ML101230138: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:PREPARED!
{{#Wiki_filter:JPM 190 Page 1 of 7 Rev. 2 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM 190 Reactivity Balance Calculation PREPARED!
REVISED BY: SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM 190 Reactivity Balance Calculation Date/ JPM 190 Page 1 of 7 Rev. 2 VALIDATED BY:
REVISED BY:                                                              Date/
* Date/ -----------------------------------===------------
VALIDATED BY: _**_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _-----=D::..:a::..:.te=.:../
APPROVED BY: CONCURRED:
Date/_ _ _ _ __
Date/ (Operations Training Manager) ** Date/ (Operations Representative)
              -----------------------------------===------------
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
APPROVED BY:                                                             Date/
PREPARED!
(Operations Training Manager)
REVISED BY: SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM 190 Reactivity Balance Calculation Date/ JPM 190 Page 1 of 7 Rev. 2 VALIDATED BY: _* ________________
CONCURRED:      **                                                       Date/
-----=D::..:a::..:.te=.:../
(Operations Representative)
_____ _ APPROVED BY: CONCURRED:
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
Date/ (Operations Training Manager) ** Date/ (Operations Representative)
                ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
 
NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 Initial Issue Y 3/17/04 Pen/ink Made corrections resulting from validation N 5/12/04 1 Developed for 6/7-14/04 NRC Exam. N 6/15/04 Transferred to JPM Bank. 2 Revised to update to the latest procedure Y 12/05/09 revision. v -Specify if the JPM change will require another Validation (Y or N). See cover sheet for criteria.
JPM 190 Pa.ge 2 of 7 Rev. 2 NUCLEAR TRAINING REVISION/USAGE LOG REVISION                 DESCRIPTION OF                   V     DATE     PAGES    PREPARED/
PAGES AFFECTED ALL 2,4-7 All All JPM 190 Pa.ge 2 of 7 Rev. 2 PREPARED/
NUMBER                       REVISION                                     AFFECTED REVISED BY:
REVISED BY: G.S. Poteet G.S. Poteet J. Kearney M Hankins NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 Initial Issue Y 3/17/04 Pen/ink Made corrections resulting from validation N 5/12/04 1 Developed for 6/7-14/04 NRC Exam. N 6/15/04 Transferred to JPM Bank. 2 Revised to update to the latest procedure Y 12/05/09 revision. v -Specify if the JPM change will require another Validation (Y or N). See cover sheet for criteria.
0                       Initial Issue                 Y     3/17/04     ALL    G.S. Poteet Pen/ink       Made corrections resulting from validation   N     5/12/04   2,4-7   G.S. Poteet 1       Developed for 6/7-14/04 NRC Exam.             N     6/15/04     All    J. Kearney Transferred to JPM Bank.
PAGES AFFECTED ALL 2,4-7 All All JPM 190 Pa.ge 2 of 7 Rev. 2 PREPARED/
2         Revised to update to the latest procedure   Y     12/05/09     All    M Hankins revision.
REVISED BY: G.S. Poteet G.S. Poteet J. Kearney M Hankins SEQUOYAH NUCLEAR PLANT AU O/RO/S RO JOB PERFORMANCE MEASURE Task: Perform a Reactivity Balance Calculation per 0-SO-62-7, Appendix E JA/TA TASK #: 0040070101 (RO) KIA Ratings: Task Standard:
v - Specify if the JPM change will require another Validation (Y or N).
2.1.25 (3.9/4.2) 004 A4.04 (3.2/3.6) 004 K5.20 (3.6/3.7)
See cover sheet for criteria.
Operator performs 0-SO-62-7 Appendix E, Reactivity Balance Calculation Evaluation Method: Simulator X --'-'---In-Plant ___ _ JPM 190 Page 3 of 7 Rev. 2 ===================================================================================
 
JPM 190 Page 3 of 7 Rev. 2 SEQUOYAH NUCLEAR PLANT AU O/RO/S RO JOB PERFORMANCE MEASURE Task: Perform a Reactivity Balance Calculation per 0-SO-62-7, Appendix E JA/TA TASK #: 0040070101 (RO)
KIA Ratings:
2.1.25 (3.9/4.2)                           004 K5.20 (3.6/3.7) 004 A4.04 (3.2/3.6)
Task Standard:
Operator performs 0-SO-62-7 Appendix E, Reactivity Balance Calculation Evaluation Method:     Simulator -_..:...X,,--_
X
                                    -'-'---
In-Plant _ _ __
===================================================================================
Performer:
Performer:
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
NAME                                         Start Time _ __
SIGNATURE DATE ===================================================================================
Performance Rating:   SAT           UNSAT           Performance Time       Finish Time _ __
COMMENTS SEQUOYAH NUCLEAR PLANT AU O/RO/S RO JOB PERFORMANCE MEASURE Task: Perform a Reactivity Balance Calculation per 0-SO-62-7, Appendix E JA/TA TASK #: 0040070101 (RO) KIA Ratings: Task Standard:
Evaluator:
2.1.25 (3.9/4.2) 004 A4.04 (3.2/3.6) 004 K5.20 (3.6/3.7)
SIGNATURE                   DATE
Operator performs 0-SO-62-7 Appendix E, Reactivity Balance Calculation Evaluation Method: Simulator
===================================================================================
_..:...X,,--_
COMMENTS
In-Plant ___ _ JPM 190 Page 3 of 7 Rev. 2 ===================================================================================
 
Performer:
JPM 190 Page 4 of 7 Rev. 2 SPECIAL INSTRUCTIONS TO EVALUATOR:
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
SIGNATURE DATE ===================================================================================
COMMENTS JPM 190 Page 4 of 7 Rev. 2 SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Critical steps identified.
: 1. Critical steps identified.
: 2. Any UNSAT requires comments 3. Ensure operator performs the following required actions for SELF-CHECKING;
: 2. Any UNSAT requires comments
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.
: 3. Ensure operator performs the following required actions for SELF-CHECKING;
: a. Identifies the correct unit, train, component, etc.
: b. Reviews the intended action and expected response.
: c. Compares the actual response to the expected response.
: c. Compares the actual response to the expected response.
Validation Time: CR. 35 min Local Tools/Equipment/Procedures Needed 1. Cycle Nuclear Design Report (NDR) 2. 0-SO-62-7 Boron Concentration Control 3. Highlighter and ruler  
Validation Time: CR.           35 min                 Local Tools/Equipment/Procedures Needed
: 1. Cycle Nuclear Design Report (NDR)
: 2. 0-SO-62-7 Boron Concentration Control
: 3. Highlighter and ruler


==References:==
==References:==


Reference Title Rev No. A. 0-SO-62-7 Boron Concentration Control 56 B. TI-44 Boron Tables 12 =============================================================================
Reference                                           Title                         Rev No.
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
A. 0-SO-62-7                                   Boron Concentration Control                           56 B. TI-44                                       Boron Tables                                         12
All steps shall be performed for this JPM. I will provide initiating cues and indicate any steps to be discussed.
=============================================================================
When you complete the task successfully, the objective for this job performance measure will be satisfied.
READ TO OPERATOR Directions to Trainee:
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
I will explain the initial conditions, and state the task to be performed. All steps shall be performed for this JPM. I will provide initiating cues and indicate any steps to be discussed.
: 1. Unit 1 is currently stable at 20 %. 2. Control rod Bank D is at 160 steps. 3. RCS boron concentration is 1400 ppm. 4. Core burnup is 600 MWD/MTU. 5. Reactor Engineering has provided following Xenon data: INITIATING CUES: XE 1 = -2430 pcm XE 2 = -2250 pcm Perform 0-SO-62-7 Appendix E, Reactivity Balance calculation, in preparation for a change in reactor power from 20% with Control Rods at 160 steps on D Bank to 70% with Control Bank D at 228 steps, using a 3%/hour power increase rate. JPM 190 Page 4 of 7 Rev. 2 SPECIAL INSTRUCTIONS TO EVALUATOR:
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
: 1. Critical steps identified.
INITIAL CONDITIONS:
: 2. Any UNSAT requires comments 3. Ensure operator performs the following required actions for SELF-CHECKING;
: 1.       Unit 1 is currently stable at 20 %.
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.
: 2.       Control rod Bank D is at 160 steps.
: c. Compares the actual response to the expected response.
: 3.       RCS boron concentration is 1400 ppm.
Validation Time: CR. 35 min Local Tools/Equipment/Procedures Needed 1. Cycle Nuclear Design Report (NDR) 2. 0-SO-62-7 Boron Concentration Control 3. Highlighter and ruler
: 4.       Core burnup is 600 MWD/MTU.
: 5.       Reactor Engineering has provided following Xenon data:
XE 1 =-2430 pcm XE 2 =-2250 pcm INITIATING CUES:
Perform 0-SO-62-7 Appendix E, Reactivity Balance calculation, in preparation for a change in reactor power from 20% with Control Rods at 160 steps on D Bank to 70% with Control Bank D at 228 steps, using a 3%/hour power increase rate.
 
JPM 190 Page 5 of 7 Rev. 2 Job Performance Checklist:
STEP/STANDARD                                SAT/UNSAT STEP 1.:      Obtain a copy of the procedure.                                     -    SAT
                                                                                    -    UNSAT STANDARD: Operator obtains a copy of 0-SO-62-7 Boron Concentration Control, Appendix E Reactivity Balance Calculation.                        Start Time__
STEP 2.:      [1] ENTER the following Data:                                        -    SAT
                                                                                    -    UNSAT Current RCS Boron Cue:        If operator contacts Chem Lab, state that RCS boron concentration is 1400 ppm STANDARD    Operator enters 1400 ppm from INITIAL CONDITIONS STEP 3.:      Core Burnup                                                          -    SAT Cue:        If ICS computer is not available inform operator that computer      -    UNSAT point 1U0981 reads 600 MWDIMTU STANDARD    Operator locates computer point 1U0981 and enters 600 MWD/MTU on Appendix E.
STEP 4.:      Current Reactor Power                                                -    SAT
                                                                                    -    UNSAT Cue:          Current reactor power is 20%, as given in the initial conditions.
STANDARD: Operator enters    20% per Initial Conditions STEP 5.:        Final Reactor Power                                                -    SAT
                                                                                    -    UNSAT Cue:      Final reactor power is 70%, as given in the initial conditions.
STANDARD:      Operator enters 70% per Initial Conditions STEP 6.:        Total Reactor Power Change                                          -    SAT
                                                                                    -   UNSAT STANDARD:      Operator determines power change to be 50%.
Critical Step
 
JPM 190 Page 6 of 7 Rev. 2 Job Performance Checklist:
STEP/STANDARD                              SAT/UN SAT STEP 7.:          Rate of Reactor Power change                                              SAT STANDARD:          Operator enters 3%/hr per initial conditions.                        _UNSAT STEP *8.:          Number of hours to change power                                          SAT
_UNSAT STANDARD: Operator calculates number of hours to change power; 50% / 3%/hour and enters results:
162/3 hours (or 16.67 hours, or 16 hours and 40 minutes) per Initial Conditions.
STEP *9.:          Current Rod Position                                                _SAT UNSAT STANDARD: Operator enters 160 steps on Bank D per Initial Conditions STEP *10.:        Final Rod Position                                                        SAT UNSAT STANDARD: Operator enters 228 steps per Initial Conditions STEP *11.:        [2] CALCULATE change in boron concentration by performing the following:
[a] b.p POWER DEFECT
_SAT b.p POWER DEFECT =___ pcm PD 1 - _ _ _ pcm          PD2=__ pcm
_UNSAT NOTE:          Use "eye-ball" interpolation between closest parameter lines. Band accuracy Y2 increment presented on figure.                        Critical Step STANDARD: Operator uses proper curve, Figure 1, U1 C17 Power Defect BOl, 1400 ppm line (long dash line) to enter data. For 20% operator should enter 350 pcm. For 70%, operator should enter 1100 pcm.
b.p POWER DEFECT =350 pcm PD      1- 1100 pcm (+/-25 pcm)  =-750 pcm STEP *12.:        [b] b.p XENON                                                            SAT b.p XENON =-2250 pcm XE    2 - (-2430 pcm) XE 1 = 180 pcm                        UNSAT STANDARD: Operator enters Xenon values (provided in the initial conditions) and calculates the change in reactivity due to Xenon.                  Critical Step I
 
JPM 190 Page 7 of 7 Rev. 2 Job Performance Checklist:
STEP/STANDARD                            SAT/UNSAT STEP *13.:         [c] I1p RODS I1p  RODS =___ pcm Rods 2 - _ _ _ pcm Rods 1 =__pcm                  _SAT
_UNSAT NOTE:          Use "eye-ball" interpolation between closest parameter lines. Band accuracy % increment presented on figure.
Critical Step STANDARD: Operator uses proper curve Figure 4, solid line to enter data. For 160 steps operator should enter -400 to -500 pcm. For 228 steps, operator should enter 0 to 50 pcm.
I1p RODS = (0 to 50) pcm Rods 2    - (-400 to -500) pcm Rods 1 = Range 375-525 pcm STEP 14.:          [d] Change in reactivity due to Power Defect, Xenon and Rods        _SAT
[a] + [b]+[c] =__      pcm                                        _UNSAT STANDARD: Operator calculates Change in reactivity due to power defect, Xenon and rods:
                    -750 pcm + 180 pcm +(375 to 525) pcm =-195 to -45 pcm            Critical Step STEP 15.:          [e]    Change in Boron Reactivity                                  _SAT Substep [d] X (-1) = 195 to 45 pcm                                  _UNSAT STANDARD: Operator calculates the change in Boron Reactivity, by multiplying substep [d] by -1.                                                Critical Step STEP 16.:          [f] Change in Boron Concentration                                  _SAT Substep [e] / Boron Worth                                                UNSAT STANDARD: Operator Records change in boron reactivity and determines the          Critical Step Boron Worth pcm/ppm from Figure 7.
Substep [e] / -6.25 pcm/ppm Boron worth =31.25 to 7.21 ppm STEP 17.:          [3] Ensure independently verified by SRO in accordance with              SAT Appendix J.
UNSAT STANDARD: Operator notifies the US an independent verification is required in accordance with Appendix J.
End Time End of JPM
 
READ TO OPERATOR Directions to Trainee:
I will explain the initial conditions, and state the task to be performed. All steps shall be performed for this JPM. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
: 6.        Unit 1 is currently stable at 20 %.
: 7.        Control rod Bank D is at 160 steps.
: 8.       RCS boron concentration is 1400 ppm.
: 9.        Core burnup is 600 MWD/MTU.
: 10.      Reactor Engineering has provided following Xenon data:
XE 1 =-2430 pcm XE 2 = -2250 pcm INITIATING CUES:
Perform 0-SO-62-7 Appendix E, Reactivity Balance calculation, in preparation for a change in reactor power from 20% with Control Rods at 160 steps on D Bank to 70% with Control Bank D at 228 steps, using a 3%/hour power increase rate.
 
JPM 123 Page 1 of 8 Rev. 2 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM123 CONTAINMENT FORMALDEHYDE STAY TIME CALCULATION PREPARED/
REVISED BY:                                                              Date/
VALIDATED BY:
* Date/
              ------------------------------------------------
APPROVED BY:                                                            Date/
(Operations Training Manager)
CONCURRED:    **                                                        Date/
(Operations Representative)
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
              ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).


==References:==
JPM 123 Page 2 of 8
_ Rev. 2 I                                                NUCLEAR TRAINING REVISION/USAGE LOG REVISION                  DESCRIPTION OF                  V      DATE    PAGES    PREPARED/
NUMBER                          REVISION                                  AFFECTED REVISED BY:
0        NewJPM                                        Y    12/5/08    All    T. Wooley 1        Revised due inaccuracies regarding            N    12/9/08    2,6    M. Chambers respiratory requirement not applicable.
2        Updated KA Task, and added steps on            Y    12/04/09    All    M Hankins determination of respirator requirements, revised initial conditions v - Specify if the JPM change will require another Validation (Y or N).
See cover sheet for criteria.


Reference Title Rev No. A. 0-SO-62-7 Boron Concentration Control 56 B. TI-44 Boron Tables 12 =============================================================================
JPM 123 Page 3 of 8 Rev. 2 SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Task:
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
Calculation Containment Formaldehyde stay time and Determine respiratory protection requirements.
All steps shall be performed for this JPM. I will provide initiating cues and indicate any steps to be discussed.
JAITA task:
When you complete the task successfully, the objective for this job performance measure will be satisfied.
KIA Ratings:
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
2.1.26 (3.4 / 3.6) Knowledge of Industrial Safety Procedures Task Standard:
: 1. Unit 1 is currently stable at 20 %. 2. Control rod Bank D is at 160 steps. 3. RCS boron concentration is 1400 ppm. 4. Core burnup is 600 MWD/MTU. 5. Reactor Engineering has provided following Xenon data: INITIATING CUES: XE 1 = -2430 pcm XE 2 = -2250 pcm Perform 0-SO-62-7 Appendix E, Reactivity Balance calculation, in preparation for a change in reactor power from 20% with Control Rods at 160 steps on D Bank to 70% with Control Bank D at 228 steps, using a 3%/hour power increase rate.
Job Performance Checklist:
STEP/ST ANDARD STEP 1.: Obtain a copy of the procedure.
STANDARD:
Operator obtains a copy of 0-SO-62-7 Boron Concentration Control, Appendix E Reactivity Balance Calculation.
STEP 2.: [1] ENTER the following Data: Current RCS Boron Cue: If operator contacts Chem Lab, state that RCS boron concentration is 1400 ppm STANDARD Operator enters 1400 ppm from INITIAL CONDITIONS STEP 3.: Core Burnup Cue: If ICS computer is not available inform operator that computer point 1 U0981 reads 600 MWDIMTU STANDARD Operator locates computer point 1 U0981 and enters 600 MWD/MTU on Appendix E. STEP 4.: Current Reactor Power Cue: Current reactor power is 20%, as given in the initial conditions.
STANDARD:
Operator enters 20% per Initial Conditions STEP 5.: Final Reactor Power Cue: Final reactor power is 70%, as given in the initial conditions.
STANDARD:
Operator enters 70% per Initial Conditions STEP 6.: Total Reactor Power Change STANDARD:
Operator determines power change to be 50%. JPM 190 Page 5 of 7 Rev. 2 SAT/UNSAT SAT -UNSAT -Start Time __ SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step Job Performance Checklist:
STEP/ST ANDARD STEP 1.: Obtain a copy of the procedure.
STANDARD:
Operator obtains a copy of 0-SO-62-7 Boron Concentration Control, Appendix E Reactivity Balance Calculation.
STEP 2.: [1] ENTER the following Data: Current RCS Boron Cue: If operator contacts Chem Lab, state that RCS boron concentration is 1400 ppm STANDARD Operator enters 1400 ppm from INITIAL CONDITIONS STEP 3.: Core Burnup Cue: If ICS computer is not available inform operator that computer point 1 U0981 reads 600 MWDIMTU STANDARD Operator locates computer point 1 U0981 and enters 600 MWD/MTU on Appendix E. STEP 4.: Current Reactor Power Cue: Current reactor power is 20%, as given in the initial conditions.
STANDARD:
Operator enters 20% per Initial Conditions STEP 5.: Final Reactor Power Cue: Final reactor power is 70%, as given in the initial conditions.
STANDARD:
Operator enters 70% per Initial Conditions STEP 6.: Total Reactor Power Change STANDARD:
Operator determines power change to be 50%. JPM 190 Page 5 of 7 Rev. 2 SAT/UNSAT SAT -UNSAT -Start Time __ SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step I Job Performance Checklist:
STEP/STANDARD STEP 7.: Rate of Reactor Power change STANDARD:
Operator enters 3%/hr per initial conditions.
STEP *8.: Number of hours to change power STANDARD:
Operator calculates number of hours to change power; 50% / 3%/hour and enters results: STEP *9.: 162/3 hours (or 16.67 hours, or 16 hours and 40 minutes) per Initial Conditions.
Current Rod Position STANDARD:
Operator enters 160 steps on Bank D per Initial Conditions STEP *10.: Final Rod Position STANDARD:
Operator enters 228 steps per Initial Conditions STEP *11.: [2] CALCULATE change in boron concentration by performing the following:
[a] b.p POWER DEFECT b.p POWER DEFECT = ___ pcm PD 1 -___ pcm PD 2= __ pcm NOTE: Use "eye-ball" interpolation between closest parameter lines. Band accuracy Y2 increment presented on figure. STANDARD:
Operator uses proper curve, Figure 1, U1 C17 Power Defect BOl, 1400 ppm line (long dash line) to enter data. For 20% operator should enter 350 pcm. For 70%, operator should enter 1100 pcm. b.p POWER DEFECT = 350 pcm PD 1 -1100 pcm (+/-25 pcm) = -750 pcm STEP *12.: [b] b.p XENON b.p XENON = -2250 pcm XE 2 -(-2430 pcm) XE 1 = 180 pcm STANDARD:
Operator enters Xenon values (provided in the initial conditions) and calculates the change in reactivity due to Xenon. JPM 190 Page 6 of 7 Rev. 2 SAT/UN SAT SAT _UNSAT SAT _UNSAT _SAT UNSAT SAT UNSAT _SAT _UNSAT Critical Step SAT UNSAT Critical Step I Job Performance Checklist:
STEP/STANDARD STEP 7.: Rate of Reactor Power change STANDARD:
Operator enters 3%/hr per initial conditions.
STEP *8.: Number of hours to change power STANDARD:
Operator calculates number of hours to change power; 50% / 3%/hour and enters results: STEP *9.: 162/3 hours (or 16.67 hours, or 16 hours and 40 minutes) per Initial Conditions.
Current Rod Position STANDARD:
Operator enters 160 steps on Bank D per Initial Conditions STEP *10.: Final Rod Position STANDARD:
Operator enters 228 steps per Initial Conditions STEP *11.: [2] CALCULATE change in boron concentration by performing the following:
[a] b.p POWER DEFECT b.p POWER DEFECT = ___ pcm PD 1 -___ pcm PD 2= __ pcm NOTE: Use "eye-ball" interpolation between closest parameter lines. Band accuracy Y2 increment presented on figure. STANDARD:
Operator uses proper curve, Figure 1, U1 C17 Power Defect BOl, 1400 ppm line (long dash line) to enter data. For 20% operator should enter 350 pcm. For 70%, operator should enter 1100 pcm. b.p POWER DEFECT = 350 pcm PD 1 -1100 pcm (+/-25 pcm) = -750 pcm STEP *12.: [b] b.p XENON b.p XENON = -2250 pcm XE 2 -(-2430 pcm) XE 1 = 180 pcm STANDARD:
Operator enters Xenon values (provided in the initial conditions) and calculates the change in reactivity due to Xenon. JPM 190 Page 6 of 7 Rev. 2 SAT/UN SAT SAT _UNSAT SAT _UNSAT _SAT UNSAT SAT UNSAT _SAT _UNSAT Critical Step SAT UNSAT Critical Step Job Performance Checklist:
STEP *13.: NOTE: STEP/STANDARD
[c] I1p RODS I1p RODS = ___ pcm Rods 2 -___ pcm Rods 1 = __ pcm Use "eye-ball" interpolation between closest parameter lines. Band accuracy % increment presented on figure. STANDARD:
Operator uses proper curve Figure 4, solid line to enter data. For 160 steps operator should enter -400 to -500 pcm. For 228 steps, operator should enter 0 to 50 pcm. I1p RODS = (0 to 50) pcm Rods 2 -(-400 to -500) pcm Rods 1 = Range 375-525 pcm STEP 14.: [d] Change in reactivity due to Power Defect, Xenon and Rods [a] + [b]+[c] = __ pcm STANDARD:
Operator calculates Change in reactivity due to power defect, Xenon and rods: -750 pcm + 180 pcm +(375 to 525) pcm = -195 to -45 pcm STEP 15.: [e] Change in Boron Reactivity Substep [d] X (-1) = 195 to 45 pcm STANDARD:
Operator calculates the change in Boron Reactivity, by multiplying substep [d] by -1. STEP 16.: [f] Change in Boron Concentration Substep [e] / Boron Worth STANDARD:
Operator Records change in boron reactivity and determines the Boron Worth pcm/ppm from Figure 7. STEP 17.: Substep [e] / -6.25 pcm/ppm Boron worth = 31.25 to 7.21 ppm [3] Ensure independently verified by SRO in accordance with Appendix J. STANDARD:
Operator notifies the US an independent verification is required in accordance with Appendix J. End of JPM JPM 190 Page 7 of 7 Rev. 2 SAT/UNSAT
_SAT _UNSAT Critical Step _SAT _UNSAT Critical Step _SAT _UNSAT Critical Step _SAT UNSAT Critical Step SAT UNSAT End Time Job Performance Checklist:
STEP *13.: NOTE: STEP/STANDARD
[c] I1p RODS I1p RODS = ___ pcm Rods 2 -___ pcm Rods 1 = __ pcm Use "eye-ball" interpolation between closest parameter lines. Band accuracy % increment presented on figure. STANDARD:
Operator uses proper curve Figure 4, solid line to enter data. For 160 steps operator should enter -400 to -500 pcm. For 228 steps, operator should enter 0 to 50 pcm. I1p RODS = (0 to 50) pcm Rods 2 -(-400 to -500) pcm Rods 1 = Range 375-525 pcm STEP 14.: [d] Change in reactivity due to Power Defect, Xenon and Rods [a] + [b]+[c] = __ pcm STANDARD:
Operator calculates Change in reactivity due to power defect, Xenon and rods: -750 pcm + 180 pcm +(375 to 525) pcm = -195 to -45 pcm STEP 15.: [e] Change in Boron Reactivity Substep [d] X (-1) = 195 to 45 pcm STANDARD:
Operator calculates the change in Boron Reactivity, by multiplying substep [d] by -1. STEP 16.: [f] Change in Boron Concentration Substep [e] / Boron Worth STANDARD:
Operator Records change in boron reactivity and determines the Boron Worth pcm/ppm from Figure 7. STEP 17.: Substep [e] / -6.25 pcm/ppm Boron worth = 31.25 to 7.21 ppm [3] Ensure independently verified by SRO in accordance with Appendix J. STANDARD:
Operator notifies the US an independent verification is required in accordance with Appendix J. End of JPM JPM 190 Page 7 of 7 Rev. 2 SAT/UNSAT
_SAT _UNSAT Critical Step _SAT _UNSAT Critical Step _SAT _UNSAT Critical Step _SAT UNSAT Critical Step SAT UNSAT End Time READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All steps shall be performed for this JPM. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 6. Unit 1 is currently stable at 20 %. 7. Control rod Bank D is at 160 steps. 8. RCS boron concentration is 1400 ppm. 9. Core burnup is 600 MWD/MTU. 10. Reactor Engineering has provided following Xenon data: INITIATING CUES: XE 1 = -2430 pcm XE 2 = -2250 pcm Perform 0-SO-62-7 Appendix E, Reactivity Balance calculation, in preparation for a change in reactor power from 20% with Control Rods at 160 steps on D Bank to 70% with Control Bank D at 228 steps, using a 3%/hour power increase rate. READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All steps shall be performed for this JPM. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 6. Unit 1 is currently stable at 20 %. 7. Control rod Bank D is at 160 steps. 8. RCS boron concentration is 1400 ppm. 9. Core burnup is 600 MWD/MTU. 10. Reactor Engineering has provided following Xenon data: INITIATING CUES: XE 1 = -2430 pcm XE 2 = -2250 pcm Perform 0-SO-62-7 Appendix E, Reactivity Balance calculation, in preparation for a change in reactor power from 20% with Control Rods at 160 steps on D Bank to 70% with Control Bank D at 228 steps, using a 3%/hour power increase rate.
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM123 JPM 123 Page 1 of 8 Rev. 2 CONTAINMENT FORMALDEHYDE STAY TIME CALCULATION PREPARED/
REVISED BY: Date/ VALIDATED BY:
* Date/ APPROVED BY: CONCURRED:
------------------------------------------------
Date/ (Operations Training Manager) ** Date/ (Operations Representative)
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM123 JPM 123 Page 1 of 8 Rev. 2 CONTAINMENT FORMALDEHYDE STAY TIME CALCULATION PREPARED/
REVISED BY: Date/ VALIDATED BY:
* Date/ APPROVED BY: CONCURRED:
------------------------------------------------
Date/ (Operations Training Manager) ** Date/ (Operations Representative)
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
I NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 NewJPM Y 12/5/08 1 Revised due inaccuracies regarding N 12/9/08 respiratory requirement not applicable.
2 Updated KA Task, and added steps on Y 12/04/09 determination of respirator requirements, revised initial conditions v -Specify if the JPM change will require another Validation (Y or N). See cover sheet for criteria.
PAGES AFFECTED All 2,6 All JPM 123 Page 2 of 8 _ Rev. 2 PREPARED/
REVISED BY: T. Wooley M. Chambers M Hankins I NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 NewJPM Y 12/5/08 1 Revised due inaccuracies regarding N 12/9/08 respiratory requirement not applicable.
2 Updated KA Task, and added steps on Y 12/04/09 determination of respirator requirements, revised initial conditions v -Specify if the JPM change will require another Validation (Y or N). See cover sheet for criteria.
PAGES AFFECTED All 2,6 All JPM 123 Page 2 of 8 _ Rev. 2 PREPARED/
REVISED BY: T. Wooley M. Chambers M Hankins Task: SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE JPM 123 Page 3 of 8 Rev. 2 Calculation Containment Formaldehyde stay time and Determine respiratory protection requirements.
JAITA task: KIA Ratings: 2.1.26 (3.4 / 3.6) Knowledge of Industrial Safety Procedures Task Standard:
Calculate containment formaldehyde stay time and determine respiratory protection requirements in accordance with O-TI-OPS-OOO-001.0.
Calculate containment formaldehyde stay time and determine respiratory protection requirements in accordance with O-TI-OPS-OOO-001.0.
Evaluation Method: Simulator
Evaluation Method:       Simulator _--'-X-'--__   In-Plant - - - -
_--'-X-'--
===================================================================================
__ In-Plant ----===================================================================================
Performer:
Performer:
NAME Start Time ___ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
NAME                                                 Start Time _ _ __
SIGNATURE DATE ===================================================================================
Performance Rating: SAT               UNSAT           Performance Time                 Finish Time _ __
COMMENTS Task: SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE JPM 123 Page 3 of 8 Rev. 2 Calculation Containment Formaldehyde stay time and Determine respiratory protection requirements.
Evaluator:
JAITA task: KIA Ratings: 2.1.26 (3.4 / 3.6) Knowledge of Industrial Safety Procedures Task Standard:
                -----~~~~~-----~/~-==-
Calculate containment formaldehyde stay time and determine respiratory protection requirements in accordance with O-TI-OPS-OOO-001.0.
SIGNATURE                   DATE
Evaluation Method: Simulator
===================================================================================
_--'-X-'--
COMMENTS
__ In-Plant ----===================================================================================
 
Performer:
JPM 123 Page 4 of 8 Rev. 2 SPECIAL INSTRUCTIONS TO EVALUATOR:
NAME Start Time ___ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
: 1. Critical steps identified by an asterisk (*).
SIGNATURE DATE ===================================================================================
: 2. Sequenced steps identified by an "s".
COMMENTS JPM 123 Page 4 of 8 Rev. 2 SPECIAL INSTRUCTIONS TO EVALUATOR: 1 . Critical steps identified by an asterisk (*). 2. Sequenced steps identified by an "s". 3. Any UNSAT requires comments.
: 3. Any UNSAT requires comments.
: 4. Ensure Operator performs the following required actions for SELF-CHECKING;
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.
: c. Compares the actual response to the expected response.
Validation Time: CR. __ _ Local ____ _ Tools/Equipment/Procedures Needed: 0-TI-OPS-000-001.0, Containment Formaldehyde Stay Time Calculation Calculator Reference Rev No. 0-TI-OPS-000-001.0 Time Calculation 5 =============================================================================
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
* Unit 1 is in Mode 1 at 100% power.
* Annunciator Window "LS-6834A18 REAC COOL PMP 2 OIL RESERVOIR LEVEL HI-LOW" is in alarm, it has been determined a Level Switch inside lower containment needs repair.
* 0-SI-OPS-000.011.0, Containment Access Control During Modes 1 -4, has been initiated in preparation for a containment entry to investigate the alarm condition.
* The containment entry is planned for 120 minutes.
* A Chemistry sample taken today at 0900 hours yielded a lower containment formaldehyde concentration of 1 .32 ppm. INITIATING CUES: 1. You are directed to: a) Calculate the allowable containment formaldehyde stay time for the current formaldehyde concentration, AND b) Determine any required respiratory protection in accordance with 0-TI-OPS-000-001.0, Containment Formaldehyde Stay Time Calculation.
JPM 123 Page 4 of 8 Rev. 2 SPECIAL INSTRUCTIONS TO EVALUATOR: 1 . Critical steps identified by an asterisk (*). 2. Sequenced steps identified by an "s". 3. Any UNSAT requires comments.
: 4. Ensure Operator performs the following required actions for SELF-CHECKING;
: 4. Ensure Operator performs the following required actions for SELF-CHECKING;
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.
: a. Identifies the correct unit, train, component, etc.
: b. Reviews the intended action and expected response.
: c. Compares the actual response to the expected response.
: c. Compares the actual response to the expected response.
Validation Time: CR. __ _ Local ____ _ Tools/Equipment/Procedures Needed: 0-TI-OPS-000-001.0, Containment Formaldehyde Stay Time Calculation Calculator  
Validation Time: CR. _ __                       Local _ _ _ __
Tools/Equipment/Procedures Needed:
0-TI-OPS-000-001.0, Containment Formaldehyde Stay Time Calculation Calculator


==References:==
==References:==


Reference Rev No. 0-TI-OPS-000-001.0 Time Calculation 5 =============================================================================
Reference                                                                           Rev No.
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
0-TI-OPS-000-001.0                                                             Time Calculation         5
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
=============================================================================
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
READ TO OPERATOR Directions to Trainee:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
* Unit 1 is in Mode 1 at 100% power.
* Unit 1 is in Mode 1 at 100% power.
* Annunciator Window "LS-6834A18 REAC COOL PMP 2 OIL RESERVOIR LEVEL HI-LOW" is in alarm, it has been determined a Level Switch inside lower containment needs repair.
* Annunciator Window "LS-6834A18 REAC COOL PMP 2 OIL RESERVOIR LEVEL HI-LOW" is in alarm, it has been determined a Level Switch inside lower containment needs repair.
* 0-SI-OPS-000.011.0, Containment Access Control During Modes 1 -4, has been initiated in preparation for a containment entry to investigate the alarm condition.
* 0-SI-OPS-000.011.0, Containment Access Control During Modes 1 - 4, has been initiated in preparation for a containment entry to investigate the alarm condition.
* The containment entry is planned for 120 minutes.
* The containment entry is planned for 120 minutes.
* A Chemistry sample taken today at 0900 hours yielded a lower containment formaldehyde concentration of 1 .32 ppm. INITIATING CUES: 1. You are directed to: a) Calculate the allowable containment formaldehyde stay time for the current formaldehyde concentration, AND b) Determine any required respiratory protection in accordance with 0-TI-OPS-000-001.0, Containment Formaldehyde Stay Time Calculation.
* A Chemistry sample taken today at 0900 hours yielded a lower containment formaldehyde concentration of 1 .32 ppm.
Job Performance Checklist STEP/STANDARD STEP 1.: Obtain the appropriate procedure.
INITIATING CUES:
STANDARD:
: 1. You are directed to:
Operator obtains a copy of 0-TI-OPS-000-001.0 and determines Section 5.1 is applicable for Unit 1 lower containment lower entry. COMMENTS:
a) Calculate the allowable containment formaldehyde stay time for the current formaldehyde concentration, AND b) Determine any required respiratory protection in accordance with 0-TI-OPS-000-001.0, Containment Formaldehyde Stay Time Calculation.
STEP 2.: 5.1 Unit 1 Lower Containment Entry [1] RECORD U-1 lower containment formaldehyde sample results and sample date/time (from Chemistry).
 
____ ppm DatelTime:
JPM 123 Page 5 of 8 Rev.2 Job Performance Checklist STEP/STANDARD                             SAT/UNSAT STEP 1.:       Obtain the appropriate procedure.                                           _SAT UNSAT STANDARD:   Operator obtains a copy of 0-TI-OPS-000-001.0 and determines Section 5.1 is applicable for Unit 1 lower containment lower entry.
__ _ STANDARD:
COMMENTS:                                                                               Start Time_ _
Operator records U-1 containment formaldehyde sample results (1.32 ppm), date and time from Initial Conditions.
STEP 2.:       5.1 Unit 1 Lower Containment Entry                                           _    SAT
STEP 3.: 5.1 Unit 1 Lower Containment Entry [2] IF entry to Unit 1 lower containment is required with formaldehyde concentration greater than 1.5 ppm, THEN PERFORM the following:
[1] RECORD U-1 lower containment formaldehyde sample results and sample date/time (from Chemistry).                                           _UNSAT
STANDARD:
_ _ _ _ ppm                                   DatelTime: _ __
Operator determines containment formaldehyde concentration not greater than 1.5 ppm and marks step 2 N/A. COMMENTS:
STANDARD:     Operator records U-1 containment formaldehyde sample results (1.32 ppm), date and time from Initial Conditions.
STEP *4.: 5.1 Unit 1 Lower Containment Entry [3] CALCULATE Unit 1 Lower containment stay time USING the following equation:
STEP 3.:         5.1 Unit 1 Lower Containment Entry                                               SAT
0.3 ppm X 480 minutes = ____ minutes sample recorded in Step 5.1[1] (1.3) _--'-".3:....:cX...:......:..;48=0'--_
[2] IF entry to Unit 1 lower containment is required with formaldehyde concentration greater than 1.5 ppm, THEN PERFORM the following:     _UNSAT STANDARD:     Operator determines containment formaldehyde concentration not greater than 1.5 ppm and marks step 2 N/A.
= = 109.1 1.32 1.32 STANDARD:
Operator calculates a containment stay time of 109.1 (+/- 1) minutes using equation.
JPM 123 Page 5 of 8 Rev.2 SAT/UNSAT
_SAT UNSAT Start Time __ _ SAT _UNSAT SAT _UNSAT _SAT _UNSAT Critical Step Job Performance Checklist STEP/STANDARD STEP 1.: Obtain the appropriate procedure.
STANDARD:
Operator obtains a copy of 0-TI-OPS-000-001.0 and determines Section 5.1 is applicable for Unit 1 lower containment lower entry. COMMENTS:
STEP 2.: 5.1 Unit 1 Lower Containment Entry [1] RECORD U-1 lower containment formaldehyde sample results and sample date/time (from Chemistry).
____ ppm DatelTime:
__ _ STANDARD:
Operator records U-1 containment formaldehyde sample results (1.32 ppm), date and time from Initial Conditions.
STEP 3.: 5.1 Unit 1 Lower Containment Entry [2] IF entry to Unit 1 lower containment is required with formaldehyde concentration greater than 1.5 ppm, THEN PERFORM the following:
STANDARD:
Operator determines containment formaldehyde concentration not greater than 1.5 ppm and marks step 2 N/A. COMMENTS:
STEP *4.: 5.1 Unit 1 Lower Containment Entry [3] CALCULATE Unit 1 Lower containment stay time USING the following equation:
0.3 ppm X 480 minutes = ____ minutes sample recorded in Step 5.1[1] (1.3) _--'-".3:....:cX...:......:..;48=0'--_
= = 109.1 1.32 1.32 STANDARD:
Operator calculates a containment stay time of 109.1 (+/- 1) minutes using equation.
JPM 123 Page 5 of 8 Rev.2 SAT/UNSAT
_SAT UNSAT Start Time __ _ SAT _UNSAT SAT _UNSAT _SAT _UNSAT Critical Step Job Performance Checklist STEP/STANDARD STEP 5.: 5.1 Unit 1 Lower Containment Entry [4] INDEPENDENTLY VERIFY stay time results obtained in Step 5.1 [3]. Cue: If asked, inform examinee that another operator has performed the IV. STANDARD:
Operator requests independent verification of stay time calculation.
STEP 6.: 5.1 Unit 1 Lower Containment Entry [5] NOTIFY Work Week Manager of maximum stay time and containment entry requirements including required level of respiratory protection.
Cue: Acknowledge report as Work Week Manager. If candidate states job can not be done due to exceeding stay time, then tell them Plant Management has decided to exceed the stay time. Then ask candidate
'what respiratory protection would be required under these circumstances'?
STANDARD:
Operator notifies Work Week Manager that planned work time exceeds stay time and containment entry will require wearing a full face air purifying respirator with formaldehyde filters. COMMENTS:
JPM 123 Page 6 of 8 Rev.2 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -Critical Step Job Performance Checklist STEP/STANDARD STEP 5.: 5.1 Unit 1 Lower Containment Entry [4] INDEPENDENTLY VERIFY stay time results obtained in Step 5.1 [3]. Cue: If asked, inform examinee that another operator has performed the IV. STANDARD:
Operator requests independent verification of stay time calculation.
STEP 6.: 5.1 Unit 1 Lower Containment Entry [5] NOTIFY Work Week Manager of maximum stay time and containment entry requirements including required level of respiratory protection.
Cue: Acknowledge report as Work Week Manager. If candidate states job can not be done due to exceeding stay time, then tell them Plant Management has decided to exceed the stay time. Then ask candidate
'what respiratory protection would be required under these circumstances'?
STANDARD:
Operator notifies Work Week Manager that planned work time exceeds stay time and containment entry will require wearing a full face air purifying respirator with formaldehyde filters. COMMENTS:
JPM 123 Page 6 of 8 Rev.2 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -Critical Step Job Performance Checklist STEP/STANDARD STEP *7.: 5.1 Unit 1 Lower Containment Entry [6] NOTIFY RADCON of maximum stay time and containment entry requirements.
Cue: Acknowledge report as Radcon. If candidate states job can not be done due to exceeding stay time, then tell them Plant Management has decided to exceed the stay time. Then ask candidate
'what respiratory protection would be required under these circumstances'?
STANDARD:
Operator notifies RADCON that planned work time exceeds stay time and containment entry will require wearing a full face air purifying respirator with formaldehyde filters. COMMENTS:
STEP 8.: 5.1 Unit 1 Lower Containment Entry [7] IF any required task CANNOT be performed within allowed stay time, THEN PERFORM the following
... [7.1] Contact Industrial Safety for additional guidance CUE: As the Industrial Safety Engineer acknowledge report from operator and state conditions will be evaluated.
STANDARD:
Operator notifies Industrial Safety that planned work time exceeds stay time and containment entry will require wearing a full face air purifying respirator with formaldehyde filters. Operator requests additional guidance from Industrial Safety Engineer.
COMMENTS:
COMMENTS:
JPM 123 Page 7 of 8 Rev.2 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step Job Performance Checklist STEP/STANDARD STEP *7.: 5.1 Unit 1 Lower Containment Entry [6] NOTIFY RADCON of maximum stay time and containment entry requirements.
STEP *4.:      5.1 Unit 1 Lower Containment Entry                                          _SAT
Cue: Acknowledge report as Radcon. If candidate states job can not be done due to exceeding stay time, then tell them Plant Management has decided to exceed the stay time. Then ask candidate  
[3] CALCULATE Unit 1 Lower containment stay time USING the following equation:                                                _UNSAT 0.3 ppm                        X      480 minutes          =____ minutes sample recorded in Step 5.1[1] (1.3)                                      Critical Step
'what respiratory protection would be required under these circumstances'?
_--'-".3:....:cX...:......:..;48=0'--_ = ~      = 109.1 1.32                        1.32 STANDARD: Operator calculates a containment stay time of 109.1 (+/- 1) minutes using equation.
STANDARD:
 
Operator notifies RADCON that planned work time exceeds stay time and containment entry will require wearing a full face air purifying respirator with formaldehyde filters. COMMENTS:
JPM 123 Page 6 of 8 Rev.2 Job Performance Checklist STEP/STANDARD                                          SAT/UNSAT STEP 5.:      5.1 Unit 1 Lower Containment Entry                                      -    SAT
STEP 8.: 5.1 Unit 1 Lower Containment Entry [7] IF any required task CANNOT be performed within allowed stay time, THEN PERFORM the following
[4] INDEPENDENTLY VERIFY stay time results obtained in Step 5.1 [3].                                                          -   UNSAT Cue:        If asked, inform examinee that another operator has performed the IV.
... [7.1] Contact Industrial Safety for additional guidance CUE: As the Industrial Safety Engineer acknowledge report from operator and state conditions will be evaluated.
STANDARD:    Operator requests independent verification of stay time calculation.
STANDARD:
STEP 6.:       5.1 Unit 1 Lower Containment Entry
Operator notifies Industrial Safety that planned work time exceeds stay time and containment entry will require wearing a full face air purifying respirator with formaldehyde filters. Operator requests additional guidance from Industrial Safety Engineer.
[5] NOTIFY Work Week Manager of maximum stay time and                   -    SAT containment entry requirements including required level of respiratory protection.                                           -    UNSAT Cue:         Acknowledge report as Work Week Manager. If candidate states job can not be done due to exceeding stay time, then tell them       Critical Step Plant Management has decided to exceed the stay time. Then ask candidate 'what respiratory protection would be required under these circumstances'?
STANDARD: Operator notifies Work Week Manager that planned work time exceeds stay time and containment entry will require wearing a full face air purifying respirator with formaldehyde filters.
COMMENTS:
COMMENTS:
JPM 123 Page 7 of 8 Rev.2 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step Job Performance Checklist STEP 9.: STEP/STANDARD 5.1 Unit 1 Lower Containment Entry [7.2] Evaluate need for lower Containment Purge in accordance with 0-SO-30-3.
 
CUE: Acknowledge report from operator if US is notified.
JPM 123 Page 7 of 8 Rev.2 Job Performance Checklist STEP/STANDARD                                                SAT/UNSAT STEP *7.:     5.1 Unit 1 Lower Containment Entry                                             -    SAT
STANDARD:
[6] NOTIFY RADCON of maximum stay time and containment entry requirements.                                                             -   UNSAT Cue:         Acknowledge report as Radcon. If candidate states job can not Critical Step be done due to exceeding stay time, then tell them Plant Management has decided to exceed the stay time.
Then ask candidate 'what respiratory protection would be required under these circumstances'?
STANDARD: Operator notifies RADCON that planned work time exceeds stay time and containment entry will require wearing a full face air purifying respirator with formaldehyde filters.
COMMENTS:
COMMENTS:
STEP 10.: Operator notifies Unit Supervisor that planned work time exceeds stay time and containment entry will require wearing a full face air purifying respirator with formaldehyde filters. Operator requests US evaluate the need for lower Containment Purge in accordance with 0-SO-30-3.
STEP 8.:      5.1 Unit 1 Lower Containment Entry                                            -    SAT
5.1 Unit 1 Lower Containment Entry [7.3] DO NOT CONTINUE task UNTIL one of the following conditions are met:
[7] IF any required task CANNOT be performed within allowed stay time, THEN PERFORM the following ...                                            -    UNSAT
* Job Safety Analysis has been performed OR
[7.1] Contact Industrial Safety for additional guidance CUE:  As the Industrial Safety Engineer acknowledge report from operator          Critical Step and state conditions will be evaluated.
* Stay Time is Acceptable.
STANDARD: Operator notifies Industrial Safety that planned work time exceeds stay time and containment entry will require wearing a full face air purifying respirator with formaldehyde filters. Operator requests additional guidance from Industrial Safety Engineer.
CUE: Acknowledge report from operator if US is notified STANDARD:
COMMENTS:
Operator notifies Unit Supervisor that task shall not be continued UNTIL one of the following is performed, either a Job Safety Analysis has been performed or the stay time is acceptable.
 
End of JPM JPM 123 Page 8 of 8 Rev.2 SAT/UNSAT SAT _UNSAT Critical Step _SAT _UNSAT Critical Step Stop Time __ Job Performance Checklist STEP 9.: STEP/STANDARD 5.1 Unit 1 Lower Containment Entry [7.2] Evaluate need for lower Containment Purge in accordance with 0-SO-30-3.
JPM 123 Page 8 of 8 Rev.2 Job Performance Checklist STEP/STANDARD                                              SAT/UNSAT STEP 9.:       5.1 Unit 1 Lower Containment Entry                                               SAT
CUE: Acknowledge report from operator if US is notified.
[7.2]     Evaluate need for lower Containment Purge in accordance with 0-SO-30-3.                                   _UNSAT CUE:   Acknowledge report from operator if US is notified.
STANDARD:
Critical Step STANDARD:     Operator notifies Unit Supervisor that planned work time exceeds stay time and containment entry will require wearing a full face air purifying respirator with formaldehyde filters. Operator requests US evaluate the need for lower Containment Purge in accordance with 0-SO-30-3.
COMMENTS:
COMMENTS:
STEP 10.: Operator notifies Unit Supervisor that planned work time exceeds stay time and containment entry will require wearing a full face air purifying respirator with formaldehyde filters. Operator requests US evaluate the need for lower Containment Purge in accordance with 0-SO-30-3.
STEP 10.:     5.1     Unit 1 Lower Containment Entry
5.1 Unit 1 Lower Containment Entry [7.3] DO NOT CONTINUE task UNTIL one of the following conditions are met:
[7.3]   DO NOT CONTINUE task UNTIL one of the following           _SAT conditions are met:
* Job Safety Analysis has been performed OR
* Job Safety Analysis has been performed                       _UNSAT OR
* Stay Time is Acceptable.
* Stay Time is Acceptable.
CUE: Acknowledge report from operator if US is notified STANDARD:
Critical Step CUE:   Acknowledge report from operator if US is notified Stop Time _ _
Operator notifies Unit Supervisor that task shall not be continued UNTIL one of the following is performed, either a Job Safety Analysis has been performed or the stay time is acceptable.
STANDARD:     Operator notifies Unit Supervisor that task shall not be continued UNTIL one of the following is performed, either a Job Safety Analysis has been performed or the stay time is acceptable.
End of JPM JPM 123 Page 8 of 8 Rev.2 SAT/UNSAT SAT _UNSAT Critical Step _SAT _UNSAT Critical Step Stop Time __
End of JPM
PREPAREDI REVISED BY: SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM 43-2 ROA2 JPM 43-2 Page 1 of 13 Rev. 0 PERFORM REACTOR COOLANT SYSTEM WATER INVENTORY (137.0) Datel VALIDATED BY:
 
* Date/ APPROVED BY: CONCURRED:
JPM 43-2 Page 1 of 13 Rev. 0 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM 43-2 ROA2 PERFORM REACTOR COOLANT SYSTEM WATER INVENTORY (137.0)
-------------------------------------------------
PREPAREDI REVISED BY:                                                              Datel VALIDATED BY:
Date/ (Operations Training Manager) ** Date/ (Operations Representative)
* Date/
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
              -------------------------------------------------
PREPAREDI REVISED BY: SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM 43-2 ROA2 JPM 43-2 Page 1 of 13 Rev. 0 PERFORM REACTOR COOLANT SYSTEM WATER INVENTORY (137.0) Datel VALIDATED BY:
APPROVED BY:                                                            Date/
* Date/ APPROVED BY: CONCURRED:
(Operations Training Manager)
-------------------------------------------------
CONCURRED:    **                                                         Date/
Date/ (Operations Training Manager) ** Date/ (Operations Representative)
(Operations Representative)
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
I NUCLEAR TRAINING REVISION/USAGE LOG Revision Description Number Of Revision V 0 JPM 43-1 was assigned a new number 43-2 and Y revised to allow performance without the use of the plant computer.
              ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
Validation time was increased due to time required to perform SI without the computer available. V -Specify if the JPM change will require another validation (Y or N). See cover sheet for criteria.
 
Date 12/1/09 JPM 43-2 Page 2 of 13 Rev. 0 Pages Prepared/
JPM 43-2 Page 2 of 13 Rev. 0 I                                                   NUCLEAR TRAINING REVISION/USAGE LOG Revision                           Description                                   Pages        Prepared/
Affected Revised By: All M. Hankins I NUCLEAR TRAINING REVISION/USAGE LOG Revision Description Number Of Revision V 0 JPM 43-1 was assigned a new number 43-2 and Y revised to allow performance without the use of the plant computer.
Number                             Of Revision                         V Date  Affected      Revised By:
Validation time was increased due to time required to perform SI without the computer available. V -Specify if the JPM change will require another validation (Y or N). See cover sheet for criteria.
0         JPM 43-1 was assigned a new number 43-2 and             Y 12/1/09   All       M. Hankins revised to allow performance without the use of the plant computer. Validation time was increased due to time required to perform SI without the computer available.
Date 12/1/09 JPM 43-2 Page 2 of 13 Rev. 0 Pages Prepared/
V - Specify if the JPM change will require another validation (Y or N).
Affected Revised By: All M. Hankins SEQUOYAH NUCLEAR PLANT ROISRO JOB PERFORMANCE MEASURE Task: Perform RCS Leakage Calculation (0-SI-OPS-068-137.0)
See cover sheet for criteria.
JA/TA task #: 0020010201 (RO) KIA Ratings: 2.2.12 (3.7/4.1 ) 002A4.01 (3.5/3.8) 002K405 (3.8/4.2) 002K504 (3.1/3.4)
 
JPM 43-2 Page 3 of 13 Rev. 0 SEQUOYAH NUCLEAR PLANT ROISRO JOB PERFORMANCE MEASURE Task: Perform RCS Leakage Calculation (0-SI-OPS-068-137.0)
JA/TA task #: 0020010201       (RO)
KIA Ratings:   2.2.12           (3.7/4.1 )
002A4.01       (3.5/3.8) 002K405         (3.8/4.2) 002K504         (3.1/3.4)
Task Standard:
Task Standard:
JPM 43-2 Page 3 of 13 Rev. 0 Upon completion of this task, the operator will have correctly determined RCS leakage per O-SI-OPS-068-137.0 and notify the SRO of Tech Spec and EPIP requirements.
Upon completion of this task, the operator will have correctly determined RCS leakage per O-SI-OPS-068-137.0 and notify the SRO of Tech Spec and EPIP requirements.
Evaluation Method: Simulator X --'-'---In-Plant __ _ ===================================================================================
Evaluation Method:   Simulator - _...:...X-,--_
X
                                    -'-'---
In-Plant _ __
===================================================================================
Performer:
Performer:
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
NAME                                                 Start Time _ __
SIGNATURE DATE ==================================================================================
Performance Rating:   SAT           UNSAT           Performance Time                   Finish Time _
COMMENTS SEQUOYAH NUCLEAR PLANT ROISRO JOB PERFORMANCE MEASURE Task: Perform RCS Leakage Calculation (0-SI-OPS-068-137.0)
__ ___
JA/TA task #: 0020010201 (RO) KIA Ratings: 2.2.12 (3.7/4.1 ) 002A4.01 (3.5/3.8) 002K405 (3.8/4.2) 002K504 (3.1/3.4)
Evaluator:   ________~-~~_--_--I_----
Task Standard:
            ---------------------------/~-==
JPM 43-2 Page 3 of 13 Rev. 0 Upon completion of this task, the operator will have correctly determined RCS leakage per O-SI-OPS-068-137.0 and notify the SRO of Tech Spec and EPIP requirements.
SIGNATURE                       DATE
Evaluation Method: Simulator
==================================================================================
_...:...X-,--_
COMMENTS
In-Plant __ _ ===================================================================================
 
Performer:
JPM 43-2 Page 4 of 13 Rev.Q SPECIAL INSTRUCTIONS TO EVALUATOR:
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
________
SIGNATURE DATE ==================================================================================
COMMENTS SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Any UNSAT requires comments.
: 1. Any UNSAT requires comments.
: 2. Ensure calculator is available for operator to perform calculations.
: 2. Ensure calculator is available for operator to perform calculations.
JPM 43-2 Page 4 of 13 Rev.Q 3. A copy of O-SI-OPS-068-137.0 and computer generated data sheet must be provided to the operator for task performance.
: 3. A copy of O-SI-OPS-068-137.0 and computer generated data sheet must be provided to the operator for task performance.
: 4. Cues will be supplied to give required information after the computer screen is entered. Validation Time: CR. 35 mins Local ____ _ Tools/Equipment/Procedures Needed: O-SI-OPS-068-137.0 Reference Title Rev No. O-SI-OPS-068-137.0 Reactor Coolant S stem Water Invento 22 ======================================================================================
: 4. Cues will be supplied to give required information after the computer screen is entered.
READ TO OPERATOR DIRECTIONS TO TRAINEE: I will explain the initial conditions, and state the task to be performed.
Validation Time: CR. 35 mins                 Local _ _ _ __
All control room steps shall be simulated for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Tools/Equipment/Procedures Needed:
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
O-SI-OPS-068-137.0
: 1. The Unit is in MODE 1. 2. The U1 MCR crew suspects RCS leakage may have increased.
: 3. CCPIT/HUT leakage has been identified as 1 gpm. INITIATING CUES: 1. You have been directed to perform O-SI-OPS-068-137.0, RCS Water Inventory, using the plant computer.
: 2. Inform the US of the results when you have finished.
SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Any UNSAT requires comments.
: 2. Ensure calculator is available for operator to perform calculations.
JPM 43-2 Page 4 of 13 Rev.Q 3. A copy of O-SI-OPS-068-137.0 and computer generated data sheet must be provided to the operator for task performance.
: 4. Cues will be supplied to give required information after the computer screen is entered. Validation Time: CR. 35 mins Local ____ _ Tools/Equipment/Procedures Needed: O-SI-OPS-068-137.0  


==References:==
==References:==


Reference Title Rev No. O-SI-OPS-068-137.0 Reactor Coolant S stem Water Invento 22 ======================================================================================
Reference                                           Title                 Rev No.
READ TO OPERATOR DIRECTIONS TO TRAINEE: I will explain the initial conditions, and state the task to be performed.
O-SI-OPS-068-137.0                     Reactor Coolant S stem Water Invento             22
All control room steps shall be simulated for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
======================================================================================
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
READ TO OPERATOR DIRECTIONS TO TRAINEE:
: 1. The Unit is in MODE 1. 2. The U1 MCR crew suspects RCS leakage may have increased.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be simulated for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
: 3. CCPIT/HUT leakage has been identified as 1 gpm. INITIATING CUES: 1. You have been directed to perform O-SI-OPS-068-137.0, RCS Water Inventory, using the plant computer.
INITIAL CONDITIONS:
: 1. The Unit is in MODE 1.
: 2. The U1 MCR crew suspects RCS leakage may have increased.
: 3. CCPIT/HUT leakage has been identified as 1 gpm.
INITIATING CUES:
: 1. You have been directed to perform O-SI-OPS-068-137.0, RCS Water Inventory, using the plant computer.
: 2. Inform the US of the results when you have finished.
: 2. Inform the US of the results when you have finished.
Job P-erfotmance Checklist:
 
STEP/STANDARD I NOTE: JPM follows sections 4.0,6.0,6.2, and Appendix C of 51137.0 STEP 1.: 4.1 [1] ENSURE Instruction to be used is a copy of the effective version, and Data Package Cover Sheet is attached.
JPM 43-2 Page 5 of 13 Rev. 0 Job P-erfotmance Checklist:
Cue: Acknowledge operator has a valid and current package. STANDARD:
STEP/STANDARD                                       SAT/U NSAT I
Operator makes sure he is using the correct version and has a valid package. NOTE: The plant ICS computer has a Group Display set up to the operators to check the points in step 4.1 [2], operator may refer to this Group Display when discussing how to identify the points that are in service. STEP 2.: 4.1 [2] IF ICS Points are to be used for leakage determination, THEN IDENTIFY ICS Points that are in service prior to performing leakage calculation:
NOTE:       JPM follows sections 4.0,6.0,6.2, and Appendix C of 51137.0                         -  SAT STEP 1.:       4.1 [1] ENSURE Instruction to be used is a copy of the effective version, and       -  UNSAT Data Package Cover Sheet is attached.
Cue: All points specified in the table are in service and are reliable.
Cue:       Acknowledge operator has a valid and current package.
STANDARD:
STANDARD: Operator makes sure he is using the correct version and has a valid package.         Start Time- -
Operator verifies pOints specified in table are in service. Plant ICS has a Group display that the operators utilize to verify ICS Points are in service. STEP 3.: 4.2 [1] IF any RCS leak sources will be quantified using a stopwatch and container  
NOTE:         The plant ICS computer has a Group Display set up to the operators to             -  SAT check the points in step 4.1 [2], operator may refer to this Group Display when discussing how to identify the points that are in service.                     -    UNSAT STEP 2.:       4.1 [2] IF ICS Points are to be used for leakage determination, THEN IDENTIFY ICS Points that are in service prior to performing leakage calculation:
...... Cue: No STOPWA TCH or Container required for this performance.
Cue:       All points specified in the table are in service and are reliable.
STANDARD:
STANDARD: Operator verifies pOints specified in table are in service.
Operator N/As this step. STEP 4.: 4.2 [2] IF any other special test equipment will be used ...... Cue: No Measuring or Test Equipment is required.
Plant ICS has a Group display that the operators utilize to verify ICS Points are in service.
STANDARD:
STEP 3.:       4.2 [1] IF any RCS leak sources will be quantified using a stopwatch and           -    SAT container ......
Operator N/As this step. STEP 5.: 4.3 [1] ENSURE reactor power and RCS average temperature (T -avg) are stable and have varied less than  
                                                                                                      -    UNSAT Cue:       No STOPWA TCH or Container required for this performance.
+/- 2% and 1°F, respectively, during the calculation test interval.
STANDARD: Operator N/As this step.
STANDARD:
STEP 4.:         4.2 [2] IF any other special test equipment will be used ......                   -    SAT Cue:       No Measuring or Test Equipment is required.                                         -  UNSAT STANDARD: Operator N/As this step.
Operator recognizes the need to maintain stable conditions during the test. (Procedure step 4.3 [1]) I JPM 43-2 Page 5 of 13 Rev. 0 SAT/U N SAT SAT -UNSAT -Start Time --SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Job P-erfotmance Checklist:
STEP 5.:         4.3 [1] ENSURE reactor power and RCS average temperature (T-avg) are               -  SAT stable and have varied less than +/- 2% and 1°F, respectively, during the calculation test interval.                                                         -  UNSAT STANDARD: Operator recognizes the need to maintain stable conditions during the test.
STEP/STANDARD I NOTE: JPM follows sections 4.0,6.0,6.2, and Appendix C of 51137.0 STEP 1.: 4.1 [1] ENSURE Instruction to be used is a copy of the effective version, and Data Package Cover Sheet is attached.
(Procedure step 4.3 [1])
Cue: Acknowledge operator has a valid and current package. STANDARD:
I
Operator makes sure he is using the correct version and has a valid package. NOTE: The plant ICS computer has a Group Display set up to the operators to check the points in step 4.1 [2], operator may refer to this Group Display when discussing how to identify the points that are in service. STEP 2.: 4.1 [2] IF ICS Points are to be used for leakage determination, THEN IDENTIFY ICS Points that are in service prior to performing leakage calculation:
 
Cue: All points specified in the table are in service and are reliable.
JPM 43-2 Page 6 of 13 Rev. 0 Job Performance Checklist:
STANDARD:
STEP/STANDARD                                        SAT/UNSAT I
Operator verifies pOints specified in table are in service. Plant ICS has a Group display that the operators utilize to verify ICS Points are in service. STEP 3.: 4.2 [1] IF any RCS leak sources will be quantified using a stopwatch and container
STEP 6.:      4.4 [1] CONTACT Chemistry Lab to verify that performance of this SI and              -   SAT limitations imposed on sampling will NOT interfere with any sampling required by Technical Specifications or Technical Requirements Manual.
...... Cue: No STOPWA TCH or Container required for this performance.
                                                                                                      -   UNSAT Cue:      Acknowledge test will be performed. No samples are scheduled or required in next four hours.
STANDARD:
STANDARD: Operator notifies Chemistry of test performance.
Operator N/As this step. STEP 4.: 4.2 [2] IF any other special test equipment will be used ...... Cue: No Measuring or Test Equipment is required.
STEP 7.:       6.0 [1]IF using the Plant Computer, THEN                                            -    SAT GO TO Section 6.2.
STANDARD:
                                                                                                      -    UNSAT Cue:      Perform Section 6.2.
Operator N/As this step. STEP 5.: 4.3 [1] ENSURE reactor power and RCS average temperature (T -avg) are stable and have varied less than
STANDARD: Operator acknowledges Section 6.0 step 1 NOTES for SI Test valve manipulations and RCS stability and transitions per step 6.0 [1] to Section 6.2 SAT STEP 8.:       6.2 [1] CHECK VCT level in desired range:                                           -
+/- 2% and 1°F, respectively, during the calculation test interval.
[a]    IF VCT level approaching auto makeup, THEN ADJUST VCT level USING 0-SO-62-7 (MANUAL MAKEUP)                                UNSAT
STANDARD:
                                                                                                      -
Operator recognizes the need to maintain stable conditions during the test. (Procedure step 4.3 [1]) I JPM 43-2 Page 5 of 13 Rev. 0 SAT/U N SAT SAT -UNSAT -Start Time --SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
Cue:      Tell operator that 1-Ll-62-129 is indicating 50.4%.
Job Performance Checklist:
STANDARD: Operator checks [1-Ll-62-129] VCT level indicator and determines the VCT level is in the desired range and not approaching auto makeup setpoint.
STEP/STANDARD I STEP 6.: 4.4 [1] CONTACT Chemistry Lab to verify that performance of this SI and limitations imposed on sampling will NOT interfere with any sampling required by Technical Specifications or Technical Requirements Manual. Cue: Acknowledge test will be performed.
STEP 9.:        [b]    IF LCV-62-118 is diverting to the HUT or VCT AUTO makeup ....               -    SAT STANDARD: Operator checks the LCV-62-118 aligned to the VCT and VCT level NORMAL
No samples are scheduled or required in next four hours. STANDARD:
                  -50% using LI-62-130 and N/As this step.                                            -    UNSAT STEP 10.:       6.2 [2] WHEN VCT level in desired range, THEN                                      -    SAT PLACE [HS-62-118Al in VCT position.
Operator notifies Chemistry of test performance.
                                                                                                      -  UNSAT STANDARD: Operator determ ines VCT level NORMAL and places HS-63-118A in the VCT position.
STEP 7.: 6.0 [1]IF using the Plant Computer, THEN GO TO Section 6.2. Cue: Perform Section 6.2. STANDARD:
Critical Step
Operator acknowledges Section 6.0 step 1 NOTES for SI Test valve manipulations and RCS stability and transitions per step 6.0 [1] to Section 6.2 STEP 8.: 6.2 [1] CHECK VCT level in desired range: [a] IF VCT level approaching auto makeup, THEN ADJUST VCT level USING 0-SO-62-7 (MANUAL MAKEUP) Cue: Tell operator that 1-Ll-62-129 is indicating 50.4%. STANDARD:
 
Operator checks [1-Ll-62-129]
JPM 43-2 Page 7 of 13 Rev. 0 Job Performance Checklist:
VCT level indicator and determines the VCT level is in the desired range and not approaching auto makeup setpoint.
STEP/STANDARD                                        SAT/UNSAT I
STEP 9.: [b] IF LCV-62-118 is diverting to the HUT or VCT AUTO makeup .... STANDARD:
STEP 11.:       6.2 [3] MAINTAIN plant conditions as stable as possible (minimum of 2           -  SAT hours).
Operator checks the LCV-62-118 aligned to the VCT and VCT level NORMAL -50% using LI-62-130 and N/As this step. STEP 10.: 6.2 [2] WHEN VCT level in desired range, THEN PLACE [HS-62-118Al in VCT position.
                                                                                                    -  UNSAT STANDARD: Operator addressing maintaining plant conditions stable for 2 hours.
STANDARD:
STEP 12.:       6.2 [4] REQUEST from Chemistry Lab the following:                                -   SAT SG1 thru 4 leakages in GPO.
Operator determ ines VCT level NORMAL and places HS-63-118A in the VCT position.
Cue:          S/G leakages are as follows:                                                    -   UNSAT
JPM 43-2 Page 6 of 13 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step Job Performance Checklist:
[a] SG 1=3.2 GPO
STEP/STANDARD I STEP 6.: 4.4 [1] CONTACT Chemistry Lab to verify that performance of this SI and limitations imposed on sampling will NOT interfere with any sampling required by Technical Specifications or Technical Requirements Manual. Cue: Acknowledge test will be performed.
[b] SG 2=2.2 GPO
No samples are scheduled or required in next four hours. STANDARD:
[c] SG 3=2.3 GPO Ed] SG 4=4.8 GPO                                                              Critical Step Operator determines total leakage in GPD and divides by 1440 min/day 12.5/1440 = 0.009 Cue:        When asked tell operator SI-50 and S1137.5 were completed 5 Hours earlier today.
Operator notifies Chemistry of test performance.
STANDARD: Operator request SG leakage and enters information in step 6.2 [4].
STEP 7.: 6.0 [1]IF using the Plant Computer, THEN GO TO Section 6.2. Cue: Perform Section 6.2. STANDARD:
Performs calculation and determines Total SG leakage = .0087 GPM.
Operator acknowledges Section 6.0 step 1 NOTES for SI Test valve manipulations and RCS stability and transitions per step 6.0 [1] to Section 6.2 STEP 8.: 6.2 [1] CHECK VCT level in desired range: [a] IF VCT level approaching auto makeup, THEN ADJUST VCT level USING 0-SO-62-7 (MANUAL MAKEUP) Cue: Tell operator that 1-Ll-62-129 is indicating 50.4%. STANDARD:
Records performance times for SI-50 and SI-137.5.
Operator checks [1-Ll-62-129]
                                                                                                    -  SAT STEP 13.:       [e] DETERMINE the amount of chemical additions made to or samples taken from the RCS during the selected performance period
VCT level indicator and determines the VCT level is in the desired range and not approaching auto makeup setpoint.
                                                                                                    -  UNSAT Cue:           Chemistry supervisor reports no additions or samples were taken from the RCS during the selected performance period.
STEP 9.: [b] IF LCV-62-118 is diverting to the HUT or VCT AUTO makeup .... STANDARD:
STANDARD:       Operator requests Chemistry lab to report any chemical additions or samples taken from the RCS during the selected performance period in gpm.
Operator checks the LCV-62-118 aligned to the VCT and VCT level NORMAL -50% using LI-62-130 and N/As this step. STEP 10.: 6.2 [2] WHEN VCT level in desired range, THEN PLACE [HS-62-118Al in VCT position.
STEP 14.:       6.2 [5] IF volume from any source (chemical addition, sampling, or make-up)       -   SAT cannot be determined from the selected performance period, THEN
STANDARD:
                                                                                                    -   UNSAT Cue:          Inform operator this step may be N/A.
Operator determ ines VCT level NORMAL and places HS-63-118A in the VCT position.
STANDARD: Operator determines step [5] [a] and [b] may be N/A.
JPM 43-2 Page 6 of 13 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step Job Performance Checklist:
 
STEP/STANDARD I STEP 11.: 6.2 [3] MAINTAIN plant conditions as stable as possible (minimum of 2 hours). STANDARD:
JPM 43-2 Page 8 of 13 Rev~O Job Performance Checklist:
Operator addressing maintaining plant conditions stable for 2 hours. STEP 12.: 6.2 [4] REQUEST from Chemistry Lab the following:
STEP/STANDARD                                  SAT/U NSAT I
SG1 thru 4 leakages in GPO. Cue: S/G leakages are as follows: [a] SG 1=3.2 GPO [b] SG 2=2.2 GPO [c] SG 3=2.3 GPO Ed] SG 4=4.8 GPO Operator determines total leakage in GPD and divides by 1440 min/day 12.5/1440
STEP 15.:      6.2 [6] IF pump down of the RCDT is a frequent occurrence, THEN ....         _SAT Cue:         Inform operator this step may be NIA.
= 0.009 Cue: When asked tell operator SI-50 and S1137.5 were completed 5 Hours earlier today. STANDARD:
_UNSAT STANDARD: Operator determines step [6] [a] and [b] may be N/A.
Operator request SG leakage and enters information in step 6.2 [4]. Performs calculation and determines Total SG leakage = .0087 GPM. Records performance times for SI-50 and SI-137.5.
STEP 16.:      6.2 [7] IF in-leakage to the CLA, THEN                                       _SAT
STEP 13.: [e] DETERMINE the amount of chemical additions made to or samples taken from the RCS during the selected performance period Cue: Chemistry supervisor reports no additions or samples were taken from the RCS during the selected performance period. STANDARD:
[a] RECORD initial CLA levels in Appendix C and wait at least two hours
Operator requests Chemistry lab to report any chemical additions or samples taken from the RCS during the selected performance period in gpm. STEP 14.: 6.2 [5] IF volume from any source (chemical addition, sampling, or make-up) cannot be determined from the selected performance period, THEN Cue: Inform operator this step may be N/A. STANDARD:
_UNSAT Cue:         Inform operator initial value for Unit 1 CLA's 1,2,3 and 4 is 7680 gals.
Operator determines step [5] [a] and [b] may be N/A. JPM 43-2 Page 7 of 13 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Job Performance Checklist:
[b] WHEN greater than 2 hours has elapsed, THEN                            Critical Step RECORD final CLA levels in Appendix C.
STEP/STANDARD I STEP 11.: 6.2 [3] MAINTAIN plant conditions as stable as possible (minimum of 2 hours). STANDARD:
Cue:          Two hours has elapsed Final values for CLA's are as follows CLA 1 7680 gal CLA 2 7680 gal CLA 3 7920 gal CLA 4 7680 gal STANDARD: Operator records CLA volumes on Appendix "C" for later entry into computer.
Operator addressing maintaining plant conditions stable for 2 hours. STEP 12.: 6.2 [4] REQUEST from Chemistry Lab the following:
STEP 17.:     6.2 [8] INITIATE RCS Leakage Program using the Plant Computer by             _SAT performing the following:
SG1 thru 4 leakages in GPO. Cue: S/G leakages are as follows: [a] SG 1=3.2 GPO [b] SG 2=2.2 GPO [c] SG 3=2.3 GPO Ed] SG 4=4.8 GPO Operator determines total leakage in GPD and divides by 1440 min/day 12.5/1440
NOTE:     Evaluator - show operator pictures of ICS computer screens to allow the           UNSAT operator to demonstrate steps to be performed using the touch screen on the ICS monitor.
= 0.009 Cue: When asked tell operator SI-50 and S1137.5 were completed 5 Hours earlier today. STANDARD:
Critical Step
Operator request SG leakage and enters information in step 6.2 [4]. Performs calculation and determines Total SG leakage = .0087 GPM. Records performance times for SI-50 and SI-137.5.
[a]    SELECT NSSS & BOP menu on monitor. (Attachment 1)
STEP 13.: [e] DETERMINE the amount of chemical additions made to or samples taken from the RCS during the selected performance period Cue: Chemistry supervisor reports no additions or samples were taken from the RCS during the selected performance period. STANDARD:
[b]    SELECT SI-137.0, RCS leakage screen on monitor. (Attachment 2)
Operator requests Chemistry lab to report any chemical additions or samples taken from the RCS during the selected performance period in gpm. STEP 14.: 6.2 [5] IF volume from any source (chemical addition, sampling, or make-up) cannot be determined from the selected performance period, THEN Cue: Inform operator this step may be N/A. STANDARD:
NOTE:     Start and Stop times are Auto-populated on the ICS computer.
Operator determines step [5] [a] and [b] may be N/A. JPM 43-2 Page 7 of 13 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -
[c]     ENSURE correct START date and time entered in Plant Computer
I Job Performance Checklist:
[d]     ENSURE correct STOP date and time entered in Plant computer (Attachment 3)
STEP/STANDARD STEP 15.: 6.2 [6] IF pump down of the RCDT is a frequent occurrence, THEN .... Cue: Inform operator this step may be NIA. STANDARD:
STANDARD: Operator locates proper pages on plant computer and ensures the start and stop times are correct, minimum time 2 hours.
Operator determines step [6] [a] and [b] may be N/A. STEP 16.: 6.2 [7] IF in-leakage to the CLA, THEN [a] RECORD initial CLA levels in Appendix C and wait at least two hours Cue: Inform operator initial value for Unit 1 CLA's 1,2,3 and 4 is 7680 gals. [b] WHEN greater than 2 hours has elapsed, THEN RECORD final CLA levels in Appendix C. Cue: Two hours has elapsed Final values for CLA's are as follows CLA 1 7680 gal CLA 2 7680 gal CLA 3 7920 gal CLA 4 7680 gal STANDARD:
 
Operator records CLA volumes on Appendix "C" for later entry into computer.
JPM 43-2 Page 9 of 13 Rev. 0 Job Performance Checklist:
STEP 17.: NOTE: NOTE: 6.2 [8] INITIATE RCS Leakage Program using the Plant Computer by performing the following:
STEP/STANDARD                                SAT/UNSAT I
Evaluator
STEP 18.:     6.2 [9] MANUALLY enter the following:                                        -   SAT NOTE        Computer will automatically populate the SG leakage with zeroes.
-show operator pictures of ICS computer screens to allow the operator to demonstrate steps to be performed using the touch screen on the ICS monitor. [a] SELECT NSSS & BOP menu on monitor. (Attachment
                                                                                              -    UNSAT
: 1) [b] SELECT SI-137.0, RCS leakage screen on monitor. (Attachment
[a] SG leakages from Chemistry.
: 2) Start and Stop times are Auto-populated on the ICS computer.
STANDARD: Operator locates proper Data Blocks on SI-137.0 Data screen and enters the   Critical Step SG leakage information recorded in section 6.2 step 4. (Attachment 3)
[c] ENSURE correct START date and time entered in Plant Computer [d] ENSURE correct STOP date and time entered in Plant computer (Attachment
STEP 19.:     [b] CLA initial and final volumes from Appendix C (if required).            -   SAT
: 3) STANDARD:
                                                            ,
Operator locates proper pages on plant computer and ensures the start and stop times are correct, minimum time 2 hours. JPM 43-2 Page 8 of 13 SAT/U N SAT _SAT _UNSAT _SAT _UNSAT Critical Step _SAT UNSAT Critical Step I Job Performance Checklist:
NOTE:         Operator will enter CLA leakage for each Accumulator as recorded previously on Appendix "C" (directed by Section 6.2 Step [7][c]).           -   UNSAT STANDARD: Operator enters CLA initial and final volumes from Appendix C into ICS.
STEP/STANDARD STEP 15.: 6.2 [6] IF pump down of the RCDT is a frequent occurrence, THEN .... Cue: Inform operator this step may be NIA. STANDARD:
Critical Step STEP 20.:       [c] CCPIT/HUT leakage (N/A if not required).                               -    SAT Cue:          Inform Operator that CCPIT/HUT value has been determined to be 1 GPM.                                                                -    UNSAT STANDARD: Operator enters 1 GPM in this step.
Operator determines step [6] [a] and [b] may be N/A. STEP 16.: 6.2 [7] IF in-leakage to the CLA, THEN [a] RECORD initial CLA levels in Appendix C and wait at least two hours Cue: Inform operator initial value for Unit 1 CLA's 1,2,3 and 4 is 7680 gals. [b] WHEN greater than 2 hours has elapsed, THEN RECORD final CLA levels in Appendix C. Cue: Two hours has elapsed Final values for CLA's are as follows CLA 1 7680 gal CLA 2 7680 gal CLA 3 7920 gal CLA 4 7680 gal STANDARD:
Critical Step STEP 21.:       [d] Other sources, such as Appendix B or Chemistry sampling                -    SAT (N/A if not required).
Operator records CLA volumes on Appendix "C" for later entry into computer.
Cue:         Inform Operator that this step is N/A                                        -  UNSAT STANDARD: Operator places N/A on this step.
STEP 17.: NOTE: NOTE: 6.2 [8] INITIATE RCS Leakage Program using the Plant Computer by performing the following:
STEP 22.:      [10] INITIATE execute for calculation results.                               -  SAT STANDARD: Operator places cursor on EXECUTE button and presses left mouse button,          -    UNSAT or uses the F2 key to execute calculation.
Evaluator
Critical Step
-show operator pictures of ICS computer screens to allow the operator to demonstrate steps to be performed using the touch screen on the ICS monitor. [a] SELECT NSSS & BOP menu on monitor. (Attachment
 
: 1) [b] SELECT SI-137.0, RCS leakage screen on monitor. (Attachment
JPM 43-2 Page 10 of 13 Rev. 0 Job Performance Checklist:
: 2) Start and Stop times are Auto-populated on the ICS computer.
STEPISTANDARD                                  SAT/UNSAT I
[c] ENSURE correct START date and time entered in Plant Computer [d] ENSURE correct STOP date and time entered in Plant computer (Attachment
STEP 23.:     [11] WHEN data collection has been completed, THEN                          -  SAT CHECK the following to indicate whether data is acceptable.
: 3) STANDARD:
Cue:        Inform operator of the following:                                            -   UNSAT A. Dates and times are correct and data collection performed for 2 hrs.
Operator locates proper pages on plant computer and ensures the start and stop times are correct, minimum time 2 hours. JPM 43-2 Page 8 of 13 SAT/U N SAT _SAT _UNSAT _SAT _UNSAT Critical Step _SAT UNSAT Critical Step Job Performance Checklist:
STANDARD: Operator determines that conditions for data collection were acceptable.
STEP/STANDARD I STEP 18.: 6.2 [9] MANUALLY enter the following:
NOTE:        For Steps on procedure page 34 of 61 ules points recorded match those in Section 4.1[2]"
NOTE Computer will automatically populate the SG leakage with zeroes. [a] SG leakages from Chemistry.
RECORD the ICS Points that were available during performance of Leakage calculation.
STANDARD:
STANDARD: All pOints were available, operator checks each box.
Operator locates proper Data Blocks on SI-137.0 Data screen and enters the SG leakage information recorded in section 6.2 step 4. (Attachment
IF ICS Points recorded in Section 4.1 [2J do NOT match ..........
: 3) STEP 19.: [b] CLA initial and final volumes from Appendix C (if required). , NOTE: Operator will enter CLA leakage for each Accumulator as recorded previously on Appendix "C" (directed by Section 6.2 Step [7][c]). STANDARD:
STANDARD: Operator marks step N/A.
Operator enters CLA initial and final volumes from Appendix C into ICS. STEP 20.: [c] CCPIT/HUT leakage (N/A if not required).
SAT STEP 24.:      [11] B. No sampling and chemical additions occurred during data            -
Cue: Inform Operator that CCPIT/HUT value has been determined to be 1 GPM. STANDARD:
collection.
Operator enters 1 GPM in this step. STEP 21.: [d] Other sources, such as Appendix B or Chemistry sampling (N/A if not required).
                                                                                              -   UNSAT STANDARD: Operator determines that no sampling and or chemical additions have occurred during data collection.
Cue: Inform Operator that this step is N/A STANDARD:
STEP 25.:      [11] C. All pumps, coolers, valve alignment remained constant              -   SAT during data collection except where makeup was accounted for by the plant computer.
Operator places N/A on this step. STEP 22.: [10] INITIATE execute for calculation results. STANDARD:
                                                                                              -   UNSAT STANDARD: Operator determines that all equipment alignment remained constant.
Operator places cursor on EXECUTE button and presses left mouse button, or uses the F2 key to execute calculation.
STEP 26.:       [11] D. eves and ReS remained nearly constant except where makeup            -  SAT was accounted for by the plant computer.
JPM 43-2 Page 9 of 13 Rev. 0 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step Job Performance Checklist:
                                                                                              -  UNSAT STANDARD: Operator determines that CVCS and RCS remained nearly constant during data taking period.
STEP/STANDARD I STEP 18.: 6.2 [9] MANUALLY enter the following:
STEP 27.:       [11] E. NO ReS dilution occurred during the data-taking period.              -  SAT
NOTE Computer will automatically populate the SG leakage with zeroes. [a] SG leakages from Chemistry.
                                                                                              -  UNSAT STANDARD: Operator determines that no RCS dilutions occurred during the data-taking period.
STANDARD:
 
Operator locates proper Data Blocks on SI-137.0 Data screen and enters the SG leakage information recorded in section 6.2 step 4. (Attachment
JPM 43-2 Page 11 of 13 Rev. 0 Job Performance Checklist:
: 3) STEP 19.: [b] CLA initial and final volumes from Appendix C (if required). , NOTE: Operator will enter CLA leakage for each Accumulator as recorded previously on Appendix "C" (directed by Section 6.2 Step [7][c]). STANDARD:
STEP/STANDARD                                      SAT/U NSAT I
Operator enters CLA initial and final volumes from Appendix C into ICS. STEP 20.: [c] CCPIT/HUT leakage (N/A if not required).
STEP 28.:      [12] IF any substep in step [11] cannot be completed, THEN ....                 -  SAT STANDARD: Operator N/As this step.                                                             -  UNSAT STEP 29.:     [13] IF calculation inputs are invalid, THEN                                      -   SAT
Cue: Inform Operator that CCPIT/HUT value has been determined to be 1 GPM. STANDARD:
[a]   INITIATE MANUAL function to correct inputs.
Operator enters 1 GPM in this step. STEP 21.: [d] Other sources, such as Appendix B or Chemistry sampling (N/A if not required).
                                                                                                  -   UNSAT
Cue: Inform Operator that this step is N/A STANDARD:
[b]   INITIATE EXECUTE function for calculated results.
Operator places N/A on this step. STEP 22.: [10] INITIATE execute for calculation results. STANDARD:
NOTE:           IF Operator identifies ANY incorrect data input THEN complete step [13]
Operator places cursor on EXECUTE button and presses left mouse button, or uses the F2 key to execute calculation.
[a] and [b].
JPM 43-2 Page 9 of 13 Rev. 0 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -Critical Step Job Performance Checklist:
STANDARD: Operator verifies calculation inputs are correct and continues with performance of SI-137.0. (Step 6.2 [13] [a] and [b]).
STEPISTANDARD I STEP 23.: [11] WHEN data collection has been completed, THEN CHECK the following to indicate whether data is acceptable.
STEP 30.:      [14] PRINT a hard copy of the results.                                          -   SAT CUE:          Examiner - hand the RCS Leakage Rate Report to Operator for interpretation.                                                                  -   UNSAT STANDARD: If computer was available the operator would print results.
Cue: Inform operator of the following:
STEP 31.:       [15] ATTACH hard copy program output (printout) to surveillance procedure        -  SAT package.
A. Dates and times are correct and data collection performed for 2 hrs. STANDARD:
STANDARD: Operator request hard copy of RCS Leakage Rate Report.                                -  UNSAT STEP 32.:      [16] WHEN all data collection has been completed, THEN                             -  SAT NOTIFY Chemistry Lab ....
Operator determines that conditions for data collection were acceptable.
                                                                                                    -  UNSAT Cue:         Acknowledge the 51-137.0 is complete and RCS sampling and chemical additions may be resumed.
NOTE: For Steps on procedure page 34 of 61 ules points recorded match those in Section 4.1[2]" RECORD the ICS Points that were available during performance of Leakage calculation.
STANDARD: Operator Notifies Chemistry Lab that RCS sampling/chemical additions may be resumed as necessary.
STANDARD:
SAT STEP 33.:      1171 IF step 6.2 [5] [b] was performed for manual data collection, THEN ...       -
All pOints were available, operator checks each box. IF ICS Points recorded in Section 4.1 [2J do NOT match ..........
STANDARD: Operator N/As this step.
STANDARD:
                                                                                                    -  UNSAT
Operator marks step N/A. STEP 24.: [11] B. No sampling and chemical additions occurred during data collection.
                                                              -
STANDARD:
 
Operator determines that no sampling and or chemical additions have occurred during data collection.
JPM 43-2 Page 12 of 13 Rev. 0 Job Performance Checklist:
STEP 25.: [11] C. All pumps, coolers, valve alignment remained constant during data collection except where makeup was accounted for by the plant computer.
STEP/STANDARD                                    SAT/UNSAT I
STANDARD:
STEP 34.:      [18] IF unidentified leakage is more negative than -0.10 GPM, THEN              -    SAT STANDARD: Operator reviews ReS Leakage Rate Report and determines ReS Unidentified Leakage is more positive than -0.10 GPM. (Operator continues      -    UNSAT to the next step.
Operator determines that all equipment alignment remained constant.
STEP 35.:      [19] IF an unidentified leakage more positive than -0.10 GPM could not be      -    SAT obtained, OR IF four consecutive performances of this Instruction have resulted in a              UNSAT negative value of unidentified leakage, THEN ....                               -
STEP 26.: [11] D. eves and ReS remained nearly constant except where makeup was accounted for by the plant computer.
STANDARD: Operator reviews ReS Leakage Rate Report and determines ReS Unidentified Leakage is more positive than -0.10 GPM and only ONE performance of this instruction has been performed. (Operator continues to the next step.)
STANDARD:
STEP 36.:     [20] CHECK appropriate box to indicate whether the following acceptance        -    SAT criteria were satisfied.
Operator determines that CVCS and RCS remained nearly constant during data taking period. STEP 27.: [11] E. NO ReS dilution occurred during the data-taking period. STANDARD:
                                                                                                -   UNSAT NOTE:          Operator must evaluate the RCS Leakage Report in order to complete check boxes. Steps 35 thru 38 of this JPM complete this step.
Operator determines that no RCS dilutions occurred during the data-taking period. JPM 43-2 Page 10 of 13 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Job Performance Checklist:
STANDARD: Operator reviews ReS Leakage Report to determine answers to statements From Technical Specification Acceptance Criteria Section
STEPISTANDARD I STEP 23.: [11] WHEN data collection has been completed, THEN CHECK the following to indicate whether data is acceptable.
                                                                                                -   SAT STEP 37.:      The maximum individual SG leakage is less than or equal to 150 GPO.
Cue: Inform operator of the following:
UNSAT
A. Dates and times are correct and data collection performed for 2 hrs. STANDARD:
                                                                                                -
Operator determines that conditions for data collection were acceptable.
STANDARD: Operator reviews ReS Leakage Report and checks Box as YES.
NOTE: For Steps on procedure page 34 of 61 ules points recorded match those in Section 4.1[2]" RECORD the ICS Points that were available during performance of Leakage calculation.
Critical Step STEP 38.:      The total identified leakage is less than or equal to 10.0 GPM.                  -  SAT
STANDARD:
                                                                                                  -  UNSAT STANDARD: Operator reviews ReS Leakage Report and checks Box as NO.
All pOints were available, operator checks each box. IF ICS Points recorded in Section 4.1 [2J do NOT match ..........
Critical Step STEP 39.:       The total unidentified leakage is less than or equal to 1.0 GPM.               -  SAT
STANDARD:
                                                                                                  -,  UNSAT STANDARD: Operator reviews ReS Leakage Report and checks Box as YES.
Operator marks step N/A. STEP 24.: [11] B. No sampling and chemical additions occurred during data collection.
Critical Step
STANDARD:
 
Operator determines that no sampling and or chemical additions have occurred during data collection.
JPM 43-2 Page 13 of 13 Rev. 0 Job Performance Checklist:
STEP 25.: [11] C. All pumps, coolers, valve alignment remained constant during data collection except where makeup was accounted for by the plant computer.
STEP/STANDARD                                SAT/UNSAT I                From Administrative Acceptance Criteria Section
STANDARD:
                                                                                              -  SAT STEP 40.:     The maximum individual SG leakage is less than or equal to 75 GPO.
Operator determines that all equipment alignment remained constant.
                                                                                              -  UNSAT STANDARD: Operator reviews ReS Leakage Report and checks Box as YES.
STEP 26.: [11] D. eves and ReS remained nearly constant except where makeup was accounted for by the plant computer.
Critical Step
STANDARD:
                                                                                              -  SAT STEP 41.:      [21] IF any of the Technical Specification acceptance criteria stated in step [21] is NOT satisfied, THEN
Operator determines that CVCS and RCS remained nearly constant during data taking period. STEP 27.: [11] E. NO ReS dilution occurred during the data-taking period. STANDARD:
                                                                                              -  UNSAT
Operator determines that no RCS dilutions occurred during the data-taking period. JPM 43-2 Page 10 of 13 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
[a]      NOTIFY SM that ReS leakage exceeds limit and action requirement (b) of Leo 3.4.6.2 must be satisfied.
Job Performance Checklist:
[b]      REFER to EPIP-1 for REP implementation.
STEP/STANDARD I STEP 28.: [12] IF any substep in step [11] cannot be completed, THEN .... STANDARD:
Critical Step
Operator N/As this step. STEP 29.: [13] IF calculation inputs are invalid, THEN [a] INITIATE MANUAL function to correct inputs. [b] INITIATE EXECUTE function for calculated results. NOTE: IF Operator identifies ANY incorrect data input THEN complete step [13] [a] and [b]. STANDARD:
[c]     REFER TO AOP-R.01, Steam Generator Tube Leak, or AOP-R.05, ReS Leak and Leak Source Identification, as applicable.
Operator verifies calculation inputs are correct and continues with performance of SI-137.0. (Step 6.2 [13] [a] and [b]). STEP 30.: [14] PRINT a hard copy of the results. CUE: Examiner -hand the RCS Leakage Rate Report to Operator for interpretation.
Cue:     Acknowledge notification and reply that the crew SROs will evaluate Tech Specs, the REP, and applicable AOPs.
STANDARD:
STANDARD: Operator notifies SM that Technical Specification limits are exceeded:
If computer was available the operator would print results. STEP 31.: [15] ATTACH hard copy program output (printout) to surveillance procedure package. STANDARD:
Operator request hard copy of RCS Leakage Rate Report. STEP 32.: [16] WHEN all data collection has been completed, THEN NOTIFY Chemistry Lab .... Cue: Acknowledge the 51-137.0 is complete and RCS sampling and chemical additions may be resumed. STANDARD:
Operator Notifies Chemistry Lab that RCS sampling/chemical additions may be resumed as necessary.
STEP 33.: 1171 IF step 6.2 [5] [b] was performed for manual data collection, THEN ... STANDARD:
Operator N/As this step. -JPM 43-2 Page 11 of 13 Rev. 0 SAT/U N SAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Job Performance Checklist:
STEP/STANDARD I STEP 28.: [12] IF any substep in step [11] cannot be completed, THEN .... STANDARD:
Operator N/As this step. STEP 29.: [13] IF calculation inputs are invalid, THEN [a] INITIATE MANUAL function to correct inputs. [b] INITIATE EXECUTE function for calculated results. NOTE: IF Operator identifies ANY incorrect data input THEN complete step [13] [a] and [b]. STANDARD:
Operator verifies calculation inputs are correct and continues with performance of SI-137.0. (Step 6.2 [13] [a] and [b]). STEP 30.: [14] PRINT a hard copy of the results. CUE: Examiner -hand the RCS Leakage Rate Report to Operator for interpretation.
STANDARD:
If computer was available the operator would print results.
STEP 31.: [15] ATTACH hard copy program output (printout) to surveillance procedure package. STANDARD:
Operator request hard copy of RCS Leakage Rate Report. STEP 32.: [16] WHEN all data collection has been completed, THEN NOTIFY Chemistry Lab .... Cue: Acknowledge the 51-137.0 is complete and RCS sampling and chemical additions may be resumed. STANDARD:
Operator Notifies Chemistry Lab that RCS sampling/chemical additions may be resumed as necessary.
STEP 33.: 1171 IF step 6.2 [5] [b] was performed for manual data collection, THEN ... STANDARD:
Operator N/As this step. -JPM 43-2 Page 11 of 13 Rev. 0 SAT/U N SAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
Job Performance Checklist:
STEP/STANDARD I STEP 34.: [18] IF unidentified leakage is more negative than -0.10 GPM, THEN STANDARD:
Operator reviews ReS Leakage Rate Report and determines ReS Unidentified Leakage is more positive than -0.10 GPM. (Operator continues to the next step. STEP 35.: [19] IF an unidentified leakage more positive than -0.10 GPM could not be obtained, OR IF four consecutive performances of this Instruction have resulted in a negative value of unidentified leakage, THEN .... STANDARD:
Operator reviews ReS Leakage Rate Report and determines ReS Unidentified Leakage is more positive than -0.10 GPM and only ONE performance of this instruction has been performed. (Operator continues to the next step.) STEP 36.: [20] CHECK appropriate box to indicate whether the following acceptance criteria were satisfied.
NOTE: Operator must evaluate the RCS Leakage Report in order to complete check boxes. Steps 35 thru 38 of this JPM complete this step. STANDARD:
Operator reviews ReS Leakage Report to determine answers to statements From Technical Specification Acceptance Criteria Section STEP 37.: The maximum individual SG leakage is less than or equal to 150 GPO. STANDARD:
Operator reviews ReS Leakage Report and checks Box as YES. STEP 38.: The total identified leakage is less than or equal to 10.0 GPM. STANDARD:
Operator reviews ReS Leakage Report and checks Box as NO. STEP 39.: The total unidentified leakage is less than or equal to 1.0 GPM. STANDARD:
Operator reviews ReS Leakage Report and checks Box as YES. JPM 43-2 Page 12 of 13 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -, Critical Step Job Performance Checklist:
STEP/STANDARD I STEP 34.: [18] IF unidentified leakage is more negative than -0.10 GPM, THEN STANDARD:
Operator reviews ReS Leakage Rate Report and determines ReS Unidentified Leakage is more positive than -0.10 GPM. (Operator continues to the next step. STEP 35.: [19] IF an unidentified leakage more positive than -0.10 GPM could not be obtained, OR IF four consecutive performances of this Instruction have resulted in a negative value of unidentified leakage, THEN .... STANDARD:
Operator reviews ReS Leakage Rate Report and determines ReS Unidentified Leakage is more positive than -0.10 GPM and only ONE performance of this instruction has been performed. (Operator continues to the next step.) STEP 36.: [20] CHECK appropriate box to indicate whether the following acceptance criteria were satisfied.
NOTE: Operator must evaluate the RCS Leakage Report in order to complete check boxes. Steps 35 thru 38 of this JPM complete this step. STANDARD:
Operator reviews ReS Leakage Report to determine answers to statements From Technical Specification Acceptance Criteria Section STEP 37.: The maximum individual SG leakage is less than or equal to 150 GPO. STANDARD:
Operator reviews ReS Leakage Report and checks Box as YES. STEP 38.: The total identified leakage is less than or equal to 10.0 GPM. STANDARD:
Operator reviews ReS Leakage Report and checks Box as NO. STEP 39.: The total unidentified leakage is less than or equal to 1.0 GPM. STANDARD:
Operator reviews ReS Leakage Report and checks Box as YES. JPM 43-2 Page 12 of 13 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -, Critical Step Job Performance Checklist:
STEP/STANDARD I From Administrative Acceptance Criteria Section STEP 40.: The maximum individual SG leakage is less than or equal to 75 GPO. STANDARD:
Operator reviews ReS Leakage Report and checks Box as YES. STEP 41.: [21] IF any of the Technical Specification acceptance criteria stated in step [21] is NOT satisfied, THEN [a] NOTIFY SM that ReS leakage exceeds limit and action requirement (b) of Leo 3.4.6.2 must be satisfied.
[b] REFER to EPIP-1 for REP implementation.
[c] REFER TO AOP-R.01, Steam Generator Tube Leak, or AOP-R.05, ReS Leak and Leak Source Identification, as applicable.
Cue: Acknowledge notification and reply that the crew SROs will evaluate Tech Specs, the REP, and applicable AOPs. STANDARD:
Operator notifies SM that Technical Specification limits are exceeded:
* Leakage determined to be 10.64 gpm identified leakage;
* Leakage determined to be 10.64 gpm identified leakage;
* REFER to EPIP-1 for REP implementation
* REFER to EPIP-1 for REP implementation
* REFER appropriate AOP. STEP 42.: [22] IF leakage is within Tech Spec limits but exceeds administrative acceptance criteria for S/G leakage, THEN ... STANDARD:
* REFER appropriate AOP.
Operator reviews ReS Leakage Report and determines S/G leakage is within administrative limits, N/A's the step. STEP 43.: [23] WHEN leakage test is complete, THEN ENSURE [HS-62-118A]
STEP 42.:       [22] IF leakage is within Tech Spec limits but exceeds administrative       -  SAT acceptance criteria for S/G leakage, THEN ...
in P-AUTO. STANDARD:
STANDARD: Operator reviews ReS Leakage Report and determines S/G leakage is within         -  UNSAT administrative limits, N/A's the step.
Operator places HS-62-118A in P-AUTO and addresses the need for an IV. NOTE The following steps are from Section 7.0. STEP 44.: [1 ] NOTIFY Unit SRO that test has been completed.
                                                                                                -  SAT STEP 43.:       [23] WHEN leakage test is complete, THEN ENSURE [HS-62-118A] in P-AUTO.
STANDARD:
                                                                                                -  UNSAT STANDARD: Operator places HS-62-118A in P-AUTO and addresses the need for an IV.
Operator notifies Unit SRO that test has been completed.
NOTE         The following steps are from Section 7.0.                                   -  SAT STEP 44.:       [1 ]     NOTIFY Unit SRO that test has been completed.
I JPM 43-2 Page 13 of 13 Rev. 0 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Stop Time __ Job Performance Checklist:
UNSAT
STEP/STANDARD I From Administrative Acceptance Criteria Section STEP 40.: The maximum individual SG leakage is less than or equal to 75 GPO. STANDARD:
                                                                                                -
Operator reviews ReS Leakage Report and checks Box as YES. STEP 41.: [21] IF any of the Technical Specification acceptance criteria stated in step [21] is NOT satisfied, THEN [a] NOTIFY SM that ReS leakage exceeds limit and action requirement (b) of Leo 3.4.6.2 must be satisfied.
STANDARD: Operator notifies Unit SRO that test has been completed.
[b] REFER to EPIP-1 for REP implementation.
Stop Time__
[c] REFER TO AOP-R.01, Steam Generator Tube Leak, or AOP-R.05, ReS Leak and Leak Source Identification, as applicable.
I
Cue: Acknowledge notification and reply that the crew SROs will evaluate Tech Specs, the REP, and applicable AOPs. STANDARD:
 
Operator notifies SM that Technical Specification limits are exceeded:
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
* Leakage determined to be 10.64 gpm identified leakage;
DIRECTION TO TRAINEE:
* REFER to EPIP-1 for REP implementation
I will explain the initial conditions, and state the task to be performed. All control room steps shall be simulated for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
* REFER appropriate AOP. STEP 42.: [22] IF leakage is within Tech Spec limits but exceeds administrative acceptance criteria for S/G leakage, THEN ... STANDARD:
INITIAL CONDITIONS:
Operator reviews ReS Leakage Report and determines S/G leakage is within administrative limits, N/A's the step. STEP 43.: [23] WHEN leakage test is complete, THEN ENSURE [HS-62-118A]
in P-AUTO. STANDARD:
Operator places HS-62-118A in P-AUTO and addresses the need for an IV. NOTE The following steps are from Section 7.0. STEP 44.: [1 ] NOTIFY Unit SRO that test has been completed.
STANDARD:
Operator notifies Unit SRO that test has been completed.
I JPM 43-2 Page 13 of 13 Rev. 0 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Stop Time __
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) DIRECTION TO TRAINEE: I will explain the initial conditions, and state the task to be performed.
All control room steps shall be simulated for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 1. The Unit is in MODE 1 and the Plant Computer is operable.
: 1. The Unit is in MODE 1 and the Plant Computer is operable.
: 2. The U1 MCR crew suspects RCS leakage may have increased.
: 2. The U1 MCR crew suspects RCS leakage may have increased.
: 3. CCPIT/HUT leakage has been identified as 1 gpm. INITIATING CUES: 1. You are directed to perform SI-137.0 using the plant computer.
: 3. CCPIT/HUT leakage has been identified as 1 gpm.
INITIATING CUES:
: 1. You are directed to perform SI-137.0 using the plant computer.
: 2. Inform the US of results when SI-137.0 is complete.
: 2. Inform the US of results when SI-137.0 is complete.
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) DIRECTION TO TRAINEE: I will explain the initial conditions, and state the task to be performed.
 
All control room steps shall be simulated for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
JPM Admin 2.4 2010 Page 1 of 8 Rev. 0 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # Admin 2.4 1002 Calculating Maximum Reactor Vessel Vent Time PREPAREDI REVISED BY:                                                             Date/
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
VALIDATED BY:
: 1. The Unit is in MODE 1 and the Plant Computer is operable.
* Date/
: 2. The U1 MCR crew suspects RCS leakage may have increased.
APPROVED BY:                                                           Date/
: 3. CCPIT/HUT leakage has been identified as 1 gpm. INITIATING CUES: 1. You are directed to perform SI-137.0 using the plant computer.
(Operations Training Manager)
: 2. Inform the US of results when SI-137.0 is complete.
CONCURRED:    **                                                         Date/
JPM Admin 2.4 2010 Page 1 of 8 Rev. 0 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # Admin 2.4 1002 Calculating Maximum Reactor Vessel Vent Time PREPAREDI REVISED BY: VALIDATED BY: APPROVED BY: CONCURRED:
(Operations Representative)
Date/
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
* Date/ Date/ (Operations Training Manager) ** Date/ (Operations Representative)
              ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
 
JPM Admin 2.4 2010 Page 1 of 8 Rev. 0 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # Admin 2.4 1002 Calculating Maximum Reactor Vessel Vent Time PREPAREDI REVISED BY: VALIDATED BY: APPROVED BY: CONCURRED:
JPM Admin 2.4 2010 Page 2 of 8 Rev. 0 NUCLEAR TRAINING REVISION/USAGE LOG REVISION                 DESCRIPTION OF                     V     DATE   PAGES        PREPARED/
Date/
NUMBER                         REVISION                                   AFFECTED    REVISED BY:
* Date/ Date/ (Operations Training Manager) ** Date/ (Operations Representative)
0                         Initial Issue               Y   12/04/09   All        M. Hankins v - Specify if the JPM change will require another Validation (Y or N).
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
See cover sheet for criteria.
NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 Initial Issue Y 12/04/09 v -Specify if the JPM change will require another Validation (Y or N). See cover sheet for criteria.
 
PAGES AFFECTED All JPM Admin 2.4 2010 Page 2 of 8 Rev. 0 PREPARED/
JPM Admin 2.4 2010 Page 3 of 8 Rev. 0 SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Task                                                                    JA/TA task #
REVISED BY: M. Hankins NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 Initial Issue Y 12/04/09 v -Specify if the JPM change will require another Validation (Y or N). See cover sheet for criteria.
Calculating Maximum Reactor Vessel Vent Time KIA Ratings:
PAGES AFFECTED All JPM Admin 2.4 2010 Page 2 of 8 Rev. 0 PREPARED/
2.4.13 4.0/4.6 Task Standard:
REVISED BY: M. Hankins Task SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Calculating Maximum Reactor Vessel Vent Time KIA Ratings: 2.4.13 4.0/4.6 Task Standard:
Evaluation Method:     Simulator _ __     In-Plant _ __
Evaluation Method: Simulator
                                                  ---
__ _ In-Plant __ _ JPM Admin 2.4 2010 Page 3 of 8 Rev. 0 JA/TA task # ====================================================================================
====================================================================================
Performer:
Performer:
NAME Start time __ _ Performance Rating: SAT UNSAT Performance Time Finish time __ _ Evaluator:  
NAME                                 Start time _ __
/ ------SIGNATURE DATE ====================================================================================
Performance Rating: SAT           UNSAT         Performance Time   Finish time _ __
COMMENTS Task SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Calculating Maximum Reactor Vessel Vent Time KIA Ratings: 2.4.13 4.0/4.6 Task Standard:
Evaluator:                                 1_ _ _ _ __
Evaluation Method: Simulator
                                          /- -----
__ _ In-Plant ---JPM Admin 2.4 2010 Page 3 of 8 Rev. 0 JA/TA task # ====================================================================================
SIGNATURE         DATE
Performer:
====================================================================================
NAME Start time __ _ Performance Rating: SAT UNSAT Performance Time Finish time __ _ Evaluator:
COMMENTS
1 _____ _ SIGNATURE DATE ====================================================================================
 
COMMENTS JPM Admin 2.4 2010 Page 4 of 8 Rev. 0 SPECIAL INSTRUCTIONS TO EVALUATOR: 1 . Critical step are identified.
JPM Admin 2.4 2010 Page 4 of 8 Rev. 0 SPECIAL INSTRUCTIONS TO EVALUATOR:
: 2. Any UNSAT requires comments
: 1.       Critical step are identified.
: 3. Ensure operator performs the following required actions for SELF-CHECKING;
: 2.       Any UNSAT requires comments
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.
: 3.       Ensure operator performs the following required actions for SELF-CHECKING;
: a. Identifies the correct unit, train, component, etc.
: b. Reviews the intended action and expected response.
: c. Compares the actual response to the expected response.
: c. Compares the actual response to the expected response.
Validation Time: CR 15 min Local ____ _ Tools/Equipment/Procedures Needed:  
Validation Time: CR 15 min                   Local -_-  __ -_ -_-
Tools/Equipment/Procedures Needed:


==REFERENCES:==
==REFERENCES:==


Reference Title Rev No. EA-0-7 Calculating Maximum Reactor Vessel Vent Time 2 I Task Number Task Title =============================================================================
Reference                                           Title                               Rev No.
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
EA-0-7                     Calculating Maximum Reactor Vessel Vent Time                 2 I Task Number                                                 Task Title                                           ContTRN
I will provide initiating cues and reports on other actions when directed by you. All steps shall be performed for this task When you complete the task successfully, the objective for this job performance measure will be satisfied.
  =============================================================================
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
READ TO OPERATOR Directions to Trainee:
Pzr Level is -95% RCS Pressure is 1000 psig (PI-68-62)
I will explain the initial conditions, and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. All steps shall be performed for this task When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
NO RCP's Running RVLlS Upper Plenum Range -95% Unit 1 is performing FR-1.3, Voids in Reactor Vessel, Step 20 INITIATING CUES: The US has directed you to perform EA-0-7 to calculate the maximum reactor vessel vent. ContTRN JPM Admin 2.4 2010 Page 4 of 8 Rev. 0 SPECIAL INSTRUCTIONS TO EVALUATOR: 1 . Critical step are identified.
INITIAL CONDITIONS:
: 2. Any UNSAT requires comments
Pzr Level is -95%
: 3. Ensure operator performs the following required actions for SELF-CHECKING;
RCS Pressure is 1000 psig (PI-68-62)
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.
NO RCP's Running RVLlS Upper Plenum Range -95%
: c. Compares the actual response to the expected response.
Unit 1 is performing FR-1.3, Voids in Reactor Vessel, Step 20 INITIATING CUES:
Validation Time: CR 15 min Local -----Tools/Equipment/Procedures Needed:  
The US has directed you to perform EA-0-7 to calculate the maximum reactor vessel vent.
 
JPM Admin 2.4 2010 Page 5 of 8 Rev. 0 Job Performance Checklist:
STEP/STANDARD                              SAT/UNSAT STEP 1.:      OBTAIN and RECORD the following data:                                -  SAT RCS Pressure
                                                                                    -  UNSAT CUE:        If asked, tell operator that PI-68-62, RCS pressure, is indicating
              -1000 psig STANDARD: Operator records RCS pressure as provided in the initial conditions or from the cue.
STEP 2.:      Containment lower compartment average air temperature (Tctmt)        -    SAT CUE:          Computer point U0983 indicates 223°F                                -    UNSAT STANDARD: Operator records 223°F for for the lower compartment temperature.
STEP 3.:      Containment lower compartment volume at standard temperature and pressure (A)                                                    -    SAT CUE:          Tell operator Computer point U0928 is inoperable.                  -    UNSAT STANDARD: Operator records that the computer point is not available and has SM initial step which is N/A'd.
STEP 4.:      Containment Hydrogen Concentration (H)
                                                                                    -  SAT CUE:          Tell operator Chemistry Supervisor reported Containment Hydrogen concentration 1.3 % - fifteen minutes ago.                  -  UNSAT STANDARD: Operator records hydrogen concentration provided in cue.
STEP 5.:        DETERMINE containment lower compartment volume at                    -   SAT standard temperature and pressure (A)
: a. If computer point U0928 available                                -  UNSAT NOTE:      U0928 is not available operator continues with the next substep.
STANDARD: Operator N/A this substep ..
 
JPM Admin 2.4 2010 Page 6 of 8 Rev. 0 Job Performance Checklist:
STEP/STANDARD                                SAT/UNSAT STEP 6.:      b. IF computer point U0928 NOT available, THEN                            SAT CALCULATE A as follows:
_UNSAT 383,000 cu ft X      492Ro    = 275, 760 cu ft (460 + 223°F)                                                        Critical Step STANDARD: Operator performs substep b, and determines A= 275,760 cu ft
                  +/- 250 cu ft.
STEP 7.:        DETERMINE maximum hydrogen volume that can be vented (8)                  SAT WHILE maintaining containment hydrogen concentration less than 3%.                                                               _UNSAT 8=    (3%-H%) X A CU FT      = 1.7 X 275,760 = 4690 100%                    100 Critical Step STANDARD: Operator utilizes data from step 4.2.1 for Containment Hydrogen concentration and step 4.2.2 (b) for the lower compartment volume, and performs calculation to determine the max hydrogen colume that can be vented while maintaining the containment hydrogen concentration less than 3%.
Range 4680 to 4700 cu ft STEP 8.:       DETERMINE hydrogen flow rate as a function of                            SAT RCS pressure (C):
: a. RECORD RCS pressure                                                _UNSAT 1000      psig 4 .. 2.1 STANDARD: Operator records RCS pressure as given in the initial conditions.
STEP 9.:        b. DETERMINE hydrogen flow rate (C ) Using Curve 8, Hydrogen          _SAT Flow vs RCS Pressure:
UNSAT C=  _____________
C= _--,-=:-_--:-:-_      SCFM
_ SCFM (Curve 8)
Critical STANDARD: Operator uses the RCS pressure from 4.2.1 to determine                  Step hydrogen flow rate using Curve 8. Range 3250 +/- 100 SCFM.
I
 
JPM Admin 2.4 2010 Page 7 of8 Rev. 0 Job Performance Checklist:
STEP/STANDARD                            SAT/UNSAT STEP 10.:      CALCULATE maximum venting time (T):                              -    SAT T=              B CU FT                                          -    UNSAT C Standard CU FT/Minute Critical T=    4690                                                      Step 3250 Cue:
STANDARD: Operator calculates the maximum venting time. Range 1.4 to 1.5 minutes.
STEP 11.:      NOTIFY SRO of maximum venting time determined using              -  SAT EA-0-7.
                                                                                  -  UNSAT Cue:
STANDARD: Operator notifies US of maximum venting time determined in EA-0-7.
End OfJPM


==REFERENCES:==
READ TO OPERATOR Directions to Trainee:
I will explain the initial conditions, and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. All steps shall be performed for this task When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Pzr Level is -95%
RCS Pressure is 1000 psig (PI-68-2)
NO RCP's Running RVLlS Upper Plenum Range -95%
Unit 1 is performing FR-1.3, Voids in Reactor Vessel, Step 20 INITIATING CUES:
The US has directed you to perform EA-0-7 to calculate the maximum reactor vessel vent.


Reference Title Rev No. EA-0-7 Calculating Maximum Reactor Vessel Vent Time 2 I Task Number Task Title =============================================================================
JPM 190-1 Page 1 of 8 Rev. 0 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM 190-1 Reactivity Balance Calculation (Independent Verification Appendix J)
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
I will provide initiating cues and reports on other actions when directed by you. All steps shall be performed for this task When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
Pzr Level is -95% RCS Pressure is 1000 psig (PI-68-62)
NO RCP's Running RVLlS Upper Plenum Range -95% Unit 1 is performing FR-1.3, Voids in Reactor Vessel, Step 20 INITIATING CUES: The US has directed you to perform EA-0-7 to calculate the maximum reactor vessel vent. ContTRN Job Performance Checklist:
STEP/STANDARD STEP 1.: OBTAIN and RECORD the following data: RCS Pressure CUE: If asked, tell operator that PI-68-62, RCS pressure, is indicating
-1000 psig STANDARD:
Operator records RCS pressure as provided in the initial conditions or from the cue. STEP 2.: Containment lower compartment average air temperature (Tctmt) CUE: Computer point U0983 indicates 223°F STANDARD:
Operator records 223°F for for the lower compartment temperature.
STEP 3.: Containment lower compartment volume at standard temperature and pressure (A) CUE: Tell operator Computer point U0928 is inoperable.
STANDARD:
Operator records that the computer point is not available and has SM initial step which is N/A'd. STEP 4.: Containment Hydrogen Concentration (H) CUE: Tell operator Chemistry Supervisor reported Containment Hydrogen concentration 1.3 % -fifteen minutes ago. STANDARD:
Operator records hydrogen concentration provided in cue. STEP 5.: DETERMINE containment lower compartment volume at standard temperature and pressure (A) a. If computer point U0928 available NOTE: U0928 is not available operator continues with the next substep. STANDARD:
Operator N/A this substep .. JPM Admin 2.4 2010 Page 5 of 8 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Job Performance Checklist:
STEP/STANDARD STEP 1.: OBTAIN and RECORD the following data: RCS Pressure CUE: If asked, tell operator that PI-68-62, RCS pressure, is indicating
-1000 psig STANDARD:
Operator records RCS pressure as provided in the initial conditions or from the cue. STEP 2.: Containment lower compartment average air temperature (Tctmt) CUE: Computer point U0983 indicates 223°F STANDARD:
Operator records 223°F for for the lower compartment temperature.
STEP 3.: Containment lower compartment volume at standard temperature and pressure (A) CUE: Tell operator Computer point U0928 is inoperable.
STANDARD:
Operator records that the computer point is not available and has SM initial step which is N/A'd. STEP 4.: Containment Hydrogen Concentration (H) CUE: Tell operator Chemistry Supervisor reported Containment Hydrogen concentration 1.3 % -fifteen minutes ago. STANDARD:
Operator records hydrogen concentration provided in cue. STEP 5.: DETERMINE containment lower compartment volume at standard temperature and pressure (A) a. If computer point U0928 available NOTE: U0928 is not available operator continues with the next substep. STANDARD:
Operator N/A this substep .. JPM Admin 2.4 2010 Page 5 of 8 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
I Job Performance Checklist:
STEP 6.: STEP/ST ANDARD b. IF computer point U0928 NOT available, THEN CALCULATE A as follows: 383,000 cu ft X 492Ro = 275, 760 cu ft (460 + 223°F) STANDARD:
Operator performs substep b, and determines A= 275,760 cu ft +/-250 cu ft. STEP 7.: DETERMINE maximum hydrogen volume that can be vented (8) WHILE maintaining containment hydrogen concentration less than 3%. 8= (3%-H%) X A CU FT = 1.7 X 275,760 = 4690 100% 100 STANDARD:
Operator utilizes data from step 4.2.1 for Containment Hydrogen concentration and step 4.2.2 (b) for the lower compartment volume, and performs calculation to determine the max hydrogen colume that can be vented while maintaining the containment hydrogen concentration less than 3%. STEP 8.: Range 4680 to 4700 cu ft DETERMINE hydrogen flow rate as a function of RCS pressure (C): a. RECORD RCS pressure 1000 psig 4 .. 2.1 STANDARD:
Operator records RCS pressure as given in the initial conditions.
STEP 9.: b. DETERMINE hydrogen flow rate (C ) Using Curve 8, Hydrogen Flow vs RCS Pressure:
C= _____________
SCFM (Curve 8) STANDARD:
Operator uses the RCS pressure from 4.2.1 to determine hydrogen flow rate using Curve 8. Range 3250 +/-100 SCFM. JPM Admin 2.4 2010 Page 6 of 8 Rev. 0 SAT/UNSAT SAT _UNSAT Critical Step SAT _UNSAT Critical Step SAT _UNSAT _SAT UNSAT Critical Step I Job Performance Checklist:
STEP 6.: STEP/ST ANDARD b. IF computer point U0928 NOT available, THEN CALCULATE A as follows: 383,000 cu ft X 492Ro = 275, 760 cu ft (460 + 223°F) STANDARD:
Operator performs substep b, and determines A= 275,760 cu ft +/-250 cu ft. STEP 7.: DETERMINE maximum hydrogen volume that can be vented (8) WHILE maintaining containment hydrogen concentration less than 3%. 8= (3%-H%) X A CU FT = 1.7 X 275,760 = 4690 100% 100 STANDARD:
Operator utilizes data from step 4.2.1 for Containment Hydrogen concentration and step 4.2.2 (b) for the lower compartment volume, and performs calculation to determine the max hydrogen colume that can be vented while maintaining the containment hydrogen concentration less than 3%. STEP 8.: Range 4680 to 4700 cu ft DETERMINE hydrogen flow rate as a function of RCS pressure (C): a. RECORD RCS pressure 1000 psig 4 .. 2.1 STANDARD:
Operator records RCS pressure as given in the initial conditions.
STEP 9.: b. DETERMINE hydrogen flow rate (C ) Using Curve 8, Hydrogen Flow vs RCS Pressure:
C= _--,-=:-_--:-:-
__ SCFM (Curve 8) STANDARD:
Operator uses the RCS pressure from 4.2.1 to determine hydrogen flow rate using Curve 8. Range 3250 +/-100 SCFM. JPM Admin 2.4 2010 Page 6 of 8 Rev. 0 SAT/UNSAT SAT _UNSAT Critical Step SAT _UNSAT Critical Step SAT _UNSAT _SAT UNSAT Critical Step Job Performance Checklist:
STEP/STANDARD STEP 10.: CALCULATE maximum venting time (T): T= B CU FT C Standard CU FT/Minute T= 4690 3250 Cue: STANDARD:
Operator calculates the maximum venting time. Range 1.4 to 1.5 minutes. STEP 11.: NOTIFY SRO of maximum venting time determined using EA-0-7. Cue: STANDARD:
Operator notifies US of maximum venting time determined in EA-0-7. End OfJPM JPM Admin 2.4 2010 Page 7 of8 Rev. 0 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -Job Performance Checklist:
STEP/STANDARD STEP 10.: CALCULATE maximum venting time (T): T= B CU FT C Standard CU FT/Minute T= 4690 3250 Cue: STANDARD:
Operator calculates the maximum venting time. Range 1.4 to 1.5 minutes. STEP 11.: NOTIFY SRO of maximum venting time determined using EA-0-7. Cue: STANDARD:
Operator notifies US of maximum venting time determined in EA-0-7. End OfJPM JPM Admin 2.4 2010 Page 7 of8 Rev. 0 SAT/UNSAT SAT -UNSAT -Critical Step SAT -UNSAT -
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
I will provide initiating cues and reports on other actions when directed by you. All steps shall be performed for this task When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
Pzr Level is -95% RCS Pressure is 1000 psig (PI-68-2)
NO RCP's Running RVLlS Upper Plenum Range -95% Unit 1 is performing FR-1.3, Voids in Reactor Vessel, Step 20 INITIATING CUES: The US has directed you to perform EA-0-7 to calculate the maximum reactor vessel vent. READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
I will provide initiating cues and reports on other actions when directed by you. All steps shall be performed for this task When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
Pzr Level is -95% RCS Pressure is 1000 psig (PI-68-2)
NO RCP's Running RVLlS Upper Plenum Range -95% Unit 1 is performing FR-1.3, Voids in Reactor Vessel, Step 20 INITIATING CUES: The US has directed you to perform EA-0-7 to calculate the maximum reactor vessel vent.
PREPARED!
PREPARED!
REVISED BY: SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM 190-1 Reactivity Balance Calculation (Independent Verification Appendix J) Date/ JPM 190-1 Page 1 of 8 Rev. 0 VALIDATED BY:
REVISED BY:                                                             Date/
VALIDATED BY:
* Date/
* Date/
APPROVED BY: CONCURRED:
              ------------------------------------------------
Date/ (Operations Training Manager) ** Date/ (Operations Representative)
              ----------------------------------~~----------
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
APPROVED BY:                                                            Date/
PREPARED!
(Operations Training Manager)
REVISED BY: SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM 190-1 Reactivity Balance Calculation (Independent Verification Appendix J) Date/ JPM 190-1 Page 1 of 8 Rev. 0 VALIDATED BY:
CONCURRED:    **                                                       Date/
* Date/ APPROVED BY: CONCURRED:
(Operations Representative)
------------------------------------------------
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
Date/ (Operations Training Manager) ** Date/ (Operations Representative)
              ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
 
NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 Initial Issue, adapted from JPM 190 Y 12/08/09 v -Specify if the JPM change will require another Validation (Y or N). See cover sheet for criteria.
JPM 190-1 Page 20f 8 Rev. 0 NUCLEAR TRAINING REVISION/USAGE LOG REVISION                   DESCRIPTION OF                 V     DATE     PAGES    PREPARED/
PAGES AFFECTED ALL JPM 190-1 Page 20f 8 Rev. 0 PREPARED/
NUMBER                           REVISION                                 AFFECTED REVISED BY:
REVISED BY: M Hankins NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 Initial Issue, adapted from JPM 190 Y 12/08/09 v -Specify if the JPM change will require another Validation (Y or N). See cover sheet for criteria.
0             Initial Issue, adapted from JPM 190     Y     12/08/09   ALL    M Hankins v - Specify if the JPM change will require another Validation (Y or N).
PAGES AFFECTED ALL JPM 190-1 Page 20f 8 Rev. 0 PREPARED/
See cover sheet for criteria.
REVISED BY: M Hankins SEQUOY AH NUCLEAR PLANT AUO/RO/SRO JOB PERFORMANCE MEASURE JPM 190-1 Page 3 of a Rev. 0 Task: Perform an Independent Verification of a Reactivity Balance Calculation per 0-SO-62-7, Appendix J JAITA TASK #: 0040070101 (RO) KIA Ratings: Task Standard:
 
2.1.25 (3.9/4.2) 004 A4.04 (3.2/3.6) 004 K5.20 (3.6/3.7)
JPM 190-1 Page 3 of a Rev. 0 SEQUOY AH NUCLEAR PLANT AUO/RO/SRO JOB PERFORMANCE MEASURE Task: Perform an Independent Verification of a Reactivity Balance Calculation per 0-SO-62-7, Appendix J JAITA TASK #: 0040070101 (RO)
KIA Ratings:
2.1.25 (3.9/4.2)                             004 K5.20 (3.6/3.7) 004 A4.04 (3.2/3.6)
Task Standard:
Operator performs 0-SO-62-7 Appendix J Independent Verification of Reactivity Balance Calculation.
Operator performs 0-SO-62-7 Appendix J Independent Verification of Reactivity Balance Calculation.
Evaluation Method: Simulator X --'-'----In-Plant ----===================================================================================
Evaluation Method:     Simulator - - ' -
X' - - - -   In-Plant -
_-_- _- _
===================================================================================
Performer:
Performer:
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
NAME                                                   Start Time _ __
SIGNATURE DATE ===================================================================================
Performance Rating:   SAT         UNSAT               Performance Time               Finish Time _
COMMENTS SEQUOY AH NUCLEAR PLANT AUO/RO/SRO JOB PERFORMANCE MEASURE JPM 190-1 Page 3 of a Rev. 0 Task: Perform an Independent Verification of a Reactivity Balance Calculation per 0-SO-62-7, Appendix J JAITA TASK #: 0040070101 (RO) KIA Ratings: Task Standard:
__ _ __
2.1.25 (3.9/4.2) 004 A4.04 (3.2/3.6) 004 K5.20 (3.6/3.7)
Evaluator:
Operator performs 0-SO-62-7 Appendix J Independent Verification of Reactivity Balance Calculation.
SIGNATURE                     DATE
Evaluation Method: Simulator X --'-'----In-Plant ___ _ ===================================================================================
===================================================================================
Performer:
COMMENTS
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
 
SIGNATURE DATE ===================================================================================
JPM 190-1 Page 4 of 8 Rev. 0 SPECIAL INSTRUCTIONS TO EVALUATOR:
COMMENTS JPM 190-1 Page 4 of 8 Rev. 0 SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Critical steps are identified.
: 1. Critical steps are identified.
: 2. Any UNSAT requires comments , 3. Ensure operator performs the following required actions for SELF-CHECKING;
: 2. Any UNSAT requires comments                               ,
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.
: 3. Ensure operator performs the following required actions for SELF-CHECKING;
: a. Identifies the correct unit, train, component, etc.
: b. Reviews the intended action and expected response.
: c. Compares the actual response to the expected response.
: c. Compares the actual response to the expected response.
: 4. This JPM should only be performed by an SRO, also provide SRO with completed Appendix E for evaluation when cued .. Validation Time: CR. 25 min Local Tools/Equipment/Procedures Needed 1 . Cycle Nuclear Design Report (NDR) 2. 0-SO-62-7 Boron Concentration Control 3. Highlighter and ruler  
: 4. This JPM should only be performed by an SRO, also provide SRO with completed Appendix E for evaluation when cued ..
Validation Time: CR.         25 min                   Local Tools/Equipment/Procedures Needed 1 . Cycle Nuclear Design Report (NDR)
: 2. 0-SO-62-7 Boron Concentration Control
: 3. Highlighter and ruler


==References:==
==References:==


Reference Title Rev No. A. 0-SO-62-7 Boron Concentration Control 56 B. TI-44 Boron Tables 12 =============================================================================
Reference                                           Title                           Rev No.
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
A. 0-SO-62-7                                   Boron Concentration Control                           56 B. TI-44                                       Boron Tables                                           12
All steps shall be performed for this JPM. I will provide initiating cues and indicate any steps to be discussed.
=============================================================================
When you complete the task successfully, the objective for this job performance measure will be satisfied.
READ TO OPERATOR Directions to Trainee:
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
I will explain the initial conditions, and state the task to be performed. All steps shall be performed for this JPM. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied.
: 1. Unit 2 is currently stable at 50%. 2. Control rod Bank D is at 170 steps. 3. RCS boron concentration is 450 ppm. 4. Core burnup is 18000 MWD/MTU. 5. Reactor Engineering has provided following Xenon data: INITIATING CUES: XE 1 = -2946 pcm XE 2 = -2792 pcm In preparation for power change from 50% to 100% on Unit 2, perform a Reactivity Balance Calculation to bring reactor power from 50% with Control Bank D rods at 170 steps to 100% with rods at 220 steps on Bank D, using a 5%/hour power increase rate. JPM 190-1 Page 4 of 8 Rev. 0 SPECIAL INSTRUCTIONS TO EVALUATOR:
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
: 1. Critical steps are identified.
INITIAL CONDITIONS:
: 2. Any UNSAT requires comments , 3. Ensure operator performs the following required actions for SELF-CHECKING;
: 1.       Unit 2 is currently stable at 50%.
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.
: 2.       Control rod Bank D is at 170 steps.
: c. Compares the actual response to the expected response.
: 3.       RCS boron concentration is 450 ppm.
: 4. This JPM should only be performed by an SRO, also provide SRO with completed Appendix E for evaluation when cued .. Validation Time: CR. 25 min Local Tools/Equipment/Procedures Needed 1 . Cycle Nuclear Design Report (NDR) 2. 0-SO-62-7 Boron Concentration Control 3. Highlighter and ruler
: 4.       Core burnup is 18000 MWD/MTU.
: 5.       Reactor Engineering has provided following Xenon data:
XE 1 =-2946 pcm XE 2 =-2792 pcm INITIATING CUES:
In preparation for power change from 50% to 100% on Unit 2, perform a Reactivity Balance Calculation to bring reactor power from 50% with Control Bank D rods at 170 steps to 100% with rods at 220 steps on Bank D, using a 5%/hour power increase rate.
 
JPM 190-1 Page 5 of 8 Rev: 0 Job Performance Checklist:
STEP/STANDARD                                SAT/UNSAT STEP 1.:      Obtain a copy of the procedure.                                     -    SAT
                                                                                    -    UNSAT STANDARD: Operator obtains a copy of 0-SO-62-7 Boron Concentration Control, Appendix J Reactivity Balance Calculation.                        Start Time_ _
STEP 2.:        [1] ENTER the following Data:                                      -    SAT
                                                                                    -    UNSAT Current RCS Boron Cue:        If operator contacts Chem Lab, state that RCS boron concentration is 450 ppm STANDARD    Operator enters 450 pm from INITIAL CONDITIONS Appendix J.
STEP 3.:        Core Burnup                                                        -    SAT Cue:        If ICS computer is not available inform operator that computer      -    UNSAT point 1U0981 reads 18,000 MWDIMTU STANDARD      Operator locates computer point 1U0981 and enters 18,000 MWD/MTU on Appendix J.
STEP 4.:        Current Reactor Power                                              -    SAT
                                                                                    -    UNSAT Cue:          Current reactor power is 50%, as given in the initial conditions.
STANDARD: Operator enters    50% per Initial Conditions STEP 5.:        Final Reactor Power                                                  -    SAT
                                                                                    -    UNSAT Cue:      Final reactor power is 100%, as given in the initial conditions.
STANDARD:      Operator enters 100% per Initial Conditions STEP 6.:        Total Reactor Power Change                                          -    SAT
                                                                                    -    UNSAT STANDARD:      Operator determines power change to be 50%.                      Critical Step
 
JPM 190-1 Page 6 of 8 Rev. 0 Job Performance Checklist:
STEP/STANDARD                                SAT/UNSAT STEP 7.:          Rate of Reactor power change                                          -    SAT STANDARD:          Operator enters 5%/hr per initial conditions.                          -    UNSAT STEP *8.:          Number of hours to change power                                        -    SAT
                                                                                            -   UNSAT STANDARD: Operator calculates number of hours to change power; 50% / 5%/hour and enters results:                                    Critical Step 10 hours STEP *9.:          Current Rod Position                                                  -    SAT
                                                                                            -    UNSAT STANDARD: Operator enters 170 steps on Bank D per Initial Conditions STEP *10.:        Final Rod Position                                                    -    SAT
                                                                                            -    UNSAT STANDARD: Operator enters 220 steps per Initial Conditions STEP *11.:        [2] CALCULATE change in boron concentration by performing the following:
[aJ 6p POWER DEFECT
                                                                                            -    SAT 6p POWER DEFECT ==          pcm PD 1 -        pcm PD2 == _ _pcm
                                                                                            -    UNSAT NOTE:            Use "eye-ball" interpolation between closest parameter lines. Band accuracy ~ increment presented on figure.                            Critical Step STANDARD: Operator uses proper curve, Figure 10, U2C17 Power Defect EOL, 450 ppm line (long dash line) to enter data. For 50% operator should enter -1440 pcm (1350 to 1450). For 100%, operator should enter
                    -2750 pcm (2650 to 2750).
6p POWER DEFECT == (1350 to 1450) pcm PD 1 - (2650 2750) pcm    =-1200 to -1400 pcm STEP *12.:        [bJ 6p XENON                                                            -    SAT 6p  XENON  =-2792 pcm XE    2 - (-2946 pcm) XE 1 =154 pcm                          -    UNSAT STANDARD: Operator enters Xenon values (provided in the initial conditions) and calculates the change in reactivity due to Xenon.
I
 
JPM 190-1 Page 7 of 8 Rev.~O Job Performance Checklist:
STEP/STANDARD                                SAT/UNSAT STEP *13.:      [c] b.p RODS b.p  RODS  =___ pcm Rods 2 - _ _ _ pcm Rods 1 =__pcm                        SAT
_UNSAT NOTE:        Use "eye-ball" interpolation between closest parameter lines. Band accuracy % increment presented on figure.
Critical Step STANDARD: Operator uses proper curve Figure 13. For 220 steps, operator should enter (0 to -50) pcm. For 170 (-550 to -600) steps operator should enter -575 pcm.
b.p RODS =(0 to -50) pcm Rods 2  - (-550 to -600) pcm Rods 1 = (500-600) pcm STEP 14.:      [d] Change in reactivity due to Power Defect, Xenon and Rods          _SAT
[a] + [b]+[c] =__      pcm                                            _UNSAT
(-1200 pcm to -1400) + 154 pcm +(500 to 600) pcm      =(-546 to -746)pcm STANDARD:      Operator adds the results for a + b+ c+ to determine change in      Critical Step reactivity due to power defect, Xenon and Rods STEP 15.:      [e]      Change in Boron Reactivity                                    _SAT Substep [d] X (-1) =(-546 to -746) pcm                                _UNSAT STANDARD:      Operator multiplies the results in substep [d] by negative one.
Critical Step STEP 16.:      [f] Change in Boron Concentration                                          SAT Substep [e] / Boron Worth                                              _UNSAT STANDARD: Operator Records change in boron reactivity and determines the          Critical Step Boron Worth pcm/ppm from Figure 14.
Substep [e] / (-7.56 to -7.64) pcm/ppm Boron worth = -71 to -98 ppm
 
JPM 190-1 Page 8 of 8 Rev. 0 Job Performance Checklist:
STEP/STANDARD                                    SAT/UNSAT NOTE:          Examiner provides operator with completed appendix E for Review when Appendix J is complete.
SAT STEP 17.:      SRO compares the results of Appendix J with the results of RO                UNSAT performance of Appendix E.
Critical Step STANDARD: SRO identifies an error made by the RO during performance of Appendix E in step [2.b], and directs the RO to reperform Appendix E. END TIME End of JPM
 
READ TO OPERATOR Directions to Trainee:
I will explain the initial conditions, and state the task to be performed. All steps shall be performed for this JPM. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
: 6.        Unit 1 is currently stable at 50%.
: 7.        Control rod Bank D is at 170 steps.
: 8.       RCS boron concentration is 450 ppm.
: 9.       Core burnup is 18000 MWD/MTU.
: 10.       Reactor Engineering has provided following Xenon data:
XE 1 = -2946 pcm
                                =
XE 2 -2792 pcm INITIATING CUES:
In preparation for power change from 50% to 90%, perform a Reactivity Balance Calculation to bring reactor power from 50% with Control Bank D rods at 170 steps to 100% with rods at 220 steps on Bank D, using a 5%/hour power increase rate.
 
JPM 410-1 Page 1 of 7 Rev. 0 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM 410-1 SROA2 Review Surveillance for Approval Original Signatures on File PREPARED!
REVISED BY:                                                              Date/
VALIDATED BY:
* Date/
APPROVED BY:                                                            Date!
(Operations Training Manager)
CONCURRED:    **                                                        Date/
(Operations Representative)
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
              ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).


==References:==
JPM 410-1 Page 2 of 7 Rev 0
                                                            -
NUCLEAR TRAINING REVISION/USAGE LOG Revision                          Description                                  Pages        Prepared/
Number                            Of Revision                    V    Date  Affected    Revised By:
0          Initial issue- adapted from SRO JPM A2 on          Y  12/7/09    All        M Hankins 3-07 AUDIT Exam, revised information recorded in SI to improve JPM evaluation v - Specify if the JPM change will require another validation (Y or N).
See cover sheet for criteria.


Reference Title Rev No. A. 0-SO-62-7 Boron Concentration Control 56 B. TI-44 Boron Tables 12 =============================================================================
JPM 410-1 Page 3 of 7 Rev. 0 SEQUOYAtt NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Task:
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
Review a surveillance for approval JAITA task # : 004 099 0201 Adjust seal injection supply controlled leakage KIA Ratings:   2.2.12 (3.7/4.1)
All steps shall be performed for this JPM. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 1. Unit 2 is currently stable at 50%. 2. Control rod Bank D is at 170 steps. 3. RCS boron concentration is 450 ppm. 4. Core burnup is 18000 MWD/MTU. 5. Reactor Engineering has provided following Xenon data: INITIATING CUES: XE 1 = -2946 pcm XE 2 = -2792 pcm In preparation for power change from 50% to 100% on Unit 2, perform a Reactivity Balance Calculation to bring reactor power from 50% with Control Bank D rods at 170 steps to 100% with rods at 220 steps on Bank D, using a 5%/hour power increase rate.
Job Performance Checklist:
STEP/STANDARD STEP 1.: Obtain a copy of the procedure.
STANDARD:
Operator obtains a copy of 0-SO-62-7 Boron Concentration Control, Appendix J Reactivity Balance Calculation.
STEP 2.: [1] ENTER the following Data: Current RCS Boron Cue: If operator contacts Chem Lab, state that RCS boron concentration is 450 ppm STANDARD Operator enters 450 pm from INITIAL CONDITIONS Appendix J. STEP 3.: Core Burnup Cue: If ICS computer is not available inform operator that computer point 1U0981 reads 18,000 MWDIMTU STANDARD Operator locates computer point 1 U0981 and enters 18,000 MWD/MTU on Appendix J. STEP 4.: Current Reactor Power Cue: Current reactor power is 50%, as given in the initial conditions.
STANDARD:
Operator enters 50% per Initial Conditions STEP 5.: Final Reactor Power Cue: Final reactor power is 100%, as given in the initial conditions.
STANDARD:
Operator enters 100% per Initial Conditions STEP 6.: Total Reactor Power Change STANDARD:
Operator determines power change to be 50%. JPM 190-1 Page 5 of 8 Rev: 0 SAT/UNSAT SAT -UNSAT -Start Time __ SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step Job Performance Checklist:
STEP/STANDARD STEP 1.: Obtain a copy of the procedure.
STANDARD:
Operator obtains a copy of 0-SO-62-7 Boron Concentration Control, Appendix J Reactivity Balance Calculation.
STEP 2.: [1] ENTER the following Data: Current RCS Boron Cue: If operator contacts Chem Lab, state that RCS boron concentration is 450 ppm STANDARD Operator enters 450 pm from INITIAL CONDITIONS Appendix J. STEP 3.: Core Burnup Cue: If ICS computer is not available inform operator that computer point 1U0981 reads 18,000 MWDIMTU STANDARD Operator locates computer point 1 U0981 and enters 18,000 MWD/MTU on Appendix J. STEP 4.: Current Reactor Power Cue: Current reactor power is 50%, as given in the initial conditions.
STANDARD:
Operator enters 50% per Initial Conditions STEP 5.: Final Reactor Power Cue: Final reactor power is 100%, as given in the initial conditions.
STANDARD:
Operator enters 100% per Initial Conditions STEP 6.: Total Reactor Power Change STANDARD:
Operator determines power change to be 50%. JPM 190-1 Page 5 of 8 Rev: 0 SAT/UNSAT SAT -UNSAT -Start Time __ SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step Job Performance Checklist:
STEP/STANDARD STEP 7.: Rate of Reactor power change STANDARD:
Operator enters 5%/hr per initial conditions.
STEP *8.: Number of hours to change power STANDARD:
Operator calculates number of hours to change power; 50% / 5%/hour and enters results: 10 hours STEP *9.: Current Rod Position STANDARD:
Operator enters 170 steps on Bank D per Initial Conditions STEP *10.: Final Rod Position STANDARD:
Operator enters 220 steps per Initial Conditions STEP *11.: [2] CALCULATE change in boron concentration by performing the following:
[aJ 6p POWER DEFECT 6p POWER DEFECT == pcm PD 1-pcm PD 2== __ pcm NOTE: Use "eye-ball" interpolation between closest parameter lines. Band accuracy increment presented on figure. STANDARD:
Operator uses proper curve, Figure 10, U2C17 Power Defect EOL, 450 ppm line (long dash line) to enter data. For 50% operator should enter -1440 pcm (1350 to 1450). For 100%, operator should enter -2750 pcm (2650 to 2750). 6p POWER DEFECT == (1350 to 1450) pcm PD 1 -(2650 2750) pcm = -1200 to -1400 pcm STEP *12.: [bJ 6p XENON 6p XENON = -2792 pcm XE 2 -(-2946 pcm) XE 1 = 154 pcm STANDARD:
Operator enters Xenon values (provided in the initial conditions) and I calculates the change in reactivity due to Xenon. JPM 190-1 Page 6 of 8 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -Job Performance Checklist:
STEP/STANDARD STEP 7.: Rate of Reactor power change STANDARD:
Operator enters 5%/hr per initial conditions.
STEP *8.: Number of hours to change power STANDARD:
Operator calculates number of hours to change power; 50% / 5%/hour and enters results: 10 hours STEP *9.: Current Rod Position STANDARD:
Operator enters 170 steps on Bank D per Initial Conditions STEP *10.: Final Rod Position STANDARD:
Operator enters 220 steps per Initial Conditions STEP *11.: [2] CALCULATE change in boron concentration by performing the following:
[aJ 6p POWER DEFECT 6p POWER DEFECT == pcm PD 1-pcm PD 2== __ pcm NOTE: Use "eye-ball" interpolation between closest parameter lines. Band accuracy increment presented on figure. STANDARD:
Operator uses proper curve, Figure 10, U2C17 Power Defect EOL, 450 ppm line (long dash line) to enter data. For 50% operator should enter -1440 pcm (1350 to 1450). For 100%, operator should enter -2750 pcm (2650 to 2750). 6p POWER DEFECT == (1350 to 1450) pcm PD 1 -(2650 2750) pcm = -1200 to -1400 pcm STEP *12.: [bJ 6p XENON 6p XENON = -2792 pcm XE 2 -(-2946 pcm) XE 1 = 154 pcm STANDARD:
Operator enters Xenon values (provided in the initial conditions) and I calculates the change in reactivity due to Xenon. JPM 190-1 Page 6 of 8 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -
Job Performance Checklist:
STEP *13.: NOTE: STEP/ST ANDARD [c] b.p RODS b.p RODS = ___ pcm Rods 2 -___ pcm Rods 1 = __ pcm Use "eye-ball" interpolation between closest parameter lines. Band accuracy % increment presented on figure. STANDARD:
Operator uses proper curve Figure 13. For 220 steps, operator should enter (0 to -50) pcm. For 170 (-550 to -600) steps operator should enter -575 pcm. STEP 14.: b.p RODS = (0 to -50) pcm Rods 2 -(-550 to -600) pcm Rods 1 = (500-600) pcm [d] Change in reactivity due to Power Defect, Xenon and Rods [a] + [b]+[c] = __ pcm (-1200 pcm to -1400) + 154 pcm +(500 to 600) pcm = (-546 to -746)pcm STANDARD:
STEP 15.: STANDARD:
STEP 16.: Operator adds the results for a + b+ c+ to determine change in reactivity due to power defect, Xenon and Rods [e] Change in Boron Reactivity Substep [d] X (-1) = (-546 to -746) pcm Operator multiplies the results in substep [d] by negative one. [f] Change in Boron Concentration Substep [e] / Boron Worth STANDARD:
Operator Records change in boron reactivity and determines the Boron Worth pcm/ppm from Figure 14. Substep [e] / (-7.56 to -7.64) pcm/ppm Boron worth = -71 to -98 ppm JPM 190-1 Page 7 of 8 SAT/UNSAT SAT _UNSAT Critical Step _SAT _UNSAT Critical Step _SAT _UNSAT Critical Step SAT _UNSAT Critical Step Job Performance Checklist:
STEP *13.: NOTE: STEP/ST ANDARD [c] b.p RODS b.p RODS = ___ pcm Rods 2 -___ pcm Rods 1 = __ pcm Use "eye-ball" interpolation between closest parameter lines. Band accuracy % increment presented on figure. STANDARD:
Operator uses proper curve Figure 13. For 220 steps, operator should enter (0 to -50) pcm. For 170 (-550 to -600) steps operator should enter -575 pcm. STEP 14.: b.p RODS = (0 to -50) pcm Rods 2 -(-550 to -600) pcm Rods 1 = (500-600) pcm [d] Change in reactivity due to Power Defect, Xenon and Rods [a] + [b]+[c] = __ pcm (-1200 pcm to -1400) + 154 pcm +(500 to 600) pcm = (-546 to -746)pcm STANDARD:
STEP 15.: STANDARD:
STEP 16.: Operator adds the results for a + b+ c+ to determine change in reactivity due to power defect, Xenon and Rods [e] Change in Boron Reactivity Substep [d] X (-1) = (-546 to -746) pcm Operator multiplies the results in substep [d] by negative one. [f] Change in Boron Concentration Substep [e] / Boron Worth STANDARD:
Operator Records change in boron reactivity and determines the Boron Worth pcm/ppm from Figure 14. Substep [e] / (-7.56 to -7.64) pcm/ppm Boron worth = -71 to -98 ppm JPM 190-1 Page 7 of 8 SAT/UNSAT SAT _UNSAT Critical Step _SAT _UNSAT Critical Step _SAT _UNSAT Critical Step SAT _UNSAT Critical Step Job Performance Checklist:
NOTE: STEP 17.: STEP/ST ANDARD Examiner provides operator with completed appendix E for Review when Appendix J is complete.
SRO compares the results of Appendix J with the results of RO performance of Appendix E. STANDARD:
SRO identifies an error made by the RO during performance of Appendix E in step [2.b], and directs the RO to reperform Appendix E. End of JPM JPM 190-1 Page 8 of 8 Rev. 0 SAT/UNSAT SAT UNSAT Critical Step END TIME Job Performance Checklist:
NOTE: STEP 17.: STEP/ST ANDARD Examiner provides operator with completed appendix E for Review when Appendix J is complete.
SRO compares the results of Appendix J with the results of RO performance of Appendix E. STANDARD:
SRO identifies an error made by the RO during performance of Appendix E in step [2.b], and directs the RO to reperform Appendix E. End of JPM JPM 190-1 Page 8 of 8 Rev. 0 SAT/UNSAT SAT UNSAT Critical Step END TIME READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All steps shall be performed for this JPM. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 6. Unit 1 is currently stable at 50%. 7. Control rod Bank D is at 170 steps. 8. RCS boron concentration is 450 ppm. 9. Core burnup is 18000 MWD/MTU. 10. Reactor Engineering has provided following Xenon data: INITIATING CUES: XE 1 = -2946 pcm XE 2 = -2792 pcm In preparation for power change from 50% to 90%, perform a Reactivity Balance Calculation to bring reactor power from 50% with Control Bank D rods at 170 steps to 100% with rods at 220 steps on Bank D, using a 5%/hour power increase rate. READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All steps shall be performed for this JPM. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 6. Unit 1 is currently stable at 50%. 7. Control rod Bank D is at 170 steps. 8. RCS boron concentration is 450 ppm. 9. Core burnup is 18000 MWD/MTU. 10. Reactor Engineering has provided following Xenon data: INITIATING CUES: XE 1 = -2946 pcm XE 2 = -2792 pcm In preparation for power change from 50% to 90%, perform a Reactivity Balance Calculation to bring reactor power from 50% with Control Bank D rods at 170 steps to 100% with rods at 220 steps on Bank D, using a 5%/hour power increase rate.
PREPARED!
REVISED BY: VALIDATED BY: APPROVED BY: CONCURRED:
* ** SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM 410-1 SROA2 Review Surveillance for Approval Original Signatures on File Date/ Date/ Date! (Operations Training Manager) Date/ (Operations Representative)
JPM 410-1 Page 1 of 7 Rev. 0
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
PREPARED!
REVISED BY: VALIDATED BY: APPROVED BY: CONCURRED:
* ** SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM 410-1 SROA2 Review Surveillance for Approval Original Signatures on File Date/ Date/ Date! (Operations Training Manager) Date/ (Operations Representative)
JPM 410-1 Page 1 of 7 Rev. 0
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision). 
-NUCLEAR TRAINING REVISION/USAGE LOG Revision Description Number Of Revision V 0 Initial issue-adapted from SRO JPM A2 on Y 3-07 AUDIT Exam, revised information recorded in SI to improve JPM evaluation v -Specify if the JPM change will require another validation (Y or N). See cover sheet for criteria.
Date 12/7/09 Pages JPM 410-1 Page 2 of 7 Rev 0 Prepared/
Affected Revised By: All M Hankins -NUCLEAR TRAINING REVISION/USAGE LOG Revision Description Number Of Revision V 0 Initial issue-adapted from SRO JPM A2 on Y 3-07 AUDIT Exam, revised information recorded in SI to improve JPM evaluation v -Specify if the JPM change will require another validation (Y or N). See cover sheet for criteria.
Date 12/7/09 Pages JPM 410-1 Page 2 of 7 Rev 0 Prepared/
Affected Revised By: All M Hankins Task: SEQUOY Att NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Review a surveillance for approval JAIT A task # : 004 099 0201 Adjust seal injection supply controlled leakage KIA Ratings: 2.2.12 (3.7/4.1)
Task Standard:
Task Standard:
JPM 410-1 Page 3 of 7 Rev. 0 Determine that seal injection flow is not within the acceptable area for the listed RCS pressure and determine that needle valves require adjustment Evaluation Method: Simulator
Determine that seal injection flow is not within the acceptable area for the listed RCS pressure and determine that needle valves require adjustment Evaluation Method:                 _~X...!...-...__
__ In-Plant __ _ ====================================================================================
Simulator _~X'-!...-...      In-Plant _
______
====================================================================================
Performer:
Performer:
NAME Start Time ___ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:  
NAME                                               Start Time _
-------_____ ---1 ___ -SIGNATURE DATE ====================================================================================
__  ____
COMMENTS Task: SEQUOY Att NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Review a surveillance for approval JAIT A task # : 004 099 0201 Adjust seal injection supply controlled leakage KIA Ratings: 2.2.12 (3.7/4.1)
Performance Rating: SAT                 UNSAT           Performance Time             Finish Time _ __
Task Standard:
Evaluator:       - - - - - - -_____---1_ _ _-
JPM 410-1 Page 3 of 7 Rev. 0 Determine that seal injection flow is not within the acceptable area for the listed RCS pressure and determine that needle valves require adjustment Evaluation Method: Simulator
SIGNATURE                     DATE
__ In-Plant ___ _ ====================================================================================
====================================================================================
Performer:
COMMENTS
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
 
-------_____ ---1 ___ -SIGNATURE DATE ====================================================================================
JPM 410-1 Page 4 of 7 Rev. 0 SPECIAL INSTRUCTIONS TO EVALUATOR:
COMMENTS SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. This JPM will be performed using passive observation of the first EOP transition brief given by the SRO that is NOT provided an exception in accordance with EPM-4 guidance, inserted prior to JPM step 1 of this JPM.
JPM 410-1 Page 4 of 7 Rev. 0 1. This JPM will be performed using passive observation of the first EOP transition brief given by the SRO that is NOT provided an exception in accordance with EPM-4 guidance, inserted prior to JPM step 1 of this JPM. 2. Any UNSAT requires comments.
: 2. Any UNSAT requires comments.
Validation Time: CR. 5 minutes Local ____ _ Tools/Equipment/Procedures Needed: None References*
Validation Time: CR. 5 minutes                     Local _ _ _ __
Reference Title Rev No. 1. 0-SI-SXX-068-137.3 Measurement of Reactor Coolant Pump Seal Injection Flow for 6 Units 1 and 2 =======================================================================================
Tools/Equipment/Procedures Needed:
READ TO OPERATOR DIRECTIONS TO TRAINEE: I will explain the initial conditions, and state the task to be performed.
None References*
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Reference                                         Title                                   Rev No.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
: 1.     0-SI-SXX-068-137.3               Measurement of Reactor Coolant Pump Seal Injection Flow for           6 Units 1 and 2
=======================================================================================
READ TO OPERATOR DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
* You are the Unit 1 Unit Supervisor
* You are the Unit 1 Unit Supervisor
* 1 A-A CCP is liS
* 1A-A CCP is liS
* O-SI-SXX-068-137.3, Measurement of Reactor Coolant Pump Seal Injection Flow For Units 1 and 2, has been completed INITIATING CUES: 1. Review the completed surveillance for approval, and identify any required actions or notifications.
* O-SI-SXX-068-137.3, Measurement of Reactor Coolant Pump Seal Injection Flow For Units 1 and 2, has been completed INITIATING CUES:
SPECIAL INSTRUCTIONS TO EVALUATOR:
: 1. Review the completed surveillance for approval, and identify any required actions or notifications.
JPM 410-1 Page 4 of 7 Rev. 0 1. This JPM will be performed using passive observation of the first EOP transition brief given by the SRO that is NOT provided an exception in accordance with EPM-4 guidance, inserted prior to JPM step 1 of this JPM. 2. Any UNSAT requires comments.
 
Validation Time: CR. 5 minutes Local ____ _ Tools/Equipment/Procedures Needed: None References*
JPM 410-1 Page 5 of 7 Rev. 0 Job Performance Checklist:
Reference Title Rev No. 1. 0-SI-SXX-068-137.3 Measurement of Reactor Coolant Pump Seal Injection Flow for 6 Units 1 and 2 =======================================================================================
STEP/STANDARD                                             SAT/UNSAT I
READ TO OPERATOR DIRECTIONS TO TRAINEE: I will explain the initial conditions, and state the task to be performed.
STEP 1.:     Reviews results of surveillance                                                         -    SAT
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
                                                                                                        -    UNSAT STANDARD:     Determines all required initials and signatures are present, steps performed have required place keeping.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
Start COMMENTS:                                                                                       Time STEP 2.:       ENSURE RCS pressure reading is 2235 +/- 20 psig
* You are the Unit 1 Unit Supervisor
                                                                                                        -    SAT STANDARD: SRO reviews step and ensure RCS pressure is within 2235 psig +/- 20 psig.
* 1 A-A CCP is liS
                                                                                                        -    UNSAT COMMENTS:
* O-SI-SXX-068-137.3, Measurement of Reactor Coolant Pump Seal Injection Flow For Units 1 and 2, has been completed INITIATING CUES: 1. Review the completed surveillance for approval, and identify any required actions or notifications.
STEP 3.:       ENSURE CCP A-A is operating .....
Job Performance Checklist:
                                                                                                        -    SAT STANDARD: SRO reviews step and ensures CCP AA is in service
STEP/STANDARD I STEP 1.: Reviews results of surveillance STANDARD:
                                                                                                        -    UNSAT COMMENTS:
Determines all required initials and signatures are present, steps performed have required place keeping. COMMENTS:
STEP 4.:       RECORD pressure reading in MCR. ....
STEP 2.: ENSURE RCS pressure reading is 2235 +/-20 psig STANDARD:
                                                                                                        -    SAT STANDARD: SRO reviews step and ensure RCS pressure recorder is within 2235 +/- 20 psig.                                                             -    UNSAT COMMENTS:
SRO reviews step and ensure RCS pressure is within 2235 psig +/-20 psig. COMMENTS:
STEP 5.:       PERFORM calculation to determine differential pressure ......                         -  SAT STANDARD:       SRO reviews calculation for differential pressure and determines it is correct       -  UNSAT COMMENTS:                                                                                         Critical Step
STEP 3.: ENSURE CCP A-A is operating  
 
..... STANDARD:
JPM 410-1 Page 6 of 7 Rev. 0 Job Performance Checklist STEP/STANDARD                                                 SAT/UNSAT I
SRO reviews step and ensures CCP AA is in service COMMENTS:
STEP 6.::       IF pressure drop is less than 100 psig ..... .                                           _SAT
STEP 4.: RECORD pressure reading in MCR. .... STANDARD:
_UNSAT STANDARD:     SRO determines step 6.1[5] is N/A since pressure drop is not less than 100 psig.
SRO reviews step and ensure RCS pressure recorder is within 2235 +/-20 psig. COMMENTS:
COMMENTS:                                                                                           Critical Step STEP 7.:       RECORD the seal injection flow rate to each of the four RCP's ...... .                         SAT
STEP 5.: PERFORM calculation to determine differential pressure ...... STANDARD:
_UNSAT STANDARD:       SRO determines flow rates are recorded for each RCP loop and that the total Injection flow rate was calculated correctly.
SRO reviews calculation for differential pressure and determines it is correct COMMENTS:
Critical Step 10.5 + 10.6+ 10.7 +10.5     =42.3 COMMENTS:
JPM 410-1 Page 5 of 7 Rev. 0 SAT/UNSAT SAT -UNSAT -Start Time SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step Job Performance Checklist:
STEP 8.:       FIND the point on the figure in Appendix A corresponding to DP ....... .                       SAT UNSAT Cue:   If applicant determines that seal injection fJow falls outside of the acceptable range, then direct them to determine technical specification actions Critical Step STANDARD:     Determines that with the actual DP, Acceptance Criteria will     not be met for the current seal injection flows.
STEP/STANDARD I STEP 1.: Reviews results of surveillance STANDARD:
COMMENTS:
Determines all required initials and signatures are present, steps performed have required place keeping. COMMENTS:
STEP 9.:       IF the plotted point for differential pressure versus seal injection flow falls               SAT outside the "acceptable region" ....... .
STEP 2.: ENSURE RCS pressure reading is 2235 +/-20 psig STANDARD:
UNSAT STANDARD:     SRO determines that the plotted pOint is not in the acceptable region:
SRO reviews step and ensure RCS pressure is within 2235 psig +/-20 psig. COMMENTS:
Following actions/notifications are required:                                         Critical Step
STEP 3.: ENSURE CCP A-A is operating
..... STANDARD:
SRO reviews step and ensures CCP AA is in service COMMENTS:
STEP 4.: RECORD pressure reading in MCR. .... STANDARD:
SRO reviews step and ensure RCS pressure recorder is within 2235 +/-20 psig. COMMENTS:
STEP 5.: PERFORM calculation to determine differential pressure ...... STANDARD:
SRO reviews calculation for differential pressure and determines it is correct COMMENTS:
JPM 410-1 Page 5 of 7 Rev. 0 SAT/UNSAT SAT -UNSAT -Start Time SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step I Job Performance Checklist STEP/STANDARD STEP 6.:: IF pressure drop is less than 100 psig ..... . STANDARD:
SRO determines step 6.1[5] is N/A since pressure drop is not less than 100 psig. COMMENTS:
STEP 7.: RECORD the seal injection flow rate to each of the four RCP's ...... . STANDARD:
SRO determines flow rates are recorded for each RCP loop and that the total Injection flow rate was calculated correctly.
10.5 + 10.6+ 10.7 +10.5 = 42.3 COMMENTS:
STEP 8.: FIND the point on the figure in Appendix A corresponding to DP ....... . Cue: If applicant determines that seal injection fJow falls outside of the acceptable range, then direct them to determine technical specification actions STANDARD:
Determines that with the actual DP, Acceptance Criteria will not be met for the current seal injection flows. COMMENTS:
STEP 9.: IF the plotted point for differential pressure versus seal injection flow falls outside the "acceptable region" ....... . STANDARD:
SRO determines that the plotted pOint is not in the acceptable region: COMMENTS:
Following actions/notifications are required:
* LCO 3.5.6 actions apply AND
* LCO 3.5.6 actions apply AND
* Section 6.3 of procedure must be performed.
* Section 6.3 of procedure must be performed.                                     Stop Time_ _
End of JPM JPM 410-1 Page 6 of 7 Rev. 0 SAT/UNSAT
COMMENTS:
_SAT _UNSAT Critical Step SAT _UNSAT Critical Step SAT UNSAT Critical Step SAT UNSAT Critical Step Stop Time __ I Job Performance Checklist STEP/STANDARD STEP 6.:: IF pressure drop is less than 100 psig ..... . STANDARD:
End of JPM
SRO determines step 6.1[5] is N/A since pressure drop is not less than 100 psig. COMMENTS:
 
STEP 7.: RECORD the seal injection flow rate to each of the four RCP's ...... . STANDARD:
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
SRO determines flow rates are recorded for each RCP loop and that the total Injection flow rate was calculated correctly.
READ TO OPERATOR DIRECTIONS TO TRAINEE:
10.5 + 10.6+ 10.7 +10.5 = 42.3 COMMENTS:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
STEP 8.: FIND the point on the figure in Appendix A corresponding to DP ....... . Cue: If applicant determines that seal injection fJow falls outside of the acceptable range, then direct them to determine technical specification actions STANDARD:
INITIAL CONDITIONS:
Determines that with the actual DP, Acceptance Criteria will not be met for the current seal injection flows. COMMENTS:
STEP 9.: IF the plotted point for differential pressure versus seal injection flow falls outside the "acceptable region" ....... . STANDARD:
SRO determines that the plotted pOint is not in the acceptable region: COMMENTS:
Following actions/notifications are required:
* LCO 3.5.6 actions apply AND
* Section 6.3 of procedure must be performed.
End of JPM JPM 410-1 Page 6 of 7 Rev. 0 SAT/UNSAT
_SAT _UNSAT Critical Step SAT _UNSAT Critical Step SAT UNSAT Critical Step SAT UNSAT Critical Step Stop Time __
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) READ TO OPERATOR DIRECTIONS TO TRAINEE: I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
* You are the Unit 1 Unit Supervisor
* You are the Unit 1 Unit Supervisor
* 1 A-A CCP is liS
* 1A-A CCP is liS
* O-SI-SXX-068-137.3, Measurement of Reactor Coolant Pump Seal Injection Flow For Units 1 and 2, has been completed INITIATING CUES: 1. Review the completed surveillance for approval, and identify any required actions or notifications.
* O-SI-SXX-068-137.3, Measurement of Reactor Coolant Pump Seal Injection Flow For Units 1 and 2, has been completed INITIATING CUES:
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) READ TO OPERATOR DIRECTIONS TO TRAINEE: I will explain the initial conditions, and state the task to be performed.
: 1. Review the completed surveillance for approval, and identify any required actions or notifications.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
 
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
JPM -A.3 Page 1 of6 REV. 1 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE ADMIN SRO A.3 JPM Approval of a Waste Gas Tank Release
* You are the Unit 1 Unit Supervisor
 
* 1 A-A CCP is liS
JPM -A.3 Page 2 of 6 REV. 1 I                                             NUCLEAR TRAINING REVISION/USAGE LOG REVISION                 DESCRIPTION OF                     V     DATE   PAGES   PREPARED/
* O-SI-SXX-068-137.3, Measurement of Reactor Coolant Pump Seal Injection Flow For Units 1 and 2, has been completed INITIATING CUES: 1. Review the completed surveillance for approval, and identify any required actions or notifications.
NUMBER                        REVISION                                    AFFECTED REVISED BY:
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE ADMIN SRO A.3 JPM Approval of a Waste Gas Tank Release JPM -A.3 Page 1 of6 REV. 1 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE ADMIN SRO A.3 JPM Approval of a Waste Gas Tank Release JPM -A.3 Page 1 of6 REV. 1 I NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 New Y 1 Revised to reflect procedure changes Y 12/08/09 v -Specify if the JPM change will require another validation (Y or N). See cover sheet for criteria.
0       New                                           Y               All 1       Revised to reflect procedure changes         Y   12/08/09   All    M Hankins v - Specify if the JPM change will require another validation (Y or N).
PAGES AFFECTED All All JPM -A.3 Page 2 of 6 REV. 1 PREPARED/
See cover sheet for criteria.
REVISED BY: M Hankins I NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 New Y 1 Revised to reflect procedure changes Y 12/08/09 v -Specify if the JPM change will require another validation (Y or N). See cover sheet for criteria.
 
PAGES AFFECTED All All JPM -A.3 Page 2 of 6 REV. 1 PREPARED/
JPM -A.3 Page 3 of 6 REV. 1 SEQUOYAH NUCLEAR PLANT ROISRO JOB PERFORMANCE MEASURE Task:
REVISED BY: M Hankins Task: SEQUOY AH NUCLEAR PLANT ROISRO JOB PERFORMANCE MEASURE Approval of a Waste Gas Tank Release JAiTA task: 5030010102 (SRO) 0690150102 (SRO) KIA Ratings: 2.3.6 (2.0/3.8) 2.3.11 Ability to Approve Release Permits. (CFR: 41.13/45.4/45.10) 2.0/3.8 Task Standard:
Approval of a Waste Gas Tank Release JAiTA task:
Candidate identifies  
5030010102 (SRO) 0690150102 (SRO)
... JPM -A.3 Page 3 of 6 REV. 1 (1) The US/SRO must approve the release if the tank if the release is to be made at 2300. (2) The required actions to allow a release with O-RM-90-118A out of service as identified in ODCM 1/21.2. (3) The required action if it takes 40 days to get parts to restore the monitor to Operable status. Valuation Method : Simulator X ---'-'---In-Plant ___ _ ===================================================================================
KIA Ratings:
2.3.6 (2.0/3.8) 2.3.11 Ability to Approve Release Permits. (CFR: 41.13/45.4/45.10) 2.0/3.8 Task Standard:
Candidate identifies ...
(1) The US/SRO must approve the release if the tank if the release is to be made at 2300.
(2) The required actions to allow a release with O-RM-90-118A out of service as identified in ODCM 1/21.2.
(3) The required action if it takes 40 days to get parts to restore the monitor to Operable status.
Valuation Method :       Simulator -_....:.X:..!....-__
X
                                      --'-'---
In-Plant _ _ __
===================================================================================
Performer:
Performer:
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:  
NAME                                                       Start Time _
--------_____ ___ -SIGNATURE DATE ===================================================================================
____  __
COMMENTS Task: SEQUOY AH NUCLEAR PLANT ROISRO JOB PERFORMANCE MEASURE Approval of a Waste Gas Tank Release JAiTA task: 5030010102 (SRO) 0690150102 (SRO) KIA Ratings: 2.3.6 (2.0/3.8) 2.3.11 Ability to Approve Release Permits. (CFR: 41.13/45.4/45.10) 2.0/3.8 Task Standard:
Performance Rating: SAT                   UNSAT             Performance Time                 Finish Time _ __
Candidate identifies
Evaluator:       - - - - - - - -_____~/------              ~/___-
... JPM -A.3 Page 3 of 6 REV. 1 (1) The US/SRO must approve the release if the tank if the release is to be made at 2300. (2) The required actions to allow a release with O-RM-90-118A out of service as identified in ODCM 1/21.2. (3) The required action if it takes 40 days to get parts to restore the monitor to Operable status. Valuation Method : Simulator
SIGNATURE                         DATE
_....:.X:..!....-
===================================================================================
__ In-Plant ___ _ ===================================================================================
COMMENTS
Performer:
 
NAME Start Time ___ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
JPM -A.3 Page 4 of 6 REV. 1 SPECIAL INSTRUCTIONS TO EVALUATOR~
--------_____
: 1. Any UNSAT requires comments
SIGNATURE DATE ===================================================================================
: 2. This task can be performed in a classroom setting.
COMMENTS SPECIAL INSTRUCTIONS TO
Validation Time: CR. 24 min                 Local _ _ _ __
: 1. Any UNSAT requires comments 2. This task can be performed in a classroom setting. Validation Time: CR. 24 min Tools/Equipment/Procedures Needed: OPDP-1, Conduct of Operations  
Tools/Equipment/Procedures Needed:
OPDP-1, Conduct of Operations


==References:==
==References:==


Reference
Reference                                           Title                          Rev No.
: 1. SON ODCM 2. 0-SI-CEM-077-410.4
: 1. SON ODCM                                   Offsite Dose Calculation Manual                            55
: 3. 0-SO-77-15 Local ____ _ Title Offsite Dose Calculation Manual Waste Gas Decay Tank Release Waste Gas Decay Tank Release JPM -A.3 Page 4 of 6 REV. 1 Rev No. 55 15 16 =============================================================================
: 2. 0-SI-CEM-077-410.4                         Waste Gas Decay Tank Release                              15
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
: 3. 0-SO-77-15                                 Waste Gas Decay Tank Release                               16
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
=============================================================================
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
READ TO OPERATOR Directions to Trainee:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
* The operating crew is preparing to release the Waste Gas Tank 'D'.
* The operating crew is preparing to release the Waste Gas Tank 'D'.
* 0-RM-90-118A, Waste Gas Radiation Monitor, is inoperable.
* 0-RM-90-118A, Waste Gas Radiation Monitor, is inoperable.
* The monthly projected offsite dose limits have not been exceeded.
* The monthly projected offsite dose limits have not been exceeded.
INITIATING CUES: You are to identify ...
INITIATING CUES:
(1) Who must approve the release if the tank is to be released on the night shift at 2300. (2) The required actions to allow a release with 0-RM-90-118A out of service. (3) The required action if it takes 40 days to get parts to restore the monitor to Operable status. SPECIAL INSTRUCTIONS TO
You are to identify ...
: 1. Any UNSAT requires comments 2. This task can be performed in a classroom setting. Validation Time: CR. 24 min Tools/Equipment/Procedures Needed: OPDP-1, Conduct of Operations
(1) Who must approve the release if the tank is to be released on the night shift at 2300.
(2) The required actions to allow a release with 0-RM-90-118A out of service.
(3) The required action if it takes 40 days to get parts to restore the monitor to Operable status.


==References:==
JPM -A.3 Page 50f6 REV. 1 Job Performance CheckHst STEP/STANDARD                                              SAT/U NSAT STEP 1.:  Identify who must approve the release if the tank is to be                  Start Time__
released on the night shift at 2300.
SAT STANDARD:        Candidate identifies the approval of the US/SRO is required, and may state that initials and justification are recorded on            _UNSAT 0-SI-CEM-077-410.4 data package cover sheet.
Critical Step COMMENTS:
STEP 2.:  The required actions to allow a release with 0-RM-90-118A out                        SAT of service.
_UNSAT STANDARD:        Candidate identifies the ODCM 1/2/1/2 required Action 40                Critical Step With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, the contents of the tank(s) may be released to the environment provided that prior to initiating the release:
: a. At least two independent samples of the tank's contents obtained by two technically qualified members of the facility staff are analyzed, and
: b. At least two technically qualified members of the Facility Staff independently verify the release rate calculations and;
: c. At least two technically qualified members of the Facility Staff independently verify the discharge valve lineup.
Otherwise, suspend release of radioactive effluents via this pathway.
COMMENTS:


Reference
JPM -A.3 Page 6 of 6 REV. 1 Job Performance Checklist STEP/STANDARD                                              SAT/U NSAT STEP 3.: The required action if it takes 40 days to get parts to restore the             SAT monitor to Operable status.
: 1. SON ODCM 2. 0-SI-CEM-077-410.4
UNSAT Critical STANDARD:       Candidate identifies that if the inoperable instruments cannot be      Step restored to OPERABLE status within 30 days, the next Annual Radioactive Effluent Report, pursuant to ODCM Administrative      Stop Time__
: 3. 0-SO-77-15 Local ____ _ Title Offsite Dose Calculation Manual Waste Gas Decay Tank Release Waste Gas Decay Tank Release JPM -A.3 Page 4 of 6 REV. 1 Rev No. 55 15 16 =============================================================================
Control 5.2, is to explain why the inoperability could not be corrected within 30 days.
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
* The operating crew is preparing to release the Waste Gas Tank 'D'.
* 0-RM-90-118A, Waste Gas Radiation Monitor, is inoperable.
* The monthly projected offsite dose limits have not been exceeded.
INITIATING CUES: You are to identify ...
(1) Who must approve the release if the tank is to be released on the night shift at 2300. (2) The required actions to allow a release with 0-RM-90-118A out of service. (3) The required action if it takes 40 days to get parts to restore the monitor to Operable status.
Job Performance CheckHst STEP/STANDARD STEP 1.: Identify who must approve the release if the tank is to be released on the night shift at 2300. STANDARD:
COMMENTS:
COMMENTS:
Candidate identifies the approval of the US/SRO is required, and may state that initials and justification are recorded on 0-SI-CEM-077-410.4 data package cover sheet. STEP 2.: The required actions to allow a release with 0-RM-90-118A out of service. STANDARD:
 
COMMENTS:
READ TO OPERATOR Directions to Trainee:
Candidate identifies the ODCM 1/2/1/2 required Action 40 With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, the contents of the tank(s) may be released to the environment provided that prior to initiating the release: a. At least two independent samples of the tank's contents obtained by two technically qualified members of the facility staff are analyzed, and b. At least two technically qualified members of the Facility Staff independently verify the release rate calculations and; c. At least two technically qualified members of the Facility Staff independently verify the discharge valve lineup. Otherwise, suspend release of radioactive effluents via this pathway. JPM -A.3 Page 50f6 REV. 1 SAT/U N SAT Start Time __ SAT _UNSAT Critical Step SAT _UNSAT Critical Step Job Performance CheckHst STEP/STANDARD STEP 1.: Identify who must approve the release if the tank is to be released on the night shift at 2300. STANDARD:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
COMMENTS:
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Candidate identifies the approval of the US/SRO is required, and may state that initials and justification are recorded on 0-SI-CEM-077-410.4 data package cover sheet. STEP 2.: The required actions to allow a release with 0-RM-90-118A out of service. STANDARD:
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
COMMENTS:
INITIAL CONDITIONS:
Candidate identifies the ODCM 1/2/1/2 required Action 40 With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, the contents of the tank(s) may be released to the environment provided that prior to initiating the release: a. At least two independent samples of the tank's contents obtained by two technically qualified members of the facility staff are analyzed, and b. At least two technically qualified members of the Facility Staff independently verify the release rate calculations and; c. At least two technically qualified members of the Facility Staff independently verify the discharge valve lineup. Otherwise, suspend release of radioactive effluents via this pathway. JPM -A.3 Page 50f6 REV. 1 SAT/U N SAT Start Time __ SAT _UNSAT Critical Step SAT _UNSAT Critical Step Job Performance Checklist STEP/STANDARD STEP 3.: The required action if it takes 40 days to get parts to restore the monitor to Operable status. STANDARD:
COMMENTS:
Candidate identifies that if the inoperable instruments cannot be restored to OPERABLE status within 30 days, the next Annual Radioactive Effluent Report, pursuant to ODCM Administrative Control 5.2, is to explain why the inoperability could not be corrected within 30 days. JPM -A.3 Page 6 of 6 REV. 1 SAT/U N SAT SAT UNSAT Critical Step Stop Time __ Job Performance Checklist STEP/STANDARD STEP 3.: The required action if it takes 40 days to get parts to restore the monitor to Operable status. STANDARD:
COMMENTS:
Candidate identifies that if the inoperable instruments cannot be restored to OPERABLE status within 30 days, the next Annual Radioactive Effluent Report, pursuant to ODCM Administrative Control 5.2, is to explain why the inoperability could not be corrected within 30 days. JPM -A.3 Page 6 of 6 REV. 1 SAT/U N SAT SAT UNSAT Critical Step Stop Time __
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
* The operating crew is preparing to release the Waste Gas Tank 'D'.
* The operating crew is preparing to release the Waste Gas Tank 'D'.
* 0-RM-90-118A, Waste Gas Radiation Monitor, is inoperable.
* 0-RM-90-118A, Waste Gas Radiation Monitor, is inoperable.
* The monthly projected offsite dose limits have not been exceeded.
* The monthly projected offsite dose limits have not been exceeded.
INITIATING CUES: You are to identify ...
INITIATING CUES:
(4) Who must approve the release if the tank is to be released on the night shift at 2300. (5) The required actions to allow a release with 0-RM-90-118A out of service. (6) The required action if it takes 40 days to get parts to restore the monitor to Operable status. READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
You are to identify ...
All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
(4) Who must approve the release if the tank is to be released on the night shift at 2300.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
(5) The required actions to allow a release with 0-RM-90-118A out of service.
* The operating crew is preparing to release the Waste Gas Tank 'D'.
(6) The required action if it takes 40 days to get parts to restore the monitor to Operable status.
* 0-RM-90-118A, Waste Gas Radiation Monitor, is inoperable.
 
* The monthly projected offsite dose limits have not been exceeded.
JPM # 19AP3 Page 1 of 9 Rev. 0 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 19AP3 Classify the Event per the REP (LOCA with Significant Fuel Failure)
INITIATING CUES: You are to identify ...
Original Signatures on File PREPARED/
(4) Who must approve the release if the tank is to be released on the night shift at 2300. (5) The required actions to allow a release with 0-RM-90-118A out of service. (6) The required action if it takes 40 days to get parts to restore the monitor to Operable status.
REVISED BY:                                                              Date/
PREPARED/
VALIDATED BY:
REVISED BY: SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 19AP3 Classify the Event per the REP (LOCA with Significant Fuel Failure) Original Signatures on File Date/ JPM # 19AP3 Page 1 of 9 Rev. 0 VALIDATED BY:
* Date/
* Date/
APPROVED BY: CONCURRED:
              ----------------------------------~=-----------
Date/ (Operations Training Manager) ** Date/ (Operations Representative)
              ----------------------------------~~----------
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
APPROVED BY:                                                             Date/
PREPARED/
(Operations Training Manager)
REVISED BY: SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 19AP3 Classify the Event per the REP (LOCA with Significant Fuel Failure) Original Signatures on File Date/ JPM # 19AP3 Page 1 of 9 Rev. 0 VALIDATED BY:
CONCURRED:    **                                                       Date/
* Date/
(Operations Representative)
APPROVED BY: CONCURRED:
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
Date/ (Operations Training Manager) ** Date/ (Operations Representative)
              ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM. ** Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
 
I NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 New JPM, adapted from JPM 19AP2 Y 12/09/09 v -Specify if the JPM change will require another validation (Y or N). See cover sheet for criteria.
JPM # 19AP3 Page 2 of 9 Rev. 0 I                                             NUCLEAR TRAINING REVISION/USAGE LOG REVISION                 DESCRIPTION OF                   V     DATE     PAGES   PREPARED/
PAGES AFFECTED All JPM # 19AP3 Page 2 of 9 Rev. 0 PREPARED/
NUMBER                        REVISION                                    AFFECTED REVISED BY:
REVISED BY: M. Hankins I NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE NUMBER REVISION 0 New JPM, adapted from JPM 19AP2 Y 12/09/09 v -Specify if the JPM change will require another validation (Y or N). See cover sheet for criteria.
0       New JPM, adapted from JPM 19AP2               Y   12/09/09   All    M. Hankins v - Specify if the JPM change will require another validation (Y or N).
PAGES AFFECTED All JPM # 19AP3 Page 2 of 9 Rev. 0 PREPARED/
See cover sheet for criteria.
REVISED BY: M. Hankins Task: SEQUOY AI"! NUCLEAR PLANT SRO JOB PERFORMANCE MEASURE Classify the Event per the REP (LOCA with Significant Fuel Failure) JAITA task #: 3440030302 (SRO) 3440190302 (SRO) KIA Ratings: 2.4.29 (2.6/4.0) 2.4.30 (2.2/3.6) 2.4.37 (2.0/3.5)
 
Evaluation Method: 2.4.38 (2.4/4.4) 2.4.40 (2.3/4.0) 2.4.41 (2.3/4.1)
JPM # 19AP3 Page 3 of 9 Rev. 0 SEQUOYAI"! NUCLEAR PLANT SRO JOB PERFORMANCE MEASURE Task:
Simulator X In-Plant __ _
Classify the Event per the REP (LOCA with Significant Fuel Failure)
* This JPM will be simulated JPM # 19AP3 Page 3 of 9 Rev. 0 ====================================================================================
JAITA task #: 3440030302       (SRO) 3440190302       (SRO)
KIA Ratings:
2.4.29 (2.6/4.0)                 2.4.38 (2.4/4.4) 2.4.30 (2.2/3.6)                 2.4.40 (2.3/4.0) 2.4.37 (2.0/3.5)                 2.4.41 (2.3/4.1)
Evaluation Method:      Simulator     X           In-Plant _ __
* This JPM will be simulated
====================================================================================
Performer:
Performer:
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:  
NAME                                       Start Time _ __
--------------------------/----
Performance Rating: SAT             UNSAT             Performance Time     Finish Time _ __
SIGNATURE DATE ====================================================================================
Evaluator:
COMMENTS Task: SEQUOY AI"! NUCLEAR PLANT SRO JOB PERFORMANCE MEASURE Classify the Event per the REP (LOCA with Significant Fuel Failure) JAITA task #: 3440030302 (SRO) 3440190302 (SRO) KIA Ratings: 2.4.29 (2.6/4.0) 2.4.30 (2.2/3.6) 2.4.37 (2.0/3.5)
                - ------         ---------/_
Evaluation Method: 2.4.38 (2.4/4.4) 2.4.40 (2.3/4.0) 2.4.41 (2.3/4.1)
                --------------------------/----
Simulator X In-Plant __ _
SIGNATURE
* This JPM will be simulated JPM # 19AP3 Page 3 of 9 Rev. 0 ====================================================================================
                                                              --
Performer:
DATE
NAME Start Time __ _ Performance Rating: SAT UNSAT Performance Time Finish Time __ _ Evaluator:
====================================================================================
----------------/_--
COMMENTS
SIGNATURE DATE ====================================================================================
 
COMMENTS JPM # 19AP3 Page 4 of9 Rev. 0 SPECIAL INSTRUCT-IONS TO EVALUATOR:
JPM # 19AP3 Page 4 of9 Rev. 0 SPECIAL INSTRUCT-IONS TO EVALUATOR:
: 1. Any UNSAT requires comments 2. Ensure operator performs the following required actions for SELF-CHECKING;
: 1. Any UNSAT requires comments
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.
: 2. Ensure operator performs the following required actions for SELF-CHECKING;
: a. Identifies the correct unit, train, component, etc.
: b. Reviews the intended action and expected response.
: c. Compares the actual response to the expected response.
: c. Compares the actual response to the expected response.
: d. Caution: DO NOT LET THE EXAMINEE FAX THE NOTIFICATION FORM OFFSITE! Validation Time: CR. 24 mins Local ____ _ Tools/Equipment/Procedures Needed: EPIP-1, Emergency Plan Classification Matrix EPIP-4, Site Area Emergency  
d.
Caution:             DO NOT LET THE EXAMINEE FAX THE NOTIFICATION FORM OFFSITE!
Validation Time: CR.       24 mins           Local -_- __  -_ -_-
Tools/Equipment/Procedures Needed:
EPIP-1, Emergency Plan Classification Matrix EPIP-4, Site Area Emergency


==References:==
==References:==


Reference Title Rev No. 1. EPIP-1 Emergency Plan Initiating Conditions Matrix 42 2. EPIP-4 Site Area Emergency 30 READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
Reference                                           Title                         Rev No.
All steps of this JPM shall be simulated.
: 1. EPIP-1                                     Emergency Plan Initiating Conditions Matrix               42
I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
: 2. EPIP-4                                     Site Area Emergency                                       30 READ TO OPERATOR Directions to Trainee:
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. The simulator is NOT representative of the scenario you are about to address. INITIAL CONDITIONS:
I will explain the initial conditions, and state the task to be performed. All steps of this JPM shall be simulated. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
The simulator is NOT representative of the scenario you are about to address.
INITIAL CONDITIONS:
: 1. Approximately 50 minutes ago, Unit 1 experienced an AUTO SI from a small RCS leak which quickly escalated to a LOCA and a high containment pressure.
: 1. Approximately 50 minutes ago, Unit 1 experienced an AUTO SI from a small RCS leak which quickly escalated to a LOCA and a high containment pressure.
: 2. RCS pressure has stabilized at 600 psig. The CLAs are injecting.
: 2. RCS pressure has stabilized at 600 psig. The CLAs are injecting.
: 3. The ONLY ECCS pump available and in service is the 18-8 RHR pump. The last of the other ECCS pumps tripped off shortly after the RCPs were removed from service per procedure.
: 3. The ONLY ECCS pump available and in service is the 18-8 RHR pump. The last of the other ECCS pumps tripped off shortly after the RCPs were removed from service per procedure. All other equipment operated as designed.
All other equipment operated as designed.
: 4. Maximum containment pressure was 5 psig.
: 4. Maximum containment pressure was 5 psig. 5. Lower containment radiation level is 1.8E+02 Rem/hr of RM-90-271A.
: 5. Lower containment radiation level is 1.8E+02 Rem/hr of RM-90-271A.
: 6. Unit 2 is at 100% RTP and stable. 7. For purposes of this JPM the TSC has not been staffed. INITIATING CUES: 1. You are the US and have assumed the SED position.
: 6. Unit 2 is at 100% RTP and stable.
: 2. The ST A reports a RED path condition exists on Core Cooling. 3. The operating crew is taking appropriate actions per the emergency procedures.
: 7. For purposes of this JPM the TSC has not been staffed.
They are now transitioning to FR-C.1. 4. You are to classify and document this event per the appropriate EPIP, make Protective Action Recommendations, if any, and perform all required actions. JPM # 19AP3 Page 4 of9 Rev. 0 SPECIAL INSTRUCT-IONS TO EVALUATOR:
INITIATING CUES:
: 1. Any UNSAT requires comments 2. Ensure operator performs the following required actions for SELF-CHECKING;
: 1. You are the US and have assumed the SED position.
: a. Identifies the correct unit, train, component, etc. b. Reviews the intended action and expected response.
: 2. The STA reports a RED path condition exists on Core Cooling.
: c. Compares the actual response to the expected response.
: 3. The operating crew is taking appropriate actions per the emergency procedures. They are now transitioning to FR-C.1.
: d. Caution: DO NOT LET THE EXAMINEE FAX THE NOTIFICATION FORM OFFSITE! Validation Time: CR. 24 mins Local -----Tools/Equipment/Procedures Needed: EPIP-1, Emergency Plan Classification Matrix EPIP-4, Site Area Emergency
: 4. You are to classify and document this event per the appropriate EPIP, make Protective Action Recommendations, if any, and perform all required actions.
 
JPM # 19AP3 Page 5 of9 Rev. 0 Job Performance Checklist:
STEP/STANDARD                                    SAT/UNSAT I
STEP 1.:       Refers to EPIP-1 to determine level of event.                              -    SAT STANDARD: Operator refers to EPIP-1, Section 1, Fission Product Barrier Matrix.           -    UNSAT Operator determines that they have met the conditions of Critical Step 1.1.1 Loss, "Core Cooling Red" 1.1.5 Loss, "Containment High Radiation" 1.2.2 Loss "RCS leak results in subcooling <40&deg;F"                    Task Start Time Utilizing "Emergency Class Criteria", operator determines the need to declare a SITE AREA EMERGENCY based on Loss of two barriers.
The following steps implement EPIP-4:
STEP 2.:        Implements EPIP-4 SITE AREA EMERGENCY.                                      -    SAT Enter time Declaration made:                                                -   UNSAT Time from Task Acceptance to Declaration:
STANDARD: Operator Implements a SITE AREA EMERGENCY per EPIP-4, Section 3.1. Operator should classify the event within 15 minutes of the time the task was accepted. Declaration Time should be consistent with the time the examinee transitions from EPIP-1 to EPIP-4.
STEP 3.:        Upon classifying the events as a SITE AREA EMERGENCY,                       -    SAT the SM/SED shall:
                                                                                              -    UNSAT
[1 ]  IF the TSC is OPERATIONAL, (SED transferred to TSC), THEN GO TO Section 3.2 Cue:          If operator requests, respond "TeS has not been manned".
STANDARD: Operator should recall from the Initiating Cues that the TSC has not been manned.
STEP 4.        [2] RECORD time of declaration.          TIME                              -    SAT NOTE:          Operator may have already stated time of declaration, but must enter        -    UNSAT time properly in EPIP-4 form.
STANDARD: Operator should enter proper time that declaration was made.
 
JPM # 19AP3 Page 6 of 9 Rev. 0 Job Performance Checklist:
STEP/STANDARD                                      SAT/UNSAT I
STEP 5.        [3] ACTIVATE Emergency Paging System (EPS) as follows:                      -    SAT
[a] IF EPS has already been activated, THEN GO TO Step 4.            -    UNSAT Cue:          If operator asks, respond "EPS has not been activated".
STANDARD:        Operator continues to implement Step [3] actions.
STEP 6.                [b] IF ongoing onsite Security events may present risk to the        -    SAT emergency responders, THEN CONSULT with Security to determine if site access is dangerous to the life and health of  -    UNSAT emergency responders.
NOTE:      There is no indication of an onsite Security event given in the initial conditions.
STANDARD:        Operator continues to implement Step [3] actions.
STEP 7.                [c] IF ongoing events make site access dangerous to the life of      -    SAT emergency responders, THEN SELECT STAGING AREA button on the terminal INSTEAD of the EMERGENCY button.          -    UNSAT NOTE:        There is no indication of an onsite event which is making site access dangerous to responders given in the initial conditions.
STANDARD:        Operator continues to implement Step [3] actions.
STEP 8.                [d] ACTIVATE EPS using touch screen terminal. IF EPS fails to        -    SAT activate, THEN continue with Step 4.
                                                                                              -    UNSAT STANDARD:        Operator continues with Step [4].
 
JPM # 19AP3 Page 7 of 9 Rev. 0 Job Performance Checklist*
STEP/STANDARD                                  SAT/U NSAT I
CAUTION:            DO NOT LET THE EXAMINEE FAX THE FORM TO THE ACTUAL ODS!
STEP 9.          [4] Complete Appendix B (TVA INITIAL NOTIFICATION FOR SITE AREA          -    SAT EMERGENCY).
                                                                                            -    UNSAT
: 1. This is a DRILL
: 2. This is [Their name, Shift Manager at SQN Plant] Sequoyah has  Critical Step declared a SITE AREA EMERGENCY affecting [Unit 1]
: 3. EAL Designator(s): [1.1.1 LOSS, 1.1.5 LOSS, and 1.2.2 LOSS]
: 4. Brief description of incident: [Core Cooling Red Path AND Containment High Radiation AND RCS leak results in subcooling <40&deg;F]
: 5. Radiological Conditions [Release information not known OR Minor releases within federally approved limits.]
: 6. Event Declared: [Time and Date]
: 7. Protective Action Recommendation: [None].
: 8. Please repeat back the information you have received to ensure accuracy.
: 9. When complete, FAX this form to the ODS.
STANDARD: Operator completely fills out Appendix B.
STEP 10.        [5]  NOTIFY ODS.                                                       -    SAT Initial      Time
                                                                                            -    UNSAT NOTE:          Enter time call is made to the ODS Time from Declaration (step 2) to ODS Notification:                    Critical Step Cue:      Inform operator that "the ODS is not answering the phone".
STANDARD:       Operator marks steps [5a] through [5e] N/A and continues to next step.
STEP 11.                [a] IF EPS failed to activate from SQN when attempted THEN      -    SAT DIRECT ODS to activate SQN EPS. IF ODS is unable to activate EPS, THEN continue with Step [5][b].                -    UNSAT STANDARD:          Operator marks step N/A and continues to next step.
STEP 12.                [b]      IF ODS is unable to ACTIVATE EPS .....                  -    SAT STANDARD:          Operator marks step N/A and continues to next step.                  -    UNSAT STEP 13.                [c] READ completed Appendix B to ODS.                            -    SAT Cue:    Inform operator that "the ODS is not answering the phone. "                    -    UNSAT STANDARD:        Operator marks step N/A and continues to next step.
It
 
JPM # 19AP3 Page 8 of 9 Rev. 0 Job Performance Checklist STEP/STANDARD                              SAT/UNSAT I
STEP 14.                [d] FAX Appendix B to the ODS.                               -    SAT Cue:      The ODS is not answering the phone.                                  -    UNSAT Caution: DO NOT LET THE EXAMINEE FAX THE FORM TO THE ACTUAL ODS!
STANDARD: Operator marks step N/A and continues to next step.
STEP 15.               [e] MONITOR for confirmation call from ODS that State/Local   -   SAT notifications complete: RECORD time State notified.
                                                                                        -   UNSAT STANDARD: Operator marks step N/A.
STEP 15          [6] IF ODS CANNOT be contacted within 10 minutes .....              -   SAT
[a] CONTACT Tennessee Emergency Management Agency (TEMA) and read completed Appendix B.                        -   UNSAT Cue:        Role playas TEMA and repeat back Appendix B information.
Critical Step STANDARD:      Operator calls TEMA and reads information from Appendix B.
Caution: DO NOT LET THE EXAMINEE FAX THE FORM TO THE                            -   SAT ACTUAL TEMA!                                                                UNSAT
                                                                                        -
STEP 16          [6][b] FAX completed Appendix B to TEMA.
Cue:        The support AUO will send the FAX for you.
STANDARD:      Operator faxes Appendix B to TEMA.
STEP 17          [7]    ENSURE MSS/wWM in the OSC (x6428) is monitoring Emergency    -    SAT Response Organization (ERO) responses using printed report available in the OSC.                                        -    UNSAT Cue:      Role play (if directed) as MSSIWWM and report you will monitor to ensure all positions responded.
STANDARD:      Operator performs directs MSS/wWM to make appropriate calls.
STEP 18          [8]    PERFORM Appendix A, Notifications and Announcements.          -   SAT (Delegate as needed.)
                                                                                        -   UNSAT Cue:      For the purposes of this JPM, Appendix A notifications shall be delegated to Unit 2 US ..
STANDARD:      Operator delegates Appendix A to Unit 2 US.


==References:==
JPM # 19AP3 Page 9 of9 Rev. 0 JOG Performance Checklist STEP/STANDARD                                        SAT/UNSAT I
STEP 19          [9]      GO TO Section 3.3                                                        SAT STANDARD:       Operator implements Section 3.3.                                          _UNSAT NOTE:      The following steps are contained in EPIP-4, Section 3.3 MONITOR CONDITIONS STEP 20          [1]      MONITOR radiation monitors                                          _SAT Cue:      If Operator checks Rad monitors, tell operator "there is no significant        _UNSAT change in radiation monitor readings".
STANDARD:      Operator monitors radiation monitors.
STEP 21          [2]      WHEN indication exists of an unplanned radiological release,        _SAT THEN ENSURE Dose Assessment is performed.
_UNSAT Cue:      If Operator checks Rad monitors, tell operator "There is no significant change in radiation monitor readings".
STANDARD: 1. Since no radiological release is indicated, the Operator is not required to direct the Chemistry Shift Supervisor to perform a dose assessment per EPIP-13.
: 2. Operator should use either ICS or the RP-30 modules to determine effluent radiation conditions. No additional classifications determined.
STEP 22:        [3]    If personnel accountability has not been previously initiated, THEN          SAT ACTIVATE assembly and accountability by using EPIP-8, Appendix C (may be delegated)                                            _UNSAT Cue:      Role play and state that an additional operator will perform EPIP-8,          Critical Step AppendixC.
STANDARD:      Operator addresses need to implement EPIP-8, Appendix C.
STEP 23:      [4] MONITOR plant conditions.                                                        SAT
[a] EVALUATE using EPIP-1 ..... .                                              UNSAT Cue:    If operator begins Monitoring plant conditions, THEN tell him "The          Stop Time:
TSC is staffed and will COMPLETE the SAE follow-up Form".
STANDARD:      Operator addresses completing SAE follow-up Form (Appendix C).
End of JPM


Reference Title Rev No. 1. EPIP-1 Emergency Plan Initiating Conditions Matrix 42 2. EPIP-4 Site Area Emergency 30 READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
READ TO OPERATOR Directions to Trainee:
All steps of this JPM shall be simulated.
I will explain the initial conditions, and state the task to be performed. All steps of this JPM shall be simulated. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your aSSigned task. To indicate that you have completed your aSSigned task return the handout sheet I provided you The simulator is NOT representative of the scenario you are about to address.
I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. The simulator is NOT representative of the scenario you are about to address. INITIAL CONDITIONS:
: h. Approximately 50 minutes ago, Unit 1 experienced an AUTO SI from a small RCS leak which quickly escalated to a LOCA and a high containment pressure.
: 1. Approximately 50 minutes ago, Unit 1 experienced an AUTO SI from a small RCS leak which quickly escalated to a LOCA and a high containment pressure.
: 2. RCS pressure has stabilized at 600 psig. The CLAs are injecting.
: 3. The ONLY ECCS pump available and in service is the 18-8 RHR pump. The last of the other ECCS pumps tripped off shortly after the RCPs were removed from service per procedure.
All other equipment operated as designed.
: 4. Maximum containment pressure was 5 psig. 5. Lower containment radiation level is 1.8E+02 Rem/hr of RM-90-271A.
: 6. Unit 2 is at 100% RTP and stable. 7. For purposes of this JPM the TSC has not been staffed. INITIATING CUES: 1. You are the US and have assumed the SED position.
: 2. The ST A reports a RED path condition exists on Core Cooling. 3. The operating crew is taking appropriate actions per the emergency procedures.
They are now transitioning to FR-C.1. 4. You are to classify and document this event per the appropriate EPIP, make Protective Action Recommendations, if any, and perform all required actions.
Job Performance Checklist:
STEP/STANDARD I STEP 1.: Refers to EPIP-1 to determine level of event. STANDARD:
Operator refers to EPIP-1, Section 1, Fission Product Barrier Matrix. Operator determines that they have met the conditions of 1.1.1 Loss, "Core Cooling Red" 1.1.5 Loss, "Containment High Radiation" 1.2.2 Loss "RCS leak results in subcooling
<40&deg;F" Utilizing "Emergency Class Criteria", operator determines the need to declare a SITE AREA EMERGENCY based on Loss of two barriers.
The following steps implement EPIP-4: STEP 2.: Implements EPIP-4 SITE AREA EMERGENCY.
Enter time Declaration made: Time from Task Acceptance to Declaration:
STANDARD:
Operator Implements a SITE AREA EMERGENCY per EPIP-4, Section 3.1. Operator should classify the event within 15 minutes of the time the task was accepted.
Declaration Time should be consistent with the time the examinee transitions from EPIP-1 to EPIP-4. STEP 3.: Upon classifying the events as a SITE AREA EMERGENCY, the SM/SED shall: [1 ] IF the TSC is OPERATIONAL, (SED transferred to TSC), THEN GO TO Section 3.2 Cue: If operator requests, respond "TeS has not been manned". STANDARD:
Operator should recall from the Initiating Cues that the TSC has not been manned. STEP 4. [2] RECORD time of declaration.
TIME NOTE: Operator may have already stated time of declaration, but must enter time properly in EPIP-4 form. STANDARD:
Operator should enter proper time that declaration was made. JPM # 19AP3 Page 5 of9 Rev. 0 SAT/UNSAT SAT -UNSAT -Critical Step Task Start Time SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Job Performance Checklist:
STEP/STANDARD I STEP 1.: Refers to EPIP-1 to determine level of event. STANDARD:
Operator refers to EPIP-1, Section 1, Fission Product Barrier Matrix. Operator determines that they have met the conditions of 1.1.1 Loss, "Core Cooling Red" 1.1.5 Loss, "Containment High Radiation" 1.2.2 Loss "RCS leak results in subcooling
<40&deg;F" Utilizing "Emergency Class Criteria", operator determines the need to declare a SITE AREA EMERGENCY based on Loss of two barriers.
The following steps implement EPIP-4: STEP 2.: Implements EPIP-4 SITE AREA EMERGENCY.
Enter time Declaration made: Time from Task Acceptance to Declaration:
STANDARD:
Operator Implements a SITE AREA EMERGENCY per EPIP-4, Section 3.1. Operator should classify the event within 15 minutes of the time the task was accepted.
Declaration Time should be consistent with the time the examinee transitions from EPIP-1 to EPIP-4. STEP 3.: Upon classifying the events as a SITE AREA EMERGENCY, the SM/SED shall: [1 ] IF the TSC is OPERATIONAL, (SED transferred to TSC), THEN GO TO Section 3.2 Cue: If operator requests, respond "TeS has not been manned". STANDARD:
Operator should recall from the Initiating Cues that the TSC has not been manned. STEP 4. [2] RECORD time of declaration.
TIME NOTE: Operator may have already stated time of declaration, but must enter time properly in EPIP-4 form. STANDARD:
Operator should enter proper time that declaration was made. JPM # 19AP3 Page 5 of9 Rev. 0 SAT/UNSAT SAT -UNSAT -Critical Step Task Start Time SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
Job Performance Checklist:
STEP/STANDARD I STEP 5. [3] ACTIVATE Emergency Paging System (EPS) as follows: [a] IF EPS has already been activated, THEN GO TO Step 4. Cue: If operator asks, respond "EPS has not been activated".
STANDARD:
Operator continues to implement Step [3] actions. STEP 6. [b] IF ongoing onsite Security events may present risk to the emergency responders, THEN CONSULT with Security to determine if site access is dangerous to the life and health of emergency responders.
NOTE: There is no indication of an onsite Security event given in the initial conditions.
STANDARD:
Operator continues to implement Step [3] actions. STEP 7. [c] IF ongoing events make site access dangerous to the life of emergency responders, THEN SELECT STAGING AREA button on the terminal INSTEAD of the EMERGENCY button. NOTE: There is no indication of an onsite event which is making site access dangerous to responders given in the initial conditions.
STANDARD:
Operator continues to implement Step [3] actions. STEP 8. [d] ACTIVATE EPS using touch screen terminal.
IF EPS fails to activate, THEN continue with Step 4. STANDARD:
Operator continues with Step [4]. JPM # 19AP3 Page 6 of 9 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Job Performance Checklist:
STEP/STANDARD STEP 5. [3] ACTIVATE Emergency Paging System (EPS) as follows: [a] IF EPS has already been activated, THEN GO TO Step 4. Cue: If operator asks, respond "EPS has not been activated".
STANDARD:
Operator continues to implement Step [3] actions. STEP 6. [b] IF ongoing onsite Security events may present risk to the emergency responders, THEN CONSULT with Security to determine if site access is dangerous to the life and health of emergency responders.
NOTE: There is no indication of an onsite Security event given in the initial conditions.
STANDARD:
Operator continues to implement Step [3] actions. STEP 7. [c] IF ongoing events make site access dangerous to the life of emergency responders, THEN SELECT STAGING AREA button on the terminal INSTEAD of the EMERGENCY button. NOTE: There is no indication of an onsite event which is making site access dangerous to responders given in the initial conditions.
STANDARD:
Operator continues to implement Step [3] actions. STEP 8. [d] ACTIVATE EPS using touch screen terminal.
IF EPS fails to activate, THEN continue with Step 4. STANDARD:
Operator continues with Step [4]. JPM # 19AP3 Page 6 of 9 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
Job Performance Checklist*
STEP/ST ANDARD I CAUTION: DO NOT LET THE EXAMINEE FAX THE FORM TO THE ACTUAL ODS! STEP 9. [4] Complete Appendix B (TVA INITIAL NOTIFICATION FOR SITE AREA EMERGENCY).
: 1. This is a DRILL 2. This is [Their name, Shift Manager at SQN Plant] Sequoyah has declared a SITE AREA EMERGENCY affecting
[Unit 1] 3. EAL Designator(s):
[1.1.1 LOSS, 1.1.5 LOSS, and 1.2.2 LOSS] 4. Brief description of incident:
[Core Cooling Red Path AND Containment High Radiation AND RCS leak results in subcooling
<40&deg;F] 5. Radiological Conditions
[Release information not known OR Minor releases within federally approved limits.] 6. Event Declared:
[Time and Date] 7. Protective Action Recommendation:
[None]. 8. Please repeat back the information you have received to ensure accuracy.
: 9. When complete, FAX this form to the ODS. STANDARD:
Operator completely fills out Appendix B. STEP 10. [5] NOTIFY ODS. Initial Time NOTE: Enter time call is made to the ODS Time from Declaration (step 2) to ODS Notification:
Cue: Inform operator that "the ODS is not answering the phone". STANDARD:
Operator marks steps [5a] through [5e] N/A and continues to next step. STEP 11. [a] IF EPS failed to activate from SQN when attempted THEN DIRECT ODS to activate SQN EPS. IF ODS is unable to activate EPS, THEN continue with Step [5][b]. STANDARD:
Operator marks step N/A and continues to next step. STEP 12. [b] IF ODS is unable to ACTIVATE EPS ..... STANDARD:
Operator marks step N/A and continues to next step. STEP 13. [c] READ completed Appendix B to ODS. Cue: Inform operator that "the ODS is not answering the phone. " STANDARD:
Operator marks step N/A and continues to next step. t JPM # 19AP3 Page 7 of 9 Rev. 0 SAT/U N SAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Job Performance Checklist*
STEP/ST ANDARD I CAUTION: DO NOT LET THE EXAMINEE FAX THE FORM TO THE ACTUAL ODS! STEP 9. [4] Complete Appendix B (TVA INITIAL NOTIFICATION FOR SITE AREA EMERGENCY).
: 1. This is a DRILL 2. This is [Their name, Shift Manager at SQN Plant] Sequoyah has declared a SITE AREA EMERGENCY affecting
[Unit 1] 3. EAL Designator(s):
[1.1.1 LOSS, 1.1.5 LOSS, and 1.2.2 LOSS] 4. Brief description of incident:
[Core Cooling Red Path AND Containment High Radiation AND RCS leak results in subcooling
<40&deg;F] 5. Radiological Conditions
[Release information not known OR Minor releases within federally approved limits.] 6. Event Declared:
[Time and Date] 7. Protective Action Recommendation:
[None]. 8. Please repeat back the information you have received to ensure accuracy.
: 9. When complete, FAX this form to the ODS. STANDARD:
Operator completely fills out Appendix B. STEP 10. [5] NOTIFY ODS. Initial Time NOTE: Enter time call is made to the ODS Time from Declaration (step 2) to ODS Notification:
Cue: Inform operator that "the ODS is not answering the phone". STANDARD:
Operator marks steps [5a] through [5e] N/A and continues to next step. STEP 11. [a] IF EPS failed to activate from SQN when attempted THEN DIRECT ODS to activate SQN EPS. IF ODS is unable to activate EPS, THEN continue with Step [5][b]. STANDARD:
Operator marks step N/A and continues to next step. STEP 12. [b] IF ODS is unable to ACTIVATE EPS ..... STANDARD:
Operator marks step N/A and continues to next step. STEP 13. [c] READ completed Appendix B to ODS. Cue: Inform operator that "the ODS is not answering the phone. " STANDARD:
Operator marks step N/A and continues to next step. I JPM # 19AP3 Page 7 of 9 Rev. 0 SAT/U N SAT SAT -UNSAT -Critical Step SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
Job Performance Checklist STEP/ST ANDARD I STEP 14. [d] FAX Appendix B to the ODS. Cue: The ODS is not answering the phone. Caution: DO NOT LET THE EXAMINEE FAX THE FORM TO THE ACTUAL ODS! STANDARD:
Operator marks step N/A and continues to next step. STEP 15. [e] MONITOR for confirmation call from ODS that State/Local notifications complete:
RECORD time State notified.
STANDARD:
Operator marks step N/A. STEP 15 [6] IF ODS CANNOT be contacted within 10 minutes ..... [a] CONTACT Tennessee Emergency Management Agency (TEMA) and read completed Appendix B. Cue: Role playas TEMA and repeat back Appendix B information.
STANDARD:
Operator calls TEMA and reads information from Appendix B. Caution: DO NOT LET THE EXAMINEE FAX THE FORM TO THE ACTUAL TEMA! STEP 16 [6][b] FAX completed Appendix B to TEMA. Cue: The support AUO will send the FAX for you. STANDARD:
Operator faxes Appendix B to TEMA. STEP 17 [7] ENSURE MSS/wWM in the OSC (x6428) is monitoring Emergency Response Organization (ERO) responses using printed report available in the OSC. Cue: Role play (if directed) as MSSIWWM and report you will monitor to ensure all positions responded.
STANDARD:
Operator performs directs MSS/wWM to make appropriate calls. STEP 18 [8] PERFORM Appendix A, Notifications and Announcements. (Delegate as needed.) Cue: For the purposes of this JPM, Appendix A notifications shall be delegated to Unit 2 US .. STANDARD:
Operator delegates Appendix A to Unit 2 US. JPM # 19AP3 Page 8 of 9 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Job Performance Checklist STEP/ST ANDARD I STEP 14. [d] FAX Appendix B to the ODS. Cue: The ODS is not answering the phone. Caution: DO NOT LET THE EXAMINEE FAX THE FORM TO THE ACTUAL ODS! STANDARD:
Operator marks step N/A and continues to next step. STEP 15. [e] MONITOR for confirmation call from ODS that State/Local notifications complete:
RECORD time State notified.
STANDARD:
Operator marks step N/A. STEP 15 [6] IF ODS CANNOT be contacted within 10 minutes ..... [a] CONTACT Tennessee Emergency Management Agency (TEMA) and read completed Appendix B. Cue: Role playas TEMA and repeat back Appendix B information.
STANDARD:
Operator calls TEMA and reads information from Appendix B. Caution: DO NOT LET THE EXAMINEE FAX THE FORM TO THE ACTUAL TEMA! STEP 16 [6][b] FAX completed Appendix B to TEMA. Cue: The support AUO will send the FAX for you. STANDARD:
Operator faxes Appendix B to TEMA. STEP 17 [7] ENSURE MSS/wWM in the OSC (x6428) is monitoring Emergency Response Organization (ERO) responses using printed report available in the OSC. Cue: Role play (if directed) as MSSIWWM and report you will monitor to ensure all positions responded.
STANDARD:
Operator performs directs MSS/wWM to make appropriate calls. STEP 18 [8] PERFORM Appendix A, Notifications and Announcements. (Delegate as needed.) Cue: For the purposes of this JPM, Appendix A notifications shall be delegated to Unit 2 US .. STANDARD:
Operator delegates Appendix A to Unit 2 US. JPM # 19AP3 Page 8 of 9 Rev. 0 SAT/UNSAT SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -Critical Step SAT -UNSAT -SAT -UNSAT -SAT -UNSAT -
I JOG Performance Checklist STEP/STANDARD STEP 19 [9] GO TO Section 3.3 STANDARD:
Operator implements Section 3.3. NOTE: STEP 20 Cue: The following steps are contained in EPIP-4, Section 3.3 MONITOR CONDITIONS
[1] MONITOR radiation monitors If Operator checks Rad monitors, tell operator "there is no significant change in radiation monitor readings".
STANDARD:
Operator monitors radiation monitors.
STEP 21 [2] WHEN indication exists of an unplanned radiological release, THEN ENSURE Dose Assessment is performed.
Cue: If Operator checks Rad monitors, tell operator "There is no significant change in radiation monitor readings".
STANDARD:
: 1. Since no radiological release is indicated, the Operator is not required to direct the Chemistry Shift Supervisor to perform a dose assessment per EPIP-13. STEP 22: Cue: 2. Operator should use either ICS or the RP-30 modules to determine effluent radiation conditions.
No additional classifications determined.
[3] If personnel accountability has not been previously initiated, THEN ACTIVATE assembly and accountability by using EPIP-8, Appendix C (may be delegated)
Role play and state that an additional operator will perform EPIP-8, AppendixC.
STANDARD:
Operator addresses need to implement EPIP-8, Appendix C. STEP 23: Cue: [4] MONITOR plant conditions.
[a] EVALUATE using EPIP-1 ..... . If operator begins Monitoring plant conditions, THEN tell him "The TSC is staffed and will COMPLETE the SAE follow-up Form". STANDARD:
Operator addresses completing SAE follow-up Form (Appendix C). End of JPM JPM # 19AP3 Page 9 of9 Rev. 0 SAT/UNSAT SAT _UNSAT _SAT _UNSAT _SAT _UNSAT SAT _UNSAT Critical Step SAT UNSAT Stop Time: I JOG Performance Checklist STEP/STANDARD STEP 19 [9] GO TO Section 3.3 STANDARD:
Operator implements Section 3.3. NOTE: STEP 20 Cue: The following steps are contained in EPIP-4, Section 3.3 MONITOR CONDITIONS
[1] MONITOR radiation monitors If Operator checks Rad monitors, tell operator "there is no significant change in radiation monitor readings".
STANDARD:
Operator monitors radiation monitors.
STEP 21 [2] WHEN indication exists of an unplanned radiological release, THEN ENSURE Dose Assessment is performed.
Cue: If Operator checks Rad monitors, tell operator "There is no significant change in radiation monitor readings".
STANDARD:
: 1. Since no radiological release is indicated, the Operator is not required to direct the Chemistry Shift Supervisor to perform a dose assessment per EPIP-13. STEP 22: Cue: 2. Operator should use either ICS or the RP-30 modules to determine effluent radiation conditions.
No additional classifications determined.
[3] If personnel accountability has not been previously initiated, THEN ACTIVATE assembly and accountability by using EPIP-8, Appendix C (may be delegated)
Role play and state that an additional operator will perform EPIP-8, AppendixC.
STANDARD:
Operator addresses need to implement EPIP-8, Appendix C. STEP 23: Cue: [4] MONITOR plant conditions.
[a] EVALUATE using EPIP-1 ..... . If operator begins Monitoring plant conditions, THEN tell him "The TSC is staffed and will COMPLETE the SAE follow-up Form". STANDARD:
Operator addresses completing SAE follow-up Form (Appendix C). End of JPM JPM # 19AP3 Page 9 of9 Rev. 0 SAT/UNSAT SAT _UNSAT _SAT _UNSAT _SAT _UNSAT SAT _UNSAT Critical Step SAT UNSAT Stop Time:
READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All steps of this JPM shall be simulated.
I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your aSSigned task. To indicate that you have completed your aSSigned task return the handout sheet I provided you The simulator is NOT representative of the scenario you are about to address. INITIAL CONDITIONS:
INITIATING CUES: h. Approximately 50 minutes ago, Unit 1 experienced an AUTO SI from a small RCS leak which quickly escalated to a LOCA and a high containment pressure.
: i. RCS pressure has stabilized at 600 psig. The CLAs are injecting.
: j. The ONLY ECCS pump available and in service is the 1 B-B RHR pump. The last of the other ECCS pumps tripped off shortly after the RCPs were removed from service per procedure.
All other equipment operated as designed.
: k. Maximum containment pressure was 5 psig. I. Lower containment radiation level is 1.8E+02 Rem/hr of RM-90-271A.
: m. Unit 2 is at 100% RTP and stable. n. For purposes of this JPM the TSC has not been staffed. 5. You are the US and have assumed the SED position.
: 6. The ST A reports a RED path condition exists on Core Cooling. 7. The operating crew is taking appropriate actions per the emergency procedures.
They are now transitioning to FR-C.1. 8. You are to classify and document this event per the appropriate EPIP AND perform all required actions. READ TO OPERATOR Directions to Trainee: I will explain the initial conditions, and state the task to be performed.
All steps of this JPM shall be simulated.
I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your aSSigned task. To indicate that you have completed your aSSigned task return the handout sheet I provided you The simulator is NOT representative of the scenario you are about to address. INITIAL CONDITIONS:
INITIATING CUES: h. Approximately 50 minutes ago, Unit 1 experienced an AUTO SI from a small RCS leak which quickly escalated to a LOCA and a high containment pressure.
: i. RCS pressure has stabilized at 600 psig. The CLAs are injecting.
: i. RCS pressure has stabilized at 600 psig. The CLAs are injecting.
: j. The ONLY ECCS pump available and in service is the 1 B-B RHR pump. The last of the other ECCS pumps tripped off shortly after the RCPs were removed from service per procedure.
: j. The ONLY ECCS pump available and in service is the 1B-B RHR pump. The last of the other ECCS pumps tripped off shortly after the RCPs were removed from service per procedure. All other equipment operated as designed.
All other equipment operated as designed.
: k. Maximum containment pressure was 5 psig.
: k. Maximum containment pressure was 5 psig. I. Lower containment radiation level is 1.8E+02 Rem/hr of RM-90-271A.
I. Lower containment radiation level is 1.8E+02 Rem/hr of RM-90-271A.
: m. Unit 2 is at 100% RTP and stable. n. For purposes of this JPM the TSC has not been staffed. 5. You are the US and have assumed the SED position.
: m. Unit 2 is at 100% RTP and stable.
: 6. The ST A reports a RED path condition exists on Core Cooling. 7. The operating crew is taking appropriate actions per the emergency procedures.
: n. For purposes of this JPM the TSC has not been staffed.
They are now transitioning to FR-C.1. 8. You are to classify and document this event per the appropriate EPIP AND perform all required actions.}}
INITIATING CUES:
: 5. You are the US and have assumed the SED position.
: 6. The STA reports a RED path condition exists on Core Cooling.
: 7. The operating crew is taking appropriate actions per the emergency procedures. They are now transitioning to FR-C.1.
: 8. You are to classify and document this event per the appropriate EPIP AND perform all required actions.}}

Revision as of 20:00, 13 November 2019

Initial Exam 2010-301 Draft Administrative JPMs
ML101230138
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/03/2010
From:
NRC/RGN-II
To:
Tennessee Valley Authority
References
50-327/10-301, 50-328/10-301
Download: ML101230138 (71)


Text

JPM 190 Page 1 of 7 Rev. 2 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM 190 Reactivity Balance Calculation PREPARED!

REVISED BY: Date/

VALIDATED BY: _**_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _-----=D::..:a::..:.te=.:../

Date/_ _ _ _ __


===------------

APPROVED BY: Date/

(Operations Training Manager)

CONCURRED: ** Date/

(Operations Representative)

  • Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
    • Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).

JPM 190 Pa.ge 2 of 7 Rev. 2 NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE PAGES PREPARED/

NUMBER REVISION AFFECTED REVISED BY:

0 Initial Issue Y 3/17/04 ALL G.S. Poteet Pen/ink Made corrections resulting from validation N 5/12/04 2,4-7 G.S. Poteet 1 Developed for 6/7-14/04 NRC Exam. N 6/15/04 All J. Kearney Transferred to JPM Bank.

2 Revised to update to the latest procedure Y 12/05/09 All M Hankins revision.

v - Specify if the JPM change will require another Validation (Y or N).

See cover sheet for criteria.

JPM 190 Page 3 of 7 Rev. 2 SEQUOYAH NUCLEAR PLANT AU O/RO/S RO JOB PERFORMANCE MEASURE Task: Perform a Reactivity Balance Calculation per 0-SO-62-7, Appendix E JA/TA TASK #: 0040070101 (RO)

KIA Ratings:

2.1.25 (3.9/4.2) 004 K5.20 (3.6/3.7) 004 A4.04 (3.2/3.6)

Task Standard:

Operator performs 0-SO-62-7 Appendix E, Reactivity Balance Calculation Evaluation Method: Simulator -_..:...X,,--_

X

-'-'---

In-Plant _ _ __

=======================================================================

Performer:

NAME Start Time _ __

Performance Rating: SAT UNSAT Performance Time Finish Time _ __

Evaluator:

SIGNATURE DATE

=======================================================================

COMMENTS

JPM 190 Page 4 of 7 Rev. 2 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps identified.
2. Any UNSAT requires comments
3. Ensure operator performs the following required actions for SELF-CHECKING;
a. Identifies the correct unit, train, component, etc.
b. Reviews the intended action and expected response.
c. Compares the actual response to the expected response.

Validation Time: CR. 35 min Local Tools/Equipment/Procedures Needed

1. Cycle Nuclear Design Report (NDR)
2. 0-SO-62-7 Boron Concentration Control
3. Highlighter and ruler

References:

Reference Title Rev No.

A. 0-SO-62-7 Boron Concentration Control 56 B. TI-44 Boron Tables 12

=================================================================

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All steps shall be performed for this JPM. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is currently stable at 20 %.
2. Control rod Bank D is at 160 steps.
3. RCS boron concentration is 1400 ppm.
4. Core burnup is 600 MWD/MTU.
5. Reactor Engineering has provided following Xenon data:

XE 1 =-2430 pcm XE 2 =-2250 pcm INITIATING CUES:

Perform 0-SO-62-7 Appendix E, Reactivity Balance calculation, in preparation for a change in reactor power from 20% with Control Rods at 160 steps on D Bank to 70% with Control Bank D at 228 steps, using a 3%/hour power increase rate.

JPM 190 Page 5 of 7 Rev. 2 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 1.: Obtain a copy of the procedure. - SAT

- UNSAT STANDARD: Operator obtains a copy of 0-SO-62-7 Boron Concentration Control, Appendix E Reactivity Balance Calculation. Start Time__

STEP 2.: [1] ENTER the following Data: - SAT

- UNSAT Current RCS Boron Cue: If operator contacts Chem Lab, state that RCS boron concentration is 1400 ppm STANDARD Operator enters 1400 ppm from INITIAL CONDITIONS STEP 3.: Core Burnup - SAT Cue: If ICS computer is not available inform operator that computer - UNSAT point 1U0981 reads 600 MWDIMTU STANDARD Operator locates computer point 1U0981 and enters 600 MWD/MTU on Appendix E.

STEP 4.: Current Reactor Power - SAT

- UNSAT Cue: Current reactor power is 20%, as given in the initial conditions.

STANDARD: Operator enters 20% per Initial Conditions STEP 5.: Final Reactor Power - SAT

- UNSAT Cue: Final reactor power is 70%, as given in the initial conditions.

STANDARD: Operator enters 70% per Initial Conditions STEP 6.: Total Reactor Power Change - SAT

- UNSAT STANDARD: Operator determines power change to be 50%.

Critical Step

JPM 190 Page 6 of 7 Rev. 2 Job Performance Checklist:

STEP/STANDARD SAT/UN SAT STEP 7.: Rate of Reactor Power change SAT STANDARD: Operator enters 3%/hr per initial conditions. _UNSAT STEP *8.: Number of hours to change power SAT

_UNSAT STANDARD: Operator calculates number of hours to change power; 50% / 3%/hour and enters results:

162/3 hours (or 16.67 hours7.75463e-4 days <br />0.0186 hours <br />1.107804e-4 weeks <br />2.54935e-5 months <br />, or 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> and 40 minutes) per Initial Conditions.

STEP *9.: Current Rod Position _SAT UNSAT STANDARD: Operator enters 160 steps on Bank D per Initial Conditions STEP *10.: Final Rod Position SAT UNSAT STANDARD: Operator enters 228 steps per Initial Conditions STEP *11.: [2] CALCULATE change in boron concentration by performing the following:

[a] b.p POWER DEFECT

_SAT b.p POWER DEFECT =___ pcm PD 1 - _ _ _ pcm PD2=__ pcm

_UNSAT NOTE: Use "eye-ball" interpolation between closest parameter lines. Band accuracy Y2 increment presented on figure. Critical Step STANDARD: Operator uses proper curve, Figure 1, U1 C17 Power Defect BOl, 1400 ppm line (long dash line) to enter data. For 20% operator should enter 350 pcm. For 70%, operator should enter 1100 pcm.

b.p POWER DEFECT =350 pcm PD 1- 1100 pcm (+/-25 pcm) =-750 pcm STEP *12.: [b] b.p XENON SAT b.p XENON =-2250 pcm XE 2 - (-2430 pcm) XE 1 = 180 pcm UNSAT STANDARD: Operator enters Xenon values (provided in the initial conditions) and calculates the change in reactivity due to Xenon. Critical Step I

JPM 190 Page 7 of 7 Rev. 2 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP *13.: [c] I1p RODS I1p RODS =___ pcm Rods 2 - _ _ _ pcm Rods 1 =__pcm _SAT

_UNSAT NOTE: Use "eye-ball" interpolation between closest parameter lines. Band accuracy % increment presented on figure.

Critical Step STANDARD: Operator uses proper curve Figure 4, solid line to enter data. For 160 steps operator should enter -400 to -500 pcm. For 228 steps, operator should enter 0 to 50 pcm.

I1p RODS = (0 to 50) pcm Rods 2 - (-400 to -500) pcm Rods 1 = Range 375-525 pcm STEP 14.: [d] Change in reactivity due to Power Defect, Xenon and Rods _SAT

[a] + [b]+[c] =__ pcm _UNSAT STANDARD: Operator calculates Change in reactivity due to power defect, Xenon and rods:

-750 pcm + 180 pcm +(375 to 525) pcm =-195 to -45 pcm Critical Step STEP 15.: [e] Change in Boron Reactivity _SAT Substep [d] X (-1) = 195 to 45 pcm _UNSAT STANDARD: Operator calculates the change in Boron Reactivity, by multiplying substep [d] by -1. Critical Step STEP 16.: [f] Change in Boron Concentration _SAT Substep [e] / Boron Worth UNSAT STANDARD: Operator Records change in boron reactivity and determines the Critical Step Boron Worth pcm/ppm from Figure 7.

Substep [e] / -6.25 pcm/ppm Boron worth =31.25 to 7.21 ppm STEP 17.: [3] Ensure independently verified by SRO in accordance with SAT Appendix J.

UNSAT STANDARD: Operator notifies the US an independent verification is required in accordance with Appendix J.

End Time End of JPM

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All steps shall be performed for this JPM. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

6. Unit 1 is currently stable at 20 %.
7. Control rod Bank D is at 160 steps.
8. RCS boron concentration is 1400 ppm.
9. Core burnup is 600 MWD/MTU.
10. Reactor Engineering has provided following Xenon data:

XE 1 =-2430 pcm XE 2 = -2250 pcm INITIATING CUES:

Perform 0-SO-62-7 Appendix E, Reactivity Balance calculation, in preparation for a change in reactor power from 20% with Control Rods at 160 steps on D Bank to 70% with Control Bank D at 228 steps, using a 3%/hour power increase rate.

JPM 123 Page 1 of 8 Rev. 2 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM123 CONTAINMENT FORMALDEHYDE STAY TIME CALCULATION PREPARED/

REVISED BY: Date/

VALIDATED BY:

  • Date/

APPROVED BY: Date/

(Operations Training Manager)

CONCURRED: ** Date/

(Operations Representative)

  • Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
    • Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).

JPM 123 Page 2 of 8

_ Rev. 2 I NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE PAGES PREPARED/

NUMBER REVISION AFFECTED REVISED BY:

0 NewJPM Y 12/5/08 All T. Wooley 1 Revised due inaccuracies regarding N 12/9/08 2,6 M. Chambers respiratory requirement not applicable.

2 Updated KA Task, and added steps on Y 12/04/09 All M Hankins determination of respirator requirements, revised initial conditions v - Specify if the JPM change will require another Validation (Y or N).

See cover sheet for criteria.

JPM 123 Page 3 of 8 Rev. 2 SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Task:

Calculation Containment Formaldehyde stay time and Determine respiratory protection requirements.

JAITA task:

KIA Ratings:

2.1.26 (3.4 / 3.6) Knowledge of Industrial Safety Procedures Task Standard:

Calculate containment formaldehyde stay time and determine respiratory protection requirements in accordance with O-TI-OPS-OOO-001.0.

Evaluation Method: Simulator _--'-X-'--__ In-Plant - - - -

=======================================================================

Performer:

NAME Start Time _ _ __

Performance Rating: SAT UNSAT Performance Time Finish Time _ __

Evaluator:


~~~~~-----~/~-==-

SIGNATURE DATE

=======================================================================

COMMENTS

JPM 123 Page 4 of 8 Rev. 2 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps identified by an asterisk (*).
2. Sequenced steps identified by an "s".
3. Any UNSAT requires comments.
4. Ensure Operator performs the following required actions for SELF-CHECKING;
a. Identifies the correct unit, train, component, etc.
b. Reviews the intended action and expected response.
c. Compares the actual response to the expected response.

Validation Time: CR. _ __ Local _ _ _ __

Tools/Equipment/Procedures Needed:

0-TI-OPS-000-001.0, Containment Formaldehyde Stay Time Calculation Calculator

References:

Reference Rev No.

0-TI-OPS-000-001.0 Time Calculation 5

=================================================================

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 is in Mode 1 at 100% power.
  • Annunciator Window "LS-6834A18 REAC COOL PMP 2 OIL RESERVOIR LEVEL HI-LOW" is in alarm, it has been determined a Level Switch inside lower containment needs repair.
  • 0-SI-OPS-000.011.0, Containment Access Control During Modes 1 - 4, has been initiated in preparation for a containment entry to investigate the alarm condition.
  • The containment entry is planned for 120 minutes.
  • A Chemistry sample taken today at 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> yielded a lower containment formaldehyde concentration of 1 .32 ppm.

INITIATING CUES:

1. You are directed to:

a) Calculate the allowable containment formaldehyde stay time for the current formaldehyde concentration, AND b) Determine any required respiratory protection in accordance with 0-TI-OPS-000-001.0, Containment Formaldehyde Stay Time Calculation.

JPM 123 Page 5 of 8 Rev.2 Job Performance Checklist STEP/STANDARD SAT/UNSAT STEP 1.: Obtain the appropriate procedure. _SAT UNSAT STANDARD: Operator obtains a copy of 0-TI-OPS-000-001.0 and determines Section 5.1 is applicable for Unit 1 lower containment lower entry.

COMMENTS: Start Time_ _

STEP 2.: 5.1 Unit 1 Lower Containment Entry _ SAT

[1] RECORD U-1 lower containment formaldehyde sample results and sample date/time (from Chemistry). _UNSAT

_ _ _ _ ppm DatelTime: _ __

STANDARD: Operator records U-1 containment formaldehyde sample results (1.32 ppm), date and time from Initial Conditions.

STEP 3.: 5.1 Unit 1 Lower Containment Entry SAT

[2] IF entry to Unit 1 lower containment is required with formaldehyde concentration greater than 1.5 ppm, THEN PERFORM the following: _UNSAT STANDARD: Operator determines containment formaldehyde concentration not greater than 1.5 ppm and marks step 2 N/A.

COMMENTS:

STEP *4.: 5.1 Unit 1 Lower Containment Entry _SAT

[3] CALCULATE Unit 1 Lower containment stay time USING the following equation: _UNSAT 0.3 ppm X 480 minutes =____ minutes sample recorded in Step 5.1[1] (1.3) Critical Step

_--'-".3:....:cX...:......:..;48=0'--_ = ~ = 109.1 1.32 1.32 STANDARD: Operator calculates a containment stay time of 109.1 (+/- 1) minutes using equation.

JPM 123 Page 6 of 8 Rev.2 Job Performance Checklist STEP/STANDARD SAT/UNSAT STEP 5.: 5.1 Unit 1 Lower Containment Entry - SAT

[4] INDEPENDENTLY VERIFY stay time results obtained in Step 5.1 [3]. - UNSAT Cue: If asked, inform examinee that another operator has performed the IV.

STANDARD: Operator requests independent verification of stay time calculation.

STEP 6.: 5.1 Unit 1 Lower Containment Entry

[5] NOTIFY Work Week Manager of maximum stay time and - SAT containment entry requirements including required level of respiratory protection. - UNSAT Cue: Acknowledge report as Work Week Manager. If candidate states job can not be done due to exceeding stay time, then tell them Critical Step Plant Management has decided to exceed the stay time. Then ask candidate 'what respiratory protection would be required under these circumstances'?

STANDARD: Operator notifies Work Week Manager that planned work time exceeds stay time and containment entry will require wearing a full face air purifying respirator with formaldehyde filters.

COMMENTS:

JPM 123 Page 7 of 8 Rev.2 Job Performance Checklist STEP/STANDARD SAT/UNSAT STEP *7.: 5.1 Unit 1 Lower Containment Entry - SAT

[6] NOTIFY RADCON of maximum stay time and containment entry requirements. - UNSAT Cue: Acknowledge report as Radcon. If candidate states job can not Critical Step be done due to exceeding stay time, then tell them Plant Management has decided to exceed the stay time.

Then ask candidate 'what respiratory protection would be required under these circumstances'?

STANDARD: Operator notifies RADCON that planned work time exceeds stay time and containment entry will require wearing a full face air purifying respirator with formaldehyde filters.

COMMENTS:

STEP 8.: 5.1 Unit 1 Lower Containment Entry - SAT

[7] IF any required task CANNOT be performed within allowed stay time, THEN PERFORM the following ... - UNSAT

[7.1] Contact Industrial Safety for additional guidance CUE: As the Industrial Safety Engineer acknowledge report from operator Critical Step and state conditions will be evaluated.

STANDARD: Operator notifies Industrial Safety that planned work time exceeds stay time and containment entry will require wearing a full face air purifying respirator with formaldehyde filters. Operator requests additional guidance from Industrial Safety Engineer.

COMMENTS:

JPM 123 Page 8 of 8 Rev.2 Job Performance Checklist STEP/STANDARD SAT/UNSAT STEP 9.: 5.1 Unit 1 Lower Containment Entry SAT

[7.2] Evaluate need for lower Containment Purge in accordance with 0-SO-30-3. _UNSAT CUE: Acknowledge report from operator if US is notified.

Critical Step STANDARD: Operator notifies Unit Supervisor that planned work time exceeds stay time and containment entry will require wearing a full face air purifying respirator with formaldehyde filters. Operator requests US evaluate the need for lower Containment Purge in accordance with 0-SO-30-3.

COMMENTS:

STEP 10.: 5.1 Unit 1 Lower Containment Entry

[7.3] DO NOT CONTINUE task UNTIL one of the following _SAT conditions are met:

  • Job Safety Analysis has been performed _UNSAT OR
  • Stay Time is Acceptable.

Critical Step CUE: Acknowledge report from operator if US is notified Stop Time _ _

STANDARD: Operator notifies Unit Supervisor that task shall not be continued UNTIL one of the following is performed, either a Job Safety Analysis has been performed or the stay time is acceptable.

End of JPM

JPM 43-2 Page 1 of 13 Rev. 0 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM 43-2 ROA2 PERFORM REACTOR COOLANT SYSTEM WATER INVENTORY (137.0)

PREPAREDI REVISED BY: Datel VALIDATED BY:

  • Date/

APPROVED BY: Date/

(Operations Training Manager)

CONCURRED: ** Date/

(Operations Representative)

  • Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
    • Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).

JPM 43-2 Page 2 of 13 Rev. 0 I NUCLEAR TRAINING REVISION/USAGE LOG Revision Description Pages Prepared/

Number Of Revision V Date Affected Revised By:

0 JPM 43-1 was assigned a new number 43-2 and Y 12/1/09 All M. Hankins revised to allow performance without the use of the plant computer. Validation time was increased due to time required to perform SI without the computer available.

V - Specify if the JPM change will require another validation (Y or N).

See cover sheet for criteria.

JPM 43-2 Page 3 of 13 Rev. 0 SEQUOYAH NUCLEAR PLANT ROISRO JOB PERFORMANCE MEASURE Task: Perform RCS Leakage Calculation (0-SI-OPS-068-137.0)

JA/TA task #: 0020010201 (RO)

KIA Ratings: 2.2.12 (3.7/4.1 )

002A4.01 (3.5/3.8) 002K405 (3.8/4.2) 002K504 (3.1/3.4)

Task Standard:

Upon completion of this task, the operator will have correctly determined RCS leakage per O-SI-OPS-068-137.0 and notify the SRO of Tech Spec and EPIP requirements.

Evaluation Method: Simulator - _...:...X-,--_

X

-'-'---

In-Plant _ __

=======================================================================

Performer:

NAME Start Time _ __

Performance Rating: SAT UNSAT Performance Time Finish Time _

__ ___

Evaluator: ________~-~~_--_--I_----


/~-==

SIGNATURE DATE

======================================================================

COMMENTS

JPM 43-2 Page 4 of 13 Rev.Q SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Any UNSAT requires comments.
2. Ensure calculator is available for operator to perform calculations.
3. A copy of O-SI-OPS-068-137.0 and computer generated data sheet must be provided to the operator for task performance.
4. Cues will be supplied to give required information after the computer screen is entered.

Validation Time: CR. 35 mins Local _ _ _ __

Tools/Equipment/Procedures Needed:

O-SI-OPS-068-137.0

References:

Reference Title Rev No.

O-SI-OPS-068-137.0 Reactor Coolant S stem Water Invento 22

==========================================================================

READ TO OPERATOR DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be simulated for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. The Unit is in MODE 1.
2. The U1 MCR crew suspects RCS leakage may have increased.
3. CCPIT/HUT leakage has been identified as 1 gpm.

INITIATING CUES:

1. You have been directed to perform O-SI-OPS-068-137.0, RCS Water Inventory, using the plant computer.
2. Inform the US of the results when you have finished.

JPM 43-2 Page 5 of 13 Rev. 0 Job P-erfotmance Checklist:

STEP/STANDARD SAT/U NSAT I

NOTE: JPM follows sections 4.0,6.0,6.2, and Appendix C of 51137.0 - SAT STEP 1.: 4.1 [1] ENSURE Instruction to be used is a copy of the effective version, and - UNSAT Data Package Cover Sheet is attached.

Cue: Acknowledge operator has a valid and current package.

STANDARD: Operator makes sure he is using the correct version and has a valid package. Start Time- -

NOTE: The plant ICS computer has a Group Display set up to the operators to - SAT check the points in step 4.1 [2], operator may refer to this Group Display when discussing how to identify the points that are in service. - UNSAT STEP 2.: 4.1 [2] IF ICS Points are to be used for leakage determination, THEN IDENTIFY ICS Points that are in service prior to performing leakage calculation:

Cue: All points specified in the table are in service and are reliable.

STANDARD: Operator verifies pOints specified in table are in service.

Plant ICS has a Group display that the operators utilize to verify ICS Points are in service.

STEP 3.: 4.2 [1] IF any RCS leak sources will be quantified using a stopwatch and - SAT container ......

- UNSAT Cue: No STOPWA TCH or Container required for this performance.

STANDARD: Operator N/As this step.

STEP 4.: 4.2 [2] IF any other special test equipment will be used ...... - SAT Cue: No Measuring or Test Equipment is required. - UNSAT STANDARD: Operator N/As this step.

STEP 5.: 4.3 [1] ENSURE reactor power and RCS average temperature (T-avg) are - SAT stable and have varied less than +/- 2% and 1°F, respectively, during the calculation test interval. - UNSAT STANDARD: Operator recognizes the need to maintain stable conditions during the test.

(Procedure step 4.3 [1])

I

JPM 43-2 Page 6 of 13 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT I

STEP 6.: 4.4 [1] CONTACT Chemistry Lab to verify that performance of this SI and - SAT limitations imposed on sampling will NOT interfere with any sampling required by Technical Specifications or Technical Requirements Manual.

- UNSAT Cue: Acknowledge test will be performed. No samples are scheduled or required in next four hours.

STANDARD: Operator notifies Chemistry of test performance.

STEP 7.: 6.0 [1]IF using the Plant Computer, THEN - SAT GO TO Section 6.2.

- UNSAT Cue: Perform Section 6.2.

STANDARD: Operator acknowledges Section 6.0 step 1 NOTES for SI Test valve manipulations and RCS stability and transitions per step 6.0 [1] to Section 6.2 SAT STEP 8.: 6.2 [1] CHECK VCT level in desired range: -

[a] IF VCT level approaching auto makeup, THEN ADJUST VCT level USING 0-SO-62-7 (MANUAL MAKEUP) UNSAT

-

Cue: Tell operator that 1-Ll-62-129 is indicating 50.4%.

STANDARD: Operator checks [1-Ll-62-129] VCT level indicator and determines the VCT level is in the desired range and not approaching auto makeup setpoint.

STEP 9.: [b] IF LCV-62-118 is diverting to the HUT or VCT AUTO makeup .... - SAT STANDARD: Operator checks the LCV-62-118 aligned to the VCT and VCT level NORMAL

-50% using LI-62-130 and N/As this step. - UNSAT STEP 10.: 6.2 [2] WHEN VCT level in desired range, THEN - SAT PLACE [HS-62-118Al in VCT position.

- UNSAT STANDARD: Operator determ ines VCT level NORMAL and places HS-63-118A in the VCT position.

Critical Step

JPM 43-2 Page 7 of 13 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT I

STEP 11.: 6.2 [3] MAINTAIN plant conditions as stable as possible (minimum of 2 - SAT hours).

- UNSAT STANDARD: Operator addressing maintaining plant conditions stable for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

STEP 12.: 6.2 [4] REQUEST from Chemistry Lab the following: - SAT SG1 thru 4 leakages in GPO.

Cue: S/G leakages are as follows: - UNSAT

[a] SG 1=3.2 GPO

[b] SG 2=2.2 GPO

[c] SG 3=2.3 GPO Ed] SG 4=4.8 GPO Critical Step Operator determines total leakage in GPD and divides by 1440 min/day 12.5/1440 = 0.009 Cue: When asked tell operator SI-50 and S1137.5 were completed 5 Hours earlier today.

STANDARD: Operator request SG leakage and enters information in step 6.2 [4].

Performs calculation and determines Total SG leakage = .0087 GPM.

Records performance times for SI-50 and SI-137.5.

- SAT STEP 13.: [e] DETERMINE the amount of chemical additions made to or samples taken from the RCS during the selected performance period

- UNSAT Cue: Chemistry supervisor reports no additions or samples were taken from the RCS during the selected performance period.

STANDARD: Operator requests Chemistry lab to report any chemical additions or samples taken from the RCS during the selected performance period in gpm.

STEP 14.: 6.2 [5] IF volume from any source (chemical addition, sampling, or make-up) - SAT cannot be determined from the selected performance period, THEN

- UNSAT Cue: Inform operator this step may be N/A.

STANDARD: Operator determines step [5] [a] and [b] may be N/A.

JPM 43-2 Page 8 of 13 Rev~O Job Performance Checklist:

STEP/STANDARD SAT/U NSAT I

STEP 15.: 6.2 [6] IF pump down of the RCDT is a frequent occurrence, THEN .... _SAT Cue: Inform operator this step may be NIA.

_UNSAT STANDARD: Operator determines step [6] [a] and [b] may be N/A.

STEP 16.: 6.2 [7] IF in-leakage to the CLA, THEN _SAT

[a] RECORD initial CLA levels in Appendix C and wait at least two hours

_UNSAT Cue: Inform operator initial value for Unit 1 CLA's 1,2,3 and 4 is 7680 gals.

[b] WHEN greater than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> has elapsed, THEN Critical Step RECORD final CLA levels in Appendix C.

Cue: Two hours has elapsed Final values for CLA's are as follows CLA 1 7680 gal CLA 2 7680 gal CLA 3 7920 gal CLA 4 7680 gal STANDARD: Operator records CLA volumes on Appendix "C" for later entry into computer.

STEP 17.: 6.2 [8] INITIATE RCS Leakage Program using the Plant Computer by _SAT performing the following:

NOTE: Evaluator - show operator pictures of ICS computer screens to allow the UNSAT operator to demonstrate steps to be performed using the touch screen on the ICS monitor.

Critical Step

[a] SELECT NSSS & BOP menu on monitor. (Attachment 1)

[b] SELECT SI-137.0, RCS leakage screen on monitor. (Attachment 2)

NOTE: Start and Stop times are Auto-populated on the ICS computer.

[c] ENSURE correct START date and time entered in Plant Computer

[d] ENSURE correct STOP date and time entered in Plant computer (Attachment 3)

STANDARD: Operator locates proper pages on plant computer and ensures the start and stop times are correct, minimum time 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

JPM 43-2 Page 9 of 13 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT I

STEP 18.: 6.2 [9] MANUALLY enter the following: - SAT NOTE Computer will automatically populate the SG leakage with zeroes.

- UNSAT

[a] SG leakages from Chemistry.

STANDARD: Operator locates proper Data Blocks on SI-137.0 Data screen and enters the Critical Step SG leakage information recorded in section 6.2 step 4. (Attachment 3)

STEP 19.: [b] CLA initial and final volumes from Appendix C (if required). - SAT

,

NOTE: Operator will enter CLA leakage for each Accumulator as recorded previously on Appendix "C" (directed by Section 6.2 Step [7][c]). - UNSAT STANDARD: Operator enters CLA initial and final volumes from Appendix C into ICS.

Critical Step STEP 20.: [c] CCPIT/HUT leakage (N/A if not required). - SAT Cue: Inform Operator that CCPIT/HUT value has been determined to be 1 GPM. - UNSAT STANDARD: Operator enters 1 GPM in this step.

Critical Step STEP 21.: [d] Other sources, such as Appendix B or Chemistry sampling - SAT (N/A if not required).

Cue: Inform Operator that this step is N/A - UNSAT STANDARD: Operator places N/A on this step.

STEP 22.: [10] INITIATE execute for calculation results. - SAT STANDARD: Operator places cursor on EXECUTE button and presses left mouse button, - UNSAT or uses the F2 key to execute calculation.

Critical Step

JPM 43-2 Page 10 of 13 Rev. 0 Job Performance Checklist:

STEPISTANDARD SAT/UNSAT I

STEP 23.: [11] WHEN data collection has been completed, THEN - SAT CHECK the following to indicate whether data is acceptable.

Cue: Inform operator of the following: - UNSAT A. Dates and times are correct and data collection performed for 2 hrs.

STANDARD: Operator determines that conditions for data collection were acceptable.

NOTE: For Steps on procedure page 34 of 61 ules points recorded match those in Section 4.1[2]"

RECORD the ICS Points that were available during performance of Leakage calculation.

STANDARD: All pOints were available, operator checks each box.

IF ICS Points recorded in Section 4.1 [2J do NOT match ..........

STANDARD: Operator marks step N/A.

SAT STEP 24.: [11] B. No sampling and chemical additions occurred during data -

collection.

- UNSAT STANDARD: Operator determines that no sampling and or chemical additions have occurred during data collection.

STEP 25.: [11] C. All pumps, coolers, valve alignment remained constant - SAT during data collection except where makeup was accounted for by the plant computer.

- UNSAT STANDARD: Operator determines that all equipment alignment remained constant.

STEP 26.: [11] D. eves and ReS remained nearly constant except where makeup - SAT was accounted for by the plant computer.

- UNSAT STANDARD: Operator determines that CVCS and RCS remained nearly constant during data taking period.

STEP 27.: [11] E. NO ReS dilution occurred during the data-taking period. - SAT

- UNSAT STANDARD: Operator determines that no RCS dilutions occurred during the data-taking period.

JPM 43-2 Page 11 of 13 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/U NSAT I

STEP 28.: [12] IF any substep in step [11] cannot be completed, THEN .... - SAT STANDARD: Operator N/As this step. - UNSAT STEP 29.: [13] IF calculation inputs are invalid, THEN - SAT

[a] INITIATE MANUAL function to correct inputs.

- UNSAT

[b] INITIATE EXECUTE function for calculated results.

NOTE: IF Operator identifies ANY incorrect data input THEN complete step [13]

[a] and [b].

STANDARD: Operator verifies calculation inputs are correct and continues with performance of SI-137.0. (Step 6.2 [13] [a] and [b]).

STEP 30.: [14] PRINT a hard copy of the results. - SAT CUE: Examiner - hand the RCS Leakage Rate Report to Operator for interpretation. - UNSAT STANDARD: If computer was available the operator would print results.

STEP 31.: [15] ATTACH hard copy program output (printout) to surveillance procedure - SAT package.

STANDARD: Operator request hard copy of RCS Leakage Rate Report. - UNSAT STEP 32.: [16] WHEN all data collection has been completed, THEN - SAT NOTIFY Chemistry Lab ....

- UNSAT Cue: Acknowledge the 51-137.0 is complete and RCS sampling and chemical additions may be resumed.

STANDARD: Operator Notifies Chemistry Lab that RCS sampling/chemical additions may be resumed as necessary.

SAT STEP 33.: 1171 IF step 6.2 [5] [b] was performed for manual data collection, THEN ... -

STANDARD: Operator N/As this step.

- UNSAT

-

JPM 43-2 Page 12 of 13 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT I

STEP 34.: [18] IF unidentified leakage is more negative than -0.10 GPM, THEN - SAT STANDARD: Operator reviews ReS Leakage Rate Report and determines ReS Unidentified Leakage is more positive than -0.10 GPM. (Operator continues - UNSAT to the next step.

STEP 35.: [19] IF an unidentified leakage more positive than -0.10 GPM could not be - SAT obtained, OR IF four consecutive performances of this Instruction have resulted in a UNSAT negative value of unidentified leakage, THEN .... -

STANDARD: Operator reviews ReS Leakage Rate Report and determines ReS Unidentified Leakage is more positive than -0.10 GPM and only ONE performance of this instruction has been performed. (Operator continues to the next step.)

STEP 36.: [20] CHECK appropriate box to indicate whether the following acceptance - SAT criteria were satisfied.

- UNSAT NOTE: Operator must evaluate the RCS Leakage Report in order to complete check boxes. Steps 35 thru 38 of this JPM complete this step.

STANDARD: Operator reviews ReS Leakage Report to determine answers to statements From Technical Specification Acceptance Criteria Section

- SAT STEP 37.: The maximum individual SG leakage is less than or equal to 150 GPO.

UNSAT

-

STANDARD: Operator reviews ReS Leakage Report and checks Box as YES.

Critical Step STEP 38.: The total identified leakage is less than or equal to 10.0 GPM. - SAT

- UNSAT STANDARD: Operator reviews ReS Leakage Report and checks Box as NO.

Critical Step STEP 39.: The total unidentified leakage is less than or equal to 1.0 GPM. - SAT

-, UNSAT STANDARD: Operator reviews ReS Leakage Report and checks Box as YES.

Critical Step

JPM 43-2 Page 13 of 13 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT I From Administrative Acceptance Criteria Section

- SAT STEP 40.: The maximum individual SG leakage is less than or equal to 75 GPO.

- UNSAT STANDARD: Operator reviews ReS Leakage Report and checks Box as YES.

Critical Step

- SAT STEP 41.: [21] IF any of the Technical Specification acceptance criteria stated in step [21] is NOT satisfied, THEN

- UNSAT

[a] NOTIFY SM that ReS leakage exceeds limit and action requirement (b) of Leo 3.4.6.2 must be satisfied.

[b] REFER to EPIP-1 for REP implementation.

Critical Step

[c] REFER TO AOP-R.01, Steam Generator Tube Leak, or AOP-R.05, ReS Leak and Leak Source Identification, as applicable.

Cue: Acknowledge notification and reply that the crew SROs will evaluate Tech Specs, the REP, and applicable AOPs.

STANDARD: Operator notifies SM that Technical Specification limits are exceeded:

  • Leakage determined to be 10.64 gpm identified leakage;
  • REFER to EPIP-1 for REP implementation
  • REFER appropriate AOP.

STEP 42.: [22] IF leakage is within Tech Spec limits but exceeds administrative - SAT acceptance criteria for S/G leakage, THEN ...

STANDARD: Operator reviews ReS Leakage Report and determines S/G leakage is within - UNSAT administrative limits, N/A's the step.

- SAT STEP 43.: [23] WHEN leakage test is complete, THEN ENSURE [HS-62-118A] in P-AUTO.

- UNSAT STANDARD: Operator places HS-62-118A in P-AUTO and addresses the need for an IV.

NOTE The following steps are from Section 7.0. - SAT STEP 44.: [1 ] NOTIFY Unit SRO that test has been completed.

UNSAT

-

STANDARD: Operator notifies Unit SRO that test has been completed.

Stop Time__

I

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be simulated for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. The Unit is in MODE 1 and the Plant Computer is operable.
2. The U1 MCR crew suspects RCS leakage may have increased.
3. CCPIT/HUT leakage has been identified as 1 gpm.

INITIATING CUES:

1. You are directed to perform SI-137.0 using the plant computer.
2. Inform the US of results when SI-137.0 is complete.

JPM Admin 2.4 2010 Page 1 of 8 Rev. 0 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # Admin 2.4 1002 Calculating Maximum Reactor Vessel Vent Time PREPAREDI REVISED BY: Date/

VALIDATED BY:

  • Date/

APPROVED BY: Date/

(Operations Training Manager)

CONCURRED: ** Date/

(Operations Representative)

  • Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
    • Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).

JPM Admin 2.4 2010 Page 2 of 8 Rev. 0 NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE PAGES PREPARED/

NUMBER REVISION AFFECTED REVISED BY:

0 Initial Issue Y 12/04/09 All M. Hankins v - Specify if the JPM change will require another Validation (Y or N).

See cover sheet for criteria.

JPM Admin 2.4 2010 Page 3 of 8 Rev. 0 SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Task JA/TA task #

Calculating Maximum Reactor Vessel Vent Time KIA Ratings:

2.4.13 4.0/4.6 Task Standard:

Evaluation Method: Simulator _ __ In-Plant _ __

---

========================================================================

Performer:

NAME Start time _ __

Performance Rating: SAT UNSAT Performance Time Finish time _ __

Evaluator: 1_ _ _ _ __

/- -----

SIGNATURE DATE

========================================================================

COMMENTS

JPM Admin 2.4 2010 Page 4 of 8 Rev. 0 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical step are identified.
2. Any UNSAT requires comments
3. Ensure operator performs the following required actions for SELF-CHECKING;
a. Identifies the correct unit, train, component, etc.
b. Reviews the intended action and expected response.
c. Compares the actual response to the expected response.

Validation Time: CR 15 min Local -_- __ -_ -_-

Tools/Equipment/Procedures Needed:

REFERENCES:

Reference Title Rev No.

EA-0-7 Calculating Maximum Reactor Vessel Vent Time 2 I Task Number Task Title ContTRN

=================================================================

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. All steps shall be performed for this task When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Pzr Level is -95%

RCS Pressure is 1000 psig (PI-68-62)

NO RCP's Running RVLlS Upper Plenum Range -95%

Unit 1 is performing FR-1.3, Voids in Reactor Vessel, Step 20 INITIATING CUES:

The US has directed you to perform EA-0-7 to calculate the maximum reactor vessel vent.

JPM Admin 2.4 2010 Page 5 of 8 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 1.: OBTAIN and RECORD the following data: - SAT RCS Pressure

- UNSAT CUE: If asked, tell operator that PI-68-62, RCS pressure, is indicating

-1000 psig STANDARD: Operator records RCS pressure as provided in the initial conditions or from the cue.

STEP 2.: Containment lower compartment average air temperature (Tctmt) - SAT CUE: Computer point U0983 indicates 223°F - UNSAT STANDARD: Operator records 223°F for for the lower compartment temperature.

STEP 3.: Containment lower compartment volume at standard temperature and pressure (A) - SAT CUE: Tell operator Computer point U0928 is inoperable. - UNSAT STANDARD: Operator records that the computer point is not available and has SM initial step which is N/A'd.

STEP 4.: Containment Hydrogen Concentration (H)

- SAT CUE: Tell operator Chemistry Supervisor reported Containment Hydrogen concentration 1.3 % - fifteen minutes ago. - UNSAT STANDARD: Operator records hydrogen concentration provided in cue.

STEP 5.: DETERMINE containment lower compartment volume at - SAT standard temperature and pressure (A)

a. If computer point U0928 available - UNSAT NOTE: U0928 is not available operator continues with the next substep.

STANDARD: Operator N/A this substep ..

JPM Admin 2.4 2010 Page 6 of 8 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 6.: b. IF computer point U0928 NOT available, THEN SAT CALCULATE A as follows:

_UNSAT 383,000 cu ft X 492Ro = 275, 760 cu ft (460 + 223°F) Critical Step STANDARD: Operator performs substep b, and determines A= 275,760 cu ft

+/- 250 cu ft.

STEP 7.: DETERMINE maximum hydrogen volume that can be vented (8) SAT WHILE maintaining containment hydrogen concentration less than 3%. _UNSAT 8= (3%-H%) X A CU FT = 1.7 X 275,760 = 4690 100% 100 Critical Step STANDARD: Operator utilizes data from step 4.2.1 for Containment Hydrogen concentration and step 4.2.2 (b) for the lower compartment volume, and performs calculation to determine the max hydrogen colume that can be vented while maintaining the containment hydrogen concentration less than 3%.

Range 4680 to 4700 cu ft STEP 8.: DETERMINE hydrogen flow rate as a function of SAT RCS pressure (C):

a. RECORD RCS pressure _UNSAT 1000 psig 4 .. 2.1 STANDARD: Operator records RCS pressure as given in the initial conditions.

STEP 9.: b. DETERMINE hydrogen flow rate (C ) Using Curve 8, Hydrogen _SAT Flow vs RCS Pressure:

UNSAT C= _____________

C= _--,-=:-_--:-:-_ SCFM

_ SCFM (Curve 8)

Critical STANDARD: Operator uses the RCS pressure from 4.2.1 to determine Step hydrogen flow rate using Curve 8. Range 3250 +/- 100 SCFM.

I

JPM Admin 2.4 2010 Page 7 of8 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 10.: CALCULATE maximum venting time (T): - SAT T= B CU FT - UNSAT C Standard CU FT/Minute Critical T= 4690 Step 3250 Cue:

STANDARD: Operator calculates the maximum venting time. Range 1.4 to 1.5 minutes.

STEP 11.: NOTIFY SRO of maximum venting time determined using - SAT EA-0-7.

- UNSAT Cue:

STANDARD: Operator notifies US of maximum venting time determined in EA-0-7.

End OfJPM

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. All steps shall be performed for this task When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Pzr Level is -95%

RCS Pressure is 1000 psig (PI-68-2)

NO RCP's Running RVLlS Upper Plenum Range -95%

Unit 1 is performing FR-1.3, Voids in Reactor Vessel, Step 20 INITIATING CUES:

The US has directed you to perform EA-0-7 to calculate the maximum reactor vessel vent.

JPM 190-1 Page 1 of 8 Rev. 0 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM 190-1 Reactivity Balance Calculation (Independent Verification Appendix J)

PREPARED!

REVISED BY: Date/

VALIDATED BY:

  • Date/


~~----------

APPROVED BY: Date/

(Operations Training Manager)

CONCURRED: ** Date/

(Operations Representative)

  • Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
    • Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).

JPM 190-1 Page 20f 8 Rev. 0 NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE PAGES PREPARED/

NUMBER REVISION AFFECTED REVISED BY:

0 Initial Issue, adapted from JPM 190 Y 12/08/09 ALL M Hankins v - Specify if the JPM change will require another Validation (Y or N).

See cover sheet for criteria.

JPM 190-1 Page 3 of a Rev. 0 SEQUOY AH NUCLEAR PLANT AUO/RO/SRO JOB PERFORMANCE MEASURE Task: Perform an Independent Verification of a Reactivity Balance Calculation per 0-SO-62-7, Appendix J JAITA TASK #: 0040070101 (RO)

KIA Ratings:

2.1.25 (3.9/4.2) 004 K5.20 (3.6/3.7) 004 A4.04 (3.2/3.6)

Task Standard:

Operator performs 0-SO-62-7 Appendix J Independent Verification of Reactivity Balance Calculation.

Evaluation Method: Simulator - - ' -

X' - - - - In-Plant -

_-_- _- _

=======================================================================

Performer:

NAME Start Time _ __

Performance Rating: SAT UNSAT Performance Time Finish Time _

__ _ __

Evaluator:

SIGNATURE DATE

=======================================================================

COMMENTS

JPM 190-1 Page 4 of 8 Rev. 0 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified.
2. Any UNSAT requires comments ,
3. Ensure operator performs the following required actions for SELF-CHECKING;
a. Identifies the correct unit, train, component, etc.
b. Reviews the intended action and expected response.
c. Compares the actual response to the expected response.
4. This JPM should only be performed by an SRO, also provide SRO with completed Appendix E for evaluation when cued ..

Validation Time: CR. 25 min Local Tools/Equipment/Procedures Needed 1 . Cycle Nuclear Design Report (NDR)

2. 0-SO-62-7 Boron Concentration Control
3. Highlighter and ruler

References:

Reference Title Rev No.

A. 0-SO-62-7 Boron Concentration Control 56 B. TI-44 Boron Tables 12

=================================================================

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All steps shall be performed for this JPM. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 2 is currently stable at 50%.
2. Control rod Bank D is at 170 steps.
3. RCS boron concentration is 450 ppm.
4. Core burnup is 18000 MWD/MTU.
5. Reactor Engineering has provided following Xenon data:

XE 1 =-2946 pcm XE 2 =-2792 pcm INITIATING CUES:

In preparation for power change from 50% to 100% on Unit 2, perform a Reactivity Balance Calculation to bring reactor power from 50% with Control Bank D rods at 170 steps to 100% with rods at 220 steps on Bank D, using a 5%/hour power increase rate.

JPM 190-1 Page 5 of 8 Rev: 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 1.: Obtain a copy of the procedure. - SAT

- UNSAT STANDARD: Operator obtains a copy of 0-SO-62-7 Boron Concentration Control, Appendix J Reactivity Balance Calculation. Start Time_ _

STEP 2.: [1] ENTER the following Data: - SAT

- UNSAT Current RCS Boron Cue: If operator contacts Chem Lab, state that RCS boron concentration is 450 ppm STANDARD Operator enters 450 pm from INITIAL CONDITIONS Appendix J.

STEP 3.: Core Burnup - SAT Cue: If ICS computer is not available inform operator that computer - UNSAT point 1U0981 reads 18,000 MWDIMTU STANDARD Operator locates computer point 1U0981 and enters 18,000 MWD/MTU on Appendix J.

STEP 4.: Current Reactor Power - SAT

- UNSAT Cue: Current reactor power is 50%, as given in the initial conditions.

STANDARD: Operator enters 50% per Initial Conditions STEP 5.: Final Reactor Power - SAT

- UNSAT Cue: Final reactor power is 100%, as given in the initial conditions.

STANDARD: Operator enters 100% per Initial Conditions STEP 6.: Total Reactor Power Change - SAT

- UNSAT STANDARD: Operator determines power change to be 50%. Critical Step

JPM 190-1 Page 6 of 8 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP 7.: Rate of Reactor power change - SAT STANDARD: Operator enters 5%/hr per initial conditions. - UNSAT STEP *8.: Number of hours to change power - SAT

- UNSAT STANDARD: Operator calculates number of hours to change power; 50% / 5%/hour and enters results: Critical Step 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> STEP *9.: Current Rod Position - SAT

- UNSAT STANDARD: Operator enters 170 steps on Bank D per Initial Conditions STEP *10.: Final Rod Position - SAT

- UNSAT STANDARD: Operator enters 220 steps per Initial Conditions STEP *11.: [2] CALCULATE change in boron concentration by performing the following:

[aJ 6p POWER DEFECT

- SAT 6p POWER DEFECT == pcm PD 1 - pcm PD2 == _ _pcm

- UNSAT NOTE: Use "eye-ball" interpolation between closest parameter lines. Band accuracy ~ increment presented on figure. Critical Step STANDARD: Operator uses proper curve, Figure 10, U2C17 Power Defect EOL, 450 ppm line (long dash line) to enter data. For 50% operator should enter -1440 pcm (1350 to 1450). For 100%, operator should enter

-2750 pcm (2650 to 2750).

6p POWER DEFECT == (1350 to 1450) pcm PD 1 - (2650 2750) pcm =-1200 to -1400 pcm STEP *12.: [bJ 6p XENON - SAT 6p XENON =-2792 pcm XE 2 - (-2946 pcm) XE 1 =154 pcm - UNSAT STANDARD: Operator enters Xenon values (provided in the initial conditions) and calculates the change in reactivity due to Xenon.

I

JPM 190-1 Page 7 of 8 Rev.~O Job Performance Checklist:

STEP/STANDARD SAT/UNSAT STEP *13.: [c] b.p RODS b.p RODS =___ pcm Rods 2 - _ _ _ pcm Rods 1 =__pcm SAT

_UNSAT NOTE: Use "eye-ball" interpolation between closest parameter lines. Band accuracy % increment presented on figure.

Critical Step STANDARD: Operator uses proper curve Figure 13. For 220 steps, operator should enter (0 to -50) pcm. For 170 (-550 to -600) steps operator should enter -575 pcm.

b.p RODS =(0 to -50) pcm Rods 2 - (-550 to -600) pcm Rods 1 = (500-600) pcm STEP 14.: [d] Change in reactivity due to Power Defect, Xenon and Rods _SAT

[a] + [b]+[c] =__ pcm _UNSAT

(-1200 pcm to -1400) + 154 pcm +(500 to 600) pcm =(-546 to -746)pcm STANDARD: Operator adds the results for a + b+ c+ to determine change in Critical Step reactivity due to power defect, Xenon and Rods STEP 15.: [e] Change in Boron Reactivity _SAT Substep [d] X (-1) =(-546 to -746) pcm _UNSAT STANDARD: Operator multiplies the results in substep [d] by negative one.

Critical Step STEP 16.: [f] Change in Boron Concentration SAT Substep [e] / Boron Worth _UNSAT STANDARD: Operator Records change in boron reactivity and determines the Critical Step Boron Worth pcm/ppm from Figure 14.

Substep [e] / (-7.56 to -7.64) pcm/ppm Boron worth = -71 to -98 ppm

JPM 190-1 Page 8 of 8 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT NOTE: Examiner provides operator with completed appendix E for Review when Appendix J is complete.

SAT STEP 17.: SRO compares the results of Appendix J with the results of RO UNSAT performance of Appendix E.

Critical Step STANDARD: SRO identifies an error made by the RO during performance of Appendix E in step [2.b], and directs the RO to reperform Appendix E. END TIME End of JPM

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All steps shall be performed for this JPM. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

6. Unit 1 is currently stable at 50%.
7. Control rod Bank D is at 170 steps.
8. RCS boron concentration is 450 ppm.
9. Core burnup is 18000 MWD/MTU.
10. Reactor Engineering has provided following Xenon data:

XE 1 = -2946 pcm

=

XE 2 -2792 pcm INITIATING CUES:

In preparation for power change from 50% to 90%, perform a Reactivity Balance Calculation to bring reactor power from 50% with Control Bank D rods at 170 steps to 100% with rods at 220 steps on Bank D, using a 5%/hour power increase rate.

JPM 410-1 Page 1 of 7 Rev. 0 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM 410-1 SROA2 Review Surveillance for Approval Original Signatures on File PREPARED!

REVISED BY: Date/

VALIDATED BY:

  • Date/

APPROVED BY: Date!

(Operations Training Manager)

CONCURRED: ** Date/

(Operations Representative)

  • Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
    • Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).

JPM 410-1 Page 2 of 7 Rev 0

-

NUCLEAR TRAINING REVISION/USAGE LOG Revision Description Pages Prepared/

Number Of Revision V Date Affected Revised By:

0 Initial issue- adapted from SRO JPM A2 on Y 12/7/09 All M Hankins 3-07 AUDIT Exam, revised information recorded in SI to improve JPM evaluation v - Specify if the JPM change will require another validation (Y or N).

See cover sheet for criteria.

JPM 410-1 Page 3 of 7 Rev. 0 SEQUOYAtt NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE Task:

Review a surveillance for approval JAITA task # : 004 099 0201 Adjust seal injection supply controlled leakage KIA Ratings: 2.2.12 (3.7/4.1)

Task Standard:

Determine that seal injection flow is not within the acceptable area for the listed RCS pressure and determine that needle valves require adjustment Evaluation Method: _~X...!...-...__

Simulator _~X'-!...-... In-Plant _

______

========================================================================

Performer:

NAME Start Time _

__ ____

Performance Rating: SAT UNSAT Performance Time Finish Time _ __

Evaluator: - - - - - - -_____---1_ _ _-

SIGNATURE DATE

========================================================================

COMMENTS

JPM 410-1 Page 4 of 7 Rev. 0 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. This JPM will be performed using passive observation of the first EOP transition brief given by the SRO that is NOT provided an exception in accordance with EPM-4 guidance, inserted prior to JPM step 1 of this JPM.
2. Any UNSAT requires comments.

Validation Time: CR. 5 minutes Local _ _ _ __

Tools/Equipment/Procedures Needed:

None References*

Reference Title Rev No.

1. 0-SI-SXX-068-137.3 Measurement of Reactor Coolant Pump Seal Injection Flow for 6 Units 1 and 2
===========================================================================

READ TO OPERATOR DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • You are the Unit 1 Unit Supervisor
  • O-SI-SXX-068-137.3, Measurement of Reactor Coolant Pump Seal Injection Flow For Units 1 and 2, has been completed INITIATING CUES:
1. Review the completed surveillance for approval, and identify any required actions or notifications.

JPM 410-1 Page 5 of 7 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT I

STEP 1.: Reviews results of surveillance - SAT

- UNSAT STANDARD: Determines all required initials and signatures are present, steps performed have required place keeping.

Start COMMENTS: Time STEP 2.: ENSURE RCS pressure reading is 2235 +/- 20 psig

- SAT STANDARD: SRO reviews step and ensure RCS pressure is within 2235 psig +/- 20 psig.

- UNSAT COMMENTS:

STEP 3.: ENSURE CCP A-A is operating .....

- SAT STANDARD: SRO reviews step and ensures CCP AA is in service

- UNSAT COMMENTS:

STEP 4.: RECORD pressure reading in MCR. ....

- SAT STANDARD: SRO reviews step and ensure RCS pressure recorder is within 2235 +/- 20 psig. - UNSAT COMMENTS:

STEP 5.: PERFORM calculation to determine differential pressure ...... - SAT STANDARD: SRO reviews calculation for differential pressure and determines it is correct - UNSAT COMMENTS: Critical Step

JPM 410-1 Page 6 of 7 Rev. 0 Job Performance Checklist STEP/STANDARD SAT/UNSAT I

STEP 6.:: IF pressure drop is less than 100 psig ..... . _SAT

_UNSAT STANDARD: SRO determines step 6.1[5] is N/A since pressure drop is not less than 100 psig.

COMMENTS: Critical Step STEP 7.: RECORD the seal injection flow rate to each of the four RCP's ...... . SAT

_UNSAT STANDARD: SRO determines flow rates are recorded for each RCP loop and that the total Injection flow rate was calculated correctly.

Critical Step 10.5 + 10.6+ 10.7 +10.5 =42.3 COMMENTS:

STEP 8.: FIND the point on the figure in Appendix A corresponding to DP ....... . SAT UNSAT Cue: If applicant determines that seal injection fJow falls outside of the acceptable range, then direct them to determine technical specification actions Critical Step STANDARD: Determines that with the actual DP, Acceptance Criteria will not be met for the current seal injection flows.

COMMENTS:

STEP 9.: IF the plotted point for differential pressure versus seal injection flow falls SAT outside the "acceptable region" ....... .

UNSAT STANDARD: SRO determines that the plotted pOint is not in the acceptable region:

Following actions/notifications are required: Critical Step

  • Section 6.3 of procedure must be performed. Stop Time_ _

COMMENTS:

End of JPM

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

READ TO OPERATOR DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • You are the Unit 1 Unit Supervisor
  • O-SI-SXX-068-137.3, Measurement of Reactor Coolant Pump Seal Injection Flow For Units 1 and 2, has been completed INITIATING CUES:
1. Review the completed surveillance for approval, and identify any required actions or notifications.

JPM -A.3 Page 1 of6 REV. 1 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE ADMIN SRO A.3 JPM Approval of a Waste Gas Tank Release

JPM -A.3 Page 2 of 6 REV. 1 I NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE PAGES PREPARED/

NUMBER REVISION AFFECTED REVISED BY:

0 New Y All 1 Revised to reflect procedure changes Y 12/08/09 All M Hankins v - Specify if the JPM change will require another validation (Y or N).

See cover sheet for criteria.

JPM -A.3 Page 3 of 6 REV. 1 SEQUOYAH NUCLEAR PLANT ROISRO JOB PERFORMANCE MEASURE Task:

Approval of a Waste Gas Tank Release JAiTA task:

5030010102 (SRO) 0690150102 (SRO)

KIA Ratings:

2.3.6 (2.0/3.8) 2.3.11 Ability to Approve Release Permits. (CFR: 41.13/45.4/45.10) 2.0/3.8 Task Standard:

Candidate identifies ...

(1) The US/SRO must approve the release if the tank if the release is to be made at 2300.

(2) The required actions to allow a release with O-RM-90-118A out of service as identified in ODCM 1/21.2.

(3) The required action if it takes 40 days to get parts to restore the monitor to Operable status.

Valuation Method : Simulator -_....:.X:..!....-__

X

--'-'---

In-Plant _ _ __

=======================================================================

Performer:

NAME Start Time _

____ __

Performance Rating: SAT UNSAT Performance Time Finish Time _ __

Evaluator: - - - - - - - -_____~/------ ~/___-

SIGNATURE DATE

=======================================================================

COMMENTS

JPM -A.3 Page 4 of 6 REV. 1 SPECIAL INSTRUCTIONS TO EVALUATOR~

1. Any UNSAT requires comments
2. This task can be performed in a classroom setting.

Validation Time: CR. 24 min Local _ _ _ __

Tools/Equipment/Procedures Needed:

OPDP-1, Conduct of Operations

References:

Reference Title Rev No.

1. SON ODCM Offsite Dose Calculation Manual 55
2. 0-SI-CEM-077-410.4 Waste Gas Decay Tank Release 15
3. 0-SO-77-15 Waste Gas Decay Tank Release 16
=================================================================

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • The operating crew is preparing to release the Waste Gas Tank 'D'.
  • 0-RM-90-118A, Waste Gas Radiation Monitor, is inoperable.
  • The monthly projected offsite dose limits have not been exceeded.

INITIATING CUES:

You are to identify ...

(1) Who must approve the release if the tank is to be released on the night shift at 2300.

(2) The required actions to allow a release with 0-RM-90-118A out of service.

(3) The required action if it takes 40 days to get parts to restore the monitor to Operable status.

JPM -A.3 Page 50f6 REV. 1 Job Performance CheckHst STEP/STANDARD SAT/U NSAT STEP 1.: Identify who must approve the release if the tank is to be Start Time__

released on the night shift at 2300.

SAT STANDARD: Candidate identifies the approval of the US/SRO is required, and may state that initials and justification are recorded on _UNSAT 0-SI-CEM-077-410.4 data package cover sheet.

Critical Step COMMENTS:

STEP 2.: The required actions to allow a release with 0-RM-90-118A out SAT of service.

_UNSAT STANDARD: Candidate identifies the ODCM 1/2/1/2 required Action 40 Critical Step With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, the contents of the tank(s) may be released to the environment provided that prior to initiating the release:

a. At least two independent samples of the tank's contents obtained by two technically qualified members of the facility staff are analyzed, and
b. At least two technically qualified members of the Facility Staff independently verify the release rate calculations and;
c. At least two technically qualified members of the Facility Staff independently verify the discharge valve lineup.

Otherwise, suspend release of radioactive effluents via this pathway.

COMMENTS:

JPM -A.3 Page 6 of 6 REV. 1 Job Performance Checklist STEP/STANDARD SAT/U NSAT STEP 3.: The required action if it takes 40 days to get parts to restore the SAT monitor to Operable status.

UNSAT Critical STANDARD: Candidate identifies that if the inoperable instruments cannot be Step restored to OPERABLE status within 30 days, the next Annual Radioactive Effluent Report, pursuant to ODCM Administrative Stop Time__

Control 5.2, is to explain why the inoperability could not be corrected within 30 days.

COMMENTS:

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • The operating crew is preparing to release the Waste Gas Tank 'D'.
  • 0-RM-90-118A, Waste Gas Radiation Monitor, is inoperable.
  • The monthly projected offsite dose limits have not been exceeded.

INITIATING CUES:

You are to identify ...

(4) Who must approve the release if the tank is to be released on the night shift at 2300.

(5) The required actions to allow a release with 0-RM-90-118A out of service.

(6) The required action if it takes 40 days to get parts to restore the monitor to Operable status.

JPM # 19AP3 Page 1 of 9 Rev. 0 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE JPM # 19AP3 Classify the Event per the REP (LOCA with Significant Fuel Failure)

Original Signatures on File PREPARED/

REVISED BY: Date/

VALIDATED BY:

  • Date/

~=-----------


~~----------

APPROVED BY: Date/

(Operations Training Manager)

CONCURRED: ** Date/

(Operations Representative)

  • Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
    • Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).

JPM # 19AP3 Page 2 of 9 Rev. 0 I NUCLEAR TRAINING REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE PAGES PREPARED/

NUMBER REVISION AFFECTED REVISED BY:

0 New JPM, adapted from JPM 19AP2 Y 12/09/09 All M. Hankins v - Specify if the JPM change will require another validation (Y or N).

See cover sheet for criteria.

JPM # 19AP3 Page 3 of 9 Rev. 0 SEQUOYAI"! NUCLEAR PLANT SRO JOB PERFORMANCE MEASURE Task:

Classify the Event per the REP (LOCA with Significant Fuel Failure)

JAITA task #: 3440030302 (SRO) 3440190302 (SRO)

KIA Ratings:

2.4.29 (2.6/4.0) 2.4.38 (2.4/4.4) 2.4.30 (2.2/3.6) 2.4.40 (2.3/4.0) 2.4.37 (2.0/3.5) 2.4.41 (2.3/4.1)

Evaluation Method: Simulator X In-Plant _ __

  • This JPM will be simulated
========================================================================

Performer:

NAME Start Time _ __

Performance Rating: SAT UNSAT Performance Time Finish Time _ __

Evaluator:

- ------ ---------/_


/----

SIGNATURE

--

DATE

========================================================================

COMMENTS

JPM # 19AP3 Page 4 of9 Rev. 0 SPECIAL INSTRUCT-IONS TO EVALUATOR:

1. Any UNSAT requires comments
2. Ensure operator performs the following required actions for SELF-CHECKING;
a. Identifies the correct unit, train, component, etc.
b. Reviews the intended action and expected response.
c. Compares the actual response to the expected response.

d.

Caution: DO NOT LET THE EXAMINEE FAX THE NOTIFICATION FORM OFFSITE!

Validation Time: CR. 24 mins Local -_- __ -_ -_-

Tools/Equipment/Procedures Needed:

EPIP-1, Emergency Plan Classification Matrix EPIP-4, Site Area Emergency

References:

Reference Title Rev No.

1. EPIP-1 Emergency Plan Initiating Conditions Matrix 42
2. EPIP-4 Site Area Emergency 30 READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All steps of this JPM shall be simulated. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

The simulator is NOT representative of the scenario you are about to address.

INITIAL CONDITIONS:

1. Approximately 50 minutes ago, Unit 1 experienced an AUTO SI from a small RCS leak which quickly escalated to a LOCA and a high containment pressure.
2. RCS pressure has stabilized at 600 psig. The CLAs are injecting.
3. The ONLY ECCS pump available and in service is the 18-8 RHR pump. The last of the other ECCS pumps tripped off shortly after the RCPs were removed from service per procedure. All other equipment operated as designed.
4. Maximum containment pressure was 5 psig.
5. Lower containment radiation level is 1.8E+02 Rem/hr of RM-90-271A.
6. Unit 2 is at 100% RTP and stable.
7. For purposes of this JPM the TSC has not been staffed.

INITIATING CUES:

1. You are the US and have assumed the SED position.
2. The STA reports a RED path condition exists on Core Cooling.
3. The operating crew is taking appropriate actions per the emergency procedures. They are now transitioning to FR-C.1.
4. You are to classify and document this event per the appropriate EPIP, make Protective Action Recommendations, if any, and perform all required actions.

JPM # 19AP3 Page 5 of9 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT I

STEP 1.: Refers to EPIP-1 to determine level of event. - SAT STANDARD: Operator refers to EPIP-1, Section 1, Fission Product Barrier Matrix. - UNSAT Operator determines that they have met the conditions of Critical Step 1.1.1 Loss, "Core Cooling Red" 1.1.5 Loss, "Containment High Radiation" 1.2.2 Loss "RCS leak results in subcooling <40°F" Task Start Time Utilizing "Emergency Class Criteria", operator determines the need to declare a SITE AREA EMERGENCY based on Loss of two barriers.

The following steps implement EPIP-4:

STEP 2.: Implements EPIP-4 SITE AREA EMERGENCY. - SAT Enter time Declaration made: - UNSAT Time from Task Acceptance to Declaration:

STANDARD: Operator Implements a SITE AREA EMERGENCY per EPIP-4, Section 3.1. Operator should classify the event within 15 minutes of the time the task was accepted. Declaration Time should be consistent with the time the examinee transitions from EPIP-1 to EPIP-4.

STEP 3.: Upon classifying the events as a SITE AREA EMERGENCY, - SAT the SM/SED shall:

- UNSAT

[1 ] IF the TSC is OPERATIONAL, (SED transferred to TSC), THEN GO TO Section 3.2 Cue: If operator requests, respond "TeS has not been manned".

STANDARD: Operator should recall from the Initiating Cues that the TSC has not been manned.

STEP 4. [2] RECORD time of declaration. TIME - SAT NOTE: Operator may have already stated time of declaration, but must enter - UNSAT time properly in EPIP-4 form.

STANDARD: Operator should enter proper time that declaration was made.

JPM # 19AP3 Page 6 of 9 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT I

STEP 5. [3] ACTIVATE Emergency Paging System (EPS) as follows: - SAT

[a] IF EPS has already been activated, THEN GO TO Step 4. - UNSAT Cue: If operator asks, respond "EPS has not been activated".

STANDARD: Operator continues to implement Step [3] actions.

STEP 6. [b] IF ongoing onsite Security events may present risk to the - SAT emergency responders, THEN CONSULT with Security to determine if site access is dangerous to the life and health of - UNSAT emergency responders.

NOTE: There is no indication of an onsite Security event given in the initial conditions.

STANDARD: Operator continues to implement Step [3] actions.

STEP 7. [c] IF ongoing events make site access dangerous to the life of - SAT emergency responders, THEN SELECT STAGING AREA button on the terminal INSTEAD of the EMERGENCY button. - UNSAT NOTE: There is no indication of an onsite event which is making site access dangerous to responders given in the initial conditions.

STANDARD: Operator continues to implement Step [3] actions.

STEP 8. [d] ACTIVATE EPS using touch screen terminal. IF EPS fails to - SAT activate, THEN continue with Step 4.

- UNSAT STANDARD: Operator continues with Step [4].

JPM # 19AP3 Page 7 of 9 Rev. 0 Job Performance Checklist*

STEP/STANDARD SAT/U NSAT I

CAUTION: DO NOT LET THE EXAMINEE FAX THE FORM TO THE ACTUAL ODS!

STEP 9. [4] Complete Appendix B (TVA INITIAL NOTIFICATION FOR SITE AREA - SAT EMERGENCY).

- UNSAT

1. This is a DRILL
2. This is [Their name, Shift Manager at SQN Plant] Sequoyah has Critical Step declared a SITE AREA EMERGENCY affecting [Unit 1]
3. EAL Designator(s): [1.1.1 LOSS, 1.1.5 LOSS, and 1.2.2 LOSS]
4. Brief description of incident: [Core Cooling Red Path AND Containment High Radiation AND RCS leak results in subcooling <40°F]
5. Radiological Conditions [Release information not known OR Minor releases within federally approved limits.]
6. Event Declared: [Time and Date]
7. Protective Action Recommendation: [None].
8. Please repeat back the information you have received to ensure accuracy.
9. When complete, FAX this form to the ODS.

STANDARD: Operator completely fills out Appendix B.

STEP 10. [5] NOTIFY ODS. - SAT Initial Time

- UNSAT NOTE: Enter time call is made to the ODS Time from Declaration (step 2) to ODS Notification: Critical Step Cue: Inform operator that "the ODS is not answering the phone".

STANDARD: Operator marks steps [5a] through [5e] N/A and continues to next step.

STEP 11. [a] IF EPS failed to activate from SQN when attempted THEN - SAT DIRECT ODS to activate SQN EPS. IF ODS is unable to activate EPS, THEN continue with Step [5][b]. - UNSAT STANDARD: Operator marks step N/A and continues to next step.

STEP 12. [b] IF ODS is unable to ACTIVATE EPS ..... - SAT STANDARD: Operator marks step N/A and continues to next step. - UNSAT STEP 13. [c] READ completed Appendix B to ODS. - SAT Cue: Inform operator that "the ODS is not answering the phone. " - UNSAT STANDARD: Operator marks step N/A and continues to next step.

It

JPM # 19AP3 Page 8 of 9 Rev. 0 Job Performance Checklist STEP/STANDARD SAT/UNSAT I

STEP 14. [d] FAX Appendix B to the ODS. - SAT Cue: The ODS is not answering the phone. - UNSAT Caution: DO NOT LET THE EXAMINEE FAX THE FORM TO THE ACTUAL ODS!

STANDARD: Operator marks step N/A and continues to next step.

STEP 15. [e] MONITOR for confirmation call from ODS that State/Local - SAT notifications complete: RECORD time State notified.

- UNSAT STANDARD: Operator marks step N/A.

STEP 15 [6] IF ODS CANNOT be contacted within 10 minutes ..... - SAT

[a] CONTACT Tennessee Emergency Management Agency (TEMA) and read completed Appendix B. - UNSAT Cue: Role playas TEMA and repeat back Appendix B information.

Critical Step STANDARD: Operator calls TEMA and reads information from Appendix B.

Caution: DO NOT LET THE EXAMINEE FAX THE FORM TO THE - SAT ACTUAL TEMA! UNSAT

-

STEP 16 [6][b] FAX completed Appendix B to TEMA.

Cue: The support AUO will send the FAX for you.

STANDARD: Operator faxes Appendix B to TEMA.

STEP 17 [7] ENSURE MSS/wWM in the OSC (x6428) is monitoring Emergency - SAT Response Organization (ERO) responses using printed report available in the OSC. - UNSAT Cue: Role play (if directed) as MSSIWWM and report you will monitor to ensure all positions responded.

STANDARD: Operator performs directs MSS/wWM to make appropriate calls.

STEP 18 [8] PERFORM Appendix A, Notifications and Announcements. - SAT (Delegate as needed.)

- UNSAT Cue: For the purposes of this JPM, Appendix A notifications shall be delegated to Unit 2 US ..

STANDARD: Operator delegates Appendix A to Unit 2 US.

JPM # 19AP3 Page 9 of9 Rev. 0 JOG Performance Checklist STEP/STANDARD SAT/UNSAT I

STEP 19 [9] GO TO Section 3.3 SAT STANDARD: Operator implements Section 3.3. _UNSAT NOTE: The following steps are contained in EPIP-4, Section 3.3 MONITOR CONDITIONS STEP 20 [1] MONITOR radiation monitors _SAT Cue: If Operator checks Rad monitors, tell operator "there is no significant _UNSAT change in radiation monitor readings".

STANDARD: Operator monitors radiation monitors.

STEP 21 [2] WHEN indication exists of an unplanned radiological release, _SAT THEN ENSURE Dose Assessment is performed.

_UNSAT Cue: If Operator checks Rad monitors, tell operator "There is no significant change in radiation monitor readings".

STANDARD: 1. Since no radiological release is indicated, the Operator is not required to direct the Chemistry Shift Supervisor to perform a dose assessment per EPIP-13.

2. Operator should use either ICS or the RP-30 modules to determine effluent radiation conditions. No additional classifications determined.

STEP 22: [3] If personnel accountability has not been previously initiated, THEN SAT ACTIVATE assembly and accountability by using EPIP-8, Appendix C (may be delegated) _UNSAT Cue: Role play and state that an additional operator will perform EPIP-8, Critical Step AppendixC.

STANDARD: Operator addresses need to implement EPIP-8, Appendix C.

STEP 23: [4] MONITOR plant conditions. SAT

[a] EVALUATE using EPIP-1 ..... . UNSAT Cue: If operator begins Monitoring plant conditions, THEN tell him "The Stop Time:

TSC is staffed and will COMPLETE the SAE follow-up Form".

STANDARD: Operator addresses completing SAE follow-up Form (Appendix C).

End of JPM

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All steps of this JPM shall be simulated. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your aSSigned task. To indicate that you have completed your aSSigned task return the handout sheet I provided you The simulator is NOT representative of the scenario you are about to address.

INITIAL CONDITIONS:

h. Approximately 50 minutes ago, Unit 1 experienced an AUTO SI from a small RCS leak which quickly escalated to a LOCA and a high containment pressure.
i. RCS pressure has stabilized at 600 psig. The CLAs are injecting.
j. The ONLY ECCS pump available and in service is the 1B-B RHR pump. The last of the other ECCS pumps tripped off shortly after the RCPs were removed from service per procedure. All other equipment operated as designed.
k. Maximum containment pressure was 5 psig.

I. Lower containment radiation level is 1.8E+02 Rem/hr of RM-90-271A.

m. Unit 2 is at 100% RTP and stable.
n. For purposes of this JPM the TSC has not been staffed.

INITIATING CUES:

5. You are the US and have assumed the SED position.
6. The STA reports a RED path condition exists on Core Cooling.
7. The operating crew is taking appropriate actions per the emergency procedures. They are now transitioning to FR-C.1.
8. You are to classify and document this event per the appropriate EPIP AND perform all required actions.