The CRs were entered into the Corrective Action Program to be dispositioned and corrected. The inspector determined that the CR issues did not impact safety and were corrected.c.ConclusionsThe licensee's organization was adequate to support ongoing decommissioningactivities. Management oversight was effective for the activities conducted. The 2Enclosurelicensee maintained an adequate surveillance and corrective action program to identifyand resolve issues.2.
| | In Section 3.1 of the previous inspection report (NRC Inspection Report No. |
|
| |
|
| Status of Decommissioning Performance and Inspection of Final Status Surveysa.Inspection Scope IPs 71801 and 83801The inspector evaluated the status of decommissioning activities and the final statussurvey (FSS) program to verify that the licensee was conducting decommissioning activities in accordance with the License Termination Plan (LTP). The inspector conducted site tours and discussed the decommissioning project status and the final status survey activity schedule. The inspector observed the licensee collect four soil samples from Survey Unit (SU) 9512-0000. The inspector reviewed the associated FSS Plan and Radiation Protection Manual (RPM) procedure, "Collection of Sample Media for FSS," (RPM 5.1-3) to assess sampling technique and methodology and verify appropriate use and calibration of survey instrumentation. The inspector followed-up with the Spent Fuel Building basement fill dose model calculation discussion and the two confirmatory inspections conducted by ORISE in April and August 2006.b.Observations and FindingsNo findings of significance were identified.
| | 05000213/2006002, dated December 19, 2006; ADAMS Accession Number ML063560253), the inspector stated that the results of the NRCs review regarding the Spent Fuel Building (SFB) basement fill dose model calculations would be discussed with the licensee in December 2006. Notwithstanding, the discussion of the basement fill dose model calculations for the SFB will be conducted at a later date and concurrent with the NRCs review of the associated FSS Report. |
|
| |
|
| Decommissioning activities were conducted in accordance with the LTP. The inspectornoted that the FSS Plan and RPM 5.1-3 procedure were adequate but contained limited guidance to ensure reproducible representative soil samples consistent with industry practices. The licensee initiated corrective actions to improve the FSS Plan and sample procedure. This issue will be reviewed during a subsequent inspection. The inspector determined through interviews and observations that the technicians were knowledgeable in the use of the survey instruments and the sampling procedures. The technicians were using appropriate and calibrated survey instruments.In Section 3.1 of the previous inspection report (NRC Inspection Report No. 05000213/2006002, dated December 19, 2006; ADAMS Accession Number ML063560253), the inspector stated that the results of the NRC's review regarding the Spent Fuel Building (SFB) basement fill dose model calculations would be discussed with the licensee in December 2006. Notwithstanding, the discussion of the basement fill dose model calculations for the SFB will be conducted at a later date and concurrent with the NRC's review of the associated FSS Report.On April 25-26, 2006, ORISE conducted surface gamma scans and collected soilsamples in SUs 9527-0001 through 9527-0004. On August 22-23, 2006, ORISE conducted surface gamma scans and collected soil samples in SUs 9304-0001 and 9304-0002, they conducted surface gamma scans in SUs 9530-0001 through 9530-0004, and conducted a second survey including surface gamma scans and soil samples in SUs 9527-0003 and 9527-0004 (originally discussed in NRC Inspection 3EnclosureReport No. 05000213/2006002, dated December 19, 2006; ADAMS Accession NumberML063560253).The details of the ORISE analysis are contained in the following ORISE Reports:"Confirmatory Survey Results for the East Mountain Side at the Connecticut Yankee Haddam Neck Plant, Haddam, Connecticut, dated July 18, 2006, and "Confirmatory Survey Results for Survey Units 9304, 9527, and 9530 at the Connecticut Yankee Haddam Neck Plant, Haddam, Connecticut, dated September 25, 2006, which are enclosed. [ADAMS Accession Numbers ML070320448 and ML070320450, respectively.]c.ConclusionsThe licensee conducted decommissioning activities in accordance with the approvedLTP requirements and adequately implemented sampling and survey procedures and protocols to support the final status survey program.3.
| | On April 25-26, 2006, ORISE conducted surface gamma scans and collected soil samples in SUs 9527-0001 through 9527-0004. On August 22-23, 2006, ORISE conducted surface gamma scans and collected soil samples in SUs 9304-0001 and 9304-0002, they conducted surface gamma scans in SUs 9530-0001 through 9530-0004, and conducted a second survey including surface gamma scans and soil samples in SUs 9527-0003 and 9527-0004 (originally discussed in NRC Inspection Report No. 05000213/2006002, dated December 19, 2006; ADAMS Accession Number ML063560253). |
|
| |
|
| Radiation Protection Programa.Inspection Scope IP 83750The inspector assessed the radiation control program to verify the adequacy of surveysnecessary to post and control high radiation and radiation areas and to verify the proper use of personal contamination monitors such as friskers, including consideration of hotparticle contamination. The inspector also reviewed the program to verify the adequacy of survey practices, including selected survey records, technical awareness of limitations of the survey instruments, and the calibration records of selected survey and monitoring instruments. The inspector conducted interviews with the cognizant personnel and reviewed the following procedures to evaluate the program: "Radiological Posting and Labeling" (RPM 2.2-27); "Personnel Monitoring, Survey and Decontamination" (RPM 2.7-3); "Control and Accountability of Portable Survey Instruments for Final Status Surveys" (RPM 5.1-04); "Calibration of the Ludlum Model 3" (RPM 4.1-19); "Calibration of the Eberline E-140 with Frisker Probe" (RPM 4.2-3); "Small Article Monitor Calibration and Relocation" (RPM 4.4-6); "Calibration of the Bicron NE MicroRem" (RPM 4.8-5); and "Portable Health Physics Instrument Source/Response Check" (RPM 2.2-10).
| | The details of the ORISE analysis are contained in the following ORISE Reports: |
| | Confirmatory Survey Results for the East Mountain Side at the Connecticut Yankee Haddam Neck Plant, Haddam, Connecticut, dated July 18, 2006, and Confirmatory Survey Results for Survey Units 9304, 9527, and 9530 at the Connecticut Yankee Haddam Neck Plant, Haddam, Connecticut, dated September 25, 2006, which are enclosed. [ADAMS Accession Numbers ML070320448 and ML070320450, respectively.] |
|
| |
|
| Additionally, the inspector reviewed the licensee's contamination control program, including implementation of "Contamination Control Program" (RPM 2.7-0). The review was a follow-up from the previous inspection period regarding the licensee's implementation to ensure the control of equipment and materials were released properly from the Radiologically Controlled Area (RCA) for unrestricted use.b.Observations and FindingsNo findings of significance were identified.
| | ====c. Conclusions==== |
| | The licensee conducted decommissioning activities in accordance with the approved LTP requirements and adequately implemented sampling and survey procedures and protocols to support the final status survey program. |
|
| |
|
| Radiation Protection (RP) technician performance for conducting radiological surveys ofpersonnel, tools, equipment, and shipping boxes containing demolition debris exiting the 4EnclosureRCA was adequate. The licensee performed effective surveys in accordance with theContamination Control Program. The licensee completed survey records as required by the survey procedures. RP technicians were cognizant of the potential for contaminated tools and hot particles and the licensee clearly and accurately documented survey results as required. Technicians demonstrated the appropriate level of understanding of the use and limitations of the survey instrumentation, including friskers, to conduct effective surveys. Radiation areas were posted appropriately. No high radiation areas existed on site during this inspection period.Technicians used calibrated survey instrumentation. The calibration records of surveyinstruments were complete and accurate. The RP instrument technician is responsible for calibrating instruments and has an appropriate level of technical understanding for calibrating survey instrumentation. Calibration and source check results for the survey instrumentation were within the acceptance criteria as defined in the procedures. The licensee used check sources that were traceable to the National Institute of Standards and Technology.c.ConclusionsThe licensee maintained an effective radiation control program, including the surveyinstrument calibration program and the contamination control program.4. | | ===3. Radiation Protection Program=== |
|
| |
|
| Radioactive Waste Treatment and Transportation Programsa.Inspection Scope IP 86750The scope of this inspection area was to evaluate the Solid Radioactive WasteManagement and Transportation programs and to determine whether the licensee properly processed, packaged, stored, and shipped radioactive materials. The inspector reviewed selected Low Specific Activity radioactive waste shipments from September through December 2006, including dry active waste and low-level radioactive demolition debris. The inspector observed the licensee conducted surveys and prepared shipments for transport.b.Observations and FindingsNo findings of significance were identified.
| | ====a. Inspection Scope==== |
| | IP 83750 The inspector assessed the radiation control program to verify the adequacy of surveys necessary to post and control high radiation and radiation areas and to verify the proper use of personal contamination monitors such as friskers, including consideration of hot particle contamination. The inspector also reviewed the program to verify the adequacy of survey practices, including selected survey records, technical awareness of limitations of the survey instruments, and the calibration records of selected survey and monitoring instruments. The inspector conducted interviews with the cognizant personnel and reviewed the following procedures to evaluate the program: Radiological Posting and Labeling (RPM 2.2-27); Personnel Monitoring, Survey and Decontamination (RPM 2.7-3); Control and Accountability of Portable Survey Instruments for Final Status Surveys (RPM 5.1-04); Calibration of the Ludlum Model 3" (RPM 4.1-19); Calibration of the Eberline E-140 with Frisker Probe (RPM 4.2-3); Small Article Monitor Calibration and Relocation (RPM 4.4-6); Calibration of the Bicron NE MicroRem (RPM 4.8-5); and Portable Health Physics Instrument Source/Response Check (RPM 2.2-10). |
|
| |
|
| The selected radioactive waste shipment records included completed copies ofCharacterization Reports, Waste Manifest Shipping papers, Emergency Response Information, Survey Record Forms, and related documentation, including shipment inspection plans and truck inspection records. The licensee met the applicable radiation and transportation requirements for the shipments reviewed.
| | Additionally, the inspector reviewed the licensees contamination control program, including implementation of Contamination Control Program (RPM 2.7-0). The review was a follow-up from the previous inspection period regarding the licensees implementation to ensure the control of equipment and materials were released properly from the Radiologically Controlled Area (RCA) for unrestricted use. |
|
| |
|
| 5Enclosurec.ConclusionsThe licensee effectively implemented the solid radioactive waste management andtransportation programs.5.
| | ====b. Observations and Findings==== |
| | No findings of significance were identified. |
|
| |
|
| Exit MeetingThe inspector presented the inspection results to representatives of the licensee's staff at theconclusion of the onsite inspection on October 26, 2007, and in-office inspections on November 7, 2006 and December 5, 2006. On April 3, 2007, a summary of the inspection findings for the entire inspection period was presented to the licensee. Licensee representatives acknowledged the inspection findings. Although proprietary items were reviewed during the inspection, no proprietary information is presented in this report.
| | Radiation Protection (RP) technician performance for conducting radiological surveys of personnel, tools, equipment, and shipping boxes containing demolition debris exiting the RCA was adequate. The licensee performed effective surveys in accordance with the Contamination Control Program. The licensee completed survey records as required by the survey procedures. RP technicians were cognizant of the potential for contaminated tools and hot particles and the licensee clearly and accurately documented survey results as required. Technicians demonstrated the appropriate level of understanding of the use and limitations of the survey instrumentation, including friskers, to conduct effective surveys. Radiation areas were posted appropriately. No high radiation areas existed on site during this inspection period. |
|
| |
|
| A-1
| | Technicians used calibrated survey instrumentation. The calibration records of survey instruments were complete and accurate. The RP instrument technician is responsible for calibrating instruments and has an appropriate level of technical understanding for calibrating survey instrumentation. Calibration and source check results for the survey instrumentation were within the acceptance criteria as defined in the procedures. The licensee used check sources that were traceable to the National Institute of Standards and Technology. |
| | |
| | ====c. Conclusions==== |
| | The licensee maintained an effective radiation control program, including the survey instrument calibration program and the contamination control program. |
| | |
| | ===4. Radioactive Waste Treatment and Transportation Programs=== |
| | |
| | ====a. Inspection Scope==== |
| | IP 86750 The scope of this inspection area was to evaluate the Solid Radioactive Waste Management and Transportation programs and to determine whether the licensee properly processed, packaged, stored, and shipped radioactive materials. The inspector reviewed selected Low Specific Activity radioactive waste shipments from September through December 2006, including dry active waste and low-level radioactive demolition debris. The inspector observed the licensee conducted surveys and prepared shipments for transport. |
| | |
| | ====b. Observations and Findings==== |
| | No findings of significance were identified. |
| | |
| | The selected radioactive waste shipment records included completed copies of Characterization Reports, Waste Manifest Shipping papers, Emergency Response Information, Survey Record Forms, and related documentation, including shipment inspection plans and truck inspection records. The licensee met the applicable radiation and transportation requirements for the shipments reviewed. |
| | |
| | ====c. Conclusions==== |
| | The licensee effectively implemented the solid radioactive waste management and transportation programs. |
| | |
| | ===5. Exit Meeting=== |
| | |
| | The inspector presented the inspection results to representatives of the licensees staff at the conclusion of the onsite inspection on October 26, 2007, and in-office inspections on November 7, 2006 and December 5, 2006. On April 3, 2007, a summary of the inspection findings for the entire inspection period was presented to the licensee. Licensee representatives acknowledged the inspection findings. Although proprietary items were reviewed during the inspection, no proprietary information is presented in this report. |
|
| |
|
| =SUPPLEMENTAL INFORMATION= | | =SUPPLEMENTAL INFORMATION= |
| | |
| PARTIAL LIST OF PERSONS CONTACTED | | PARTIAL LIST OF PERSONS CONTACTED |
| Licensee* | | Licensee |
| : [[contact::J. Arnold]], Executive Staff Assistant | | * |
| | : [[contact::J. Arnold]], Executive Staff Assistant |
| : [[contact::B. Couture]], Project Support, Resource Conservation and Recovery Act Coordinator | | : [[contact::B. Couture]], Project Support, Resource Conservation and Recovery Act Coordinator |
| : [[contact::J. Fan]], Project Support and Engineering Manager | | : [[contact::J. Fan]], Project Support and Engineering Manager |
Line 81: |
Line 150: |
| : [[contact::J. Wagner]], FSS Supervisor, FSS | | : [[contact::J. Wagner]], FSS Supervisor, FSS |
| * | | * |
| : [[contact::G. van Noordennen]], Manager, Nuclear Safety/Regulatory Affairs*These individuals participated in the exit briefing held on April 3, 2007.INSPECTION PROCEDURES USED36801Organization, Management, and Cost Controls40801Self-Assessment, Auditing, and Corrective Action | | : [[contact::G. van Noordennen]], Manager, Nuclear Safety/Regulatory Affairs |
| 60855Operation of Independent Spent Fuel Storage Installation
| | *These individuals participated in the exit briefing held on April 3, 2007. |
| 2801Maintenance and Surveillance
| | INSPECTION PROCEDURES USED |
| 71801Decommissioning Performance and Status Reviews
| | 36801 Organization, Management, and Cost Controls |
| 83750Occupational Radiation Exposure
| | 40801 Self-Assessment, Auditing, and Corrective Action |
| 83801Inspection of Final Status Surveys
| | 60855 Operation of Independent Spent Fuel Storage Installation |
| 86750Solid Radioactive Waste Management and Transportation of Radioactive Materials
| | 2801 Maintenance and Surveillance |
| A-2ITEMS OPEN, CLOSED, AND DISCUSSEDItems Opened:
| | 71801 Decommissioning Performance and Status Reviews |
| NoneItems Closed:
| | 83750 Occupational Radiation Exposure |
| NoneItems Discussed:
| | 83801 Inspection of Final Status Surveys |
| NoneLIST OF ACRONYMS USEDCRCondition ReportsCY Connecticut Yankee
| | 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials |
| FSSFinal Status Survey
| | ITEMS OPEN, CLOSED, AND DISCUSSED |
| IPInspection Procedure
| | Items Opened: |
| LTPLicense Termination Plan
| | None |
| ORISEOak Ridge Institute for Science and Education
| | Items Closed: |
| QSRQuality Surveillance Reports
| | None |
| RCARadiologically Controlled Area
| | Items Discussed: |
| RPRadiation Protection
| | None |
| RPMRadiation Protection Manual
| | LIST OF ACRONYMS USED |
| SFBSpent Fuel Building
| | CR Condition Reports |
| SUSurvey Unit
| | CY Connecticut Yankee |
| | FSS Final Status Survey |
| | IP Inspection Procedure |
| | LTP License Termination Plan |
| | ORISE Oak Ridge Institute for Science and Education |
| | QSR Quality Surveillance Reports |
| | RCA Radiologically Controlled Area |
| | RP Radiation Protection |
| | RPM Radiation Protection Manual |
| | SFB Spent Fuel Building |
| | SU Survey Unit |
| }} | | }} |
|
---|
Category:Inspection Report
MONTHYEARIR 05000213/20240012024-08-27027 August 2024 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation NRC Inspection Report Nos. 07200039/2024001 and 05000213/2024001 IR 05000213/19740012024-06-27027 June 2024 49-50; License; Amendment No. 12; License No. 50-21374-01; Mail Control No. 639882 IR 07200039/20224012022-10-0505 October 2022 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Security Inspection Report No. 07200039/2022401 IR 05000213/20210012021-10-26026 October 2021 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2021001 and 05000213/2021001 IR 07200039/20204012020-11-20020 November 2020 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Report 07200039/2020401, Without Enclosure (Public - Cover Letter Only) IR 05000213/20180012018-05-31031 May 2018 NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2018001 and 05000213/2018001, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 07200039/20184012018-05-17017 May 2018 Connecticut Yankee Atomic Power Company Independent Spent Fuel Storage Security Inspection Report No. 07200039/2018401 - (Cover Letter Only) IR 05000213/20160022016-11-22022 November 2016 NRC Inspection Report No. 05000213/2016002 and 07200039/2016002, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20160012016-05-18018 May 2016 IR 05000213-16-001 and 07200039-16-001 on 4/21/16, Connecticut Yankee Atomic Power Company, East Hampton, CT Site IR 07200039/20140012014-05-0606 May 2014 IR 07200039-14-001, on 04/17-18/14, Independent Spent Fuel Installation Inspection, Connecticut Yankee Atomic Power Company, East Hampton, CT IR 07200039/20100012010-12-22022 December 2010 IR 07200039-10-001, on 11/29/10, Connecticut Yankee Atomic Power Company, East Hampton, CT IR 05000213/20070012007-11-20020 November 2007 IR 05000213-07-001, on 04/23-26/07, 06/06-07/07, 07/17/07, 09/04/07, 10/29/07, 10/31/07, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut IR 05000213/20060032007-04-11011 April 2007 IR 05000213-06-003, on 10/01/2006 - 03/30/2007, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20060022006-09-19019 September 2006 IR 05000213-06-002, on 06/26-29/2006, 07/24-28/2006, and 08/21-25/2006, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20060012006-07-14014 July 2006 IR 05000213-06-001, on 01/27/06 - 06/15/2006, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20050032006-02-0707 February 2006 IR 05000213-05-003; Connecticut Yankee Atomic Power Company; on 10/01/2006 - 01/26/2006; Connecticut Yankee Atomic Power Company IR 05000213/20050022005-11-10010 November 2005 IR 05000213-05-002, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20050012005-08-0505 August 2005 IR 05000213-05-001, on 01/01/2005 - 03/31/2005, Connecticut Yankee Atomic Power Company, Haddam Neck Plant, Office of Investigations Report No. 1-2004-032 and Notice of Violation IR 05000213/20040022005-02-0808 February 2005 IR 05000213-04-002, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site and Notice of Violation IR 05000213/20040012004-09-20020 September 2004 IR 05000213-04-001, on 02/07/04 to 06/08/04, Connecticut Yankee Atomic Power Company IR 05000213/20030012003-07-0303 July 2003 IR 05000213-03-001 on 02/18/03 - 06/11/03 for Haddam Neck, Regarding Dismantlement and Decommissioning of Facility ML0320401272003-06-24024 June 2003 Powerpoint Presentation at Yankee Rowe Connecticut Yankee Management Meeting with the NRC, June 23, 2003 IR 05000213/19990021999-08-20020 August 1999 Insp Rept 50-213/99-02 on 990420-0719.No Violations Noted. Major Areas Inspected:Decommissioning Operations & Sf Safety Maint & Surveillance,Plant Support & Rediological Controls IR 05000213/19990011999-05-21021 May 1999 Insp Rept 50-213/99-01 on 980119-990419.No Violations Noted. Major Areas Inspected:Aspects of Licensee Activities in Preparation for Dismantlement & Decommissioning of Facility IR 05000213/19960121999-04-0505 April 1999 Discusses NRC Insp Repts 50-213/96-12 & 50-213/98-04 on 961102-27 Re Airborne Radioactivity Contamination Event That Occurred in Fuel Transfer Canal & Reactor Cavity in Nov 1996.Notice of Violation Encl IR 05000213/19980061999-02-26026 February 1999 Insp Rept 50-213/98-06 on 981103-990118.Violations Noted. Major Areas Inspected:Aspects of Licensee Activities in Preparation for Dismantlement & Decommissioning of Facility. Security Program Was Also Inspected IR 05000213/19980051998-12-21021 December 1998 Insp Rept 50-213/98-05 on 980720-1102.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000213/19980041998-11-27027 November 1998 Forwards Special Insp Rept 50-213/98-04 of Licensee Performance During Reactor Coolant Sys Chemical Decontamination IR 05000213/19980031998-08-21021 August 1998 Insp Rept 50-213/98-03 on 980414-0803 & 13.Violations Noted. Major Areas Inspected:Operations,Maint,Sf Safety, Decommissioning Activities & Radiological Controls IR 05000213/19980011998-05-13013 May 1998 Insp Rept 50-213/98-01 on 980113-0413.Violations Noted.Major Areas Inspected:Decommissioning Support Activities,Spent Fuel Safety,Plant Support & Radiological Controls & Facility Mgt & Control IR 05000213/19980021998-05-0505 May 1998 Insp Rept 50-213/98-02 on 980316-20 & 25-27.No Violations Noted.Major Areas Inspected:Radiological Control Programs IR 05000213/19970091998-02-17017 February 1998 Insp Rept 50-213/97-09 on 971012-980112.Violations Noted. Major Areas Inspected:Decommissioning Operations & Planning & Included Aspects of Engineering,Maint & Plant Support IR 05000213/19970101998-02-0202 February 1998 Discusses Inspection Rept 50-213/97-10 & Forwards Worker Dose Assessment.Insp Rept Provides Analysis of Occupational Dose Assessment for Workers Involved in 961102 Airborne Radioactivity Event.No Exposures in Excess Identified IR 05000213/19970081998-01-29029 January 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/97-08 on 970703 & 0811-0919.Violation Involved Failure to Follow Radiation Protection Procedures IR 05000213/19970121998-01-15015 January 1998 Insp Rept 50-213/97-12 on 970812-13 & 1006-09.No Violations Noted.Major Areas Inspected:Status of Rp&C Facilities & Equipment IR 05000213/19970111997-12-29029 December 1997 Insp Rept 50-213/97-11 on 971006-09 & 1103-07.No Violations Noted.Major Areas Inspected:Programs for Radioactive Liquid Control IR 05000213/19970051997-11-26026 November 1997 Insp Rept 50-213/97-05 on 970708-1006.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Engineering & Plant Support IR 05000213/19970031997-10-0909 October 1997 Insp Rept 50-213/97-03 on 970408-0707 & 0805.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000213/19970071997-08-18018 August 1997 Insp Rept 50-213/97-07 on 970715-30.No Violations Noted. Major Areas Inspected:Plant Support Area IR 05000213/19970061997-08-12012 August 1997 Insp Rept 50-213/97-06 on 970616-0718.Violations Noted. Major Areas Inspected:Radiological Controls Program at Cyap Station,Haddam,Ct IR 05000213/19970011997-07-31031 July 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/97-01 IR 05000213/19970041997-06-0303 June 1997 Physical Security Insp Rept 50-213/97-04 on 970505-08.No Violations Noted.Major Areas Inspected:Previously Identified Items,Mgt Control,Pa Detection Aids,Alarm Stations & Communication,Testing,Maint & Compensatory Measures IR 05000213/19950271997-05-12012 May 1997 Discusses Insp Repts 50-213/95-27,50-213/96-06,50-213/96-07, 50-213/96-08,50-213/96-11,50-213/96-80 & 50-213/96-201 on 951121-961122 & Forwards NOV & Proposed Imposition of Civil Penalty in Amount of $650,000 IR 05000213/19960071997-04-0909 April 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/96-07 IR 05000245/19960121997-03-27027 March 1997 Informs That Info Will Be Withheld from Public Disclosure Per Licensee 970303 Request.Licensee Re Exam Rept 50-245/96-12,dtd 970207 Also Discussed IR 05000213/19970021997-03-21021 March 1997 Insp Rept 50-213/97-02 on 970207-07 & 0224-26.Violation Noted.Major Area Inspected:Programs for Radioactive Liquid & Gaseous Effluent Control,Including Organization & Effectiveness of Program Implementation IR 05000213/19960111997-03-0707 March 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 50-213/96-11.Exam of Actions Will Be Done During Future Insp IR 05000213/19960101996-11-0505 November 1996 Insp Rept 50-213/96-10 on 960811-0920.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000213/19962011996-11-0505 November 1996 Ack Receipt of Requesting Schedule Change for pre-decisional EC Re Plant Insp Repts 50-213/96-201, 50-213/96-06,50-213/96-08.Originally Scheduled EC for 961018 Requested to Be Delayed Until Dec 1996 IR 05000213/19960801996-10-30030 October 1996 Insp Rept 50-213/96-80 on 960903-1002.Violation Noted. Major Areas Inspected:Operations,Maint,Engineering & Mgt Oversight & Controls 2024-08-27
[Table view] Category:Letter
MONTHYEARIR 05000213/20240012024-08-27027 August 2024 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation NRC Inspection Report Nos. 07200039/2024001 and 05000213/2024001 ML24094A0742024-05-30030 May 2024 Issuance of Exemption for Connecticut Yankee Atomic Power Company Regarding Haddam Neck Plant Independent Spent Fuel Storage Installation ML23342A0972024-01-0909 January 2024 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan CY-23-014, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI2023-12-0404 December 2023 Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI ML23124A2012023-04-20020 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2022 CY-23-006, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-23-007, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22340A4922023-02-24024 February 2023 Closeout Letter to Connecticut Yankee Regarding 2018 and 2021 Updated DFPs for Haddam Neck Plant ISFSI CY-23-003, Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage CY-23-004, Independent Spent Fuel Storage Installation, Property Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Property Insurance Coverage CY-23-002, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments CY-23-001, Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments IR 07200039/20224012022-10-0505 October 2022 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Security Inspection Report No. 07200039/2022401 CY-22-012, Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2022-08-0303 August 2022 Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-22-010, Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager2022-05-25025 May 2022 Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager CY-22-006, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 20212022-04-25025 April 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2021 CY-22-003, and Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report2022-03-14014 March 2022 and Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report CY-22-004, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2022-03-14014 March 2022 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22011A1352022-01-31031 January 2022 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan CY-22-002, Independent Spent Fuel Storage Installation - Property Insurance Coverage2022-01-20020 January 2022 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-22-001, Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage2022-01-20020 January 2022 Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage CY-21-015, Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2021-12-10010 December 2021 Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-21-011, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI2021-12-0101 December 2021 Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI CY-21-013, Biennial Update to the Haddam Neck Plant License Termination Plan2021-12-0101 December 2021 Biennial Update to the Haddam Neck Plant License Termination Plan ML22075A2382021-12-0101 December 2021 Biennial Update to the Haddam Neck Plant Updated Final Safety Analysis Report CY-21-014, Independent Spent Fuel Storage Installation - Adoption of Amendment 8 of NAC-MPC Certificate of Compliance No. 72-1025 and Canister Registration2021-11-18018 November 2021 Independent Spent Fuel Storage Installation - Adoption of Amendment 8 of NAC-MPC Certificate of Compliance No. 72-1025 and Canister Registration IR 05000213/20210012021-10-26026 October 2021 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2021001 and 05000213/2021001 ML21144A2512021-04-13013 April 2021 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2020 CY-21-006, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-21-005, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-21-004, Independent Spent Fuel Storage Installation - Property Insurance Coverage2021-01-27027 January 2021 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-21-003, Independent Spent Fuel Storage Installation Nuclear Liability Insurance Coverage2021-01-27027 January 2021 Independent Spent Fuel Storage Installation Nuclear Liability Insurance Coverage ML21012A3192021-01-13013 January 2021 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan IR 07200039/20204012020-11-20020 November 2020 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Report 07200039/2020401, Without Enclosure (Public - Cover Letter Only) ML20150A3352020-06-19019 June 2020 COVID-19 Exemption for Haddam Neck CY-20-011, Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement2020-05-14014 May 2020 Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement ML20143A0972020-04-16016 April 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2019 CY-20-007, Independent Spent Fuel Storage Installation - Formal Announcement of New Tsfst Manager2020-03-31031 March 2020 Independent Spent Fuel Storage Installation - Formal Announcement of New Tsfst Manager CY-20-004, Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste2020-03-17017 March 2020 Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste CY-20-003, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2020-03-12012 March 2020 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-20-002, Independent Spent Fuel Storage Installation, Letter Notifying NRC the Amount of Property Insurance Coverage in Force for 20202020-01-22022 January 2020 Independent Spent Fuel Storage Installation, Letter Notifying NRC the Amount of Property Insurance Coverage in Force for 2020 ML20015A5262020-01-15015 January 2020 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML19269C4642019-10-11011 October 2019 Letter to B. Mitchell Exemption from 10 CFR 72.212 and 72.214 for Dry Spent Fuel Storage Activities - Haddam Neck Plant Independent Spent Fuel Storage Installation CY-19-014, Independent Spent Fuel Storage Installation - Formal Announcement of ISFSI Manager'S Return2019-06-0505 June 2019 Independent Spent Fuel Storage Installation - Formal Announcement of ISFSI Manager'S Return CY-19-012, Independent Spent Fuel Storage Installation - 2018 Individual Monitoring NRC Form 5 Report2019-04-23023 April 2019 Independent Spent Fuel Storage Installation - 2018 Individual Monitoring NRC Form 5 Report ML19070A0332019-02-20020 February 2019 Letter to C. Pizzella Nuclear Regulatory Commission'S Analysis of Connecticut Yankee Atomic Power Company'S Initial and Updated Decommissioning Funding Plans for the Haddam Neck Plant Independent Spent Fuel Storage Installation CY-18-021, Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2018-12-10010 December 2018 Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan IR 05000213/20180012018-05-31031 May 2018 NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2018001 and 05000213/2018001, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 07200039/20184012018-05-17017 May 2018 Connecticut Yankee Atomic Power Company Independent Spent Fuel Storage Security Inspection Report No. 07200039/2018401 - (Cover Letter Only) CY-18-004, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2018-03-0505 March 2018 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report 2024-08-27
[Table view] |
Text
UNITED STATES ril 11, 2007
SUBJECT:
INSPECTION 05000213/2006003, CONNECTICUT YANKEE ATOMIC POWER COMPANY, EAST HAMPTON, CONNECTICUT SITE
Dear Mr. Norton:
On March 30, 2007, the United States Nuclear Regulatory Commission completed an announced inspection at your Haddam Neck facility. The enclosed report (Enclosure 1)
documents the inspection results which were discussed with Mr. G. van Noordennen and other members of your staff on April 3, 2007.
The inspection examined your decommissioning activities as they relate to safety and compliance with the Commissions rules and regulations. The inspector reviewed selected procedures and records, interviewed personnel, and observed activities. The report also includes two survey reports (Enclosures 2 and 3) conducted by the Oak Ridge Institute for Science and Education (ORISE). With respect to these inspection areas, we noted that you maintained effective programs for decommissioning the site and for the safe storage of spent fuel.
Based on the results of this inspection, no violations were identified.
In accordance with Section 2.390 of the NRCs Rules and Practices, Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Room (PDR) and will be accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. No reply to this letter is required. Your cooperation with us is appreciated.
Sincerely,
/RA/
Samuel Hansell, Chief Decommissioning Branch Division of Nuclear Materials Safety Enclosure:
1. NRC Region I Inspection Report No. 05000213/2006003 2. Confirmatory Survey Results for the East Mountain Side at the Connecticut Yankee Haddam Neck Plant, Haddam, Connecticut, dated July 18, 2006 [ADAMS Accession Number ML070320448]
3. Confirmatory Survey Results for Survey Units 9304, 9527, and 9530 at the Connecticut Yankee Haddam Neck Plant, Haddam, Connecticut, dated September 25, 2006, which are enclosed [ADAMS Accession Number ML070320450]
cc w/encls:
T. Smith, Executive Director of Business Operations G. van Noordennen, Director, Nuclear Safety/Regulatory Affairs C. Pizzella, Treasurer J. Fay, General Council R. Capstick, Communications Manager R. Bassilakis, Citizens Awareness Network J. Brooks, CT Attorney T. Bondi, Town of Haddam E. Woollacott, NEAC H. Curley, Chair, SFAC State of Connecticut
EXECUTIVE SUMMARY
Connecticut Yankee Atomic Power Company
NRC Inspection Report No. 05000213/2006003 This integrated inspection includes aspects of decommissioning activities regarding dismantlement and decommissioning of the facility, and storage of spent fuel. The report covers announced safety inspections conducted by one regional inspector. The report includes evaluations of your decommissioning activities related to organization, management oversight, the surveillance program, the corrective action program, the decommissioning performance and final status survey programs, the radiation protection program, and the solid radioactive waste treatment and transportation programs. The report also includes two Oak Ridge Institute for Science and Education (ORISE) Reports regarding two confirmatory inspections conducted in April and August 2006.
Organization, Management Oversight, Surveillances, and Corrective Action The licensees organization was adequate to support ongoing decommissioning activities.
Management oversight was effective for the activities conducted. The licensee maintained an adequate surveillance and corrective action program to identify and resolve issues.
Status of Decommissioning Performance and Inspection of Final Status Surveys The licensee conducted decommissioning activities in accordance with the approved License Termination Plan requirements, and adequately implemented sampling and survey procedures and protocols to support the final status survey program.
Radiation Protection Program The licensee maintained an effective radiation protection program, including the survey instrument calibration program and the contamination control program.
Radioactive Waste Treatment and Transportation Programs The licensee effectively implemented the solid radioactive waste management and transportation programs.
ii
REPORT DETAILS
1. Organization, Management Oversight, Surveillances, and Corrective Action Program
a. Inspection Scope
Inspection Procedures (IPs) 36801 and 40801 The inspector reviewed the decommissioning organization changes since September 2006 to determine the effectiveness of the Connecticut Yankee (CY) management oversight of overall decommissioning and plant support activities. The inspector assessed the effectiveness of management oversight through discussions with CY managers and staff regarding organization changes and observations of managers and staff in the field and during staff meetings.
The inspector evaluated three Quality Surveillance Reports (QSRs) and five Condition Reports (CRs) from October through December 2006 to determine the licensees ability to identify, resolve, and prevent the recurrence of conditions that could degrade the safety or quality of decommissioning activities. The inspector reviewed the QSRs for the following activities: trans-loading concrete rubble at the Worcester, MA facility; Radiation Protection Release Program of equipment, material, and vehicles; and guidance for preparing Final Status Survey Release Records. The inspector reviewed CRs for issues related to the following: the final status survey program, the radiation protection program, and the radioactive waste and transportation of radioactive materials programs.
b. Observations and Findings
No findings of significance were identified.
The inspector noted a reduction of approximately 100 management and staff positions since the last inspection. The reductions were proportional to the decrease in decommissioning activities. The inspector also noted that managers continued to be directly involved in the implementation of decommissioning activities. The managers conducted site tours and verification checks in the field, making themselves accessible to the staff for oversight support. The surveillance activities performed by the licensee were sufficiently detailed and thorough to identify areas of declining performance. A review of selected CRs indicated that the licensee continued to maintain a program for reporting potential safety issues. The licensee generated CRs when deficiencies were noted. The CRs were entered into the Corrective Action Program to be dispositioned and corrected. The inspector determined that the CR issues did not impact safety and were corrected.
c. Conclusions
The licensees organization was adequate to support ongoing decommissioning activities. Management oversight was effective for the activities conducted. The licensee maintained an adequate surveillance and corrective action program to identify and resolve issues.
2. Status of Decommissioning Performance and Inspection of Final Status Surveys
a. Inspection Scope
IPs 71801 and 83801 The inspector evaluated the status of decommissioning activities and the final status survey (FSS) program to verify that the licensee was conducting decommissioning activities in accordance with the License Termination Plan (LTP). The inspector conducted site tours and discussed the decommissioning project status and the final status survey activity schedule. The inspector observed the licensee collect four soil samples from Survey Unit (SU) 9512-0000. The inspector reviewed the associated FSS Plan and Radiation Protection Manual (RPM) procedure, Collection of Sample Media for FSS, (RPM 5.1-3) to assess sampling technique and methodology and verify appropriate use and calibration of survey instrumentation. The inspector followed-up with the Spent Fuel Building basement fill dose model calculation discussion and the two confirmatory inspections conducted by ORISE in April and August 2006.
b. Observations and Findings
No findings of significance were identified.
Decommissioning activities were conducted in accordance with the LTP. The inspector noted that the FSS Plan and RPM 5.1-3 procedure were adequate but contained limited guidance to ensure reproducible representative soil samples consistent with industry practices. The licensee initiated corrective actions to improve the FSS Plan and sample procedure. This issue will be reviewed during a subsequent inspection. The inspector determined through interviews and observations that the technicians were knowledgeable in the use of the survey instruments and the sampling procedures. The technicians were using appropriate and calibrated survey instruments.
In Section 3.1 of the previous inspection report (NRC Inspection Report No.
05000213/2006002, dated December 19, 2006; ADAMS Accession Number ML063560253), the inspector stated that the results of the NRCs review regarding the Spent Fuel Building (SFB) basement fill dose model calculations would be discussed with the licensee in December 2006. Notwithstanding, the discussion of the basement fill dose model calculations for the SFB will be conducted at a later date and concurrent with the NRCs review of the associated FSS Report.
On April 25-26, 2006, ORISE conducted surface gamma scans and collected soil samples in SUs 9527-0001 through 9527-0004. On August 22-23, 2006, ORISE conducted surface gamma scans and collected soil samples in SUs 9304-0001 and 9304-0002, they conducted surface gamma scans in SUs 9530-0001 through 9530-0004, and conducted a second survey including surface gamma scans and soil samples in SUs 9527-0003 and 9527-0004 (originally discussed in NRC Inspection Report No. 05000213/2006002, dated December 19, 2006; ADAMS Accession Number ML063560253).
The details of the ORISE analysis are contained in the following ORISE Reports:
Confirmatory Survey Results for the East Mountain Side at the Connecticut Yankee Haddam Neck Plant, Haddam, Connecticut, dated July 18, 2006, and Confirmatory Survey Results for Survey Units 9304, 9527, and 9530 at the Connecticut Yankee Haddam Neck Plant, Haddam, Connecticut, dated September 25, 2006, which are enclosed. [ADAMS Accession Numbers ML070320448 and ML070320450, respectively.]
c. Conclusions
The licensee conducted decommissioning activities in accordance with the approved LTP requirements and adequately implemented sampling and survey procedures and protocols to support the final status survey program.
3. Radiation Protection Program
a. Inspection Scope
IP 83750 The inspector assessed the radiation control program to verify the adequacy of surveys necessary to post and control high radiation and radiation areas and to verify the proper use of personal contamination monitors such as friskers, including consideration of hot particle contamination. The inspector also reviewed the program to verify the adequacy of survey practices, including selected survey records, technical awareness of limitations of the survey instruments, and the calibration records of selected survey and monitoring instruments. The inspector conducted interviews with the cognizant personnel and reviewed the following procedures to evaluate the program: Radiological Posting and Labeling (RPM 2.2-27); Personnel Monitoring, Survey and Decontamination (RPM 2.7-3); Control and Accountability of Portable Survey Instruments for Final Status Surveys (RPM 5.1-04); Calibration of the Ludlum Model 3" (RPM 4.1-19); Calibration of the Eberline E-140 with Frisker Probe (RPM 4.2-3); Small Article Monitor Calibration and Relocation (RPM 4.4-6); Calibration of the Bicron NE MicroRem (RPM 4.8-5); and Portable Health Physics Instrument Source/Response Check (RPM 2.2-10).
Additionally, the inspector reviewed the licensees contamination control program, including implementation of Contamination Control Program (RPM 2.7-0). The review was a follow-up from the previous inspection period regarding the licensees implementation to ensure the control of equipment and materials were released properly from the Radiologically Controlled Area (RCA) for unrestricted use.
b. Observations and Findings
No findings of significance were identified.
Radiation Protection (RP) technician performance for conducting radiological surveys of personnel, tools, equipment, and shipping boxes containing demolition debris exiting the RCA was adequate. The licensee performed effective surveys in accordance with the Contamination Control Program. The licensee completed survey records as required by the survey procedures. RP technicians were cognizant of the potential for contaminated tools and hot particles and the licensee clearly and accurately documented survey results as required. Technicians demonstrated the appropriate level of understanding of the use and limitations of the survey instrumentation, including friskers, to conduct effective surveys. Radiation areas were posted appropriately. No high radiation areas existed on site during this inspection period.
Technicians used calibrated survey instrumentation. The calibration records of survey instruments were complete and accurate. The RP instrument technician is responsible for calibrating instruments and has an appropriate level of technical understanding for calibrating survey instrumentation. Calibration and source check results for the survey instrumentation were within the acceptance criteria as defined in the procedures. The licensee used check sources that were traceable to the National Institute of Standards and Technology.
c. Conclusions
The licensee maintained an effective radiation control program, including the survey instrument calibration program and the contamination control program.
4. Radioactive Waste Treatment and Transportation Programs
a. Inspection Scope
IP 86750 The scope of this inspection area was to evaluate the Solid Radioactive Waste Management and Transportation programs and to determine whether the licensee properly processed, packaged, stored, and shipped radioactive materials. The inspector reviewed selected Low Specific Activity radioactive waste shipments from September through December 2006, including dry active waste and low-level radioactive demolition debris. The inspector observed the licensee conducted surveys and prepared shipments for transport.
b. Observations and Findings
No findings of significance were identified.
The selected radioactive waste shipment records included completed copies of Characterization Reports, Waste Manifest Shipping papers, Emergency Response Information, Survey Record Forms, and related documentation, including shipment inspection plans and truck inspection records. The licensee met the applicable radiation and transportation requirements for the shipments reviewed.
c. Conclusions
The licensee effectively implemented the solid radioactive waste management and transportation programs.
5. Exit Meeting
The inspector presented the inspection results to representatives of the licensees staff at the conclusion of the onsite inspection on October 26, 2007, and in-office inspections on November 7, 2006 and December 5, 2006. On April 3, 2007, a summary of the inspection findings for the entire inspection period was presented to the licensee. Licensee representatives acknowledged the inspection findings. Although proprietary items were reviewed during the inspection, no proprietary information is presented in this report.
SUPPLEMENTAL INFORMATION
PARTIAL LIST OF PERSONS CONTACTED
Licensee
- J. Arnold, Executive Staff Assistant
- B. Couture, Project Support, Resource Conservation and Recovery Act Coordinator
- J. Fan, Project Support and Engineering Manager
- R. Haight, Waste Management Coordinator, Waste Management, Decommissioning
- J. McCarthy, Engineer, FSS
- R. McGrath, Radiation Protection/FSS Manager
- R. Mitchell, ISFSI/Unit Manager
- W. Norton, President and Chief Executive Officer
- C. Newson, Technical Support Supervisor/FSS
- C. Young, Waste Management Engineer, Waste Management, Decommissioning
- J. Wagner, FSS Supervisor, FSS
- G. van Noordennen, Manager, Nuclear Safety/Regulatory Affairs
- These individuals participated in the exit briefing held on April 3, 2007.
INSPECTION PROCEDURES USED
36801 Organization, Management, and Cost Controls
40801 Self-Assessment, Auditing, and Corrective Action
60855 Operation of Independent Spent Fuel Storage Installation
2801 Maintenance and Surveillance
71801 Decommissioning Performance and Status Reviews
83750 Occupational Radiation Exposure
83801 Inspection of Final Status Surveys
86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials
ITEMS OPEN, CLOSED, AND DISCUSSED
Items Opened:
None
Items Closed:
None
Items Discussed:
None
LIST OF ACRONYMS USED
CR Condition Reports
CY Connecticut Yankee
FSS Final Status Survey
IP Inspection Procedure
LTP License Termination Plan
ORISE Oak Ridge Institute for Science and Education
QSR Quality Surveillance Reports
RCA Radiologically Controlled Area
RP Radiation Protection
RPM Radiation Protection Manual
SFB Spent Fuel Building
SU Survey Unit