CP-200800928, Submittal of Tenth Refueling Outage (2RF10) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval): Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:u Mike Blevins Senior Vice President& Chief Nuclear Officer mike.blevins@luminant.com Luminant Power P 0 Box 1002 6322 North FM 56 Glen Rose, TX 76043 T 254 897 5209 C 817 559 9085 F 254 897,6652 CP-200800928 TXX(-08098 Ref. # 10CFR50.55a July 10, 2008 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555  
{{#Wiki_filter:u Mike Blevins                         Luminant Power Senior Vice President               P 0 Box 1002
                                                            & Chief Nuclear Officer             6322 North FM 56 mike.blevins@luminant.com           Glen Rose, TX 76043 T 254 897 5209 C 817 559 9085 F 254 897,6652 CP-200800928                                                                         Ref. # 10CFR50.55a TXX(-08098 July 10, 2008 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK NUCLEAR POWER PLANT (CPNPP)DOCKET NO. 50-446 SUBMITTAL OF UNIT 2 TENTH REFUELING OUTAGE (2RF10) INSERVICE INSPECTION (ISI)  
COMANCHE PEAK NUCLEAR POWER PLANT (CPNPP)
DOCKET NO. 50-446 SUBMITTAL OF UNIT 2 TENTH REFUELING OUTAGE (2RF10) INSERVICE INSPECTION (ISI)  


==SUMMARY==
==SUMMARY==
REPORT (UNIT 2:1998 EDITION OF ASME CODE SECTION XI THROUGH 2000 ADDENDA, INTERVAL START DATE -AUGUST 3, 2004, SECOND INTERVAL)
REPORT (UNIT 2:1998 EDITION OF ASME CODE SECTION XI THROUGH 2000 ADDENDA, INTERVAL START DATE - AUGUST 3, 2004, SECOND INTERVAL)


==Dear Sir or Madam:==
==Dear Sir or Madam:==
In accordance with 10CFR50.55a, Luminant Generation Company LLC (Luminant Power) forwards the Inservice Inspection Summary Report for the tenth refueling outage of CPNPP Unit 2. The enclosed report is being provided to you pursuant to the ASME Boiler and Pressure Vessel Code, Section XI, paragraph IWA-6240(b).
 
A copy of this report is also forwarded to the Chief Inspector in accordance with the Texas Boiler Law & Rules and Regulations, paragraph 65.100.g.4.
In accordance with 10CFR50.55a, Luminant Generation Company LLC (Luminant Power) forwards the Inservice Inspection Summary Report for the tenth refueling outage of CPNPP Unit 2. The enclosed report is being provided to you pursuant to the ASME Boiler and Pressure Vessel Code, Section XI, paragraph IWA-6240(b). A copy of this report is also forwarded to the Chief Inspector in accordance with the Texas Boiler Law & Rules and Regulations, paragraph 65.100.g.4.
This communication contains no new licensing basis commitments regarding CPNPP Unit 2.A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway Comanche Peak
This communication contains no new licensing basis commitments regarding CPNPP Unit 2.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance                       ACFr7 Callaway Comanche Peak
* Diablo Canyon
* Diablo Canyon
* Palo Verde -San Onofre
* Palo Verde - San Onofre
* South Texas Project Wolf Creek.ACFr7 U. S. Nuclear Regulatory Commission TXX-08098 Page 2 07/10/2008 If you have any questions or need additional information regarding this matter, please feel free to contact Jack Hicks at (254) 897-6725.Sincerely, Luminant Generation Company LLC Mike Blevins By: 6/FredW._Madden Director, Oversight  
* South Texas Project   Wolf Creek.
& Regulatory Affairs Enclosure c -E. E. Collins, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak A. Jones, Chief Inspector, TDLR B. Welch, ANII, Comanche Peak ENCLOSURE to TXX-08098 FORM OAR- I OWNER'S ACTITY REPORT Report Number CPSES U2 2RF10 Luminant Power P.O. Box 1002 Glen Rose, Texas 76043 Owner Plant (Name and Address of Plant)Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose, Texas 76043 (Name and Address of Plant)3 August 3, 19934 W" ri,0c16 Unit No. 2 Current inspection interva Current inspection period Commercial service date Refueling outage no. 10 2 (0st, 2 nd, 3 rd 4 th% other)2 list, 2 nd, 3 rd)Edition and Addenda of Section Xl applicable to the inspection plan 1998 Edition, 2000 Addenda Date and revision of inspection plan CPSES ISI Program Plan, Interval 2, Rev. 3. February 28, 2008 Edition and Addenda of Section Xl applicable to repairs and replacements, if different than the inspection plan. Same CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.Certificate of Authorization N/A Expiration Date N/A if applicable Signed o r Ownr s Date 7) 2itoe Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut, have inspected the items described in thisOwner's Activity Report, during the period of January 15, 2007 to June 30, 2008, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacement, evaluations and corrective measures described in this report.Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a Loss of any kind arising from the connected with this inspection.
 
Commissions  
U. S. Nuclear Regulatory Commission TXX-08098 Page 2 07/10/2008 If you have any questions or need additional information regarding this matter, please feel free to contact Jack Hicks at (254) 897-6725.
.. ( , Inspect r's, gnature National Board, State, Province and Endorsements Date 1-1-04/This form (E00127) may be obtained from the Order Dept., ASME, 22 Law Drive, Box 2300, Fairfield, NJ 07007-2300 TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Total Total Total Total Examinations Examinations Examinations Examinations Credited (%) to Examination Required For The Credited for This Credited (%) for Date for the Category Interval Period* The Period- Interval Remarks B-A 24 0 0 4 NOTE 3 B-B1 8 1 25 38 B-D 36 4 67 39 B-G-1 165 0 0 0 NOTE 4 B-G-2 19 3 50 37 NOTE 4 B-K 8 1 25 38 B-L-1 1 0 0 0 NOTES 1, 3 B-L-2 1 0 0 0 NOTES 1, 4 B-M-2 4 0 0 25 NOTES 1, 4 B-N-1 3 1 100 67 NOTE 2 B-N-2 1 0 0 0 NOTE 3 B-N-3 1 0 0 0 NOTE 3 B-0 4 0 0 0 NOTE 3 B-P NOTE 5 -NOTE 5 NOTE 5 NOTE 5 NOTES 2, 5 B-Q NOTE 7 NOTE 7 NOTE 7 NOTE 7 NOTE 7 C-A 19 6 60 53 C-B 8 0 0 25 C-C 95 22 56 49 C-D 1 0 0 100 C-G 6 0 0 33 C-H NOTE 5 NOTE 5 NOTE 5 NOTE 5 NOTE 5 D-A 140 17 33 41 D-B NOTE 5 NOTE 5 NOTE 5 NOTE 5 NOTE 5 F-A F1i10 85 14 52 38 F-A F1.20 252 35 34 38 F-A F1.30 168 26 39 48 F-A F1.40 102 23 52 54 R-A 144 20 35 41 NOTE 6 This column is interpreted to represent the cumulative number of exams performed to date in this period.** This column is interpreted to represent the cumulative percentage of scheduled exams for the interval which have been completed to date in this period.OAR-1 Page 2 of 5 NOTES: 1. Examinations for pumps and valves are limited to components selected for examination under Examination Categories B-L-i, B-L-2, and B-M-2.2. Examination Categories B-N-1 and B-P do not have to follow the required percentages of Table IWB-2412-1.
Sincerely, Luminant Generation Company LLC Mike Blevins By:   6
: 3. Examinations for Examination Categories B-A, B-L-1, B-N-2, B-N-3, and B-O may be deferred to the end of the inspection interval.4. Examinations for Examination Categories B-G-1, B-G-2, B-L-2, and B-M-2 may be deferred until disassembly of a component for maintenance, repair/replacement, or volumetric examination.
                                                                  /FredW._Madden Director, Oversight & Regulatory Affairs Enclosure c-         E. E. Collins, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak A. Jones, Chief Inspector, TDLR B. Welch, ANII, Comanche Peak
: 5. Visual Examinations (VT-2) for system leakage tests are performed each fuel cycle, period, and interval, according to the requirements of IWA-2212 and IWA-5240.
 
All required VT-2 examinations have been completed for this fuel cycle, except for portions of CS system in Work Orders 408602 and 409739, scheduled for examinations during the weeks of 8/03/08 and 8/10/08, respectively.
ENCLOSURE to TXX-08098 FORM OAR- I OWNER'S ACTITY REPORT Report Number                   CPSES U2 2RF10 Owner                          Luminant Power       P.O. Box 1002 Glen Rose, Texas 76043 (Name and Address of Plant)
In addition, examination of the piping and HX in the Regen HX Room was not completed because of dose concerns (no surveys readily available) coming down in power for 2RF10. This portion of the test(-3a 1 along with -3a2), which are identified in VT-2 package 2-CS-2-2-3a 1 and -3a2, will be rescheduled for 2RF12.6. Examination Category R-A includes previous Examination Categories B-F, B-J, C-F-i, and C-F-2, 7. Examination Category B-Q, Steam Generator Tubing, is reported per the requirements of the Plant Technical Specifications.
Plant                          Comanche Peak Steam Electric Station         P.O. Box 1002 Glen Rose, Texas 76043 (Name and Address of Plant) 3 Unit No.          2            Commercial service date            August 3, 19934 W"           ri,0c16             Refueling outage no.       10 Current inspection interva                       2 (0st, 2 nd, 3 rd 4 th% other)
OAR-1 Page 3 of 5 TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Flaw Flaw or Relevant Condition Found Examination Item Item Description Characterization During Scheduled Section XI Category Number (IWA-3300)
Current inspection period                        2 list, 2 nd, 3 rd)
Examination or Test (Yes or No)F-A F1.10 RI-Recordable Indication-N/A Yes Broken cotter pin in pipe clamp. Pin was intact and support was functional.
Edition and Addenda of Section Xl applicable to the inspection plan                                                 1998 Edition, 2000 Addenda Date and revision of inspection plan                               CPSES ISI Program Plan, Interval 2, Rev. 3. February 28, 2008 Edition and Addenda of Section Xl applicable to repairs and replacements, if different than the inspection plan.                           Same CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.
SMF-2008-001122 written. Removed cotter pin and replaced with rue ring. Re-examination of the pipe support was conducted and was acceptable.
Certificate of Authorization           N/A                                                     Expiration Date                   N/A if applicable Signed                                             o Ownr r     s                                                 Date                   7) 2itoe Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut, have inspected the items described in thisOwner's Activity Report, during the period of January 15, 2007 to June 30, 2008, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
C-C C3.20 RI-Recordable Indication-Surface Planar flaw Yes 1/4" linear indication identified on the weld of a saddle to the pipe, Evaluated per ASME Section Xl Code and found acceptable as-is.Reference SMF-2008-001250.t I I* 4 I 4 I I 9 4 9 4 9 I I I t I 4 4 4. I S OAR-1 Page 4 of 5 TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Flaw or Relevant Condition Found Repair, During Repair/Replacement Scheduled Replaceme Code or Corrective Item Description Section XI Date nt Class Measure Description of Work Examination or Complet Plan Test (Yes/No) e Number 1 Repair Steam Generator Flange Installed Helicoil No 4/16/08 2RC08-004__ .1 ____ I ________ I __________
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacement, evaluations and corrective measures described in this report.
I ____ I __ .1 ___I I J.OAR-1 Page 5 of 5}}
Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a Loss of any kind arising from the connected with this inspection.
Commissions                   ..                         (     ,
Inspect r's, gnature                                                                         National Board, State, Province and Endorsements Date                     1-1-04/
This form (E00127) may be obtained from the Order Dept., ASME, 22 Law Drive, Box 2300, Fairfield, NJ 07007-2300
 
TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Total                     Total                     Total             Total Examinations Examinations             Examinations               Examinations           Credited (%) to Examination             Required For The           Credited for This         Credited (%) for             Date for the Category                   Interval                 Period*                 The Period-                 Interval               Remarks B-A                       24                       0                         0                         4                   NOTE 3 B-B1                       8                         1                       25                       38 B-D                       36                       4                         67                       39 B-G-1                       165                       0                         0                         0                   NOTE 4 B-G-2                       19                       3                       50                       37                   NOTE 4 B-K                       8                         1                       25                       38 B-L-1                       1                       0                         0                         0                 NOTES 1, 3 B-L-2                       1                       0                         0                         0                 NOTES 1, 4 B-M-2                       4                         0                         0                       25                 NOTES 1, 4 B-N-1                       3                         1                       100                       67                   NOTE 2 B-N-2                       1                       0                         0                         0                   NOTE 3 B-N-3                       1                       0                         0                         0                   NOTE 3 B-0                       4                         0                         0                         0                   NOTE 3 B-P                     NOTE 5 -                 NOTE 5                   NOTE 5                   NOTE 5               NOTES 2, 5 B-Q                     NOTE 7                   NOTE 7                   NOTE 7                   NOTE 7                 NOTE 7 C-A                         19                       6                       60                       53 C-B                         8                       0                         0                       25 C-C                         95                       22                         56                       49 C-D                         1                       0                         0                       100 C-G                         6                       0                         0                       33 C-H                     NOTE 5                   NOTE 5                   NOTE 5                   NOTE 5                 NOTE 5 D-A                       140                       17                         33                       41 D-B                     NOTE 5                   NOTE 5                   NOTE 5                   NOTE 5                 NOTE 5 F-A F1i10                     85                       14                         52                       38 F-A F1.20                     252                       35                         34                       38 F-A F1.30                     168                       26                         39                       48 F-A F1.40                     102                       23                         52                       54 R-A                       144                       20                         35                       41                   NOTE 6 This column is interpreted to represent the cumulative number of exams performed to date in this period.
**This column is interpreted to represent the cumulative percentage of scheduled exams for the interval which have been completed to date in this period.
OAR-1 Page 2 of 5
 
NOTES:
: 1. Examinations for pumps and valves are limited to components selected for examination under Examination Categories B-L-i, B-L-2, and B-M-2.
: 2. Examination Categories B-N-1 and B-P do not have to follow the required percentages of Table IWB-2412-1.
: 3. Examinations for Examination Categories B-A, B-L-1, B-N-2, B-N-3, and B-O may be deferred to the end of the inspection interval.
: 4. Examinations for Examination Categories B-G-1, B-G-2, B-L-2, and B-M-2 may be deferred until disassembly of a component for maintenance, repair/replacement, or volumetric examination.
: 5. Visual Examinations (VT-2) for system leakage tests are performed each fuel cycle, period, and interval, according to the requirements of IWA-2212 and IWA-5240. All required VT-2 examinations have been completed for this fuel cycle, except for portions of CS system in Work Orders 408602 and 409739, scheduled for examinations during the weeks of 8/03/08 and 8/10/08, respectively. In addition, examination of the piping and HX in the Regen HX Room was not completed because of dose concerns (no surveys readily available) coming down in power for 2RF10. This portion of the test(-3a 1 along with -3a2), which are identified in VT-2 package 2-CS-2-2-3a 1 and -3a2, will be rescheduled for 2RF12.
: 6. Examination Category R-A includes previous Examination Categories B-F, B-J, C-F-i, and C-F-2,
: 7. Examination Category B-Q, Steam Generator Tubing, is reported per the requirements of the Plant Technical Specifications.
OAR-1 Page 3 of 5
 
TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Flaw           Flaw or Relevant Condition Found Examination   Item           Item Description           Characterization       During Scheduled Section XI Category     Number                                         (IWA-3300)         Examination or Test (Yes or No)
F-A       F1.10   RI-Recordable Indication-       N/A                   Yes Broken cotter pin in pipe clamp. Pin was intact and support was functional. SMF-2008-001122 written. Removed cotter pin and replaced with rue ring. Re-examination of the pipe support was conducted and was acceptable.
C-C       C3.20   RI-Recordable Indication-       Surface Planar flaw   Yes 1/4" linear indication identified on the weld of a saddle to the pipe, Evaluated per ASME Section Xl Code and found acceptable as-is.
Reference SMF-2008-001250.
t       I                                 I
* 4                                 I                     4 I       I                                 9                     4 9       4                                 9 I                                         I I       t                                 I                     4 4       4.                               I                     S OAR-1 Page 4 of 5
 
TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Flaw or Relevant Condition Found Repair,                                                                                       During                     Repair/
Replacement                                                                                     Scheduled                 Replaceme Code         or Corrective                   Item                                     Description           Section XI         Date       nt Class         Measure                 Description                                   of Work           Examination or     Complet       Plan Test (Yes/No)         e       Number 1         Repair             Steam Generator Flange             Installed Helicoil                     No                   4/16/08   2RC08-004
__      .1
____               I________                        I __________                           I ____               I __       .1
___
I                                                                        I                   J.
OAR-1 Page 5 of 5}}

Revision as of 15:52, 14 November 2019

Submittal of Tenth Refueling Outage (2RF10) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval)
ML082000122
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 07/10/2008
From: Blevins M
Luminant Generation Co, Luminant Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CP-200800928, TXX-08098
Download: ML082000122 (8)


Text

u Mike Blevins Luminant Power Senior Vice President P 0 Box 1002

& Chief Nuclear Officer 6322 North FM 56 mike.blevins@luminant.com Glen Rose, TX 76043 T 254 897 5209 C 817 559 9085 F 254 897,6652 CP-200800928 Ref. # 10CFR50.55a TXX(-08098 July 10, 2008 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT (CPNPP)

DOCKET NO. 50-446 SUBMITTAL OF UNIT 2 TENTH REFUELING OUTAGE (2RF10) INSERVICE INSPECTION (ISI)

SUMMARY

REPORT (UNIT 2:1998 EDITION OF ASME CODE SECTION XI THROUGH 2000 ADDENDA, INTERVAL START DATE - AUGUST 3, 2004, SECOND INTERVAL)

Dear Sir or Madam:

In accordance with 10CFR50.55a, Luminant Generation Company LLC (Luminant Power) forwards the Inservice Inspection Summary Report for the tenth refueling outage of CPNPP Unit 2. The enclosed report is being provided to you pursuant to the ASME Boiler and Pressure Vessel Code,Section XI, paragraph IWA-6240(b). A copy of this report is also forwarded to the Chief Inspector in accordance with the Texas Boiler Law & Rules and Regulations, paragraph 65.100.g.4.

This communication contains no new licensing basis commitments regarding CPNPP Unit 2.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance ACFr7 Callaway Comanche Peak

  • Diablo Canyon
  • Palo Verde - San Onofre
  • South Texas Project Wolf Creek.

U. S. Nuclear Regulatory Commission TXX-08098 Page 2 07/10/2008 If you have any questions or need additional information regarding this matter, please feel free to contact Jack Hicks at (254) 897-6725.

Sincerely, Luminant Generation Company LLC Mike Blevins By: 6

/FredW._Madden Director, Oversight & Regulatory Affairs Enclosure c- E. E. Collins, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak A. Jones, Chief Inspector, TDLR B. Welch, ANII, Comanche Peak

ENCLOSURE to TXX-08098 FORM OAR- I OWNER'S ACTITY REPORT Report Number CPSES U2 2RF10 Owner Luminant Power P.O. Box 1002 Glen Rose, Texas 76043 (Name and Address of Plant)

Plant Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose, Texas 76043 (Name and Address of Plant) 3 Unit No. 2 Commercial service date August 3, 19934 W" ri,0c16 Refueling outage no. 10 Current inspection interva 2 (0st, 2 nd, 3 rd 4 th% other)

Current inspection period 2 list, 2 nd, 3 rd)

Edition and Addenda of Section Xl applicable to the inspection plan 1998 Edition, 2000 Addenda Date and revision of inspection plan CPSES ISI Program Plan, Interval 2, Rev. 3. February 28, 2008 Edition and Addenda of Section Xl applicable to repairs and replacements, if different than the inspection plan. Same CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.

Certificate of Authorization N/A Expiration Date N/A if applicable Signed o Ownr r s Date 7) 2itoe Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut, have inspected the items described in thisOwner's Activity Report, during the period of January 15, 2007 to June 30, 2008, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacement, evaluations and corrective measures described in this report.

Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a Loss of any kind arising from the connected with this inspection.

Commissions .. ( ,

Inspect r's, gnature National Board, State, Province and Endorsements Date 1-1-04/

This form (E00127) may be obtained from the Order Dept., ASME, 22 Law Drive, Box 2300, Fairfield, NJ 07007-2300

TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Total Total Total Total Examinations Examinations Examinations Examinations Credited (%) to Examination Required For The Credited for This Credited (%) for Date for the Category Interval Period* The Period- Interval Remarks B-A 24 0 0 4 NOTE 3 B-B1 8 1 25 38 B-D 36 4 67 39 B-G-1 165 0 0 0 NOTE 4 B-G-2 19 3 50 37 NOTE 4 B-K 8 1 25 38 B-L-1 1 0 0 0 NOTES 1, 3 B-L-2 1 0 0 0 NOTES 1, 4 B-M-2 4 0 0 25 NOTES 1, 4 B-N-1 3 1 100 67 NOTE 2 B-N-2 1 0 0 0 NOTE 3 B-N-3 1 0 0 0 NOTE 3 B-0 4 0 0 0 NOTE 3 B-P NOTE 5 - NOTE 5 NOTE 5 NOTE 5 NOTES 2, 5 B-Q NOTE 7 NOTE 7 NOTE 7 NOTE 7 NOTE 7 C-A 19 6 60 53 C-B 8 0 0 25 C-C 95 22 56 49 C-D 1 0 0 100 C-G 6 0 0 33 C-H NOTE 5 NOTE 5 NOTE 5 NOTE 5 NOTE 5 D-A 140 17 33 41 D-B NOTE 5 NOTE 5 NOTE 5 NOTE 5 NOTE 5 F-A F1i10 85 14 52 38 F-A F1.20 252 35 34 38 F-A F1.30 168 26 39 48 F-A F1.40 102 23 52 54 R-A 144 20 35 41 NOTE 6 This column is interpreted to represent the cumulative number of exams performed to date in this period.

    • This column is interpreted to represent the cumulative percentage of scheduled exams for the interval which have been completed to date in this period.

OAR-1 Page 2 of 5

NOTES:

1. Examinations for pumps and valves are limited to components selected for examination under Examination Categories B-L-i, B-L-2, and B-M-2.
2. Examination Categories B-N-1 and B-P do not have to follow the required percentages of Table IWB-2412-1.
3. Examinations for Examination Categories B-A, B-L-1, B-N-2, B-N-3, and B-O may be deferred to the end of the inspection interval.
4. Examinations for Examination Categories B-G-1, B-G-2, B-L-2, and B-M-2 may be deferred until disassembly of a component for maintenance, repair/replacement, or volumetric examination.
5. Visual Examinations (VT-2) for system leakage tests are performed each fuel cycle, period, and interval, according to the requirements of IWA-2212 and IWA-5240. All required VT-2 examinations have been completed for this fuel cycle, except for portions of CS system in Work Orders 408602 and 409739, scheduled for examinations during the weeks of 8/03/08 and 8/10/08, respectively. In addition, examination of the piping and HX in the Regen HX Room was not completed because of dose concerns (no surveys readily available) coming down in power for 2RF10. This portion of the test(-3a 1 along with -3a2), which are identified in VT-2 package 2-CS-2-2-3a 1 and -3a2, will be rescheduled for 2RF12.
6. Examination Category R-A includes previous Examination Categories B-F, B-J, C-F-i, and C-F-2,
7. Examination Category B-Q, Steam Generator Tubing, is reported per the requirements of the Plant Technical Specifications.

OAR-1 Page 3 of 5

TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Flaw Flaw or Relevant Condition Found Examination Item Item Description Characterization During Scheduled Section XI Category Number (IWA-3300) Examination or Test (Yes or No)

F-A F1.10 RI-Recordable Indication- N/A Yes Broken cotter pin in pipe clamp. Pin was intact and support was functional. SMF-2008-001122 written. Removed cotter pin and replaced with rue ring. Re-examination of the pipe support was conducted and was acceptable.

C-C C3.20 RI-Recordable Indication- Surface Planar flaw Yes 1/4" linear indication identified on the weld of a saddle to the pipe, Evaluated per ASME Section Xl Code and found acceptable as-is.

Reference SMF-2008-001250.

t I I

  • 4 I 4 I I 9 4 9 4 9 I I I t I 4 4 4. I S OAR-1 Page 4 of 5

TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Flaw or Relevant Condition Found Repair, During Repair/

Replacement Scheduled Replaceme Code or Corrective Item Description Section XI Date nt Class Measure Description of Work Examination or Complet Plan Test (Yes/No) e Number 1 Repair Steam Generator Flange Installed Helicoil No 4/16/08 2RC08-004

__ .1

____ I________ I __________ I ____ I __ .1

___

I I J.

OAR-1 Page 5 of 5