{{#Wiki_filter:From:talentz@firstenergycorp.comSent:Friday, May 28, 2010 11:56 PM To:Mahoney, Michael Cc:phlashley@firstenergycorp.com; kmnesser@firstenergycorp.com;  
{{#Wiki_filter:From: talentz@firstenergycorp.com Sent: Friday, May 28, 2010 11:56 PM To:   Mahoney, Michael Cc:   phlashley@firstenergycorp.com; kmnesser@firstenergycorp.com; kwbyrd@firstenergycorp.com; apwise@firstenergycorp.com; ctdaft@firstenergycorp.com; gmwolf@firstenergycorp.com
 
kwbyrd@firstenergycorp.com; apwise@firstenergycorp.com;  
 
ctdaft@firstenergycorp.com; gmwolf@firstenergycorp.com


==Subject:==
==Subject:==
FENOC Follow-up Clarifications for the Davis-Besse RPV Head  
FENOC Follow-up Clarifications for the Davis-Besse RPV Head Penetration Nozzle 50.55a Request Attachments:     20100528093714771.pdf; 20100526154647573.pdf; Nozzle 4
 
- 52M Deposit Depth.pdf Follow Up Flag:   Follow up Flag Status:     Flagged ADAMSAccessionNumber:   ML101520088 Mike:
Penetration  
In response to the telecon conducted on May 24, 2010, FENOC provides the following clarifications regarding the subject relief request. :
 
: 1. The NRC has received the proprietary calculations that were submitted by FENOC on May 17, 2010 and they have been forwarded to the appropriate technical reviewers. No further action is required by FENOC.
Nozzle 50.55a Request Attachments:20100528093714771.pdf; 20100526154647573.pdf; Nozzle 4
: 2. As a result of a question from the NRC Special Inspection Team it was discovered that the post-weld PT examinations for ten nozzles did not have sufficient coverage in bands of the examination area due to the field of view on the camera vs the spacer size used. This post weld PT examination overlap issue affected nozzles. 10, 24, 28, 43, 51, 55, 58, 59, 61 and 67.
- 52M Deposit  
This is documented in the site corrective action program under FENOC CR 10-77201 (Areva CR 2010-3544). As a result, the post weld PTs for these nozzles are being reperformed. For nozzles 51, 55, 58, 59, 61 and 67, since abrasive water jet machining remediation has already been completed, the PT will now be performed after water jet remediation. This is contrary to the process overview provided in our April 1, 2010, 10 CFR 50.55a request. Specifically, on page 4 of 20 of the Enclosure, FENOC provided an overview of the basic steps of the repair process. Step 6 and 7 will now be reversed for these six nozzles.
 
As discussed on the telecon yesterday and, in part, in our April 16, 2010 response to RAI Question 2(4), the order of these two steps can be interchanged, as the material removed by the water jetting is minimal (approximately 0.030 inches) and the abrasive water jet machining remediation will not interfere with the subsequent surface examination (i.e., the abrasive water jet
Depth.pdfFollow Up Flag:Follow upFlag Status:FlaggedADAMSAccessionNumber:ML101520088 Mike: In response to the telecon conducted on May 24, 2010, FENOC provides the following  
 
clarifications regarding the subject relief request. :
: 1. The NRC has received the proprietary calculations that were submitted by FENOC on May  
 
17, 2010 and they have been forwarded to the appropriate technical  
 
reviewers. No further  
 
action is required by FENOC.
: 2. As a result of a question from the NRC Special Inspection Team it was discovered that the  
 
post-weld PT examinations for ten nozzles did not have sufficient  
 
coverage in bands of the  
 
examination area due to the field of view on the camera vs the spacer  
 
size used. This post weld  
 
PT examination overlap issue affected nozzles. 10, 24, 28, 43, 51, 55, 58, 59, 61 and 67.
 
This is documented in the site corrective action program under FENOC CR
 
10-77201 (Areva CR 2010-3544). As a result, the post weld PTs for these
 
nozzles are being  
 
reperformed. For nozzles 51, 55, 58, 59, 61 and 67, since abrasive  
 
water jet machining  
 
remediation has already been completed, the PT will now be performed  
 
after water jet  
 
remediation. This is contrary to the process overview provided in our  
 
April 1, 2010, 10 CFR  
 
50.55a request. Specifically, on page 4 of 20 of the Enclosure, FENOC  
 
provided an overview of  
 
the basic steps of the repair process. Step 6 and 7 will now be  
 
reversed for these six nozzles.
 
As discussed on the telecon yesterday and, in part, in our April 16, 2010 response to RAI  
 
Question 2(4), the order of these two steps can be interchanged, as the  
 
material removed by the  
 
water jetting is minimal (approximately 0.030 inches) and the abrasive  
 
water jet machining  
 
remediation will not interfere with the subsequent surface examination (i.e., the abrasive water jet machining remediation is not considered a peening process).
: 3. As provided in our May 17, 2010 response to RAI Question 3(2), the examination area for the
 
preservice examination following repair and for future inservice
 
inspections shall include the
 
wetted surface of the new weld from the toe of the weld up through 0.5
 
inches above the rolled
 
region of the nozzle remnant. In accordance with Figure 3 of Attachment
 
1 of the April 1, 2010
 
relief request, during the post-weld PT examination following repairs, the examination includes
 
the area 1/2 inch below the toe of the weld. This PT will also serve as
 
the preservice
 
examination.
As noted in the 50.55a request, FENOC plans to use a surface examination method for future
 
inservice inspections. If PT is used, the examination will be in
 
accordance with Code Case N-
 
729-1 and the 50.55a request. In addition, the DB "ISI database" has
 
been updated (see
 
attached) to ensure the PT will include the area 1/4 inch below the toe
 
of the weld. If other
 
surface or volumetric examination techniques (e.g. eddy current or UT)
 
are developed and
 
qualified per Code Case N-729-1, the qualified examination area would
 
include, as a minimum
 
the wetted surface of the new weld from the toe of the weld up through
 
0.5 inches above the
 
rolled region of the nozzle remnant.(See attached file: 20100528093714771.pdf)
: 4. As requested, the subject DB nozzle 4 repair weld NDE results are attached.(See attached file: 20100526154647573.pdf)
 
Subsequent to the May 24, 2010 telecon, the NRC provided the following additional question via
 
email on May 25, 2010 (question highlighted in
 
bold): By letters dated April 1, 2010 and May 17, 2010, the licensee submitted the half nozzle repair
 
relief request for the control rod drive mechanism (CRDM) nozzles at Davis Besse. In response to RAI Question number 2 in to the May 17, 2010, submittal, the licensee stated that
 
Code Case N-416-3 will be
 
used to satisfy pressure testing requirements subsequent to the CRDM
 
nozzle repair. In the
 
teleconference dated May 24, 2010, the licensee indicated that it will
 
perform a visual (VT-2)
 
examination from outside the service structure of the reactor pressure
 
vessel without any direct
 
view of the surface of the head in the areas that were repaired during
 
the system leakage test. 
 
In general, the NRC accepts this type of indirect visual (VT-2)
 
examination. However, it may not be appropriate for Davis-Besse CRDM nozzle repairs based on the following:
: 1)    A larger number of repaired CRDM nozzles increases possibility
 
for fabrication defects that may be missed by nondestructive
 
examination.
: 2)    Several unsuccessful repairs on CRDM nozzle 4 create the
 
possibility for unforeseen fabrication defects.
: 3)    Inability of a visual (VT-2) examination from the outside
 
service structure to detect small leakage from a through-wall
 
fabrication defect in a repaired nozzle.
For these reasons, the staff requests a direct viewing of the bare metal head surface through
 
one or more access hole penetrations during the system leakage test to
 
provide an additional
 
defense in-depth and increase confidence in these nozzle repairs. 
 
Alternatively, the licensee
 
needs to justify why the proposed indirect visual (VT-2) examination is
 
acceptable.
: 5. As noted in the 50.55a request, the CRDM nozzle repair weld is a partial penetration weld. 
 
ASME Code NB-5245 requires a progressive surface examination of partial
 
penetration welds. 
 
In lieu of the progressive surface examination, a surface examination
 
and an ultrasonic
 
examination, qualified to detect flaws in the new weld and base material
 
is performed on the
 
partial penetration weld as described in the 50.55a request, Figure 3.
 
This UT examination, exceeds construction code requirements and along
 
with the liquid
 
penetrant examination of the weld area provides a high degree of
 
confidence in the integrity of
 
the repair weld.
Pressure testing requirements will be met  by the completion of a VT-2 examination that will be
 
conducted in accordance with the requirements of IWA-5000 and Code Case
 
N-416-3 which is
 
endorsed in NRC Regulatory Guide
 
1.147 Revision 15 with no conditions noted. IWA-5000 permits a VT-2
 
visual examination with
 
insulation installed. As specified in IWA-5242, the VT-2 examination
 
will be conducted at the
 
lowest elevation where leakage may be detectable. Examination of the
 
surrounding area such
 
as floor areas, equipment surfaces or underneath components is required.
 
A remote VT-2
 
examination will be conducted by examining the refueling canal floor in
 
the area of the reactor
 
vessel flange. A direct VT-2 examination of the reactor vessel
 
insulation joints from under the
 
reactor vessel will also be performed. Together, the NDE and pressure
 
test visual examination
 
will provide a high level of confidence in the integrity of the CRDM
 
repairs.The CRDM penetrations are located within the service structure below the reactor vessel head's insulation package. Access to this area is available through inspection
 
ports, however, during the
 
system leakage test, the Reactor Coolant System is at normal operating
 
temperature and
 
pressure (approximately 532 degrees Fahrenheit and 2150 psig) with all
 
insulation in place as
 
permitted by IWA-5000. This insulation covers the inspection ports. 
 
Opening the inspection
 
ports would require removal of the insulation and the hot inspection
 
ports. Air emitted from the
 
ports could approach 500 degrees Fahrenheit. Inspection would be
 
difficult and access would
 
require personnel to be in close proximity to the hot surfaces creating
 
an industrial safety hazard. 
 
The benefit of this direct visual examination is considered to be
 
limited given the additional level
 
of NDE and pressure test visual examination noted above. However, In
 
addition to the VT-2
 
examination discussed above, FENOC intends to perform a visual
 
inspection for leakage from
 
the reactor vessel head through an inspection port to the extent that
 
access and environmental
 
conditions permit.
Why is it not necessary to perform AWJ conditioning of the repair made to CRDM penetration
 
#58?6. The purpose for Abrasive Water Jet (AWJ) machining is to mitigate the initiation of
 
pressurized water stress corrosion cracking (PWSCC) in PWSCC susceptible
 
materials. Of the
 
three materials that are part of the RVCH CRDM penetration modification


[RVCH Low Alloy
machining remediation is not considered a peening process).
: 3. As provided in our May 17, 2010 response to RAI Question 3(2), the examination area for the preservice examination following repair and for future inservice inspections shall include the wetted surface of the new weld from the toe of the weld up through 0.5 inches above the rolled region of the nozzle remnant. In accordance with Figure 3 of Attachment 1 of the April 1, 2010 relief request, during the post-weld PT examination following repairs, the examination includes the area 1/2 inch below the toe of the weld. This PT will also serve as the preservice examination.
As noted in the 50.55a request, FENOC plans to use a surface examination method for future inservice inspections. If PT is used, the examination will be in accordance with Code Case N-729-1 and the 50.55a request. In addition, the DB "ISI database" has been updated (see attached) to ensure the PT will include the area 1/4 inch below the toe of the weld. If other surface or volumetric examination techniques (e.g. eddy current or UT) are developed and qualified per Code Case N-729-1, the qualified examination area would include, as a minimum the wetted surface of the new weld from the toe of the weld up through 0.5 inches above the rolled region of the nozzle remnant.
(See attached file: 20100528093714771.pdf)
: 4. As requested, the subject DB nozzle 4 repair weld NDE results are attached.
(See attached file: 20100526154647573.pdf)
Subsequent to the May 24, 2010 telecon, the NRC provided the following additional question via email on May 25, 2010 (question highlighted in bold):
By letters dated April 1, 2010 and May 17, 2010, the licensee submitted the half nozzle repair relief request for the control rod drive mechanism (CRDM) nozzles at Davis Besse. In response to RAI Question number 2 in  to the May 17, 2010, submittal, the licensee stated that Code Case N-416-3 will be used to satisfy pressure testing requirements subsequent to the CRDM nozzle repair. In the teleconference dated May 24, 2010, the licensee indicated that it will perform a visual (VT-2) examination from outside the service structure of the reactor pressure vessel without any direct view of the surface of the head in the areas that were repaired during the system leakage test.
In general, the NRC accepts this type of indirect visual (VT-2) examination. However, it may not


Steel base metal (SA-533, Gr.
be appropriate for Davis-Besse CRDM nozzle repairs based on the following:
: 1)    A larger number of repaired CRDM nozzles increases possibility for fabrication defects that may be missed by nondestructive examination.
: 2)    Several unsuccessful repairs on CRDM nozzle 4 create the possibility for unforeseen fabrication defects.
: 3)    Inability of a visual (VT-2) examination from the outside service structure to detect small leakage from a through-wall fabrication defect in a repaired nozzle.
For these reasons, the staff requests a direct viewing of the bare metal head surface through one or more access hole penetrations during the system leakage test to provide an additional defense in-depth and increase confidence in these nozzle repairs.
Alternatively, the licensee needs to justify why the proposed indirect visual (VT-2) examination is acceptable.
: 5. As noted in the 50.55a request, the CRDM nozzle repair weld is a partial penetration weld.
ASME Code NB-5245 requires a progressive surface examination of partial penetration welds.
In lieu of the progressive surface examination, a surface examination and an ultrasonic examination, qualified to detect flaws in the new weld and base material is performed on the partial penetration weld as described in the 50.55a request, Figure 3.
This UT examination, exceeds construction code requirements and along with the liquid penetrant examination of the weld area provides a high degree of confidence in the integrity of the repair weld.
Pressure testing requirements will be met by the completion of a VT-2 examination that will be conducted in accordance with the requirements of IWA-5000 and Code Case N-416-3 which is endorsed in NRC Regulatory Guide 1.147 Revision 15 with no conditions noted. IWA-5000 permits a VT-2 visual examination with insulation installed. As specified in IWA-5242, the VT-2 examination will be conducted at the lowest elevation where leakage may be detectable. Examination of the surrounding area such as floor areas, equipment surfaces or underneath components is required.
A remote VT-2 examination will be conducted by examining the refueling canal floor in the area of the reactor vessel flange. A direct VT-2 examination of the reactor vessel insulation joints from under the reactor vessel will also be performed. Together, the NDE and pressure test visual examination will provide a high level of confidence in the integrity of the CRDM repairs.
The CRDM penetrations are located within the service structure below the


reactor vessel heads insulation package. Access to this area is available through inspection ports, however, during the system leakage test, the Reactor Coolant System is at normal operating temperature and pressure (approximately 532 degrees Fahrenheit and 2150 psig) with all insulation in place as permitted by IWA-5000. This insulation covers the inspection ports.
Opening the inspection ports would require removal of the insulation and the hot inspection ports. Air emitted from the ports could approach 500 degrees Fahrenheit. Inspection would be difficult and access would require personnel to be in close proximity to the hot surfaces creating an industrial safety hazard.
The benefit of this direct visual examination is considered to be limited given the additional level of NDE and pressure test visual examination noted above. However, In addition to the VT-2 examination discussed above, FENOC intends to perform a visual inspection for leakage from the reactor vessel head through an inspection port to the extent that access and environmental conditions permit.
Why is it not necessary to perform AWJ conditioning of the repair made to CRDM penetration
#58?
: 6. The purpose for Abrasive Water Jet (AWJ) machining is to mitigate the initiation of pressurized water stress corrosion cracking (PWSCC) in PWSCC susceptible materials. Of the three materials that are part of the RVCH CRDM penetration modification
[RVCH Low Alloy Steel base metal (SA-533, Gr.
B, Cl 1), CRDM Nozzle (Alloy 600), and weld filler material (Alloy 52M)]
B, Cl 1), CRDM Nozzle (Alloy 600), and weld filler material (Alloy 52M)]
 
only the CRDM nozzle Alloy 600 material is known to be susceptible to PWSCC. The weld repair to the IDTB weld in penetration #58 was limited to the Alloy 52M weld material. The machining hard stop, acting as a plug, was positioned so that the lower end extended down to just below the upper weld toe (the Alloy 600 / Alloy 52M interface). The position of the hard stop prevented repair activities (cavity grinding and post-weld grinding) from contacting the Alloy 600 nozzle material.
only the CRDM nozzle  
This response clarifies the scope of AWJ for nozzle 58 as described in the FENOC response to RAI #3 dated April 16, 2010.
 
Alloy 600 material is known to be susceptible to PWSCC. The weld repair
 
to the IDTB weld in  
 
penetration #58 was limited to the Alloy 52M weld material. The  
 
machining hard stop, acting as  
 
a plug, was positioned so that the lower end extended down to just below
 
the upper weld toe (the  
 
Alloy 600 / Alloy 52M interface). The position of the hard stop  
 
prevented repair activities (cavity  
 
grinding and post-weld grinding) from contacting the Alloy 600 nozzle  
 
material.This response clarifies the scope of AWJ for nozzle 58 as described in the FENOC response to  
 
RAI #3 dated April 16, 2010.
The "as-built" nozzle 4 weld plan is also attached for information:
The "as-built" nozzle 4 weld plan is also attached for information:
: 7. PS0139 required five layers of Alloy 52M weld filler metal to adequately cover the Alloy 82  
: 7. PS0139 required five layers of Alloy 52M weld filler metal to adequately cover the Alloy 82 filler metal. The five layers of Alloy 52M was to clearly communicate to the welding operators the amount of Alloy 52M to be deposited over the Alloy 82 . The
 
filler metal. The five layers of Alloy 52M was to clearly communicate to
 
the welding operators  
 
the amount of Alloy 52M to be deposited over the Alloy 82 . The intention was to achieve a minimum of five layers cover of Alloy 52M over the Alloy 82 in the as-
 
welded condition. This
 
would allow for the machining and abrasive water jet material removal
 
operations and still
 
maintain a minimum of 0.125 inch thickness of Alloy 52M covering the
 
Alloy 82 filler metal to
 
avoid reactor coolant exposure of the Alloy 82 filler metal that is
 
susceptible to PWSCC.


intention was to achieve a minimum of five layers cover of Alloy 52M over the Alloy 82 in the as-welded condition. This would allow for the machining and abrasive water jet material removal operations and still maintain a minimum of 0.125 inch thickness of Alloy 52M covering the Alloy 82 filler metal to avoid reactor coolant exposure of the Alloy 82 filler metal that is susceptible to PWSCC.
The average Alloy 82 and Alloy 52M layer thickness is 0.08 inches.
The average Alloy 82 and Alloy 52M layer thickness is 0.08 inches.
 
Therefore, this would provide a cover thickness of Alloy 52M filler metal of significantly more than 0.125 in. over the Alloy 82 filler metal after final machining and abrasive waterjet remediation.
Therefore, this would provide a cover thickness of Alloy 52M filler  
(See attached file: Nozzle 4 - 52M Deposit Depth.pdf)
 
metal of significantly more  
 
than 0.125 in. over the Alloy 82 filler metal after final machining and  
 
abrasive waterjet  
 
remediation.(See attached file: Nozzle 4 - 52M Deposit Depth.pdf)
 
-----------------------------------------
-----------------------------------------
The information contained in this message is intended only for the  
The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.
 
E-mail Properties Mail Envelope Properties  (OF6EBA7F63.148BCE6D-ON85257732.000F0135-85257732.0015A002)
personal and confidential use  
 
of the recipient(s) named above. If the reader of this message is not  
 
the intended recipient or an  
 
agent responsible for delivering it to the intended recipient, you are  
 
hereby notified that you have  
 
received this document in error and that any review, dissemination, distribution, or copying of this  
 
message is strictly prohibited. If you have received this communication  
 
in error, please notify us  
 
immediately, and delete the original message.
E-mail Properties Mail Envelope Properties  (OF6EBA7F63.148BCE6D-ON85257732.000F0135-
 
85257732.0015A002)


==Subject:==
==Subject:==
FENOC Follow-up Clarifications for the Davis-Besse RPV Head Penetration Nozzle 50.55a Request Sent Date:5/28/2010 11:57:19 PM Received Date:5/28/2010 11:57:20 PM From:talentz@firstenergycorp.comCreated By: talentz@firstenergycorp.com
FENOC Follow-up Clarifications for the Davis-Besse RPV Head Penetration Nozzle 50.55a Request Sent Date: 5/28/2010 11:57:19 PM Received Date:   5/28/2010 11:57:20 PM From:       talentz@firstenergycorp.com Created By:       talentz@firstenergycorp.com Recipients:
 
Recipients:
Michael.Mahoney@nrc.gov (Mahoney, Michael)
Michael.Mahoney@nrc.gov (Mahoney, Michael)
Tracking Status: None phlashley@firstenergycorp.com (phlashley@firstenergycorp.com)
Tracking Status: None phlashley@firstenergycorp.com (phlashley@firstenergycorp.com)
Line 413: Line 83:
Tracking Status: None ctdaft@firstenergycorp.com (ctdaft@firstenergycorp.com)
Tracking Status: None ctdaft@firstenergycorp.com (ctdaft@firstenergycorp.com)
Tracking Status: None gmwolf@firstenergycorp.com (gmwolf@firstenergycorp.com)
Tracking Status: None gmwolf@firstenergycorp.com (gmwolf@firstenergycorp.com)
Tracking Status: None Post Office:
Tracking Status: None Post Office:
FirstEnergyCorp.comFilesSizeDate & TimeMESSAGE47586495/28/2010 20100528093714771.pdf176228 20100526154647573.pdf4532624 Nozzle 4 - 52M Deposit Depth.pdf24252 Options Expiration Date:
FirstEnergyCorp.com Files      Size Date & Time MESSAGE    4758649    5/28/2010 20100528093714771.pdf  176228 20100526154647573.pdf  4532624 Nozzle 4 - 52M Deposit Depth.pdf    24252 Options Expiration Date:
Priority:olImportanceNormal ReplyRequested:False Return Notification:False Sensitivity: olNormalRecipients received:Follow up. Start by Tuesday, June 01, 2010. Due  
Priority:               olImportanceNormal ReplyRequested:   False Return Notification:   False Sensitivity:     olNormal Recipients received:   Follow up. Start by Tuesday, June 01, 2010. Due by Tuesday, June 01, 2010}}
 
by Tuesday, June 01, 2010}}

Revision as of 18:39, 13 November 2019

Response to Request for Additional Information 50.55a Relief Request
ML101520112
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/28/2010
From: Lentz T
FirstEnergy Corp
To: Michael Mahoney
Plant Licensing Branch III
mahoney, m NRR/DORL/LPLIII-2 415-3867
Shared Package
ML101520113 List:
References
Download: ML101520112 (6)


Text

From: talentz@firstenergycorp.com Sent: Friday, May 28, 2010 11:56 PM To: Mahoney, Michael Cc: phlashley@firstenergycorp.com; kmnesser@firstenergycorp.com; kwbyrd@firstenergycorp.com; apwise@firstenergycorp.com; ctdaft@firstenergycorp.com; gmwolf@firstenergycorp.com

Subject:

FENOC Follow-up Clarifications for the Davis-Besse RPV Head Penetration Nozzle 50.55a Request Attachments: 20100528093714771.pdf; 20100526154647573.pdf; Nozzle 4

- 52M Deposit Depth.pdf Follow Up Flag: Follow up Flag Status: Flagged ADAMSAccessionNumber: ML101520088 Mike:

In response to the telecon conducted on May 24, 2010, FENOC provides the following clarifications regarding the subject relief request. :

1. The NRC has received the proprietary calculations that were submitted by FENOC on May 17, 2010 and they have been forwarded to the appropriate technical reviewers. No further action is required by FENOC.
2. As a result of a question from the NRC Special Inspection Team it was discovered that the post-weld PT examinations for ten nozzles did not have sufficient coverage in bands of the examination area due to the field of view on the camera vs the spacer size used. This post weld PT examination overlap issue affected nozzles. 10, 24, 28, 43, 51, 55, 58, 59, 61 and 67.

This is documented in the site corrective action program under FENOC CR 10-77201 (Areva CR 2010-3544). As a result, the post weld PTs for these nozzles are being reperformed. For nozzles 51, 55, 58, 59, 61 and 67, since abrasive water jet machining remediation has already been completed, the PT will now be performed after water jet remediation. This is contrary to the process overview provided in our April 1, 2010, 10 CFR 50.55a request. Specifically, on page 4 of 20 of the Enclosure, FENOC provided an overview of the basic steps of the repair process. Step 6 and 7 will now be reversed for these six nozzles.

As discussed on the telecon yesterday and, in part, in our April 16, 2010 response to RAI Question 2(4), the order of these two steps can be interchanged, as the material removed by the water jetting is minimal (approximately 0.030 inches) and the abrasive water jet machining remediation will not interfere with the subsequent surface examination (i.e., the abrasive water jet

machining remediation is not considered a peening process).

3. As provided in our May 17, 2010 response to RAI Question 3(2), the examination area for the preservice examination following repair and for future inservice inspections shall include the wetted surface of the new weld from the toe of the weld up through 0.5 inches above the rolled region of the nozzle remnant. In accordance with Figure 3 of Attachment 1 of the April 1, 2010 relief request, during the post-weld PT examination following repairs, the examination includes the area 1/2 inch below the toe of the weld. This PT will also serve as the preservice examination.

As noted in the 50.55a request, FENOC plans to use a surface examination method for future inservice inspections. If PT is used, the examination will be in accordance with Code Case N-729-1 and the 50.55a request. In addition, the DB "ISI database" has been updated (see attached) to ensure the PT will include the area 1/4 inch below the toe of the weld. If other surface or volumetric examination techniques (e.g. eddy current or UT) are developed and qualified per Code Case N-729-1, the qualified examination area would include, as a minimum the wetted surface of the new weld from the toe of the weld up through 0.5 inches above the rolled region of the nozzle remnant.

(See attached file: 20100528093714771.pdf)

4. As requested, the subject DB nozzle 4 repair weld NDE results are attached.

(See attached file: 20100526154647573.pdf)

Subsequent to the May 24, 2010 telecon, the NRC provided the following additional question via email on May 25, 2010 (question highlighted in bold):

By letters dated April 1, 2010 and May 17, 2010, the licensee submitted the half nozzle repair relief request for the control rod drive mechanism (CRDM) nozzles at Davis Besse. In response to RAI Question number 2 in to the May 17, 2010, submittal, the licensee stated that Code Case N-416-3 will be used to satisfy pressure testing requirements subsequent to the CRDM nozzle repair. In the teleconference dated May 24, 2010, the licensee indicated that it will perform a visual (VT-2) examination from outside the service structure of the reactor pressure vessel without any direct view of the surface of the head in the areas that were repaired during the system leakage test.

In general, the NRC accepts this type of indirect visual (VT-2) examination. However, it may not

be appropriate for Davis-Besse CRDM nozzle repairs based on the following:

1) A larger number of repaired CRDM nozzles increases possibility for fabrication defects that may be missed by nondestructive examination.
2) Several unsuccessful repairs on CRDM nozzle 4 create the possibility for unforeseen fabrication defects.
3) Inability of a visual (VT-2) examination from the outside service structure to detect small leakage from a through-wall fabrication defect in a repaired nozzle.

For these reasons, the staff requests a direct viewing of the bare metal head surface through one or more access hole penetrations during the system leakage test to provide an additional defense in-depth and increase confidence in these nozzle repairs.

Alternatively, the licensee needs to justify why the proposed indirect visual (VT-2) examination is acceptable.

5. As noted in the 50.55a request, the CRDM nozzle repair weld is a partial penetration weld.

ASME Code NB-5245 requires a progressive surface examination of partial penetration welds.

In lieu of the progressive surface examination, a surface examination and an ultrasonic examination, qualified to detect flaws in the new weld and base material is performed on the partial penetration weld as described in the 50.55a request, Figure 3.

This UT examination, exceeds construction code requirements and along with the liquid penetrant examination of the weld area provides a high degree of confidence in the integrity of the repair weld.

Pressure testing requirements will be met by the completion of a VT-2 examination that will be conducted in accordance with the requirements of IWA-5000 and Code Case N-416-3 which is endorsed in NRC Regulatory Guide 1.147 Revision 15 with no conditions noted. IWA-5000 permits a VT-2 visual examination with insulation installed. As specified in IWA-5242, the VT-2 examination will be conducted at the lowest elevation where leakage may be detectable. Examination of the surrounding area such as floor areas, equipment surfaces or underneath components is required.

A remote VT-2 examination will be conducted by examining the refueling canal floor in the area of the reactor vessel flange. A direct VT-2 examination of the reactor vessel insulation joints from under the reactor vessel will also be performed. Together, the NDE and pressure test visual examination will provide a high level of confidence in the integrity of the CRDM repairs.

The CRDM penetrations are located within the service structure below the

reactor vessel heads insulation package. Access to this area is available through inspection ports, however, during the system leakage test, the Reactor Coolant System is at normal operating temperature and pressure (approximately 532 degrees Fahrenheit and 2150 psig) with all insulation in place as permitted by IWA-5000. This insulation covers the inspection ports.

Opening the inspection ports would require removal of the insulation and the hot inspection ports. Air emitted from the ports could approach 500 degrees Fahrenheit. Inspection would be difficult and access would require personnel to be in close proximity to the hot surfaces creating an industrial safety hazard.

The benefit of this direct visual examination is considered to be limited given the additional level of NDE and pressure test visual examination noted above. However, In addition to the VT-2 examination discussed above, FENOC intends to perform a visual inspection for leakage from the reactor vessel head through an inspection port to the extent that access and environmental conditions permit.

Why is it not necessary to perform AWJ conditioning of the repair made to CRDM penetration

  1. 58?
6. The purpose for Abrasive Water Jet (AWJ) machining is to mitigate the initiation of pressurized water stress corrosion cracking (PWSCC) in PWSCC susceptible materials. Of the three materials that are part of the RVCH CRDM penetration modification

[RVCH Low Alloy Steel base metal (SA-533, Gr.

B, Cl 1), CRDM Nozzle (Alloy 600), and weld filler material (Alloy 52M)]

only the CRDM nozzle Alloy 600 material is known to be susceptible to PWSCC. The weld repair to the IDTB weld in penetration #58 was limited to the Alloy 52M weld material. The machining hard stop, acting as a plug, was positioned so that the lower end extended down to just below the upper weld toe (the Alloy 600 / Alloy 52M interface). The position of the hard stop prevented repair activities (cavity grinding and post-weld grinding) from contacting the Alloy 600 nozzle material.

This response clarifies the scope of AWJ for nozzle 58 as described in the FENOC response to RAI #3 dated April 16, 2010.

The "as-built" nozzle 4 weld plan is also attached for information:

7. PS0139 required five layers of Alloy 52M weld filler metal to adequately cover the Alloy 82 filler metal. The five layers of Alloy 52M was to clearly communicate to the welding operators the amount of Alloy 52M to be deposited over the Alloy 82 . The

intention was to achieve a minimum of five layers cover of Alloy 52M over the Alloy 82 in the as-welded condition. This would allow for the machining and abrasive water jet material removal operations and still maintain a minimum of 0.125 inch thickness of Alloy 52M covering the Alloy 82 filler metal to avoid reactor coolant exposure of the Alloy 82 filler metal that is susceptible to PWSCC.

The average Alloy 82 and Alloy 52M layer thickness is 0.08 inches.

Therefore, this would provide a cover thickness of Alloy 52M filler metal of significantly more than 0.125 in. over the Alloy 82 filler metal after final machining and abrasive waterjet remediation.

(See attached file: Nozzle 4 - 52M Deposit Depth.pdf)


The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.

E-mail Properties Mail Envelope Properties (OF6EBA7F63.148BCE6D-ON85257732.000F0135-85257732.0015A002)

Subject:

FENOC Follow-up Clarifications for the Davis-Besse RPV Head Penetration Nozzle 50.55a Request Sent Date: 5/28/2010 11:57:19 PM Received Date: 5/28/2010 11:57:20 PM From: talentz@firstenergycorp.com Created By: talentz@firstenergycorp.com Recipients:

Michael.Mahoney@nrc.gov (Mahoney, Michael)

Tracking Status: None phlashley@firstenergycorp.com (phlashley@firstenergycorp.com)

Tracking Status: None kmnesser@firstenergycorp.com (kmnesser@firstenergycorp.com)

Tracking Status: None kwbyrd@firstenergycorp.com (kwbyrd@firstenergycorp.com)

Tracking Status: None apwise@firstenergycorp.com (apwise@firstenergycorp.com)

Tracking Status: None ctdaft@firstenergycorp.com (ctdaft@firstenergycorp.com)

Tracking Status: None gmwolf@firstenergycorp.com (gmwolf@firstenergycorp.com)

Tracking Status: None Post Office:

FirstEnergyCorp.com Files Size Date & Time MESSAGE 4758649 5/28/2010 20100528093714771.pdf 176228 20100526154647573.pdf 4532624 Nozzle 4 - 52M Deposit Depth.pdf 24252 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: Follow up. Start by Tuesday, June 01, 2010. Due by Tuesday, June 01, 2010