{{#Wiki_filter:UNITED NUCLEAR REGULATORY | {{#Wiki_filter:UNITED STATES | ||
REGION 475 ALLENDALE KING OF PRUSSIA, PENNSYLVANIA | NUCLEAR REGULATORY COMMISSION | ||
March 3, 2010 Mr. Timothy S. Rausch Senior Vice President | REGION ~ | ||
and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard | 475 ALLENDALE ROAD | ||
Berwick, PA 18603-0467 | KING OF PRUSSIA, PENNSYLVANIA 19406-1415 | ||
ANNUAL ASSESSMENT | March 3, 2010 | ||
LETTER --SUSQUEHANNA | Mr. Timothy S. Rausch | ||
STEAM | Senior Vice President and Chief Nuclear Officer | ||
STATION, UNITS 1 AND 2 (05000387/2010001 | PPL Susquehanna, LLC | ||
and | 769 Salem Boulevard | ||
Dear Mr. Rausch: On February 16,2010, the NRC staff completed | Berwick, PA 18603-0467 | ||
its performance | SURIECT: ANNUAL ASSESSMENT LETTER -- SUSQUEHANNA STEAM ELECTRIC | ||
review of the Susquehanna | STATION, UNITS 1 AND 2 (05000387/2010001 and 0500038812010001) | ||
Steam Electric Station (Susquehanna). | Dear Mr. Rausch: | ||
Our technical | On February 16,2010, the NRC staff completed its performance review of the Susquehanna | ||
staff reviewed performance | Steam Electric Station (Susquehanna). Our technical staff reviewed performance indicators | ||
(Pis) for the most recent quarter and inspection results for the period from January 1, 2009 | |||
results for the period from January 1, 2009 through December 31, 2009. The purpose of this letter is to inform you of our assessment | through December 31, 2009. The purpose of this letter is to inform you of our assessment of | ||
your safety performance during this period and our plans for future inspections at your facility. | |||
during this period and our plans for future inspections | This performance review and enclosed inspection plan do not include security information. | ||
at your facility. | A separate letter designated and marked as "Official Use Only - Security Information" will | ||
This performance | include the security cornerstone review and resultant inspection plan. | ||
review and enclosed inspection | Overall, Susquehanna Units 1 and 2 operated in a manner that preserved public health and | ||
plan do not include security information. | safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, | ||
A separate letter designated | as well as for the first three quarters of the assessment cycle, was within the Licensee | ||
and marked as "Official | Response column of the NRC's Action Matrix, based on all inspection findings being classified | ||
Use Only -Security Information" will include the security cornerstone | as having very low safety significance (Green) and all Pis indicating performance at a level | ||
review and resultant | requiring no additional NRC oversight (Green) for the six cornerstones under the Reactor and | ||
inspection | Radiation Safety strategic performance areas. Therefore, we plan to conduct reactor oversight | ||
plan. Overall, Susquehanna | process (ROP) baseline inspections at your facility. | ||
Units 1 and 2 operated in a manner that preserved | On January 28, 2009, we issued you a potential Chilling Effect Letter (CEl) regarding the Safety | ||
public health and safety and fully met all cornerstone | Conscious Work Environment (SCWE) at Susquehanna (ML090280115) 1. In that letter we | ||
objectives. | expressed concem with the progress and effectiveness of your actions to address indications of | ||
Plant performance | a declining SCWE and negative employee perceptions during 2008, as it may have impacted | ||
for the most recent quarter, as well as for the first three quarters of the assessment | employee willingness to raise safety concerns and could lead to a chilling effect on site. As | ||
cycle, was within the Licensee Response column of the NRC's Action Matrix, based on all inspection | discussed in the 2009 Mid-Cycle Performance Assessment Letter (ML0924402700), issuance of | ||
findings being classified | 1 Designation in parenthesis refers to an Agencywide Documents Access and Management System | ||
as having very low safety significance (Green) and all Pis indicating | (ADAMS) accession number. Documents referenced in this letter are publicly available using the | ||
performance | accession number in ADAMS. | ||
at a level requiring | |||
no additional | T. Rausch 2 | ||
NRC oversight (Green) for the six cornerstones | the potential CEl met the first criterion for consideration of a SeWE Substantive Cross Cutting | ||
under the Reactor and Radiation | Issue (SCCI) over the next three plant assessment cycles. This assessment is the second | ||
Safety strategic | since the issuance of the potential eEL. | ||
performance | During 2009, we reviewed your action plans and root cause evaluation to address SCWE issues | ||
areas. Therefore, we plan to conduct reactor oversight | at the site. We also performed targeted inspection samples and trend reviews to monitor your | ||
process (ROP) baseline inspections | progress and reviewed the results of an independent culture survey (Ml091330762, | ||
at your facility. | Ml092230158, ML093170375, and Ml100321652). In addition, NRC management conducted | ||
On January 28, 2009, we issued you a potential | several site visits and held a public meeting on July 6, 2009, to discuss work environment | ||
Chilling Effect Letter (CEl) regarding | issues (Ml091940440). Based on these activities, we note that PPL has taken reasonable | ||
the Safety Conscious | actions to improve SCWE at the site. PPL actions included several organizational changes, | ||
Work Environment (SCWE) at Susquehanna (ML090280115) | improved communications to the workforce, additional SCWE training for supervisors and | ||
1. In that letter we expressed | managers, work policy revisions, and development of additional means for workers to raise | ||
concem with the progress and effectiveness | issues. NRC inspections confirmed the effectiveness of these actions and documented an | ||
of your actions to address indications | improving work environment, SCWE metrics, and safety culture survey results. Furthermore, | ||
we noted that the number of allegations received by the NRC from onsite sources during 2009 | |||
SCWE and negative employee perceptions | (15), although stili greater than the industry norm, was significantly lower than in 2008 (32). | ||
during 2008, as it may have impacted employee willingness | Based on direct inspection, allegation trend data, SCWE metriCS, and survey results, the NRC | ||
to raise safety concerns and could lead to a chilling effect on site. As discussed | has determined that you have made reasonable progress in addressing SCWE issues at | ||
in the 2009 Mid-Cycle | Susquehanna during 2009. Specifically, in evaluating your scope of efforts and progress in | ||
Performance | addressing SCWE issues, the staff determined that you recognized the issue impacted multiple | ||
Assessment | areas across the site; took appropriate and timely actions to address it; and completed a range | ||
Letter (ML0924402700), issuance of 1 Designation | of corrective actions which have been implemented and are judged, at this time, to have been | ||
in parenthesis | effective in addressing the underlying issues. Therefore, the staff has concluded that a SeWE | ||
refers to an Agencywide | SCCI does not exist at this time. | ||
Documents | Notwithstanding this progress, the NRC will continue to monitor your activities to address SCWE | ||
Access and Management | issues at Susquehanna through the baseline inspection program. Specifically, the NRC will use | ||
focused inspection samples and a biennial problem identification and resolution team inspection | |||
number. Documents | to continue to review the progress and effectiveness of your corrective actions in this area. | ||
referenced | Also, the NRC continues to review some events that occurred during 2008. You will be | ||
in this letter are publicly available | informed of the outcome of these deliberations via separate correspondence. The NRC | ||
using the accession | acknowledges that following your evaluations of SCWE plan effectiveness during 2009, you | ||
number in ADAMS. | made revisions to the plan in a timely manner (ML090760146, ML091800460, ML100260405). | ||
T. Rausch 2 the potential | Similarly, PPl wifLneed to continue to evaluate and assess new information going forward to | ||
CEl met the first criterion | make appropriate adjustments to SCWE improvement plans, if warranted. | ||
for consideration | The enclosed inspection plan details the inspections, less those related to physical protection, | ||
of a SeWE Substantive | scheduled through June 30, 2011. In addition to the baseline inspections, we also plan on | ||
Cross Cutting Issue (SCCI) over the next three plant assessment | conducting inspection procedure 71004 regarding Unit 1 power uprate activities. The inspection | ||
cycles. This assessment | plan is provided to allow for the resolution of any scheduling conflicts and personnel availability | ||
is the second since the issuance of the potential | issues well in advance of inspector arrival onsite. Routine resident inspections are not listed | ||
eEL. During 2009, we reviewed your action plans and root cause evaluation | due to their ongoing and continuous nature. The inspections in the last nine months of the | ||
to address SCWE issues at the site. We also performed | inspection plan are tentative and may be revised at the mid-cycle review. | ||
targeted inspection | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its | ||
samples and trend reviews to monitor your progress and reviewed the results of an independent | enclosure will be made available electronically for public inspection in the NRC Public | ||
culture survey (Ml091330762, Ml092230158, ML093170375, and Ml100321652). | Document Room or from the Publicly Available Records (PARS) component of NRC's | ||
In addition, NRC management | Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible | ||
conducted | from the NRC website at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic | ||
several site visits and held a public meeting on July 6, 2009, to discuss work environment | Reading Room). | ||
issues (Ml091940440). | |||
Based on these activities, we note that PPL has taken reasonable | T. Rausch 3 | ||
actions to improve SCWE at the site. PPL actions included several organizational | If circumstances arise which cause us to change this inspection plan, we will contact you to | ||
changes, improved communications | discuss the change as soon as possible. Please contact Paul Krohn at 610-337-5120 with any | ||
to the workforce, additional | questions you may have regarding this letter or the inspection plan. | ||
SCWE training for supervisors | ( | ||
David C. Lew, Director | |||
of additional | Division of Reactor Projects | ||
means for workers to raise issues. NRC inspections | Region I | ||
confirmed | Docket Nos. 50-387; 50-388 | ||
the effectiveness | License Nos. NPF-14, NPF-22 | ||
of these actions and documented | cc w!encl: Distribution via ListServ | ||
Susquehanna Inspection! Activity Plan | |||
work environment, SCWE metrics, and safety culture survey results. Furthermore, we noted that the number of allegations | |||
received by the NRC from onsite sources during 2009 (15), although stili greater than the industry norm, was significantly | I | ||
lower than in 2008 (32). Based on direct inspection, allegation | T. Rausch 3 | ||
trend data, SCWE metriCS, and survey results, the NRC has determined | I | ||
that you have made reasonable | If circumstances arise which cause us to change this inspection plan, we will contact you to | ||
progress in addressing | discuss the change as soon as possible. Please contact Paul Krohn at 610-337-5120 with any | ||
SCWE issues at Susquehanna | I | ||
during 2009. Specifically, in evaluating | questions you may have regarding this letter or the inspection plan. | ||
your scope of efforts and progress in addressing | Sincerely, | ||
SCWE issues, the staff determined | IRA! | ||
that you recognized | David C. Lew, Director | ||
the issue impacted multiple areas across the site; took appropriate | Division of Reactor Projects | ||
and timely actions to address it; and completed | Distribution w/encl: (via a-mail) P. Finney, DRP, SHI N. Sheehan, RI | ||
a range of corrective | S.Collins, RA J. Bream, DRP, Acting RI R Barkley, R | ||
actions which have been implemented | M. Dapas, DRA S. Farrell, DRP, OA John Thompson, NRR | ||
and are judged, at this time, to have been effective | D. Lew, DRP L. Trocine, RI OEDO RidsNrrPMSusquehannaResource | ||
in addressing | J. Clifford, DRP DRS Directors RidsNrrDirslpab@nrc.gov | ||
the underlying | P. Krohn, DRP DRS Branch Chiefs (6) ROPreportsResource@nrc.gov | ||
issues. Therefore, the staff has concluded | A. RosebrooK, DRP N. McNamara, RI | ||
that a SeWE SCCI does not exist at this time. Notwithstanding | E. Torres, DRP D. Tifft. RI | ||
this progress, the NRC will continue to monitor your activities | J. Bream, DRP D. Serena, RI | ||
to address SCWE issues at Susquehanna | SUNSI REVIEW COMPLETE: AAR (Reviewer's Initials) ML100621039 | ||
through the baseline inspection | DOC NAME S;\ROP-1 0 EOC RevieW\Branch 4\SSES ROP-10 EOC\Susquehanna 2009 EOC Letter Rev1.doc | ||
program. Specifically, the NRC will use focused inspection | After declaring this document "An Official Agency Record n it will be released to the Public. | ||
samples and a biennial problem identification | To receive acopy of ibis document, indicate In the box: 'C' =Copy without attachment/enclosure 'E'" Copy with attachment/enclosure 'N' = No copy | ||
and resolution | OFFICE IRlfDRP I RIIDRP 1 HQlAAC RlfDRP 1 | ||
team inspection | NAME IARosebrook/ MR PKrohni AAR for LMJarriell AAR* DLewl DCl | ||
to continue to review the progress and effectiveness | DATE 102/23110 03/02/10 03/02 110 03/02/10 | ||
of your corrective | OFFICIAL RECORD COPY | ||
actions in this area. Also, the NRC continues | * CONCUR VIA EMAIL | ||
to review some events that occurred during 2008. You will be informed of the outcome of these deliberations | |||
via separate correspondence. | Page 1 of2 Susquehanna | ||
The NRC acknowledges | 0212412010 11 :19:41 Inspection I Activity Plan | ||
that following | Report 22 | ||
your evaluations | 01/01/2010 * 06/3012011 | ||
of SCWE plan effectiveness | Planned Dates | ||
during 2009, you made revisions | Start | ||
to the plan in a timely manner (ML090760146, ML091800460, | M!!.!iiM iN t!f:!~.MJ ~!:l!~2!l2nfctiYJt¥ I! !MIl ¥6 WM5%M#W§!!IA S"ga%S%';!et ; | ||
Similarly, PPl wifLneed to continue to evaluate and assess new information | Title | ||
going forward to make appropriate | ! tHttiii¥thffih U ¥MfM!M5 ""! ,*w.!!!J lIi\!!MllI!$iW" | ||
adjustments | 71152B -PI&R 4 | ||
to SCWE improvement | 1,2 01/11/2010 01/15/2010 lP 711528 Identification and Resolution of Problems | ||
plans, if warranted. | 1.2 01/2512010 01129/2010 IP 711528 Identification and Resolution of Problems | ||
The enclosed inspection | 2515/173 * GROUNDWATER TI | ||
plan details the inspections, less those related to physical protection, scheduled | 1,2 02/0812010 02/12/2010 IP 25151173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative | ||
through June 30, 2011. In addition to the baseline inspections, we also plan on conducting | 71004 - UNIT 1 POWER UPRATE INSPECTION 2 | ||
inspection | 03/0212010 04/15/2010 IP 71004 Power Uprate | ||
procedure | 7111108G * U1 INSERVICE INSPECTION 1 | ||
71004 regarding | 03115/2010 03/1912010 IP 7111108G Inservice Inspection Activities - BWR | ||
Unit 1 power uprate activities. | 71124 -HP | ||
The inspection | 03/15/2010 03/19/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls | ||
plan is provided to allow for the resolution | 03f15f2010 03{19(2010 IP 71124.02 Occupational ALARA Planning and Controls | ||
of any scheduling | 03115/2010 03/19/2010 IP 71124,Q3 In-Plant Airborne Radioactivity Control and Mitigation | ||
conflicts | 71124 -RETS | ||
and personnel | 1.2 05/1012010 05114/2010 IP 71124.05 Radiation Monitoring Instrumentation | ||
availability | 1.2 05/1012010 05/14/2010 IP 71124.06 Radioactive Gaseous and liquid Effluent Treatment | ||
issues well in advance of inspector | 71124 -HP | ||
arrival onsite. Routine resident inspections | i.2 06128120iQ 07/02/'201U IP 71124.01 Radiologicai Hazard Assessment and Exposure Con trois | ||
are not listed due to their ongoing and continuous | 1.2 06/28/2010 07(0212010 IP 71124.02 Occupational ALARA Planning and Controls | ||
nature. The inspections | 1,2 06128/2010 07/02/2010 IP 71124.04 Occupational Dose Assessment | ||
in the last nine months of the inspection | 71124 - HP &ISFSI 1 | ||
plan are tentative | 1,2 08/23/2010 08/27/2010 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants | ||
and may be revised at the mid-cycle | 1.2 08123/2010 08/2712010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls | ||
review. In accordance | 1.2 08123/2010 08127/2010 IP 71124.05 Radiation Monitoring Instrumentation | ||
with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure | 1,2 08123/2010 08/2712010 IP 71151*0R01 Occupational Exposure Control Effectiveness | ||
will be made available | CDBI - COMPONENT DESIGN BASES INSPECTION 6 | ||
electronically | 1.2 09/1312010 09/17/2010 IP 7111121 Component Design Bases Inspection | ||
for public inspection | 1.2 09127/2010 10/0812010 IP 7111121 Component Bases Inspection | ||
in the NRC Public Document Room or from the Publicly Available | 12/13EXM - INITIAL OPERATOR LICENSING EXAM 4 | ||
Records (PARS) component | 12/13/2010 12/1712010 U01793 FY11- SUSQUEHANNA Ul&2INITIAL OPERATOR LICENSING EXAM | ||
of NRC's Agencywide | 01/10/2011 01(14/2011 U01793 FY11* SUSQUEHANNA U1&2INITIAL OPERATOR LICENSING EXAM | ||
Documents | EPEX - EP EXERCISE EVALUATION 4 | ||
Access and Management | 1.2 10/04/2010 10/0812010 IP 7111401 Exercise Evaluation | ||
System (ADAMS). ADAMS is accessible | 1.2 10/04/2010 10/08/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes | ||
from the NRC website at http://www.nrc.gov/reading-rm/adams.html(the | 1.2 10/04/2010 10/0812010 IP 71151-EP01 Drill/Exercise Performance | ||
Public Electronic | ~hlSrellOrt does not include lNPO iiiia5UrAGE activities. | ||
Reading Room). | [ThiS report shom only on-site and announced inspection procedures. | ||
T. 3 If circumstances | |||
arise which cause us to change this inspection | Page 2 of2 ,. Susquehanna | ||
plan, we will contact you to discuss the change as soon as possible. | 02124/201011 :19:41 Inspection I Activity Plan | ||
Please contact Paul Krohn at 610-337-5120 | Report 22 | ||
with any questions | 01/01/2010. - 06/30/2011 | ||
you may have regarding | lPIanned Dates | ||
this letter or the inspection | . Start End Title | ||
plan. ( David C. Lew, Director Division of Reactor Projects Region Docket Nos. 50-387; License Nos. NPF-14, cc Distribution | EPEX - EP EXERCISE EVALUATION 4 | ||
via ListServ Susquehanna | 1,2 10/0412010 10/0812010 IP 71151-EP02 ERO Drill Participation | ||
Inspection! | 1.2 10/04/2010 10/0812010 IP 711S1-EP03 Alert & Notification System | ||
Activity Plan | 71124.08 - RADWASTE | ||
I T. Rausch 3 I If circumstances | 1,2 11/29/2010 1210312010 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling. Storage. and Transportation | ||
arise which cause us to change this inspection | 1,2 11/29/2010 12/03/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent | ||
plan, we will contact you to | 7111108G - U21NSERVICE INSPECTION | ||
Please contact Paul Krohn at 610-337-5120 | 2 04/11/2011 04/1512011 IP 7111108G Inservice Inspection Activities - BWR | ||
with any questions | 71124 * HP | ||
you may have regarding | 2 05/02/2011 0510612011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls | ||
this letter or the inspection | 2 05/02/2011 05/0612011 IP 71124.02 Occupational ALARA Planning and Controls | ||
plan. Sincerely, IRA! David C. Lew, Director Division of Reactor Projects Distribution | 2 05/02/2011 05/06/2011 IP 71124.03 In-Plant Airbome Radioactivity Control and Mitigation | ||
w/encl: (via a-mail) S.Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP | TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 3 | ||
1,2 06/06/2011 06/10/2011 IP 71111051 Fire Protection [Triennial! | |||
1,2 06/2012011 06/24/2011 IP 7111105T Fire Protection [Triennial] | |||
71124 - REMP | |||
1,2 06/0612011 06110/2011 lP 71124.07 Public Radiation Safety | |||
his report does not inClude INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
I!!MIl ¥6 WM5%M#W§!!IA | |||
S"ga%S%';!et | |||
tHttiii¥thffih | |||
U ¥MfM!M5 ""! ,*w.!!!J lIi\!!MllI!$iW" | |||
1 | |||
1 | |||
1 | |||
1 | |||
01 | |||
07/02/ | |||
08/27/2010 | |||
08/2712010 | |||
08127/2010 | |||
08/2712010 | |||
10/0812010 | |||
12/1712010 | |||
01(14/2011 | |||
10/0812010 | |||
10/ | |||
10/ | |||
2 | |||
Inspection | |||
Activities | |||
-BWR | |||
ALARA Planning and Controls | |||
- | |||
}} | }} |
Latest revision as of 21:18, 13 November 2019
ML100621039 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 03/03/2010 |
From: | David Lew Reactor Projects Region 1 Branch 4 |
To: | Rausch T Susquehanna |
KROHN P, RI/DRP/PB4/610-337-5120 | |
References | |
IR-10-001 | |
Download: ML100621039 (6) | |
See also: IR 05000387/2010001
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION ~
475 ALLENDALE ROAD
KING OF PRUSSIA, PENNSYLVANIA 19406-1415
March 3, 2010
Mr. Timothy S. Rausch
Senior Vice President and Chief Nuclear Officer
769 Salem Boulevard
Berwick, PA 18603-0467
SURIECT: ANNUAL ASSESSMENT LETTER -- SUSQUEHANNA STEAM ELECTRIC
STATION, UNITS 1 AND 2 (05000387/2010001 and 0500038812010001)
Dear Mr. Rausch:
On February 16,2010, the NRC staff completed its performance review of the Susquehanna
Steam Electric Station (Susquehanna). Our technical staff reviewed performance indicators
(Pis) for the most recent quarter and inspection results for the period from January 1, 2009
through December 31, 2009. The purpose of this letter is to inform you of our assessment of
your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information.
A separate letter designated and marked as "Official Use Only - Security Information" will
include the security cornerstone review and resultant inspection plan.
Overall, Susquehanna Units 1 and 2 operated in a manner that preserved public health and
safety and fully met all cornerstone objectives. Plant performance for the most recent quarter,
as well as for the first three quarters of the assessment cycle, was within the Licensee
Response column of the NRC's Action Matrix, based on all inspection findings being classified
as having very low safety significance (Green) and all Pis indicating performance at a level
requiring no additional NRC oversight (Green) for the six cornerstones under the Reactor and
Radiation Safety strategic performance areas. Therefore, we plan to conduct reactor oversight
process (ROP) baseline inspections at your facility.
On January 28, 2009, we issued you a potential Chilling Effect Letter (CEl) regarding the Safety
Conscious Work Environment (SCWE) at Susquehanna (ML090280115) 1. In that letter we
expressed concem with the progress and effectiveness of your actions to address indications of
a declining SCWE and negative employee perceptions during 2008, as it may have impacted
employee willingness to raise safety concerns and could lead to a chilling effect on site. As
discussed in the 2009 Mid-Cycle Performance Assessment Letter (ML0924402700), issuance of
1 Designation in parenthesis refers to an Agencywide Documents Access and Management System
(ADAMS) accession number. Documents referenced in this letter are publicly available using the
accession number in ADAMS.
T. Rausch 2
the potential CEl met the first criterion for consideration of a SeWE Substantive Cross Cutting
Issue (SCCI) over the next three plant assessment cycles. This assessment is the second
since the issuance of the potential eEL.
During 2009, we reviewed your action plans and root cause evaluation to address SCWE issues
at the site. We also performed targeted inspection samples and trend reviews to monitor your
progress and reviewed the results of an independent culture survey (Ml091330762,
Ml092230158, ML093170375, and Ml100321652). In addition, NRC management conducted
several site visits and held a public meeting on July 6, 2009, to discuss work environment
issues (Ml091940440). Based on these activities, we note that PPL has taken reasonable
actions to improve SCWE at the site. PPL actions included several organizational changes,
improved communications to the workforce, additional SCWE training for supervisors and
managers, work policy revisions, and development of additional means for workers to raise
issues. NRC inspections confirmed the effectiveness of these actions and documented an
improving work environment, SCWE metrics, and safety culture survey results. Furthermore,
we noted that the number of allegations received by the NRC from onsite sources during 2009
(15), although stili greater than the industry norm, was significantly lower than in 2008 (32).
Based on direct inspection, allegation trend data, SCWE metriCS, and survey results, the NRC
has determined that you have made reasonable progress in addressing SCWE issues at
Susquehanna during 2009. Specifically, in evaluating your scope of efforts and progress in
addressing SCWE issues, the staff determined that you recognized the issue impacted multiple
areas across the site; took appropriate and timely actions to address it; and completed a range
of corrective actions which have been implemented and are judged, at this time, to have been
effective in addressing the underlying issues. Therefore, the staff has concluded that a SeWE
SCCI does not exist at this time.
Notwithstanding this progress, the NRC will continue to monitor your activities to address SCWE
issues at Susquehanna through the baseline inspection program. Specifically, the NRC will use
focused inspection samples and a biennial problem identification and resolution team inspection
to continue to review the progress and effectiveness of your corrective actions in this area.
Also, the NRC continues to review some events that occurred during 2008. You will be
informed of the outcome of these deliberations via separate correspondence. The NRC
acknowledges that following your evaluations of SCWE plan effectiveness during 2009, you
made revisions to the plan in a timely manner (ML090760146, ML091800460, ML100260405).
Similarly, PPl wifLneed to continue to evaluate and assess new information going forward to
make appropriate adjustments to SCWE improvement plans, if warranted.
The enclosed inspection plan details the inspections, less those related to physical protection,
scheduled through June 30, 2011. In addition to the baseline inspections, we also plan on
conducting inspection procedure 71004 regarding Unit 1 power uprate activities. The inspection
plan is provided to allow for the resolution of any scheduling conflicts and personnel availability
issues well in advance of inspector arrival onsite. Routine resident inspections are not listed
due to their ongoing and continuous nature. The inspections in the last nine months of the
inspection plan are tentative and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the NRC website at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic
Reading Room).
T. Rausch 3
If circumstances arise which cause us to change this inspection plan, we will contact you to
discuss the change as soon as possible. Please contact Paul Krohn at 610-337-5120 with any
questions you may have regarding this letter or the inspection plan.
(
David C. Lew, Director
Division of Reactor Projects
Region I
Docket Nos. 50-387; 50-388
cc w!encl: Distribution via ListServ
Susquehanna Inspection! Activity Plan
I
T. Rausch 3
I
If circumstances arise which cause us to change this inspection plan, we will contact you to
discuss the change as soon as possible. Please contact Paul Krohn at 610-337-5120 with any
I
questions you may have regarding this letter or the inspection plan.
Sincerely,
IRA!
David C. Lew, Director
Division of Reactor Projects
Distribution w/encl: (via a-mail) P. Finney, DRP, SHI N. Sheehan, RI
S.Collins, RA J. Bream, DRP, Acting RI R Barkley, R
M. Dapas, DRA S. Farrell, DRP, OA John Thompson, NRR
D. Lew, DRP L. Trocine, RI OEDO RidsNrrPMSusquehannaResource
J. Clifford, DRP DRS Directors RidsNrrDirslpab@nrc.gov
P. Krohn, DRP DRS Branch Chiefs (6) ROPreportsResource@nrc.gov
A. RosebrooK, DRP N. McNamara, RI
E. Torres, DRP D. Tifft. RI
J. Bream, DRP D. Serena, RI
SUNSI REVIEW COMPLETE: AAR (Reviewer's Initials) ML100621039
DOC NAME S;\ROP-1 0 EOC RevieW\Branch 4\SSES ROP-10 EOC\Susquehanna 2009 EOC Letter Rev1.doc
After declaring this document "An Official Agency Record n it will be released to the Public.
To receive acopy of ibis document, indicate In the box: 'C' =Copy without attachment/enclosure 'E'" Copy with attachment/enclosure 'N' = No copy
OFFICE IRlfDRP I RIIDRP 1 HQlAAC RlfDRP 1
NAME IARosebrook/ MR PKrohni AAR for LMJarriell AAR* DLewl DCl
DATE 102/23110 03/02/10 03/02 110 03/02/10
OFFICIAL RECORD COPY
- CONCUR VIA EMAIL
Page 1 of2 Susquehanna
0212412010 11 :19:41 Inspection I Activity Plan
Report 22
01/01/2010 * 06/3012011
Planned Dates
Start
M!!.!iiM iN t!f:!~.MJ ~!:l!~2!l2nfctiYJt¥ I! !MIl ¥6 WM5%M#W§!!IA S"ga%S%';!et ;
Title
! tHttiii¥thffih U ¥MfM!M5 ""! ,*w.!!!J lIi\!!MllI!$iW"
71152B -PI&R 4
1,2 01/11/2010 01/15/2010 lP 711528 Identification and Resolution of Problems
1.2 01/2512010 01129/2010 IP 711528 Identification and Resolution of Problems
2515/173 * GROUNDWATER TI
1,2 02/0812010 02/12/2010 IP 25151173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative
71004 - UNIT 1 POWER UPRATE INSPECTION 2
03/0212010 04/15/2010 IP 71004 Power Uprate
7111108G * U1 INSERVICE INSPECTION 1
03115/2010 03/1912010 IP 7111108G Inservice Inspection Activities - BWR
71124 -HP
03/15/2010 03/19/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
03f15f2010 03{19(2010 IP 71124.02 Occupational ALARA Planning and Controls
03115/2010 03/19/2010 IP 71124,Q3 In-Plant Airborne Radioactivity Control and Mitigation
71124 -RETS
1.2 05/1012010 05114/2010 IP 71124.05 Radiation Monitoring Instrumentation
1.2 05/1012010 05/14/2010 IP 71124.06 Radioactive Gaseous and liquid Effluent Treatment
71124 -HP
i.2 06128120iQ 07/02/'201U IP 71124.01 Radiologicai Hazard Assessment and Exposure Con trois
1.2 06/28/2010 07(0212010 IP 71124.02 Occupational ALARA Planning and Controls
1,2 06128/2010 07/02/2010 IP 71124.04 Occupational Dose Assessment
71124 - HP &ISFSI 1
1,2 08/23/2010 08/27/2010 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
1.2 08123/2010 08/2712010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
1.2 08123/2010 08127/2010 IP 71124.05 Radiation Monitoring Instrumentation
1,2 08123/2010 08/2712010 IP 71151*0R01 Occupational Exposure Control Effectiveness
CDBI - COMPONENT DESIGN BASES INSPECTION 6
1.2 09/1312010 09/17/2010 IP 7111121 Component Design Bases Inspection
1.2 09127/2010 10/0812010 IP 7111121 Component Bases Inspection
12/13EXM - INITIAL OPERATOR LICENSING EXAM 4
12/13/2010 12/1712010 U01793 FY11- SUSQUEHANNA Ul&2INITIAL OPERATOR LICENSING EXAM
01/10/2011 01(14/2011 U01793 FY11* SUSQUEHANNA U1&2INITIAL OPERATOR LICENSING EXAM
EPEX - EP EXERCISE EVALUATION 4
1.2 10/04/2010 10/0812010 IP 7111401 Exercise Evaluation
1.2 10/04/2010 10/08/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes
1.2 10/04/2010 10/0812010 IP 71151-EP01 Drill/Exercise Performance
~hlSrellOrt does not include lNPO iiiia5UrAGE activities.
[ThiS report shom only on-site and announced inspection procedures.
Page 2 of2 ,. Susquehanna
02124/201011 :19:41 Inspection I Activity Plan
Report 22
01/01/2010. - 06/30/2011
lPIanned Dates
. Start End Title
EPEX - EP EXERCISE EVALUATION 4
1,2 10/0412010 10/0812010 IP 71151-EP02 ERO Drill Participation
1.2 10/04/2010 10/0812010 IP 711S1-EP03 Alert & Notification System
71124.08 - RADWASTE
1,2 11/29/2010 1210312010 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling. Storage. and Transportation
1,2 11/29/2010 12/03/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent
7111108G - U21NSERVICE INSPECTION
2 04/11/2011 04/1512011 IP 7111108G Inservice Inspection Activities - BWR
71124 * HP
2 05/02/2011 0510612011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
2 05/02/2011 05/0612011 IP 71124.02 Occupational ALARA Planning and Controls
2 05/02/2011 05/06/2011 IP 71124.03 In-Plant Airbome Radioactivity Control and Mitigation
TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 3
1,2 06/06/2011 06/10/2011 IP 71111051 Fire Protection [Triennial!
1,2 06/2012011 06/24/2011 IP 7111105T Fire Protection [Triennial]
71124 - REMP
1,2 06/0612011 06110/2011 lP 71124.07 Public Radiation Safety
his report does not inClude INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.