{{#Wiki_filter:1 WBN2Public Resource From: Poole, Justin Sent: Tuesday, January 18, 2011 4:17 PM To: Garg, Hukam; Darbali, Samir; Carte, Norbert; Singh, Gursharan Cc: WBN2HearingFile Resource
{{#Wiki_filter:WBN2Public Resource From:                     Poole, Justin Sent:                     Tuesday, January 18, 2011 4:17 PM To:                       Garg, Hukam; Darbali, Samir; Carte, Norbert; Singh, Gursharan Cc:                       WBN2HearingFile Resource


==Subject:==
==Subject:==
FW: 20110107 Open Item List Master TVA Update 01-07-11.docx Attachments:
FW: 20110107 Open Item List Master TVA Update 01-07-11.docx Attachments:               20110107 Open Item List Master TVA Update 01-07-11.docx FYI Justin C. Poole Project Manager NRR/DORL/LPWB U.S. Nuclear Regulatory Commission (301)4152048 email: Justin.Poole@nrc.gov From: Clark, Mark Steven [mailto:msclark0@tva.gov]
20110107 Open Item List Master TVA Update 01-07-11.docx FYI JustinC.PooleProjectManagerNRR/DORL/LPWBU.S.NuclearRegulatoryCommission(301)4152048email:Justin.Poole@nrc.gov From: Clark, Mark Steven [mailto:msclark0@tva.gov]
Sent: Tuesday, January 18, 2011 3:19 PM To: Crouch, William D Cc: Hilmes, Steven A; Poole, Justin; Knuettel, Edward Terry
Sent: Tuesday, January 18, 2011 3:19 PM To: Crouch, William D Cc: Hilmes, Steven A; Poole, Justin; Knuettel, Edward Terry  


==Subject:==
==Subject:==
20110107 Open Item List Master TVA Update 01-07-11.docx Bill:
20110107 Open Item List Master TVA Update 01-07-11.docx Bill:
Please forward the attached update to Justin.  
Please forward the attached update to Justin.
: Thanks, Steve Steve Clark Bechtel Power Corp.
Control Systems Watts Bar 2 Completion Project Phone: 423.365.3007 e-mail: msclark0@tva.gov 1


Thanks,  Steve  Steve Clark Bechtel Power Corp.Control SystemsWatts Bar 2 Completion ProjectPhone: 423.365.3007e-mail: msclark0@tva.gov Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 250   Mail Envelope Properties   (19D990B45D535548840D1118C451C74D7B6471553B)
Hearing Identifier:     Watts_Bar_2_Operating_LA_Public Email Number:           250 Mail Envelope Properties     (19D990B45D535548840D1118C451C74D7B6471553B)


==Subject:==
==Subject:==
FW: 20110107 Open Item List Master TVA Update 01-07-11.docx Sent Date:   1/18/2011 4:17:18 PM Received Date: 1/18/2011 4:17:23 PM From:   Poole, Justin Created By:   Justin.Poole@nrc.gov Recipients:     "WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
FW: 20110107 Open Item List Master TVA Update 01-07-11.docx Sent Date:             1/18/2011 4:17:18 PM Received Date:         1/18/2011 4:17:23 PM From:                   Poole, Justin Created By:             Justin.Poole@nrc.gov Recipients:
Tracking Status: None "Garg, Hukam" <Hukam.Garg@nrc.gov>
"WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
Tracking Status: None "Darbali, Samir" <Samir.Darbali@nrc.gov> Tracking Status: None "Carte, Norbert" <Norbert.Carte@nrc.gov> Tracking Status: None "Singh, Gursharan" <Gursharan.Singh@nrc.gov>
Tracking Status: None "Garg, Hukam" <Hukam.Garg@nrc.gov>
Tracking Status: None Post Office:   HQCLSTR02.nrc.gov
Tracking Status: None "Darbali, Samir" <Samir.Darbali@nrc.gov>
Tracking Status: None "Carte, Norbert" <Norbert.Carte@nrc.gov>
Tracking Status: None "Singh, Gursharan" <Gursharan.Singh@nrc.gov>
Tracking Status: None Post Office:           HQCLSTR02.nrc.gov Files                          Size                  Date & Time MESSAGE                        693                    1/18/2011 4:17:23 PM 20110107 Open Item List Master TVA Update 01-07-11.docx                    440542 Options Priority:                      Standard Return Notification:            No Reply Requested:                No Sensitivity:                    Normal Expiration Date:
Recipients Received:


Files    Size      Date & Time MESSAGE    693      1/18/2011 4:17:23 PM  20110107 Open Item List Master TVA Update 01-07-11.docx    440542 Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                             rad94FD7.docx                                                                             Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 001 All All B (A The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (A g enc y 12/15/2009 Presentation Slides
: 1. Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09:
The FSAR contains 002 All All B (A Are there I&C com p onents and s y stems that have chan g ed to a 12/15/2009 Presentation Slides
: 2. Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09:
The FSAR contains 003 All All B (A Because a di gital I&C p latform can be confi g ured and p ro grammed 12/15/2009 Presentation Slides
: 3. Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09:
The FSAR contains 004 All All B (APlease identif y the information that will be submitted for each Res p onder: Webb        1/13/10 Public Meetin g 4. Y Closed Closed EICB RAI Januar y 13 , 2010 NNC 11/19/09:
LIC-110 Rev.
1 Section 005 7.1.3.1  (G B y letter date Februar y 28 , 2008 (A g enc ywide Documents Access Res p onder: Crai g/Webb 5. Y Closed Closed EICB RAI TVA Letter dated 006    (G A mendment 95 of the FSAR
, Cha p ter 7.3 , shows that chan g e 7.3-B y letter dated Februar y 5 , 2010: TVA p rovided the Unit 2
: 6. Y Closed Closed EICB RAI TVA Letter dated NNC: WCAP-12096 Rev. 7 007 7.1.3.1  (G The set p oint methodolo gy has been reviewed and a pp roved b y the TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 7
: 7. Y Closed Closed EICB RAI TVA Letter dated TVA to p rovide Rev. 8 of the Unit 1 008 7.3  (G There are several staff positions that p rovide guidance on set point TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 8
: 8. Y Closed Closed EICB RAI TVA Letter dated 009 7.3.2 5.6 , (D a r Chan g e 7.3-2 , identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 9
: 9. Y Closed Closed EICB RAI 3/12/10 ,  010 7.3 7.3 (D a r The ori g inal SER on Watts Bar (NUREG-0847
) documents that the TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 10
: 10. Y Closed Closed EICB RAI 3/12/10 ,  011 7.3.2 5.6 , (D a rNUREG-0847 Su pplement No. 2 Section 7.3.2 includes an TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 11
: 11. Y Closed Closed EICB RAI ML101680598
,  012 7.4 7.4 (D a r The ori g inal SER on Watts Bar (NUREG-0847
) documents that the TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 12
: 12. Y Closed Closed EICB RAI TVA Letter dated 013 7.1.3.1  (G Cha p ter 7 and Cha p ter 16 of Amendment 95 to the FSAR do not TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 13
: 13. Y Closed Closed EICB RAI TVA Letter dated TS have been docketed.
014 All All B (A Provide the justification for an y hardware and software chan g es Date: 4/27/10
: 14. Y Closed Closed NRC Meetin g TVA Letter dated 015    (G Verif y that the refurbishment of the p ower ran ge nuclear Date: 4/27/10
: 15. Y Closed Closed NRC Meetin g TVA Letter dated 016    (C aIdentify the precedents in license amendment requests (LARs), if Date: 4/27/10
: 16. Y Closed Closed NRC Meeting TVA Letter dated 017 7.3.1 7.3.1 , (D a r Identif y precedents in LARs
, if an y, for the solid state p rotection Date: 4/27/10
: 17. Y Closed Closed NRC Meetin g TVA Letter dated 018    (G Identif y an y chan g es made to an y instrumentation and control Date: 4/27/10
: 18. Y Closed Closed NRC Meetin g TVA Letter dated 019    (G Verif y that the containment p ur ge isolation radiation monitor is the Date: 4/27/10
: 19. Y Closed Closed NRC Meetin g TVA Letter dated 020    (GProvide environmental q ualification information p ursuant to Section Date: 4/27/10
: 20. Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:
SRP Section 7.0 states:
021  7.3  (GFor the Foxboro S p ec 200 p latform , identif y an y chan g es in Date: 5/25/10
: 21. Y Closed Closed NRC Meetin g TVA Letter dated The resolution of this item will be 022 7.3.2 5.6 , (D a r Verif y the auxiliar y feedwater control refurbishment results in a Date: 4/27/10
: 22. Y Closed Closed  NRC Meetin g TVA Letter dated 023    (GProvide environmental q ualification (10 CFR 50.49
) information for Date: 4/27/10
: 23. Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:
SRP Section 7.0 states:
024    (C aProvide a schedule b y the Januar y 13 , 2010 , meetin g for providin g Durin g the Januar y 13 , 2010 meetin g, TVA p resented a
: 24. Y Closed Closed  NRC Meetin g N/A - Re q uest for NNC 4/30/10:
Carte to address 025 7.5.2 7.5.1  (S i For the containment radiation hi g h radiation monitor
, verif y that the Date: 4/27/10
: 25. Y Closed Closed NRC Meetin g ML101230248
,  026    (GProvide environmental q ualification (10 CFR 50.49
) information for Date: 4/27/10
: 26. Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:
SRP Section 7.0 states:
027 7.7.1.4  (C aFor Foxboro I/A p rovide information re g ardin g safet y/non-safet y-Date: 4/27/10
: 27. Y Closed Closed NRC Meetin g TVA Letter dated 028    (GFor the turbine control AEH s ystem , verif y that the refurbishment Res p onder: Mark Scansen
: 28. Y Closed Closed NRC Meetin g TVA Letter dated 029    (C aFor the rod control s y stem , verif y that the refurbishment results in a Date: 4/27/10
: 29. Y Closed Closed NRC Meetin g TVA Letter dated 030    (G Re g ardin g the refurbishment of I&C e q ui p ment , identif y an y Res p onder: Clark
: 30. Y Closed Closed NRC Meetin g TVA Letter dated 031    (C a For the rod position indication s y stem (CERPI), p rovide information Date: 4/27/10
: 31. Y Closed Closed NRC Meetin g TVA Letter dated CERPI is non-safet y related. 032    (C a For the process com p uter , need to consider c yber securit y issues Date: 4/27/10
: 32. Y Closed Closed NRC Meetin g TVA Letter dated EICB will no lon g er consider c yber 033    (C a For the loose p arts monitorin g s y stem , provide information Date: 4/27/10
: 33. Y Closed Closed NRC Meetin g TVA Letter dated The loose p arts monitorin g s ystem is 034    (G 2/4/2010 Res ponder: TVA
: 34. Y Closed Closed N/A TVA Letter dated 034.1  a r g  Cha p ter 7.1 - Introduction
: 35. Y Closed Closed N/A N/A  034.2    (G  Cha pter 7.2 - Reactor Tri p S y stem  36. Y Closed Closed N/A N/A  034.3 7.3 7.3 (D a r  Cha p ter 7.3 - ESFAS  37. Y Closed Closed N/A N/A  034.4 7.5.1.1 7.5.2 (M a  Cha pter 7.5 - Instrumentation S y stems Im p ortant to Safet y  38. Y Closed Closed  N/A N/A Closed  034.5 7.5.1.1 7.5.2 r c u  Cha p ter 7.6 -
A ll Other S ystems Re quired for Safet y  39. Y Closed Closed  N/A  N/A Closed  034.6  n g h/  Cha pter 7.7 Control S ystems  40. Y Closed Closed  N/A N/A  035    (S i 2/18/2010 Res p onder: Clark
: 41. Y Closed Closed RAI No. 1 TVA Letter dated LIC-110 Section 6.2.2 states: "Desi g n 036 7.5.2 7.5.1  (C aFebruar y 18 , 2010 Date: 5/25/10
: 42. Y Closed Closed NRC Meetin g  NNC: Unit 2 FSAR Section 7.5.1
, "Post 037 7.5.1.1 7.5.2 (M a 2/18/2010 Res p onder: Clark                      Date: 5/25/10
: 43. Y Closed Closed N/A TVA Letter dated FSAR Amendment 100 p rovides Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 038 7.5.1.1 7.5.2 (M a 2/18/2010 Res p onder: Clark                Date: 5/25/10
: 44. Y Closed Closed EICB RAI TVA Letter dated The slides presented at the December 039    (G Januar y 13 , 2010 Res p onder: Clark                                Date: 5/25/10
: 45. Y Closed Closed EICB RAI FSAR amendment The e quation for the calculation of the 040    (G Januar y 13 , 2010 Res p onder: Clark                              Date: 5/25/10
: 46. Y Closed Closed EICB RAI EICB RAI FSAR amendment The e quation for the calculation of the 042 All All B (AFebruar y 25 , 2010:  Telecom Date: 5/25/10
: 47. Y Closed Closed EICB RAI TVA Letter dated The drawin g provided did not have the 044 7.5.2 7.5.1  (C aFebruar y 25 , 2010 Date: 5/25/10
: 48. Y Closed Closed EICB RAI TVA Letter dated 045    (C aFebruar y 25 , 2010 Date: 5/25/10
: 49. Y Closed Closed EICB RAI TVA Letter dated 046    (C aFebruar y 25 , 2010 Date: 5/25/10
: 50. Y Closed Closed N/A - Re q uest for N/A  047 7.5.2 7.5.1  (C a 4/8/2010 Res p onder: WEC/Hilmes                Date: 5/25/10
: 51. Y Closed Closed EICB RAI TVA Letter dated 048 7.5.2 7.5.1  (C a Ap ril 8 , 2010 Date: 5/25/10
: 52. Y Closed Closed EICB RAI TVA Letter dated 049 7.5.2 7.5.1  (C a 4/8/2010 Res ponder: WEC              Date: 5/25/10
: 53. Y Closed Closed EICB RAI TVA Letter dated 051    (G Ap ril 15 , 2010 Date: 5/25/10
: 54. Y Closed Closed N/A N/A Review addressed b y another O p en 052 7.5.2 7.5.1  (S i Ap ril 19 , 2010 Date: 5/25/10
: 55. Y Closed Closed RAI No. 12 053 7.5.2 7.5.1  (S i Ap ril 19 , 2010 Date: 5/25/10
: 56. Y Closed Closed RAI No. 13 054 7.5.2 7.5.1  (S i 4/19/2010 Res ponder: Slifer/Clark                    Date: 5/25/10
: 57. Y Closed Closed RAI No. 14 TVA Letter dated 055 7.5.2 7.5.1  (S i 4/19/2010 Res ponder: Slifer/Clark                  Date: 5/25/10
: 58. Y Closed Closed RAI No. 15 TVA Letter dated 056    (S i Ap ril 19 , 2010 Date: 5/25/10
: 59. Y Closed Closed RAI No. 16 TVA Letter dated Sorrento Radiation Monitorin g 057 7.5.2 7.5.1  (S i 4/19/2010 Res ponder: TVA I&C Staff                    Date: 5/25/10
: 60. Y Closed Closed RAI No. 17 TVA Letter dated 058 7.5.0 7.5  (S i Ap ril 19 , 2010 Date: 5/25/10
: 61. Y Closed Closed RAI No. 18 TVA Letter dated 059 7.5.2 7.5.1  (S i Ap ril 19 , 2010 Date:  62. Y Closed Closed RAI No. 19 TVA Letter dated 060 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10
: 63. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 47 061 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10
: 64. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 48 062 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10
: 65. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 49 063 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10
: 66. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 50 064 7.5.2 7.5.1  (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res p onder: Webb      Date: 4/8/2010
: 67. Y Closed Closed N/A - No q uestion TVA Letter dated 065 7.5.2 7.5.1  (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res ponder: WEC                Date: 5/25/10
: 68. Y Closed Closed N/A - No q uestion TVA Letter dated 066 7.5.2 7.5.1  (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res p onder: WEC                          Date: 5/25/10
: 69. Y Closed Closed N/A - No q uestion TVA Letter dated 072 7.5.2 7.5.1  (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res p onder: WEC                      Date: 5/25/10
: 70. Y Closed Closed  N/A - No q uestion N/A  076 7.5.2 7.5.1  (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res p onder: Clark Date: 5/25/10
: 71. Y Closed Closed  N/A - No q uestion N/A  077 7.5.2 7.5.1  (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res p onder: WEC                          Date: 5/25/10
: 72. Y Closed  Closed N/A - No q uestion TVA Letter dated 078    (G 4/26/2010 Res p onder: Clark                          Date: 5/25/10
: 73. Y Closed  Closed  EICB RAI TVA Letter dated 079    (G 4/26/2010 Res p onder: Clark                              Date: 5/25/10
: 74. Y Closed Closed EICB RAI TVA Letter dated Reviewed under Item 154 080    (S i 4/26/2010 Res p onder: WEC
: 75. Y Closed Closed RAI No. 2 TVA Letter dated 083 7.5.2 7.5.1  (C a Ma y 6 , 2010 Date:  6/18/10
: 76. Y Closed Closed EICB RAI TVA Letter dated 084 7.5.2 7.5.1  (C a May 6, 2010 Date:  6/18/10
: 77. Y Closed Closed EICB RAI TVA Letter dated 087 7.5.2 7.5.1  (S i Ma y 6 , 2010 Date:  5/24/10
: 78. Y Closed Closed RAI No. 20 TVA Letter dated 088 7.5.2 7.5.1  (S i May 6, 2010 Date:  5/24/10
: 79. Y Closed Closed RAI No. 21 TVA Letter dated 089    (C a 5/6/2010 Res p onder: Clark
: 80. Y Closed Closed EICB RAI TVA Letter dated NNC:  Docketed res p onse states that 090    (C a 5/6/2010 Res p onder: Clark                        Date: 5/25/10
: 81. Y Closed Closed EICB RAI TVA Letter dated 091 7.4 7.4 (D a r Ma y 20 , 2010 Date:  5/25/10
: 82. Y Closed Closed EICB RAI No.1 TVA Letter dated 093    (G Ma y 20 , 2010 Date:  5/25/10
: 83. Y Closed Closed N/A N/A Will be reviewed under item 154 094    (G 5/20/2010 Res p onder: Clark                          Date: 5/25/10
: 84. Y Closed Closed N/A N/A Information was found in FSAR 095 7.8.1 , XX (D a r Ma y 20 , 2010 Date:  85. Y Closed Closed EICB RAI No. 2 TVA Letter dated 096 7.7.5 XX (D a r 5/20/2010 Res p onder: 86. Y Closed Closed  EICB RAI No.3 TVA Letter dated


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 097 7.4.2 7.4 (D a r Ma y 20 , 2010 Date:   87. Y Closed Closed EICB RAI No.4 TVA Letter dated 098 7.4.2 7.4 (D a r Ma y 25 , 2010 Date:   88. Y Closed Closed EICB RAI No.5 TVA Letter dated 099  (B a April 12, 2010 Date:   89. Y Closed Closed  Closed to Item 129 100    (C a 5/20/2010 Res p onder: WEC
===Response===
: 90. Y Closed Closed N/A - No q uestion N/A  102    (C a Ma y 24 , 2010 Date: 5/24/10
SE     FSAR         NRC No.                                                                         Issue                                                   TVA Response(s)                         Acceptable       Status/ Current Actions     Resolution Path     RAI No. & Date   RAI Resp. Date                   Comments Sec.     Sec.       POC                                                                                                                                                Y/N B        (
: 91. Y Closed Closed N/A TVA Letter dated Re q uest for schedule not information.
: 1. Y 001      All      All              A        The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (Agency          12/15/2009 Presentation Slides                                          Closed                        Closed              EICB RAI           3/12/2010          NNC 11/19/09: The FSAR contains B        (
103 7.4 7.4 (D a r 5/27/2010 Res p onder: A y ala                    Date: 5/27/10
: 2. Y 002      All      All              A        Are there I&C components and systems that have changed to a           12/15/2009 Presentation Slides                                          Closed                        Closed              EICB RAI          3/12/2010          NNC 11/19/09: The FSAR contains B        (
: 92. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 104 7.4 7.4 (D a r 5/27/2010 Res ponder: Merten Date: 5/27/10
: 3. Y 003      All      All              A        Because a digital I&C platform can be configured and programmed 12/15/2009 Presentation Slides                                                Closed                       Closed               EICB RAI           3/12/2010         NNC 11/19/09: The FSAR contains
: 93. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 105    (G Ap ril 29 , 2010 Date:  94. Y Closed Closed N/A N/A Will be reviewed under item 154.
(        B 004      All      All                      Please identify the information that will be submitted for each      Responder: Webb      1/13/10 Public Meeting                4. Y       Closed                       Closed               EICB RAI          January 13, 2010 NNC 11/19/09: LIC-110 Rev. 1 Section 005    7.1.3.1                              By letter date February 28, 2008 (Agencywide Documents Access Responder: Craig/Webb                                              5. Y       Closed                       Closed               EICB RAI          TVA Letter dated D                                                                                                                                                    6. Y
106    (S i May 6, 2010 Date:  5/25/10
( ( ( (
: 95. Y Closed Closed RAI No. 9 TVA Letter dated 107    (S i May 6, 2010 Date:  5/28/10
006                                          Amendment 95 of the FSAR, Chapter 7.3, shows that change 7.3- By letter dated February 5, 2010: TVA provided the Unit 2                        Closed                       Closed               EICB RAI           TVA Letter dated NNC: WCAP-12096 Rev. 7 007    7.1.3.1          a        (       The setpoint methodology has been reviewed and approved by the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 7          7. Y       Closed                       Closed               EICB RAI           TVA Letter dated TVA to provide Rev. 8 of the Unit 1 008      7.3                G G G G         There are several staff positions that provide guidance on setpoint TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 8      8. Y       Closed                       Closed               EICB RAI          TVA Letter dated r        A 009    7.3.2    5.6,                       Change 7.3-2, identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 9        9. Y      Closed                        Closed              EICB RAI          3/12/10,
: 96. Y Closed Closed RAI No. 22 TVA Letter dated 108    (G Ma y 6 , 2010 Date:  5/25/10
(
: 97. Y Closed Closed N/A N/A Will be reviewed under OI#154 109.a 7.8 XX (D a r 5/6/2010 Res ponder: N/A
010      7.3      7.3                      The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 10          10. Y       Closed                       Closed               EICB RAI          3/12/10, D
: 98. Y Closed Closed N/A N/A  109.b    (C a 5/6/2010 Res ponder: N/A
a r
: 99. Y Closed Closed N/A N/A Du plicate of another o p en Item. 110   (G Ma y 6 , 2010 Date:  100. Y Closed Closed N/A N/A Information was found.
(
111    (C a May 6, 2010 Date: 5/28/10 101. Y Closed Closed N/A TVA Letter dated Request to help find, not a request for 112    (G June 1, 2010 Date:   102. Y Closed Closed N/A N/A Information was received 113    (G 6/1/2010 Res p onder: Clark 103. Y Closed Closed EICB RAI TVA Letter dated 114 7.2 7.2  (G 6/1/2010 Res p onder: WEC 104. Y Close Closed EICB RAI TVA Letter dated 115    (C a 2/25/2010 Res p onder: Clark 105. Y Closed Closed EICB RAI TVA Letter dated 116    (G 6/3/2010 Res p onder: WEC 106. Y Closed Closed EICB RAI TVA Letter dated Letter sent to Westin g house re q uestin g 117 7.1 7.1  (G 6/3/2010 Res p onder: Hilmes 107. Y Closed Closed EICB RAI TVA Letter dated 118 7.4 7.4 (D a r 6/8/2010 Res ponder: Merten 108. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 119    (S i June 10 , 2010 Date:   109. Y Closed Closed RAI No. 23 TVA Letter dated 120    (C a 5/6/2010 Res p onder: Hilmes/Merten/Costle y 110. Y Closed Closed EICB RAI TVA Letter dated 121    (C a 5/6/2010 Res p onder: Webb/Webber 111. Y Closed Closed EICB RAI TVA Letter dated 122    (C a June 14 , 2010 Date:   112. Y Closed Closed N/A - Re quest for N/A  123 7.7.3 7.4.1 , (D a r 6/14/2010 Res p onder: 113. Y Closed Closed ML101720589
011    7.3.2    5.6,                      NUREG-0847 Supplement No. 2 Section 7.3.2 includes an                TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 11  11. Y       Closed                       Closed               EICB RAI          ML101680598, D
, TVA Letter dated 124 7.7.5 XX (D a r 6/14/2010 Res p onder: 114. Y Closed Closed ML101720589
a r
, Item TVA Letter dated 125 7.7.8 7.7.1.12 (D a r 6/14/2010 Res p onder: 115. Y Closed Closed ML101720589
(                                                                                                                                                  12. Y 012      7.4      7.4   ( D                The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 12                        Closed                       Closed               EICB RAI          TVA Letter dated G a r                                                                                                                                                  13. Y 013    7.1.3.1                              Chapter 7 and Chapter 16 of Amendment 95 to the FSAR do not          TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 13                Closed                        Closed              EICB RAI          TVA Letter dated TS have been docketed.
, Item TVA Letter dated 126 7.8 7.8 (D a r June 14 , 2010 Date:   116. Y Closed Closed ML101720589
014      All      All    (    B            Provide the justification for any hardware and software changes      Date: 4/27/10                                               14. Y       Closed                       Closed               NRC Meeting        TVA Letter dated 015                      D (               Verify that the refurbishment of the power range nuclear              Date: 4/27/10                                              15. Y       Closed                       Closed               NRC Meeting        TVA Letter dated
, Item TVA Letter dated 127 7.2 7.2  (G 6/16/2010 Res p onder: WEC/Clar k 117. Y Closed Closed EICB RAI TVA Letter dated 128 7.2 7.2  (G 6/18/2010 Res p onder: WEC Drake /TVA Crai g 118. Y Closed Closed EICB RAI TVA Letter dated Track throu gh SE o p en item 129    (P o 6/12/2010 Res p onder: WEC 119. Y Closed Closed N/A TVA Letter dated 130    (P o 6/28/2010 Res p onder: Clark 120. Y Closed Closed N/A TVA Letter dated 131    (P o 6/28/2010 Res p onder: Clark 121. Y Closed Closed N/A TVA Letter dated 132    (P o 6/28/2010 Res p onder: Clark 122. Y Closed Closed N/A TVA Letter dated 133    (P o 6/28/2010 Res p onder: Clark 123. Y Closed Closed TVA Letter dated 134    (P o 6/28/2010 Res p onder: Clark 124. Y Closed Closed TVA Letter dated 135 7.3.1 7.3.1 (D a r 6/30/2010 Res p onder: Clark 125. Y Closed Closed RAI not necessar y TVA Letter dated 136 7.3.2 , 7.4 , 5.6 , (D a r 6/30/2010 Res p onder: Clark 126. Y Closed Closed RAI not necessar y TVA Letter dated 137   (C aSeveral WBN2 PAMS documents contain a table titled
(
, "Document Res p onder: WEC 127. Y Closed Closed ML101650255
016                      a C  (            Identify the precedents in license amendment requests (LARs), if      Date: 4/27/10                                              16. Y       Closed                       Closed              NRC Meeting        TVA Letter dated G
, Item TVA Letter dated 139    (C a The WBN2 PAMS S y stem Re q uirements S p ecification (WBN2 Res p onder: WEC 128. Y Closed Closed ML101650255
r a   A                                                                                                                                              17. Y 017    7.3.1    7.3.1,                    Identify precedents in LARs, if any, for the solid state protection  Date: 4/27/10                                                            Closed                       Closed               NRC Meeting        TVA Letter dated
, Item TVA Letter dated WBN2 PAMS S y stem Re q uirements 141    (C a Deleted b y DORL Date:   129. Y Closed Closed ML101650255
(
, Item  WBN2 PAMS S y stem Re q uirements Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 146    (C a 6/17/2010 Res p onder: 130. Y Closed Closed ML101650255
018                                          Identify any changes made to any instrumentation and control          Date: 4/27/10                                              18. Y       Closed                       Closed               NRC Meeting        TVA Letter dated 019                                          Verify that the containment purge isolation radiation monitor is the Date: 4/27/10                                                19. Y       Closed                       Closed               NRC Meeting        TVA Letter dated
, Item  PAMS S ystem Re q uirements 147    (C a 6/17/2010 Res p onder: 131. Y Closed Closed ML101650255
(   D 020                                          Provide environmental qualification information pursuant to Section Date: 4/27/10                                                20. Y       Closed                       Closed               NRC Meeting        TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
, Item  PAMS S ystem Re q uirements 148    (C a 6/17/2010 Res p onder: 132. Y Closed Closed ML101650255
021                7.3      (  ( ( ( (      For the Foxboro Spec 200 platform, identify any changes in            Date: 5/25/10                                              21. Y       Closed                       Closed               NRC Meeting        TVA Letter dated The resolution of this item will be C   a G  G G G G 022    7.3.2    5.6,                      Verify the auxiliary feedwater control refurbishment results in a    Date: 4/27/10                                              22. Y       Closed                       Closed               NRC Meeting        TVA Letter dated a  r 023                                          Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10                                                  23. Y        Closed                       Closed               NRC Meeting        TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
, Item  PAMS S ystem Re q uirements 149 7.2 7.2 (G FSAR Section 7.1.1.2 (2), Overtem perature delta T and Res ponder: Tindell 133. Y Close Closed ML101720589
024                                          Provide a schedule by the January 13, 2010, meeting for providing During the January 13, 2010 meeting, TVA presented a           24. Y       Closed                       Closed               NRC Meeting        N/A - Request for NNC 4/30/10: Carte to address
, Item TVA Letter dated 150 7.2 7.2  (G Man y of the chan g es were based on the Westin ghouse document Res p onder: Clark 134. Y Close Closed ML101720589
( ( (  (  (  (
, Item TVA Letter dated 151 7.2 7.2  (G Provide the EDCR 52378 and 54504 which discusses the basis for Res p onder: Clark 135. Y Close Closed ML101720589
025    7.5.2    7.5.1                     For the containment radiation high radiation monitor, verify that the Date: 4/27/10                                              25. Y       Closed                       Closed               NRC Meeting        ML101230248, 026                                          Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10                                                  26. Y       Closed                       Closed               NRC Meeting        TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
, Item TVA Letter dated 152 7.2 7.2 (G Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR Res ponder: Merten/Clark 136. Y Close Closed ML101720589
(      (  (  (
, Item TVA Letter dated 153 7.2 7.2  (GFSAR section 7.2.1.1.7 added the reference to FSAR section Res p onder: Crai g/Webb 137. Y Close Closed ML101720589
027    7.7.1.4                              For Foxboro I/A provide information regarding safety/non-safety-      Date: 4/27/10                                              27. Y       Closed                       Closed               NRC Meeting        TVA Letter dated 028                                          For the turbine control AEH system, verify that the refurbishment    Responder: Mark Scansen                                    28. Y       Closed                       Closed               NRC Meeting        TVA Letter dated C C C  C  C  S 029                                          For the rod control system, verify that the refurbishment results in a Date: 4/27/10                                              29. Y       Closed                       Closed               NRC Meeting        TVA Letter dated G      G  G  G 030                                          Regarding the refurbishment of I&C equipment, identify any            Responder: Clark                                           30. Y       Closed                       Closed               NRC Meeting        TVA Letter dated 031                                          For the rod position indication system (CERPI), provide information Date: 4/27/10                                                31. Y       Closed                       Closed               NRC Meeting        TVA Letter dated CERPI is non-safety related.
, Item TVA Letter dated 154 7.2 7.2  (GFSAR section 7.2.1.1.10
a a a  a  a  i 032                                          For the process computer, need to consider cyber security issues Date: 4/27/10                                                    32. Y       Closed                       Closed               NRC Meeting        TVA Letter dated EICB will no longer consider cyber 033                                          For the loose parts monitoring system, provide information            Date: 4/27/10                                              33. Y       Closed                       Closed               NRC Meeting        TVA Letter dated The loose parts monitoring system is 034                                          2/4/2010                                                             Responder: TVA                                              34. Y       Closed                       Closed               N/A                TVA Letter dated 034.1                      (                  Chapter 7.1 - Introduction                                                                                                    35. Y       Closed                       Closed               N/A                N/A
, set p oints: NRC staff has issued RIS Res p onder: Crai g/Webb 138. Y Closed Closed ML101720589
(    a 034.2                       D                  Chapter 7.2 - Reactor Trip System                                                                                              36. Y       Closed                       Closed               N/A                N/A M  ( r 034.3   7.3      7.3      a                   Chapter 7.3 - ESFAS                                                                                                            37. Y       Closed                       Closed               N/A                N/A G g r                                                                                                                                                  38. Y 034.4 7.5.1.1    7.5.2                        Chapter 7.5 - Instrumentation Systems Important to Safety                                                                                  Closed                        Closed              N/A                N/A                Closed 034.5 7.5.1.1    7.5.2                        Chapter 7.6 - All Other Systems Required for Safety                                                                            39. Y       Closed                        Closed               N/A                N/A                Closed r
, Item TVA Letter dated EICB RAI ML102861885 sent to DORL 155 7.2 7.2  (G Summar y of FSAR chan ge document section 7.2 states that Date:  139. Y Closed Closed ML101720589
c u
, Item  156 7.2 7.2  (GFSAR section 7.2.2.1.1 states that dashed lines in Fi g ure 15.1-Res p onder: WEC 140. Y Closed Closed ML101720589
034.6                                           Chapter 7.7 Control Systems                                                                                                    40. Y       Closed                       Closed               N/A                N/A n
, Item TVA Letter dated Res p onse on hold p endin g 157 7.2 7.2  (GFSAR section 7.2.2.1.1
g h
, fifth p ara g ra p h was deleted exce p t for the Res ponder: Tindell 141. Y Close Closed ML101720589
                          /
, Item TVA Letter dated 158 7.2 7.2  (GFSAR section 7.2.2.1.1
035                        (                 2/18/2010                                                             Responder: Clark                                            41. Y       Closed                       Closed               RAI No. 1          TVA Letter dated LIC-110 Section 6.2.2 states: Design
, p ara g ra p h six was chan g ed to state that Res ponder: Tindell 142. Y Closed Closed ML101720589
( (
, Item TVA Letter dated 159 7.2 7.2  (GFSAR section 7.2.2.1.2 discusses reactor coolant flow Res p onder: Crai g 143. Y Close Closed ML101720589
M 036    7.5.2     7.5.1      C S            February 18, 2010                                                    Date: 5/25/10                                              42. Y       Closed                        Closed               NRC Meeting                          NNC: Unit 2 FSAR Section 7.5.1, Post a
, Item TVA Letter dated 160 7.2 7.2  (GFSAR section 7.2.2.2 (7) deleted text which has references 12 and Res ponder: Tindell 144. Y Close Closed ML101720589
a i                                                                                                                                              43. Y 037    7.5.1.1  7.5.2                     2/18/2010                                                            Responder: Clark                Date: 5/25/10                          Closed                        Closed               N/A                TVA Letter dated FSAR Amendment 100 provides
, Item TVA Letter dated 161 7.2 7.2  (GFSAR section 7.2.2.3 states that chan g es to the control function Res p onder: Clark 145. Y Closed Closed ML101720589
, Item TVA Letter dated 162 7.2 7.2  (GFSAR section 7.2.2.2 (14) states that b yp ass of a p rotection Res ponder: Tindell 146. Y Closed Closed ML101720589
, Item TVA Letter dated 163 7.2 7.2  (G Deleted b y DORL Date:  147. Y Closed Closed ML101720589
, Item  164 7.2 7.2 a r glFSAR section 7.2.2.2 (20) has been revised to include the p lant Res p onder: Perkins 148. Y Closed Closed ML101720589
, Item TVA Letter dated Item No. 8 sent to DORL 165 7.2 7.2  (GFSAR section 7.2.2.3.2
, last p ara g ra p h of this section has been Res p onder: Clark 149. Y Closed Closed ML101720589
, Item TVA Letter dated 166 7.2 7.2  (G Chan ges to FSAR section 7.2.2.2 (20) are justified based on the Res p onder: Clark 150. Y Closed Closed ML101720589
, Item TVA Letter dated 167 7.2 7.2  (GFSAR section 7.2.2.4
, p rovide an anal y sis or reference to cha p ter Res p onder: Clark 151. Y Close Closed ML101720589
, Item TVA Letter dated 168 7.2 7.2  (G FSAR table 7.2-4
, item 9 deleted loss of offsite p ower to station Res p onder: Clark 152. Y Close Closed ML101720589
, Item TVA Letter dated 169    (G 6/18/2010 Res p onder: Clark 153. Y Closed Closed    170    (G 6/17/2010 Res p onder: Clark 154. Y Closed Closed    171 7.2 7.2  (G 6/17/2010 Res p onder: Crai g 155. Y Closed Closed EICB RAI TVA Letter dated Closed to SE O p en Item 172    (G 6/17/2010 Res p onder: Crai g 156. Y Closed Closed EICB RAI  173 7.1 7.1  (G 6/17/2010 Res p onder: Crai g/Webb/Powers 157. Y Closed Closed  EICB RAI  174    (G 6/28/2010 Res p onder: Hilmes/Crai g 158. Y Closed Closed EICB RAI  175    (G June 28 , 2010 Res p onder:  159. Y Closed Closed EICB RAI  176 7.1 7.1  (G 6/28/2010 Res p onder: Crai g/Webb 160. Y Closed Closed  EICB RAI  177 7.5.2.1 7.5.1 (M a 7/15/2010 Res p onder: Clark 161. Y Closed Closed N/A TVA Letter dated RAI not re q uired 178 7.5.2.1 7.5.1 (M a 7/15/2010 Res p onder: Clark 162. Y Closed Closed N/A TVA Letter dated RAI not re q uired 179    (C a A n em p hasis is placed on traceabilit y in S ystem Re q uirements Res p onder: WEC 163. Y Closed  Closed N/A - Closed to NA  180    (C a The SRP , BTP 7-14 , Section B.3.3.1 states that Re g ulator y Guide Res p onder: WEC 164. Y Closed Closed N/A - Closed to NA  181    (C a A n em p hasis is placed on traceabilit y in S ystem Re q uirements Res p onder: WEC 165. Y Closed Closed N/A - Closed to NA  182    (C aCharacteristics that the SRP states that a Software Re quirements Res p onder: WEC 166. Y Closed Closed N/A - Closed to NA  184    (C a 7/15/2010 Res p onder: WEC 167. Y Closed Closed N/A - Closed to N/A  186 7.7.8 7.7.1.12 (D a r 7/15/2010 Res p onder: Perkins/Clark 168. Y Closed Closed EICB RAI No.6 TVA Letter dated 188    (C a B y letter dated June 30
, 2010 , TVA docketed
, "Tennessee Valle y Res p onder: Clark 169. Y Closed Closed  ML101970033
, Item TVA Letter dated 189  7.6.7  (S i 7/20/2010 Res p onder: Clark 170. Y Closed Closed RAI No. 3 TVA Letter dated 190 7.9  (S i FSAR Table 7.1-1 states: "Re g ulator y Guide 1.133
, Ma y 1981 Res p onder: Clark 171. Y Closed Closed  RAI No. 4 TVA Letter dated Closed to OI-331.
191 7.9  (C aNUREG-0800 Cha p ter 7 , Section 7.9
, "Data Communication Res p onder: Jimmie Perkins 172. Y Closed  Closed ML10197016
, Item TVA Letter dated  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 192 7.5.1.1 7.5.2 (M a The NRC Staff is usin g SRP (NUREG-0800
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                           rad94FD7.docx                                                                             Open Items to be Resolved for SER Approval
) Cha p ter 7 Section Res p onder: Clark 173. Y Closed Closed Item No. 1 sent to TVA Letter dated EICB RAI ML1028618855 sent to 193 7.5.1.1 7.5.2 (M aThe WBU2 FSAR
, Section 7.5.2
, "Plant Com p uter S y stem ," Res p onder: Clark 174. Y Closed Closed Item No. 2 sent to TVA Letter dated EICB RAI ML1028618855 sent to 194 7.5.1.1 7.5.2.1 (M aThe WBU2 FSAR Section 7.5.2.1
, "Safet y Parameter Dis p la y Res p onder: Costle y/Norman 175. Y Closed Closed Item No. 3 sent to TVA Letter dated EICB RAI ML1028618855 sent to 195 7.5.1.1 7.5.2.2 (M a B ypassed and Ino p erable Status Indication (BISI) Res p onder: Costle y/Norman 176. Y Closed Closed Item No. 4 sent to TVA Letter dated EICB RAI ML1028618855 sent to 196 7.5.1.1 7.5.2.2 (M a B ypassed and Ino p erable Status Indication (BISI) Res p onder: Costle y/Norman 177. Y Closed Closed Item No. 5 sent to TVA Letter dated EICB RAI ML1028618855 sent to 197  X O pen Item 197 was never issued.
178. Y Closed Closed    198 7.5.1.1 7.5.2.2 (M a SRP Section 7.5
, Subsection III
, "Review Procedures" states:
Res p onder: Costle y/Norman 179. Y Closed Closed Item No. 6 sent to TVA Letter dated EICB RAI ML1028618855 sent to 199 7.5.1.1 7.5.2.3 (M aThe WBU2 FSAR Section 7.5.2.3
, "Technical Su pport Center and Res p onder: Costle y/Norman 180. Y Closed Closed Item No. 7 sent to TVA Letter dated Related SE Section 7.5.5.3 EICB RAI 200 7.2  7/21/2010 Res p onder: Clark 181. Y Closed Closed EICB RAI TVA Letter dated 201 7.7.1.1 7.7.11  (C a 7/21/2010 Res p onder: Webb 182. Y Closed Closed EICB RAI TVA Letter dated 203 7.5.1.1 7.5.2 (M a 7/26/2010 Res p onder: Clark 183. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 204 7.5.1.1 7.5.2 (M a 7/26/2010 Res p onder: Costle y/Norman 184. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 205    (G 7/26/2010 Res p onder: Clark 185. Y Closed Closed EICB RAI TVA Letter dated Question B related to prior NRC 206 7.5.1.1 7.5.2 (M a 7/27/2010 Res p onder: Clark 186. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 207    (C a Jul y 27 , 2010 Date:  187. Y Closed Closed    208 7.5.2.1 7.5.1 (M a 7/27/2010 Res p onder: Clark 188. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 209 7.5.2.1 7.5.1 (M a 7/27/2010 Res p onder: Clark 189. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 210 7.5.2.1 7.5.1 (M a 7/27/2010 Res p onder: Clark 190. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 211 7.5.1.1  (C a 7/27/2010 Res p onder: Clark 191. Y Closed Closed EICB RAI TVA Letter dated Relates to SE Sections:
214    (C a 7/27/2010 Res p onder: WEC 192. Y Closed Closed EICB RAI TVA Letter dated 215    (P o 7/29/2010 Res p onder: WEC 193. Y Closed Closed    216 7.5.1.1 7.5.2 (M a 7/29/2010 Res p onder: Clark 194. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 217    (G 7/6/2010 Res p onder: Clark 195. Y Close Closed EICB RAI TVA Letter dated 218    (G 7/6/2010 Res p onder: Clark 196. Y Closed Closed EICB RAI TVA Letter dated 219    (G 8/4/2010 Res ponder: TVA Licensin g 197. Y Closed Closed EICB RAI  220    (G 8/4/2010 Res p onder: A y ala 198. Y Closed Closed EICB RAI TVA Letter dated 221 7.7.1.2 7.7.1.3 (M a 8/4/2010 Res ponder: Trelease 199. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 222    (G 8/4/2010 Res p onder: Clark 200. Y Close Closed EICB RAI TVA Letter dated 223    (G 8/4/2010 Res p onder: Clark 201. Y Closed Closed EICB RAI  224 7.5.1.1 7.5.2 (M a 8/4/2010 Res p onder: Norman (TVA CEG) 202. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 225    (G 8/4/2010 Res p onder: Scansen 203. Y Close Closed EICB RAI TVA Letter dated 226    (C a 8/4/2010 Res ponder: TVA Licensin g 204. Y Closed Closed N/A - Information TVA Letter dated See also O p en Item Nos. 41 & 270.
227    (G 8/4/2010 Res p onder: Clark 205. Y Close Closed EICB RAI TVA Letter dated 228    (C a 8/4/2010 Res p onder: Clark 206. Y Closed  Closed EICB RAI TVA Letter dated 229    (C a 8/4/2010 Res p onder: Clark 207. Y Closed Closed EICB RAI TVA Letter dated 230    (C a 8/4/2010 Res p onder: Webb 208. Y Closed Closed EICB RAI TVA Letter dated 231    (G 8/4/2010 Res p onder: Clark 209. Y Closed Closed EICB RAI TVA Letter dated 232    (S i 8/4/2010 Res p onder: Clark 210. Y Closed Closed RAI No. 5 TVA Letter dated 233    (C a 8/4/2010 Res p onder: Clark 211. Y Closed Closed EICB RAI TVA Letter dated 234    (C a 8/4/2010 Res p onder: 212. Y Closed Closed N/A - Du p licate N/A  235    (G 8/4/2010 Res ponder: TVA Licensin g 213. Y Closed Closed N/A N/A  236    (G 8/4/2010 Res p onder: Clark 214. Y Close Closed EICB RAI TVA Letter dated 237    (C a 8/4/2010 Res p onder: Clark 215. Y Closed Closed EICB RAI TVA Letter dated


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 238   (C a 8/4/2010 Res p onder: Webb/Hilmes 216. Y Closed Closed N/A - Du p licate N/A  239    (C a 8/4/2010 Res p onder: Hilmes 217. Y Closed Closed N/A - Meetin g N/A  240    (G 8/4/2010 Res p onder: Clark 218. Y Close Closed Ml102910008 TVA Letter dated 241   (S i 8/4/2010 Res p onder: Davies 219. Y Closed Closed RAI No. 10 TVA Letter dated 242    (G 8/4/2010 Res p onder: Hilmes 220. Y Close Closed EICB RAI TVA Letter dated 243    (C a 8/3/2010 Res p onder: WEC 221. Y Closed Closed N/A - Closed to N/A 247   (C a 8/8/2010 Res p onder: WEC 222. Y Closed Closed EICB RAI Res p onse is LIC-101 Rev. 3 A ppendix B Section 4
===Response===
, 248    (C a 8/8/2010 Res p onder: WEC 223. Y Closed Closed Res p onse is LIC-101 Rev. 3 A ppendix B Section 4
SE     FSAR       NRC No.                                                                         Issue                                                   TVA Response(s)                     Acceptable       Status/ Current Actions     Resolution Path     RAI No. & Date     RAI Resp. Date                 Comments Sec.      Sec.      POC                                                                                                                                              Y/N 038   7.5.1.1  7.5.2        (                 2/18/2010                                                         Responder: Clark            Date: 5/25/10                44. Y         Closed                       Closed               EICB RAI            TVA Letter dated The slides presented at the December 039                      ( ( M                January 13, 2010                                                  Responder: Clark                      Date: 5/25/10      45. Y         Closed                       Closed               EICB RAI            FSAR amendment The equation for the calculation of the G G a                                                                                                                                            46. Y 040                                            January 13, 2010                                                  Responder: Clark                      Date: 5/25/10                    Closed                        Closed              EICB RAI EICB RAI FSAR amendment The equation for the calculation of the B
, 249    (C a 8/8/2010 Res p onder: WEC 224. Y Closed Closed   LIC-101 Rev. 3 A ppendix B Section 4
042      All      All                          February 25, 2010: Telecom                                        Date: 5/25/10                                            47. Y         Closed                       Closed              EICB RAI            TVA Letter dated The drawing provided did not have the 044   7.5.2    7.5.1                          February 25, 2010                                                Date: 5/25/10                                            48. Y         Closed                       Closed               EICB RAI           TVA Letter dated
, 253   (C a 8/8/2010 Res p onder: Clark 225. Y Closed Closed TVA Letter dated Related to O pen Item no. 83.
( ( ( ( ( (
254    (C a 8/10/2010 Res p onder: WEC 226. Y Closed Closed N/A - Re quest to TVA Letter dated 255    (C a 8/10/2010 Res p onder: WEC 227. Y Closed Closed N/A - Re quest to TVA Letter dated 256   (C a 8/10/2010 Res p onder: WEC 228. Y Closed Closed N/A - Re quest to TVA Letter dated 257   (C a 8/10/2010 Res p onder: WEC 229. Y Closed Closed N/A - Re quest to N/A  258    (C a 8/10/2010 Res p onder: WEC 230. Y Closed Closed N/A - Re quest to N/A  259   (C a 8/10/2010 Res p onder: WEC 231. Y Closed Closed N/A - Re quest to TVA Letter dated 260   (C a 8/10/2010 Res p onder: WEC 232. Y Closed Closed N/A - Re quest to N/A 261   (C a 8/10/2010 Res p onder: WEC 233. Y Closed Closed N/A - Closed to TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:
045                                            February 25, 2010                                                Date: 5/25/10                                            49. Y         Closed                       Closed              EICB RAI           TVA Letter dated
262    (C a 8/10/2010 Res p onder: WEC 234. Y Closed Closed N/A - Re quest to N/A 263   (C a 8/11/2010 Res p onder: WEC 235. Y Closed Closed ML101650255
(
, Item   264   (C a 8/11/2010 Res p onder: WEC 236. Y Closed Closed ML101650255
046                                            February 25, 2010                                                Date: 5/25/10                                            50. Y         Closed                       Closed               N/A - Request for  N/A C C C C C C (
, Item  265   (C a 8/11/2010 Res p onder: WEC 237. Y Closed Closed ML101650255
047   7.5.2    7.5.1                          4/8/2010                                                         Responder: WEC/Hilmes            Date: 5/25/10          51. Y         Closed                       Closed               EICB RAI           TVA Letter dated G
, Item   266   (C a 8/11/2010 Res p onder: Webb/Webber 238. Y Closed Closed TVA Letter dated 267   (C a 8/11/2010 Res p onder: WEC 239. Y Closed Closed    268    (C a 8/19/2010 Res p onder: WEC 240. N O p en Closed    269    (P o 8/20/2010 Res p onder: NRC 241. Y Closed Closed N/A N/A  270   (C a 8/23/2010 Res p onder: Clark 242. Y Closed Closed  See also O p en Item Nod. 41 & 245.
048    7.5.2    7.5.1                          April 8, 2010                                                    Date: 5/25/10                                            52. Y        Closed                        Closed              EICB RAI            TVA Letter dated a a a a a a A 049    7.5.2    7.5.1                          4/8/2010                                                         Responder: WEC             Date: 5/25/10                53. Y         Closed                       Closed               EICB RAI            TVA Letter dated 051                                            April 15, 2010                                                    Date: 5/25/10                                            54. Y        Closed                        Closed              N/A                N/A               Review addressed by another Open
271    (C a 8/23/2010 Res p onder: WEC 243. Y Closed Closed N/A - Closed to NA  272 7.5.2.1 7.5.1 (M a 8/26/2010 Res p onder: Clark 244. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 273 7.5.2.1 7.5.1 (M a 8/26/2010 Res p onder: Clark 245. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 274.b    (S i 8/26/2010 Res p onder: Stockton 246. Y Closed Closed RAI No. 6 TVA Letter dated 274.a 7.5.2.1 7.5.1 (M a 8/26/2010 Res p onder: Clark 247. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 275    (S i 8/27/2010 Res p onder: Clark 248. Y Closed Closed Not Re q uired  N/A  276 7.6 7.6  (G 8/27/2010 Res p onder: Webb 249. Y Closed Closed EICB RAI TVA Letter dated 277 7.6 7.6.3  (G 8/27/2010 Res p onder: Clark 250. Y Close Closed EICB RAI TVA Letter dated 278 7.6 7.6.6 (G 8/27/2010 Res ponder: Trelease 251. Y Close Closed EICB RAI TVA Letter dated 279 7.6 7.6.6 (G 8/27/2010 Res ponder: Mather 252. Y Close Closed EICB RAI TVA Letter dated 280 7.6 7.6.6 (G 8/27/2010 Res ponder: Trelease 253. Y Closed Closed EICB RAI TVA Letter dated 282 7.6 7.6.9  (G 8/27/2010 Res ponder: Trelease 254. Y Close Closed EICB RAI TVA Letter dated 283 7.7.5 XX (D a r 8/27/2010 Res p onder: Clark 255. Y Closed Closed EICB RAI No.13 TVA Letter dated This item is a follow-u p q uestion to item 284 7.7.3 7.4.1 (D a r 8/27/2010 Res p onder: Webber 256. Y Closed Closed EICB RAI No.14 TVA Letter dated This item is a follow-u p q uestion to item 285 7.3.3 7.3 (D a r 8/27/2010 Res p onder: McNeil 257. Y Closed Closed EICB RAI No.15 TVA Letter dated This item is a follow-u p q uestion to item 286 7.7.3 9.3.4.2.(D a r 8/27/2010 Res p onder: Webber 258. Y Closed Closed EICB RAI No.16 TVA Letter dated  
(
052    7.5.2    7.5.1                          April 19, 2010                                                    Date: 5/25/10                                            55. Y        Closed                        Closed              RAI No. 12 S
i
(
053    7.5.2    7.5.1                          April 19, 2010                                                   Date: 5/25/10                                            56. Y         Closed                       Closed               RAI No. 13 S
i
(
054   7.5.2    7.5.1                          4/19/2010                                                         Responder: Slifer/Clark           Date: 5/25/10        57. Y         Closed                       Closed               RAI No. 14          TVA Letter dated S
i
(
055    7.5.2    7.5.1                          4/19/2010                                                         Responder: Slifer/Clark          Date: 5/25/10          58. Y         Closed                       Closed               RAI No. 15          TVA Letter dated S
i
(
056                                            April 19, 2010                                                    Date: 5/25/10                                           59. Y         Closed                       Closed               RAI No. 16          TVA Letter dated Sorrento Radiation Monitoring S
i
(
057   7.5.2    7.5.1                          4/19/2010                                                         Responder: TVA I&C Staff                Date: 5/25/10    60. Y         Closed                       Closed               RAI No. 17          TVA Letter dated S
i
(
058   7.5.0      7.5                          April 19, 2010                                                   Date: 5/25/10                                           61. Y         Closed                       Closed               RAI No. 18          TVA Letter dated S
i
( ( ( ( ( ( ( ( ( ( (
059   7.5.2    7.5.1                          April 19, 2010                                                   Date:                                                   62. Y         Closed                       Closed               RAI No. 19          TVA Letter dated 060   7.5.2    7.5.1                          April 19, 2010                                                    Date: 5/25/10                                           63. Y         Closed                       Closed               N/A                 N/A               Addressed by Open Item No. 47 061   7.5.2    7.5.1                          April 19, 2010                                                    Date: 5/25/10                                           64. Y         Closed                       Closed               N/A                 N/A                Addressed by Open Item No. 48
( (
062    7.5.2     7.5.1                          April 19, 2010                                                    Date: 5/25/10                                           65. Y         Closed                       Closed               N/A                 N/A               Addressed by Open Item No. 49 063   7.5.2    7.5.1                          April 19, 2010                                                    Date: 5/25/10                                            66. Y         Closed                       Closed               N/A                N/A                Addressed by Open Item No. 50 C C C C C C C C C C S 064   7.5.2    7.5.1                          By letter dated March 12, 2010 TVA stated that the target submittal Responder: Webb   Date: 4/8/2010                     67. Y         Closed                       Closed               N/A - No question   TVA Letter dated 065   7.5.2    7.5.1                          By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC          Date: 5/25/10                68. Y         Closed                       Closed               N/A - No question  TVA Letter dated G G 066   7.5.2    7.5.1                          By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                 Date: 5/25/10          69. Y         Closed                       Closed               N/A - No question  TVA Letter dated 072   7.5.2    7.5.1                          By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC               Date: 5/25/10            70. Y         Closed                       Closed               N/A - No question  N/A a a a a a a a a a a i 076    7.5.2     7.5.1                         By letter dated March 12, 2010 TVA stated that the target submittal Responder: Clark             Date: 5/25/10            71. Y         Closed                       Closed               N/A - No question  N/A 077    7.5.2     7.5.1                         By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                  Date: 5/25/10          72. Y         Closed                       Closed               N/A - No question  TVA Letter dated 078                                            4/26/2010                                                         Responder: Clark                  Date: 5/25/10          73. Y         Closed                       Closed               EICB RAI           TVA Letter dated 079                                            4/26/2010                                                         Responder: Clark                   Date: 5/25/10        74. Y         Closed                       Closed               EICB RAI           TVA Letter dated Reviewed under Item 154 080                        ( ( (               4/26/2010                                                         Responder: WEC                                          75. Y         Closed                       Closed               RAI No. 2          TVA Letter dated 083    7.5.2    7.5.1      C C S              May 6, 2010                                                      Date: 6/18/10                                            76. Y         Closed                       Closed              EICB RAI           TVA Letter dated 084    7.5.2    7.5.1      a a i              May 6, 2010                                                      Date: 6/18/10                                            77. Y         Closed                        Closed               EICB RAI           TVA Letter dated
(
087    7.5.2    7.5.1                          May 6, 2010                                                      Date: 5/24/10                                            78. Y         Closed                        Closed               RAI No. 20          TVA Letter dated S
i 088    7.5.2    7.5.1                          May 6, 2010                                                      Date: 5/24/10                                            79. Y         Closed                       Closed               RAI No. 21          TVA Letter dated
(
089                      D ( ( (               5/6/2010                                                         Responder: Clark                                        80. Y         Closed                        Closed               EICB RAI           TVA Letter dated NNC: Docketed response states that 090                      a C C S                5/6/2010                                                         Responder: Clark                 Date: 5/25/10          81. Y         Closed                       Closed               EICB RAI           TVA Letter dated r a a i                                                                                                                                          82. Y 091    7.4      7.4                           May 20, 2010                                                      Date: 5/25/10                                                          Closed                       Closed               EICB RAI No.1      TVA Letter dated 093                      (                      May 20, 2010                                                      Date: 5/25/10                                            83. Y        Closed                        Closed              N/A                N/A                Will be reviewed under item 154 D ( (
094                      a                     5/20/2010                                                        Responder: Clark                Date: 5/25/10          84. Y        Closed                        Closed              N/A                N/A                Information was found in FSAR r G G 095    7.8.1,    XX                            May 20, 2010                                                     Date:                                                   85. Y         Closed                       Closed               EICB RAI No. 2      TVA Letter dated
(
096    7.7.5      XX                            5/20/2010                                                         Responder:                                               86. Y         Closed                       Closed               EICB RAI No.3      TVA Letter dated D
a r


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 287 7.3 7.3-1 (D a r 8/27/2010 Res p onder: Elton 259. Y Closed Closed ML102390538
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                           rad94FD7.docx                                                                               Open Items to be Resolved for SER Approval
, Item Res p onse  288 7.3  (G 9/2/2010 Res p onder: McNeil 260. Y Closed Closed EICB RAI  289    (S i 9/2/2010 Res ponder: Faulkner 261. Y Closed Closed  RAI No. 24 TVA Letter dated 290  7.7  (C a 9/7/2010 Res p onder: Clark 262. Y Closed Closed N/A N/A This item is a du plicate of item 291.
291  7.7  (C a 9/7/2010 Res p onder: Clark 263. Y Closed Closed  TVA Letter dated 292 7.2.5 7.2  (G 9/7/2010 Res p onder: Crai g 264. Y Closed Closed EICB RAI TVA Letter dated 293 7.7.4 7.2.2.3.(M a 9/8/2010 Res p onder: Crai g 265. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 294 7.3 7.3.1.1.(D a r 9/9/2010 Res p onder: Elton 266. Y Closed Closed ML102390538
, Item Res p onse  295 7.3 7.3.1.1.(D a r 9/9/2010 Res p onder: Elton 267. Y Closed Closed ML102390538
, Item Res p onse  296 7.3 7.3.1.2.(D a r 9/9/2010 Res p onder: Elton 268. Y Closed Closed ML102390538
, Item Res p onse  297 7.3 7.3.1.2.(D a r 9/9/2010 Res p onder: Elton 269. Y Closed Closed ML102390538
, Item Res p onse  298 7.3 XX (D a r 9/9/2010 Res p onder: Clark 270. Y Closed Closed ML102390538
, Item Res p onse  299    (C aProvide Common Q Software Re q uirements S pecification Post A ttachment 41 of the 10/5 letter contains the Common Q 271. Y Closed Closed  TVA Letter dated 300    (S i Need Radiation Monitorin g S ystem Descri p tion/Desi g n Criteria Res p onder: Tem p les/Mather 272. Y Closed Closed RAI No. 25 TVA Letter 301    (S i 1.TVA is re q uested to address the conse q uences of software Res ponder: WEC/Davies/Clark 273. Y Closed Closed RAI No. 11 TVA Letter dated Note 1: 302 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell 274. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 303 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell 275. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 304 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell 276. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 305 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell 277. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 306 7.1 7.1  (GFSAR amendment 100
, p a g e 7.1-12 p rovides the definition of Res p onder: Hilmes 278. Y Closed Closed EICB RAI TVA Letter dated 307 7.1 7.1  (G (1) FSAR amendment 100
, Section 7.1
, p a g e 7.1-12 , definition of Res p onder: Hilmes 279. Y Closed Closed EICB RAI TVA Letter dated 308 7.1 7.1  (G (1) FSAR Amendment 100
, Section 7.1
, p a g e 7.1-13 , definition of Res p onder: Hilmes 280. Y Closed Closed EICB RAI TVA Letter dated 309 7.1 7.1.2.1. (G (1) FSAR amendment 100
, Pa g e 7.1-14 , Westin g house set p oint Res p onder: Hilmes 281. Y Closed Closed EICB RAI TVA Letter dated 310 7.1 7.1.2.1. (G (1) FSAR amendment 100
, Pa g e 7.1-14 , TVA set p oint Res p onder: Hilmes 282. Y Closed Closed EICB RAI TVA Letter dated 311 7.1 7.1  (G Both Westin ghouse and TVA set p oint methodolo gy do not have Res p onder: Hilmes 283. Y Closed Closed EICB RAI TVA Letter dated 312  7.0  (G B y letter dated Se p tember 10 ,2010 , TVA p rovided the summar y Res p onder: Stockton 284. Y Close Closed EICB RAI TVA Letter dated 313 7.7.8 7.7.1.12 (D a r EDCR 52408 (installation of AMSAC in Unit 2
) states that Desi g n Res p onder: A y ala 285. Y Closed Closed EICB RAI No.18 TVA Letter dated 314 7.3 7.3 (D a r The followin g 50.59 chan ges were listed in the March 12 RAI Res p onder: Stockton 286. Y Closed Closed EICB RAI No. 19 TVA Letter dated Related to OI 10 315 7.5.3 7.5.3  (GIE Bulletin 79-27 re quired that emer g enc y o p eratin g p rocedures to Res p onder: S. Smith (TVA O perations) 287. Y Close Closed EICB RAI TVA Letter dated 316 7.5.2.3 7.5  (S i TVA has provided various documents in su pport of RM-1000 hi g h Res p onder: Tem p les/Mather 288. Y Closed Closed RAI No. 26 317 7.5.2.3 7.5  (S i TVA has p rovided a p ro p rietar y and a non-p ro prietar y version of Res p onder: Tem ples 289. Y Closed Closed RAI No. 27 TVA Letter dated 319 7.5.2.3 7.5  (S i TVA p rovided S ystem Verification Test Results 04507007-1TR Res p onder: Tem ples 290. Y Closed Closed RAI No. 29 TVA Letter dated 320  E I Per Westin g house letter WBT-D-2340
, TENNESSEE VALLEY Res p onder: Clark 291. Y Closed Closed N/A N/A Du plicate of item 156 321  E I For the p ur poses of measurin g reactor coolant flow for Reactor Res p onder: Clark 292. Y Closed Closed N/A N/A Du plicate of OI# 157 322  7.7.1.11  (C aSection 7.7.1.11 will be added to FSAR Amendment 101 to provide Res p onder: Clark 293. Y Closed Closed    324  (M aPer the NRC reviewer
, the BISI calculation is not re q uired to be 294. Y Closed Closed    325  B (G a The Unit 2 loo ps in service for Unit 1 that are scheduled to be Res ponder: TVA Startu p Olson 295. Y Closed Closed  Closed to o p en item ? 326  B (G a TVA uses double-sided methodolo gy for as-found and as-left Res p onder: Webb 296. Y Closed Closed  TVA Letter dated 328 7.5.2.3 7.5  (S iProvide the model number for the four containment hi g h ran g e Res p onder: Tem ples 297. Y Closed Closed RAI No. 30 TVA Letter dated 329 7.6.1 7.6.7  (S iSection 7.6.7 of the FSAR (Amendment 100
) states that
, "The Res p onder: Clark 298. Y Closed Closed RAI No. 1 TVA Letter dated 330 7.3 7.3 (D a r Related to Item 298 Res p onder: Hilmes/Faulkner 299. Y Closed Closed EICB RAI No.20 Item 7 , TVA letter 331 7.6.1 7.6.7  (S i A s a follow u p of OI 190
, Staff has reviewed the p ro p rietar y version Res p onder: WEC/Harless/Clark 300. Y Closed Closed RAI No. 8 TVA Letter dated Follow-u p of OI-190.
332 7.5.2.1 7.5.1 (M a 10/26/2010 301. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 333 7.5.2.1 7.5.1 (M a 10/27/2010 302. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL 336 7.5.2.3 7.5 (S iRe: RM-1000 Re p ort 04508905-QR Res ponder: GA 303. Y Closed Closed    337 7.5.2.3 7.5 (S iRe: RM-1000 Re p ort 04508905-QR Res ponder: GA 304. Y Closed Closed    342 7.5.2.3 7.(S iPlease confirm that RM-1000 monitors and the associated The RM-1000 containment hi g h ran g e radiation monitors are 305. Y Closed Closed   343 7.5.2.3 7.(S iSeismic RRS in the 04508905-QR re p ort Fi gures 3-2 and 3-3 (1) The cause of the difference between the RRS and TRS 306. Y Closed Closed   041 7.5.2 7.5.1 EICB (Carte) 2/19/2010  
===Response===
SE       FSAR         NRC No.                                                                 Issue                                               TVA Response(s)                   Acceptable       Status/ Current Actions     Resolution Path     RAI No. & Date       RAI Resp. Date                 Comments Sec.      Sec.        POC                                                                                                                            Y/N
(
097    7.4.2     7.4                    May 20, 2010                                                Date:                                                87. Y        Closed                        Closed              EICB RAI No.4        TVA Letter dated D
a r
(
098    7.4.2      7.4                    May 25, 2010                                                Date:                                                88. Y        Closed                        Closed              EICB RAI No.5         TVA Letter dated D
a r
099                                      April 12, 2010                                              Date:                                                89. Y        Closed                        Closed                                                        Closed to Item 129
(
(
100                      D ( (           5/20/2010                                                  Responder: WEC                                      90. Y        Closed                        Closed              N/A - No question    N/A B
102                      a C C          May 24, 2010                                                Date: 5/24/10                                       91. Y        Closed                        Closed              N/A                  TVA Letter dated Request for schedule not information.
a r a a                                                                                                                            92. Y 103      7.4      7.4                    5/27/2010                                                   Responder: Ayala          Date: 5/27/10                          Closed                       Closed               EICB RAI No.1        TVA Letter dated Submittal date is based on current
(                                                                                                                              93. Y 104      7.4      7.4    ( D            5/27/2010                                                  Responder: Merten            Date: 5/27/10                        Closed                        Closed              EICB RAI No.1        TVA Letter dated Submittal date is based on current G a r                                                                                                                              94. Y 105                                      April 29, 2010                                              Date:                                                              Closed                        Closed              N/A                  N/A              Will be reviewed under item 154.
106                                      May 6, 2010                                                Date: 5/25/10                                        95. Y        Closed                        Closed              RAI No. 9            TVA Letter dated
(
S i
107                      (              May 6, 2010                                                Date: 5/28/10                                        96. Y        Closed                        Closed              RAI No. 22            TVA Letter dated D ( (
108                      a  S          May 6, 2010                                                Date: 5/25/10                                        97. Y         Closed                       Closed               N/A                  N/A                Will be reviewed under OI#154 r G i 109.a   7.8      XX                    5/6/2010                                                    Responder: N/A                                      98. Y        Closed                        Closed              N/A                  N/A
(
109.b                                    5/6/2010                                                    Responder: N/A                                      99. Y        Closed                        Closed              N/A                  N/A                Duplicate of another open Item.
110                                      May 6, 2010                                                Date:                                                100. Y        Closed                        Closed              N/A                  N/A              Information was found.
111                                      May 6, 2010                                                Date: 5/28/10                                        101. Y        Closed                        Closed              N/A                  TVA Letter dated Request to help find, not a request for D    (      (  (
112                                      June 1, 2010                                                Date:                                                102. Y        Closed                        Closed              N/A                  N/A                Information was received
( (  ( ( (  (
113                                      6/1/2010                                                    Responder: Clark                                    103. Y        Closed                        Closed              EICB RAI              TVA Letter dated a    C      C  C 114      7.2      7.2                    6/1/2010                                                    Responder: WEC                                      104. Y        Close                        Closed              EICB RAI              TVA Letter dated G G  G G G  G 115                                      2/25/2010                                                  Responder: Clark                                    105. Y        Closed                        Closed              EICB RAI              TVA Letter dated 116                                      6/3/2010                                                    Responder: WEC                                      106. Y        Closed                        Closed              EICB RAI              TVA Letter dated Letter sent to Westinghouse requesting r    a      a  a 117      7.1      7.1                    6/3/2010                                                    Responder: Hilmes                                    107. Y        Closed                        Closed              EICB RAI              TVA Letter dated 118      7.4      7.4                    6/8/2010                                                    Responder: Merten                                    108. Y        Closed                        Closed              EICB RAI No.1        TVA Letter dated Submittal date is based on current
(
119                                      June 10, 2010                                              Date:                                                109. Y        Closed                        Closed              RAI No. 23            TVA Letter dated 120                                      5/6/2010                                                    Responder: Hilmes/Merten/Costley                    110. Y        Closed                        Closed              EICB RAI              TVA Letter dated D ( ( ( (
121                                      5/6/2010                                                    Responder: Webb/Webber                              111. Y        Closed                        Closed              EICB RAI              TVA Letter dated a C C C S 122                                      June 14, 2010                                              Date:                                               112. Y        Closed                        Closed              N/A - Request for    N/A r a a a i 123    7.7.3    7.4.1,                  6/14/2010                                                  Responder:                                          113. Y        Closed                        Closed              ML101720589,          TVA Letter dated
(
124    7.7.5      XX                    6/14/2010                                                  Responder:                                           114. Y       Closed                       Closed               ML101720589, Item TVA Letter dated D
a r
(
125    7.7.8   7.7.1.12                6/14/2010                                                  Responder:                                          115. Y        Closed                        Closed              ML101720589, Item TVA Letter dated D
a r
126      7.8      7.8        (           June 14, 2010                                              Date:                                                116. Y       Closed                       Closed               ML101720589, Item TVA Letter dated
( ( D 127      7.2      7.2       a          6/16/2010                                                  Responder: WEC/Clark                                117. Y        Closed                        Closed              EICB RAI              TVA Letter dated G G r 128      7.2      7.2                    6/18/2010                                                  Responder: WEC Drake /TVA Craig                      118. Y        Closed                        Closed              EICB RAI              TVA Letter dated Track through SE open item
(
129                                      6/12/2010                                                  Responder: WEC                                      119. Y        Closed                        Closed              N/A                  TVA Letter dated P
o
(
130                                      6/28/2010                                                  Responder: Clark                                    120. Y        Closed                        Closed              N/A                  TVA Letter dated P
o
(
131                                      6/28/2010                                                  Responder: Clark                                    121. Y        Closed                        Closed              N/A                  TVA Letter dated P
o
(
132                                      6/28/2010                                                  Responder: Clark                                    122. Y        Closed                        Closed              N/A                  TVA Letter dated P
o
(
133                                      6/28/2010                                                  Responder: Clark                                    123. Y        Closed                        Closed                                    TVA Letter dated P
o
( (
134                                      6/28/2010                                                  Responder: Clark                                    124. Y        Closed                        Closed                                    TVA Letter dated 135    7.3.1    7.3.1                   6/30/2010                                                  Responder: Clark                                    125. Y       Closed                       Closed               RAI not necessary TVA Letter dated 136    7.3.27.4, 5.6,( ( ( D D (     6/30/2010                                                   Responder: Clark                                    126. Y        Closed                        Closed              RAI not necessary TVA Letter dated 137                      C C C a a P    Several WBN2 PAMS documents contain a table titled, Document Responder: WEC                                    127. Y        Closed                        Closed              ML101650255, Item TVA Letter dated 139                                      The WBN2 PAMS System Requirements Specification (WBN2      Responder: WEC                                      128. Y        Closed                        Closed              ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements a a a r r o 141                                      Deleted by DORL                                            Date:                                                129. Y        Closed                        Closed              ML101650255, Item                        WBN2 PAMS System Requirements


Please provide the following Westinghouse documents: (1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements Specification" (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                                     rad94FD7.docx                                                                              Open Items to be Resolved for SER Approval


Specification" (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g" Please provide the following Westinghouse documents or pointers to where the material was reviewed and approved in the CQ TR or
===Response===
SE      FSAR                NRC No.                                                                                            Issue                                                    TVA Response(s)            Acceptable      Status/ Current Actions      Resolution Path    RAI No. & Date    RAI Resp. Date                Comments Sec.      Sec.              POC                                                                                                                                              Y/N
( ( (
146                                                              6/17/2010                                                          Responder:                                    130. Y        Closed                        Closed              ML101650255, Item                      PAMS System Requirements 147                                                              6/17/2010                                                          Responder:                                    131. Y        Closed                        Closed              ML101650255, Item                      PAMS System Requirements 148                                                              6/17/2010                                                          Responder:                                    132. Y        Closed                        Closed              ML101650255, Item                      PAMS System Requirements
( ( ( ( ( ( ( ( ( ( ( ( ( ( (
149    7.2        7.2                                          FSAR Section 7.1.1.2(2), Overtemperature delta T and                Responder: Tindell                            133. Y        Close                        Closed              ML101720589, Item TVA Letter dated 150    7.2        7.2                                          Many of the changes were based on the Westinghouse document Responder: Clark                                      134. Y        Close                        Closed              ML101720589, Item TVA Letter dated 151    7.2        7.2                                          Provide the EDCR 52378 and 54504 which discusses the basis for Responder: Clark                                    135. Y        Close                        Closed              ML101720589, Item TVA Letter dated C C C 152    7.2        7.2                                          Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR        Responder: Merten/Clark                        136. Y        Close                        Closed              ML101720589, Item TVA Letter dated 153    7.2        7.2                                          FSAR section 7.2.1.1.7 added the reference to FSAR section          Responder: Craig/Webb                          137. Y        Close                        Closed              ML101720589, Item TVA Letter dated 154    7.2        7.2                                          FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS        Responder: Craig/Webb                          138. Y        Closed                        Closed              ML101720589, Item TVA Letter dated EICB RAI ML102861885 sent to DORL G G G G G G G G G G G G G G G 155    7.2        7.2                                          Summary of FSAR change document section 7.2 states that            Date:                                          139. Y        Closed                        Closed              ML101720589, Item 156    7.2        7.2                                          FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1-    Responder: WEC                                140. Y        Closed                        Closed              ML101720589, Item TVA Letter dated Response on hold pending 157    7.2        7.2                                          FSAR section 7.2.2.1.1, fifth paragraph was deleted except for the Responder: Tindell                              141. Y        Close                        Closed              ML101720589, Item TVA Letter dated a a a 158    7.2        7.2                                          FSAR section 7.2.2.1.1, paragraph six was changed to state that    Responder: Tindell                            142. Y        Closed                        Closed              ML101720589, Item TVA Letter dated 159    7.2        7.2                                          FSAR section 7.2.2.1.2 discusses reactor coolant flow              Responder: Craig                              143. Y        Close                        Closed              ML101720589, Item TVA Letter dated 160    7.2        7.2                                          FSAR section 7.2.2.2(7) deleted text which has references 12 and Responder: Tindell                                144. Y        Close                        Closed              ML101720589, Item TVA Letter dated 161    7.2        7.2                                          FSAR section 7.2.2.3 states that changes to the control function    Responder: Clark                              145. Y        Closed                        Closed              ML101720589, Item TVA Letter dated 162    7.2        7.2                                          FSAR section 7.2.2.2(14) states that bypass of a protection        Responder: Tindell                            146. Y        Closed                        Closed              ML101720589, Item TVA Letter dated 163    7.2        7.2                                          Deleted by DORL                                                    Date:                                          147. Y        Closed                        Closed              ML101720589, Item 164    7.2        7.2                                          FSAR section 7.2.2.2(20) has been revised to include the plant      Responder: Perkins                            148. Y        Closed                        Closed              ML101720589, Item TVA Letter dated Item No. 8 sent to DORL a
r g
l
(
165    7.2        7.2                                          FSAR section 7.2.2.3.2, last paragraph of this section has been    Responder: Clark                              149. Y        Closed                        Closed              ML101720589, Item TVA Letter dated 166    7.2        7.2                                          Changes to FSAR section 7.2.2.2(20) are justified based on the      Responder: Clark                              150. Y        Closed                        Closed              ML101720589, Item TVA Letter dated 167    7.2        7.2                                          FSAR section 7.2.2.4, provide an analysis or reference to chapter Responder: Clark                                151. Y        Close                        Closed              ML101720589, Item TVA Letter dated
( (
168    7.2        7.2                                          FSAR table 7.2-4, item 9 deleted loss of offsite power to station  Responder: Clark                              152. Y        Close                        Closed              ML101720589, Item TVA Letter dated 169                                                              6/18/2010                                                          Responder: Clark                              153. Y        Closed                        Closed 170                                                              6/17/2010                                                          Responder: Clark                              154. Y        Closed                        Closed
( D ( ( ( ( (
171    7.2        7.2                                          6/17/2010                                                          Responder: Craig                              155. Y        Closed                        Closed              EICB RAI            TVA Letter dated Closed to SE Open Item 172                                                              6/17/2010                                                          Responder: Craig                              156. Y        Closed                        Closed              EICB RAI M M ( ( ( ( ( ( ( ( ( ( ( (
173    7.1        7.1                                          6/17/2010                                                          Responder: Craig/Webb/Powers                  157. Y        Closed                        Closed              EICB RAI 174                                                              6/28/2010                                                          Responder: Hilmes/Craig                        158. Y        Closed                        Closed              EICB RAI 175                                                              June 28, 2010                                                      Responder:                                    159. Y        Closed                        Closed              EICB RAI C a C C C C C 176    7.1        7.1                                          6/28/2010                                                          Responder: Craig/Webb                          160. Y        Closed                        Closed              EICB RAI 177    7.5.2.1    7.5.1                                          7/15/2010                                                          Responder: Clark                              161. Y        Closed                        Closed              N/A                TVA Letter dated RAI not required a a G G G G G G G G G G G G 178    7.5.2.1    7.5.1                                          7/15/2010                                                          Responder: Clark                              162. Y        Closed                        Closed              N/A                TVA Letter dated RAI not required 179                                                              An emphasis is placed on traceability in System Requirements        Responder: WEC                                163. Y        Closed                        Closed              N/A - Closed to    NA 180                                                              The SRP, BTP 7-14, Section B.3.3.1 states that Regulatory Guide Responder: WEC                                    164. Y        Closed                        Closed              N/A - Closed to    NA a r a a a a a 181                                                              An emphasis is placed on traceability in System Requirements        Responder: WEC                                165. Y        Closed                        Closed              N/A - Closed to    NA 182                                                              Characteristics that the SRP states that a Software Requirements Responder: WEC                                    166. Y        Closed                        Closed              N/A - Closed to    NA 184                                                              7/15/2010                                                          Responder: WEC                                167. Y        Closed                        Closed              N/A - Closed to    N/A 186    7.7.8    7.7.1.12                                        7/15/2010                                                          Responder: Perkins/Clark                      168. Y        Closed                        Closed              EICB RAI No.6      TVA Letter dated 188                                                              By letter dated June 30, 2010, TVA docketed, Tennessee Valley      Responder: Clark                              169. Y        Closed                        Closed              ML101970033, Item TVA Letter dated
(
189              7.6.7                                          7/20/2010                                                          Responder: Clark                              170. Y        Closed                        Closed              RAI No. 3          TVA Letter dated S
i 190    7.9                        ( (                          FSAR Table 7.1-1 states: Regulatory Guide 1.133, May 1981          Responder: Clark                              171. Y        Closed                        Closed              RAI No. 4          TVA Letter dated Closed to OI-331.
C S a i                                                                                                                                            172. Y 191    7.9                                                      NUREG-0800 Chapter 7, Section 7.9, "Data Communication              Responder: Jimmie Perkins                                    Closed                        Closed              ML10197016, Item TVA Letter dated


SPM: (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q Safety systems" (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                       rad94FD7.docx                                                                                Open Items to be Resolved for SER Approval


Procedure" Responder: WEC  
===Response===
SE      FSAR            NRC No.                                                                                Issue                                                  TVA Response(s)            Acceptable      Status/ Current Actions      Resolution Path    RAI No. & Date        RAI Resp. Date                Comments Sec.      Sec.          POC                                                                                                                                      Y/N
( ( ( ( (
192    7.5.1.1  7.5.2                                The NRC Staff is using SRP (NUREG-0800) Chapter 7 Section      Responder: Clark                                173. Y        Closed                        Closed              Item No. 1 sent to    TVA Letter dated EICB RAI ML1028618855 sent to 193    7.5.1.1  7.5.2                                The WBU2 FSAR, Section 7.5.2, Plant Computer System,        Responder: Clark                                174. Y        Closed                        Closed              Item No. 2 sent to    TVA Letter dated EICB RAI ML1028618855 sent to 194    7.5.1.1  7.5.2.1  M M M M M                  The WBU2 FSAR Section 7.5.2.1, Safety Parameter Display      Responder: Costley/Norman                      175. Y        Closed                        Closed              Item No. 3 sent to    TVA Letter dated EICB RAI ML1028618855 sent to a a a a a 195    7.5.1.1  7.5.2.2                              Bypassed and Inoperable Status Indication (BISI)              Responder: Costley/Norman                      176. Y        Closed                        Closed              Item No. 4 sent to    TVA Letter dated EICB RAI ML1028618855 sent to 196    7.5.1.1  7.5.2.2                              Bypassed and Inoperable Status Indication (BISI)              Responder: Costley/Norman                      177. Y        Closed                        Closed              Item No. 5 sent to    TVA Letter dated EICB RAI ML1028618855 sent to 197                        ( (                        Open Item 197 was never issued.                                                                                178. Y        Closed                        Closed 198    7.5.1.1  7.5.2.2  M M X                      SRP Section 7.5, Subsection III, Review Procedures states:  Responder: Costley/Norman                      179. Y        Closed                        Closed              Item No. 6 sent to    TVA Letter dated EICB RAI ML1028618855 sent to a a                                                                                                                                        180. Y 199    7.5.1.1  7.5.2.3                              The WBU2 FSAR Section 7.5.2.3, Technical Support Center and Responder: Costley/Norman                                      Closed                        Closed              Item No. 7 sent to    TVA Letter dated Related SE Section 7.5.5.3 EICB RAI 200    7.2                                            7/21/2010                                                      Responder: Clark                                181. Y        Closed                        Closed              EICB RAI              TVA Letter dated
( ( (  (  ( (
201    7.7.1.1  7.7.11                                7/21/2010                                                      Responder: Webb                                182. Y        Closed                        Closed              EICB RAI              TVA Letter dated 203    7.5.1.1  7.5.2                                7/26/2010                                                      Responder: Clark                                183. Y        Closed                        Closed              EICB RAI              TVA Letter dated EICB RAI ML102861885 sent to DORL
( (      (        (
204    7.5.1.1  7.5.2                                7/26/2010                                                      Responder: Costley/Norman                      184. Y        Closed                        Closed              EICB RAI              TVA Letter dated EICB RAI ML102861885 sent to DORL M M M  M ( M M 205                                                    7/26/2010                                                      Responder: Clark                                185. Y        Closed                        Closed              EICB RAI              TVA Letter dated Question B related to prior NRC 206    7.5.1.1  7.5.2                                7/27/2010                                                      Responder: Clark                                186. Y        Closed                        Closed              EICB RAI              TVA Letter dated EICB RAI ML102861885 sent to DORL C C      C        C 207                                                    July 27, 2010                                                  Date:                                          187. Y        Closed                        Closed a a a  a G a a 208    7.5.2.1  7.5.1                                7/27/2010                                                      Responder: Clark                                188. Y        Closed                        Closed              EICB RAI              TVA Letter dated EICB RAI ML102861885 sent to DORL 209    7.5.2.1  7.5.1                                7/27/2010                                                      Responder: Clark                                189. Y        Closed                        Closed              EICB RAI              TVA Letter dated EICB RAI ML102861885 sent to DORL a a      a        a 210    7.5.2.1  7.5.1                                7/27/2010                                                      Responder: Clark                                190. Y        Closed                        Closed              EICB RAI              TVA Letter dated EICB RAI ML102861885 sent to DORL 211    7.5.1.1                                        7/27/2010                                                      Responder: Clark                                191. Y        Closed                        Closed              EICB RAI              TVA Letter dated Relates to SE Sections:
214                                                    7/27/2010                                                      Responder: WEC                                 192. Y        Closed                        Closed              EICB RAI              TVA Letter dated
(    (        (
215                                                    7/29/2010                                                      Responder: WEC                                  193. Y        Closed                        Closed 216    7.5.1.1  7.5.2                                7/29/2010                                                      Responder: Clark                                194. Y        Closed                        Closed              EICB RAI              TVA Letter dated EICB RAI ML102861885 sent to DORL 217                                                    7/6/2010                                                      Responder: Clark                                195. Y        Close                        Closed              EICB RAI              TVA Letter dated
( ( (  (                    (
218                                                    7/6/2010                                                      Responder: Clark                                196. Y        Closed                        Closed              EICB RAI              TVA Letter dated 219                                                    8/4/2010                                                      Responder: TVA Licensing                        197. Y        Closed                        Closed              EICB RAI
(      (  ( M ( ( M ( ( ( ( M 220                                                    8/4/2010                                                      Responder: Ayala                                198. Y        Closed                        Closed              EICB RAI              TVA Letter dated 221    7.7.1.2  7.7.1.3                              8/4/2010                                                      Responder: Trelease                            199. Y        Closed                        Closed              EICB RAI              TVA Letter dated EICB RAI ML102861885 sent to DORL 222                                                    8/4/2010                                                      Responder: Clark                                200. Y        Close                        Closed              EICB RAI              TVA Letter dated C C C  C                    P 223                                                    8/4/2010                                                      Responder: Clark                                201. Y        Closed                        Closed              EICB RAI 224    7.5.1.1  7.5.2                                8/4/2010                                                      Responder: Norman (TVA CEG)                    202. Y        Closed                        Closed              EICB RAI              TVA Letter dated EICB RAI ML102861885 sent to DORL G      G  G a G G a G G G G a 225                                                    8/4/2010                                                      Responder: Scansen                              203. Y        Close                        Closed              EICB RAI              TVA Letter dated 226                                                    8/4/2010                                                      Responder: TVA Licensing                        204. Y        Closed                        Closed              N/A - Information      TVA Letter dated See also Open Item Nos. 41 & 270.
a a a  a                    o 227                                                    8/4/2010                                                      Responder: Clark                                205. Y        Close                        Closed              EICB RAI              TVA Letter dated 228                                                    8/4/2010                                                      Responder: Clark                                206. Y        Closed                        Closed              EICB RAI              TVA Letter dated 229                                                    8/4/2010                                                      Responder: Clark                                207. Y        Closed                        Closed              EICB RAI              TVA Letter dated 230                                                    8/4/2010                                                      Responder: Webb                                208. Y        Closed                        Closed              EICB RAI              TVA Letter dated 231                                                    8/4/2010                                                      Responder: Clark                                209. Y        Closed                        Closed              EICB RAI              TVA Letter dated
(    ( ( (
232                                                    8/4/2010                                                      Responder: Clark                                210. Y        Closed                        Closed              RAI No. 5              TVA Letter dated
( (
233                                                    8/4/2010                                                      Responder: Clark                                211. Y        Closed                        Closed              EICB RAI              TVA Letter dated C    C C S 234                                                    8/4/2010                                                      Responder:                                      212. Y        Closed                        Closed              N/A - Duplicate        N/A G G 235                                                    8/4/2010                                                      Responder: TVA Licensing                        213. Y        Closed                        Closed              N/A                    N/A a    a a i 236                                                    8/4/2010                                                      Responder: Clark                                214. Y        Close                        Closed              EICB RAI              TVA Letter dated 237                                                    8/4/2010                                                      Responder: Clark                                215. Y        Closed                        Closed              EICB RAI              TVA Letter dated


Items (1) and (2) were docketed by TVA letter dated April 8, 2010.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                       rad94FD7.docx                                                                              Open Items to be Resolved for SER Approval
Item (3) will be addressed by Revision 2 of the Licensing


Technical Report. Due 12/3/10 Item (4) will be addressed by Westinghouse developing a WBN2 Specific Test Plan to compensate for the fact that the NRC disapproved WNA-PT-00058-GEN during the original Common Q review. Due 12/7/10
===Response===
SE      FSAR          NRC No.                                                                          Issue                        TVA Response(s)            Acceptable      Status/ Current Actions      Resolution Path    RAI No. & Date      RAI Resp. Date                  Comments Sec.      Sec.          POC                                                                                                      Y/N 238                            ( (                              8/4/2010            Responder: Webb/Hilmes                          216. Y        Closed                        Closed              N/A - Duplicate      N/A
(
239                            C C                              8/4/2010            Responder: Hilmes                              217. Y        Closed                        Closed              N/A - Meeting        N/A G
a a                                                                                                  218. Y 240                                                              8/4/2010            Responder: Clark                                              Close                        Closed              Ml102910008          TVA Letter dated
( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( (  (
241                                                              8/4/2010            Responder: Davies                              219. Y        Closed                        Closed              RAI No. 10          TVA Letter dated 242                                                              8/4/2010            Responder: Hilmes                              220. Y        Close                        Closed              EICB RAI            TVA Letter dated 243                                                              8/3/2010            Responder: WEC                                  221. Y        Closed                        Closed              N/A - Closed to      N/A 247                                                              8/8/2010            Responder: WEC                                  222. Y        Closed                        Closed              EICB RAI            Response is        LIC-101 Rev. 3 Appendix B Section 4,
(
248                                                              8/8/2010            Responder: WEC                                  223. Y        Closed                        Closed                                    Response is        LIC-101 Rev. 3 Appendix B Section 4, 249                                                              8/8/2010            Responder: WEC                                  224. Y        Closed                        Closed                                                      LIC-101 Rev. 3 Appendix B Section 4, 253                                                              8/8/2010            Responder: Clark                                225. Y        Closed                        Closed                                    TVA Letter dated Related to Open Item no. 83.
254                                                              8/10/2010          Responder: WEC                                  226. Y        Closed                        Closed              N/A - Request to    TVA Letter dated C C C C C C C C C C C C C C C C C C C C  S 255                                                              8/10/2010          Responder: WEC                                  227. Y        Closed                        Closed              N/A - Request to    TVA Letter dated 256                                                              8/10/2010          Responder: WEC                                  228. Y        Closed                        Closed              N/A - Request to    TVA Letter dated 257                                                              8/10/2010          Responder: WEC                                  229. Y        Closed                        Closed              N/A - Request to    N/A G
258                                                              8/10/2010          Responder: WEC                                  230. Y        Closed                        Closed              N/A - Request to    N/A 259                                                              8/10/2010          Responder: WEC                                  231. Y        Closed                        Closed              N/A - Request to    TVA Letter dated 260                                                              8/10/2010          Responder: WEC                                  232. Y        Closed                        Closed              N/A - Request to    N/A 261                                                              8/10/2010          Responder: WEC                                  233. Y        Closed                        Closed              N/A - Closed to      TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:
a a a a a a a a a a a a a a a a a a a a   i 262                                                              8/10/2010          Responder: WEC                                  234. Y        Closed                        Closed              N/A - Request to     N/A 263                                                              8/11/2010          Responder: WEC                                  235. Y        Closed                        Closed              ML101650255, Item 264                                                              8/11/2010          Responder: WEC                                  236. Y        Closed                        Closed              ML101650255, Item 265                                                              8/11/2010          Responder: WEC                                  237. Y        Closed                        Closed              ML101650255, Item 266                                                              8/11/2010          Responder: Webb/Webber                          238. Y        Closed                        Closed                                    TVA Letter dated 267                                                              8/11/2010          Responder: WEC                                  239. Y        Closed                        Closed 268                                                              8/19/2010          Responder: WEC                                  240. N        Open                          Closed
( (
269                                                              8/20/2010          Responder: NRC                                 241. Y        Closed                        Closed              N/A                  N/A 270                              ( ( (                            8/23/2010          Responder: Clark                                242. Y        Closed                        Closed                                                      See also Open Item Nod. 41 & 245.
M M C C P 271                                                              8/23/2010          Responder: WEC                                  243. Y        Closed                        Closed              N/A - Closed to      NA 272    7.5.2.1    7.5.1    a a                                  8/26/2010          Responder: Clark                                244. Y        Closed                        Closed              EICB RAI            TVA Letter dated EICB RAI ML102861885 sent to DORL a a o 273    7.5.2.1    7.5.1                                          8/26/2010          Responder: Clark                                245. Y        Closed                        Closed              EICB RAI            TVA Letter dated EICB RAI ML102861885 sent to DORL 274.b                        ( (                                  8/26/2010          Responder: Stockton                            246. Y        Closed                        Closed              RAI No. 6            TVA Letter dated M S a i 274.a 7.5.2.1      7.5.1                                          8/26/2010          Responder: Clark                                247. Y        Closed                        Closed              EICB RAI            TVA Letter dated EICB RAI ML102861885 sent to DORL
(
275                                                              8/27/2010          Responder: Clark                                248. Y        Closed                        Closed              Not Required        N/A 276      7.6        7.6                                          8/27/2010          Responder: Webb                                249. Y        Closed                        Closed              EICB RAI            TVA Letter dated D            (
277      7.6      7.6.3                                          8/27/2010          Responder: Clark                                250. Y        Close                        Closed              EICB RAI            TVA Letter dated
( ( ( ( ( (
278      7.6      7.6.6                                          8/27/2010          Responder: Trelease                            251. Y        Close                        Closed              EICB RAI            TVA Letter dated a            S 279      7.6      7.6.6                                          8/27/2010          Responder: Mather                              252. Y        Close                        Closed              EICB RAI            TVA Letter dated G G G G G G 280      7.6      7.6.6                                          8/27/2010          Responder: Trelease                            253. Y        Closed                        Closed              EICB RAI            TVA Letter dated r            i 282      7.6      7.6.9                                          8/27/2010          Responder: Trelease                            254. Y        Close                        Closed              EICB RAI            TVA Letter dated 283    7.7.5      XX                                            8/27/2010          Responder: Clark                                255. Y        Closed                        Closed              EICB RAI No.13      TVA Letter dated This item is a follow-up question to item
(
284    7.7.3      7.4.1                                          8/27/2010          Responder: Webber                              256. Y        Closed                        Closed              EICB RAI No.14      TVA Letter dated This item is a follow-up question to item D
a r
(
285    7.3.3      7.3                                          8/27/2010          Responder: McNeil                              257. Y        Closed                        Closed              EICB RAI No.15      TVA Letter dated This item is a follow-up question to item D
a r
(
286    7.7.3    9.3.4.2.                                        8/27/2010          Responder: Webber                              258. Y        Closed                        Closed              EICB RAI No.16      TVA Letter dated D
a r


Item (5) Procedures that are listed in the SPM compliance table in the Licensing Technical Report revision 1 supersede that test procedure WNA-TP-00357-GEN.Due 10/22/10
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                       rad94FD7.docx                                                                                Open Items to be Resolved for SER Approval


For Item 3, Attachment 19 contains the Westinghouse document "Post-Accident Monitoring System (PAMS) Licensing Technical Report," WNA-LI-00058-WBT, Revision 2, dated December 2010. Attachment 20 contains the Westinghouse Application for Withholding for the "Post-Accident Monitoring System (PAMS) Licensing Technical Report," WNA-LI-00058-WBT, Revision 2, dated December 2010. For Item 4, Attachment 9 contains the Westinghouse document "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the WNA-PT-00138-WBT, Revision 0 "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 17, 2010.
===Response===
: 1. N Open Final Response included in letter dated 12/3/10
SE      FSAR          NRC No.                                                                          Issue                                                    TVA Response(s)                    Acceptable      Status/ Current Actions      Resolution Path    RAI No. & Date    RAI Resp. Date                    Comments Sec.      Sec.          POC                                                                                                                                          Y/N
(                                                                                                                                              259. Y 287    7.3      7.3-1  ( D                  8/27/2010                                                          Responder: Elton                                                      Closed                        Closed              ML102390538, Item Response G a r                                                                                                                                              260. Y 288    7.3                                   9/2/2010                                                          Responder: McNeil                                                    Closed                        Closed              EICB RAI
(
289                                            9/2/2010                                                          Responder: Faulkner                                      261. Y      Closed                        Closed              RAI No. 24          TVA Letter dated 290                7.7      (                  9/7/2010                                                          Responder: Clark                                        262. Y      Closed                        Closed              N/A                N/A                  This item is a duplicate of item 291.
D    ( ( (                                                                                                                                      263. Y M (
291                7.7                        9/7/2010                                                          Responder: Clark                                                      Closed                        Closed                                  TVA Letter dated 292    7.2.5      7.2    a    C C S          9/7/2010                                                          Responder: Craig                                        264. Y      Closed                        Closed              EICB RAI            TVA Letter dated 293    7.7.4    7.2.2.3. a G                9/8/2010                                                          Responder: Craig                                        265. Y      Closed                        Closed              EICB RAI            TVA Letter dated EICB RAI ML102861885 sent to DORL r    a a i 294    7.3      7.3.1.1.                      9/9/2010                                                          Responder: Elton                                        266. Y      Closed                        Closed              ML102390538, Item Response
(
295    7.3      7.3.1.1.                      9/9/2010                                                          Responder: Elton                                        267. Y      Closed                        Closed              ML102390538, Item Response D
a r
(
296    7.3      7.3.1.2.                      9/9/2010                                                          Responder: Elton                                        268. Y      Closed                        Closed              ML102390538, Item Response D
a r
297    7.3      7.3.1.2.  ( (                9/9/2010                                                          Responder: Elton                                        269. Y      Closed                        Closed              ML102390538, Item Response
( D D 298    7.3        XX    C a a                9/9/2010                                                           Responder: Clark                                        270. Y      Closed                        Closed              ML102390538, Item Response a r r                                                                                                                                            271. Y 299                                            Provide Common Q Software Requirements Specification Post          Attachment 41 of the 10/5 letter contains the Common Q                Closed                        Closed                                  TVA Letter dated
(
300                                            Need Radiation Monitoring System Description/Design Criteria      Responder: Temples/Mather                                272. Y      Closed                        Closed              RAI No. 25          TVA Letter S
i
(
301                                            1.TVA is requested to address the consequences of software        Responder: WEC/Davies/Clark                              273. Y      Closed                        Closed              RAI No. 11          TVA Letter dated Note 1:
302    7.5.2.1    7.5.1                        09/17/2010                                                        Responder: Tindell                                      274. Y      Closed                        Closed              EICB RAI            TVA Letter dated EICB RAI ML102861885 sent to DORL
( ( ( (
303    7.5.2.1    7.5.1                        09/17/2010                                                        Responder: Tindell                                      275. Y      Closed                        Closed              EICB RAI            TVA Letter dated EICB RAI ML102861885 sent to DORL 304    7.5.2.1    7.5.1                        09/17/2010                                                        Responder: Tindell                                      276. Y      Closed                        Closed              EICB RAI            TVA Letter dated EICB RAI ML102861885 sent to DORL D                      (
305    7.5.2.1    7.5.1                        09/17/2010                                                        Responder: Tindell                                      277. Y      Closed                        Closed              EICB RAI            TVA Letter dated EICB RAI ML102861885 sent to DORL
( ( ( ( ( ( ( M M M M 306    7.1        7.1                        FSAR amendment 100, page 7.1-12 provides the definition of        Responder: Hilmes                                        278. Y      Closed                        Closed              EICB RAI            TVA Letter dated 307    7.1        7.1                        (1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of    Responder: Hilmes                                        279. Y      Closed                        Closed              EICB RAI            TVA Letter dated a                      S 308    7.1        7.1                        (1) FSAR Amendment 100, Section 7.1, page 7.1-13, definition of Responder: Hilmes                                          280. Y      Closed                        Closed              EICB RAI            TVA Letter dated G G G G G G G a a a a 309    7.1      7.1.2.1.                      (1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint        Responder: Hilmes                                        281. Y      Closed                        Closed              EICB RAI            TVA Letter dated 310    7.1      7.1.2.1.                      (1) FSAR amendment 100, Page 7.1-14, TVA setpoint                  Responder: Hilmes                                        282. Y      Closed                        Closed              EICB RAI            TVA Letter dated r                      i 311    7.1        7.1                        Both Westinghouse and TVA setpoint methodology do not have        Responder: Hilmes                                        283. Y      Closed                        Closed              EICB RAI            TVA Letter dated 312                7.0                         By letter dated September 10,2010, TVA provided the summary        Responder: Stockton                                      284. Y      Close                        Closed              EICB RAI            TVA Letter dated 313    7.7.8    7.7.1.12                      EDCR 52408 (installation of AMSAC in Unit 2) states that Design    Responder: Ayala                                        285. Y      Closed                        Closed              EICB RAI No.18      TVA Letter dated
(                                                                                                                                              286. Y 314    7.3        7.3    ( D                  The following 50.59 changes were listed in the March 12 RAI        Responder: Stockton                                                  Closed                        Closed              EICB RAI No. 19    TVA Letter dated Related to OI 10 G a r                                                                                                                                              287. Y 315    7.5.3      7.5.3                        IE Bulletin 79-27 required that emergency operating procedures to Responder: S. Smith (TVA Operations)                                  Close                        Closed              EICB RAI            TVA Letter dated
(
316    7.5.2.3    7.5                        TVA has provided various documents in support of RM-1000 high Responder: Temples/Mather                                    288. Y      Closed                        Closed              RAI No. 26 S
i
(
317    7.5.2.3    7.5                        TVA has provided a proprietary and a non-proprietary version of    Responder: Temples                                      289. Y      Closed                        Closed              RAI No. 27          TVA Letter dated S
i
(
319    7.5.2.3    7.5                        TVA provided System Verification Test Results 04507007-1TR        Responder: Temples                                      290. Y      Closed                        Closed              RAI No. 29          TVA Letter dated S
i E
320                            I              Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY              Responder: Clark                                        291. Y      Closed                        Closed              N/A                N/A                  Duplicate of item 156 321                      B                      For the purposes of measuring reactor coolant flow for Reactor  Responder: Clark                                        292. Y      Closed                        Closed              N/A                N/A                  Duplicate of OI# 157
(
322              7.7.1.11 (  ( E              Section 7.7.1.11 will be added to FSAR Amendment 101 to provide Responder: Clark                                            293. Y      Closed                        Closed M
324                      G  C I              Per the NRC reviewer, the BISI calculation is not required to be                                                            294. Y      Closed                        Closed a
a  a                                                                                                                                            295. Y 325                                            The Unit 2 loops in service for Unit 1 that are scheduled to be    Responder: TVA Startup Olson                                          Closed                        Closed                                                        Closed to open item ?
B 326                                            TVA uses double-sided methodology for as-found and as-left        Responder: Webb                                          296. Y      Closed                        Closed                                  TVA Letter dated
(
G a
(
328    7.5.2.3    7.5                        Provide the model number for the four containment high range      Responder: Temples                                      297. Y      Closed                        Closed              RAI No. 30          TVA Letter dated S
i
(                                                                                                                                                298. Y 329    7.6.1      7.6.7  D (                  Section 7.6.7 of the FSAR (Amendment 100) states that, The        Responder: Clark                                                      Closed                        Closed              RAI No. 1           TVA Letter dated a S r i                                                                                                                                              299. Y 330    7.3        7.3                        Related to Item 298                                                Responder: Hilmes/Faulkner                                            Closed                        Closed              EICB RAI No.20      Item 7, TVA letter 331    7.6.1      7.6.7      ( (              As a follow up of OI 190, Staff has reviewed the proprietary version Responder: WEC/Harless/Clark                          300. Y      Closed                        Closed              RAI No. 8          TVA Letter dated Follow-up of OI-190.
M S a i 332    7.5.2.1    7.5.1                        10/26/2010                                                                                                                  301. Y      Closed                        Closed              ML103000105 Item TBD                    EICB RAI ML103000105 sent to DORL


Partial Response is included in letter dated 10/5/10.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                      rad94FD7.docx                                                                                        Open Items to be Resolved for SER Approval
The SysRS and SRS incorporate requirements from


many other documents by reference.  
===Response===
SE      FSAR    NRC No.                                                                  Issue                                                      TVA Response(s)                            Acceptable        Status/ Current Actions          Resolution Path      RAI No. & Date    RAI Resp. Date                  Comments Sec.      Sec. POC                                                                                                                                                    Y/N
(
333    7.5.2.1  7.5.1                  10/27/2010                                                                                                                          302. Y        Closed                            Closed                ML103000105 Item TBD                  EICB RAI ML103000105 sent to DORL M
a
(
336    7.5.2.3    7.5                  Re: RM-1000 Report 04508905-QR                                      Responder: GA                                                    303. Y        Closed                            Closed S
i
(
337    7.5.2.3    7.5                  Re: RM-1000 Report 04508905-QR                                      Responder: GA                                                    304. Y        Closed                            Closed S
i
(
342    7.5.2.3    7.5                  Please confirm that RM-1000 monitors and the associated            The RM-1000 containment high range radiation monitors are        305. Y        Closed                            Closed S
i
(
343    7.5.2.3    7.5                  Seismic RRS in the 04508905-QR report Figures 3-2 and 3-3            (1) The cause of the difference between the RRS and TRS        306. Y        Closed                            Closed S
i 041    7.5.2    7.5.1                  2/19/2010                                                          Responder: WEC                                                    1.      N  Open                              Open-NRC Review        NRC Meeting        TVA Letter dated See also Open Item Nos. 226 & 270.
EICB (Carte)
Summary NRC        6/18/10 Please provide the following Westinghouse documents:                Items (1) and (2) were docketed by TVA letter dated April 8,                  Final Response included in        Due:                  Meeting Summary (1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements              2010.                                                                          letter dated 12/3/10              (3) 12/3/10            ML093560019, Item  TVA Letter dated Specification"                                                                                                                                                                        (4) 12/10/10          No. 11              10/5/10 (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design                    Item (3) will be addressed by Revision 2 of the Licensing Specification"                                                      Technical Report. Due 12/3/10                                                  Partial Response is included in TVA to docket (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g"                                                                                            letter dated 10/5/10.          information indentified Please provide the following Westinghouse documents or pointers    Item (4) will be addressed by Westinghouse developing a                        The SysRS and SRS              in ISG6.
to where the material was reviewed and approved in the CQ TR or    WBN2 Specific Test Plan to compensate for the fact that the                    incorporate requirements from SPM:                                                                NRC disapproved WNA-PT-00058-GEN during the original                          many other documents by (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q          Common Q review. Due 12/7/10                                                  reference.
Safety systems" (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test                Item (5) Procedures that are listed in the SPM compliance                      NNC 8/25/10: (3) An earlier Procedure"                                                          table in the Licensing Technical Report revision 1 supersede                  version of this report was that test procedure WNA-TP-00357-GEN.Due 10/22/10                              docketed for the Common Q topical report; therefore, there For Item 3, Attachment 19 contains the Westinghouse                            should be no problem to docket document Post-Accident Monitoring System (PAMS)                              this version. (4) Per Licensing Technical Report, WNA-LI-00058-WBT, Revision                        ML091560352, the testing 2, dated December 2010. Attachment 20 contains the                            process document does not Westinghouse Application for Withholding for the Post-                        address the test plan Accident Monitoring System (PAMS) Licensing Technical                          requirements of the SPM.
Report, WNA-LI-00058-WBT, Revision 2, dated December                          Please provide a test plan that 2010.                                                                          implements the requirements of the SPM.
For Item 4, Attachment 9 contains the Westinghouse document Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the WNA-PT-00138-WBT, Revision 0 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 17, 2010.
043    7.5.2    7.5.1                  2/19/2010                                                          Responder: WEC                    Date: 5/25/10                  2. N      Open                              Open-NRC Review        EICB RAI            TVA Letter dated NNC 8/25/10: A CQ PAMS ISG6 EICB (Carte)
ML102910002        2/5/10          compliance matrix was docketed on: (1)
The PAMS ISG6 compliance matrix supplied as Enclosure 1 to            The PAMS ISG6 compliance matrix supplied as Enclosure 1                      Revised response included in      Due 12/1/10            Item No. 2                          February, 5 12010, (2) March 12, 2010, TVA letter dated February 5, 2010 is a first draft of the information to TVA letter dated February 5, 2010 is a first draft of the                letter dated 12/22/10.                                                        TVA Letter dated & (3) June 18, 2010. The staff has needed. The shortcomings of the first three lines in the matrix are: information needed.                                                                                                                                        5/12/10          expressed issued with all of these compliance evaluations. The staff is still Line 1: Section 11 of the Common Q topical report did include a    By letter dated April 8, 2010 TVA provided the PAMS                            Response is included in letter                                                TVA Letter dated waiting for a good compliance commercial grade dedication program, but this program was not      Licensing Technical Report provided additional information.                    dated 10/5/10.                                                                6/18/10          evaluation.
approved in the associated SE. Westinghouse stated that this was the program and it could now be reviewed. The NRC stated that      Attachment 3 contains the revised Common Q PAMS ISG-6                          Revised compliance matrix is                                                  TVA Letter dated NNC 11/23/10: WNA-LI-00058-WT-P TVA should identified what they believe was previously reviewed    Compliance Matrix, dated June 11, 2010, that addresses                        unacceptable.                                                                10/5/10          Rev. 1 Section 7 does not include the and approved.                                                      these items (Reference 13).                                                                                                                                                  RSED documents, and it should. Table NNC 8/12/10: It is not quite                                                                  6-1 Item No. 15 should also include the Line 2: TVA stated the D3 analysis was not applicable to PAMS, By letter Dated June 18, 2010 (see Attachment 3) TVA                                enough to provide all of the                                                                  RSED RTMs.
but provided no justification. The NRC asked for justification since provided a table, "Watts Bar 2 - Common Q PAMS ISG-6                          documents requested. There


NNC 8/25/10: (3) An earlier version of this report was docketed for the Common Q topical report; therefore, there
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                       rad94FD7.docx                                                                                              Open Items to be Resolved for SER Approval


should be no problem to docket this version. (4) Per ML091560352, the testing process document does not address the test plan
===Response===
SE    FSAR    NRC No.                                                                  Issue                                                        TVA Response(s)                          Acceptable        Status/ Current Actions              Resolution Path          RAI No. & Date    RAI Resp. Date              Comments Sec. Sec. POC                                                                                                                                                      Y/N SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as              Compliance Matrix."                                                          are two possible routes to being SRP acceptance criteria for PAMS.                                                                                                              review that the NRC can It is TVAs understanding that this comment is focused on                    undertake: (1) follow ISG6, and Line 3: TVA identified that the Design report for computer integrity    the fact that there are documents that NRC has requested                    (2) follow the CQ SPM. The was completed as part of the common Q topical report. The NRC          that are currently listed as being available for audit at the                TVA response that was noted that this report is applicable for a system in a plant, and the  Westinghouse offices. For those Common Q PAMS                                originally pursued was to follow CQ topical report did no specifically address this PAMS system at      documents that are TVA deliverable documents from                            ISG6, but some of the Watts Bar Unit 2.                                                      Westinghouse, TVA has agreed to provide those to NRC.                        compliance items for ISG6 were Westinghouse documents that are not deliverable to TVA will                  addressed by referencing the NRC then concluded that TVA should go through and provide a            be available for audit as stated above. Requirements                        SPM. The NRC approved the more complete and thorough compliance matrix.                          Traceability Matrix issues will be tracked under NRC RAI                    CQ TR and associated SPM; it Matrix Items 142 (Software Requirements Specification) and                  may be more appropriate to 145 (System Design Specification). Commercial Item                          review the WBN2 PAMS Dedication issues will be tracked under NRC RAI Matrix                      application to for adherence to Item 138. This item is considered closed.                                    the SPM that to ISG6. In either path chosen, the applicant TVA Response to Follow-up NRC Request:                                      should provide documents and a justification for the acceptability WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring                    of any deviation from the path System (PAMS) Licensing Technical Report submitted in                      chosen. For example, it TVA Letter to NRC dated December 3, 2010, (Reference 1)                      appears that the contains the following changes to address the NRC                            Westinghouse's CDIs are requests:                                                                    commercial grade dedication plans, but Westinghouse (1) While RSEDs are not specifically mentioned, Section 7                    maintains that they are has been revised to be applicable to both hardware and                  commercial grade dedication software which includes the RSEDs.                                      reports; this apparent deviation (2) Table 6-1 item 15 reference added for WNA-VR-00280-                      should be justified or explained.
WBT (RESD) 050    7.5.2  7.5.1                  4/8/2010                                                                Responder: WEC                  Date: 5/25/10                  3. N      Open                                  Open-NRC Review            EICB RAI          TVA Letter dated NNC 11/18/10: SysRS Rev. 2 contains EICB (Carte)
ML102910002      6/18/10          several Reference 8, however, How should the "shall" statements outside of the bracketed              These sections are descriptive text and not requirements.                    Revised response included in          Due12/22/10                Item No. 8                        Reference 8 has been deleted.
requirements in Common Q requirements documents be                      The next revision of the Watts Bar Unit 2 PAMS System                        letter dated 12/22/10.                Discuss at 11/22 phone                        TVA Letter dated interpreted?                                                            Requirements Specification will remove shall from the                                                            call.                                        10/29/10 wording in those sections. A date for completing the next                                                                                                        Enclosure 1 Item revision of the System Requirements Specification will be                    TVA response is inconsistent          This will be corrected in                    No. 1 provided no later than August 31, 2010.                                      (e.g., WNA-DS-01667-WBT              the Revision 3 Rev. 1 page 1-1, Section 1.3.1        document due to TVA The System Requirements Specification will be revised by                    implies that "SysRS Section          12/10/10 September 30, 2010 and submitted within two of receipt from                  ###" has requirements. See Westinghouse.                                                                also SDS4.4.2.1-1 on page 4-32).
TVA Revised Response Is there a requirement on the Shall statements within the scope of the System                              shall referenced above??
Requirements Specification (SysRS) and System Design Specification (SysDS) were reviewed by Westinghouse. The                    Response is provided in letter statements were either relocated to the numbered                            dated 10/29/10.
requirements section or the wording was changed to identify that it was not a requirement. This item is resolved by                      TVA Revised Response in TVA submittal of revision 2 of the SysRS and the SysDS                          Letter dated 10/29/10 Enclosure (attachments 7 and 8 of TVA Letter to NRC dated 10/25/10).                  1 Item No. 1 is Acceptable TVA Response to Follow-up NRC Request:                                      NNC 11/18/10: Revised Response is not a statement of This item is corrected in the revision 3 requirements                        fact. SysRS Rev. 2 (i.e., WNA-documents.                                                                  DS-01617-WBT Rev. 2) contains many shalls that are


requirements of the SPM. Please provide a test plan that implements the requirements of
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                              rad94FD7.docx                                                                                        Open Items to be Resolved for SER Approval


the SPM. Open-NRC Review
===Response===
 
SE     FSAR    NRC No.                                                               Issue                                                   TVA Response(s)                           Acceptable       Status/ Current Actions           Resolution Path     RAI No. & Date   RAI Resp. Date     Comments Sec. Sec. POC                                                                                                                                               Y/N Attachment 1 contains the proprietary version of WNA-DS-                     not within numbered 01617-WBT-P, Revision 3, Post Accident Monitoring                           requirements sections, for System- System Requirements Specification, dated                           example:
Due:  (3) 12/3/10  (4) 12/10/10
November 2010. Attachment 2 contains the non-proprietary                     (1) Page 2-1, Section 2.3.1 -
 
version WNA-DS-01617-WBT-NP, Revision 3, Post                               See guidance statement Accident Monitoring System - System Requirements                             (2) Page 2-10, top of page 1 -
TVA to docket information indentified in ISG6. NRC Meeting Summary NRC
Specification, dated December 2010. Attachment 3                           See guidance statement contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01617-WBT-P, Revision 3, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System - System Requirements Specification (Proprietary),
 
Meeting Summary ML093560019, Item No. 11 TVA Letter dated 6/18/10 TVA Letter dated 10/5/10 See also Open Item Nos. 226 & 270.
043 7.5.2 7.5.1 EICB (Carte) 2/19/2010
 
The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the information needed. The shortcomings of the firs t three lines in the matrix are:
 
Line 1: Section 11 of the Common Q topical report did include a commercial grade dedication program, but this program was not approved in the associated SE. Westinghouse stated that this was the program and it could now be reviewed. The NRC stated that TVA should identified what they believe was previously reviewed
 
and approved.
Line 2: TVA stated the D3 analysis was not applicable to PAMS, but provided no justification. The NRC asked for justification since Responder: WEC                        Date: 5/25/10
 
The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the information needed. 
 
By letter dated April 8, 2010 TVA provided the PAMS Licensing Technical Report provided additional information.
Attachment 3 contains the revised Common Q PAMS ISG-6 Compliance Matrix, dated June 11, 2010, that addresses these items (Reference 13).
By letter Dated June 18, 2010 (see Attachment 3) TVA provided a table, "Watts Bar 2 - Common Q PAMS ISG-6
: 2. N Open Revised response included in
 
letter dated 12/22/10.
 
Response is included in letter
 
dated 10/5/10.
Revised compliance matrix is unacceptable.
 
NNC 8/12/10:
It is not quite enough to provide all of the
 
documents requested. There Open-NRC Review
 
Due 12/1/10 EICB RAI ML102910002
 
Item No. 2 TVA Letter dated 2/5/10
 
TVA Letter dated 5/12/10 TVA Letter dated
 
6/18/10  TVA Letter dated
 
10/5/10 NNC 8/25/10:
A CQ PAMS ISG6 compliance matrix was docketed on: (1)
February, 5 12010, (2) March 12, 2010,
& (3) June 18, 2010. The staff has expressed issued with all of these compliance evaluations. The staff is still
 
waiting for a good compliance evaluation.
NNC 11/23/10: WNA-LI-00058-WT-P Rev. 1 Section 7 does not include the RSED documents, and it should. Table 6-1 Item No. 15 should also include the RSED RTMs.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as being SRP acceptance criteria for PAMS.
Line 3: TVA identified that the Design report for computer integrity was completed as part of the common Q topical report. The NRC noted that this report is applicable for a system in a plant, and the CQ topical report did no specifically address this PAMS system at Watts Bar Unit 2.
 
NRC then concluded that TVA should go through and provide a more complete and thorough compliance matrix.
Compliance Matrix."
It is TVA's understanding that this comment is focused on the fact that there are documents that NRC has requested that are currently listed as being available for audit at the Westinghouse offices. For those Common Q PAMS documents that are TVA deliverable documents from Westinghouse, TVA has agreed to provide those to NRC. 
 
Westin ghouse documents that are not deliverable to TVA will be available for audit as stated above. Requirements Traceability Matrix issues will be tracked under NRC RAI Matrix Items 142 (Software Requirements Specification) and 145 (System Design Specification). Commercial Item Dedication issues will be  tracked under NRC RAI Matrix Item 138. This item is considered closed.
 
TVA Response to Follow-up NRC Request:
WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:
 
(1) While RSEDs are not specifically mentioned, Section 7 has been revised to be applicable to both hardware and
 
software which includes the RSEDs.
(2) Table 6-1 item 15 reference added for WNA-VR-00280-WBT (RESD) are two possible routes to review that the NRC can undertake: (1) follow ISG6, and (2) follow the CQ SPM. The
 
TVA response that was originally pursued was to follow ISG6, but some of the compliance items for ISG6 were
 
addressed by referencing the SPM. The NRC approved the CQ TR and associated SPM; it may be more appropriate to
 
review the WBN2 PAMS application to for adherence to the SPM that to ISG6. In either path chosen, the applicant should provide documents and a justification for the acceptability of any deviation from the path chosen. For example, it
 
appears that the Westinghouse's CDIs are commercial grade dedication plans, but Westinghouse maintains that they are
 
commercial grade dedication
 
reports; this apparent deviation should be justified or explained.
050 7.5.2 7.5.1 EICB (Carte) 4/8/2010  How should the "shall" statements outside of the bracketed requirements in Common Q requirements documents be interpreted?
 
Responder: WEC                        Date: 5/25/10 These sections are descriptive text and not requirements. The next revision of the Watts Bar Unit 2 PAMS System Requirements Specification will remove "shall" from the wording in those sections. A date for completing the next revision of the System Requirements Specification will be provided no later than August 31, 2010.
 
The System Requirements Specification will be revised by September 30, 2010 and submitted within two of receipt from Westinghouse.
 
TVA Revised Response
 
Shall statements within the scope of the System Requirements Specification (SysRS) and System Design Specification (SysDS) were reviewed by Westinghouse. The statements were either relocated to the numbered requirements section or the wording was changed to identify that it was not a requirement. This item is resolved by
 
submittal of revision 2 of the SysRS and the SysDS (attachments 7 and 8 of TVA Letter to NRC dated 10/25/10).
 
TVA Response to Follow-up NRC Request:
 
This item is corrected in the revision 3 requirements documents.
: 3. N Open  Revised response included in letter dated 12/22/10.
 
TVA response is inconsistent (e.g., WNA-DS-01667-WBT
 
Rev. 1 page 1-1, Section 1.3.1
 
implies that "SysRS Section
###" has requirements. See also SDS4.4.2.1-1 on page 4-32).
 
Is there a requirement on the shall referenced above??
 
Response is provided in letter
 
dated 10/29/10.
TVA Revised Response in TVA Letter dated 10/29/10 Enclosure 1 Item No. 1 is Acceptable NNC 11/18/10:
Revised Response is not a statement of fact. SysRS Rev. 2 (i.e., WNA-DS-01617-WBT Rev. 2) contains many "shalls" that are Open-NRC Review Due12/22/10 Discuss at 11/22 phone call.
This will be corrected in the Revision 3
 
document due to TVA
 
12/10/10 EICB RAI ML102910002 Item No. 8 TVA Letter dated 6/18/10  TVA Letter dated
 
10/29/10  Item No. 1 NNC 11/18/10: SysRS Rev. 2 contains several "Reference 8", however, Reference 8 has been deleted.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Attachment 1 contains the proprietary version of WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System- System Requirements Specification," dated November 2010. Attachment 2 contains the non-proprietary  
 
version WNA-DS-01617-WBT-NP, Revision 3, "Post Accident Monitoring System - System Requirements Specification," dated December 2010. Attachment 3 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01617-WBT-P, Revision 3, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System - System Requirements Specification" (Proprietary),
dated December 6, 2010.
dated December 6, 2010.
Attachment 4 contains the proprietary version of WNA-DS-01667-WBT-P, Revision 3, "Post Accident Monitoring System - System Design Specification," dated November 2010. Attachment 5 contains the non-proprietary version WNA-DS-01667-WBT-NP, Revision 3, "Post Accident Monitoring System - System Design Specification," dated December 2010. Attachment 6 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01667-WBT-P, Revision 3, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification" (Proprietary), dated December 6, 2010.
Attachment 4 contains the proprietary version of WNA-DS-01667-WBT-P, Revision 3, Post Accident Monitoring System - System Design Specification, dated November 2010. Attachment 5 contains the non-proprietary version WNA-DS-01667-WBT-NP, Revision 3, Post Accident Monitoring System - System Design Specification, dated December 2010. Attachment 6 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01667-WBT-P, Revision 3, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (Proprietary), dated December 6, 2010.
Attachment 7 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System,"
Attachment 7 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated November 2010. Attachment 8 contains the non-proprietary version WWNA-SD-00239-WBT-NP, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010. Attachment 9 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-SD-00239-WBT-P, Revision 3, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System (Proprietary), dated December 8, 2010.
dated November 2010. Attachment 8 contains the non-proprietary version WWNA-SD-00239-WBT-NP, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System," dated December 2010. Attachment 9 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-SD-00239-WBT-P, Revision 3, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System" (Proprietary), dated December 8, 2010.
067   7.5.2   7.5.1                 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                Date: 5/25/10                  4. N      Open                              Open-NRC Review      N/A - No question TVA Letter dated EICB (Carte) date for the "Commercial Grade Dedication Instructions for AI687,                                                                                                                                     was asked. Item 6/18/10 AI688, Upgraded PC node box and flat panels." was September The following status is from the revised WB2 Common Q                             Response included in letter        Due 12/3/10          was opened to track 28, 2010.                                                          PAMS ISG-6 Compliance Matrix submitted in response to                     dated 12/22/10.                                        comm8ittment Item 43:                                                                                                                         made by applicant.
not within numbered requirements sections, for example:  (1) Page 2-1, Section 2.3.1 -
This item is addressed in Rev. 2
See guidance statement (2) Page 2-10, top of page 1 - See guidance statement 067 7.5.2 7.5.1 EICB (Carte)
: a. AI687, AI688 - Scheduled for September 28, 2010                           of the Licensing Technical Report
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Commercial Grade Dedication Instructions for AI687, AI688, Upgraded PC node box and flat panels." was September  
: b. Upgraded PC node box and flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), these items are available for audit at the Westinghouse Rockville office.
 
: c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
28, 2010.
Responder: WEC                          Date: 5/25/10
 
The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:
: a. AI687, AI688 - Scheduled for September 28, 2010
: b. Upgraded PC node box and flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7
), these items are available for audit at the Westinghouse Rockville office.
: c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
 
To be addressed during 9/20-9/21 audit
To be addressed during 9/20-9/21 audit
: 4. N Open Response included in letter


dated 12/22/10.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                rad94FD7.docx                                                                                      Open Items to be Resolved for SER Approval
This item is addressed in Rev. 2 of the Licensing Technical Report Open-NRC Review


Due 12/3/10
===Response===
 
SE     FSAR   NRC No.                                                               Issue                                                     TVA Response(s)                           Acceptable       Status/ Current Actions           Resolution Path     RAI No. & Date   RAI Resp. Date     Comments Sec. Sec. POC                                                                                                                                                Y/N TVA Response to Follow-up NRC Request:
N/A - No question was asked. Item
WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:
 
Section 7, Commercial Grade Dedication Process, has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.
was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response to Follow-up NRC Request:
068   7.5.2   7.5.1                 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                    Date: 5/25/10            5. N      Open                              Open-NRC Review      N/A - No question TVA Letter dated EICB (Carte) date for the "Summary Report on acceptance of AI687, AI688,                                                                                                                                           was asked. Item 6/18/10 Upgraded PC node box, flat panels, and power supplies." was         The following status is from the revised WB2 Common Q                     Response included in letter        Due 12/3/10          was opened to track September 28, 2010.                                                PAMS ISG-6 Compliance Matrix submitted in response to                     dated 12/22/10.                                        comm8ittment Item 43:                                                                                                                         made by applicant.
WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:
: a. AI687, AI688 - Scheduled for September 28, 2010                           This item is addressed in Rev. 2 of the Licensing Technical
Section 7, "Commercial Grade Dedication Process," has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.
: b. Upgraded PC node box - Per Westinghouse letter WBT-                       Report D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
068 7.5.2 7.5.1 EICB (Carte)
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Summary Report on acceptance of AI687, AI688, Upgraded PC node box, flat panels, and power supplies." was September 28, 2010.
Responder: WEC                          Date: 5/25/10
 
The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:
: a. AI687, AI688 - Scheduled for September 28, 2010
: b. Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
: d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
To be addressed during 9/20-9/21 audit  
To be addressed during 9/20-9/21 audit TVA Response to Follow-up NRC Request:
 
For the commercial grade dedication process, please see the response to Request for Additional Information (RAI) item 3 in this letter, NRC Matrix Item 067.
TVA Response to Follow-up NRC Request:
For the commercial grade dedication process, please see  
 
the response to Request for Additional Information (RAI) item 3 in this letter, NRC Matrix Item 067.
The component level EQ/Seismic summary reports for the hardware listed above are available for NRC review/audit as described below:
The component level EQ/Seismic summary reports for the hardware listed above are available for NRC review/audit as described below:
(1) AI687 and AI688, the following documents were submitted in TVA Letter to NRC dated October 26, 2010, "Watts Bar Nuclear Plant (WBN) Unit 2 -  
(1) AI687 and AI688, the following documents were submitted in TVA Letter to NRC dated October 26, 2010, Watts Bar Nuclear Plant (WBN) Unit 2 -
Instrumentation and Controls Staff Information Requests, (Reference 5):
: a. EQ-EV-62-WBT, Revision 0, Common Q PAMS Comparison of Tested Conditions for the AI687 and AI688 Common Q Modules and Supporting Components to the Watts Bar Unit 2 (WBT)
Requirements, dated September 10, 2010
: b. EQLR-171, Revision 0, Environmental and Seismic Test Report, Analog Input (AI)687 &
AI688 Modules for use in Common Q PAMS, dated September 10, 2010


Instrumentation and Controls Staff Information Requests," (Reference 5):
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                   rad94FD7.docx                                                                                    Open Items to be Resolved for SER Approval
: a. EQ-EV-62-WBT, Revision 0, "Common Q PAMS Comparison of Tested Conditions for the AI687


and AI688 Common Q Modules  and Supporting Components to the Watts Bar Unit 2 (WBT) Requirements," dated September 10, 2010
===Response===
: b. EQLR-171, Revision 0, "Environmental and Seismic Test Report, Analog Input (AI)687 & AI688 Modules for use in Common Q PAMS,"
SE    FSAR    NRC No.                                                                Issue                                                      TVA Response(s)                          Acceptable      Status/ Current Actions          Resolution Path    RAI No. & Date      RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                                  Y/N
dated September 10, 2010
: c. CN-EQT-10-44, Revision 0, Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS), dated September 28, 2010 (2) Upgraded PC Node Box - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office, (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:
: 5. N Open Response included in letter dated 12/22/10.  
: a. CDI-3722, Revision 7, Next Generation PC Node Box Commercial Dedication Instruction
: b. LTR-EQ-10-50 PC Node Box/Flat Panel Display System Components Qualification Summary (3) Flat Panel Displays - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office, (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:
: a. CDI-3803, Revision 8, Next Generation Flat Panel Display (FPD) Commercial Dedication Instruction
: b. LTR-EQ-10-50 PC Node Box/Flat Panel Display System Components Qualification Summary (4) Power supplies - As stated in Westinghouse letter WBT-D-2035 dated June 11, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office (Reference 7), the following documents are available for NRC audit at the Westinghouse Rockville office:
: a. CDI- 4057, Revision 4, Commercial Dedication Instruction
: b. EQ-TP-1 05-GEN, Revision 0, Electromagnetic Compatibility Test Plan and Procedure for Quint Power Supplies and Safety System Line Filter
: c. Breakers, EQ-TP-114-GEN, Revision 0, Seismic Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, Line Filter Assemblies, and South Texas Units 3 & 4 Circuit
: d. EQ-TP-117-GEN, Revision 0, Environmental Qualification Test Procedure For Common Q Powe Supplies, Quint Power Supplies, and Line Filter Assemblies 070    7.5.2  7.5.1                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                  Date: 5/25/10                6. N       Open                              Open-NRC Review      N/A - No question    TVA Letter dated NNC 11/23/10: The dues date in this EICB (Carte) date for the "Concept and Definition Phase V&V Report" was                                                                                                                                            was asked. Item      6/18/10          open item does not agree with the due March 31, 2010.                                                    Per Westinghouse letter WBT-D-1961, this document is                        Final Response included in       Due 12/17/10        was opened to track                    dated in Open Item No. 71.
available for audit at the Westinghouse Rockville office.                  letter dated 12/3/10                                   comm8ittment          TVA Letter dated made by applicant. 8/20/10 WNA-VR- 00283-WBT, Rev 0 was submitted on TVA letter                        Partial Response is included in to the NRC dated August 20, 2010.                                          letter dated 10/5/10.                                                        TVA Letter dated 10/5/10 The submitted V&V did not address the Requirements                          Regulations require that the Traceability Matrix and did not summarize anomalies. At the                NRC review be based on September 15th public meeting, Westinghouse agreed to                      docketed material. Awaiting for include the Concept and Definitions Phase Requirements                      document to be docketed by


This item is addressed in Rev. 2 of the Licensing Technical Report Open-NRC Review
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                  rad94FD7.docx                                                                                    Open Items to be Resolved for SER Approval


Due 12/3/10 N/A - No question was asked. Item
===Response===
 
SE     FSAR   NRC No.                                                               Issue                                                     TVA Response(s)                           Acceptable       Status/ Current Actions         Resolution Path     RAI No. & Date   RAI Resp. Date                 Comments Sec. Sec. POC                                                                                                                                                 Y/N Traceability Matrix (RTM) in the next IV&V report along with                 TVA.
was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments
partial Design Phase updates to the RTM.
: c. CN-EQT-10-44, Revision 0, "Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS)," dated September 28, 2010  (2) Upgraded PC Node Box - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 "NRC Access to Common Q Documents at the Westinghouse Rockville Office," (Reference 6), the following
NNC 8/25/10: Requirements TVA Revised Response:                                                       Phase SVVR provided by TVA TVA submitted WNA-VR- 00283-WBT, Rev 0 to NRC in                             letter dated 8/20/10.
 
letter dated August 20, 2010 (Reference 6).                                                               NNC 11/23/10: The The next Independent Verification and Validation (IV&V)                     requirements Phase SVVR report will include the Design                                               provided by TVA on 8/20/10, is Phase Requirements Traceability Matrix. The Design Phase                     not complete. This report IV&V Report will be submitted                                               should address the RTM, which to NRC by February 11, 2011.                                                 it did not. TVA/WEC agreed to address the concept phase RTM Attachment 14contains the Westinghouse document                             in the next revision.
documents are available for NRC audit at the Westinghouse Rockville office:
Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT, Revision 1, dated November 2010. Attachment 15 contains the Westinghouse Application for Withholding for the WNA-VR-00283-WBT, Revision 1, Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, dated November 8, 2010.
: a. CDI-3722, Revision 7, "Next Generation PC Node Box Commercial Dedication Instruction"
NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the Licensing Technical Report Revision 2 (Attachment
: b. LTR-EQ-10-50 "PC Node Box/Flat Panel Display System Components Qualification Summary" (3) Flat Panel Displays - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 "NRC Access to Common Q Documents at the Westinghouse Rockville Office," (Reference 6), the following documents are
: 19) for the current contract compliance matrix.
 
071   7.5.2   7.5.1                 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC            Date: 5/25/10                      7. N      Open                            Open-NRC Review      N/A - No question N/A              NNC 11/23/10: The dues date in this EICB (Carte) date for Revision 2 of the I V&V Report" covering the Design and                                                                                                                                     was asked. Item                    open item does not agree with the due Implementation phases was July 30, 2010.                           Attachment 16 contains the Westinghouse document IV&V                     Response included in letter      Due 12/10/10        was opened to track                dated in Open Item No. 70.
available for NRC audit at the Westinghouse Rockville office: a. CDI-3803, Revision 8, "Next Generation Flat Panel Display (FPD) Commercial Dedication Instruction"
Summary Report for the Post Accident Monitoring System,                   dated 12/3/10                                        commitment made WNA-VR-00283-WBT, Revision 2, dated November 2010.                                                                               by applicant.
: b. LTR-EQ-10-50 "PC Node Box/Flat Panel Display System Components Qualification Summary" (4) Power supplies - As stated in Westinghouse letter WBT-D-2035 dated June 11, 2010 "NRC Access to Common Q Documents at the Westinghouse Rockville Office" (Reference 7), the following documents are available for NRC audit at the Westinghouse Rockville office:
Attachment 17 contains the Westinghouse Application for                     Awaiting for document to be withholding for the IV&V Summary Report for the Post                       docketed by TVA.
: a. CDI- 4057, Revision 4, "Commercial Dedication Instruction"
Accident Monitoring System, WNA-VR-00283-WBT, Revision 2, dated November 2010.
: b. EQ-TP-1 05-GEN, Revision 0, "Electromagnetic Compatibility Test Plan and Procedure for Quint Power Supplies and Safety System Line Filter"
: c. Breakers," EQ-TP-114-GEN, Revision 0, "Seismic Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, Line Filter Assemblies, and South Texas Units 3 & 4 Circuit"
: d. EQ-TP-117-GEN, Revision 0, "Environmental Qualification Test Procedure For Common Q Pow eSupplies, Quint Power Supplies, and Line Filter Assemblies" 070 7.5.2 7.5.1 EICB (Carte)
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Concept and Definition Phase V&V Report" was March 31, 2010.
Responder: WEC                      Date: 5/25/10 Per Westinghouse letter WBT-D-1961, this document is available for audit at the Westinghouse Rockville office.
 
WNA-VR- 00283-WBT, Rev 0 was submitted on TVA letter to the NRC dated August 20, 2010.
 
The submitted V&V did not address the Requirements Traceability Matrix and did not summarize anomalies. At the September 15 th public meeting, Westinghouse agreed to include the Concept and Definitions Phase Requirements
: 6. N Open  Final Response included in letter dated 12/3/10
 
Partial Response is included in letter dated 10/5/10.
 
Regulations require that the NRC review be based on docketed material. Awaiting for document to be docketed by Open-NRC Review Due 12/17/10 N/A - No question was asked. Item was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10  TVA Letter dated
 
8/20/10 TVA Letter dated 10/5/10 NNC 11/23/10:  The dues date in this open item does not agree with the due dated in Open Item No. 71.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Traceability Matrix (RTM) in the next IV&V report along with partial Design Phase updates to the RTM.
TVA Revised Response:
TVA submitted WNA-VR- 00283-WBT, Rev 0 to NRC in  
 
letter dated August 20, 2010 (Reference 6). The next Independent Verification and Validation (IV&V) report will include the Design  
 
Phase Requirements Traceability Matrix. The Design Phase IV&V Report will be submitted to NRC by February 11, 2011.  
 
Attachment 14contains the Westinghouse document "Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT, Revision 1, dated November 2010. Attachment 15 contains the Westinghouse Application for Withholding for the WNA-VR-00283-WBT, Revision 1, "Nuclear Automation Watts Bar  
 
Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System,"
dated November 8, 2010.
NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the Licensing Technical Report Revision 2 (Attachment 19) for the current contract compliance matrix.
TVA. NNC 8/25/10:
Requirements Phase SVVR provided by TVA
 
letter dated 8/20/10.
 
NNC 11/23/10:  The requirements Phase SVVR
 
provided by TVA on 8/20/10, is
 
not complete. This report should address the RTM, which it did not. TVA/WEC agreed to address the concept phase RTM in the next revision.
071 7.5.2 7.5.1 EICB (Carte)
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for Revision 2 of the I V&V Report" covering the Design and Implementation phases was July 30, 2010. Responder: WEC              Date: 5/25/10 Attachment 16 contains the Westinghouse document "IV&V Summary Report for the Post Accident Monitoring System,"
WNA-VR-00283-WBT, Revision 2, dated November 2010.
 
Attachment 17 contains the Westinghouse Application for withholding for the "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT, Revision 2, dated November 2010.
NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the Licensing Technical Report Revision 2 (Attachment
NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the Licensing Technical Report Revision 2 (Attachment
: 19) for the current contract compliance matrix.
: 19) for the current contract compliance matrix.
: 7. N Open   Response included in letter dated 12/3/10  
073    7.5.2   7.5.1                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                Date: 5/25/10                   8. N      Open                            Open-NRC Review     N/A - No question N/A EICB (Carte) date for Revision 3 of the IV&V Report covering the Integration                                                                                                                                       was asked. Item phase was October 29, 2010.                                         WNA-VR-00283-WBT, Revision 3, IV&V Summary Report                         Response included in letter      Due 12/22/10        was opened to track for the Post Accident Monitoring System, covers the                       dated 12/22/10                                        commitment made Integration phase. Attachment 10 contains the proprietary                                                                         by applicant.
 
version of IV&V Summary Report for the Post Accident                       Awaiting for document to be Monitoring System, WNA-VR-00283-WBT-P, Revision 3,                         docketed by TVA.
Awaiting for document to be docketed by TVA.
dated December 2010. Attachment 11 contains the non-proprietary version IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-NP, Revision 3, dated December 2010. Attachment 12 contains the Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283-WBT, Revision 3, Nuclear Automation Watts Bar 2 NSSS Completion
Open-NRC Review Due 12/10/10 N/A - No question was asked. Item was opened to track commitment made by applicant.
N/A NNC 11/23/10:  The dues date in this open item does not agree with the due dated in Open Item No. 70.
073 7.5.2 7.5.1 EICB (Carte)
By letter dated March 12, 2010 TVA stated that the tar g et submittal date for Revision 3 of the IV&V Report covering the Integration  
 
phase was October 29, 2010.
Responder: WEC                    Date: 5/25/10
 
WNA-VR-00283-WBT, Revision 3, "IV&V Summary Report for the Post Accident Monitoring System," covers the Integration phase. Attachment 10 contains the proprietary version of "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT-P, Revision 3, dated December 2010. Attachment 11 contains the non-proprietary version "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT-NP, Revision 3, dated December 2010. Attachment 12 contains the Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283-WBT, Revision 3, "Nuclear Automation Watts Bar 2 NSSS Completion
: 8. N Open Response included in letter
 
dated 12/22/10 Awaiting for document to be
 
docketed by TVA.
Open-NRC Review
 
Due 12/22/10 N/A - No question was asked. Item
 
was opened to track commitment made by applicant.
N/A Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Program I&C Projects, IV &V Summary Report for the Post Accident Monitoring System" (Proprietary), dated December 10, 2010.
075 7.5.2 7.5.1 EICB (Carte)
By letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Watts Bar 2 PAMS Specific FAT Procedure" was
 
September 30, 2010. Responder: WEC                  Date: 5/25/10
 
Attachment 12 contains the Westinghouse document "Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test," WNA-TP-02988-WBT, Revision 0, dated November 2010. 
 
Attachment 13 contains the Westinghouse Application for Withholding for WNA-TP-02988-WBT, Revision 0,"Nuclear Automation Watts Bar Unit 2 NSSS Completion Pro g ram I&C Projects, Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test," dated November 2010. 9. N Open Response included in letter
 
dated 12/3/10 Awaiting for document to be
 
docketed by TVA.
Open-NRC Review
 
Due 12/3/10 N/A - No question was asked. Item
 
was opened to track commitment made by applicant.
N/A  082 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.
 
0, Dated April 2010), in Section 2.3, lists hardware/software changes to the Common Q PAMS previously reviewed by the NRC. However the Common Q ISG-6 Compliance Matrix does not contain activities that address qualification of all changes specifically:
2.c - CI527 AF100 Peripheral Component Interconnect (PCI)
 
interface card
: 3. - Common Q TC514 AF100 Fiber Optic Modems (Evolutionary Product Maintenance/Improvements) 4.a - PM646A Processor Module 4.b - CI631 AF100 Communication Interface Module 4.e - DO620 Digital Output Card Please provide sufficient detail regarding the changes for the NRC to independently evaluate the acceptability of the changes.
Responder: WEC                                Date: 6/18/10
 
These components can be found in the Summary Qualification Report Of Hardware Testing For Common Q Applications, 00000-ICE-37764, Rev 3 and TWICE Qualification Status Report, WNAQR-00011-SSP  Per Westinghouse letter WBT-D-2024, (Reference __) dated June 9, 2010, these documents are available for audit at the Westinghouse Rockville Office.
 
TVA provided information by letter dated July 30, 2010 (ML102160349) - See Enclosure 1 Item No. 7.
Revision 1 of the Licensing Technical Report provides additional detail on the platform specific to WBN2 and
 
references to the evaluation documentation.
TVA Response to Follow-up NRC Request:
 
Please see the response to Request for Additional Information (RAI) item 3 in letter dated 12/22/10, NRC Matrix Item 067.
: 10. N Open Revised response included in
 
letter dated 12/22/10 Regulations require that the NRC review be based on
 
docketed material. Awaiting for document to be docketed by TVA.
 
NNC 8/9/10:
per telephone conversation on 8/5/10, it is not clear how Westinghouse Commercial Grade Dedication
 
Plans and Reports for Digital I&C. Westinghouse agree to present to the NRC in a public
 
meeting on August 17, 2010, and explanation of how their system addresses regulatory criteria for both commercial grade dedication and equipment qualification.
NNC 8/25/10: In the August 17, 2010 public meeting Westinghouse stated that the CDI were the plans. The NRC requested that the plans and
 
associated reports be docketed.
NNC 11/18/10:
During the September 20-21, 2010 audit, TVA agreed to put a description
 
of the commercial grade
 
dedication program and implementation in Rev. 2 of the CQ PAMS LTR.
Open-NRC Review
 
Due 12/3/10
 
Commercial Grade Dedication to be
 
addressed in LTR Rev.
 
2,  EICB RAI ML102910002
 
Item No. 10 TVA Letter dated 7/30/10 NNC 11/18/10: See also Open Item No.
41, Item No. 3.
085 7.5.2 7.5.1 CB (C ar t 5/6/2010  Responder: WEC
: 11. N Open  Open-NRC Review EICB RAI ML102910002
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Please provide a detailed description of the PAMS MTP data link to the plant computer. This description should identify all equipment (model & version) and describe the functions that each piece of equipment performs. This description should be of sufficient detail for the NRC to independently evaluate the statements made in WNA-LI-00058-WBT Rev. 0, Section 5.3. Is the WEC ISG4 evaluation inadequate?
Operation of the MTP as a barrier device. MTP Fails as a barrier device. Describe what prevents a MTP failure from
 
propagating to the AC160? 
 
Node loss on the bus?  Bus loss? 
 
Revise the ISG4 section of the Licensing Technical Report (Rev. 2) to provide a more detailed description of the MTP as a barrier device. 
 
TVA Response to Follow-up NRC Request:
WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA letter to NRC dated December 3, 2010 (Reference 1), contains the following changes to address the NRC requests:
Section 2.2, "System Description" page 2-3 provides a description of the MTP Fiber-Optic (FO) data link to the plant computer. Section 2.2.1.4, "Hardware" has been expanded to include a table detailing all hardware changes that have occurred since the initial submittal. Section 2.2.2, "Software" has been expanded to include a table detailing all software changes that have occurred since the initial submittal.
Revised response included in letter dated 12/22/10 A response will be provided by


10/31/10 NNC 8/11/10:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                  rad94FD7.docx                                                                                        Open Items to be Resolved for SER Approval
Design information should be available


now. By letter dated July 30, 2010 (ML102160349) TVA stated that the MTP was connected to a Red Hat Linux
===Response===
SE    FSAR    NRC No.                                                                 Issue                                                      TVA Response(s)                          Acceptable      Status/ Current Actions            Resolution Path    RAI No. & Date    RAI Resp. Date              Comments Sec. Sec. POC                                                                                                                                                  Y/N Program I&C Projects, IV &V Summary Report for the Post Accident Monitoring System (Proprietary), dated December 10, 2010.
075    7.5.2  7.5.1                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC              Date: 5/25/10                    9. N      Open                                Open-NRC Review      N/A - No question N/A EICB (Carte) date for the "Watts Bar 2 PAMS Specific FAT Procedure" was                                                                                                                                              was asked. Item September 30, 2010.                                                Attachment 12 contains the Westinghouse document                            Response included in letter        Due 12/3/10          was opened to track Nuclear Automation Watts Bar Unit 2 NSSS Completion                        dated 12/3/10                                            commitment made Program I&C Projects, Post Accident Monitoring System                                                                                by applicant.
Channel Integration Test/Factory Acceptance Test, WNA-                    Awaiting for document to be TP-02988-WBT, Revision 0, dated November 2010.                              docketed by TVA.
Attachment 13 contains the Westinghouse Application for Withholding for WNA-TP-02988-WBT, Revision 0,Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test, dated November 2010.
082    7.5.2  7.5.1                  5/6/2010                                                          Responder: WEC                        Date: 6/18/10            10. N        Open                                Open-NRC Review      EICB RAI          TVA Letter dated NNC 11/18/10: See also Open Item No.
EICB (Carte)
ML102910002        7/30/10          41, Item No. 3.
The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.        These components can be found in the Summary                                Revised response included in        Due 12/3/10          Item No. 10 0, Dated April 2010), in Section 2.3, lists hardware/software      Qualification Report Of Hardware Testing For Common Q                        letter dated 12/22/10 changes to the Common Q PAMS previously reviewed by the            Applications, 00000-ICE-37764, Rev 3 and                                                                    Commercial Grade NRC. However the Common Q ISG-6 Compliance Matrix does not        TWICE Qualification Status Report, WNAQR-00011-SSP                          Regulations require that the    Dedication to be contain activities that address qualification of all changes      Per Westinghouse letter WBT-D-2024, (Reference __) dated                    NRC review be based on          addressed in LTR Rev.
specifically:                                                      June 9, 2010, these documents are available for audit at the                docketed material. Awaiting for 2, Westinghouse Rockville Office.                                              document to be docketed by 2.c - CI527 AF100 Peripheral Component Interconnect (PCI)                                                                                      TVA.
interface card                                                    TVA provided information by letter dated July 30, 2010
: 3. - Common Q TC514 AF100 Fiber Optic Modems (Evolutionary        (ML102160349) - See Enclosure 1 Item No. 7.                                  NNC 8/9/10: per telephone Product Maintenance/Improvements)                                                                                                              conversation on 8/5/10, it is not 4.a - PM646A Processor Module                                      Revision 1 of the Licensing Technical Report provides                        clear how Westinghouse 4.b - CI631 AF100 Communication Interface Module                  additional detail on the platform specific to WBN2 and                      Commercial Grade Dedication 4.e - DO620 Digital Output Card                                    references to the evaluation documentation.                                  Plans and Reports for Digital I&C. Westinghouse agree to Please provide sufficient detail regarding the changes for the NRC TVA Response to Follow-up NRC Request:                                      present to the NRC in a public to independently evaluate the acceptability of the changes.                                                                                    meeting on August 17, 2010, Please see the response to Request for Additional                            and explanation of how their Information (RAI) item 3 in letter dated 12/22/10, NRC Matrix                system addresses regulatory Item 067.                                                                    criteria for both commercial grade dedication and equipment qualification.
NNC 8/25/10: In the August 17, 2010 public meeting Westinghouse stated that the CDI were the plans. The NRC requested that the plans and associated reports be docketed.
NNC 11/18/10: During the September 20-21, 2010 audit, TVA agreed to put a description of the commercial grade dedication program and implementation in Rev. 2 of the CQ PAMS LTR.
085    7.5.2  7.5.1  CB              5/6/2010                                                          Responder: WEC                                                  11. N        Open                                Open-NRC Review      EICB RAI (C
art                                                                                                                                                                                                                      ML102910002


Server (see Enclosure 1, Item No. 14 part b.). It is presumed that this server is not safety-related. IEEE 603-1991 Clause
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                 rad94FD7.docx                                                                                            Open Items to be Resolved for SER Approval


5.6.3(1) states, "Isolation devices used to affect a safety system boundary shall be classified as part of the safety system."
===Response===
Please describe how the MTP serves as the isolation device.
SE    FSAR    NRC No.                                                             Issue                                                      TVA Response(s)                             Acceptable      Status/ Current Actions            Resolution Path        RAI No. & Date    RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                                    Y/N Please provide a detailed description of the PAMS MTP data link    Is the WEC ISG4 evaluation inadequate?                                        Revised response included in      Due 12/3/10               Item No. 13 to the plant computer. This description should identify all                                                                                      letter dated 12/22/10 equipment (model & version) and describe the functions that each  Operation of the MTP as a barrier device. MTP Fails as a                                                          Hardware is in Rev. 1 piece of equipment performs. This description should be of        barrier device. Describe what prevents a MTP failure from                      A response will be provided by    of the Licensing sufficient detail for the NRC to independently evaluate the        propagating to the AC160?                                                      10/31/10                          Technical Report due statements made in WNA-LI-00058-WBT Rev. 0, Section 5.3.                                                                                                                            10/22.
Due 12/3/10 Hardware is in Rev. 1 of the Licensing  
Node loss on the bus? Bus loss?                                                NNC 8/11/10: Design information should be available    NNC 8/25/10:
 
Revise the ISG4 section of the Licensing Technical Report                      now. By letter dated July 30,      Disagree with path (Rev. 2) to provide a more detailed description of the MTP as                  2010 (ML102160349) TVA            forward input by TVA a barrier device.                                                              stated that the MTP was            above. An explanation connected to a Red Hat Linux      is about the design is TVA Response to Follow-up NRC Request:                                        Server (see Enclosure 1, Item      needed.
Technical Report due  
No. 14 part b.). It is presumed WNA-LI-00058-WBT-P, Revision 2, Post-Accident                                that this server is not safety-    FAT test procedure to Monitoring System (PAMS) Licensing Technical Report                          related. IEEE 603-1991 Clause      include data storm submitted in TVA letter to NRC dated December 3, 2010                          5.6.3(1) states, "Isolation        testing of the MTP (Reference 1), contains the following changes to address the                  devices used to affect a safety    interface NRC requests:                                                                  system boundary shall be classified as part of the safety  NNC 11/18/10: WEC Section 2.2, System Description page 2-3 provides a                          system."                          response states that description of the MTP Fiber-Optic (FO) data link to the plant                                                    CQ PAMS LTR Rev. 2 computer. Section 2.2.1.4, Hardware has been expanded                        Please describe how the MTP        will contain relevant to include a table detailing all hardware changes that have                    serves as the isolation device. information.
 
occurred since the initial submittal. Section 2.2.2, Software has been expanded to include a table detailing all software changes that have occurred since the initial submittal.
10/22. NNC 8/25/10:
101                                 4/12/2010                                                          Responder: Slifer                                                12. Y        Open                              Open-NRC Review          N/A                                  TVA is working with the vendor to meet DORL (Poole) the 6/30 date, however there is the The non-proprietary versions of the following RM-1000,             The documents, and affidavits for withholding for the listed                  Documents provided in letter      Due 10/14/10                                                  potential this will slip to 7/14.
Disagree with path forward input by TVA above. An explanation is about the design is  
Containment High Range Post Accident Radiation Monitor             documents were submitted to the NRC on TVA letter to the                      dated 07/15/10 documents will be provided by June 30, 2010.                      NRC dated July 15, 2010.                                                                                          Confirm receipt.
 
needed.
FAT test procedure to include data storm  
 
testing of the MTP  
 
interface NNC 11/18/10:
WEC response states that CQ PAMS LTR Rev. 2 will contain relevant information.
Item No. 13 101   DORL (Poole) 4/12/2010
 
The non-proprietary versions of the following RM-1000, Containment High Range Post Accident Radiation Monitor documents will be provided by June 30, 2010.
: 1. V&V Report 04508006A
: 1. V&V Report 04508006A
: 2. System Description 04508100-1TM
: 2. System Description 04508100-1TM
: 3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
: 3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
: 4. Functional Testing Report 04507007-1TR Responder: Slifer
: 4. Functional Testing Report 04507007-1TR 138                                  By letter dated February 3, 2010, Westinghouse informed TVA that Responder: WEC                                                      13. N        Open                              Open-NRC Review          ML101650255, Item EICB (Carte) certain PAMS documentation has been completed.                                                                                                                                                                No. 2 This item is used to track all Commercial Grade                                Revised response included in      Due 12/3/10 (a) The draft ISG6 states that a commercial grade dedication plan Dedication issues.                                                              letter dated 12/22/10 should be provided with an application for a Tier 2 review.                                                                                                                          To be addressed by
 
: a. WNA-LI-00058-WT-P, Revision 2, Post-Accident                                TVA agreed to include a            Rev. 2 of the Licensing By letter dated February 5, 2010, TVA stated that the commercial      Monitoring System (PAMS) Licensing Technical Report                        description of the generic        Technical Report.
The documents, and affidavits for withholding for the listed documents were submitted to the NRC on TVA letter to the NRC dated July 15, 2010.
grade dedication plan was included in the Common Q Topical            submitted in TVA Letter to NRC dated December 3,                            Westinghouse hardware Report Section 11, Commercial Grade Dedication Program.            2010, (Reference 1) contains the following changes to                      commercial grade dedication Section 11 includes a description of the Common Q Commercial          address the NRC request:                                                    process in the PAMS licensing Grade Dedication Program, and states: A detailed review plan is                                                                                  technical report. (see developed for each Common Q hardware or software component            Section 7, Commercial Grade Dedication Process has                        ML102920031 Item No 1) that requires commercial grade dedication.                          been revised to describe the general commercial grade dedication process for both hardware and software and                      TVA agreed to include (in the Please provide the commercial grade dedication plans for each        uses a description of the AI687 dedication process as                      PAMS licensing technical report)
: 12. Y Open Documents provided in letter
Common Q hardware or software component that has not been            an example of how the process is applied.                                  an evaluation of WBN2 critical previously reviewed and approved by the NRC.                                                                                                     characteristics for commercial As listed in Table 6-3. Westinghouse Watts Bar 2                          Westinghouse hardware (b) The draft ISG6 states that a commercial grade dedication          Common Q PAMS Documents at Westinghouse                                    components against the generic report should be provided within 12 months of requested approval      Rockville Office, the following commercial grade                            critical characteristics. (see for a Tier 2 review.                                                  dedication documents are available for NRC audit at the                    ML102920031 Item No 2)


dated 07/15/10 Open-NRC Review
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                      rad94FD7.docx                                                                                        Open Items to be Resolved for SER Approval


Due 10/14/10  
===Response===
SE    FSAR    NRC No.                                                                Issue                                                        TVA Response(s)                              Acceptable      Status/ Current Actions          Resolution Path    RAI No. & Date    RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                                        Y/N Westinghouse Rockville office: (list included in letter)
(i) Please provide 00000-ICE-37722 Rev. 0, Commercial Grade                                                                                          TVA agreed to include a Dedication Report for the QNX Operating System for Common Q            b. It is TVAs understanding that the submittal of the                        description of the generic Applications.                                                              documents listed in (b.i) and (b.ii) is no longer required.                Westinghouse software Rather, it was agreed, that the inclusion of a description                commercial grade dedication (ii) Please provide WNA-CD-00018-GEN Rev. 3, Commercial                    of the commercial grade dedication process in revision                    process in the PAMS licensing Dedication Report for QNX 4.25G for Common Q Applications.                2 of the Post-Accident Monitoring System (PAMS)                            technical report. (see Licensing Technical Report, WNA-LI-00058-WT-P,                            ML102920031 Item No 3) would be sufficient to address this request.
TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4) 140                                  The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1)            Responder: Clark                                                  14. N        Open                              Open-NRC Review      ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements EICB (Carte) states: The PAMS shall be capable of operation during normal                                                                                                                                                  No. 4            10/29/10        Specification and abnormal environments and plant operating modes. The              WBN Unit 2 FSAR Amendment 100 Section 7.5.1.8, Post                            Revised response included in      Due 12/3/10                           Enclosure 1 Item rational for this requirement is that it is necessary to meet          Accident Monitoring System (PAMS) specifies the Reg.                          letter dated 12/22/10                                                    No. 10          TVA docketed WNA-DS-01617-WBT Regulatory Guide (RG) 1.97.                                            Guide 1.97 variables implemented in the Common Q based                                                            TVA to docket PAMS                                      Rev. 1, RRAS Watts Bar 2 NSSS WBN Unit 2 PAMS                                                                NNC 11/3/10: The origin of the Licensing Technical                                        Completion Program I&C Projects Post What document specifies which RG 1.97 variables are                                                                                                    requirements in the SysRS are Report Rev. 2.                                              Accident Monitoring System- System implemented in the Common Q based WBN2 PAMS?                          TVA Response to Follow-up NRC Request:                                          not clearly document. Rev. 1 of                                                            Requirements Specification, dated the Common Q PAMS Licensing                                                                December 2009.
WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring                        Technical Report contains an System (PAMS) Licensing Technical Report was submitted                        open item that will be addressed in TVA Letter to NRC, dated December 3, 2010 (Reference                        in Rev. 2; this open item is to 1). Revision 2 contains the following change to address this                    include TVAs enhanced request:                                                                        contract compliance matrix. It is expected that this matrix will Section 11, TVA Contract Compliance Matrix has been                          address this open item.
added. Specifically the items of concern are addressed by Requirements 7 through 19 (pages 11-1 and 11-2).
142                                  The applicable regulatory guidance for reviewing the WBN2 PAMS        Responder: WEC                                                    15. N        Open                              Open-NRC Review      ML101650255, Item                    WBN2 PAMS System Requirements EICB (Carte)
SysRS would be IEEE 830 as endorsed by Regulatory Guide                                                                                                                                                        No. 6                                Specification 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities -          This item is used to track all traceability issues with the                    Response included in letter        Due 12/22/10 Software Requirements Specifications. IEEE 830-1994 Section          Software Requirements Specification (SRS).                                      dated 12/22/10                                                                              TVA docketed WNA-DS-01617-WBT 4.3.8, Traceable, states: A [requirements specification] is                                                                                                                          To be addressed by                                          Rev. 1, RRAS Watts Bar 2 NSSS traceable of the origin of each of its requirements is clear        1. How did TVA ensure the traceability of each                                TVA/Westinghouse agreed to Revision of the RTM,                                              Completion Program I&C Projects Post requirement in the WBN2 PAMS SysRS.                                        include the V&V evaluation of SRS, SysRS, and                                                Accident Monitoring System- System
: 1. How did TVA ensure the traceability of each requirement in                                                                                        their reusable software element SysDS.                                                      Requirements Specification, dated the WBN2 PAMS SysRS.                                                  TVA Response:                                                              development process in the                                                                  December 2009.
V&V design phase summary
: 2. Explain the source(s) of the requirements present in the Post          Traceability of requirements for the WBN Unit 2                            report. This evaluation would Accident Monitoring Systems Software Requirements                    Common Q PAMS is ensured by:                                              include an evaluation against Specification. To clarify, many documents have                                                                                                    the development process requirements that are incorporated by reference into the              a. Preparation of the TVA Contract Compliance Matrix                    requirements. This evaluation SRS, but what served to direct the author to include those                  contained in WNA-LI-00058-WBT-P, Revision 2,                          would also include an evaluation various documents in the SRS or, if the requirement is based                Post-Accident Monitoring System (PAMS)                              of how the WBN2 specific on the System Requirements Specification, what directed the                Licensing Technical Report submitted in TVA                          requirements were addressed author to include the requirement there?                                    Letter to NRC dated December 3, 2010 (Reference                      by the reusable software 1).                                                                  elements. (see ML102920031
: 3. Clarify whether the unnumbered paragraphs in the Post                                                                                            Item No 5)
Accident Monitoring Systems Software Requirements                    b. Engineering review/comment/status of each Specification, such as in the section headings, or are all such            revision of:
sections simply considered to be informative?


Confirm receipt. N/A  TVA is working with the vendor to meet the 6/30 date, however there is the potential this will slip to 7/14.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                       rad94FD7.docx                                                               Open Items to be Resolved for SER Approval
138  EICB (Carte) By letter dated February 3, 2010, Westinghouse informed TVA that certain PAMS documentation has been completed.
 
(a) The draft ISG6 states that a commercial grade dedication plan should be provided with an application for a Tier 2 review.
 
By letter dated February 5, 2010, TVA stated that the commercial grade dedication plan was included in the Common Q Topical Report Section 11, "Commercial Grade Dedication Program."
Section 11 includes a description of the Common Q Commercial Grade Dedication Program, and states: "A detailed review plan is developed for each Common Q hardware or software component that requires commercial grade dedication."
 
Please provide the commercial grade dedication plans for each Common Q hardware or software component that has not been previously reviewed and approved by the NRC.
 
(b) The draft ISG6 states that a commercial grade dedication report should be provided within 12 months of requested approval for a Tier 2 review.
Responder: WEC
 
This item is used to track all Commercial Grade Dedication issues.
: a. WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC request:
Section 7, "Commercial Grade Dedication Process" has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.
As listed in Table 6-3. "Westinghouse Watts Bar 2 Common Q PAMS Documents at Westinghouse Rockville Office, the following commercial grade dedication documents are available for NRC audit at the
: 13. N Open Revised response included in letter dated 12/22/10
 
TVA agreed to include a description of the generic Westinghouse hardware commercial grade dedication process in the PAMS licensing
 
technical report.  (see ML102920031 Item No 1)
 
TVA agreed to include (in the PAMS licensin g technical report) an evaluation of WBN2 critical characteristics for commercial Westinghouse hardware components against the generic critical characteristics. (see ML102920031 Item No 2)
Open-NRC Review
 
Due 12/3/10 To be addressed by
 
Rev. 2 of the Licensing
 
Technical Report.
ML101650255, Item No. 2 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (i) Please provide 00000-ICE-37722 Rev. 0, "Commercial Grade Dedication Report for the QNX Operating System for Common Q Applications."
 
(ii) Please provide WNA-CD-00018-GEN Rev. 3, "Commercial Dedication Report for QNX 4.25G for Common Q Applications." Westinghouse Rockville office: (list included in letter)
: b. It is TVA's understanding that the submittal of the documents listed in (b.i) and (b.ii) is no longer required.
Rather, it was agreed, that the inclusion of a description of the commercial grade dedication process in revision 2 of the Post-Accident Monitoring System (PAMS)
Licensing Technical Report, WNA-LI-00058-WT-P, would be sufficient to address this request.
TVA agreed to include a description of the generic Westinghouse software commercial grade dedication process in the PAMS licensing technical report.  (see ML102920031 Item No 3)
 
TVA agreed to include (in the PAMS licensin g technical report) an evaluation of WBN2 critical characteristics for commercial
 
software components against the generic critical characteristics. (see
 
ML102920031 Item No 4) 140  EICB (Carte) The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1) states: "The PAMS shall be capable of operation during normal and abnormal environments and plant operating modes."  The rational for this requirement is that it is necessary to meet Regulatory Guide (RG) 1.97. 
 
What document specifies which RG 1.97 variables are implemented in the Common Q based WBN2 PAMS?
Responder: Clark WBN Unit 2 FSAR Amendment 100 Section 7.5.1.8, "Post Accident Monitoring System (PAMS)" specifies the Reg.
Guide 1.97 variables implemented in the Common Q  based
 
WBN Unit 2 PAMS TVA Response to Follow-up NRC Request:
WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" was submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1). Revision 2 contains the following change to address this request:  Section 11, "TVA Contract Compliance Matrix" has been added. Specifically the items of concern are addressed by Requirements 7 through 19 (pages 11-1 and 11-2).
: 14. N Open  Revised response included in letter dated 12/22/10
 
NNC 11/3/10:
The origin of the requirements in the SysRS are not clearly document. Rev. 1 of the Common Q PAMS Licensin g Technical Report contains an open item that will be addressed in Rev. 2; this open item is to include "TVA's enhanced contract compliance matrix". It is expected that this matrix will address this open item.
Open-NRC Review Due 12/3/10
 
TVA to docket PAMS Licensing Technical Report Rev. 2.
 
ML101650255, Item No. 4 TVA Letter dated 10/29/10 Enclosure 1 Item No. 10 WBN2 PAMS System Requirements Specification TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.
142  EICB (Carte) The applicable regulatory guidance for reviewing the WBN2 PAMS SysRS would be IEEE 830 as endorsed by Regulatory Guide 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities -
 
Software Requirements Specifications."  IEEE 830-1994 Section 4.3.8, "Traceable," states: "A [requirements specification] is traceable of the origin of each of its requirements is clear-"
: 1. How did TVA ensure the traceability of each requirement in the WBN2 PAMS SysRS.
: 2. Explain the source(s) of the requirements present in the Post Accident Monitoring System's Software Requirements Specification. To clarify, many documents have requirements that are incorporated by reference into the SRS, but what served to direct the author to include those various documents in the SRS or, if the requirement is based on the System Requirements Specification, what directed the author to include the requirement there?
: 3. Clarify whether the unnumbered paragraphs in the Post Accident Monitoring System's Software Requirements Specification, such as in the section headings, or are all such sections simply considered to be informative?
Responder: WEC This item is used to track all traceability issues with the Software Requirements Specification (SRS).
: 1. How did TVA ensure the traceability of each requirement in the WBN2 PAMS SysRS.
 
TVA Response:
Traceability of requirements for the WBN Unit 2 Common Q PAMS is ensured by:
: a. Preparation of the TVA Contract Compliance Matrix contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS)
Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1). b. Engineering review/comment/status of each revision of:
: 15. N Open  Response included in letter
 
dated 12/22/10 TVA/Westinghouse agreed to include the V&V evaluation of
 
their reusable software element
 
development process in the V&V design phase summary report. This evaluation would include an evaluation against the development process requirements. This evaluation would also include an evaluation
 
of how the WBN2 specific requirements were addressed by the reusable software elements. (see ML102920031 Item No 5)
Open-NRC Review Due 12/22/10
 
To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.
ML101650255, Item No. 6  WBN2 PAMS System Requirements Specification
 
TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Does the same apply to documents referenced by the SRS?  Such as WCAP-16096-NP-A, Rev. 1A, "Software Program Manual for Common Q Systems," which is incorporated by reference in requirement R2.3-2 in the SRS.
R2.3-2  [The PAMS software shall comply with the requirements and guidelines defined in WCAP-16096-NP-A, "Software Program Manual for Common Q Systems" (reference 5).]
If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, please list them, describe why they satisfy the fundamental requirement of unambiguity, and describe how they were verified.
: 4. Are there any sources of requirements in parallel with the Post Accident Monitoring System's Software Requirements Specification?  Meaning does the SRS contain, explicitly or by reference, all the requirements that were used in the design phase for the application specific software, or do software design phase activities use requirements found in any other source or document?  If so, what are these


===Response===
SE    FSAR  NRC No.                                                      Issue                                                    TVA Response(s)                        Acceptable Status/ Current Actions Resolution Path RAI No. & Date  RAI Resp. Date        Comments Sec. Sec. POC                                                                                                                                      Y/N
: i. WNA-DS-01617-WBT, Post Accident Does the same apply to documents referenced by the SRS?                      Monitoring System - System Requirements Such as WCAP-16096-NP-A, Rev. 1A, Software Program                          Specification Manual for Common Q Systems, which is incorporated by reference in requirement R2.3-2 in the SRS.                            ii. WNA-DS-01667-WBT, Post Accident Monitoring System - System Design R2.3-2 [The PAMS software shall comply with the                              Specification (hardware) requirements and guidelines defined in WCAP-16096-NP-A, Software Program Manual for Common Q Systems                        iii. WNA-SD-00239-WBT, Software (reference 5).]                                                                Requirements Specification for the Post Accident Monitoring System (software)
If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, 2. Explain the source(s) of the requirements present in the please list them, describe why they satisfy the fundamental        Post Accident Monitoring Systems Software requirement of unambiguity, and describe how they were            Requirements Specification. To clarify, many verified.                                                          documents have requirements that are incorporated by reference into the Software Requirements Specification
: 4. Are there any sources of requirements in parallel with the        (SRS), but what served to direct the author to include Post Accident Monitoring Systems Software Requirements          those various documents in the SRS or, if the Specification? Meaning does the SRS contain, explicitly or        requirement is based on the System Requirements by reference, all the requirements that were used in the          Specification, what directed the author to include the design phase for the application specific software, or do        requirement there?
software design phase activities use requirements found in any other source or document? If so, what are these              TVA Response:
sources or documents?
sources or documents?
: 5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring System's Software Requirements Specification are various types of "-Reusable Software Element-".
As documented in the RTM, some software
These references are used in the body of the SRS, for example:"  
: 5. References 12, 27, 29, and 31-44 in the Post Accident             requirements are taken from generic documents. The Monitoring Systems Software Requirements Specification           decision to include generic software requirements was are various types of Reusable Software Element.               to reduce the overall scope for Common Q features that are unchanged across projects. Westinghouse reviewed These references are used in the body of the SRS, for             the generic PAMS requirements and included those example:                                                         requirements that were applicable to WBN Unit 2 PAMS.
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR                Source: E-mail from Westinghouse (Matthew A.
terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software            Shakun) to Bechtel (Mark S. Clark), RE: December 22 Element Document CRC for Calibration Data" [Reference            letter review, dated December 17, 2010 (Reference 13) 12]).]
: 3. Clarify whether the unnumbered paragraphs in the Post They are also included via tables such as found in                Accident Monitoring Systems Software Requirements requirement R7.1.2-1                                              Specification, such as in the section headings, contain requirements or are all such sections simply considered
[The Watts Bar 2 PAMS shall use the application-specific          to be informative?
type circuits and custom PC elements listed in Table 7.1-1.]
Does the same apply to documents referenced by the Do the referenced reusable software element documents include            SRS? Such as WCAP-16096-NP-A, Rev. 1A, Software requirements not explicitly stated in the SRS? If so what is their      Program Manual for Common Q Systems, which is origin?                                                                  incorporated by reference in requirement R2.3-2 in the SRS.
R2.3-2 [The PAMS software shall comply with the requirements and guidelines defined in WCAP-16096-NP-A, Software Program Manual for Common Q Systems (reference 5).]
If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, please list them, describe why they satisfy the fundamental requirement of unambiguity,


R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                  rad94FD7.docx                                                              Open Items to be Resolved for SER Approval


12]).]
===Response===
They are also included via tables such as found in requirement R7.1.2-1
SE   FSAR  NRC No.                                       Issue                            TVA Response(s)                       Acceptable Status/ Current Actions Resolution Path RAI No. & Date  RAI Resp. Date        Comments Sec. Sec. POC                                                                                                  Y/N and describe how they were verified.
 
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS?   If so what is their origin? i. WNA-DS-01617-WBT, "Post Accident Monitoring System - System Requirements Specification" ii. WNA-DS-01667-WBT, "Post Accident Monitoring System - System Design Specification" (hardware) iii. WNA-SD-00239-WBT, "Software Requirements Specification for the Post Accident Monitoring System" (software)
: 2. Explain the source(s) of the requirements present in the Post Accident Monitoring System's Software Requirements Specification. To clarify, many documents have requirements that are incorporated by reference into the Software Requirements Specification (SRS), but what served to direct the author to include those various documents in the SRS or, if the requirement is based on the System Requirements Specification, what directed the author to include the
 
requirement there?
TVA Response:
TVA Response:
 
Unnumbered paragraphs in the Post Accident Monitoring Systems Software Requirements Specification, such as in the section headings, are informative and are not to be interpreted as requirements. All requirements are explicitly numbered.
As documented in the RTM, some software
It depends on the document type. The statement would be true for requirements documents (such as the SysRS or SDS) if they were incorporated by reference.
 
requirements are taken from generic documents. The decision to include generic software requirements was to reduce the overall scope for Common Q features that
 
are unchan g ed across pro j ects. Westin ghouse reviewed the generic PAMS requirements and included those requirements that were applicable to WBN Unit 2 PAMS.
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 3. Clarify whether the unnumbered paragraphs in the Post Accident Monitoring System's Software Requirements Specification, such as in the section headings, contain requirements or are all such sections simply considered to be informative?
Does the same apply to documents referenced by the SRS?  Such as WCAP-16096-NP-A, Rev. 1A, "Software Program Manual for Common Q Systems," which is incorporated by reference in requirement R2.3-2 in the SRS. 
 
R2.3-2  [The PAMS software shall comply with the requirements and guidelines defined in WCAP-16096-NP-A, "Software Program Manual for Common Q Systems" (reference 5).] 
 
If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, please list them, describe why they satisfy the fundamental requirement of unambiguity, Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments and describe how they were verified.
TVA Response:
 
Unnumbered paragraphs in the Post Accident Monitoring System's Software Requirements Specification, such as in the section headings, are informative and are not to be interpreted as requirements. All requirements are explicitly numbered.
It depends on the document type. The statement would be true for requirements documents (such as the  
 
SysRS or SDS) if they were incorporated by reference.
However, for the specific item cited, WCAP-16096-NP-A, Rev. 1A, it does not contain numbered requirements.
However, for the specific item cited, WCAP-16096-NP-A, Rev. 1A, it does not contain numbered requirements.
The requirements contained in this document are contained within the text of the various sections.
The requirements contained in this document are contained within the text of the various sections.
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Source: E-mail from Westinghouse (Matthew A.
: 4. Are there any sources of requirements in parallel with the Post Accident Monitoring System's Software Requirements Specification?   Meaning does the SRS  
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
 
: 4. Are there any sources of requirements in parallel with the Post Accident Monitoring Systems Software Requirements Specification? Meaning does the SRS contain, explicitly or by reference, all the requirements that were used in the design phase for the application specific software, or do software design phase activities use requirements found in any other source or document? If so, what are these sources or documents?
contain, explicitly or by re ference, all the requirements that were used in the design phase for the application specific software, or do software design phase activities use requirements found in any other source or  
 
document?   If so, what are these sources or documents?
TVA Response:
TVA Response:
The Westinghouse SRS, WNA-SD-00239-WBT, Revision 3 contains references to other Westinghouse software requirements documents. Specifically, 00000-ICE-3238, Revision 5, Software Requirements Specification Post Accident Monitoring System 00000-ICE-3239, Revision 13, Software Requirements Specification for the Common Q Generic Flat Panel Display Software Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification are various types of Reusable Software Element.
These references are used in the body of the SRS, for example:
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective


The Westinghouse SRS, WNA-SD-00239-WBT, Revision 3 contains references to other Westinghouse software requirements documents. Specifically, 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                  rad94FD7.docx                                                                  Open Items to be Resolved for SER Approval
 
00000-ICE-3238, Revision 5, "Software Requirements Specification Post Accident Monitoring System"
 
00000-ICE-3239, Revision 13, "Software Requirements Specification for the Common Q Generic Flat Panel Display Software"


Source: E-mail from Westinghouse (Matthew A.
===Response===
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
SE   FSAR   NRC No.                                       Issue                               TVA Response(s)                         Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                    Y/N ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]
: 5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring System's Software Requirements Specification are various t ypes of "-Reusable Software Element-".
These references are used in the body of the SRS, for example:"
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]
They are also included via tables such as found in requirement R7.1.2-1
They are also included via tables such as found in requirement R7.1.2-1
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
Do the referenced reusable software element documents include requirements not explicitly stated in  
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?
 
the SRS? If so what is their origin?
TVA Response:
TVA Response:
 
Requirements for the reusable software elements (RSEDs) are evaluated in WNA-VR-00283-WBT-P, Revision 3, IV&V Summary Report for the Post Accident Monitoring System, dated December 2010 (Attachment 10).
Requirements for the reusable software elements (RSEDs) are evaluated in WNA-VR-00283-WBT-P, Revision 3, "IV&V Summary Report for the Post Accident Monitoring System," dated December 2010 (Attachment 10).
RSED traceability is contained in WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS)
RSED traceability is contained in WNA-VR-00280-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements.This document can be made available for audit at the Westinghouse Rockville office.
Custom PC Elements. This document can be made available for audit at the Westinghouse Rockville office.
At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the traceability concerns with the Software Requirements Specification.
At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the traceability concerns with the Software Requirements Specification.
: 6. Westinghouse will perform a review of the Requirements Traceability Matrix(RTM), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
: 6. Westinghouse will perform a review of the Requirements Traceability Matrix(RTM), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
TVA Response:
TVA Response:
 
Please see response to letter Item 13 (NRC Matrix Item 145).
Please see response to letter Item 13 (NRC Matrix Item 145). 7. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.  
: 7. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
 
TVA Response:
TVA Response:
Please see response to letter Item 13 (NRC Matrix Item 145).
Please see response to letter Item 13 (NRC Matrix Item 145).
: 8. Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address items not in the SRS or SysRS.  
: 8. Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address items not in the SRS or SysRS.
 
TVA Response:
TVA Response:


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments A comments column has been added to WNA-VR-00279-WBT, Revision 3, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                               rad94FD7.docx                                                               Open Items to be Resolved for SER Approval


System."
===Response===
SE    FSAR  NRC No.                                        Issue                            TVA Response(s)                      Acceptable Status/ Current Actions Resolution Path RAI No. & Date  RAI Resp. Date        Comments Sec. Sec. POC                                                                                                Y/N A comments column has been added to WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System.
Source: E-mail from Westinghouse (Matthew A.
Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 9. IEEE 830 says you shouldn't have planning information in the SRS. Westinghouse has agreed to remove this  
: 9. IEEE 830 says you shouldnt have planning information in the SRS. Westinghouse has agreed to remove this information.
 
information.
TVA Response:
TVA Response:
 
Westinghouse has confirmed that process requirements have been removed from the SRS.
Westin ghouse has confirmed that process requirements have been removed from the SRS.
Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)
 
: 10. IEEE 830 says you shouldnt have process requirements in the SRS. Westinghouse has agreed to remove these requirements.
Source: E-mail from Westi nghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)
: 10. IEEE 830 says you shouldn't have process requirements in the SRS. Westinghouse has agreed to  
 
remove these requirements.
TVA Response:
TVA Response:
 
Westinghouse confirmed that process requirements have been removed from the SRS.
Westinghouse confirmed that process requirements have been removed from the SRS.  
Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)
 
: 11. Westinghouse will perform and document an evaluation of the SRS to ensure compliance with Reg. Guide 1.172 and justify any deviations.
Source: E-mail from Westi nghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)
: 11. Westinghouse will perform and document an evaluation of the SRS to ensure compliance with Reg. Guide 1.172 and justify any deviations.  
 
TVA Response:
TVA Response:
WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1):
WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1):
Section 9, "Compliance Evaluation Of The Watts Bar 2 PAMS Software Requirements Specification To IEEE Standard 830-1998 And Regulatory Guide 1.172" has been added.
Section 9, Compliance Evaluation Of The Watts Bar 2 PAMS Software Requirements Specification To IEEE Standard 830-1998 And Regulatory Guide 1.172 has been added.
: 12. 25 issues identified by V&V where some requirements have not been included in the System Design Specification (SDS) (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed?  
: 12. 25 issues identified by V&V where some requirements have not been included in the System Design Specification (SDS) (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed?
 
TVA Response:
TVA Response:


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments The twenty-five (25) issues are captured in Exception Reports (ERs): V&V-769 and V&V-770. These ERs have all been addressed and the ERs have been closed satisfactorily by Westinghouse IV&V. 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                 rad94FD7.docx                                                                 Open Items to be Resolved for SER Approval
 
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 13. Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). 


===Response===
SE    FSAR  NRC No.                                        Issue                              TVA Response(s)                        Acceptable Status/ Current Actions Resolution Path RAI No. & Date  RAI Resp. Date        Comments Sec. Sec. POC                                                                                                  Y/N The twenty-five (25) issues are captured in Exception Reports (ERs): V&V-769 and V&V-770. These ERs have all been addressed and the ERs have been closed satisfactorily by Westinghouse IV&V.
Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 13. Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS).
These will be removed from the SRS and incorporated into the next revision of the SDS.
These will be removed from the SRS and incorporated into the next revision of the SDS.
TVA Response:
TVA Response:
The hardware requirements in the Software Requirements Specification have been deleted and moved to System Design Specification.
The hardware requirements in the Software Requirements Specification have been deleted and moved to System Design Specification.
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 16, 2010 (Reference 15)
Source: E-mail from Westinghouse (Matthew A.
: 14. RTM item R4.2-2 protection class software set to 0. Needs to be fixed internally. Write CAPs to revise the application restrictions document on AC160.  
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 16, 2010 (Reference 15)
 
: 14. RTM item R4.2-2 protection class software set to 0.
Needs to be fixed internally. Write CAPs to revise the application restrictions document on AC160.
TVA Response:
TVA Response:
Westinghouse CAPs IR# 10-259-M034 has been issued. This item will be addressed in revision 4 of the RTM. Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Westinghouse CAPs IR# 10-259-M034 has been issued. This item will be addressed in revision 4 of the RTM.
: 15. Westinghouse to improve the traceability of the tests that are performed with the function enable (FE) switch in the "ENABLE" position.  
Source: E-mail from Westinghouse (Matthew A.
 
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 15. Westinghouse to improve the traceability of the tests that are performed with the function enable (FE) switch in the ENABLE position.
TVA Response:
TVA Response:
The tests that are performed with the FE keyswitch in the ENABLE position are defined in the SRS Sections:
The tests that are performed with the FE keyswitch in the ENABLE position are defined in the SRS Sections:
6.2 "Manually Initiated Testing," 7.2.23 "Annunciator Test Display," 7.2.25 "Saturation Margin Test Display,"
6.2 Manually Initiated Testing, 7.2.23 Annunciator Test Display, 7.2.25 Saturation Margin Test Display, and 7.2.26 Analog Output Test Display.
and 7.2.26 "Analog Output Test Display."
: 16. Westinghouse to revise documents to be consistent with referring to the FE switch in the ENABLE position.
: 16. Westinghouse to revise documents to be consistent with referring to the FE switch in the "ENABLE" position.
TVA Response:
TVA Response:
Westinghouse has elected to standardize on the terms "FE keyswitch" and "ENABLE.A review of recent documents for compliance with this comment and Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments commitment was performed with the following results:
Westinghouse has elected to standardize on the terms FE keyswitch and ENABLE. A review of recent documents for compliance with this comment and
: a. Revision 3 of the SysRS, and SDS have been revised to use the terms "FE keyswitch."  Revision 3 of the SDS is consistent in use of the term
 
"ENABLE." b. SysRS Revision 3 is not consistent in use of the term "ENABLE" as noted below:
: i. R2.5.2.1-2 uses the term "ENABLED" instead of "ENABLE" ii. R2.5.2.1.3-3, R2.6.3.3-1, R2.6.3.3-2, R2.6.3.3-3, and R2.6.3.3-7, use the term "Enable"
 
instead of "ENABLE"
: c. Revision 3 of the SRS is not consistent in use of the terms "FE keyswitch" and "ENABLE" as noted below: i. Tables 7.2-1 "Train A PAMS Data Transmitted to the Plant Computer" and 7.2-2 "Train B PAMS Data Transmitted to the Plant Computer" items 101 and 102 in the SRS refer to the FE switch.
All other items in the SRS refer to the FE
 
keyswitch.
ii. Section 2.1, page 2-4, uses the term "Enable" instead of "ENABLE" iii. Requirements R7.2.14-6 and R7.2.16-7 use the term "active" instead of "ENABLE" iv. Requirements R7.2.23-2, R7.2.25-2, R7.2.26-2, R7.2.31-4, 7.2.56 FPDS Availability, and R7.2.57-4 use the term "enabled" instead of
 
"ENABLE" d. WNA-AR-00180-WBT-P, Revision 0, "Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System," dated October 2010, submitted in TVA letter to NRC dated (Reference
: 12) is not consistent in use of the term "FE keyswitch" as noted below:
: i. Section 2.2 "System Description" and Table 3-1 "WB2 PAMS FMEA" refer to the FE switch.
ii. Table 3-1 describes the switch as the "Functional Enable (FE) switch" and the "FE key-switch"
: e. Revision 2 of the Licensing Technical Report is not consistent in use of the term "FE keyswitch" as noted below:
: i. Sections 2.2, 5.3 use the term (FE) keylock switch on pages 2-3 (2 places), page 5-3, page


5-6 (4 places)
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                     rad94FD7.docx                                                              Open Items to be Resolved for SER Approval
The identified discrepancies in the use of the terms "FE
 
keyswitch" and "ENABLE" in the SysRS, SRS, FMEA and Licensing Technical Report, will be corrected in the next revision of the documents.
: 17. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.


===Response===
SE    FSAR  NRC No.                                        Issue                                TVA Response(s)                      Acceptable Status/ Current Actions Resolution Path RAI No. & Date  RAI Resp. Date        Comments Sec. Sec. POC                                                                                                    Y/N commitment was performed with the following results:
: a. Revision 3 of the SysRS, and SDS have been revised to use the terms FE keyswitch. Revision 3 of the SDS is consistent in use of the term ENABLE.
: b. SysRS Revision 3 is not consistent in use of the term ENABLE as noted below:
: i. R2.5.2.1-2 uses the term ENABLED instead of ENABLE ii. R2.5.2.1.3-3, R2.6.3.3-1, R2.6.3.3-2, R2.6.3.3-3, and R2.6.3.3-7, use the term Enable instead of ENABLE
: c. Revision 3 of the SRS is not consistent in use of the terms FE keyswitch and ENABLE as noted below:
: i. Tables 7.2-1 Train A PAMS Data Transmitted to the Plant Computer and 7.2-2 Train B PAMS Data Transmitted to the Plant Computer items 101 and 102 in the SRS refer to the FE switch.
All other items in the SRS refer to the FE keyswitch.
ii. Section 2.1, page 2-4, uses the term Enable instead of ENABLE iii. Requirements R7.2.14-6 and R7.2.16-7 use the term active instead of ENABLE iv. Requirements R7.2.23-2, R7.2.25-2, R7.2.26-2, R7.2.31-4, 7.2.56 FPDS Availability, and R7.2.57-4 use the term enabled instead of ENABLE
: d. WNA-AR-00180-WBT-P, Revision 0, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System, dated October 2010, submitted in TVA letter to NRC dated (Reference
: 12) is not consistent in use of the term FE keyswitch as noted below:
: i. Section 2.2 System Description and Table 3-1 WB2 PAMS FMEA refer to the FE switch.
ii. Table 3-1 describes the switch as the Functional Enable (FE) switch and the FE key-switch
: e. Revision 2 of the Licensing Technical Report is not consistent in use of the term FE keyswitch as noted below:
: i. Sections 2.2, 5.3 use the term (FE) keylock switch on pages 2-3 (2 places), page 5-3, page 5-6 (4 places)
The identified discrepancies in the use of the terms FE keyswitch and ENABLE in the SysRS, SRS, FMEA and Licensing Technical Report, will be corrected in the next revision of the documents.
: 17. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS.
Need a good write up of how the process works.
TVA Response:
TVA Response:


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Please see response to letter item 13 (NRC Matrix Item 145). 18. Westinghouse and TVA will develop a revised schedule for document submittals and provide it to the NRC no later than 9/30/10
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                 rad94FD7.docx                                                               Open Items to be Resolved for SER Approval


TVA Response:
===Response===
SE    FSAR  NRC No.                                        Issue                            TVA Response(s)                      Acceptable Status/ Current Actions Resolution Path RAI No. & Date  RAI Resp. Date        Comments Sec. Sec. POC                                                                                                Y/N Please see response to letter item 13 (NRC Matrix Item 145).
: 18. Westinghouse and TVA will develop a revised schedule for document submittals and provide it to the NRC no later than 9/30/10 TVA Response:
The revised document submittal schedule was included as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010 (Reference 5).
The revised document submittal schedule was included as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010 (Reference 5).
: 19. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
: 19. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
TVA Response:
TVA Response:
 
The Procurement Requisition Resolution Matrix has been updated and is included in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS)
The Procurement Requisition Resolution Matrix has been updated and is included in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1), as Section 11, "TVA Contract Compliance Matrix."
Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1), as Section 11, TVA Contract Compliance Matrix.
: 20. Westinghouse to add the Software Design Descriptions to the RTM  
: 20. Westinghouse to add the Software Design Descriptions to the RTM TVA Response:
 
TVA Response:
 
The Software Design Description documents were added to the RTM in WNA-VR-00279-WBT, Rev 2.
The Software Design Description documents were added to the RTM in WNA-VR-00279-WBT, Rev 2.
Source: E-mail from Westinghouse (Matthew A.
Source: E-mail from Westinghouse (Matthew A.
Line 942: Line 625:
: 21. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.
: 21. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.
TVA Response:
TVA Response:
When a Common Q PAMS requirements document references a section of another document, all requirements in that section are applicable.
Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 22. Westinghouse to review the use of shall outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.


When a Common Q PAMS requirements document references a section of another document, all requirements in that section are applicable.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                 rad94FD7.docx                                                                Open Items to be Resolved for SER Approval
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 22. Westinghouse to review the use of "shall" outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response:
===Response===
SE   FSAR   NRC No.                                       Issue                             TVA Response(s)                       Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                  Y/N TVA Response:
See response in letter dated December 22, 2010, item 2 (NRC Matrix Item 050).
See response in letter dated December 22, 2010, item 2 (NRC Matrix Item 050).
: 23. Westinghouse to resolve the following questions concerning Software Design Descriptions (SDDs)
: 23. Westinghouse to resolve the following questions concerning Software Design Descriptions (SDDs)
: a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
: a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
: b. What are the SDDs?
: b. What are the SDDs?
: c. PAMS is a delta document so how do we capture all the generic requirements for traceability.  
: c. PAMS is a delta document so how do we capture all the generic requirements for traceability.
 
TVA Response:
TVA Response:
: a. There are three SDDs prepared specifically for the Watts Bar 2 PAMS project. These are listed below in Item b. These documents and superior  
: a. There are three SDDs prepared specifically for the Watts Bar 2 PAMS project. These are listed below in Item b. These documents and superior requirements documents refer to other generic SDDs also listed in Item b.
 
requirements documents refer to other generic SDDs also listed in Item b.
: b. The SDDs developed for this project are:
: b. The SDDs developed for this project are:
: i. WNA-SD-00248-WBT, Revision 1, "Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display" ii. WNA-SD-00250-WBT, Revision 1, "Watts Bar 2 NSSS Completion Program I&C  
: i. WNA-SD-00248-WBT, Revision 1, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display ii. WNA-SD-00250-WBT, Revision 1, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System AC160 Software iii. WNA-SD-00277-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display System Screen Design Details iv.      Other generic SDDs referenced by the PAMS project are:
(a) 00000-ICE-20157, Revision 18, Software Design Description for the Common Q Generic Flat-Panel Software (b) 00000-ICE-30152, Revision 5, Software Design Description Post Accident Monitoring System AC160 (c) 00000-ICE-30140, Revision 4, Software Design Description for the Common Q Core Protection Calculator


Projects Software Design Description for the Post Accident Monitoring System AC160 Software" 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                  rad94FD7.docx                                                                                    Open Items to be Resolved for SER Approval


iii. WNA-SD-00277-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display System Screen Design Details" iv. Other generic SDDs referenced by the PAMS project are:
===Response===
(a) 00000-ICE-20157, Revision 18, "Software Design Description for the Common Q Generic Flat-Panel Software" (b) 00000-ICE-30152, Revision 5, "Software Design Description Post Accident Monitoring System AC160" (c) 00000-ICE-30140, Revision 4, "Software Design Description for the Common Q Core Protection Calculator Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments System Database and Utility Functions"
SE   FSAR   NRC No.                                                               Issue                                                       TVA Response(s)                           Acceptable       Status/ Current Actions     Resolution Path       RAI No. & Date   RAI Resp. Date               Comments Sec. Sec. POC                                                                                                                                                    Y/N System Database and Utility Functions
: c. Refer to WNA-VR-00279-WBT, Revision 3.
: c. Refer to WNA-VR-00279-WBT, Revision 3.
Source: E-mail from Westinghouse (Matthew A.
Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 24. For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the SPM and qualified using the Software Elements Test procedure under Appendix B program. Provide a summary of RSEDs generic WCAP. Westinghouse to determine if  
: 24. For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the SPM and qualified using the Software Elements Test procedure under Appendix B program. Provide a summary of RSEDs generic WCAP. Westinghouse to determine if the WCAP was docketed under the AP1000. RSED concept is not in the SPM. WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was acceptable. RSEDs are listed in the SDD References.
 
the WCAP was docketed under the AP1000. RSED concept is not in the SPM. WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was  
 
acceptable. RSEDs are listed in the SDD References.
TVA Response:
TVA Response:
Section 3.2.4.1 of WCAP-15927 describes the RSED design process for custom PC elements and type circuits. The Glossary of Terms in the SPM defines custom PC elements and type circuits as modules.
Section 3.2.4.1 of WCAP-15927 describes the RSED design process for custom PC elements and type circuits. The Glossary of Terms in the SPM defines custom PC elements and type circuits as modules.
Therefore, the relationship between WCAP-15927 describing the RSED process as circuits, is defined in  
Therefore, the relationship between WCAP-15927 describing the RSED process as circuits, is defined in the SPM requirements for software module development.
 
the SPM requirements for software module development.
WCAP-15927 is on the AP1000 docket.
WCAP-15927 is on the AP1000 docket.
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13) 143   EICB (Carte) The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS - ML101050202) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the  
Source: E-mail from Westinghouse (Matthew A.
 
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13) 143                                 The WBN2 PAMS Software Requirements Specification (WBN2              Responder: WEC                                                  16. N        Open                          Open-NRC Review        ML101650255, Item                    WBN2 PAMS System Requirements EICB (Carte)
WBN2 PAMS SRS was created to support the three documents identified (one of which is the WBN2 PAMS SysRS). Section 1.1, "Overview," of the WBN2 PAMS SRS states: "This document describes requirements for the major software components -"
PAMS SRS - ML101050202) contains a table (see page iii) titled,                                                                                                                                         No. 7                                Specification Document Traceability & Compliance, which states that the           Addressed in the 9/15 public meeting and 9/20 - 9/21 audit.                  Response included in letter  Due 12/22/10 WBN2 PAMS SRS was created to support the three documents             A detailed explanation will be provided.                                    dated 12/22/10                                                                            TVA docketed WNA-DS-01617-WBT identified (one of which is the WBN2 PAMS SysRS). Section 1.1,                                                                                                                   To be addressed by                                          Rev. 1, RRAS Watts Bar 2 NSSS Overview, of the WBN2 PAMS SRS states: This document               TVA Response:                                                                                              Revision of the RTM,                                        Completion Program I&C Projects Post describes requirements for the major software components                                                                                                                       SRS, SysRS, and                                            Accident Monitoring System- System (a) and (b) The requested information is provided in the                                                  SysDS.                                                      Requirements Specification, dated (a) Please list and describe each of the major software                   following documents:                                                                                                                                            December 2009.
 
components. Please include a description of any NRC review for             i. WNA-LI-00058-WBT-P, Revision 2, Post-each of these components.                                                         Accident Monitoring System (PAMS) Licensing Technical Report, Table 6-1, Document (b) Please list and describe each of the other software                            Requirements which lists the software components. Please include a description of any NRC review for                     documentation requirements for the Common Q each of these components.                                                         PAMS and Section 11 TVA Contract Compliance Matrix submitted in TVA Letter to (c) What other documents contain the requirements for the other                    NRC, dated December 3, 2010 (Reference 1).
(a) Please list and describe each of the "major software components". Please include a description of any NRC review for each of these components.  
software components?                                                      ii. WNA-DS-01617-WBT-P, Revision 3, Post Accident Monitoring System- System The WBN2 PAMS System Design Specification (WBN2 PAMS                              Requirements Specification, dated December SDS) contains a table (see page iii) titled, Document Traceability                2010 (Attachment 1)
 
                                    & Compliance, which states that the WBN2 PAMS SysRS was                  iii. WNA-SD-00239-WBT-P, Revision 3, Software created to support the WBN2 PAMS SysRS. Section 1.1,                              Requirements Specification for the Post Accident Purpose, of the WBN2 PAMS SDS states: The purpose of this                      Monitoring System, dated December 2010
(b) Please list and describe each of the other software components. Please include a description of any NRC review for each of these components.  


(c) What other documents contain the requirements for the other
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                 rad94FD7.docx                                                                                            Open Items to be Resolved for SER Approval


software components?
===Response===
The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, "Document Traceability  
SE    FSAR    NRC No.                                                              Issue                                                      TVA Response(s)                            Acceptable      Status/ Current Actions          Resolution Path          RAI No. & Date  RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                                    Y/N document is to define the hardware design requirements                        (Attachment 7) iv.      WNA-VR-00279-WBT, Revision 3, Watts Bar 2 (c) Do the WBN2 PAMS SRS and SDS, together, implement all of                    NSSS Completion Program I&C Projects the requirements in the WBN2 PAMS SysRS?                                        Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC (e) Please briefly describe all of the documents that implement                  audit at the Westinghouse Rockville office) the WBN2 PAMS SysRS.                                                          To the best of TVAs knowledge, no prior NRC review of the software components has been performed.
& Compliance," which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, "Purpose," of the WBN2 PAMS SDS states: "The purpose of this Responder: WEC Addressed in the 9/15 public meeting and 9/20 - 9/21 audit.
(c) WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office)
A detailed explanation will be provided.  
(d) No. Please see Item (e) below.
(e) The documents that describe the requirements that implement the WBN Unit 2 SysRS are:
: i.      WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office) ii.      WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office)
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13) 144                                  The WBN2 PAMS Software Requirements Specification (WBN2            Responder: WEC                                                  17. N        Open                            Open-NRC Review            ML101650255, Item TVA Letter dated WBN2 PAMS Software Requirements EICB (Carte)
PAMS SRS) contains a table (see page iii) titled, Document                                                                                                                                                   No. 8            10/5/10          Specification Traceability & Compliance, which states that the WBN2 PAMS         (a) The purpose of NABU-DP-00014-GEN document is to                          Revised response included in    Due 12/3/10 SRS was created to support the three documents identified (two of  define the process for system level design, software design                  letter dated 12/22/10                                                                          By letter dated April 8, 2010 these documents have been provided on the docket).                  and implementation, and hardware design and                                                                    Responses to items a                                          (ML10101050203), TVA docketed implementation for Common Q safety system development.                       Response provided in letter      and e provided.                                               WNA-SD-00239-WBT, Revision 1, (a) Please describe the third document (i.e., NABU-DP-00014-        This document supplements the Common Q SPM, WCAP-                            dated 10/5/10                                                                                  "RRAS Watts Bar 2 NSSS Completion GEN Revision 2, Design Process for Common Q Safety                16096-NP-A. The scope of NABU-DP-00014-GEN includes                                                          NNC 11/18/10:                                                   Program I&C Projects, Software Systems).                                                          the design and implementation processes for the application                  NRC Review and WEC to          (1) Items b-d closed to                                        Requirements Specification for the Post development. For a fuller description of the design process                  complete response.              other Open Item nos.                                            Accident Monitoring System, dated (b) Please describe the flow of information between these three    described in NABU-DP-00014-GEN please refer to the                                                           (2) The point of these                                          February 2010 (ML101050202).
documents.                                                          Design Process for AP1000 Common Q Safety Systems,                            b-d to be addressed at public   questions was to WCAP-15927 on the AP1000 docket. Since this is a                              meeting and audit. Will require understand how the (c) Does the PAMS SRS implement the requirements in these          Westinghouse process document that is not specifically                        information to be docketed. origin of the three documents?                                                    referenced in the SRS, it will be removed in the next revision                                                requirements in the of the document.                                                                                              requirements (d) Please describe if and how these three documents are used in                                                                                                                  specifications were the development of the PAMS Software Design Description.            (b) - Closed to items 142 and 145                                                                            documented. TVA stated that the origin of (e) Do the WBN2 V&V activities include verification that the        (c) - Closed 142                                                                                              the requirements would requirements of these three documents have been incorporated                                                                                                                      be demonstrated in into the WBN2 PAMS SRS.                                            (d) - Closed to Item 142                                                                                      Rev. 2 of the CQ PAMS LTR.
(e) WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document


TVA Response:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                               rad94FD7.docx                                                                                     Open Items to be Resolved for SER Approval
(a) and (b) The requested information is provided in the following documents:
: i. WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report," Table 6-1, "Document Requirements" which lists the software
 
documentation requirements for the Common Q PAMS and Section 11 "TVA Contract Compliance Matrix" submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).
ii. WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System- System Requirements Specification," dated December
 
2010 (Attachment 1) iii. WNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System," dated December 2010
: 16. N Open  Response included in letter
 
dated 12/22/10 Open-NRC Review Due 12/22/10
 
To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.
 
ML101650255, Item No. 7  WBN2 PAMS System Requirements Specification
 
TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments document is to define the hardware design requirements -"
(c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?
 
(e) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS. (Attachment 7) iv. WNA-VR-00279-WBT, Revision 3, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System" (available for NRC audit at the Westinghouse Rockville office) To the best of TVA's knowledge, no prior NRC review of the software components has been performed. (c) WNA-VR-00280-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements" (available for NRC audit at the Westinghouse Rockville office) (d) No. Please see Item (e) below. (e) The documents that describe the requirements that implement the WBN Unit 2 SysRS are:
: i. WNA-VR-00279-WBT, Revision 3, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System" (available for NRC audit at the Westinghouse Rockville office) ii. WNA-VR-00280-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements" (available for NRC audit at the Westinghouse Rockville office)
 
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13) 144  EICB (Carte) The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS SRS was created to support the three documents identified (two of these documents have been provided on the docket).
(a) Please describe the third document (i.e., NABU-DP-00014-GEN Revision 2, "Design Process for Common Q Safety Systems").
(b) Please describe the flow of information between these three documents.
(c) Does the PAMS SRS implement the requirements in these three documents?
(d) Please describe if and how these three documents are used in the development of the PAMS Software Design Description.
(e) Do the WBN2 V&V activities include verification that the requirements of these three documents have been incorporated into the WBN2 PAMS SRS.
Responder: WEC (a) The purpose of NABU-DP-00014-GEN document is to define the process for system level design, software design
 
and implementation, and hardware design and implementation for Common Q safety system development.
This document supplements the Common Q SPM, WCAP-16096-NP-A. The scope of NABU-DP-00014-GEN includes the design and implementation processes for the application
 
development. For a fuller description of the design process described in NABU-DP-00014-GEN please refer to the Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket. Since this is a Westinghouse process document that is not specifically referenced in the SRS, it will be removed in the next revision of the document.
(b) - Closed to items 142 and 145 (c) - Closed 142 (d) - Closed to Item 142 (e)  WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document
: 17. N Open  Revised response included in letter dated 12/22/10
 
Response provided in letter
 
dated 10/5/10 NRC Review and WEC to
 
complete response.
 
b-d to be addressed at public meeting and audit. Will require information to be docketed.
Open-NRC Review Due 12/3/10
 
Responses to items a
 
and e provided.
 
NNC 11/18/10:
(1) Items b-d closed to other Open Item nos.
(2) The point of these questions was to understand how the
 
origin of the
 
requirements in the requirements specifications were
 
documented. TVA
 
stated that the origin of the requirements would be demonstrated in
 
Rev. 2 of the CQ PAMS LTR. ML101650255, Item No. 8 TVA Letter dated 10/5/10 WBN2 PAMS Software Requirements Specification By letter dated April 8, 2010 (ML10101050203), TVA docketed WNA-SD-00239-WBT, Revision 1,
""RRAS Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System," dated February 2010 (ML101050202).
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1). 
 
IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0. 


===Response===
SE    FSAR    NRC No.                                                              Issue                                                    TVA Response(s)                          Acceptable      Status/ Current Actions        Resolution Path      RAI No. & Date    RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                              Y/N Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).
IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.
IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.
IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.
TVA Response to Follow-up NRC Request:
(1) Item (a) in the original list, NABU-DP-00014-GEN Revision 2, "Design Process for Common Q Safety Systems," is available for NRC audit at the Westinghouse Rockville office.
(2) WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:
Section 11, "TVA Contract Compliance Matrix" showing the origin of the requirements was added.
145  EICB (Carte) The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS SDS was created to support the WBN2 PAMS SysRS.
(a) Does the WBN2 PAMS SDS implement all of the hardware requirements in the WBN2 PAMS SysRS?
(b) Please briefly describe all of the documents that implement the hardware requirements of the WBN2 PAMS SysRS.
This item is used to track all traceability issues with the System Design Specification (SDS).
At the September 15 public meeting in Rockville, the following Responder: WEC (1) The review and update of the RTM is complete. The revised RTM can be made available for NRC audit at the Westinghouse office in Rockville.
(2) Please see letter Item 10 (NRC Matrix Item 142, sub item 13).
(3) Please see letter Item 10 (NRC Matrix Item 142, sub item 12).
(4) Section 11 "TVA Contract Compliance Matrix" was added to WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing
: 18. N Open  Response included in letter
dated 12/22/10
During the September 20-21, 2010 audit at Westinghouse, it was acknowledged that TVA/Westinghouse had previously (in September 15, 2010 public meeting) stated:
TVA would provide the RSED RTM. (see ML102920031 Item No 6) Open-NRC Review Due 12/22/10
To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.
ML101650255, Item No. 9  WBN2 PAMS System Design Specification
TVA docketed WNA-DS-01667-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Design Specification," dated December
2009.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments actions were agreed to. These items partially address the traceability concerns with the System Design Specification. This item will be updated with the results of the September 20 and 21 Commercial Grade Dedication and SDS RTM audit.
: 1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
: 2. Some hardware requirements are contained in the SRS instead of the S y stem Desi gn Specification (SDS). These will be removed from the SRS and incorporated into the next
revision of the SDS.
: 3. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and  SRS (11) at the
revisions reviewed by V&V. Have these been addressed?  Yes. The next revisions of the SDS and SRS address these issues.
: 4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
: 5. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
: 6. Westinghouse to provide the generic AC160 and flat panel specifications.
: 7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.
: 8. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a
good write up of how the process works.
Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1).
(5) WNA-VR-00283-WBT, Revision 1, "IV&V Summary Report for the Post Accident Monitoring System,"
submitted in TVA to NRC letter dated December 3, 2010 (Reference 1) includes the Requirements and Design phase reviews.
(6) Per Westinghouse letter WBT-D-2268 "NRC Access to Common Q Documents at the Westinghouse Rockville Office" dated August 16, 2010 (Reference 9) "System Requirements Specification for the Common Q Generic Flat Panel Display," 00000-ICE-30155, Revision 9 is available for audit at the Westin ghouse Rockville office.
The generic AC160 specifications are contained in the documents listed below. The documents are available for NRC audit at the Westinghouse Rockville office in accordance with the letter number referenced. List is contained in letter.
(7) A schedule was developed and is reviewed weekly by Westinghouse and TVA project management.
(8) The revised document submittal schedule was included as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010 (Reference Error! Reference source not found.
).  (9) The flow of documentation information was provided to the NRC inspector during the Common Q PAMS audit.
Source: E-mail from Westinghous e (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI on SysRS, dated December 8, 2010 (Reference 18)
TVA would revise and resubmit the PAMS RTM to address all types of issues identified in the public meeting. (see
ML102920031 Item No 7)
TVA would revise and resubmit
the Software Verification and Validation phase summary report for the requirements phase to document the completion of the requirements
phase review. (see ML102920031 Item No 8) 183  EICB (Carte) 7/15/2010 An emphasis is placed on traceability in System Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word "should" to say "Each identifiable requirement in an SRS
must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies" On page 1-2 of the Post Accident Monitoring System's Software Requirements Specification in the background section, is the sentence "Those sections of the above references that require modification from the generic PAMS are defined in the document"  referring purely to the changes from WNA-DS-01617-WBT "Post Accident Monitoring System-System Requirements Specification" or is it saying that there are additional changes beyond those and that the SRS defines them?
Responder: WEC The generic Software Requirements Specification applies except as modified b y the WBN Unit 2 S y stem Requirements Specification.
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
(1) Item (a) in the original list, NABU-DP-00014-GEN Revision 2, Design Process for Common Q Safety Systems, is available for NRC audit at the Westinghouse Rockville office.
(2) WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:
Section 11, TVA Contract Compliance Matrix showing the origin of the requirements was added.
145                                  The WBN2 PAMS System Design Specification (WBN2 PAMS                Responder: WEC                                              18. N        Open                            Open-NRC Review        ML101650255, Item                    WBN2 PAMS System Design EICB (Carte)
SDS) contains a table (see page iii) titled, Document Traceability                                                                                                                                  No. 9                                Specification
                                    & Compliance, which states that the WBN2 PAMS SDS was              (1) The review and update of the RTM is complete. The                  Response included in letter      Due 12/22/10 created to support the WBN2 PAMS SysRS.                                  revised RTM can be made available for NRC audit at                  dated 12/22/10                                                                              TVA docketed WNA-DS-01667-WBT the Westinghouse office in Rockville.                                                                To be addressed by                                          Rev. 1, RRAS Watts Bar 2 NSSS (a) Does the WBN2 PAMS SDS implement all of the hardware                                                                                    During the September 20-21,      Revision of the RTM,                                        Completion Program I&C Projects Post requirements in the WBN2 PAMS SysRS?                                (2) Please see letter Item 10 (NRC Matrix Item 142, sub                2010 audit at Westinghouse, it  SRS, SysRS, and                                            Accident Monitoring System- System item 13).                                                          was acknowledged that            SysDS.                                                      Design Specification, dated December (b) Please briefly describe all of the documents that implement the                                                                          TVA/Westinghouse had                                                                        2009.
hardware requirements of the WBN2 PAMS SysRS.                        (3) Please see letter Item 10 (NRC Matrix Item 142, sub                previously (in September 15, item 12).                                                          2010 public meeting) stated:
This item is used to track all traceability issues with the System Design Specification (SDS).                                  (4) Section 11 TVA Contract Compliance Matrix was                    TVA would provide the RSED added to WNA-LI-00058-WBT-P, Revision 2, Post-                    RTM. (see ML102920031 Item At the September 15 public meeting in Rockville, the following          Accident Monitoring System (PAMS) Licensing                        No 6)


Please see the response to RAI item 12 in letter dated 12/222/10, NRC Matrix Item 144.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                 rad94FD7.docx                                                                                           Open Items to be Resolved for SER Approval
: 19. Y Open  Revised response included in
 
letter dated 12/22/10.
 
Response provided in letter
 
dated 10/21/10 Open-NRC Review Due 12/3/10
 
NNC 11/18/10:  The point behind this open item was that TVA must
 
demonstrate that the
 
origin of each requirement in the WEC requirements specification is known
 
and documented. TVA stated that this information would be in CQ PAMS LTR Rev. 2.
EICB RAI ML102980066 Item No. 9 TVA Letter dated 10/21/10 Enclosure 1 Item
 
No. 4 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments If there are additional changes, what is their origin?
185  EICB (Carte) 7/15/2010 An emphasis is placed on the traceability of requirements in Software Requirements Specifications  in the SRP, in the
 
unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word "should" to say "Each identifiable requirement in an SRS must be traceable
 
backwards to the system requirements and the design bases or
 
regulatory requirements that is satisfies"    Also the NRC considers that the SRS is the complete set of requirements used for the design of the software, whether it is contained within one document or many. In order to evaluate an SRS against the guidance in the SRP the staff needs access to all the requirements.


References 12, 27, 29, and 31-44 in the Post Accident Monitoring System's Software Requirements Specification are various types of "-Reusable Software Element-".   
===Response===
SE    FSAR    NRC No.                                                                Issue                                                      TVA Response(s)                        Acceptable      Status/ Current Actions            Resolution Path          RAI No. & Date  RAI Resp. Date      Comments Sec. Sec. POC                                                                                                                                                Y/N actions were agreed to. These items partially address the            Technical Report submitted in TVA Letter to NRC traceability concerns with the System Design Specification.          dated December 3, 2010, (Reference 1).                                  TVA would revise and resubmit This item will be updated with the results of the September 20                                                                                the PAMS RTM to address all and 21 Commercial Grade Dedication and SDS RTM audit.            (5) WNA-VR-00283-WBT, Revision 1, IV&V Summary                              types of issues identified in the Report for the Post Accident Monitoring System,                        public meeting. (see
: 1. Westinghouse will perform completed a review of the              submitted in TVA to NRC letter dated December 3,                        ML102920031 Item No 7)
Requirements Traceability Matrix(RT), using the issues          2010 (Reference 1) includes the Requirements and identified at the 9/15 public meeting as a guide (documented    Design phase reviews.                                                    TVA would revise and resubmit below) and update the RTM as required.                                                                                                    the Software Verification and (6) Per Westinghouse letter WBT-D-2268 NRC Access to                        Validation phase summary
: 2. Some hardware requirements are contained in the SRS              Common Q Documents at the Westinghouse Rockville                        report for the requirements instead of the System Design Specification (SDS). These will    Office dated August 16, 2010 (Reference 9) System                      phase to document the be removed from the SRS and incorporated into the next          Requirements Specification for the Common Q Generic                      completion of the requirements revision of the SDS.                                            Flat Panel Display, 00000-ICE-30155, Revision 9 is                      phase review. (see available for audit at the Westinghouse Rockville office.                ML102920031 Item No 8)
: 3. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and SRS (11) at the            The generic AC160 specifications are contained in the revisions reviewed by V&V. Have these been addressed?            documents listed below. The documents are available Yes. The next revisions of the SDS and SRS address these        for NRC audit at the Westinghouse Rockville office in issues.                                                          accordance with the letter number referenced. List is contained in letter.
: 4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS          (7) A schedule was developed and is reviewed weekly by design meets the contract requirements.                          Westinghouse and TVA project management.
: 5. The next issue of the IV&V report will include the              (8) The revised document submittal schedule was Requirements phase review of the RTM and a partial review          included as item 3 NRC Request (Matrix Item Number for the Design phase.                                              142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010 (Reference Error!
: 6. Westinghouse to provide the generic AC160 and flat panel            Reference source not found.).
specifications.
(9) The flow of documentation information was provided to
: 7. Westinghouse and TVA to develop a schedule of licensing            the NRC inspector during the Common Q PAMS audit.
document submittals that can be met by the project team.
Source: E-mail from Westinghouse (Andrew P. Drake) to
: 8. The flow of information is from the SysRS to the SDS    Bechtel (Mark S. Clark), RE: RAI on SysRS, dated (hardware) and SRS (software). Describe how the          December 8, 2010 (Reference 18) documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.
183                                  7/15/2010                                                            Responder: WEC                                              19. Y        Open                                Open-NRC Review          EICB RAI        TVA Letter dated EICB (Carte)
ML102980066 Item 10/21/10 An emphasis is placed on traceability in System Requirements        The generic Software Requirements Specification applies                  Revised response included in        Due 12/3/10              No. 9            Enclosure 1 Item Specifications in the SRP, in the unmodified IEEE std 830-1993,      except as modified by the WBN Unit 2 System Requirements                  letter dated 12/22/10.                                                         No. 4 and even more so given the modifications to the standard listed in   Specification.                                                                                                NNC 11/18/10: The Regulatory Guide 1.172, which breaks with typical NRC use of the                                                                                                                  point behind this open word should to say Each identifiable requirement in an SRS        TVA Response to Follow-up NRC Request:                                    Response provided in letter        item was that TVA must must be traceable backwards to the system requirements and the                                                                                dated 10/21/10                      demonstrate that the design bases or regulatory requirements that is satisfies          Please see the response to RAI item 12 in letter dated                                                        origin of each 12/222/10, NRC Matrix Item 144.                                                                              requirement in the On page 1-2 of the Post Accident Monitoring Systems Software                                                                                                                      WEC requirements Requirements Specification in the background section, is the                                                                                                                      specification is known sentence Those sections of the above references that require                                                                                                                      and documented. TVA modification from the generic PAMS are defined in the document                                                                                                                    stated that this referring purely to the changes from WNA-DS-01617-WBT Post                                                                                                                        information would be in Accident Monitoring System-System Requirements Specification                                                                                                                      CQ PAMS LTR Rev. 2.
or is it saying that there are additional changes beyond those and that the SRS defines them?


These references are used in the body of the SRS, for example:"
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                  rad94FD7.docx                                                                                        Open Items to be Resolved for SER Approval


===Response===
SE    FSAR    NRC No.                                                                Issue                                                      TVA Response(s)                        Acceptable      Status/ Current Actions          Resolution Path          RAI No. & Date    RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                                Y/N If there are additional changes, what is their origin?
185                                  7/15/2010                                                            Responder: WEC                                              20. N        Open                              Open-NRC Review          EICB RAI EICB (Carte)
ML102980066 Item An emphasis is placed on the traceability of requirements in        Steve Clark to look at how to combine traceability items.                Response included in letter      Due (1) 12/3/10          No. 17 Software Requirements Specifications in the SRP, in the                                                                                        dated 12/22/10.                      (2) 12/22/10 unmodified IEEE std 830-1993, and even more so given the            Was addressed to during the 9/15 meeting and 9/20 - 9/21 modifications to the standard listed in Regulatory Guide 1.172,      audit.                                                                                                      NNC 11/18/10: (1)The which breaks with typical NRC use of the word should to say                                                                                                                    point behind this open Each identifiable requirement in an SRS must be traceable          TVA Response to Follow-up NRC Request:                                                                      item was that TVA must backwards to the system requirements and the design bases or                                                                                                                    demonstrate that the regulatory requirements that is satisfies Also the NRC considers    (1) Please see the response to Item 12 in this letter (NRC                                                  origin of each that the SRS is the complete set of requirements used for the            Matrix Item 144).                                                                                      requirement in the design of the software, whether it is contained within one                                                                                                                      WEC requirements document or many. In order to evaluate an SRS against the        (2) There is no RTM for development of the individual                                                          specification is known guidance in the SRP the staff needs access to all the                reusable software elements. As listed in item 15 of                                                        and documented. TVA requirements.                                                        Table 6-1 Document Requirements of WNA-LI-00058-                                                          stated that this WT-P, Revision 2, Post-Accident Monitoring System                                                          information would be in References 12, 27, 29, and 31-44 in the Post Accident Monitoring    (PAMS) Licensing Technical Report submitted in TVA                                                        CQ PAMS LTR Rev. 2.
Systems Software Requirements Specification are various types      Letter to NRC, dated December 3, 2010, a RTM for                                                            (2) TVA also said it of Reusable Software Element.                                    implementation of the RSEDs (WNA-VR-00280-WBT)                                                              would provide a RTM for the WBN Unit 2 Common Q PAMS has been                                                                  for the RSED These references are used in the body of the SRS, for example:      developed. This document is available for NRC audit at the Westinghouse Rockville office.
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]
They are also included via tables such as found in requirement R7.1.2-1
They are also included via tables such as found in requirement R7.1.2-1
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]  
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
 
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS?   If so what is their origin? Responder: WEC Steve Clark to look at how to combine traceability items.
187                                  By letter dated June 18, 2010, TVA docketed responses to NRC         Responder: Merten                                            21. N        Open                              Open-NRC Review          ML101970033, Item TVA Letter dated Are these connections already EICB (Carte) requests for information.                                                                                                                                                                                 No. 1 & 2         10/5/10         docketed?
 
: 1) Please refer to the revised response to letter dated                     Revised response included in      Due 12/22/10
Was addressed to during the 9/15 meeting and 9/20 - 9/21
: 1) Enclosure 1, Item No. 33 of the TVA letter dated June 18, 2010, 10/5/10 Item 18 (RAI Matrix item 115).                                      letter dated 12/22/10.
 
did not identify any connection from the PAMS Operator Modules                                                                                                                   Revise Response (OMs) to the plant computer and printers; however, Figure 2.1-1 of                                                                             Partial Response provided in the PAMS System Requirements Specification (WNA-DS-01617- 2) This is a duplicate of closed RAI Matrix Item 45.                                letter dated 10/5/10 WBT Rev. 1 - ML101680578) shows a TCP connection from the OMs to the plant computer and printer. Please explain.             TVA Response to Follow-up NRC Request:
audit. TVA Response to Follow-up NRC Request:  
NNC 8/25/10: Why did TVA not
 
: 2) Please clarify whether any digital safety-related systems or     A review of the following documents determined that the                    catch this on the review of the components have a digital communications path to non-safety-       connection between the OM and the plant computer has                      PAMS SysRS or SRS? Does related systems or with safety related systems in another division. been changed to a connection to a printer:                                TVA check that the CQ PAMS If so, NRC staff will need these paths identified on the docket.                                                                               system meets the requirements
(1) Please see the response to Item 12 in this letter (NRC Matrix Item 144).
: 1. WNA-DS-01617-WBT-P, Revision 3, Post Accident                     in its purchase specifications?
(2) There is no RTM for development of the individual reusable software elements. As listed in item 15 of Table 6-1 "Document Requirements" of WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC, dated December 3, 2010, a RTM for implementation of the RSEDs (WNA-VR-00280-WBT) for the WBN Unit 2 Common Q PAMS has been developed. This document is available for NRC audit at the Westinghouse Rockville office.
Monitoring System - System Requirements Specification, dated November 2010 (Attachment 1)
: 20. N Open  Response included in letter dated 12/22/10.
: 2.     WNA-DS-01667-WBT-P, Revision 3, Post Accident Monitoring System - System Design Specification, dated November 2010 (Attachment 4)
 
Open-NRC Review Due (1) 12/3/10         (2) 12/22/10
 
NNC 11/18/10
: (1)The point behind this open item was that TVA must
 
demonstrate that the  
 
origin of each requirement in the WEC requirements specification is known
 
and documented. TVA stated that this information would be in CQ PAMS LTR Rev. 2. 
 
(2) TVA also said it would provide a RTM for the RSED EICB RAI ML102980066 Item No. 17  187  EICB (Carte)
By letter dated June 18, 2010, TVA docketed responses to NRC requests for information.
: 1) Enclosure 1, Item No. 33 of the TVA letter dated June 18, 2010, did not identify any connection from the PAMS Operator Modules (OMs) to the plant computer and printers; however, Figure 2.1-1 of the PAMS System Requirements Specification (WNA-DS-01617-WBT Rev. 1 - ML101680578) shows a TCP connection from the OMs to the plant computer and printer. Please explain.
: 2) Please clarify whether any digital safety-related systems or components have a digital communications path to non-safety-related systems or with safety related systems in another division.
If so, NRC staff will need these paths identified on the docket. Responder: Merten
: 1) Please refer to the revised response to letter dated 10/5/10 Item 18 (RAI Matrix item 115).
: 2) This is a duplicate of closed RAI Matrix Item 45.
TVA Response to Follow-up NRC Request:
A review of the following documents determined that the connection between the OM and the plant computer has been changed to a connection to a printer:
: 1. WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System - System Requirements Specification," dated November 2010 (Attachment 1)
: 2. WNA-DS-01667-WBT-P, Revision 3, "Post Accident Monitoring System - System Design Specification,"
dated November 2010 (Attachment 4)
: 21. N Open Revised response included in letter dated 12/22/10.
 
Partial Response provided in
 
letter dated 10/5/10
 
NNC 8/25/10: Why did TVA not catch this on the review of the PAMS SysRS or SRS?  Does TVA check that the CQ PAMS system meets the requirements in its purchase specifications?
Open-NRC Review


Due 12/22/10 Revise Response
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                  rad94FD7.docx                                                                                      Open Items to be Resolved for SER Approval


ML101970033, Item No. 1 & 2 TVA Letter dated 10/5/10 Are these connections already docketed?
===Response===
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments
SE     FSAR   NRC No.                                                                 Issue                                                     TVA Response(s)                           Acceptable       Status/ Current Actions     Resolution Path         RAI No. & Date   RAI Resp. Date     Comments Sec. Sec. POC                                                                                                                                                  Y/N
: 3. WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report," dated November 2010, submitted in TVA to NRC letter December 3, 2010 (Reference 1)
: 3.       WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, dated November 2010, submitted in TVA to NRC letter December 3, 2010 (Reference 1)
Review of the newly released Common Q PAMS documents listed below confirmed the y correctl y show a connection from the OM to a printer and not the plant computer. None of the other newly released documents contain a figure of the Common Q PAMS system showing the connection from the OM. The exception is WCAP-17351 which was created to allow a non-proprietary version of a generic Common Q document to be submitted on the docket and was not intended to reflect the WBN Unit 2 configuration.
Review of the newly released Common Q PAMS documents listed below confirmed they correctly show a connection from the OM to a printer and not the plant computer. None of the other newly released documents contain a figure of the Common Q PAMS system showing the connection from the OM. The exception is WCAP-17351 which was created to allow a non-proprietary version of a generic Common Q document to be submitted on the docket and was not intended to reflect the WBN Unit 2 configuration.
Note: The OM printer connection is only used for maintenance. A printer is not normally connected to the OM. To use the OM printer connection, the FE keyswitch must installed and be in the "ENABLE" position.  
Note: The OM printer connection is only used for maintenance. A printer is not normally connected to the OM. To use the OM printer connection, the FE keyswitch must installed and be in the ENABLE position.
(1)      WNA-TP-02988-WBT, Revision 0, Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test, dated November 2010, submitted in TVA to NRC letter December 3, 2010 (Reference 1)
(2) WNA-AR-00180-WBT-P, Revision 0, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System, dated October 2010, submitted in TVA to NRC letter November 5, 2010 (Reference 12) 212    7.5.2                          7/27/2010                                                          Responder: WEC                                                  22. N        Open                          Open-NRC Review          EICB RAI EICB (Carte)
ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated            Application specific requirements for testing. This cannot be                Response included in letter  Due 12/22/10              No. 10 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system      addressed in a topical report. Evaluation of how the                        dated 12/22/10.
design specification and software requirements specification      hardware meets the regulatory requirements.                                                                To be addressed by contain information to address the "Design Report on Computer                                                                                                                WBN2 specific test plan Integrity, Test and Calibration..." The staff has reviewed these  WEC to provide the information and determine where the documents, and it is not clear how this is the case.              information will be located.
(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.      1. IEEE-603 1991 (2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.                    5.5 System Integrity. The safety systems shall be designed to accomplish their safety functions under the full range of applicable conditions enumerated in the design basis.
TVA Response: The applicable conditions and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) Section 11, Contract Compliance Matrix items:
87 and 88 Seismic 89, 90, 91, 92 and 185 EMI/RFI


(1) WNA-TP-02988-WBT, Revision 0, "Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test," dated November 2010, submitted in TVA to NRC letter December 3, 2010 (Reference
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                               rad94FD7.docx                                                                Open Items to be Resolved for SER Approval
: 1)  (2) WNA-AR-00180-WBT-P, Revision 0, "Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System," dated October 2010, submitted in TVA to NRC letter November 5, 2010 (Reference 12) 212 7.5.2  EICB (Carte) 7/27/2010


By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification
===Response===
SE    FSAR  NRC No.                                        Issue                          TVA Response(s)                        Acceptable Status/ Current Actions Resolution Path RAI No. & Date  RAI Resp. Date        Comments Sec. Sec. POC                                                                                              Y/N 300, 301 and 302 Environmental 5.7 Capability for Test and Calibration. Capability for testing and calibration of safety system equipment shall be provided while retaining the capability of the safety systems to accomplish their safety functions.
The capability for testing and calibration of safety system equipment shall be provided during power operation and shall duplicate, as closely as practicable, performance of the safety function. Testing of Class 1E systems shall be in accordance with the requirements of IEEE Std 338-1987 [3]. Exceptions to testing and calibration during power operation are allowed where this capability cannot be provided without adversely affecting the safety or operability of the generating station. In this case:
(1) appropriate justification shall be provided (for example, demonstration that no practical design exists),
(2) acceptable reliability of equipment operation shall be otherwise demonstrated, and (3) the capability shall be provided while the generating station is shut down.
TVA Response: The requirements for test and calibration and Common Q PAMS system compliance, are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11, TVA Contract Compliance Matrix items:
202 self test 350 Maintenance Bypass 351 Loop Tuning Parameters, 400 and 401 3.7.2 Testing, Calibration, and Verification 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.10 Repair. The safety systems shall be designed to facilitate timely recognition, location, replacement, repair, and adjustment of malfunctioning equipment.
TVA Response: The requirements for repair and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11, TVA Contract Compliance Matrix items:
179 Mean time to repair 202 self test 398 3.7 Maintenance 399 3.7.1 Troubleshooting 6.5 Capability for Testing and Calibration


contain information to address the "Design Report on Computer
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                  rad94FD7.docx                                                              Open Items to be Resolved for SER Approval


Integrity, Test and Calibration..."  The staff has reviewed these documents, and it is not clear how this is the case.
===Response===
(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.
SE    FSAR   NRC No.                                       Issue                           TVA Response(s)                         Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                 Y/N 6.5.1 Means shall be provided for checking, with a high degree of confidence, the operational availability of each sense and command feature input sensor required for a safety function during reactor operation.
 
This may be accomplished in various ways; for example:
(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.
(1) by perturbing the monitored variable, (2) within the constraints of 6.6, by introducing and varying, as appropriate, a substitute input to the sensor of the same nature as the measured variable, or (3) by cross-checking between channels that bear a known relationship to each other and that have readouts available.
Responder: WEC
6.5.2 One of the following means shall be provided for assuring the operational availability of each sense and command feature required during the post-accident period:
 
(1) Checking the operational availability of sensors by use of the methods described in 6.5.1.
Application specific requirements for testing. This cannot be addressed in a topical report. Evaluation of how the hardware meets the regulatory requirements.    
 
WEC to provide the information and determine where the information will be located.
: 1. IEEE-603 1991 5.5 System Integrity. The safety systems shall be desi gned to accomplish their safet y functions under the full range of applicable conditions enumerated in the design basis.
TVA Response: The applicable conditions and Common Q PAMS s ystem compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) Section 11, "Contract Compliance Matrix" items:
87 and 88 Seismic  89, 90, 91, 92 and 185 EMI/RFI
: 22. N Open Response included in letter dated 12/22/10.
Open-NRC Review
 
Due 12/22/10 To be addressed by WBN2 specific test plan EICB RAI ML102980066 Item
 
No. 10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 300, 301 and 302 Environmental 5.7 Capability for Test and Calibration. Capability for testing and calibration of safety system equipment shall be provided while retaining the capability of the safety systems to accomplish their safety functions.
The capability for testing and calibration of safety system equipment shall be provided during power operation and shall duplicate, as closel y as practicable, performance of the safety function. Testing of Class 1E systems shall be in accordance with the requirements of IEEE Std 338-1987 [3]. Exceptions to testing and calibration during power operation are allowed where this capability cannot be provided without adversely affecting the safety or operability of the generating station. In this case:
(1) appropriate justification shall be provided (for example, demonstration that no practical design exists), (2) acceptable reliability of equipment operation shall be otherwise demonstrated, and (3) the capability shall be provided while the generating station is shut down.
 
TVA Response: The requirements for test and calibration and Common Q PAMS system compliance, are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" Section 11, "TVA Contract Compliance Matrix" items:
202 self test    350 Maintenance Bypass  351 Loop Tuning Parameters,  400 and 401 3.7.2 Testing, Calibration, and Verification  402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.10 Repair. The safety systems shall be designed to facilitate timely recognition, location, replacement, repair, and adjustment of malfunctioning equipment.
TVA Response: The requirements for repair and Common Q PAMS s ystem compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" Section 11, "TVA Contract Compliance Matrix" items:  179 Mean time to repair  202 self test  398 3.7 Maintenance  399 3.7.1 Troubleshooting 6.5 Capability for Testing and Calibration
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 6.5.1 Means shall be provided for checking, with a high degree of confidence, the operational availability of each sense and command feature input sensor required for a safety function during reactor operation.
This may be accomplished in various ways; for example: (1) by perturbing the monitored variable, (2) within the constraints of 6.6, by introducing and varying, as appropriate, a substitute input to the sensor of the same nature as the measured variable, or (3) by cross-checking between channels that bear a known relationship to each other and that have readouts available.
6.5.2 One of the following means shall be provided for assuring the operational availability of each sense and command feature required during the post-accident period: (1) Checkin g the operational availabilit y of sensors b y use of the methods described in 6.5.1.
(2) Specifying equipment that is stable and retains its calibration during the post-accident time period.
(2) Specifying equipment that is stable and retains its calibration during the post-accident time period.
TVA Response: The requirements for sense and command feature testing and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" Section 11 "TVA Contract Compliance Matrix" items:
TVA Response: The requirements for sense and command feature testing and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:
10, display of sensor diagnostic information 202 self test   205 self diagnostics and watchdog timer 264 through 271, system self checks 311 system status displays,   341 alarms, 344 on-line diagnostics
10, display of sensor diagnostic information 202 self test 205 self diagnostics and watchdog timer 264 through 271, system self checks 311 system status displays, 341 alarms, 344 on-line diagnostics
: 2. IEEE 7-4.3.2-2003 5.5 System integrity In addition to the system integrity criteria provided by IEEE Std 603-1998, the following are necessary to achieve system integrity in digital equipment for use in safety systems:  
: 2. IEEE 7-4.3.2-2003 5.5 System integrity In addition to the system integrity criteria provided by IEEE Std 603-1998, the following are necessary to achieve system integrity in digital equipment for use in safety systems:
- Design for computer integrity  
Design for computer integrity Design for test and calibration Fault detection and self-diagnostics 5.5.1 Design for computer integrity The computer shall be designed to perform its safety
- Design for test and calibration  
- Fault detection and self-diagnostics 5.5.1 Design for computer integrity  
 
The computer shall be designed to perform its safety Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments function when subjected to conditions, external or internal, that have significant potential for defeating the safety function. For example, input and output processing failures, precis ion or round off problems, improper recovery actions, electrical input voltage and frequency fluctuations, and maximum credible number of coincident signal changes. 


If the system requirements identify a safety system
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                              rad94FD7.docx                                                                  Open Items to be Resolved for SER Approval


preferred failure mode, failures of the computer shall not preclude the safety system from being placed in that mode. Performance of computer system restart operations shall not result in the safety system being  
===Response===
 
SE    FSAR  NRC No.                                        Issue                        TVA Response(s)                          Acceptable Status/ Current Actions Resolution Path RAI No. & Date  RAI Resp. Date        Comments Sec. Sec. POC                                                                                                Y/N function when subjected to conditions, external or internal, that have significant potential for defeating the safety function. For example, input and output processing failures, precision or round off problems, improper recovery actions, electrical input voltage and frequency fluctuations, and maximum credible number of coincident signal changes.
inhibited from performing its function.
If the system requirements identify a safety system preferred failure mode, failures of the computer shall not preclude the safety system from being placed in that mode. Performance of computer system restart operations shall not result in the safety system being inhibited from performing its function.
TVA Response: Common Q PAMS system reliability and failure modes are described in:
TVA Response: Common Q PAMS system reliability and failure modes are described in:
WNA-AR-00180-WBT, Revision 0, "Failure Modes and Effects Anal y sis (FMEA) for the Post Accident Monitoring System" WNA-AR-00189-WBT, Revision 0 "Post Accident Monitoring System Reliability Analysis" The requirements for mean time between failure and Common Q PAMS s ystem compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report," Section 11 "TVA Contract Compliance Matrix"
WNA-AR-00180-WBT, Revision 0, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System WNA-AR-00189-WBT, Revision 0 Post Accident Monitoring System Reliability Analysis The requirements for mean time between failure and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Section 11 TVA Contract Compliance Matrix item 178.
 
5.5.2 Design for test and calibration Test and calibration functions shall not adversely affect the ability of the computer to perform its safety function. Appropriate bypass of one redundant channel is not considered an adverse effect in this context. It shall be verified that the test and calibration functions do not affect computer functions that are not included in a calibration change (e.g., setpoint change).
item 178.
V&V, configuration management, and QA shall be required for test and calibration functions on separate computers (e.g., test and calibration computer) that provide the sole verification of test and calibration data.
5.5.2 Design for test and calibration Test and calibration functions shall not adversely affect the ability of the computer to perform its safety function. Appropriate bypass of one redundant channel is not considered an adverse effect in this context. It shall be verified that the test and calibration functions do not affect computer functions that are not included in a calibration change (e.g., setpoint change). V&V, configuration management, and QA shall be required for test and calibration functions on separate computers (e.g., test and calibration computer) that provide the sole verification of test and calibration data.
V&V, configuration management, and QA shall be required when the test and calibration function is inherent to the computer that is part of the safety system.
V&V, configuration management, and QA shall be required when the test and calibration function is inherent to the computer that is part of the safety system.
V&V, configuration management, and QA are not required when the test and calibration function is resident on a separate computer and does not provide the sole verification of test and calibration data for the computer that is part of the safety system.  
V&V, configuration management, and QA are not required when the test and calibration function is resident on a separate computer and does not provide the sole verification of test and calibration data for the computer that is part of the safety system.
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response: The requirements for test and calibration and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing


Technical Report" Section 11 "TVA Contract
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                              rad94FD7.docx                                                                  Open Items to be Resolved for SER Approval


Compliance Matrix" items:
===Response===
202 self test   350 Maintenance Bypass   351 Loop Tuning Parameters,   400 and 401 3.7.2 Testing, Calibration, and Verification 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.5.3 Fault detection and self-diagnostics Computer systems can experience partial failures that can degrade the capabilities of the computer system, but may not be immediately detectable by the system.
SE    FSAR  NRC No.                                        Issue                          TVA Response(s)                        Acceptable Status/ Current Actions Resolution Path RAI No. & Date  RAI Resp. Date        Comments Sec. Sec. POC                                                                                                Y/N TVA Response: The requirements for test and calibration and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:
202 self test 350 Maintenance Bypass 351 Loop Tuning Parameters, 400 and 401 3.7.2 Testing, Calibration, and Verification 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.5.3 Fault detection and self-diagnostics Computer systems can experience partial failures that can degrade the capabilities of the computer system, but may not be immediately detectable by the system.
Self-diagnostics are one means that can be used to assist in detecting these failures. Fault detection and self-diagnostics requirements are addressed in this sub-clause.
Self-diagnostics are one means that can be used to assist in detecting these failures. Fault detection and self-diagnostics requirements are addressed in this sub-clause.
The reliability requirements of the safety system shall be used to establish the need for self-diagnostics. Self diagnostics are not required for systems in which failures can be detected by alternate means in a timely manner. If self-diagnostics are incorporated into the system requirements, these functions shall be subject to the same V&V processes as the safety system functions.
The reliability requirements of the safety system shall be used to establish the need for self-diagnostics. Self diagnostics are not required for systems in which failures can be detected by alternate means in a timely manner. If self-diagnostics are incorporated into the system requirements, these functions shall be subject to the same V&V processes as the safety system functions.
If reliability requirements warrant self-diagnostics, then computer programs shall incorporate functions to detect and report computer system faults and failures in a timely manner. Conversely, self-diagnostic functions shall not adversely affect the ability of the computer system to perform its safety function, or cause spurious actuations of the safety function. A typical set of self-diagnostic functions includes the following:  
If reliability requirements warrant self-diagnostics, then computer programs shall incorporate functions to detect and report computer system faults and failures in a timely manner. Conversely, self-diagnostic functions shall not adversely affect the ability of the computer system to perform its safety function, or cause spurious actuations of the safety function. A typical set of self-diagnostic functions includes the following:
- Memory functionality and integrity tests (e.g., PROM checksum and RAM tests)  
Memory functionality and integrity tests (e.g.,
- Computer system instruction set (e.g., calculation tests) - Computer peripheral hardware tests (e.g., watchdog timers and keyboards)  
PROM checksum and RAM tests)
- Computer architecture support hardware (e.g., address lines and shared memory interfaces)  
Computer system instruction set (e.g., calculation tests)
- Communication link diagnostics (e.g., CRC checks) Infrequent communication link failures that do not result in a system failure or a lack of system functionality do not require reporting.
Computer peripheral hardware tests (e.g.,
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments When self-diagnostics are applied, the following self-diagnostic features shall be incorporated into the system design:
watchdog timers and keyboards)
a) Self-diagnostics during computer system startup b) Periodic self-diagnostics while the computer system is operating c) Self-diagnostic test failure reporting TVA Response: The requirements for fault detection and self diagnostics and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" Section 11 "TVA Contract Compliance Matrix" items:
Computer architecture support hardware (e.g.,
107 error free download  202 self test  205 self diagnostics and watchdog timer  263 primary and backup communication  264 through 271, continuous on-line self checks  311 system status displays,  341 alarms,  344 on-line diagnostics 5.7 Capability for test and calibration No requirements beyond IEEE Std 603-1998 are necessary.
address lines and shared memory interfaces)
TVA Response: No response required. 
Communication link diagnostics (e.g., CRC checks)
 
Infrequent communication link failures that do not result in a system failure or a lack of system functionality do not require reporting.
Concurrence: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI 212 Response - Errors in the Contract Compliance Matrix, dated December 17, 2010 (Reference 14) 213 7.5.2  EICB (Carte) 7/27/2010 By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Theory of Operation Description."  The staff has reviewed these documents, and it is not clear how this is the case. The docketed material does not appear to contain the design basis information that is required to evaluate compliance with the Clause of IEEE 603. (1) Please provide the design basis (as described in IEEE 604 Clause 4) of the Common Q PAMS.
(2) Please provide a regulatory evaluation of how the PAMs complies with the applicable regulatory requirements for the theory of operation. For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the manually controlled protective actions? (2) How do the documents identified demonstrate compliance with this clause?
Responder: WEC Conformance with IEEE 603 is documented in the revised Common Q PAMS Licensing Technical Report and the Common Q PAMS System Design Specification.
 
Attachment 1 contains the proprietary version of Westinghouse document  "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" Attachment 8 contains the proprietary version of Westinghouse document "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification", WNA-DS-01667-WBT, Rev. 2 dated September 2010.
: 23. N Open  Response is included in letter dated 10/25/10


NNC to review and revise this question after LTR R2 is received.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                     rad94FD7.docx                                                                                     Open Items to be Resolved for SER Approval
Open-NRC Review Due 12/31/10.
EICB RAI ML102980066 Item No. 18  244  CB (C ar t 8/3/2010  Responder: WEC
: 24. N Open  Open-NRC Review EICB RAI ML102980066 Item Response is provided in letter LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Section 8.2.2 of the Common Q SPM (ML050350234) states that the Software Requirements Specification (SRS) shall be developed using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS should address the software product, not the process of producing the software. In addition Section 4.3.2.1 of the SPM states "Any alternatives to the SPM processe s or additional project specific information for the ...SCMP...shall be specified in the PQP.


Contrary to these two statements in the SPM, the WBN2 PAMS SRS (ML101050202
===Response===
) contains man y process related requirements, for example all seventeen requirements in Section 2.3.2, "Configuration Control," address process requirements for configuration control.
SE    FSAR    NRC No.                                                                  Issue                                                      TVA Response(s)                          Acceptable      Status/ Current Actions        Resolution Path    RAI No. & Date    RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                                    Y/N When self-diagnostics are applied, the following self-diagnostic features shall be incorporated into the system design:
Please explain how the above meets the intent of the approved
a)  Self-diagnostics during computer system startup b)  Periodic self-diagnostics while the computer system is operating c)  Self-diagnostic test failure reporting TVA Response: The requirements for fault detection and self diagnostics and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS)
Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:
107 error free download 202 self test 205 self diagnostics and watchdog timer 263 primary and backup communication 264 through 271, continuous on-line self checks 311 system status displays, 341 alarms, 344 on-line diagnostics 5.7 Capability for test and calibration No requirements beyond IEEE Std 603-1998 are necessary.
TVA Response: No response required.
Concurrence: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI 212 Response - Errors in the Contract Compliance Matrix, dated December 17, 2010 (Reference 14) 213    7.5.2                           7/27/2010                                                            Responder: WEC                                                23. N        Open                            Open-NRC Review      EICB RAI EICB (Carte)
ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated                Conformance with IEEE 603 is documented in the revised                      Response is included in letter  Due 12/31/10.        No. 18 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system          Common Q PAMS Licensing Technical Report and the                            dated 10/25/10 design specification and software requirements specification          Common Q PAMS System Design Specification.
contain information to address the "Theory of Operation                                                                                          NNC to review and revise this Description." The staff has reviewed these documents, and it is      Attachment 1 contains the proprietary version of                            question after LTR R2 is not clear how this is the case. The docketed material does not        Westinghouse document Tennessee Valley Authority                          received.
appear to contain the design basis information that is required to    (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring evaluate compliance with the Clause of IEEE 603.                      System (PAMS), Licensing Technical Report, Revision 1, (1) Please provide the design basis (as described in IEEE 604        WNA-LI-00058-WBT-P, Dated October 2010 Clause 4) of the Common Q PAMS.
(2) Please provide a regulatory evaluation of how the PAMs            Attachment 8 contains the proprietary version of complies with the applicable regulatory requirements for the theory  Westinghouse document Nuclear Automation Watts Bar 2 of operation.                                                        NSSS Completion Program I&C Projects Post Accident For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the        Monitoring System - System Design Specification, WNA-manually controlled protective actions? (2) How do the documents      DS-01667-WBT, Rev. 2 dated September 2010.
identified demonstrate compliance with this clause?
244                    CB              8/3/2010                                                              Responder: WEC                                                24. N        Open                            Open-NRC Review      EICB RAI        Response is          LIC-101 Rev. 3 Appendix B Section 4, (C
art                                                                                                                                                                                                                    ML102980066 Item provided in letter  "Safety Evaluation" states: "the


SPM. The process related requirements have been removed from revision 2 of the Software Requirements Specification (SRS).
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                 rad94FD7.docx                                                                                            Open Items to be Resolved for SER Approval
Attachment 3 of letter dated 10/25/10 contains the proprietary version of Westinghouse document "Nuclear


Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System", WNA-SD-00239-WBT, Revision 2, Dated September 2010.  
===Response===
SE    FSAR    NRC No.                                                              Issue                                                      TVA Response(s)                          Acceptable      Status/ Current Actions          Resolution Path          RAI No. & Date    RAI Resp. Date                  Comments Sec. Sec. POC                                                                                                                                                  Y/N Section 8.2.2 of the Common Q SPM (ML050350234) states that        The process related requirements have been removed from                    Revised response is included in Due 12/22/10                No. 14            dated 10/25/10. information relied upon in the SE must the Software Requirements Specification (SRS) shall be developed    revision 2 of the Software Requirements Specification (SRS).                letter dated 12/22/10                                                                              be docketed correspondence."
using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS        Attachment 3 of letter dated 10/25/10 contains the                          Response is provided in letter                                                                    LIC-101 Rev. 3 states: "The safety should address the software product, not the process of producing  proprietary version of Westinghouse document Nuclear                      dated 10/25/10.                                                                                    analysis that supports the change the software. In addition Section 4.3.2.1 of the SPM states "Any    Automation, Watts Bar 2 NSSS Completion Program, I&C                                                                                                                           requested should include technical alternatives to the SPM processes or additional project specific    Projects, Software Requirements Specification for the Post                 NNC 11/18/10: SysRS Rev. 2                                                                        information in sufficient detail to enable information for the ...SCMP...shall be specified in the PQP.        Accident Monitoring System, WNA-SD-00239-WBT,                              also contains process                                                                              the NRC staff to make an independent Revision 2, Dated September 2010.                                          requirements that are more                                                                        assessment regarding the acceptability Contrary to these two statements in the SPM, the WBN2 PAMS                                                                                      appropriately incorporated into                                                                    of the proposal in terms of regulatory SRS (ML101050202) contains many process related requirements, TVA Response to Follow-up NRC Request:                                            process documentation.                                                                            requirements and the protection of for example all seventeen requirements in Section 2.3.2,                                                                                                                                                                                          public health and safety."
                                    "Configuration Control," address process requirements for    As shown is the listed documents, process related configuration control.                                        requirements have been deleted from the SRS and SysRS in Revision 3:
Please explain how the above meets the intent of the approved SPM.                                                          Attachment 1 contains proprietary version of WNA-DS-01617-WBT-P, Revision 3, Post Accident Monitoring System-System Requirements Specification, dated December 2010.
Attachment 7 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010.
Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17) 245                                  8/3/2010                                                            Responder: WEC                                                25. N        Open                              Open-NRC Review            EICB RAI                              LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
ML102980066 Item                      "Safety Evaluation" states: "the Section 5.8 of the Common Q SPM (ML050350234) identifies the        Relates to the commitment to provide the test plan and the                  Response included in letter      Due 12/22/10              No. 119                              information relied upon in the SE must required test documentation for systems developed using the        SPM compliance matrix                                                      dated 12/3/10                                                                                      be docketed correspondence."
Common Q SPM. Please provide sufficient information for the NRC staff to independently assess whether the test plan for WBN2    Attachment 9 contains the Westinghouse document Post                                                                                                                          LIC-101 Rev. 3 states: "The safety PAMS, is as described in the SPM (e.g., Section 5.8.1).            Accident Monitoring System Test Plan, WNA-PT-00138-                                                                                                                          analysis that supports the change WBT, Revision 0, dated November 2010. Attachment 10                                                                                                                            requested should include technical contains the Westinghouse Application for Withholding for                                                                                                                      information in sufficient detail to enable the Post Accident Monitoring System Test Plan, WNA-PT-                                                                                                                      the NRC staff to make an independent 00138-WBT, Revision 0, dated November 2010.                                                                                                                                    assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
246                                  8/3/2010                                                            Responder: WEC                                                26. N        Open                              Open-NRC Review            EICB RAI        Response is          LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
ML102980066 Item provided in letter  "Safety Evaluation" states: "the Section 4.3.2.1, "Initiation Phase" of the Common Q SPM            As agreed ISG6 does not apply to the Common Q PAMS                          Response is provided in letter    Due 10/22/10              No. 15          dated 10/25/10      information relied upon in the SE must (ML050350234) requires that a Project Quality Plan (PQP) be        platform. The information required to address this question                dated 10/25/10                                                                                    be docketed correspondence."
developed. Many other section of the SPM identify that this PQP    concerning the PQP and SPM has been added to                                                                  NNC 11/18/10: NRC to should contain information required by ISG6. Please provide the    compliance matrix in revision 1 of the Licensing Technical                  NNC 11/18/10: PQP has not        go to WEC Rockville                                              LIC-101 Rev. 3 states: "The safety PQP. If "PQP" is not the name of the documentation produced,        Report.                                                                    been provided and CQ PAMS        Offices and look at                                              analysis that supports the change please describe the documentation produced and provide the                                                                                      LTR Rev. 1 does not contain      PQP to decide if it must                                        requested should include technical information that the SPM states should be in the PQP.              Attachment 1 of letter dated 10/25/10 contains the                          comparable information.          docketed.                                                        information in sufficient detail to enable proprietary version of Westinghouse document Tennessee                                                                                                                        the NRC staff to make an independent Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-                                                                                                                        assessment regarding the acceptability Accident Monitoring System (PAMS), Licensing Technical                                                                                                                        of the proposal in terms of regulatory Report, Revision 1, WNA-LI-00058-WBT-P, Dated October                                                                                                                          requirements and the protection of 2010                                                                                                                                                                         public health and safety."


TVA Response to Follow-up NRC Request:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                  rad94FD7.docx                                                                                      Open Items to be Resolved for SER Approval


As shown is the listed documents, process related requirements have been deleted from the SRS and S y sRS in Revision 3:
===Response===
contains proprietary version of WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System-System Requirements Specification," dated December 2010.    
SE   FSAR   NRC No.                                                               Issue                                                      TVA Response(s)                         Acceptable      Status/ Current Actions          Resolution Path      RAI No. & Date  RAI Resp. Date                  Comments Sec. Sec. POC                                                                                                                                                Y/N 250                                  8/8/2010                                                             Responder: WEC                                               27. N       Open                             Open-NRC Review                                             LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
 
                                                                                                                                                                                                                                                                                  "Safety Evaluation" states: "the The SPM describes the software and documents that will be           Westinghouse develops Software Release Reports/Records                    Revised response included in     Due 12/22/10                                               information relied upon in the SE must created and placed under configuration control. The SCMP (e.g.,     and a Configuration Management Release Report. Describe                  letter dated 12/22/10                                                                        be docketed correspondence."
contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System,"
SPM Section 6, Software Configuration Management Plan)             the documents and when they will be produced. Summarize                                                    10/25/10 is a partial describes the implementation tasks that are to be carried out. The   guidance on how to produce these records, focus on project                Response included in letter      response. Still waiting                                    LIC-101 Rev. 3 states: "The safety acceptance criterion for software CM implementation is that the     specific requirements in SPM etc.                                        dated 10/25/10.                  on Software Test Plan                                      analysis that supports the change tasks in the SCMP have been carried out in their entirety.                                                                                                                       and all other testing                                      requested should include technical Documentation should exist that shows that the configuration         TVA Response to Follow-up NRC Request:                                                                      documentation.                                              information in sufficient detail to enable management tasks for that activity group have been successfully                                                                                                                                                                             the NRC staff to make an independent accomplished. Please provide information that shows that the CM     The following documentation shows that the configuration                                                                                                                assessment regarding the acceptability tasks have been successfully accomplished for each life cycle       management tasks for that activity group have been                                                                                                                     of the proposal in terms of regulatory activity group.                                                      successfully accomplished.                                                                                                                                             requirements and the protection of public health and safety."
 
: 1. WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:
dated December 2010.    
 
Source: E-mail from Westinghous e (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)
Revised response is included in letter dated 12/22/10 Response is provided in letter
 
dated 10/25/10.  
 
NNC 11/18/10: SysRS Rev. 2 also contains process
 
requirements that are more
 
appropriately incorporated into process documentation. Due 12/22/10 No. 14 dated 10/25/10. information relied upon in the SE must be docketed correspondence."  LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability
 
of the proposal in terms of regulatory requirements and the protection of public health and safety." 245  EICB (Carte) 8/3/2010 Section 5.8 of the Common Q SPM (ML050350234) identifies the required test documentation for systems developed using the Common Q SPM. Please provide sufficient information for the
 
NRC staff to independently assess whether the test plan for WBN2 PAMS, is as described in the SPM (e.g., Section 5.8.1).
Responder: WEC Relates to the commitment to provide the test plan and the SPM compliance matrix
 
Attachment 9 contains the Westinghouse document "Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the "Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 2010.
: 25. N Open Response included in letter dated 12/3/10 Open-NRC Review Due 12/22/10 EICB RAI ML102980066 Item No. 119  LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
 
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety." 246  EICB (Carte) 8/3/2010  Section 4.3.2.1, "Initiation Phase" of the Common Q SPM (ML050350234) requires that a Project Quality Plan (PQP) be developed. Many other section of the SPM identify that this PQP should contain information required by ISG6. Please provide the PQP. If "PQP" is not the name of the documentation produced, please describe the documentation produced and provide the information that the SPM states should be in the PQP.
Responder: WEC As agreed ISG6 does not apply to the Common Q PAMS
 
platform. The information required to address this question concerning the PQP and SPM has been added to compliance matrix in revision 1 of the Licensing Technical Report.
of letter dated 10/25/10 contains the proprietary version of Westinghouse document  "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical
 
Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" 26. N Open  Response is provided in letter
 
dated 10/25/10
 
NNC 11/18/10: PQP has not been provided and CQ PAMS LTR Rev. 1 does not contain
 
comparable information.
Open-NRC Review Due 10/22/10  
 
NNC 11/18/10: NRC to go to WEC Rockville Offices and look at PQP to decide if it must docketed.
EICB RAI ML102980066 Item No. 15 Response is provided in letter dated 10/25/10 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must  
 
be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory
 
requirements and the protection of public health and safety."
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 250  EICB (Carte) 8/8/2010  The SPM describes the software and documents that will be created and placed under configuration control. The SCMP (e.g.,
SPM Section 6, "Software Configuration Management Plan")
describes the implementation tasks that are to be carried out. The acceptance criterion for software CM implementation is that the tasks in the SCMP have been carried out in their entirety.
Documentation should exist that shows that the configuration management tasks for that activity group have been successfully accomplished. Please provide information that shows that the CM tasks have been successfully accomplished for each life cycle activity group.
Responder: WEC Westinghouse develops Software Release Reports/Records and a Configuration Management Release Report. Describe the documents and when they will be produced. Summarize guidance on how to produce these records, focus on project specific requirements in SPM etc. 
 
TVA Response to Follow-up NRC Request:
The following documentation shows that the configuration management tasks for that activity group have been successfully accomplished.
: 1. WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:
: a. Section 2.2.1 Hardware/Software Change Process has been added to describe the process of how changes are evaluated.
: a. Section 2.2.1 Hardware/Software Change Process has been added to describe the process of how changes are evaluated.
: b. Section 2.2.2, "Software" has been expanded to include a table detailing evolutionary software changes that have occurred since the initial submittal and the change evaluation of the life cycle. 2. WNA-PT-00138-WBT, Revision 0, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan," (Proprietary), dated November 2010 submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).
: b. Section 2.2.2, Software has been expanded to include a table detailing evolutionary software changes that have occurred since the initial submittal and the change evaluation of the life cycle.
: 27. N Open Revised response included in letter dated 12/22/10
: 2. WNA-PT-00138-WBT, Revision 0, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, (Proprietary), dated November 2010 submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).
 
251                                  8/8/2010                                                            Responder: WEC                                              28. N       Open                             Open-NRC Review                                             LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
Response included in letter dated 10/25/10.
                                                                                                                                                                                                                                                                                  "Safety Evaluation" states: "the The SPM describes the software testing and documents that will       The software testing performed and documents created are                  Revised response included in      Due 12/22/10.                                              information relied upon in the SE must be created. The SPM also describes the testing tasks that are to     addressed by the SPM Compliance matrix contained in                      letter dated 12/22/10                                                                        be docketed correspondence."
Open-NRC Review Due 12/22/10
be carried out. The acceptance criterion for software test           Revision 1 of the Licensing Technical Report.                                                              10/25/10 is a partial implementation is that the tasks in the SPM have been carried out                                                                             Partial response is provided in  response. Still waiting                                    LIC-101 Rev. 3 states: "The safety in their entirety. Please provide information that shows that       Attachment 1 of the letter dated 10/25/10 contains the                   letter dated 10/25/10            on Software Test Plan                                      analysis that supports the change testing been successfully accomplished.                              Proprietary version of Westinghouses document titled:                                                     and all other testing                                      requested should include technical Tennessee Valley Authority (TVA), Watts Bar Unit 2                                                         documentation.                                              information in sufficient detail to enable (WBN2), Post-Accident Monitoring System (PAMS),                                                                                                                         the NRC staff to make an independent Licensing Technical Report, Revision 1, WNA-LI-00058-                                                                                                                   assessment regarding the acceptability WBT-P, Dated October 2010                                                                                                                                             of the proposal in terms of regulatory requirements and the protection of TVA Response to Follow-up NRC Request:                                                                                                                                 public health and safety."
 
10/25/10 is a partial response. Still waiting on Software Test Plan and all other testing documentation. LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
 
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory
 
requirements and the protection of public health and safety." 251  EICB (Carte) 8/8/2010  The SPM describes the software testing and documents that will be created. The SPM also describes the testing tasks that are to  
 
be carried out. The acceptance criterion for software test implementation is that the tasks in the SPM have been carried out in their entirety. Please provide information that shows that testing been successfully accomplished.
Responder: WEC The software testing performed and documents created are addressed by the SPM Compliance matrix  contained in Revision 1 of the Licensing Technical Report.
Attachment 1 of the letter dated 10/25/10 contains the Proprietary version of Westinghouse's document titled:
 
"Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010"
 
TVA Response to Follow-up NRC Request:
Please see the response to RAI item 21 in letter dated 12/22/10, NRC Matrix Item 250.
Please see the response to RAI item 21 in letter dated 12/22/10, NRC Matrix Item 250.
: 28. N Open Revised response included in letter dated 12/22/10
252                                  8/8/2010                                                            Responder: WEC                                              29. N       Open                             Open-NRC Review                                             LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
 
                                                                                                                                                                                                                                                                                  "Safety Evaluation" states: "the The SPM contain requirements for software requirements              Explain response to AP1000 audit report.                                  Response included in letter      Due 12/22/10                                                information relied upon in the SE must traceability analysis and associated documentation (see Section     RTM docketed NRC awaiting V&V evaluation of RTM.                          dated 12/22/10                                                                                be docketed correspondence."
Partial response is provided in letter dated 10/25/10 Open-NRC Review Due 12/22/10.
5.4.5.3, Requirements Traceability Analysis). Please provide information that demonstrates that requirements traceability         The following responses are based on WBN Unit 2 Common                   Read ML091560352                 Check on this Hilmes                                       LIC-101 Rev. 3 states: "The safety
 
10/25/10 is a partial response. Still waiting on Software Test Plan and all other testing documentation. LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
 
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory
 
requirements and the protection of public health and safety." 252  EICB (Carte) 8/8/2010  The SPM contain requirements for software requirements traceability analysis and associated documentation (see Section 5.4.5.3, "Requirements Traceability Analysis"). Please provide information that demonstrates that requirements traceability Responder: WEC Explain response to AP1000 audit report. RTM docketed NRC awaiting V&V evaluation of RTM.
 
The following responses are based on WBN Unit 2 Common
: 29. N Open  Response included in letter dated 12/22/10
 
Read ML091560352 Open-NRC Review Due 12/22/10
 
Check on this Hilmes   LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
 
LIC-101 Rev. 3 states: "The safety Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments analysis has been successfully accomplished. Q PAMS traceability:
Software requirements traceability analysis is described in the following documents:
: 1. WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) Section 11, "TVA


Contract Compliance Matrix"
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                              rad94FD7.docx                                                                Open Items to be Resolved for SER Approval
: 2. WNA-VR-00279-WBT, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability


Matrix for the Post Accident Monitoring System" (available for NRC audit at the Westinghouse Rockville office)
===Response===
: 3. WNA-VR-00280-WBT, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements" (available for NRC audit at the Westinghouse Rockville office) This document addresses the RSEDs used in the WBN Unit 2 Common Q PAMS.
SE    FSAR  NRC No.                                                  Issue                                TVA Response(s)                      Acceptable Status/ Current Actions Resolution Path RAI No. & Date  RAI Resp. Date                Comments Sec. Sec. POC                                                                                                              Y/N analysis has been successfully accomplished. Q PAMS traceability:                                                                                                                          analysis that supports the change requested should include technical Software requirements traceability analysis is described in                                                                                    information in sufficient detail to enable the following documents:                                                                                                                      the NRC staff to make an independent assessment regarding the acceptability
: 1. WNA-LI-00058-WBT-P, Revision 2, Post-Accident                                                                                          of the proposal in terms of regulatory Monitoring System (PAMS) Licensing Technical                                                                                            requirements and the protection of Report submitted in TVA Letter to NRC dated                                                                                            public health and safety."
December 3, 2010, (Reference 1) Section 11, TVA Contract Compliance Matrix
: 2. WNA-VR-00279-WBT, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office)
: 3. WNA-VR-00280-WBT, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office) This document addresses the RSEDs used in the WBN Unit 2 Common Q PAMS.
The V&V evaluation of the RTM is documented in section 2.2.2 of the following documents:
The V&V evaluation of the RTM is documented in section 2.2.2 of the following documents:
: 1. The Independent Verification & Validation (IV&V) report covering the Concept and Definition phases  
: 1. The Independent Verification & Validation (IV&V) report covering the Concept and Definition phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 1, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
 
: 2. The Independent Verification &Validation (IV&V) report covering the Design and Implementation phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 2, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
("Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System,"
: 3. The integration phase is covered in Attachment 10, the proprietary version of IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-P, Revision 3, dated December 2010.
(Proprietary), WNA-VR-00283-WBT, Revision 1, dated  
Attachment 11 contains the non-proprietary version of IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-NP, Revision 3, dated December 2010. Attachment 12 contains the Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283-WBT-P, Revision 3, IV &V Summary Report for the Post Accident Monitoring System (Proprietary), dated December 2010.
 
November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
: 2. The Independent Verification &Validation (IV&V) report covering the Design and Implementation phases
("Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System,"
(Proprietary), WNA-VR-00283-WBT, Revision 2, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
: 3. The integration phase is covered in Attachment 10, the proprietary version of "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-
 
WBT-P, Revision 3, dated December 2010.
1 contains the non-proprietary version of "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT-NP, Revision 3, dated December 2010. Attachment 12 contains the "Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283- WBT-P, Revision 3, "IV &V Summary Report for the Post Accident Monitoring System" (Proprietary)," dated December 2010. analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability
 
of the proposal in terms of regulatory requirements and the protection of public health and safety."
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 327  DORL (Poole) Attachment 36 contains Foxboro proprietary drawings 08F802403-SC-2001 sheets 1 through 6. An affidavit for withholding and non-proprietary versions of the drawings will be submitted by January 31, 2011.
Responder: Webber In accordance with correspondence from Foxboro, there is no proprietary information contained in the 08F802403-SC-2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.
: 30. Y Open  Response Included in letter dated 11/24/10 Open-NRC Review Due 11/24/10    092  DORL (Poole) 5/20/2010
 
TVA to review Licensee Open Item list and determine which items are proprietary.
Responder: Hilmes
 
This item will close when we are no longer using this document as a communications tool.
: 1. Y Open Open-TVA
 
Due: SER Issue  Continuous review as items are added 323  EICB(Garg) WCAP-13869 revision 1 was previously reviewed under WBN Unit 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An analysis of the differences and  their acceptability will be submitted
 
to the NRC by November 15, 2010 Responder: Hilmes/Unit 1 2 contains the WCAP 13869 Revision 1 to Revision 2 Change Analysis.
: 1. Y Open Response is included in letter
 
dated 10/29/10
 
The staff is confused with the response since both units have
 
reference leg  not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 Open-TVA Unit 1 
 
Due: 12/22/10
 
TVA Letter dated 10/29/10  Item


No. 36  281 7.6 7.6.8 EICB (Garg) 8/27/2010 For FSAR Section 7.6.8 in amendment 96, redline version has completely rewritten this section of the FSAR, however, the staff is not able to determine any changes made to the section. Explain
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                       rad94FD7.docx                                                                                          Open Items to be Resolved for SER Approval


what changes have been made to this FSAR Section.
===Response===
Responder: Webb Attachment 5 contains the WBN Unit 2 FSAR markup for Section 7.6.8, "Interlocks for RCS Pressure Control During Low Temperature Operation," showing what was changed between Amendments 95 and 96.
SE    FSAR    NRC No.                                                                Issue                                                        TVA Response(s)                              Acceptable      Status/ Current Actions          Resolution Path      RAI No. & Date    RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                                          Y/N 327                                  Attachment 36 contains Foxboro proprietary drawings 08F802403- Responder: Webber                                                        30. Y        Open                              Open-NRC Review SC-2001 sheets 1 through 6. An affidavit for withholding and non-DORL (Poole) proprietary versions of the drawings will be submitted by January In accordance with correspondence from Foxboro, there is                            Response Included in letter      Due 11/24/10 31, 2011.                                                        no proprietary information contained in the 08F802403-SC-                            dated 11/24/10 2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.
TVA Response to Follow-up NRC Request:
092                                  5/20/2010                                                              Responder: Hilmes                                                1. Y        Open                              Open-TVA                                                    Continuous review as items are added DORL (Poole)        TVA to review Licensee Open Item list and determine which items This item will close when we are no longer using this                                                                   Due: SER Issue are proprietary.                                                document as a communications tool.
The interlock for the RCS Pressure Control for Unit 2 is implemented differently than Unit 1 implementation. There are no differences between Unit 1 and Unit 2 interlocks, operation of interlocks and operator interface for operation of the RCS Pressure Control. Primary sensing elements and final control elements are identical and operations of these devices are identical. For Unit 2, once si g nals are processed by the Eagle 21 system, interlock implementation is by software modules in the Foxboro I/A Distributed Control System (DCS). Hardware outputs, generated in the DCS, operate the PORVs. The Unit 2 DCS is implemented via EDCRs 52378 and 54504. Section 7.6.8 in Amendment 101 of the WBN Unit 2 FSAR reflects the Unit 2 changes associated with implementation of the DCS.
323                                  WCAP-13869 revision 1 was previously reviewed under WBN Unit Responder: Hilmes/Unit 1                                                    1. Y        Open                              Open-TVA Unit 1                          TVA Letter dated 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An                                                                                                                                                                      10/29/10 analysis of the differences and their acceptability will be submitted Attachment 12 contains the WCAP 13869 Revision 1 to                              Response is included in letter    Due: 12/22/10                            Enclosure 1 Item to the NRC by November 15, 2010                                      Revision 2 Change Analysis.                                                      dated 10/29/10                                                              No. 36 EICB(Garg)
The staff is confused with the response since both units have reference leg not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 281    7.6    7.6.8                  8/27/2010                                                              Responder: Webb                                                   1. Y        Open                              Open-TVA/Bechtel        EICB RAI          TVA Letter dated EICB (Garg)
ML102910008      10/29/10 For FSAR Section 7.6.8 in amendment 96, redline version has            Attachment 5 contains the WBN Unit 2 FSAR markup for                           Response provided in letter      Due 11/24/10            Item#65          Enclosure 1 Item completely rewritten this section of the FSAR, however, the staff is  Section 7.6.8, Interlocks for RCS Pressure Control During                     dated 10/29/10                                                              No. 16 not able to determine any changes made to the section. Explain        Low Temperature Operation, showing what was changed                                                             Provide the basis for what changes have been made to this FSAR Section.                      between Amendments 95 and 96.                                                                                    the changes. Look at FSAR Amendment 101 did not        Foxboro I/A impact.
TVA Response to Follow-up NRC Request:                                         reflect the changes in 7.6.8 associated with implementation The interlock for the RCS Pressure Control for Unit 2 is                       of the DCS. Provide the basis implemented differently than Unit 1 implementation. There                       for acceptance to use Foxboro are no differences between Unit 1 and Unit 2 interlocks,                       I?A DCS inplace of analog operation of interlocks and operator interface for operation of                 instrumentation and relays.
the RCS Pressure Control. Primary sensing elements and final control elements are identical and operations of these devices are identical. For Unit 2, once signals are processed by the Eagle 21 system, interlock implementation is by software modules in the Foxboro I/A Distributed Control System (DCS). Hardware outputs, generated in the DCS, operate the PORVs. The Unit 2 DCS is implemented via EDCRs 52378 and 54504. Section 7.6.8 in Amendment 101 of the WBN Unit 2 FSAR reflects the Unit 2 changes associated with implementation of the DCS.
TVA Response to Second Follow-up NRC Request:
TVA Response to Second Follow-up NRC Request:
The highlighted text from FSAR Amendment 101 Section 7.6.8 reflects the installation of the Foxboro DCS.
The highlighted text from FSAR Amendment 101 Section 7.6.8 reflects the installation of the Foxboro DCS.
7.6.8 Text from FSAR Amendment 101 The wide range temperature signals, as inputs to the Protection Sets I and II, continuously monitor RCS temperature conditions. In Protection Set I, the existing RCS wide range temperature channels on RCS loops 1 and 2
7.6.8 Text from FSAR Amendment 101 The wide range temperature signals, as inputs to the Protection Sets I and II, continuously monitor RCS temperature conditions. In Protection Set I, the existing RCS wide range temperature channels on RCS loops 1 and 2
: 1. Y Open  Response provided in letter dated 10/29/10
FSAR Amendment 101 did not reflect the changes in 7.6.8 associated with implementation of the DCS. Provide the basis for acceptance to use Foxboro I?A DCS inplace of analog instrumentation and relays.
Open-TVA/Bechtel


Due 11/24/10
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                      rad94FD7.docx                                                                                        Open Items to be Resolved for SER Approval


Provide the basis for the changes. Look at
===Response===
 
SE     FSAR   NRC No.                                                                   Issue                                                       TVA Response(s)                           Acceptable       Status/ Current Actions         Resolution Path       RAI No. & Date   RAI Resp. Date     Comments Sec.      Sec. POC                                                                                                                                                    Y/N provide inputs to the Eagle 21 digital process protection system. Eagle 21 provides isolated analog signals to the digital process control system. An auctioneer function selects the lowest temperature signal which is then used to calculate an acceptable reference pressure limit (PORV setpoint) considering the plants allowable pressure and temperature Protection Set III. The calculated reference pressure is compared to the actual RCS pressure monitored by the wide range pressure channel. The auctioneered temperature signal will annunciate a main control room (MCR) alarm whenever the measured temperature approaches, within a predetermined amount, the reference temperature for arming the system. Similarly, whenever the measured pressure approaches within a predetermined amount of the programmed setpoint, another MCR alarm will be generated.
Foxboro I/A impact.
When the measured RCS pressure is equal to or above the programmed setpoint (nominal values), a PORV open signal is initiated and a MCR alarm is actuated. A manually armed permissive allows this actuation signal to control the Train A PORV (PCV-68-340A). The manually armed permissive also serves to block a spurious PORV opening due to potential instrument failure whenever the RCS temperature is above the arming reference temperature.
EICB RAI ML102910008 Item#65 TVA Letter dated 10/29/10 Enclosure 1 Item No. 16 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments provide inputs to the Eagle 21 digital process protection system. Eagle 21 provides isolated analog signals to the di g ital process control s ystem. An auctioneer function selects the lowest temperature signal which is then used to calculate an acceptable reference pressure limit (PORV setpoint) considering the plant's allowable pressure and temperature Protection Set III. The calculated reference pressure is compared to the actual RCS pressure monitored by the wide range pressure channel. The auctioneered temperature signal will annunciate a main control room (MCR) alarm whenever the measured temperature approaches, within a predetermined amount, the reference temperature for armin g the system. Similarly, whenever the measured pressure approaches within a predetermined amount of the programmed setpoint, another MCR alarm will be generated. When the measured RCS pressure is equal to or above the programmed setpoint (nominal values), a PORV open signal is initiated and a MCR alarm is actuated. A manually armed permissive allows this actuation signal to control the Train A PORV (PCV-68-340A). The man ually armed permissive also serves to block a spurious PORV opening due to potential instrument failure whenever the RCS temperature is above the arming reference temperature.
The monitored generating station variables that generate the actuation signal for the Train B PORV (PCV-68-334) are processed in a similar manner. The RCS loops 3 and 4 wide range temperature signals and the RCS pressure signal are provided from Protection Set II. Therefore, the generating station variables used for the Train B PORV are derived from a protection set that is independent of the sets from which generating station variables used for the Train A PORV are derived. The wide range temperature auctioneer function and the programmed pressure setpoint calculation for the Train B PORV are performed in a different group of the digital process control system than those for the Train A PORV. Each of these control groups has a fault tolerant, redundant processor pair and redundant power supplies with different power sources.
The monitored generating station variables that generate the actuation signal for the Train B PORV (PCV-68-334) are processed in a similar manner. The RCS loops 3 and 4 wide range temperature signals and the RCS pressure signal are provided from Protection Set II. Therefore, the generating station variables used for the Train B PORV are derived from a protection set that is independent of the sets from which generating station variables used for the Train A PORV are derived. The wide range temperature auctioneer function and the programmed pressure setpoint calculation for the Train B PORV are performed in a different group of the digital process control system than those for the Train A PORV. Each of these control groups has a fault tolerant, redundant processor pair and redundant power supplies with different power sources.
318 7.5.2.3 7.5 EICB (Singh) TVA has provided the following documents for RM-1000 equipment qualification:  
318   7.5.2.3   7.5                   TVA has provided the following documents for RM-1000                 Responder: Temples                                              2. N      Open                            Open-TVA/Bechtel          RAI No. 28        TVA Letter dated equipment qualification:                                                                                                                                                                                     ML102980005      10/29/10, Encl 1 Revised response is included in Due 12/22/10              10/26/2010        Item 34, and TVA (i)     Qualification Test Report for RM-1000 Processor Module                                                                                     letter dated 12/22/10.                                                      letter 11/24/10, and Current-To-Frequency Converter 04508905-QR               (i)   Applicable to WBN Unit 2. 04508905-1QR is                                                             Response update                            Att. 2.
 
(January 2001)                                                      applicable only in regards to the RM-1000, with the                   Note check 04508905-1QR or required. It is clear that (ii)    Qualification Test Report Supplement, RM-1000 Upgrades              exception of re-qualification of certain RM-1000                       QR. Staff version is QR only. 04508903-2SP and -
(i) Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter 04508905-QR (January 2001) (ii) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-1SP (June 2006) (iii) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-2SP (June 2008) (iv) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-3SP (May 2008)
04508905-1SP (June 2006)                                            equipment differences covered in the -1SP report.                                                      3SP are not applicable.
Please clarify whether all of thes e are fully applicable to WBN2 or are they applicable with exceptions?  If with exceptions, then please clarify what those are.
EICB (Singh)
 
(iii)  Qualification Test Report Supplement, RM-1000 Upgrades              The Current-to-Frequency (I-F) converter module                       Response is included in letter The response for 04508905-2SP (June 2008)                                           qualifications in the base report and the -1SP report                  dated 10/29/10                  applicability of (iv)   Qualification Test Report Supplement, RM-1000 Upgrades              are not applicable to the RM-1000s, and will be used                                                  04508905-QR and -
Supplement 3 was issued one month prior to supplement 2. Please explain the reason for the same. Responder: Temples (i) Applicable to WBN Unit 2.
04508905-3SP (May 2008)                                            later as references in the WBN Unit 2 specific                                                        1SP to RM-1000 and IF qualification reports.                                                                                 converter is not clear.
04508905-1QR is applicable only in regards to the RM-1000, with the exception of re-qualification of certain RM-1000  
Please clarify whether all of these are fully applicable to WBN2 or are they applicable with exceptions? If with exceptions, then      (ii)   Applicable to WBN Unit 2.                                                                             Check page numbers of please clarify what those are.                                                                                                                                                     Appendix F (iii)   Not applicable to WBN Unit 2 (missing/duplicate Supplement 3 was issued one month prior to supplement 2.             (iv)  Not applicable to WBN Unit 2                                                                          pages).
 
Please explain the reason for the same.                                                                                                                                           Check applicability of
equipment differences covered in the -1SP report.
The Current-to-Frequency (I-F) converter module qualifications in the base report and the -1SP report are not applicable to the RM-1000s, and will be used later as references in the WBN Unit 2 specific qualification reports.
(ii) Applicable to WBN Unit 2.  (iii) Not applicable to WBN Unit 2 (iv) Not applicable to WBN Unit 2
: 2. N Open  Revised response is included in
 
letter dated 12/22/10.
 
Note check 04508905-1QR or QR. Staff version is QR only.
 
Response is included in letter dated 10/29/10 Open-TVA/Bechtel Due 12/22/10
 
Response update required. It is clear that 04508903-2SP and -
 
3SP are not applicable.
The response for applicability of 04508905-QR and -
1SP to RM-1000 and IF
 
converter is not clear.
Check page numbers of Appendix F (missing/duplicate pages). Check applicability of RAI No. 28 ML102980005 10/26/2010 TVA Letter dated 10/29/10, Encl 1 Item  34, and TVA
 
letter 11/24/10, Att. 2.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments The 04508905-3SP report was prepared for another TVA plant, as a monitor system-level report, where the system included equipment mostly based on the base report equipment items. These two -2SP and -3SP supplement reports were essentially worked concurrently, but the -2SP document review/release process resulted in the release
 
time difference. TVA Response to Follow-up NRC Request:
NOTE: The response for the current to frequency (I to F) converter in item 1 below is a reversal of the response previously provided in TVA to NRC letter dated October 29, 2010 (Reference 22). General Atomics Electronic Systems Inc. (GA-ESI) notified TVA of this change on December 8, 2010 (Reference 20).
(1) The applicability of the qualification reports from GA-ESI e-mail dated December 10, 2010 (Reference 19
) is as follows:
: a. 04508905-QR "Qualification Test Report for RM-1000 Processor Module and Current-to-Frequency Converter" is applicable to the WBN Unit 2 RM-1000 and I to F converter modules.
: b. 04508905-1SP "Supplement to Qualification Test Report for RM-1000 Processor Module and Current-to-Frequency Converter" is applicable to the WBN Unit 2 RM-1000 module.
: c. 04508905-1SP is not applicable to the WBN Unit 2 I to F converter module.
: d. 04508905-2SP "Qualification Test Report Supplement, I-F Converter Upgrades" is applicable to the WBN Unit 2 I to F converter module.
GA-ESI provided two other reports required to support qualification of the containment high range radiation monitors. The report descriptions are from GA-ESI e-mail on December 8, 2010 (Reference 20). The reports are:
: e. GA-ESI report 04038903-QSR, "Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors:"  The report is the principle report and the starting point for all
 
the radiation monitors provided as part of the replacement contract. The report describes each monitor; referenced to the technical manual for the physical and functional description and lists
 
the major components of the monitor system.
 
Report section 3 identifies the TVA Watts Bar Unit 2 Environmental, Seismic, Electromagnetic Compatibility (EMC), and software requirements for each monitor. In section 4 a brief description of GA-ESI generic qualification programs for all Appendix C to RM1000 instead of RM2300? See items 336 and 337.
 
All equipment qualification reports including supplements 2SP and 3SP have
 
been reviewed as
 
vendor drawings for WBN-2. Please explain the reason for applicability of one report and not the other.
Further all TVA/Bechtel reviews seems to be dispositioned as Code 4, "Review not required.
Work may proceed." 
 
The applicable reports should have been reviewed prior to dispositioning them.
Please explain the apparent lack of review of WBN-2 applicable documents. Was 
 
appropriate review guidance used?
Further update required
 
Provide model number/part number for the RM-1000 and I/F
 
converter used for
 
WBN-2. This information is needed to verify that the model or part number used is
 
the equipment that has been qualified for WBN-
: 2.
 
Provide qualification reports 04038903-QSR and 04038903-7SP by
 
the dues date of  


1/22/11.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                    rad94FD7.docx                                                                          Open Items to be Resolved for SER Approval
Submit a copy of any other relevant reviewed


versions of the qualification reports.
===Response===
SE    FSAR  NRC No.                                        Issue                              TVA Response(s)                        Acceptable Status/ Current Actions      Resolution Path    RAI No. & Date  RAI Resp. Date        Comments Sec. Sec. POC                                                                                                    Y/N The 04508905-3SP report was prepared for another TVA                                              Appendix C to RM1000 plant, as a monitor system-level report, where the system                                          instead of RM2300?
included equipment mostly based on the base report                                                See items 336 and 337.
equipment items. These two -2SP and -3SP supplement reports were essentially worked concurrently, but the -2SP                                        All equipment document review/release process resulted in the release                                            qualification reports time difference.                                                                                  including supplements 2SP and 3SP have TVA Response to Follow-up NRC Request:                                                            been reviewed as vendor drawings for NOTE: The response for the current to frequency (I to F)                                          WBN-2. Please explain converter in item 1 below is a reversal of the                                            the reason for response previously provided in TVA to NRC letter                                        applicability of one dated October 29, 2010 (Reference 22). General                                            report and not the Atomics Electronic Systems Inc. (GA-ESI) notified                                        other.
TVA of this change on December 8, 2010 (Reference 20).                                                                          Further all TVA/Bechtel reviews seems to be (1) The applicability of the qualification reports from GA-                                      dispositioned as Code ESI e-mail dated December 10, 2010 (Reference 19) is                                        4, Review not required.
as follows:                                                                                  Work may proceed.
The applicable reports
: a. 04508905-QR Qualification Test Report for RM-should have been 1000 Processor Module and Current-to-reviewed prior to Frequency Converter is applicable to the WBN dispositioning them.
Unit 2 RM-1000 and I to F converter modules.
Please explain the
: b. 04508905-1SP Supplement to Qualification Test                                        apparent lack of review Report for RM-1000 Processor Module and                                                of WBN-2 applicable Current-to-Frequency Converter is applicable to                                      documents. Was the WBN Unit 2 RM-1000 module.                                                        appropriate review guidance used?
: c. 04508905-1SP is not applicable to the WBN Unit 2 I to F converter module.                                                            Further update required
: d. 04508905-2SP Qualification Test Report                                                Provide model Supplement, I-F Converter Upgrades is                                                number/part number for applicable to the WBN Unit 2 I to F converter                                          the RM-1000 and I/F module.                                                                                converter used for WBN-2. This GA-ESI provided two other reports required to support                                        information is needed qualification of the containment high range radiation                                        to verify that the model monitors. The report descriptions are from GA-ESI e-                                        or part number used is mail on December 8, 2010 (Reference 20). The                                                the equipment that has reports are:                                                                                been qualified for WBN-2.
: e. GA-ESI report 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit                                        Provide qualification 2 Replacement Radiation Monitors: The report is                                      reports 04038903-QSR the principle report and the starting point for all                                    and 04038903-7SP by the radiation monitors provided as part of the                                        the dues date of replacement contract. The report describes each                                        1/22/11.
monitor; referenced to the technical manual for the physical and functional description and lists                                      Submit a copy of any the major components of the monitor system.                                            other relevant reviewed Report section 3 identifies the TVA Watts Bar Unit                                    versions of the 2 Environmental, Seismic, Electromagnetic                                              qualification reports.
Compatibility (EMC), and software requirements for each monitor. In section 4 a brief description                                    Submit copies of the of GA-ESI generic qualification programs for all                                      reviewed reports for


Submit copies of the reviewed reports for Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments radiation monitoring equipment in each of the four above areas is provided. The qualification basis for each monitor is provided in a separate supplement to the principle report and is identified in section 5.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                               rad94FD7.docx                                                                                     Open Items to be Resolved for SER Approval
: f. GA-ESI report 04038903-7SP, "Qualification Basis for 04034101-001 (2-RE-90-271, -272, -273, & -274) [TVA Note: These are the containment post accident high range radiation monitors.]:"  GA-ESI report 04038903-7SP is divided into subsections to address the Environmental, Seismic, EMC, and Software qualification basis for the High Range Area Monitors. Within each subsection, the HRAM is compared to a tested or analyzed article to demonstrate similarity and/or evaluate differences, the tests that were performed, and evaluation to demonstrate qualification. In most


cases, the qualification basis references other documents. In addition to qualification, a section is provided that lists the life of those replaceable components that have life expectancy less than 40 years.
===Response===
SE      FSAR    NRC No.                                                                Issue                                                  TVA Response(s)                            Acceptable      Status/ Current Actions      Resolution Path        RAI No. & Date  RAI Resp. Date      Comments Sec.      Sec. POC                                                                                                                                              Y/N radiation monitoring equipment in each of the four                                              04508905-QR, above areas is provided. The qualification basis                                                04508905-1SP, for each monitor is provided in a separate                                                      04508905-2SP.
supplement to the principle report and is identified in section 5.                                                                                    Clarification of applicability of existing
: f. GA-ESI report 04038903-7SP, Qualification                                                      reports is acceptable.
Basis for 04034101-001 (2-RE-90-271, -272, -
273, & -274) [TVA Note: These are the containment post accident high range radiation monitors.]: GA-ESI report 04038903-7SP is divided into subsections to address the Environmental, Seismic, EMC, and Software qualification basis for the High Range Area Monitors. Within each subsection, the HRAM is compared to a tested or analyzed article to demonstrate similarity and/or evaluate differences, the tests that were performed, and evaluation to demonstrate qualification. In most cases, the qualification basis references other documents. In addition to qualification, a section is provided that lists the life of those replaceable components that have life expectancy less than 40 years.
(2) This is addressed by response to RAI Question 336 in TVA to NRC letter dated November 24, 2010 (Reference 8)
(2) This is addressed by response to RAI Question 336 in TVA to NRC letter dated November 24, 2010 (Reference 8)
(3) This is addressed by response to RAI Question 337 in TVA to NRC letter dated November 24, 2010 (Reference 8)
(3) This is addressed by response to RAI Question 337 in TVA to NRC letter dated November 24, 2010 (Reference 8)
(4) The 04508905-3SP Qualification Test Report Supplement, RM-1000 Upgrades" is not applicable to WBN Unit 2 (Reference 19).
(4) The 04508905-3SP Qualification Test Report Supplement, RM-1000 Upgrades is not applicable to WBN Unit 2 (Reference 19).
Please see Item 1, above, for applicability of the other reports.
Please see Item 1, above, for applicability of the other reports.
(5) TVA provided the proprietary versions of the reports by letter dated March 12, 2010 (Reference 10). By letter dated July 15, 2010 (Reference 23), TVA provided the non-proprietary version of the reports and included a copy of the proprietary report which had been erroneously marked as having not been reviewed.
(5) TVA provided the proprietary versions of the reports by letter dated March 12, 2010 (Reference 10). By letter dated July 15, 2010 (Reference 23), TVA provided the non-proprietary version of the reports and included a copy of the proprietary report which had been erroneously marked as having not been reviewed.
04508905-QR report has been reviewed by TVA. The review of the remaining reports is ongoing.
04508905-QR report has been reviewed by TVA. The review of the remaining reports is ongoing.
(6) See item 5.
(6) See item 5.
04508905-QR, 04508905-1SP, 04508905-2SP.  
338    7.5.2.3    7.5                  In page 3-15 and appendix B of Qualification Test Report          Responder: Civil EQB                                        3. N      Open                        Open-TVA/Bechtel 04508905-QR, licensee described the selection of seismic EICB (Singh) required response spectra (RRS) and indicated Figure 3-2 (page Get date from Bob Brown                                                                                  Due: 12/22/10 3-17), Figure 3-3 (page 3-18) are the RRSs used. The RRS curves used for actual testing are lower than the RRS curves that are shown on Figures 3-2 and 3-3. The RRS curves used for testing are shown in Figure 4-5, 4-6, 4-7, 4-8, 4-11, 4-12, 4-13, and 4-14 (pages 4-25, 4-26, 4-28, 4-29, 4-37, 4-38, 4-40, 4-41).


Clarification of applicability of existing reports is acceptable.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                       rad94FD7.docx                                                                                       Open Items to be Resolved for SER Approval
338 7.5.2.3 7.5 EICB (Singh) In page 3-15 and appendix B of Qualification Test Report 04508905-QR, licensee described the selection of seismic required response spectra (RRS) and indicated Figure 3-2 (page 3-17), Figure 3-3 (page 3-18) are the RRSs used. The  RRS curves used for actual testing are lower than the RRS curves that are shown on Figures 3-2 and 3-3. The RRS curves used for testing are shown in Figure 4-5, 4-6, 4-7, 4-8, 4-11, 4-12, 4-13, and 4-14 (pages 4-25, 4-26, 4-28, 4-29, 4-37, 4-38, 4-40, 4-41).
 
Responder: Civil EQB Get date from Bob Brown
===Response===
: 3. N Open Open-TVA/Bechtel Due: 12/22/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Please clarify and justify why the RRS curves used in actual tests are lower than the RRS curves determined in Figures 3-2 and 3-3.
SE     FSAR   NRC No.                                                                   Issue                                                       TVA Response(s)                             Acceptable       Status/ Current Actions       Resolution Path       RAI No. & Date   RAI Resp. Date     Comments Sec.      Sec. POC                                                                                                                                                      Y/N Please clarify and justify why the RRS curves used in actual tests are lower than the RRS curves determined in Figures 3-2 and 3-3.
In addition please justify that the RRS used for testing envelopes the RRS required for WBN-2 application specific seismic conditions.
In addition please justify that the RRS used for testing envelopes the RRS required for WBN-2 application specific seismic conditions.
339 7.5.2.3 7.5 EICB (Singh) In the Qualification Test Report 04508905-QR, the licensee provided only eight Safe Shutdown Earthquake (SSE) Test Response Spectra (TRS) as mentioned in the previous open item (OI-338). Please provide all SSE and Operating Basis Earthquake (OBE) TRS plots for NRC review. Responder: Bob Brown
339   7.5.2.3   7.5                   In the Qualification Test Report 04508905-QR, the licensee   Responder: Bob Brown                                                    4. N      Open                          Open-TVA/Bechtel provided only eight Safe Shutdown Earthquake (SSE) Test EICB Response Spectra (TRS) as mentioned in the previous open item                                                                                                                   Due: 12/22/10 (Singh)        (OI-338). Please provide all SSE and Operating Basis Earthquake (OBE) TRS plots for NRC review.
: 4. N Open Open-TVA/Bechtel Due: 12/22/10   340 7.5.2.3 7.5 EICB (Singh) Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 (page 3-8) of the Qualification Test Report 04508905-QR. In addition, please provide the standards or the guidance documents used as the source for ENV 50140, ENV 55011 Class A, and EN 55022 Class B. Responder: GA
340   7.5.2.3   7.5                   Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 Responder: GA                                                  5. Y      Open                          Open-TVA/Bechtel (page 3-8) of the Qualification Test Report 04508905-QR. In addition, please provide the standards or the guidance documents The following responses are based on e-mail: GA-ESI to                            Response included in letter  Provide the qual reports used as the source for ENV 50140, ENV 55011 Class A, and EN Bechtel, dated December 8, 2010 (Reference 20),                                       dated 12/22/10.              by 1/28/11 per TVA 55022 Class B.                                                                                                                                                                  letter of 12/22/10.
 
(1) The EMI/RFI tests described in Table 3-2 are based on GA-ESI report 04509050 and are summarized in GA-                                                     Due:12/22/10 ESI report 04508905-QR. The independent laboratory report, with curves, is part of GA-ESI report 04509050.
The following responses are based on e-mail: GA-ESI to Bechtel, dated December 8, 2010 (Reference 20),
Subsequent to issuing GA-ESI report 04508905-QR additional EMC testing was performed in accordance with TVA specific requirements. The results of the subsequent EMC testing are reported in GA-ESI report 04038800. GA-ESI report 04038800 includes the test curves and the report is used as the basis for EMC qualification of the Upper and Lower Inside Containment Post Accident Radiation Monitors (2-RE-EICB (Singh) 90-271 through -274). The results of the testing and the acceptability of the RM-1000 monitors for use at WBN Unit 2 are addressed in GA-ESI report 04038903-7SP. This report will be submitted no later than January 28, 2010.
(1) The EMI/RFI tests described in Table 3-2 are based on GA-ESI report 04509050 and are summarized in GA-ESI report 04508905-QR. The independent laboratory report, with curves, is part of GA-ESI report 04509050.
Subsequent to issuing GA-ESI report 04508905-QR additional EMC testing was performed in accordance  
 
with TVA specific requirements. The results of the subsequent EMC testing are reported in GA-ESI report 04038800. GA-ESI report 04038800 includes the test curves and the report is used as the basis for EMC qualification of the Upper and Lower Inside  
 
Containment Post Accident Radiation Monitors (2-RE-90-271 through -274). The results of the testing and the acceptability of the RM-1000 monitors for use at WBN Unit 2 are addressed in GA-ESI report 04038903-7SP. This report will be submitted no later than January 28, 2010.
(2) ENV 50140, EN 55011, and EN 55022 are British Standard Institution (BSI) publications concerning equipment electromagnetic and radio frequency performance. The standard titles are shown below:
(2) ENV 50140, EN 55011, and EN 55022 are British Standard Institution (BSI) publications concerning equipment electromagnetic and radio frequency performance. The standard titles are shown below:
: a. ENV 50140 - Electromagnetic Compatibility - Basic Immunity Standard - Radiated Radio-Frequency Electromagnetic Field - Immunity Test
: a. ENV 50140 - Electromagnetic Compatibility -
Basic Immunity Standard - Radiated Radio-Frequency Electromagnetic Field - Immunity Test
: b. EN 55011 - Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurement
: b. EN 55011 - Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurement
: c. EN 55022 - Information technology equipment -
: c. EN 55022 - Information technology equipment -
Radio disturbance characteristics - Limits and  
Radio disturbance characteristics - Limits and methods of measurement 341   7.5.2.3   7.5                   FSAR Tables 3.10 list seismically qualified equipment. However,     A review of WBN Unit 2 FSAR amendment 102 chapters              6. Y      Open                          Open-TVA/Bechtel these tables do not list the containment high range radiation       3.10, 11 and 12 was performed. The reviewer was unable to monitors. Please add them to the appropriate FSAR table(s) or       locate seismic qualification information for the radiation                                                  Will be closed on EICB (Singh) justify why they should not be included in the FSAR 3.10 series of   monitoring system in those chapters. A review of chapter                                                   update of FSAR 3.10 tables.                                                              3.11 confirmed that radiation monitoring is included in the                                                 series tables.
 
environmentally qualified systems.
methods of measurement
: 5. Y Open Response included in letter
 
dated 12/22/10.
Open-TVA/Bechtel Provide the qual reports by 1/28/11 per TVA letter of 12/22/10.
Due:12/22/10   341 7.5.2.3 7.5 EICB (Singh) FSAR Tables 3.10 list seismically qualified equipment. However, these tables do not list the containment high range radiation monitors. Please add them to the appropriate FSAR table(s) or justify why they should not be included in the FSAR 3.10 series of tables. A review of WBN Unit 2 FSAR amendment 102 chapters 3.10, 11 and 12 was performed. The reviewer was unable to locate seismic qualification information for the radiation monitoring system in those chapters. A review of chapter 3.11 confirmed that radiation monitoring is included in the environmentally qualified systems.
It appears that seismic qualification of the radiation monitoring equipment was unintentionally omitted from
It appears that seismic qualification of the radiation monitoring equipment was unintentionally omitted from
: 6. Y Open Open-TVA/Bechtel Will be closed on update of FSAR 3.10 series tables.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments FSAR chapter 3.10. FSAR chapter 3.10 will be updated to include the qualified radiation monitoring equipment in a future FSAR amendment.
344 7.6.6 ? Eicg(Garg) Unit 1 SE discussed in Section 7.6.5, "Valve Power Lockout". There is no section in FSAR which provides discussion on this subject. SE section discusses compliance with PSB-18. Provide a discussion which can be used by the staff to determine similar conclusion as Unit 1 and if the desi gn is similar to Unit 1 then make a statement to that effect. Also provide the list of the valves where power lockout during normal reactor operation is utilized for valves whose inadvertent operation could affect plant safety. The requested information is contained in FSAR Amendment 102 as follows:
7.6.2.1 Description 5 th paragraph: "The motor-operated bypass valves are located in bypass lines paralleling the normal RHR suction isolation valves FCV 74-1 and FCV 74-2 which are in series in the flowpath. Valves FCV 74-8 and FCV 74-9 are normally closed and remain closed with power locked out unless one of the two main isolation valves (FCV 74-1 or FCV 74-2) cannot be opened and the plant must be cooled down."
And:  7.6.6 Spurious Actuation Protection for Motor Operated Valves 7. N Open Open-TVA/Bechtel 345 7.5.2.3 7.5 EICB (Singh) Provide the normal temperatures and expected periods of high/low temperature excursions to assess aging requirements. TVA to further clarify if 86&#xba;F for 40 years was used as the qualification requirement for aging tests. This has been stated in some of the subsections under section 4.2 of the 04508905-QR report but  the rationale for using 86&#xba;F (includes an internal temperature rise of 18&#xba;F) for 40 years has not been justified in the 04508905-QR report or the supplement reports.
TVA to provide the rationale for this acceptance criteria for WBN-2.
: 8. N Open Open-TVA/Bechtel 346 7.5.2.3 7.5 EICB (Singh) TVA has previously stated in response to open item 319 that RM-1000 System Verification Test Results report, 04507007-1TR is not applicable to WBN-2. However, TVA has not provided a WBN-2 specific test results report. Please identify and provide the appropriate test results reports to complete the review.
: 9. N Open Open-TVA/Bechtel 347 7.5.2.3 7.5 EICB (Singh) Qualification report 04508905-1SP does not address EMI/RFI qualification for the new RM-1000 modules. TVA to provide the updated qualification or explain the basis for not addressing the
EMI/RFI qualification.
: 10. N Open Open-TVA/Bechtel 348 7.5.2.3 7.5 EICB (Singh) Qualification report 04508905-2SP does not address EMI/RFI qualification for the new I/F converters. TVA to provide the updated qualification or explain the basis for not addressing the
EMI/RFI qualification.
: 11. N Open Open-TVA/Bechtel 349 7.5.2.3 7.5 EICB (Singh) Radiation testing was not considered in any of the test reports as all the equipment has been assumed to be located in nuclear power plant areas with mild environments and radiation dosages less than 1 x 10 3 rads for total integrated dose (TID). However,  the radiation monitors and the I/F converters are located in the main control room which is defined as mild environment. For WBN-2 mild environment is defined as room or building zone where (1) the temperature, pressure, or relative humidity resulting from the direct effects of a design basis event (DBE)  (e.g., temperature rise due to steam release) are no more severe than those which would occur during an abnormal plant operational condition, (2) the temperature will not exceed 130&#xba;F due to indirect effects of a DBE, (3) the event radiation dose is less than or equal to 1 x 10 4 rads, and (4) the total event plus the 40 year TID (total In response to aquestion about Common Q PAMS equipment qualification, TVA re-evaluated the Control and Aux Instrument Room TID and concluded it to be less than 1x10 3 RAD. 12. N Open Open-TVA/Bechtel Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments integrated dose) is less than or equal to 5 x 10 4 rads (reference WB-DC-40-54). TVA to address lack of radiation qualification for WBN-2. 350 7.5.2.3 7.5 EICB (Singh) The seismic required response spectra (RRS) is shown in Figures 3-1 of 04508905-1SP and Figure 3-1 of 0458905-2SP report. The actual test response spectra are shown in Figures 4-5 and 4-6 of 04508905-QR report. The actual test response spectra does not seem to fully envelope the RRS. However, this statement is based on visual reading of unidentified numbers. TVA to provide clarification to the values at the inflection point of all lines on the
RRS and the actual test response spectra. The seismic qualification issue is open  till further clarification is received from TVA. 13. N Open Open-TVA/Bechtel 351 7.5.2.3 7.5 EICB (Singh) The replacement schedule for the components that have a qualified life of less than 40 years is noted in Table 6-1 of the supplemental qualification report 04508905-1SP. It is not clear if the components identified for replacement in this report are the only components or if the components which are in addition to the components previously identified in qualification report 04508905-QR. Are there any age sensitive components for the I/F converter used for WBN-2?  (Note:  Report 04508905-2SP does not state an y a g e sensitive components that require replacement during the qualified life). 14. N Open Open-TVA/Bechtel 352 7.5.2.3 7.5 EICB (Singh) Please calrify how many RM-1000 radaition monitors are being procured for WBN-2, is the quantity 2 or four. MR 25402-011-MRA-HARA-00002, R4 under Item 1.6 indicates that the quantit y is 2. If so, is WBN-2 using dual channel indication on each RM-1000 unit. TVA to clarify.
: 15. N Open Open-TVA/Bechtel 334 7 7 EICB (Darbali) FSAR Figure 7A-3 "Mechanical Flow and Control Diagram Symbols" doesn't show the symbols for the first column of valves.
Please correct this in a future FSAR amendment.
Update: Please fix symbols for Gate Valve, Globe Valve and Float operated valve. Responder: Stockton
: 1. Y Open  Figure will be corrected in FSAR Amendment 103. Open-TVA/Licensing RAI not required. N/A RAI not required because the figure is not part of any SE section.
069 7.5.2 7.5.1 EICB (Carte) B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Watts Bar 2 PAMS Specific FAT Report" was October 2010. Responder: WEC                    Date: 5/25/10
: 1. N Open  Awaiting for document to be
docketed by TVA.
Open-TVA/WEC Due 2/18/11 N/A - No question was asked. Item was opened to track comm8ittment made by applicant.
N/A  074 7.5.2 7.5.1 EICB (Carte) B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the Post FAT IV&V Phase Summary Report was November 30, 2010. Responder: WEC                  Date: 5/25/10
: 2. N Open  TVA to provide due date.
Open-TVA/WEC Due 2/21/11 N/A - No question was asked. Item was opened to track commitment made by applicant.
N/A  081 7.5.2 7.5.1 EICB (Carte) 5/6/2010  The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.
0, Dated April 2010), in Section 7, lists codes and standards applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:  (1) RG 1.29 - September 1978 vs. March 2007 (2) RG 1.53 - June 1973 vs. November 2003 Responder: Merten/WEC The codes and standards documents listed in Section 7 of the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved
: 3. N Open  ML101600092 Item No.1:  There are three sets of regulatory
criteria that relate to a Common Q application (e.g. WBN2 PAMS):
(a) Common Q platform Open-TVA/WEC Due 12/22/10
TVA to provide requested information.
EICB RAI ML102910002 Item No. 9 TVA Letter dated 6/18/10 NNC 1/5/11:
See Also Open Item No.
86 and 202.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (a) IEEE 379-1994 vs. -2000 (3) RG 1.75 - September 1975 vs. February 2005 (a) IEEE 384-1992 vs. -1992 (4) RG 1.100 - June 1988 vs. September 2009 (a) IEEE 344-1987 vs. -2004 (5) RG 1.152 - January 1996 vs. January 2006 (a) IEEE 7-4.33.2-1993 vs. -2003 (6) RG 1.168 - September 1997 vs. February 2004 (a) IEEE 1012-1986 vs. -1998 (b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991 (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 
endorses 323-1974)
However, LIC-110, "Watts Bar Unit 2 License Application Review," states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions."  Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences. Common Q topical report and approved SER and the codes and standards on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review.


Bechtel to develop a matrix and work with Westinghouse to provide justification.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                       rad94FD7.docx                                                                              Open Items to be Resolved for SER Approval
components - Common Q TR (b) Application Development Processes - Common Q SPM (c) Application Specific - current


regulatory criteria The Common Q Topical Report and associated appendices primarily addressed (a) and (b).
===Response===
The Common Q SER states:
SE      FSAR    NRC No.                                                                    Issue                                                          TVA Response(s)                        Acceptable      Status/ Current Actions      Resolution Path  RAI No. & Date  RAI Resp. Date      Comments Sec.      Sec. POC                                                                                                                                                    Y/N FSAR chapter 3.10. FSAR chapter 3.10 will be updated to include the qualified radiation monitoring equipment in a future FSAR amendment.
344    7.6.6      ?                      Unit 1 SE discussed in Section 7.6.5, Valve Power Lockout.            The requested information is contained in FSAR Amendment    7. N      Open                        Open-TVA/Bechtel There is no section in FSAR which provides discussion on this          102 as follows:
subject. SE section discusses compliance with PSB-18. Provide a discussion which can be used by the staff to determine similar          7.6.2.1 Description conclusion as Unit 1 and if the design is similar to Unit 1 then make a statement to that effect. Also provide the list of the valves where  5th paragraph: The motor-operated bypass valves are power lockout during normal reactor operation is utilized for valves    located in bypass lines paralleling the normal RHR suction Eicg(Garg) whose inadvertent operation could affect plant safety.                  isolation valves FCV 74-1 and FCV 74-2 which are in series in the flowpath. Valves FCV 74-8 and FCV 74-9 are normally closed and remain closed with power locked out unless one of the two main isolation valves (FCV 74-1 or FCV 74-2) cannot be opened and the plant must be cooled down.
And:
7.6.6 Spurious Actuation Protection for Motor Operated Valves 345    7.5.2.3    7.5                    Provide the normal temperatures and expected periods of high/low                                                                    8. N      Open                        Open-TVA/Bechtel temperature excursions to assess aging requirements. TVA to further clarify if 86&#xba;F for 40 years was used as the qualification EICB (Singh) requirement for aging tests. This has been stated in some of the subsections under section 4.2 of the 04508905-QR report but the rationale for using 86&#xba;F (includes an internal temperature rise of 18&#xba;F) for 40 years has not been justified in the 04508905-QR report or the supplement reports. TVA to provide the rationale for this acceptance criteria for WBN-2.
346    7.5.2.3    7.5                    TVA has previously stated in response to open item 319 that RM-                                                                      9. N      Open                        Open-TVA/Bechtel 1000 System Verification Test Results report, 04507007-1TR is not EICB applicable to WBN-2. However, TVA has not provided a WBN-2 (Singh)         specific test results report. Please identify and provide the appropriate test results reports to complete the review.
347    7.5.2.3    7.5                    Qualification report 04508905-1SP does not address EMI/RFI                                                                          10. N        Open                        Open-TVA/Bechtel EICB          qualification for the new RM-1000 modules. TVA to provide the (Singh)         updated qualification or explain the basis for not addressing the EMI/RFI qualification.
348    7.5.2.3    7.5                    Qualification report 04508905-2SP does not address EMI/RFI                                                                          11. N        Open                        Open-TVA/Bechtel EICB          qualification for the new I/F converters. TVA to provide the (Singh)        updated qualification or explain the basis for not addressing the EMI/RFI qualification.
349    7.5.2.3    7.5                    Radiation testing was not considered in any of the test reports as      In response to aquestion about Common Q PAMS                12. N        Open                        Open-TVA/Bechtel all the equipment has been assumed to be located in nuclear            equipment qualification, TVA re-evaluated the Control and power plant areas with mild environments and radiation dosages          Aux Instrument Room TID and concluded it to be less than less than 1 x 103 rads for total integrated dose (TID). However,        1x103 RAD.
the radiation monitors and the I/F converters are located in the EICB (Singh) main control room which is defined as mild environment. For WBN-2 mild environment is defined as room or building zone where (1) the temperature, pressure, or relative humidity resulting from the direct effects of a design basis event (DBE) (e.g.,
temperature rise due to steam release) are no more severe than those which would occur during an abnormal plant operational condition, (2) the temperature will not exceed 130&#xba;F due to indirect effects of a DBE, (3) the event radiation dose is less than or equal to 1 x 104 rads, and (4) the total event plus the 40 year TID (total


'-Appendix 1, "Post Accident Monitoring Systems," provides the functional requirements and
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                          rad94FD7.docx                                                                                            Open Items to be Resolved for SER Approval


conceptual design approach for upgrading an existing PAMS based on Common Q  
===Response===
SE      FSAR    NRC No.                                                                      Issue                                                        TVA Response(s)                        Acceptable      Status/ Current Actions          Resolution Path      RAI No. & Date      RAI Resp. Date                Comments Sec.      Sec. POC                                                                                                                                                        Y/N integrated dose) is less than or equal to 5 x 104 rads (reference WB-DC-40-54). TVA to address lack of radiation qualification for WBN-2.
350    7.5.2.3    7.5                      The seismic required response spectra (RRS) is shown in Figures                                                                      13. N        Open                              Open-TVA/Bechtel 3-1 of 04508905-1SP and Figure 3-1 of 0458905-2SP report. The actual test response spectra are shown in Figures 4-5 and 4-6 of EICB (Singh) 04508905-QR report. The actual test response spectra does not seem to fully envelope the RRS. However, this statement is based on visual reading of unidentified numbers. TVA to provide clarification to the values at the inflection point of all lines on the RRS and the actual test response spectra. The seismic qualification issue is open till further clarification is received from TVA.
351    7.5.2.3    7.5                      The replacement schedule for the components that have a                                                                              14. N        Open                              Open-TVA/Bechtel qualified life of less than 40 years is noted in Table 6-1 of the supplemental qualification report 04508905-1SP. It is not clear if the components identified for replacement in this report are the EICB (Singh) only components or if the components which are in addition to the components previously identified in qualification report 04508905-QR.
Are there any age sensitive components for the I/F converter used for WBN-2? (Note: Report 04508905-2SP does not state any age sensitive components that require replacement during the qualified life).
352    7.5.2.3    7.5                      Please calrify how many RM-1000 radaition monitors are being                                                                        15. N        Open                              Open-TVA/Bechtel procured for WBN-2, is the quantity 2 or four. MR 25402-011-EICB MRA-HARA-00002, R4 under Item 1.6 indicates that the quantity is (Singh)          2. If so, is WBN-2 using dual channel indication on each RM-1000 unit. TVA to clarify.
334      7        7                        FSAR Figure 7A-3 Mechanical Flow and Control Diagram            Responder: Stockton                                                1. Y        Open                              Open-TVA/Licensing    RAI not required. N/A              RAI not required because the figure is Symbols doesnt show the symbols for the first column of valves.                                                                                                                                                                                    not part of any SE section.
EICB (Darbali)
Please correct this in a future FSAR amendment.                                                                                                    Figure will be corrected in FSAR Amendment 103.
Update:
Please fix symbols for Gate Valve, Globe Valve and Float operated valve.
069    7.5.2    7.5.1                    By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                    Date: 5/25/10                1. N        Open                              Open-TVA/WEC          N/A - No question N/A EICB            date for the "Watts Bar 2 PAMS Specific FAT Report" was October                                                                                                                                              was asked. Item (Carte)          2010.                                                                                                                                              Awaiting for document to be        Due 2/18/11            was opened to track docketed by TVA.                                          comm8ittment made by applicant.
074    7.5.2    7.5.1                    By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                    Date: 5/25/10                  2. N        Open                              Open-TVA/WEC          N/A - No question N/A EICB            date for the Post FAT IV&V Phase Summary Report was                                                                                                                                                          was asked. Item (Carte)          November 30, 2010.                                                                                                                                TVA to provide due date.          Due 2/21/11            was opened to track commitment made by applicant.
081    7.5.2    7.5.1                    5/6/2010                                                                  Responder: Merten/WEC                                      3. N        Open                              Open-TVA/WEC          EICB RAI              TVA Letter dated NNC 1/5/11: See Also Open Item No.
EICB (Carte)
ML102910002          6/18/10          86 and 202.
The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.                The codes and standards documents listed in Section 7 of                ML101600092 Item No.1: There Due 12/22/10                Item No. 9 0, Dated April 2010), in Section 7, lists codes and standards            the Common Q PAMS Licensing Technical Report are the                    are three sets of regulatory applicable to the Common Q PAMS. This list contains references            documents that the Common Q platform was licensed to                    criteria that relate to a Common TVA to provide to old revisions of several regulatory documents, for example:            when the NRC approved the original topical report and                    Q application (e.g. WBN2        requested information.
(1) RG 1.29 - September 1978 vs. March 2007                              issued the approved SER. The WBN Unit 2 Common Q                        PAMS):
(2) RG 1.53 - June 1973 vs. November 2003                                PAMS is designed in accordance with the approved                        (a) Common Q platform


components (page 58, Section
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                           rad94FD7.docx                                                                                      Open Items to be Resolved for SER Approval
 
4.4.1.1, "Description")-On the basis of the above review, the staff concludes that Appendix 1 does not contain sufficient
 
information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, "PAMS
 
Evaluation")-'
 
The NRC did not approve the proposed PAMS design.
 
Section 6, "References," and
 
Section 7, "Codes and Standards Applicable to the Common Q PAMS," of the PAMS Licensing Technical
 
Report contain items that are not the current regulatory criteria.


===Response===
SE    FSAR    NRC No.                                                        Issue                                                        TVA Response(s)                        Acceptable      Status/ Current Actions            Resolution Path    RAI No. & Date    RAI Resp. Date              Comments Sec. Sec. POC                                                                                                                                          Y/N (a) IEEE 379-1994 vs. -2000                                            Common Q topical report and approved SER and the codes                    components - Common Q TR (3) RG 1.75 - September 1975 vs. February 2005                          and standards on which the SER was based. Since the                      (b) Application Development (a) IEEE 384-1992 vs. -1992                                            current versions referenced are not applicable to WBN Unit                Processes - Common Q SPM (4) RG 1.100 - June 1988 vs. September 2009                            2, there is no basis for a comparison review.                            (c) Application Specific - current (a) IEEE 344-1987 vs. -2004                                                                                                                      regulatory criteria (5) RG 1.152 - January 1996 vs. January 2006                            Bechtel to develop a matrix and work with Westinghouse to                The Common Q Topical Report (a) IEEE 7-4.33.2-1993 vs. -2003                                        provide justification.                                                    and associated appendices (6) RG 1.168 - September 1997 vs. February 2004                                                                                                  primarily addressed (a) and (b).
(a) IEEE 1012-1986 vs. -1998                                                                                                                      The Common Q SER states:
(b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991                                                                                                                    Appendix 1, Post Accident (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984                                                                                            Monitoring Systems, provides endorses 323-1974)                                                                                                                                the functional requirements and However, LIC-110, "Watts Bar Unit 2 License Application Review,"                                                                                  conceptual design approach for states: "Design features and administrative programs that are                                                                                    upgrading an existing PAMS unique to Unit 2 should then be reviewed in accordance with the                                                                                  based on Common Q current staff positions." Please identify all differences between the                                                                            components (page 58, Section versions referenced and the current staff positions. Please provide                                                                              4.4.1.1, Description)On the a justification for the acceptability PAMS with respect to these                                                                                  basis of the above review, the differences.                                                                                                                                      staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, PAMS Evaluation)
The NRC did not approve the proposed PAMS design.
Section 6, References, and Section 7, Codes and Standards Applicable to the Common Q PAMS, of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.
Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design. For example IEEE Std.
Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design. For example IEEE Std.
603-1991 Clause 5.6.3, "Independence Between Safety  
603-1991 Clause 5.6.3, Independence Between Safety Systems and Other Systems, and Clause 6.3, Interaction Between the Sense and Command Features and Other Systems, contain application specific requirements that must be addressed by a PAMS system.
 
Systems and Other Systems,"
and Clause 6.3, "Interaction Between the Sense and Command Features and Other  
 
Systems," contain application specific requirements that must be addressed by a PAMS system.
Awaiting TVA Response.
Awaiting TVA Response.
086 7.5.2 7.5.1 CB (C ar t 5/6/2010 Responder: WEC                             Date: 5/24/10
086   7.5.2   7.5.1   CB   5/6/2010                                                               Responder: WEC                   Date: 5/24/10             4. N       Open                                 Open-TVA/WEC       EICB RAI         TVA Letter dated NNC 1/6/11: See Also Open Item No.81 (C
: 4. N Open Open-TVA/WEC EICB RAI ML102910002 TVA Letter dated 6/18/10 NNC 1/6/11:
art                                                                                                                                                                                                              ML102910002      6/18/10         & 202
See Also Open Item No.81  
& 202 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 6, lists references applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:
(1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 (ML083310185) However, LIC-110, "Watts Bar Unit 2 License Application Review," states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions."  Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences. The regulatory documents listed in the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the regulatory documents on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a
 
comparison review.
Rev 0 of the Licensin g Technical Report references Rev. 1 of ISG4 TVA to address with item OI
: 81. Due 12/22/10 Item No. 14 202 7.5.2  EICB (Carte) 7/22/2010 The letter (ML0003740165) which transmitted the Safety Evaluation for the Common Q topical report to Westinghouse stated: "Should our criteria or regulations change so that our conclusions as to the acceptability of the report are invalidated, CE Nuclear Power and/or the applicant referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation."  Question No 81 identified many criteria changes; please revise the respective documentation or submit justification for continued applicability of the topical report.
Responder: WEC Revision 1 of the Licensing Technical Report will provide more detailed information on the changes to the platform.
 
Rev. 2 of the Licensing Technical Report will include the applicability of guidance.
 
TVA Response to Follow-up NRC Request:
WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" (LTR) submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to


address the NRC request:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                        rad94FD7.docx                                                                                          Open Items to be Resolved for SER Approval
Section 9, "Compliance Evaluation of the Watts Bar 2 PAMS Software Requirements Specification to IEEE Standard 830-


1998 and Regulatory Guide 1.172" to show the origin of the requirements has been added.  
===Response===
 
SE    FSAR    NRC No.                                                                  Issue                                                          TVA Response(s)                          Acceptable      Status/ Current Actions            Resolution Path        RAI No. & Date  RAI Resp. Date              Comments Sec. Sec. POC                                                                                                                                                        Y/N The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.              The regulatory documents listed in the Common Q PAMS                        TVA to address with item OI        Due 12/22/10              Item No. 14 0, Dated April 2010), in Section 6, lists references applicable to the   Licensing Technical Report are the documents that the                       81.
The descriptions and commitments in the Topical Report (TR) still apply. The LTR provides compliance evidence to the new ISG-04 criteria. The statement in the SE means that the TR can be evaluated against later NRC criteria when it
Common Q PAMS. This list contains references to old revisions of        Common Q platform was licensed to when the NRC several regulatory documents, for example:                              approved the original topical report and issued the approved (1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1                        SER. The WBN Unit 2 Common Q PAMS is designed in (ML083310185)                                                            accordance with the approved Common Q topical report and However, LIC-110, "Watts Bar Unit 2 License Application Review,"        approved SER and the regulatory documents on which the states: "Design features and administrative programs that are            SER was based. Since the current versions referenced are unique to Unit 2 should then be reviewed in accordance with the         not applicable to WBN Unit 2, there is no basis for a current staff positions." Please identify all differences between the   comparison review.
 
versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these        Rev 0 of the Licensing Technical Report references Rev. 1 of differences.                                                            ISG4 202    7.5.2                          7/22/2010                                                               Responder: WEC                                                5. N       Open                              Open-TVA/WEC              EICB RAI        TVA Letter dated NNC 1/5/11: See Also Open Item No.
appears.  
EICB (Carte)
 
Response included in letter                                 ML102980066 Item 10/5/10          81 and 86.
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
The letter (ML0003740165) which transmitted the Safety                  Revision 1 of the Licensing Technical Report will provide                  dated 12/22/10                     to provide information    No. 4 Evaluation for the Common Q topical report to Westinghouse              more detailed information on the changes to the platform.                                                      requested.
: 5. N Open Response included in letter dated 12/22/10  
stated: "Should our criteria or regulations change so that our                                                                                      Partial Response provided in conclusions as to the acceptability of the report are invalidated, CE    Rev. 2 of the Licensing Technical Report will include the                  letter dated 10/5/10               Due TBD Nuclear Power and/or the applicant referencing the topical report        applicability of guidance.
 
will be expected to revise and resubmit their respective                                                                                            NNC 1/5/11: Summary provided documentation, or submit justification for continued applicability of    TVA Response to Follow-up NRC Request:                                      in Licensing Technical Report the topical report without revision of the respective                    WNA-LI-00058-WBT-P, Revision 2, Post-Accident                              R2 has been reviewed and documentation." Question No 81 identified many criteria changes;        Monitoring System (PAMS) Licensing Technical Report                        found to be unacceptable.
Partial Response provided in  
please revise the respective documentation or submit justification      (LTR) submitted in TVA Letter to NRC dated December 3, for continued applicability of the topical report.                      2010, (Reference 1) contains the following change to                        LTR Section 9 evaluates the address the NRC request:                                                    compliance of the SRS to IEEE 830-1998. There are two issues Section 9, Compliance Evaluation of the Watts Bar 2 PAMS                  with this evaluiation:
 
Software Requirements Specification to IEEE Standard 830-                  (1) IEEE 830-1998 is not the 1998 and Regulatory Guide 1.172 to show the origin of the                  current SRP acceptance criteria.
letter dated 10/5/10 NNC 1/5/11:
requirements has been added.                                                IEEE 830-1998 has not been formally endorsed by a The descriptions and commitments in the Topical Report                      regulatory guide.
Summary provided in Licensing Technical Report R2 has been reviewed and found to be unacceptable.
(TR) still apply. The LTR provides compliance evidence to                  (2) Westinghouse committed to the new ISG-04 criteria. The statement in the SE means that                evaluate the SRS against 830 the TR can be evaluated against later NRC criteria when it                  when the NRC identified several appears.                                                                    inconsistencies.
LTR Section 9 evaluates the compliance of the SRS to IEEE 830-1998. There are two issues with this evaluiation: (1) IEEE 830-1998 is not the current SRP acceptance criteria.
Source: E-mail from Westinghouse (Matthew A. Shakun) to                    Yes ISG-4 is one new criteria, Bechtel (Mark S. Clark), RE: December 22 letter review,                    and an evaluation against it has dated December 17, 2010 (Reference 13)                                      been provided.
IEEE 830-1998 has not been formally endorsed by a regulatory guide.
In addition, LTR Rev. 2 Section 13 states: The applicable NRC regulatory guides, IEEE and EPRI industry standards fo the common Q PAMS are shown below. Compliance to these codes and standards are stated in Section 4 of Reference 1.
(2) Westinghouse committed to evaluate the SRS against 830 when the NRC identified several inconsistencies.  
 
Yes ISG-4 is one new criteria, and an evaluation against it has been provided.  
 
In addition, LTR Rev. 2 Section 13 states: "The applicable NRC regulatory guides, IEEE and EPRI industry standards fo the common Q PAMS are shown below. Compliance to these codes and standards are stated in Section 4 of Reference 1."
Reference 1 is the common Q topical report.
Reference 1 is the common Q topical report.
Open-TVA/WEC
335   7.6.1   7.6.7                   LPMS: Reference to OI-331, sub item 2.                                   Responder: WEC                                                6. Y      Open                              Open-TVA/WEC EICB Provide analysis, test, or combined analysis and test for normal         TVA has reviewed the information provided by                                Partial Response included in      Submit qual report by (Singh)        operating radiation, temperature, and humidity environment per           Westinghouse describing how the Loose Part Monitoring                      letter dated 12/22/10              3/11/11 as stated in regulatory position C.1.g of RG 1.133. As an alternate TVA may           System (LPMS) sensor is qualified for normal operating                                                        TVA letter of 12/22/10,
 
to provide information requested.
 
Due TBD EICB RAI ML102980066 Item No. 4 TVA Letter dated 10/5/10 NNC 1/5/11:
See Also Open Item No.
81 and 86.
335 7.6.1 7.6.7 EICB (Singh) LPMS: Reference to OI-331, sub item 2.  
 
Provide analysis, test, or combined analysis and test for normal operating radiation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may Responder: WEC


TVA has reviewed the information provided by Westinghouse describing how the Loose Part Monitoring System (LPMS) sensor is qualified for normal operating
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                 rad94FD7.docx                                                                  Open Items to be Resolved for SER Approval
: 6. Y Open Partial Response included in letter dated 12/22/10 Open-TVA/WEC


Submit qual report by 3/11/11 as stated in TVA letter of 12/22/10, Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments confirm that the required equipment has been qualified for the environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable. conditions provided in Westinghouse letter WBT-D-2782, dated December 17, 2010 (Reference 11) as addressed in regulatory position C.1.g of Reg. Guide 1.133 and found it acceptable. The qualification information on the softline cable and charge converter/preamplifier is being assembled and will be submitted by March 11, 2011. Encl 1, Item 28.
===Response===
Due 12/22/10}}
SE   FSAR   NRC No.                                                   Issue                                                   TVA Response(s)                     Acceptable Status/ Current Actions   Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                                                Y/N confirm that the required equipment has been qualified for the   conditions provided in Westinghouse letter WBT-D-2782,                                        Encl 1, Item 28.
environments stated in RG 1.133, position C.1.g and that TVA has dated December 17, 2010 (Reference 11) as addressed in reviewed the test report and found it acceptable.                regulatory position C.1.g of Reg. Guide 1.133 and found it                                   Due 12/22/10 acceptable. The qualification information on the softline cable and charge converter/preamplifier is being assembled and will be submitted by March 11, 2011.}}

Revision as of 04:38, 13 November 2019

2011/01/18 Watts Bar 2 OL - FW: 20110107 Open Item List Master TVA Update 01-07-11.docx
ML110400659
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 01/18/2011
From:
Office of Nuclear Reactor Regulation
To:
Division of Operating Reactor Licensing
References
Download: ML110400659 (50)


Text

WBN2Public Resource From: Poole, Justin Sent: Tuesday, January 18, 2011 4:17 PM To: Garg, Hukam; Darbali, Samir; Carte, Norbert; Singh, Gursharan Cc: WBN2HearingFile Resource

Subject:

FW: 20110107 Open Item List Master TVA Update 01-07-11.docx Attachments: 20110107 Open Item List Master TVA Update 01-07-11.docx FYI Justin C. Poole Project Manager NRR/DORL/LPWB U.S. Nuclear Regulatory Commission (301)4152048 email: Justin.Poole@nrc.gov From: Clark, Mark Steven [1]

Sent: Tuesday, January 18, 2011 3:19 PM To: Crouch, William D Cc: Hilmes, Steven A; Poole, Justin; Knuettel, Edward Terry

Subject:

20110107 Open Item List Master TVA Update 01-07-11.docx Bill:

Please forward the attached update to Justin.

Thanks, Steve Steve Clark Bechtel Power Corp.

Control Systems Watts Bar 2 Completion Project Phone: 423.365.3007 e-mail: msclark0@tva.gov 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 250 Mail Envelope Properties (19D990B45D535548840D1118C451C74D7B6471553B)

Subject:

FW: 20110107 Open Item List Master TVA Update 01-07-11.docx Sent Date: 1/18/2011 4:17:18 PM Received Date: 1/18/2011 4:17:23 PM From: Poole, Justin Created By: Justin.Poole@nrc.gov Recipients:

"WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>

Tracking Status: None "Garg, Hukam" <Hukam.Garg@nrc.gov>

Tracking Status: None "Darbali, Samir" <Samir.Darbali@nrc.gov>

Tracking Status: None "Carte, Norbert" <Norbert.Carte@nrc.gov>

Tracking Status: None "Singh, Gursharan" <Gursharan.Singh@nrc.gov>

Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 693 1/18/2011 4:17:23 PM 20110107 Open Item List Master TVA Update 01-07-11.docx 440542 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N B (

1. Y 001 All All A The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (Agency 12/15/2009 Presentation Slides Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains B (
2. Y 002 All All A Are there I&C components and systems that have changed to a 12/15/2009 Presentation Slides Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains B (
3. Y 003 All All A Because a digital I&C platform can be configured and programmed 12/15/2009 Presentation Slides Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains

( B 004 All All Please identify the information that will be submitted for each Responder: Webb 1/13/10 Public Meeting 4. Y Closed Closed EICB RAI January 13, 2010 NNC 11/19/09: LIC-110 Rev. 1 Section 005 7.1.3.1 By letter date February 28, 2008 (Agencywide Documents Access Responder: Craig/Webb 5. Y Closed Closed EICB RAI TVA Letter dated D 6. Y

( ( ( (

006 Amendment 95 of the FSAR, Chapter 7.3, shows that change 7.3- By letter dated February 5, 2010: TVA provided the Unit 2 Closed Closed EICB RAI TVA Letter dated NNC: WCAP-12096 Rev. 7 007 7.1.3.1 a ( The setpoint methodology has been reviewed and approved by the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 7 7. Y Closed Closed EICB RAI TVA Letter dated TVA to provide Rev. 8 of the Unit 1 008 7.3 G G G G There are several staff positions that provide guidance on setpoint TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 8 8. Y Closed Closed EICB RAI TVA Letter dated r A 009 7.3.2 5.6, Change 7.3-2, identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 9 9. Y Closed Closed EICB RAI 3/12/10,

(

010 7.3 7.3 The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 10 10. Y Closed Closed EICB RAI 3/12/10, D

a r

(

011 7.3.2 5.6, NUREG-0847 Supplement No. 2 Section 7.3.2 includes an TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 11 11. Y Closed Closed EICB RAI ML101680598, D

a r

( 12. Y 012 7.4 7.4 ( D The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 12 Closed Closed EICB RAI TVA Letter dated G a r 13. Y 013 7.1.3.1 Chapter 7 and Chapter 16 of Amendment 95 to the FSAR do not TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 13 Closed Closed EICB RAI TVA Letter dated TS have been docketed.

014 All All ( B Provide the justification for any hardware and software changes Date: 4/27/10 14. Y Closed Closed NRC Meeting TVA Letter dated 015 D ( Verify that the refurbishment of the power range nuclear Date: 4/27/10 15. Y Closed Closed NRC Meeting TVA Letter dated

(

016 a C ( Identify the precedents in license amendment requests (LARs), if Date: 4/27/10 16. Y Closed Closed NRC Meeting TVA Letter dated G

r a A 17. Y 017 7.3.1 7.3.1, Identify precedents in LARs, if any, for the solid state protection Date: 4/27/10 Closed Closed NRC Meeting TVA Letter dated

(

018 Identify any changes made to any instrumentation and control Date: 4/27/10 18. Y Closed Closed NRC Meeting TVA Letter dated 019 Verify that the containment purge isolation radiation monitor is the Date: 4/27/10 19. Y Closed Closed NRC Meeting TVA Letter dated

( D 020 Provide environmental qualification information pursuant to Section Date: 4/27/10 20. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

021 7.3 ( ( ( ( ( For the Foxboro Spec 200 platform, identify any changes in Date: 5/25/10 21. Y Closed Closed NRC Meeting TVA Letter dated The resolution of this item will be C a G G G G G 022 7.3.2 5.6, Verify the auxiliary feedwater control refurbishment results in a Date: 4/27/10 22. Y Closed Closed NRC Meeting TVA Letter dated a r 023 Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10 23. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

024 Provide a schedule by the January 13, 2010, meeting for providing During the January 13, 2010 meeting, TVA presented a 24. Y Closed Closed NRC Meeting N/A - Request for NNC 4/30/10: Carte to address

( ( ( ( ( (

025 7.5.2 7.5.1 For the containment radiation high radiation monitor, verify that the Date: 4/27/10 25. Y Closed Closed NRC Meeting ML101230248, 026 Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10 26. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

( ( ( (

027 7.7.1.4 For Foxboro I/A provide information regarding safety/non-safety- Date: 4/27/10 27. Y Closed Closed NRC Meeting TVA Letter dated 028 For the turbine control AEH system, verify that the refurbishment Responder: Mark Scansen 28. Y Closed Closed NRC Meeting TVA Letter dated C C C C C S 029 For the rod control system, verify that the refurbishment results in a Date: 4/27/10 29. Y Closed Closed NRC Meeting TVA Letter dated G G G G 030 Regarding the refurbishment of I&C equipment, identify any Responder: Clark 30. Y Closed Closed NRC Meeting TVA Letter dated 031 For the rod position indication system (CERPI), provide information Date: 4/27/10 31. Y Closed Closed NRC Meeting TVA Letter dated CERPI is non-safety related.

a a a a a i 032 For the process computer, need to consider cyber security issues Date: 4/27/10 32. Y Closed Closed NRC Meeting TVA Letter dated EICB will no longer consider cyber 033 For the loose parts monitoring system, provide information Date: 4/27/10 33. Y Closed Closed NRC Meeting TVA Letter dated The loose parts monitoring system is 034 2/4/2010 Responder: TVA 34. Y Closed Closed N/A TVA Letter dated 034.1 ( Chapter 7.1 - Introduction 35. Y Closed Closed N/A N/A

( a 034.2 D Chapter 7.2 - Reactor Trip System 36. Y Closed Closed N/A N/A M ( r 034.3 7.3 7.3 a Chapter 7.3 - ESFAS 37. Y Closed Closed N/A N/A a G g r 38. Y 034.4 7.5.1.1 7.5.2 Chapter 7.5 - Instrumentation Systems Important to Safety Closed Closed N/A N/A Closed 034.5 7.5.1.1 7.5.2 Chapter 7.6 - All Other Systems Required for Safety 39. Y Closed Closed N/A N/A Closed r

c u

034.6 Chapter 7.7 Control Systems 40. Y Closed Closed N/A N/A n

g h

/

035 ( 2/18/2010 Responder: Clark 41. Y Closed Closed RAI No. 1 TVA Letter dated LIC-110 Section 6.2.2 states: Design

( (

M 036 7.5.2 7.5.1 C S February 18, 2010 Date: 5/25/10 42. Y Closed Closed NRC Meeting NNC: Unit 2 FSAR Section 7.5.1, Post a

a i 43. Y 037 7.5.1.1 7.5.2 2/18/2010 Responder: Clark Date: 5/25/10 Closed Closed N/A TVA Letter dated FSAR Amendment 100 provides

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 038 7.5.1.1 7.5.2 ( 2/18/2010 Responder: Clark Date: 5/25/10 44. Y Closed Closed EICB RAI TVA Letter dated The slides presented at the December 039 ( ( M January 13, 2010 Responder: Clark Date: 5/25/10 45. Y Closed Closed EICB RAI FSAR amendment The equation for the calculation of the G G a 46. Y 040 January 13, 2010 Responder: Clark Date: 5/25/10 Closed Closed EICB RAI EICB RAI FSAR amendment The equation for the calculation of the B

042 All All February 25, 2010: Telecom Date: 5/25/10 47. Y Closed Closed EICB RAI TVA Letter dated The drawing provided did not have the 044 7.5.2 7.5.1 February 25, 2010 Date: 5/25/10 48. Y Closed Closed EICB RAI TVA Letter dated

( ( ( ( ( (

045 February 25, 2010 Date: 5/25/10 49. Y Closed Closed EICB RAI TVA Letter dated

(

046 February 25, 2010 Date: 5/25/10 50. Y Closed Closed N/A - Request for N/A C C C C C C (

047 7.5.2 7.5.1 4/8/2010 Responder: WEC/Hilmes Date: 5/25/10 51. Y Closed Closed EICB RAI TVA Letter dated G

048 7.5.2 7.5.1 April 8, 2010 Date: 5/25/10 52. Y Closed Closed EICB RAI TVA Letter dated a a a a a a A 049 7.5.2 7.5.1 4/8/2010 Responder: WEC Date: 5/25/10 53. Y Closed Closed EICB RAI TVA Letter dated 051 April 15, 2010 Date: 5/25/10 54. Y Closed Closed N/A N/A Review addressed by another Open

(

052 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 55. Y Closed Closed RAI No. 12 S

i

(

053 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 56. Y Closed Closed RAI No. 13 S

i

(

054 7.5.2 7.5.1 4/19/2010 Responder: Slifer/Clark Date: 5/25/10 57. Y Closed Closed RAI No. 14 TVA Letter dated S

i

(

055 7.5.2 7.5.1 4/19/2010 Responder: Slifer/Clark Date: 5/25/10 58. Y Closed Closed RAI No. 15 TVA Letter dated S

i

(

056 April 19, 2010 Date: 5/25/10 59. Y Closed Closed RAI No. 16 TVA Letter dated Sorrento Radiation Monitoring S

i

(

057 7.5.2 7.5.1 4/19/2010 Responder: TVA I&C Staff Date: 5/25/10 60. Y Closed Closed RAI No. 17 TVA Letter dated S

i

(

058 7.5.0 7.5 April 19, 2010 Date: 5/25/10 61. Y Closed Closed RAI No. 18 TVA Letter dated S

i

( ( ( ( ( ( ( ( ( ( (

059 7.5.2 7.5.1 April 19, 2010 Date: 62. Y Closed Closed RAI No. 19 TVA Letter dated 060 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 63. Y Closed Closed N/A N/A Addressed by Open Item No. 47 061 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 64. Y Closed Closed N/A N/A Addressed by Open Item No. 48

( (

062 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 65. Y Closed Closed N/A N/A Addressed by Open Item No. 49 063 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 66. Y Closed Closed N/A N/A Addressed by Open Item No. 50 C C C C C C C C C C S 064 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: Webb Date: 4/8/2010 67. Y Closed Closed N/A - No question TVA Letter dated 065 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 68. Y Closed Closed N/A - No question TVA Letter dated G G 066 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 69. Y Closed Closed N/A - No question TVA Letter dated 072 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 70. Y Closed Closed N/A - No question N/A a a a a a a a a a a i 076 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: Clark Date: 5/25/10 71. Y Closed Closed N/A - No question N/A 077 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 72. Y Closed Closed N/A - No question TVA Letter dated 078 4/26/2010 Responder: Clark Date: 5/25/10 73. Y Closed Closed EICB RAI TVA Letter dated 079 4/26/2010 Responder: Clark Date: 5/25/10 74. Y Closed Closed EICB RAI TVA Letter dated Reviewed under Item 154 080 ( ( ( 4/26/2010 Responder: WEC 75. Y Closed Closed RAI No. 2 TVA Letter dated 083 7.5.2 7.5.1 C C S May 6, 2010 Date: 6/18/10 76. Y Closed Closed EICB RAI TVA Letter dated 084 7.5.2 7.5.1 a a i May 6, 2010 Date: 6/18/10 77. Y Closed Closed EICB RAI TVA Letter dated

(

087 7.5.2 7.5.1 May 6, 2010 Date: 5/24/10 78. Y Closed Closed RAI No. 20 TVA Letter dated S

i 088 7.5.2 7.5.1 May 6, 2010 Date: 5/24/10 79. Y Closed Closed RAI No. 21 TVA Letter dated

(

089 D ( ( ( 5/6/2010 Responder: Clark 80. Y Closed Closed EICB RAI TVA Letter dated NNC: Docketed response states that 090 a C C S 5/6/2010 Responder: Clark Date: 5/25/10 81. Y Closed Closed EICB RAI TVA Letter dated r a a i 82. Y 091 7.4 7.4 May 20, 2010 Date: 5/25/10 Closed Closed EICB RAI No.1 TVA Letter dated 093 ( May 20, 2010 Date: 5/25/10 83. Y Closed Closed N/A N/A Will be reviewed under item 154 D ( (

094 a 5/20/2010 Responder: Clark Date: 5/25/10 84. Y Closed Closed N/A N/A Information was found in FSAR r G G 095 7.8.1, XX May 20, 2010 Date: 85. Y Closed Closed EICB RAI No. 2 TVA Letter dated

(

096 7.7.5 XX 5/20/2010 Responder: 86. Y Closed Closed EICB RAI No.3 TVA Letter dated D

a r

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

(

097 7.4.2 7.4 May 20, 2010 Date: 87. Y Closed Closed EICB RAI No.4 TVA Letter dated D

a r

(

098 7.4.2 7.4 May 25, 2010 Date: 88. Y Closed Closed EICB RAI No.5 TVA Letter dated D

a r

099 April 12, 2010 Date: 89. Y Closed Closed Closed to Item 129

(

(

100 D ( ( 5/20/2010 Responder: WEC 90. Y Closed Closed N/A - No question N/A B

102 a C C May 24, 2010 Date: 5/24/10 91. Y Closed Closed N/A TVA Letter dated Request for schedule not information.

a r a a 92. Y 103 7.4 7.4 5/27/2010 Responder: Ayala Date: 5/27/10 Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current

( 93. Y 104 7.4 7.4 ( D 5/27/2010 Responder: Merten Date: 5/27/10 Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current G a r 94. Y 105 April 29, 2010 Date: Closed Closed N/A N/A Will be reviewed under item 154.

106 May 6, 2010 Date: 5/25/10 95. Y Closed Closed RAI No. 9 TVA Letter dated

(

S i

107 ( May 6, 2010 Date: 5/28/10 96. Y Closed Closed RAI No. 22 TVA Letter dated D ( (

108 a S May 6, 2010 Date: 5/25/10 97. Y Closed Closed N/A N/A Will be reviewed under OI#154 r G i 109.a 7.8 XX 5/6/2010 Responder: N/A 98. Y Closed Closed N/A N/A

(

109.b 5/6/2010 Responder: N/A 99. Y Closed Closed N/A N/A Duplicate of another open Item.

110 May 6, 2010 Date: 100. Y Closed Closed N/A N/A Information was found.

111 May 6, 2010 Date: 5/28/10 101. Y Closed Closed N/A TVA Letter dated Request to help find, not a request for D ( ( (

112 June 1, 2010 Date: 102. Y Closed Closed N/A N/A Information was received

( ( ( ( ( (

113 6/1/2010 Responder: Clark 103. Y Closed Closed EICB RAI TVA Letter dated a C C C 114 7.2 7.2 6/1/2010 Responder: WEC 104. Y Close Closed EICB RAI TVA Letter dated G G G G G G 115 2/25/2010 Responder: Clark 105. Y Closed Closed EICB RAI TVA Letter dated 116 6/3/2010 Responder: WEC 106. Y Closed Closed EICB RAI TVA Letter dated Letter sent to Westinghouse requesting r a a a 117 7.1 7.1 6/3/2010 Responder: Hilmes 107. Y Closed Closed EICB RAI TVA Letter dated 118 7.4 7.4 6/8/2010 Responder: Merten 108. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current

(

119 June 10, 2010 Date: 109. Y Closed Closed RAI No. 23 TVA Letter dated 120 5/6/2010 Responder: Hilmes/Merten/Costley 110. Y Closed Closed EICB RAI TVA Letter dated D ( ( ( (

121 5/6/2010 Responder: Webb/Webber 111. Y Closed Closed EICB RAI TVA Letter dated a C C C S 122 June 14, 2010 Date: 112. Y Closed Closed N/A - Request for N/A r a a a i 123 7.7.3 7.4.1, 6/14/2010 Responder: 113. Y Closed Closed ML101720589, TVA Letter dated

(

124 7.7.5 XX 6/14/2010 Responder: 114. Y Closed Closed ML101720589, Item TVA Letter dated D

a r

(

125 7.7.8 7.7.1.12 6/14/2010 Responder: 115. Y Closed Closed ML101720589, Item TVA Letter dated D

a r

126 7.8 7.8 ( June 14, 2010 Date: 116. Y Closed Closed ML101720589, Item TVA Letter dated

( ( D 127 7.2 7.2 a 6/16/2010 Responder: WEC/Clark 117. Y Closed Closed EICB RAI TVA Letter dated G G r 128 7.2 7.2 6/18/2010 Responder: WEC Drake /TVA Craig 118. Y Closed Closed EICB RAI TVA Letter dated Track through SE open item

(

129 6/12/2010 Responder: WEC 119. Y Closed Closed N/A TVA Letter dated P

o

(

130 6/28/2010 Responder: Clark 120. Y Closed Closed N/A TVA Letter dated P

o

(

131 6/28/2010 Responder: Clark 121. Y Closed Closed N/A TVA Letter dated P

o

(

132 6/28/2010 Responder: Clark 122. Y Closed Closed N/A TVA Letter dated P

o

(

133 6/28/2010 Responder: Clark 123. Y Closed Closed TVA Letter dated P

o

( (

134 6/28/2010 Responder: Clark 124. Y Closed Closed TVA Letter dated 135 7.3.1 7.3.1 6/30/2010 Responder: Clark 125. Y Closed Closed RAI not necessary TVA Letter dated 136 7.3.2, 7.4, 5.6,( ( ( D D ( 6/30/2010 Responder: Clark 126. Y Closed Closed RAI not necessary TVA Letter dated 137 C C C a a P Several WBN2 PAMS documents contain a table titled, Document Responder: WEC 127. Y Closed Closed ML101650255, Item TVA Letter dated 139 The WBN2 PAMS System Requirements Specification (WBN2 Responder: WEC 128. Y Closed Closed ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements a a a r r o 141 Deleted by DORL Date: 129. Y Closed Closed ML101650255, Item WBN2 PAMS System Requirements

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

( ( (

146 6/17/2010 Responder: 130. Y Closed Closed ML101650255, Item PAMS System Requirements 147 6/17/2010 Responder: 131. Y Closed Closed ML101650255, Item PAMS System Requirements 148 6/17/2010 Responder: 132. Y Closed Closed ML101650255, Item PAMS System Requirements

( ( ( ( ( ( ( ( ( ( ( ( ( ( (

149 7.2 7.2 FSAR Section 7.1.1.2(2), Overtemperature delta T and Responder: Tindell 133. Y Close Closed ML101720589, Item TVA Letter dated 150 7.2 7.2 Many of the changes were based on the Westinghouse document Responder: Clark 134. Y Close Closed ML101720589, Item TVA Letter dated 151 7.2 7.2 Provide the EDCR 52378 and 54504 which discusses the basis for Responder: Clark 135. Y Close Closed ML101720589, Item TVA Letter dated C C C 152 7.2 7.2 Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR Responder: Merten/Clark 136. Y Close Closed ML101720589, Item TVA Letter dated 153 7.2 7.2 FSAR section 7.2.1.1.7 added the reference to FSAR section Responder: Craig/Webb 137. Y Close Closed ML101720589, Item TVA Letter dated 154 7.2 7.2 FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS Responder: Craig/Webb 138. Y Closed Closed ML101720589, Item TVA Letter dated EICB RAI ML102861885 sent to DORL G G G G G G G G G G G G G G G 155 7.2 7.2 Summary of FSAR change document section 7.2 states that Date: 139. Y Closed Closed ML101720589, Item 156 7.2 7.2 FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1- Responder: WEC 140. Y Closed Closed ML101720589, Item TVA Letter dated Response on hold pending 157 7.2 7.2 FSAR section 7.2.2.1.1, fifth paragraph was deleted except for the Responder: Tindell 141. Y Close Closed ML101720589, Item TVA Letter dated a a a 158 7.2 7.2 FSAR section 7.2.2.1.1, paragraph six was changed to state that Responder: Tindell 142. Y Closed Closed ML101720589, Item TVA Letter dated 159 7.2 7.2 FSAR section 7.2.2.1.2 discusses reactor coolant flow Responder: Craig 143. Y Close Closed ML101720589, Item TVA Letter dated 160 7.2 7.2 FSAR section 7.2.2.2(7) deleted text which has references 12 and Responder: Tindell 144. Y Close Closed ML101720589, Item TVA Letter dated 161 7.2 7.2 FSAR section 7.2.2.3 states that changes to the control function Responder: Clark 145. Y Closed Closed ML101720589, Item TVA Letter dated 162 7.2 7.2 FSAR section 7.2.2.2(14) states that bypass of a protection Responder: Tindell 146. Y Closed Closed ML101720589, Item TVA Letter dated 163 7.2 7.2 Deleted by DORL Date: 147. Y Closed Closed ML101720589, Item 164 7.2 7.2 FSAR section 7.2.2.2(20) has been revised to include the plant Responder: Perkins 148. Y Closed Closed ML101720589, Item TVA Letter dated Item No. 8 sent to DORL a

r g

l

(

165 7.2 7.2 FSAR section 7.2.2.3.2, last paragraph of this section has been Responder: Clark 149. Y Closed Closed ML101720589, Item TVA Letter dated 166 7.2 7.2 Changes to FSAR section 7.2.2.2(20) are justified based on the Responder: Clark 150. Y Closed Closed ML101720589, Item TVA Letter dated 167 7.2 7.2 FSAR section 7.2.2.4, provide an analysis or reference to chapter Responder: Clark 151. Y Close Closed ML101720589, Item TVA Letter dated

( (

168 7.2 7.2 FSAR table 7.2-4, item 9 deleted loss of offsite power to station Responder: Clark 152. Y Close Closed ML101720589, Item TVA Letter dated 169 6/18/2010 Responder: Clark 153. Y Closed Closed 170 6/17/2010 Responder: Clark 154. Y Closed Closed

( D ( ( ( ( (

171 7.2 7.2 6/17/2010 Responder: Craig 155. Y Closed Closed EICB RAI TVA Letter dated Closed to SE Open Item 172 6/17/2010 Responder: Craig 156. Y Closed Closed EICB RAI M M ( ( ( ( ( ( ( ( ( ( ( (

173 7.1 7.1 6/17/2010 Responder: Craig/Webb/Powers 157. Y Closed Closed EICB RAI 174 6/28/2010 Responder: Hilmes/Craig 158. Y Closed Closed EICB RAI 175 June 28, 2010 Responder: 159. Y Closed Closed EICB RAI C a C C C C C 176 7.1 7.1 6/28/2010 Responder: Craig/Webb 160. Y Closed Closed EICB RAI 177 7.5.2.1 7.5.1 7/15/2010 Responder: Clark 161. Y Closed Closed N/A TVA Letter dated RAI not required a a G G G G G G G G G G G G 178 7.5.2.1 7.5.1 7/15/2010 Responder: Clark 162. Y Closed Closed N/A TVA Letter dated RAI not required 179 An emphasis is placed on traceability in System Requirements Responder: WEC 163. Y Closed Closed N/A - Closed to NA 180 The SRP, BTP 7-14, Section B.3.3.1 states that Regulatory Guide Responder: WEC 164. Y Closed Closed N/A - Closed to NA a r a a a a a 181 An emphasis is placed on traceability in System Requirements Responder: WEC 165. Y Closed Closed N/A - Closed to NA 182 Characteristics that the SRP states that a Software Requirements Responder: WEC 166. Y Closed Closed N/A - Closed to NA 184 7/15/2010 Responder: WEC 167. Y Closed Closed N/A - Closed to N/A 186 7.7.8 7.7.1.12 7/15/2010 Responder: Perkins/Clark 168. Y Closed Closed EICB RAI No.6 TVA Letter dated 188 By letter dated June 30, 2010, TVA docketed, Tennessee Valley Responder: Clark 169. Y Closed Closed ML101970033, Item TVA Letter dated

(

189 7.6.7 7/20/2010 Responder: Clark 170. Y Closed Closed RAI No. 3 TVA Letter dated S

i 190 7.9 ( ( FSAR Table 7.1-1 states: Regulatory Guide 1.133, May 1981 Responder: Clark 171. Y Closed Closed RAI No. 4 TVA Letter dated Closed to OI-331.

C S a i 172. Y 191 7.9 NUREG-0800 Chapter 7, Section 7.9, "Data Communication Responder: Jimmie Perkins Closed Closed ML10197016, Item TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

( ( ( ( (

192 7.5.1.1 7.5.2 The NRC Staff is using SRP (NUREG-0800) Chapter 7 Section Responder: Clark 173. Y Closed Closed Item No. 1 sent to TVA Letter dated EICB RAI ML1028618855 sent to 193 7.5.1.1 7.5.2 The WBU2 FSAR, Section 7.5.2, Plant Computer System, Responder: Clark 174. Y Closed Closed Item No. 2 sent to TVA Letter dated EICB RAI ML1028618855 sent to 194 7.5.1.1 7.5.2.1 M M M M M The WBU2 FSAR Section 7.5.2.1, Safety Parameter Display Responder: Costley/Norman 175. Y Closed Closed Item No. 3 sent to TVA Letter dated EICB RAI ML1028618855 sent to a a a a a 195 7.5.1.1 7.5.2.2 Bypassed and Inoperable Status Indication (BISI) Responder: Costley/Norman 176. Y Closed Closed Item No. 4 sent to TVA Letter dated EICB RAI ML1028618855 sent to 196 7.5.1.1 7.5.2.2 Bypassed and Inoperable Status Indication (BISI) Responder: Costley/Norman 177. Y Closed Closed Item No. 5 sent to TVA Letter dated EICB RAI ML1028618855 sent to 197 ( ( Open Item 197 was never issued. 178. Y Closed Closed 198 7.5.1.1 7.5.2.2 M M X SRP Section 7.5, Subsection III, Review Procedures states: Responder: Costley/Norman 179. Y Closed Closed Item No. 6 sent to TVA Letter dated EICB RAI ML1028618855 sent to a a 180. Y 199 7.5.1.1 7.5.2.3 The WBU2 FSAR Section 7.5.2.3, Technical Support Center and Responder: Costley/Norman Closed Closed Item No. 7 sent to TVA Letter dated Related SE Section 7.5.5.3 EICB RAI 200 7.2 7/21/2010 Responder: Clark 181. Y Closed Closed EICB RAI TVA Letter dated

( ( ( ( ( (

201 7.7.1.1 7.7.11 7/21/2010 Responder: Webb 182. Y Closed Closed EICB RAI TVA Letter dated 203 7.5.1.1 7.5.2 7/26/2010 Responder: Clark 183. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL

( ( ( (

204 7.5.1.1 7.5.2 7/26/2010 Responder: Costley/Norman 184. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL M M M M ( M M 205 7/26/2010 Responder: Clark 185. Y Closed Closed EICB RAI TVA Letter dated Question B related to prior NRC 206 7.5.1.1 7.5.2 7/27/2010 Responder: Clark 186. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL C C C C 207 July 27, 2010 Date: 187. Y Closed Closed a a a a G a a 208 7.5.2.1 7.5.1 7/27/2010 Responder: Clark 188. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 209 7.5.2.1 7.5.1 7/27/2010 Responder: Clark 189. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL a a a a 210 7.5.2.1 7.5.1 7/27/2010 Responder: Clark 190. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 211 7.5.1.1 7/27/2010 Responder: Clark 191. Y Closed Closed EICB RAI TVA Letter dated Relates to SE Sections:

214 7/27/2010 Responder: WEC 192. Y Closed Closed EICB RAI TVA Letter dated

( ( (

215 7/29/2010 Responder: WEC 193. Y Closed Closed 216 7.5.1.1 7.5.2 7/29/2010 Responder: Clark 194. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 217 7/6/2010 Responder: Clark 195. Y Close Closed EICB RAI TVA Letter dated

( ( ( ( (

218 7/6/2010 Responder: Clark 196. Y Closed Closed EICB RAI TVA Letter dated 219 8/4/2010 Responder: TVA Licensing 197. Y Closed Closed EICB RAI

( ( ( M ( ( M ( ( ( ( M 220 8/4/2010 Responder: Ayala 198. Y Closed Closed EICB RAI TVA Letter dated 221 7.7.1.2 7.7.1.3 8/4/2010 Responder: Trelease 199. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 222 8/4/2010 Responder: Clark 200. Y Close Closed EICB RAI TVA Letter dated C C C C P 223 8/4/2010 Responder: Clark 201. Y Closed Closed EICB RAI 224 7.5.1.1 7.5.2 8/4/2010 Responder: Norman (TVA CEG) 202. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL G G G a G G a G G G G a 225 8/4/2010 Responder: Scansen 203. Y Close Closed EICB RAI TVA Letter dated 226 8/4/2010 Responder: TVA Licensing 204. Y Closed Closed N/A - Information TVA Letter dated See also Open Item Nos. 41 & 270.

a a a a o 227 8/4/2010 Responder: Clark 205. Y Close Closed EICB RAI TVA Letter dated 228 8/4/2010 Responder: Clark 206. Y Closed Closed EICB RAI TVA Letter dated 229 8/4/2010 Responder: Clark 207. Y Closed Closed EICB RAI TVA Letter dated 230 8/4/2010 Responder: Webb 208. Y Closed Closed EICB RAI TVA Letter dated 231 8/4/2010 Responder: Clark 209. Y Closed Closed EICB RAI TVA Letter dated

( ( ( (

232 8/4/2010 Responder: Clark 210. Y Closed Closed RAI No. 5 TVA Letter dated

( (

233 8/4/2010 Responder: Clark 211. Y Closed Closed EICB RAI TVA Letter dated C C C S 234 8/4/2010 Responder: 212. Y Closed Closed N/A - Duplicate N/A G G 235 8/4/2010 Responder: TVA Licensing 213. Y Closed Closed N/A N/A a a a i 236 8/4/2010 Responder: Clark 214. Y Close Closed EICB RAI TVA Letter dated 237 8/4/2010 Responder: Clark 215. Y Closed Closed EICB RAI TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 238 ( ( 8/4/2010 Responder: Webb/Hilmes 216. Y Closed Closed N/A - Duplicate N/A

(

239 C C 8/4/2010 Responder: Hilmes 217. Y Closed Closed N/A - Meeting N/A G

a a 218. Y 240 8/4/2010 Responder: Clark Close Closed Ml102910008 TVA Letter dated

( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( (

241 8/4/2010 Responder: Davies 219. Y Closed Closed RAI No. 10 TVA Letter dated 242 8/4/2010 Responder: Hilmes 220. Y Close Closed EICB RAI TVA Letter dated 243 8/3/2010 Responder: WEC 221. Y Closed Closed N/A - Closed to N/A 247 8/8/2010 Responder: WEC 222. Y Closed Closed EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4,

(

248 8/8/2010 Responder: WEC 223. Y Closed Closed Response is LIC-101 Rev. 3 Appendix B Section 4, 249 8/8/2010 Responder: WEC 224. Y Closed Closed LIC-101 Rev. 3 Appendix B Section 4, 253 8/8/2010 Responder: Clark 225. Y Closed Closed TVA Letter dated Related to Open Item no. 83.

254 8/10/2010 Responder: WEC 226. Y Closed Closed N/A - Request to TVA Letter dated C C C C C C C C C C C C C C C C C C C C S 255 8/10/2010 Responder: WEC 227. Y Closed Closed N/A - Request to TVA Letter dated 256 8/10/2010 Responder: WEC 228. Y Closed Closed N/A - Request to TVA Letter dated 257 8/10/2010 Responder: WEC 229. Y Closed Closed N/A - Request to N/A G

258 8/10/2010 Responder: WEC 230. Y Closed Closed N/A - Request to N/A 259 8/10/2010 Responder: WEC 231. Y Closed Closed N/A - Request to TVA Letter dated 260 8/10/2010 Responder: WEC 232. Y Closed Closed N/A - Request to N/A 261 8/10/2010 Responder: WEC 233. Y Closed Closed N/A - Closed to TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:

a a a a a a a a a a a a a a a a a a a a i 262 8/10/2010 Responder: WEC 234. Y Closed Closed N/A - Request to N/A 263 8/11/2010 Responder: WEC 235. Y Closed Closed ML101650255, Item 264 8/11/2010 Responder: WEC 236. Y Closed Closed ML101650255, Item 265 8/11/2010 Responder: WEC 237. Y Closed Closed ML101650255, Item 266 8/11/2010 Responder: Webb/Webber 238. Y Closed Closed TVA Letter dated 267 8/11/2010 Responder: WEC 239. Y Closed Closed 268 8/19/2010 Responder: WEC 240. N Open Closed

( (

269 8/20/2010 Responder: NRC 241. Y Closed Closed N/A N/A 270 ( ( ( 8/23/2010 Responder: Clark 242. Y Closed Closed See also Open Item Nod. 41 & 245.

M M C C P 271 8/23/2010 Responder: WEC 243. Y Closed Closed N/A - Closed to NA 272 7.5.2.1 7.5.1 a a 8/26/2010 Responder: Clark 244. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL a a o 273 7.5.2.1 7.5.1 8/26/2010 Responder: Clark 245. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 274.b ( ( 8/26/2010 Responder: Stockton 246. Y Closed Closed RAI No. 6 TVA Letter dated M S a i 274.a 7.5.2.1 7.5.1 8/26/2010 Responder: Clark 247. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL

(

275 8/27/2010 Responder: Clark 248. Y Closed Closed Not Required N/A 276 7.6 7.6 8/27/2010 Responder: Webb 249. Y Closed Closed EICB RAI TVA Letter dated D (

277 7.6 7.6.3 8/27/2010 Responder: Clark 250. Y Close Closed EICB RAI TVA Letter dated

( ( ( ( ( (

278 7.6 7.6.6 8/27/2010 Responder: Trelease 251. Y Close Closed EICB RAI TVA Letter dated a S 279 7.6 7.6.6 8/27/2010 Responder: Mather 252. Y Close Closed EICB RAI TVA Letter dated G G G G G G 280 7.6 7.6.6 8/27/2010 Responder: Trelease 253. Y Closed Closed EICB RAI TVA Letter dated r i 282 7.6 7.6.9 8/27/2010 Responder: Trelease 254. Y Close Closed EICB RAI TVA Letter dated 283 7.7.5 XX 8/27/2010 Responder: Clark 255. Y Closed Closed EICB RAI No.13 TVA Letter dated This item is a follow-up question to item

(

284 7.7.3 7.4.1 8/27/2010 Responder: Webber 256. Y Closed Closed EICB RAI No.14 TVA Letter dated This item is a follow-up question to item D

a r

(

285 7.3.3 7.3 8/27/2010 Responder: McNeil 257. Y Closed Closed EICB RAI No.15 TVA Letter dated This item is a follow-up question to item D

a r

(

286 7.7.3 9.3.4.2. 8/27/2010 Responder: Webber 258. Y Closed Closed EICB RAI No.16 TVA Letter dated D

a r

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

( 259. Y 287 7.3 7.3-1 ( D 8/27/2010 Responder: Elton Closed Closed ML102390538, Item Response G a r 260. Y 288 7.3 9/2/2010 Responder: McNeil Closed Closed EICB RAI

(

289 9/2/2010 Responder: Faulkner 261. Y Closed Closed RAI No. 24 TVA Letter dated 290 7.7 ( 9/7/2010 Responder: Clark 262. Y Closed Closed N/A N/A This item is a duplicate of item 291.

D ( ( ( 263. Y M (

291 7.7 9/7/2010 Responder: Clark Closed Closed TVA Letter dated 292 7.2.5 7.2 a C C S 9/7/2010 Responder: Craig 264. Y Closed Closed EICB RAI TVA Letter dated 293 7.7.4 7.2.2.3. a G 9/8/2010 Responder: Craig 265. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL r a a i 294 7.3 7.3.1.1. 9/9/2010 Responder: Elton 266. Y Closed Closed ML102390538, Item Response

(

295 7.3 7.3.1.1. 9/9/2010 Responder: Elton 267. Y Closed Closed ML102390538, Item Response D

a r

(

296 7.3 7.3.1.2. 9/9/2010 Responder: Elton 268. Y Closed Closed ML102390538, Item Response D

a r

297 7.3 7.3.1.2. ( ( 9/9/2010 Responder: Elton 269. Y Closed Closed ML102390538, Item Response

( D D 298 7.3 XX C a a 9/9/2010 Responder: Clark 270. Y Closed Closed ML102390538, Item Response a r r 271. Y 299 Provide Common Q Software Requirements Specification Post Attachment 41 of the 10/5 letter contains the Common Q Closed Closed TVA Letter dated

(

300 Need Radiation Monitoring System Description/Design Criteria Responder: Temples/Mather 272. Y Closed Closed RAI No. 25 TVA Letter S

i

(

301 1.TVA is requested to address the consequences of software Responder: WEC/Davies/Clark 273. Y Closed Closed RAI No. 11 TVA Letter dated Note 1:

302 7.5.2.1 7.5.1 09/17/2010 Responder: Tindell 274. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL

( ( ( (

303 7.5.2.1 7.5.1 09/17/2010 Responder: Tindell 275. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 304 7.5.2.1 7.5.1 09/17/2010 Responder: Tindell 276. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL D (

305 7.5.2.1 7.5.1 09/17/2010 Responder: Tindell 277. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL

( ( ( ( ( ( ( M M M M 306 7.1 7.1 FSAR amendment 100, page 7.1-12 provides the definition of Responder: Hilmes 278. Y Closed Closed EICB RAI TVA Letter dated 307 7.1 7.1 (1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of Responder: Hilmes 279. Y Closed Closed EICB RAI TVA Letter dated a S 308 7.1 7.1 (1) FSAR Amendment 100, Section 7.1, page 7.1-13, definition of Responder: Hilmes 280. Y Closed Closed EICB RAI TVA Letter dated G G G G G G G a a a a 309 7.1 7.1.2.1. (1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint Responder: Hilmes 281. Y Closed Closed EICB RAI TVA Letter dated 310 7.1 7.1.2.1. (1) FSAR amendment 100, Page 7.1-14, TVA setpoint Responder: Hilmes 282. Y Closed Closed EICB RAI TVA Letter dated r i 311 7.1 7.1 Both Westinghouse and TVA setpoint methodology do not have Responder: Hilmes 283. Y Closed Closed EICB RAI TVA Letter dated 312 7.0 By letter dated September 10,2010, TVA provided the summary Responder: Stockton 284. Y Close Closed EICB RAI TVA Letter dated 313 7.7.8 7.7.1.12 EDCR 52408 (installation of AMSAC in Unit 2) states that Design Responder: Ayala 285. Y Closed Closed EICB RAI No.18 TVA Letter dated

( 286. Y 314 7.3 7.3 ( D The following 50.59 changes were listed in the March 12 RAI Responder: Stockton Closed Closed EICB RAI No. 19 TVA Letter dated Related to OI 10 G a r 287. Y 315 7.5.3 7.5.3 IE Bulletin 79-27 required that emergency operating procedures to Responder: S. Smith (TVA Operations) Close Closed EICB RAI TVA Letter dated

(

316 7.5.2.3 7.5 TVA has provided various documents in support of RM-1000 high Responder: Temples/Mather 288. Y Closed Closed RAI No. 26 S

i

(

317 7.5.2.3 7.5 TVA has provided a proprietary and a non-proprietary version of Responder: Temples 289. Y Closed Closed RAI No. 27 TVA Letter dated S

i

(

319 7.5.2.3 7.5 TVA provided System Verification Test Results 04507007-1TR Responder: Temples 290. Y Closed Closed RAI No. 29 TVA Letter dated S

i E

320 I Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY Responder: Clark 291. Y Closed Closed N/A N/A Duplicate of item 156 321 B For the purposes of measuring reactor coolant flow for Reactor Responder: Clark 292. Y Closed Closed N/A N/A Duplicate of OI# 157

(

322 7.7.1.11 ( ( E Section 7.7.1.11 will be added to FSAR Amendment 101 to provide Responder: Clark 293. Y Closed Closed M

324 G C I Per the NRC reviewer, the BISI calculation is not required to be 294. Y Closed Closed a

a a 295. Y 325 The Unit 2 loops in service for Unit 1 that are scheduled to be Responder: TVA Startup Olson Closed Closed Closed to open item ?

B 326 TVA uses double-sided methodology for as-found and as-left Responder: Webb 296. Y Closed Closed TVA Letter dated

(

G a

(

328 7.5.2.3 7.5 Provide the model number for the four containment high range Responder: Temples 297. Y Closed Closed RAI No. 30 TVA Letter dated S

i

( 298. Y 329 7.6.1 7.6.7 D ( Section 7.6.7 of the FSAR (Amendment 100) states that, The Responder: Clark Closed Closed RAI No. 1 TVA Letter dated a S r i 299. Y 330 7.3 7.3 Related to Item 298 Responder: Hilmes/Faulkner Closed Closed EICB RAI No.20 Item 7, TVA letter 331 7.6.1 7.6.7 ( ( As a follow up of OI 190, Staff has reviewed the proprietary version Responder: WEC/Harless/Clark 300. Y Closed Closed RAI No. 8 TVA Letter dated Follow-up of OI-190.

M S a i 332 7.5.2.1 7.5.1 10/26/2010 301. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

(

333 7.5.2.1 7.5.1 10/27/2010 302. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL M

a

(

336 7.5.2.3 7.5 Re: RM-1000 Report 04508905-QR Responder: GA 303. Y Closed Closed S

i

(

337 7.5.2.3 7.5 Re: RM-1000 Report 04508905-QR Responder: GA 304. Y Closed Closed S

i

(

342 7.5.2.3 7.5 Please confirm that RM-1000 monitors and the associated The RM-1000 containment high range radiation monitors are 305. Y Closed Closed S

i

(

343 7.5.2.3 7.5 Seismic RRS in the 04508905-QR report Figures 3-2 and 3-3 (1) The cause of the difference between the RRS and TRS 306. Y Closed Closed S

i 041 7.5.2 7.5.1 2/19/2010 Responder: WEC 1. N Open Open-NRC Review NRC Meeting TVA Letter dated See also Open Item Nos. 226 & 270.

EICB (Carte)

Summary NRC 6/18/10 Please provide the following Westinghouse documents: Items (1) and (2) were docketed by TVA letter dated April 8, Final Response included in Due: Meeting Summary (1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements 2010. letter dated 12/3/10 (3) 12/3/10 ML093560019, Item TVA Letter dated Specification" (4) 12/10/10 No. 11 10/5/10 (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design Item (3) will be addressed by Revision 2 of the Licensing Specification" Technical Report. Due 12/3/10 Partial Response is included in TVA to docket (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g" letter dated 10/5/10. information indentified Please provide the following Westinghouse documents or pointers Item (4) will be addressed by Westinghouse developing a The SysRS and SRS in ISG6.

to where the material was reviewed and approved in the CQ TR or WBN2 Specific Test Plan to compensate for the fact that the incorporate requirements from SPM: NRC disapproved WNA-PT-00058-GEN during the original many other documents by (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q Common Q review. Due 12/7/10 reference.

Safety systems" (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test Item (5) Procedures that are listed in the SPM compliance NNC 8/25/10: (3) An earlier Procedure" table in the Licensing Technical Report revision 1 supersede version of this report was that test procedure WNA-TP-00357-GEN.Due 10/22/10 docketed for the Common Q topical report; therefore, there For Item 3, Attachment 19 contains the Westinghouse should be no problem to docket document Post-Accident Monitoring System (PAMS) this version. (4) Per Licensing Technical Report, WNA-LI-00058-WBT, Revision ML091560352, the testing 2, dated December 2010. Attachment 20 contains the process document does not Westinghouse Application for Withholding for the Post- address the test plan Accident Monitoring System (PAMS) Licensing Technical requirements of the SPM.

Report, WNA-LI-00058-WBT, Revision 2, dated December Please provide a test plan that 2010. implements the requirements of the SPM.

For Item 4, Attachment 9 contains the Westinghouse document Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the WNA-PT-00138-WBT, Revision 0 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 17, 2010.

043 7.5.2 7.5.1 2/19/2010 Responder: WEC Date: 5/25/10 2. N Open Open-NRC Review EICB RAI TVA Letter dated NNC 8/25/10: A CQ PAMS ISG6 EICB (Carte)

ML102910002 2/5/10 compliance matrix was docketed on: (1)

The PAMS ISG6 compliance matrix supplied as Enclosure 1 to The PAMS ISG6 compliance matrix supplied as Enclosure 1 Revised response included in Due 12/1/10 Item No. 2 February, 5 12010, (2) March 12, 2010, TVA letter dated February 5, 2010 is a first draft of the information to TVA letter dated February 5, 2010 is a first draft of the letter dated 12/22/10. TVA Letter dated & (3) June 18, 2010. The staff has needed. The shortcomings of the first three lines in the matrix are: information needed. 5/12/10 expressed issued with all of these compliance evaluations. The staff is still Line 1: Section 11 of the Common Q topical report did include a By letter dated April 8, 2010 TVA provided the PAMS Response is included in letter TVA Letter dated waiting for a good compliance commercial grade dedication program, but this program was not Licensing Technical Report provided additional information. dated 10/5/10. 6/18/10 evaluation.

approved in the associated SE. Westinghouse stated that this was the program and it could now be reviewed. The NRC stated that Attachment 3 contains the revised Common Q PAMS ISG-6 Revised compliance matrix is TVA Letter dated NNC 11/23/10: WNA-LI-00058-WT-P TVA should identified what they believe was previously reviewed Compliance Matrix, dated June 11, 2010, that addresses unacceptable. 10/5/10 Rev. 1 Section 7 does not include the and approved. these items (Reference 13). RSED documents, and it should. Table NNC 8/12/10: It is not quite 6-1 Item No. 15 should also include the Line 2: TVA stated the D3 analysis was not applicable to PAMS, By letter Dated June 18, 2010 (see Attachment 3) TVA enough to provide all of the RSED RTMs.

but provided no justification. The NRC asked for justification since provided a table, "Watts Bar 2 - Common Q PAMS ISG-6 documents requested. There

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as Compliance Matrix." are two possible routes to being SRP acceptance criteria for PAMS. review that the NRC can It is TVAs understanding that this comment is focused on undertake: (1) follow ISG6, and Line 3: TVA identified that the Design report for computer integrity the fact that there are documents that NRC has requested (2) follow the CQ SPM. The was completed as part of the common Q topical report. The NRC that are currently listed as being available for audit at the TVA response that was noted that this report is applicable for a system in a plant, and the Westinghouse offices. For those Common Q PAMS originally pursued was to follow CQ topical report did no specifically address this PAMS system at documents that are TVA deliverable documents from ISG6, but some of the Watts Bar Unit 2. Westinghouse, TVA has agreed to provide those to NRC. compliance items for ISG6 were Westinghouse documents that are not deliverable to TVA will addressed by referencing the NRC then concluded that TVA should go through and provide a be available for audit as stated above. Requirements SPM. The NRC approved the more complete and thorough compliance matrix. Traceability Matrix issues will be tracked under NRC RAI CQ TR and associated SPM; it Matrix Items 142 (Software Requirements Specification) and may be more appropriate to 145 (System Design Specification). Commercial Item review the WBN2 PAMS Dedication issues will be tracked under NRC RAI Matrix application to for adherence to Item 138. This item is considered closed. the SPM that to ISG6. In either path chosen, the applicant TVA Response to Follow-up NRC Request: should provide documents and a justification for the acceptability WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring of any deviation from the path System (PAMS) Licensing Technical Report submitted in chosen. For example, it TVA Letter to NRC dated December 3, 2010, (Reference 1) appears that the contains the following changes to address the NRC Westinghouse's CDIs are requests: commercial grade dedication plans, but Westinghouse (1) While RSEDs are not specifically mentioned, Section 7 maintains that they are has been revised to be applicable to both hardware and commercial grade dedication software which includes the RSEDs. reports; this apparent deviation (2) Table 6-1 item 15 reference added for WNA-VR-00280- should be justified or explained.

WBT (RESD) 050 7.5.2 7.5.1 4/8/2010 Responder: WEC Date: 5/25/10 3. N Open Open-NRC Review EICB RAI TVA Letter dated NNC 11/18/10: SysRS Rev. 2 contains EICB (Carte)

ML102910002 6/18/10 several Reference 8, however, How should the "shall" statements outside of the bracketed These sections are descriptive text and not requirements. Revised response included in Due12/22/10 Item No. 8 Reference 8 has been deleted.

requirements in Common Q requirements documents be The next revision of the Watts Bar Unit 2 PAMS System letter dated 12/22/10. Discuss at 11/22 phone TVA Letter dated interpreted? Requirements Specification will remove shall from the call. 10/29/10 wording in those sections. A date for completing the next Enclosure 1 Item revision of the System Requirements Specification will be TVA response is inconsistent This will be corrected in No. 1 provided no later than August 31, 2010. (e.g., WNA-DS-01667-WBT the Revision 3 Rev. 1 page 1-1, Section 1.3.1 document due to TVA The System Requirements Specification will be revised by implies that "SysRS Section 12/10/10 September 30, 2010 and submitted within two of receipt from ###" has requirements. See Westinghouse. also SDS4.4.2.1-1 on page 4-32).

TVA Revised Response Is there a requirement on the Shall statements within the scope of the System shall referenced above??

Requirements Specification (SysRS) and System Design Specification (SysDS) were reviewed by Westinghouse. The Response is provided in letter statements were either relocated to the numbered dated 10/29/10.

requirements section or the wording was changed to identify that it was not a requirement. This item is resolved by TVA Revised Response in TVA submittal of revision 2 of the SysRS and the SysDS Letter dated 10/29/10 Enclosure (attachments 7 and 8 of TVA Letter to NRC dated 10/25/10). 1 Item No. 1 is Acceptable TVA Response to Follow-up NRC Request: NNC 11/18/10: Revised Response is not a statement of This item is corrected in the revision 3 requirements fact. SysRS Rev. 2 (i.e., WNA-documents. DS-01617-WBT Rev. 2) contains many shalls that are

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Attachment 1 contains the proprietary version of WNA-DS- not within numbered 01617-WBT-P, Revision 3, Post Accident Monitoring requirements sections, for System- System Requirements Specification, dated example:

November 2010. Attachment 2 contains the non-proprietary (1) Page 2-1, Section 2.3.1 -

version WNA-DS-01617-WBT-NP, Revision 3, Post See guidance statement Accident Monitoring System - System Requirements (2) Page 2-10, top of page 1 -

Specification, dated December 2010. Attachment 3 See guidance statement contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01617-WBT-P, Revision 3, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System - System Requirements Specification (Proprietary),

dated December 6, 2010.

Attachment 4 contains the proprietary version of WNA-DS-01667-WBT-P, Revision 3, Post Accident Monitoring System - System Design Specification, dated November 2010. Attachment 5 contains the non-proprietary version WNA-DS-01667-WBT-NP, Revision 3, Post Accident Monitoring System - System Design Specification, dated December 2010. Attachment 6 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01667-WBT-P, Revision 3, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (Proprietary), dated December 6, 2010.

Attachment 7 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated November 2010. Attachment 8 contains the non-proprietary version WWNA-SD-00239-WBT-NP, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010. Attachment 9 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-SD-00239-WBT-P, Revision 3, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System (Proprietary), dated December 8, 2010.

067 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 4. N Open Open-NRC Review N/A - No question TVA Letter dated EICB (Carte) date for the "Commercial Grade Dedication Instructions for AI687, was asked. Item 6/18/10 AI688, Upgraded PC node box and flat panels." was September The following status is from the revised WB2 Common Q Response included in letter Due 12/3/10 was opened to track 28, 2010. PAMS ISG-6 Compliance Matrix submitted in response to dated 12/22/10. comm8ittment Item 43: made by applicant.

This item is addressed in Rev. 2

a. AI687, AI688 - Scheduled for September 28, 2010 of the Licensing Technical Report
b. Upgraded PC node box and flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), these items are available for audit at the Westinghouse Rockville office.
c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.

To be addressed during 9/20-9/21 audit

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N TVA Response to Follow-up NRC Request:

WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:

Section 7, Commercial Grade Dedication Process, has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.

068 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 5. N Open Open-NRC Review N/A - No question TVA Letter dated EICB (Carte) date for the "Summary Report on acceptance of AI687, AI688, was asked. Item 6/18/10 Upgraded PC node box, flat panels, and power supplies." was The following status is from the revised WB2 Common Q Response included in letter Due 12/3/10 was opened to track September 28, 2010. PAMS ISG-6 Compliance Matrix submitted in response to dated 12/22/10. comm8ittment Item 43: made by applicant.

a. AI687, AI688 - Scheduled for September 28, 2010 This item is addressed in Rev. 2 of the Licensing Technical
b. Upgraded PC node box - Per Westinghouse letter WBT- Report D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.

To be addressed during 9/20-9/21 audit TVA Response to Follow-up NRC Request:

For the commercial grade dedication process, please see the response to Request for Additional Information (RAI) item 3 in this letter, NRC Matrix Item 067.

The component level EQ/Seismic summary reports for the hardware listed above are available for NRC review/audit as described below:

(1) AI687 and AI688, the following documents were submitted in TVA Letter to NRC dated October 26, 2010, Watts Bar Nuclear Plant (WBN) Unit 2 -

Instrumentation and Controls Staff Information Requests, (Reference 5):

a. EQ-EV-62-WBT, Revision 0, Common Q PAMS Comparison of Tested Conditions for the AI687 and AI688 Common Q Modules and Supporting Components to the Watts Bar Unit 2 (WBT)

Requirements, dated September 10, 2010

b. EQLR-171, Revision 0, Environmental and Seismic Test Report, Analog Input (AI)687 &

AI688 Modules for use in Common Q PAMS, dated September 10, 2010

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

c. CN-EQT-10-44, Revision 0, Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS), dated September 28, 2010 (2) Upgraded PC Node Box - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office, (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:
a. CDI-3722, Revision 7, Next Generation PC Node Box Commercial Dedication Instruction
b. LTR-EQ-10-50 PC Node Box/Flat Panel Display System Components Qualification Summary (3) Flat Panel Displays - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office, (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:
a. CDI-3803, Revision 8, Next Generation Flat Panel Display (FPD) Commercial Dedication Instruction
b. LTR-EQ-10-50 PC Node Box/Flat Panel Display System Components Qualification Summary (4) Power supplies - As stated in Westinghouse letter WBT-D-2035 dated June 11, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office (Reference 7), the following documents are available for NRC audit at the Westinghouse Rockville office:
a. CDI- 4057, Revision 4, Commercial Dedication Instruction
b. EQ-TP-1 05-GEN, Revision 0, Electromagnetic Compatibility Test Plan and Procedure for Quint Power Supplies and Safety System Line Filter
c. Breakers, EQ-TP-114-GEN, Revision 0, Seismic Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, Line Filter Assemblies, and South Texas Units 3 & 4 Circuit
d. EQ-TP-117-GEN, Revision 0, Environmental Qualification Test Procedure For Common Q Powe Supplies, Quint Power Supplies, and Line Filter Assemblies 070 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 6. N Open Open-NRC Review N/A - No question TVA Letter dated NNC 11/23/10: The dues date in this EICB (Carte) date for the "Concept and Definition Phase V&V Report" was was asked. Item 6/18/10 open item does not agree with the due March 31, 2010. Per Westinghouse letter WBT-D-1961, this document is Final Response included in Due 12/17/10 was opened to track dated in Open Item No. 71.

available for audit at the Westinghouse Rockville office. letter dated 12/3/10 comm8ittment TVA Letter dated made by applicant. 8/20/10 WNA-VR- 00283-WBT, Rev 0 was submitted on TVA letter Partial Response is included in to the NRC dated August 20, 2010. letter dated 10/5/10. TVA Letter dated 10/5/10 The submitted V&V did not address the Requirements Regulations require that the Traceability Matrix and did not summarize anomalies. At the NRC review be based on September 15th public meeting, Westinghouse agreed to docketed material. Awaiting for include the Concept and Definitions Phase Requirements document to be docketed by

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Traceability Matrix (RTM) in the next IV&V report along with TVA.

partial Design Phase updates to the RTM.

NNC 8/25/10: Requirements TVA Revised Response: Phase SVVR provided by TVA TVA submitted WNA-VR- 00283-WBT, Rev 0 to NRC in letter dated 8/20/10.

letter dated August 20, 2010 (Reference 6). NNC 11/23/10: The The next Independent Verification and Validation (IV&V) requirements Phase SVVR report will include the Design provided by TVA on 8/20/10, is Phase Requirements Traceability Matrix. The Design Phase not complete. This report IV&V Report will be submitted should address the RTM, which to NRC by February 11, 2011. it did not. TVA/WEC agreed to address the concept phase RTM Attachment 14contains the Westinghouse document in the next revision.

Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT, Revision 1, dated November 2010. Attachment 15 contains the Westinghouse Application for Withholding for the WNA-VR-00283-WBT, Revision 1, Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, dated November 8, 2010.

NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the Licensing Technical Report Revision 2 (Attachment

19) for the current contract compliance matrix.

071 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 7. N Open Open-NRC Review N/A - No question N/A NNC 11/23/10: The dues date in this EICB (Carte) date for Revision 2 of the I V&V Report" covering the Design and was asked. Item open item does not agree with the due Implementation phases was July 30, 2010. Attachment 16 contains the Westinghouse document IV&V Response included in letter Due 12/10/10 was opened to track dated in Open Item No. 70.

Summary Report for the Post Accident Monitoring System, dated 12/3/10 commitment made WNA-VR-00283-WBT, Revision 2, dated November 2010. by applicant.

Attachment 17 contains the Westinghouse Application for Awaiting for document to be withholding for the IV&V Summary Report for the Post docketed by TVA.

Accident Monitoring System, WNA-VR-00283-WBT, Revision 2, dated November 2010.

NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the Licensing Technical Report Revision 2 (Attachment

19) for the current contract compliance matrix.

073 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 8. N Open Open-NRC Review N/A - No question N/A EICB (Carte) date for Revision 3 of the IV&V Report covering the Integration was asked. Item phase was October 29, 2010. WNA-VR-00283-WBT, Revision 3, IV&V Summary Report Response included in letter Due 12/22/10 was opened to track for the Post Accident Monitoring System, covers the dated 12/22/10 commitment made Integration phase. Attachment 10 contains the proprietary by applicant.

version of IV&V Summary Report for the Post Accident Awaiting for document to be Monitoring System, WNA-VR-00283-WBT-P, Revision 3, docketed by TVA.

dated December 2010. Attachment 11 contains the non-proprietary version IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-NP, Revision 3, dated December 2010. Attachment 12 contains the Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283-WBT, Revision 3, Nuclear Automation Watts Bar 2 NSSS Completion

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Program I&C Projects, IV &V Summary Report for the Post Accident Monitoring System (Proprietary), dated December 10, 2010.

075 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 9. N Open Open-NRC Review N/A - No question N/A EICB (Carte) date for the "Watts Bar 2 PAMS Specific FAT Procedure" was was asked. Item September 30, 2010. Attachment 12 contains the Westinghouse document Response included in letter Due 12/3/10 was opened to track Nuclear Automation Watts Bar Unit 2 NSSS Completion dated 12/3/10 commitment made Program I&C Projects, Post Accident Monitoring System by applicant.

Channel Integration Test/Factory Acceptance Test, WNA- Awaiting for document to be TP-02988-WBT, Revision 0, dated November 2010. docketed by TVA.

Attachment 13 contains the Westinghouse Application for Withholding for WNA-TP-02988-WBT, Revision 0,Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test, dated November 2010.

082 7.5.2 7.5.1 5/6/2010 Responder: WEC Date: 6/18/10 10. N Open Open-NRC Review EICB RAI TVA Letter dated NNC 11/18/10: See also Open Item No.

EICB (Carte)

ML102910002 7/30/10 41, Item No. 3.

The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. These components can be found in the Summary Revised response included in Due 12/3/10 Item No. 10 0, Dated April 2010), in Section 2.3, lists hardware/software Qualification Report Of Hardware Testing For Common Q letter dated 12/22/10 changes to the Common Q PAMS previously reviewed by the Applications, 00000-ICE-37764, Rev 3 and Commercial Grade NRC. However the Common Q ISG-6 Compliance Matrix does not TWICE Qualification Status Report, WNAQR-00011-SSP Regulations require that the Dedication to be contain activities that address qualification of all changes Per Westinghouse letter WBT-D-2024, (Reference __) dated NRC review be based on addressed in LTR Rev.

specifically: June 9, 2010, these documents are available for audit at the docketed material. Awaiting for 2, Westinghouse Rockville Office. document to be docketed by 2.c - CI527 AF100 Peripheral Component Interconnect (PCI) TVA.

interface card TVA provided information by letter dated July 30, 2010

3. - Common Q TC514 AF100 Fiber Optic Modems (Evolutionary (ML102160349) - See Enclosure 1 Item No. 7. NNC 8/9/10: per telephone Product Maintenance/Improvements) conversation on 8/5/10, it is not 4.a - PM646A Processor Module Revision 1 of the Licensing Technical Report provides clear how Westinghouse 4.b - CI631 AF100 Communication Interface Module additional detail on the platform specific to WBN2 and Commercial Grade Dedication 4.e - DO620 Digital Output Card references to the evaluation documentation. Plans and Reports for Digital I&C. Westinghouse agree to Please provide sufficient detail regarding the changes for the NRC TVA Response to Follow-up NRC Request: present to the NRC in a public to independently evaluate the acceptability of the changes. meeting on August 17, 2010, Please see the response to Request for Additional and explanation of how their Information (RAI) item 3 in letter dated 12/22/10, NRC Matrix system addresses regulatory Item 067. criteria for both commercial grade dedication and equipment qualification.

NNC 8/25/10: In the August 17, 2010 public meeting Westinghouse stated that the CDI were the plans. The NRC requested that the plans and associated reports be docketed.

NNC 11/18/10: During the September 20-21, 2010 audit, TVA agreed to put a description of the commercial grade dedication program and implementation in Rev. 2 of the CQ PAMS LTR.

085 7.5.2 7.5.1 CB 5/6/2010 Responder: WEC 11. N Open Open-NRC Review EICB RAI (C

art ML102910002

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Please provide a detailed description of the PAMS MTP data link Is the WEC ISG4 evaluation inadequate? Revised response included in Due 12/3/10 Item No. 13 to the plant computer. This description should identify all letter dated 12/22/10 equipment (model & version) and describe the functions that each Operation of the MTP as a barrier device. MTP Fails as a Hardware is in Rev. 1 piece of equipment performs. This description should be of barrier device. Describe what prevents a MTP failure from A response will be provided by of the Licensing sufficient detail for the NRC to independently evaluate the propagating to the AC160? 10/31/10 Technical Report due statements made in WNA-LI-00058-WBT Rev. 0, Section 5.3. 10/22.

Node loss on the bus? Bus loss? NNC 8/11/10: Design information should be available NNC 8/25/10:

Revise the ISG4 section of the Licensing Technical Report now. By letter dated July 30, Disagree with path (Rev. 2) to provide a more detailed description of the MTP as 2010 (ML102160349) TVA forward input by TVA a barrier device. stated that the MTP was above. An explanation connected to a Red Hat Linux is about the design is TVA Response to Follow-up NRC Request: Server (see Enclosure 1, Item needed.

No. 14 part b.). It is presumed WNA-LI-00058-WBT-P, Revision 2, Post-Accident that this server is not safety- FAT test procedure to Monitoring System (PAMS) Licensing Technical Report related. IEEE 603-1991 Clause include data storm submitted in TVA letter to NRC dated December 3, 2010 5.6.3(1) states, "Isolation testing of the MTP (Reference 1), contains the following changes to address the devices used to affect a safety interface NRC requests: system boundary shall be classified as part of the safety NNC 11/18/10: WEC Section 2.2, System Description page 2-3 provides a system." response states that description of the MTP Fiber-Optic (FO) data link to the plant CQ PAMS LTR Rev. 2 computer. Section 2.2.1.4, Hardware has been expanded Please describe how the MTP will contain relevant to include a table detailing all hardware changes that have serves as the isolation device. information.

occurred since the initial submittal. Section 2.2.2, Software has been expanded to include a table detailing all software changes that have occurred since the initial submittal.

101 4/12/2010 Responder: Slifer 12. Y Open Open-NRC Review N/A TVA is working with the vendor to meet DORL (Poole) the 6/30 date, however there is the The non-proprietary versions of the following RM-1000, The documents, and affidavits for withholding for the listed Documents provided in letter Due 10/14/10 potential this will slip to 7/14.

Containment High Range Post Accident Radiation Monitor documents were submitted to the NRC on TVA letter to the dated 07/15/10 documents will be provided by June 30, 2010. NRC dated July 15, 2010. Confirm receipt.

1. V&V Report 04508006A
2. System Description 04508100-1TM
3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
4. Functional Testing Report 04507007-1TR 138 By letter dated February 3, 2010, Westinghouse informed TVA that Responder: WEC 13. N Open Open-NRC Review ML101650255, Item EICB (Carte) certain PAMS documentation has been completed. No. 2 This item is used to track all Commercial Grade Revised response included in Due 12/3/10 (a) The draft ISG6 states that a commercial grade dedication plan Dedication issues. letter dated 12/22/10 should be provided with an application for a Tier 2 review. To be addressed by
a. WNA-LI-00058-WT-P, Revision 2, Post-Accident TVA agreed to include a Rev. 2 of the Licensing By letter dated February 5, 2010, TVA stated that the commercial Monitoring System (PAMS) Licensing Technical Report description of the generic Technical Report.

grade dedication plan was included in the Common Q Topical submitted in TVA Letter to NRC dated December 3, Westinghouse hardware Report Section 11, Commercial Grade Dedication Program. 2010, (Reference 1) contains the following changes to commercial grade dedication Section 11 includes a description of the Common Q Commercial address the NRC request: process in the PAMS licensing Grade Dedication Program, and states: A detailed review plan is technical report. (see developed for each Common Q hardware or software component Section 7, Commercial Grade Dedication Process has ML102920031 Item No 1) that requires commercial grade dedication. been revised to describe the general commercial grade dedication process for both hardware and software and TVA agreed to include (in the Please provide the commercial grade dedication plans for each uses a description of the AI687 dedication process as PAMS licensing technical report)

Common Q hardware or software component that has not been an example of how the process is applied. an evaluation of WBN2 critical previously reviewed and approved by the NRC. characteristics for commercial As listed in Table 6-3. Westinghouse Watts Bar 2 Westinghouse hardware (b) The draft ISG6 states that a commercial grade dedication Common Q PAMS Documents at Westinghouse components against the generic report should be provided within 12 months of requested approval Rockville Office, the following commercial grade critical characteristics. (see for a Tier 2 review. dedication documents are available for NRC audit at the ML102920031 Item No 2)

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Westinghouse Rockville office: (list included in letter)

(i) Please provide 00000-ICE-37722 Rev. 0, Commercial Grade TVA agreed to include a Dedication Report for the QNX Operating System for Common Q b. It is TVAs understanding that the submittal of the description of the generic Applications. documents listed in (b.i) and (b.ii) is no longer required. Westinghouse software Rather, it was agreed, that the inclusion of a description commercial grade dedication (ii) Please provide WNA-CD-00018-GEN Rev. 3, Commercial of the commercial grade dedication process in revision process in the PAMS licensing Dedication Report for QNX 4.25G for Common Q Applications. 2 of the Post-Accident Monitoring System (PAMS) technical report. (see Licensing Technical Report, WNA-LI-00058-WT-P, ML102920031 Item No 3) would be sufficient to address this request.

TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4) 140 The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1) Responder: Clark 14. N Open Open-NRC Review ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements EICB (Carte) states: The PAMS shall be capable of operation during normal No. 4 10/29/10 Specification and abnormal environments and plant operating modes. The WBN Unit 2 FSAR Amendment 100 Section 7.5.1.8, Post Revised response included in Due 12/3/10 Enclosure 1 Item rational for this requirement is that it is necessary to meet Accident Monitoring System (PAMS) specifies the Reg. letter dated 12/22/10 No. 10 TVA docketed WNA-DS-01617-WBT Regulatory Guide (RG) 1.97. Guide 1.97 variables implemented in the Common Q based TVA to docket PAMS Rev. 1, RRAS Watts Bar 2 NSSS WBN Unit 2 PAMS NNC 11/3/10: The origin of the Licensing Technical Completion Program I&C Projects Post What document specifies which RG 1.97 variables are requirements in the SysRS are Report Rev. 2. Accident Monitoring System- System implemented in the Common Q based WBN2 PAMS? TVA Response to Follow-up NRC Request: not clearly document. Rev. 1 of Requirements Specification, dated the Common Q PAMS Licensing December 2009.

WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring Technical Report contains an System (PAMS) Licensing Technical Report was submitted open item that will be addressed in TVA Letter to NRC, dated December 3, 2010 (Reference in Rev. 2; this open item is to 1). Revision 2 contains the following change to address this include TVAs enhanced request: contract compliance matrix. It is expected that this matrix will Section 11, TVA Contract Compliance Matrix has been address this open item.

added. Specifically the items of concern are addressed by Requirements 7 through 19 (pages 11-1 and 11-2).

142 The applicable regulatory guidance for reviewing the WBN2 PAMS Responder: WEC 15. N Open Open-NRC Review ML101650255, Item WBN2 PAMS System Requirements EICB (Carte)

SysRS would be IEEE 830 as endorsed by Regulatory Guide No. 6 Specification 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities - This item is used to track all traceability issues with the Response included in letter Due 12/22/10 Software Requirements Specifications. IEEE 830-1994 Section Software Requirements Specification (SRS). dated 12/22/10 TVA docketed WNA-DS-01617-WBT 4.3.8, Traceable, states: A [requirements specification] is To be addressed by Rev. 1, RRAS Watts Bar 2 NSSS traceable of the origin of each of its requirements is clear 1. How did TVA ensure the traceability of each TVA/Westinghouse agreed to Revision of the RTM, Completion Program I&C Projects Post requirement in the WBN2 PAMS SysRS. include the V&V evaluation of SRS, SysRS, and Accident Monitoring System- System

1. How did TVA ensure the traceability of each requirement in their reusable software element SysDS. Requirements Specification, dated the WBN2 PAMS SysRS. TVA Response: development process in the December 2009.

V&V design phase summary

2. Explain the source(s) of the requirements present in the Post Traceability of requirements for the WBN Unit 2 report. This evaluation would Accident Monitoring Systems Software Requirements Common Q PAMS is ensured by: include an evaluation against Specification. To clarify, many documents have the development process requirements that are incorporated by reference into the a. Preparation of the TVA Contract Compliance Matrix requirements. This evaluation SRS, but what served to direct the author to include those contained in WNA-LI-00058-WBT-P, Revision 2, would also include an evaluation various documents in the SRS or, if the requirement is based Post-Accident Monitoring System (PAMS) of how the WBN2 specific on the System Requirements Specification, what directed the Licensing Technical Report submitted in TVA requirements were addressed author to include the requirement there? Letter to NRC dated December 3, 2010 (Reference by the reusable software 1). elements. (see ML102920031
3. Clarify whether the unnumbered paragraphs in the Post Item No 5)

Accident Monitoring Systems Software Requirements b. Engineering review/comment/status of each Specification, such as in the section headings, or are all such revision of:

sections simply considered to be informative?

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

i. WNA-DS-01617-WBT, Post Accident Does the same apply to documents referenced by the SRS? Monitoring System - System Requirements Such as WCAP-16096-NP-A, Rev. 1A, Software Program Specification Manual for Common Q Systems, which is incorporated by reference in requirement R2.3-2 in the SRS. ii. WNA-DS-01667-WBT, Post Accident Monitoring System - System Design R2.3-2 [The PAMS software shall comply with the Specification (hardware) requirements and guidelines defined in WCAP-16096-NP-A, Software Program Manual for Common Q Systems iii. WNA-SD-00239-WBT, Software (reference 5).] Requirements Specification for the Post Accident Monitoring System (software)

If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, 2. Explain the source(s) of the requirements present in the please list them, describe why they satisfy the fundamental Post Accident Monitoring Systems Software requirement of unambiguity, and describe how they were Requirements Specification. To clarify, many verified. documents have requirements that are incorporated by reference into the Software Requirements Specification

4. Are there any sources of requirements in parallel with the (SRS), but what served to direct the author to include Post Accident Monitoring Systems Software Requirements those various documents in the SRS or, if the Specification? Meaning does the SRS contain, explicitly or requirement is based on the System Requirements by reference, all the requirements that were used in the Specification, what directed the author to include the design phase for the application specific software, or do requirement there?

software design phase activities use requirements found in any other source or document? If so, what are these TVA Response:

sources or documents?

As documented in the RTM, some software

5. References 12, 27, 29, and 31-44 in the Post Accident requirements are taken from generic documents. The Monitoring Systems Software Requirements Specification decision to include generic software requirements was are various types of Reusable Software Element. to reduce the overall scope for Common Q features that are unchanged across projects. Westinghouse reviewed These references are used in the body of the SRS, for the generic PAMS requirements and included those example: requirements that were applicable to WBN Unit 2 PAMS.

R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR Source: E-mail from Westinghouse (Matthew A.

terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Shakun) to Bechtel (Mark S. Clark), RE: December 22 Element Document CRC for Calibration Data" [Reference letter review, dated December 17, 2010 (Reference 13) 12]).]

3. Clarify whether the unnumbered paragraphs in the Post They are also included via tables such as found in Accident Monitoring Systems Software Requirements requirement R7.1.2-1 Specification, such as in the section headings, contain requirements or are all such sections simply considered

[The Watts Bar 2 PAMS shall use the application-specific to be informative?

type circuits and custom PC elements listed in Table 7.1-1.]

Does the same apply to documents referenced by the Do the referenced reusable software element documents include SRS? Such as WCAP-16096-NP-A, Rev. 1A, Software requirements not explicitly stated in the SRS? If so what is their Program Manual for Common Q Systems, which is origin? incorporated by reference in requirement R2.3-2 in the SRS.

R2.3-2 [The PAMS software shall comply with the requirements and guidelines defined in WCAP-16096-NP-A, Software Program Manual for Common Q Systems (reference 5).]

If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, please list them, describe why they satisfy the fundamental requirement of unambiguity,

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N and describe how they were verified.

TVA Response:

Unnumbered paragraphs in the Post Accident Monitoring Systems Software Requirements Specification, such as in the section headings, are informative and are not to be interpreted as requirements. All requirements are explicitly numbered.

It depends on the document type. The statement would be true for requirements documents (such as the SysRS or SDS) if they were incorporated by reference.

However, for the specific item cited, WCAP-16096-NP-A, Rev. 1A, it does not contain numbered requirements.

The requirements contained in this document are contained within the text of the various sections.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

4. Are there any sources of requirements in parallel with the Post Accident Monitoring Systems Software Requirements Specification? Meaning does the SRS contain, explicitly or by reference, all the requirements that were used in the design phase for the application specific software, or do software design phase activities use requirements found in any other source or document? If so, what are these sources or documents?

TVA Response:

The Westinghouse SRS, WNA-SD-00239-WBT, Revision 3 contains references to other Westinghouse software requirements documents. Specifically, 00000-ICE-3238, Revision 5, Software Requirements Specification Post Accident Monitoring System 00000-ICE-3239, Revision 13, Software Requirements Specification for the Common Q Generic Flat Panel Display Software Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification are various types of Reusable Software Element.

These references are used in the body of the SRS, for example:

R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]

They are also included via tables such as found in requirement R7.1.2-1

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]

Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?

TVA Response:

Requirements for the reusable software elements (RSEDs) are evaluated in WNA-VR-00283-WBT-P, Revision 3, IV&V Summary Report for the Post Accident Monitoring System, dated December 2010 (Attachment 10).

RSED traceability is contained in WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS)

Custom PC Elements. This document can be made available for audit at the Westinghouse Rockville office.

At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the traceability concerns with the Software Requirements Specification.

6. Westinghouse will perform a review of the Requirements Traceability Matrix(RTM), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.

TVA Response:

Please see response to letter Item 13 (NRC Matrix Item 145).

7. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.

TVA Response:

Please see response to letter Item 13 (NRC Matrix Item 145).

8. Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address items not in the SRS or SysRS.

TVA Response:

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N A comments column has been added to WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

9. IEEE 830 says you shouldnt have planning information in the SRS. Westinghouse has agreed to remove this information.

TVA Response:

Westinghouse has confirmed that process requirements have been removed from the SRS.

Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)

10. IEEE 830 says you shouldnt have process requirements in the SRS. Westinghouse has agreed to remove these requirements.

TVA Response:

Westinghouse confirmed that process requirements have been removed from the SRS.

Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)

11. Westinghouse will perform and document an evaluation of the SRS to ensure compliance with Reg. Guide 1.172 and justify any deviations.

TVA Response:

WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1):

Section 9, Compliance Evaluation Of The Watts Bar 2 PAMS Software Requirements Specification To IEEE Standard 830-1998 And Regulatory Guide 1.172 has been added.

12. 25 issues identified by V&V where some requirements have not been included in the System Design Specification (SDS) (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed?

TVA Response:

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N The twenty-five (25) issues are captured in Exception Reports (ERs): V&V-769 and V&V-770. These ERs have all been addressed and the ERs have been closed satisfactorily by Westinghouse IV&V.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

13. Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS).

These will be removed from the SRS and incorporated into the next revision of the SDS.

TVA Response:

The hardware requirements in the Software Requirements Specification have been deleted and moved to System Design Specification.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 16, 2010 (Reference 15)

14. RTM item R4.2-2 protection class software set to 0.

Needs to be fixed internally. Write CAPs to revise the application restrictions document on AC160.

TVA Response:

Westinghouse CAPs IR# 10-259-M034 has been issued. This item will be addressed in revision 4 of the RTM.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

15. Westinghouse to improve the traceability of the tests that are performed with the function enable (FE) switch in the ENABLE position.

TVA Response:

The tests that are performed with the FE keyswitch in the ENABLE position are defined in the SRS Sections:

6.2 Manually Initiated Testing, 7.2.23 Annunciator Test Display, 7.2.25 Saturation Margin Test Display, and 7.2.26 Analog Output Test Display.

16. Westinghouse to revise documents to be consistent with referring to the FE switch in the ENABLE position.

TVA Response:

Westinghouse has elected to standardize on the terms FE keyswitch and ENABLE. A review of recent documents for compliance with this comment and

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N commitment was performed with the following results:

a. Revision 3 of the SysRS, and SDS have been revised to use the terms FE keyswitch. Revision 3 of the SDS is consistent in use of the term ENABLE.
b. SysRS Revision 3 is not consistent in use of the term ENABLE as noted below:
i. R2.5.2.1-2 uses the term ENABLED instead of ENABLE ii. R2.5.2.1.3-3, R2.6.3.3-1, R2.6.3.3-2, R2.6.3.3-3, and R2.6.3.3-7, use the term Enable instead of ENABLE
c. Revision 3 of the SRS is not consistent in use of the terms FE keyswitch and ENABLE as noted below:
i. Tables 7.2-1 Train A PAMS Data Transmitted to the Plant Computer and 7.2-2 Train B PAMS Data Transmitted to the Plant Computer items 101 and 102 in the SRS refer to the FE switch.

All other items in the SRS refer to the FE keyswitch.

ii. Section 2.1, page 2-4, uses the term Enable instead of ENABLE iii. Requirements R7.2.14-6 and R7.2.16-7 use the term active instead of ENABLE iv. Requirements R7.2.23-2, R7.2.25-2, R7.2.26-2, R7.2.31-4, 7.2.56 FPDS Availability, and R7.2.57-4 use the term enabled instead of ENABLE

d. WNA-AR-00180-WBT-P, Revision 0, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System, dated October 2010, submitted in TVA letter to NRC dated (Reference
12) is not consistent in use of the term FE keyswitch as noted below:
i. Section 2.2 System Description and Table 3-1 WB2 PAMS FMEA refer to the FE switch.

ii. Table 3-1 describes the switch as the Functional Enable (FE) switch and the FE key-switch

e. Revision 2 of the Licensing Technical Report is not consistent in use of the term FE keyswitch as noted below:
i. Sections 2.2, 5.3 use the term (FE) keylock switch on pages 2-3 (2 places), page 5-3, page 5-6 (4 places)

The identified discrepancies in the use of the terms FE keyswitch and ENABLE in the SysRS, SRS, FMEA and Licensing Technical Report, will be corrected in the next revision of the documents.

17. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS.

Need a good write up of how the process works.

TVA Response:

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Please see response to letter item 13 (NRC Matrix Item 145).

18. Westinghouse and TVA will develop a revised schedule for document submittals and provide it to the NRC no later than 9/30/10 TVA Response:

The revised document submittal schedule was included as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010 (Reference 5).

19. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.

TVA Response:

The Procurement Requisition Resolution Matrix has been updated and is included in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS)

Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1), as Section 11, TVA Contract Compliance Matrix.

20. Westinghouse to add the Software Design Descriptions to the RTM TVA Response:

The Software Design Description documents were added to the RTM in WNA-VR-00279-WBT, Rev 2.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

21. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.

TVA Response:

When a Common Q PAMS requirements document references a section of another document, all requirements in that section are applicable.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

22. Westinghouse to review the use of shall outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N TVA Response:

See response in letter dated December 22, 2010, item 2 (NRC Matrix Item 050).

23. Westinghouse to resolve the following questions concerning Software Design Descriptions (SDDs)
a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
b. What are the SDDs?
c. PAMS is a delta document so how do we capture all the generic requirements for traceability.

TVA Response:

a. There are three SDDs prepared specifically for the Watts Bar 2 PAMS project. These are listed below in Item b. These documents and superior requirements documents refer to other generic SDDs also listed in Item b.
b. The SDDs developed for this project are:
i. WNA-SD-00248-WBT, Revision 1, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display ii. WNA-SD-00250-WBT, Revision 1, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System AC160 Software iii. WNA-SD-00277-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display System Screen Design Details iv. Other generic SDDs referenced by the PAMS project are:

(a) 00000-ICE-20157, Revision 18, Software Design Description for the Common Q Generic Flat-Panel Software (b) 00000-ICE-30152, Revision 5, Software Design Description Post Accident Monitoring System AC160 (c) 00000-ICE-30140, Revision 4, Software Design Description for the Common Q Core Protection Calculator

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N System Database and Utility Functions

c. Refer to WNA-VR-00279-WBT, Revision 3.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

24. For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the SPM and qualified using the Software Elements Test procedure under Appendix B program. Provide a summary of RSEDs generic WCAP. Westinghouse to determine if the WCAP was docketed under the AP1000. RSED concept is not in the SPM. WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was acceptable. RSEDs are listed in the SDD References.

TVA Response:

Section 3.2.4.1 of WCAP-15927 describes the RSED design process for custom PC elements and type circuits. The Glossary of Terms in the SPM defines custom PC elements and type circuits as modules.

Therefore, the relationship between WCAP-15927 describing the RSED process as circuits, is defined in the SPM requirements for software module development.

WCAP-15927 is on the AP1000 docket.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13) 143 The WBN2 PAMS Software Requirements Specification (WBN2 Responder: WEC 16. N Open Open-NRC Review ML101650255, Item WBN2 PAMS System Requirements EICB (Carte)

PAMS SRS - ML101050202) contains a table (see page iii) titled, No. 7 Specification Document Traceability & Compliance, which states that the Addressed in the 9/15 public meeting and 9/20 - 9/21 audit. Response included in letter Due 12/22/10 WBN2 PAMS SRS was created to support the three documents A detailed explanation will be provided. dated 12/22/10 TVA docketed WNA-DS-01617-WBT identified (one of which is the WBN2 PAMS SysRS). Section 1.1, To be addressed by Rev. 1, RRAS Watts Bar 2 NSSS Overview, of the WBN2 PAMS SRS states: This document TVA Response: Revision of the RTM, Completion Program I&C Projects Post describes requirements for the major software components SRS, SysRS, and Accident Monitoring System- System (a) and (b) The requested information is provided in the SysDS. Requirements Specification, dated (a) Please list and describe each of the major software following documents: December 2009.

components. Please include a description of any NRC review for i. WNA-LI-00058-WBT-P, Revision 2, Post-each of these components. Accident Monitoring System (PAMS) Licensing Technical Report, Table 6-1, Document (b) Please list and describe each of the other software Requirements which lists the software components. Please include a description of any NRC review for documentation requirements for the Common Q each of these components. PAMS and Section 11 TVA Contract Compliance Matrix submitted in TVA Letter to (c) What other documents contain the requirements for the other NRC, dated December 3, 2010 (Reference 1).

software components? ii. WNA-DS-01617-WBT-P, Revision 3, Post Accident Monitoring System- System The WBN2 PAMS System Design Specification (WBN2 PAMS Requirements Specification, dated December SDS) contains a table (see page iii) titled, Document Traceability 2010 (Attachment 1)

& Compliance, which states that the WBN2 PAMS SysRS was iii. WNA-SD-00239-WBT-P, Revision 3, Software created to support the WBN2 PAMS SysRS. Section 1.1, Requirements Specification for the Post Accident Purpose, of the WBN2 PAMS SDS states: The purpose of this Monitoring System, dated December 2010

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N document is to define the hardware design requirements (Attachment 7) iv. WNA-VR-00279-WBT, Revision 3, Watts Bar 2 (c) Do the WBN2 PAMS SRS and SDS, together, implement all of NSSS Completion Program I&C Projects the requirements in the WBN2 PAMS SysRS? Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC (e) Please briefly describe all of the documents that implement audit at the Westinghouse Rockville office) the WBN2 PAMS SysRS. To the best of TVAs knowledge, no prior NRC review of the software components has been performed.

(c) WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office)

(d) No. Please see Item (e) below.

(e) The documents that describe the requirements that implement the WBN Unit 2 SysRS are:

i. WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office) ii. WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office)

Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13) 144 The WBN2 PAMS Software Requirements Specification (WBN2 Responder: WEC 17. N Open Open-NRC Review ML101650255, Item TVA Letter dated WBN2 PAMS Software Requirements EICB (Carte)

PAMS SRS) contains a table (see page iii) titled, Document No. 8 10/5/10 Specification Traceability & Compliance, which states that the WBN2 PAMS (a) The purpose of NABU-DP-00014-GEN document is to Revised response included in Due 12/3/10 SRS was created to support the three documents identified (two of define the process for system level design, software design letter dated 12/22/10 By letter dated April 8, 2010 these documents have been provided on the docket). and implementation, and hardware design and Responses to items a (ML10101050203), TVA docketed implementation for Common Q safety system development. Response provided in letter and e provided. WNA-SD-00239-WBT, Revision 1, (a) Please describe the third document (i.e., NABU-DP-00014- This document supplements the Common Q SPM, WCAP- dated 10/5/10 "RRAS Watts Bar 2 NSSS Completion GEN Revision 2, Design Process for Common Q Safety 16096-NP-A. The scope of NABU-DP-00014-GEN includes NNC 11/18/10: Program I&C Projects, Software Systems). the design and implementation processes for the application NRC Review and WEC to (1) Items b-d closed to Requirements Specification for the Post development. For a fuller description of the design process complete response. other Open Item nos. Accident Monitoring System, dated (b) Please describe the flow of information between these three described in NABU-DP-00014-GEN please refer to the (2) The point of these February 2010 (ML101050202).

documents. Design Process for AP1000 Common Q Safety Systems, b-d to be addressed at public questions was to WCAP-15927 on the AP1000 docket. Since this is a meeting and audit. Will require understand how the (c) Does the PAMS SRS implement the requirements in these Westinghouse process document that is not specifically information to be docketed. origin of the three documents? referenced in the SRS, it will be removed in the next revision requirements in the of the document. requirements (d) Please describe if and how these three documents are used in specifications were the development of the PAMS Software Design Description. (b) - Closed to items 142 and 145 documented. TVA stated that the origin of (e) Do the WBN2 V&V activities include verification that the (c) - Closed 142 the requirements would requirements of these three documents have been incorporated be demonstrated in into the WBN2 PAMS SRS. (d) - Closed to Item 142 Rev. 2 of the CQ PAMS LTR.

(e) WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).

IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.

IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.

TVA Response to Follow-up NRC Request:

(1) Item (a) in the original list, NABU-DP-00014-GEN Revision 2, Design Process for Common Q Safety Systems, is available for NRC audit at the Westinghouse Rockville office.

(2) WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:

Section 11, TVA Contract Compliance Matrix showing the origin of the requirements was added.

145 The WBN2 PAMS System Design Specification (WBN2 PAMS Responder: WEC 18. N Open Open-NRC Review ML101650255, Item WBN2 PAMS System Design EICB (Carte)

SDS) contains a table (see page iii) titled, Document Traceability No. 9 Specification

& Compliance, which states that the WBN2 PAMS SDS was (1) The review and update of the RTM is complete. The Response included in letter Due 12/22/10 created to support the WBN2 PAMS SysRS. revised RTM can be made available for NRC audit at dated 12/22/10 TVA docketed WNA-DS-01667-WBT the Westinghouse office in Rockville. To be addressed by Rev. 1, RRAS Watts Bar 2 NSSS (a) Does the WBN2 PAMS SDS implement all of the hardware During the September 20-21, Revision of the RTM, Completion Program I&C Projects Post requirements in the WBN2 PAMS SysRS? (2) Please see letter Item 10 (NRC Matrix Item 142, sub 2010 audit at Westinghouse, it SRS, SysRS, and Accident Monitoring System- System item 13). was acknowledged that SysDS. Design Specification, dated December (b) Please briefly describe all of the documents that implement the TVA/Westinghouse had 2009.

hardware requirements of the WBN2 PAMS SysRS. (3) Please see letter Item 10 (NRC Matrix Item 142, sub previously (in September 15, item 12). 2010 public meeting) stated:

This item is used to track all traceability issues with the System Design Specification (SDS). (4) Section 11 TVA Contract Compliance Matrix was TVA would provide the RSED added to WNA-LI-00058-WBT-P, Revision 2, Post- RTM. (see ML102920031 Item At the September 15 public meeting in Rockville, the following Accident Monitoring System (PAMS) Licensing No 6)

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N actions were agreed to. These items partially address the Technical Report submitted in TVA Letter to NRC traceability concerns with the System Design Specification. dated December 3, 2010, (Reference 1). TVA would revise and resubmit This item will be updated with the results of the September 20 the PAMS RTM to address all and 21 Commercial Grade Dedication and SDS RTM audit. (5) WNA-VR-00283-WBT, Revision 1, IV&V Summary types of issues identified in the Report for the Post Accident Monitoring System, public meeting. (see

1. Westinghouse will perform completed a review of the submitted in TVA to NRC letter dated December 3, ML102920031 Item No 7)

Requirements Traceability Matrix(RT), using the issues 2010 (Reference 1) includes the Requirements and identified at the 9/15 public meeting as a guide (documented Design phase reviews. TVA would revise and resubmit below) and update the RTM as required. the Software Verification and (6) Per Westinghouse letter WBT-D-2268 NRC Access to Validation phase summary

2. Some hardware requirements are contained in the SRS Common Q Documents at the Westinghouse Rockville report for the requirements instead of the System Design Specification (SDS). These will Office dated August 16, 2010 (Reference 9) System phase to document the be removed from the SRS and incorporated into the next Requirements Specification for the Common Q Generic completion of the requirements revision of the SDS. Flat Panel Display, 00000-ICE-30155, Revision 9 is phase review. (see available for audit at the Westinghouse Rockville office. ML102920031 Item No 8)
3. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and SRS (11) at the The generic AC160 specifications are contained in the revisions reviewed by V&V. Have these been addressed? documents listed below. The documents are available Yes. The next revisions of the SDS and SRS address these for NRC audit at the Westinghouse Rockville office in issues. accordance with the letter number referenced. List is contained in letter.
4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS (7) A schedule was developed and is reviewed weekly by design meets the contract requirements. Westinghouse and TVA project management.
5. The next issue of the IV&V report will include the (8) The revised document submittal schedule was Requirements phase review of the RTM and a partial review included as item 3 NRC Request (Matrix Item Number for the Design phase. 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010 (Reference Error!
6. Westinghouse to provide the generic AC160 and flat panel Reference source not found.).

specifications.

(9) The flow of documentation information was provided to

7. Westinghouse and TVA to develop a schedule of licensing the NRC inspector during the Common Q PAMS audit.

document submittals that can be met by the project team.

Source: E-mail from Westinghouse (Andrew P. Drake) to

8. The flow of information is from the SysRS to the SDS Bechtel (Mark S. Clark), RE: RAI on SysRS, dated (hardware) and SRS (software). Describe how the December 8, 2010 (Reference 18) documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.

183 7/15/2010 Responder: WEC 19. Y Open Open-NRC Review EICB RAI TVA Letter dated EICB (Carte)

ML102980066 Item 10/21/10 An emphasis is placed on traceability in System Requirements The generic Software Requirements Specification applies Revised response included in Due 12/3/10 No. 9 Enclosure 1 Item Specifications in the SRP, in the unmodified IEEE std 830-1993, except as modified by the WBN Unit 2 System Requirements letter dated 12/22/10. No. 4 and even more so given the modifications to the standard listed in Specification. NNC 11/18/10: The Regulatory Guide 1.172, which breaks with typical NRC use of the point behind this open word should to say Each identifiable requirement in an SRS TVA Response to Follow-up NRC Request: Response provided in letter item was that TVA must must be traceable backwards to the system requirements and the dated 10/21/10 demonstrate that the design bases or regulatory requirements that is satisfies Please see the response to RAI item 12 in letter dated origin of each 12/222/10, NRC Matrix Item 144. requirement in the On page 1-2 of the Post Accident Monitoring Systems Software WEC requirements Requirements Specification in the background section, is the specification is known sentence Those sections of the above references that require and documented. TVA modification from the generic PAMS are defined in the document stated that this referring purely to the changes from WNA-DS-01617-WBT Post information would be in Accident Monitoring System-System Requirements Specification CQ PAMS LTR Rev. 2.

or is it saying that there are additional changes beyond those and that the SRS defines them?

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N If there are additional changes, what is their origin?

185 7/15/2010 Responder: WEC 20. N Open Open-NRC Review EICB RAI EICB (Carte)

ML102980066 Item An emphasis is placed on the traceability of requirements in Steve Clark to look at how to combine traceability items. Response included in letter Due (1) 12/3/10 No. 17 Software Requirements Specifications in the SRP, in the dated 12/22/10. (2) 12/22/10 unmodified IEEE std 830-1993, and even more so given the Was addressed to during the 9/15 meeting and 9/20 - 9/21 modifications to the standard listed in Regulatory Guide 1.172, audit. NNC 11/18/10: (1)The which breaks with typical NRC use of the word should to say point behind this open Each identifiable requirement in an SRS must be traceable TVA Response to Follow-up NRC Request: item was that TVA must backwards to the system requirements and the design bases or demonstrate that the regulatory requirements that is satisfies Also the NRC considers (1) Please see the response to Item 12 in this letter (NRC origin of each that the SRS is the complete set of requirements used for the Matrix Item 144). requirement in the design of the software, whether it is contained within one WEC requirements document or many. In order to evaluate an SRS against the (2) There is no RTM for development of the individual specification is known guidance in the SRP the staff needs access to all the reusable software elements. As listed in item 15 of and documented. TVA requirements. Table 6-1 Document Requirements of WNA-LI-00058- stated that this WT-P, Revision 2, Post-Accident Monitoring System information would be in References 12, 27, 29, and 31-44 in the Post Accident Monitoring (PAMS) Licensing Technical Report submitted in TVA CQ PAMS LTR Rev. 2.

Systems Software Requirements Specification are various types Letter to NRC, dated December 3, 2010, a RTM for (2) TVA also said it of Reusable Software Element. implementation of the RSEDs (WNA-VR-00280-WBT) would provide a RTM for the WBN Unit 2 Common Q PAMS has been for the RSED These references are used in the body of the SRS, for example: developed. This document is available for NRC audit at the Westinghouse Rockville office.

R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]

They are also included via tables such as found in requirement R7.1.2-1

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]

Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?

187 By letter dated June 18, 2010, TVA docketed responses to NRC Responder: Merten 21. N Open Open-NRC Review ML101970033, Item TVA Letter dated Are these connections already EICB (Carte) requests for information. No. 1 & 2 10/5/10 docketed?

1) Please refer to the revised response to letter dated Revised response included in Due 12/22/10
1) Enclosure 1, Item No. 33 of the TVA letter dated June 18, 2010, 10/5/10 Item 18 (RAI Matrix item 115). letter dated 12/22/10.

did not identify any connection from the PAMS Operator Modules Revise Response (OMs) to the plant computer and printers; however, Figure 2.1-1 of Partial Response provided in the PAMS System Requirements Specification (WNA-DS-01617- 2) This is a duplicate of closed RAI Matrix Item 45. letter dated 10/5/10 WBT Rev. 1 - ML101680578) shows a TCP connection from the OMs to the plant computer and printer. Please explain. TVA Response to Follow-up NRC Request:

NNC 8/25/10: Why did TVA not

2) Please clarify whether any digital safety-related systems or A review of the following documents determined that the catch this on the review of the components have a digital communications path to non-safety- connection between the OM and the plant computer has PAMS SysRS or SRS? Does related systems or with safety related systems in another division. been changed to a connection to a printer: TVA check that the CQ PAMS If so, NRC staff will need these paths identified on the docket. system meets the requirements
1. WNA-DS-01617-WBT-P, Revision 3, Post Accident in its purchase specifications?

Monitoring System - System Requirements Specification, dated November 2010 (Attachment 1)

2. WNA-DS-01667-WBT-P, Revision 3, Post Accident Monitoring System - System Design Specification, dated November 2010 (Attachment 4)

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

3. WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, dated November 2010, submitted in TVA to NRC letter December 3, 2010 (Reference 1)

Review of the newly released Common Q PAMS documents listed below confirmed they correctly show a connection from the OM to a printer and not the plant computer. None of the other newly released documents contain a figure of the Common Q PAMS system showing the connection from the OM. The exception is WCAP-17351 which was created to allow a non-proprietary version of a generic Common Q document to be submitted on the docket and was not intended to reflect the WBN Unit 2 configuration.

Note: The OM printer connection is only used for maintenance. A printer is not normally connected to the OM. To use the OM printer connection, the FE keyswitch must installed and be in the ENABLE position.

(1) WNA-TP-02988-WBT, Revision 0, Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test, dated November 2010, submitted in TVA to NRC letter December 3, 2010 (Reference 1)

(2) WNA-AR-00180-WBT-P, Revision 0, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System, dated October 2010, submitted in TVA to NRC letter November 5, 2010 (Reference 12) 212 7.5.2 7/27/2010 Responder: WEC 22. N Open Open-NRC Review EICB RAI EICB (Carte)

ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated Application specific requirements for testing. This cannot be Response included in letter Due 12/22/10 No. 10 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system addressed in a topical report. Evaluation of how the dated 12/22/10.

design specification and software requirements specification hardware meets the regulatory requirements. To be addressed by contain information to address the "Design Report on Computer WBN2 specific test plan Integrity, Test and Calibration..." The staff has reviewed these WEC to provide the information and determine where the documents, and it is not clear how this is the case. information will be located.

(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5. 1. IEEE-603 1991 (2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57. 5.5 System Integrity. The safety systems shall be designed to accomplish their safety functions under the full range of applicable conditions enumerated in the design basis.

TVA Response: The applicable conditions and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) Section 11, Contract Compliance Matrix items:

87 and 88 Seismic 89, 90, 91, 92 and 185 EMI/RFI

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 300, 301 and 302 Environmental 5.7 Capability for Test and Calibration. Capability for testing and calibration of safety system equipment shall be provided while retaining the capability of the safety systems to accomplish their safety functions.

The capability for testing and calibration of safety system equipment shall be provided during power operation and shall duplicate, as closely as practicable, performance of the safety function. Testing of Class 1E systems shall be in accordance with the requirements of IEEE Std 338-1987 [3]. Exceptions to testing and calibration during power operation are allowed where this capability cannot be provided without adversely affecting the safety or operability of the generating station. In this case:

(1) appropriate justification shall be provided (for example, demonstration that no practical design exists),

(2) acceptable reliability of equipment operation shall be otherwise demonstrated, and (3) the capability shall be provided while the generating station is shut down.

TVA Response: The requirements for test and calibration and Common Q PAMS system compliance, are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11, TVA Contract Compliance Matrix items:

202 self test 350 Maintenance Bypass 351 Loop Tuning Parameters, 400 and 401 3.7.2 Testing, Calibration, and Verification 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.10 Repair. The safety systems shall be designed to facilitate timely recognition, location, replacement, repair, and adjustment of malfunctioning equipment.

TVA Response: The requirements for repair and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11, TVA Contract Compliance Matrix items:

179 Mean time to repair 202 self test 398 3.7 Maintenance 399 3.7.1 Troubleshooting 6.5 Capability for Testing and Calibration

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 6.5.1 Means shall be provided for checking, with a high degree of confidence, the operational availability of each sense and command feature input sensor required for a safety function during reactor operation.

This may be accomplished in various ways; for example:

(1) by perturbing the monitored variable, (2) within the constraints of 6.6, by introducing and varying, as appropriate, a substitute input to the sensor of the same nature as the measured variable, or (3) by cross-checking between channels that bear a known relationship to each other and that have readouts available.

6.5.2 One of the following means shall be provided for assuring the operational availability of each sense and command feature required during the post-accident period:

(1) Checking the operational availability of sensors by use of the methods described in 6.5.1.

(2) Specifying equipment that is stable and retains its calibration during the post-accident time period.

TVA Response: The requirements for sense and command feature testing and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:

10, display of sensor diagnostic information 202 self test 205 self diagnostics and watchdog timer 264 through 271, system self checks 311 system status displays, 341 alarms, 344 on-line diagnostics

2. IEEE 7-4.3.2-2003 5.5 System integrity In addition to the system integrity criteria provided by IEEE Std 603-1998, the following are necessary to achieve system integrity in digital equipment for use in safety systems:

Design for computer integrity Design for test and calibration Fault detection and self-diagnostics 5.5.1 Design for computer integrity The computer shall be designed to perform its safety

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N function when subjected to conditions, external or internal, that have significant potential for defeating the safety function. For example, input and output processing failures, precision or round off problems, improper recovery actions, electrical input voltage and frequency fluctuations, and maximum credible number of coincident signal changes.

If the system requirements identify a safety system preferred failure mode, failures of the computer shall not preclude the safety system from being placed in that mode. Performance of computer system restart operations shall not result in the safety system being inhibited from performing its function.

TVA Response: Common Q PAMS system reliability and failure modes are described in:

WNA-AR-00180-WBT, Revision 0, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System WNA-AR-00189-WBT, Revision 0 Post Accident Monitoring System Reliability Analysis The requirements for mean time between failure and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Section 11 TVA Contract Compliance Matrix item 178.

5.5.2 Design for test and calibration Test and calibration functions shall not adversely affect the ability of the computer to perform its safety function. Appropriate bypass of one redundant channel is not considered an adverse effect in this context. It shall be verified that the test and calibration functions do not affect computer functions that are not included in a calibration change (e.g., setpoint change).

V&V, configuration management, and QA shall be required for test and calibration functions on separate computers (e.g., test and calibration computer) that provide the sole verification of test and calibration data.

V&V, configuration management, and QA shall be required when the test and calibration function is inherent to the computer that is part of the safety system.

V&V, configuration management, and QA are not required when the test and calibration function is resident on a separate computer and does not provide the sole verification of test and calibration data for the computer that is part of the safety system.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N TVA Response: The requirements for test and calibration and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:

202 self test 350 Maintenance Bypass 351 Loop Tuning Parameters, 400 and 401 3.7.2 Testing, Calibration, and Verification 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.5.3 Fault detection and self-diagnostics Computer systems can experience partial failures that can degrade the capabilities of the computer system, but may not be immediately detectable by the system.

Self-diagnostics are one means that can be used to assist in detecting these failures. Fault detection and self-diagnostics requirements are addressed in this sub-clause.

The reliability requirements of the safety system shall be used to establish the need for self-diagnostics. Self diagnostics are not required for systems in which failures can be detected by alternate means in a timely manner. If self-diagnostics are incorporated into the system requirements, these functions shall be subject to the same V&V processes as the safety system functions.

If reliability requirements warrant self-diagnostics, then computer programs shall incorporate functions to detect and report computer system faults and failures in a timely manner. Conversely, self-diagnostic functions shall not adversely affect the ability of the computer system to perform its safety function, or cause spurious actuations of the safety function. A typical set of self-diagnostic functions includes the following:

Memory functionality and integrity tests (e.g.,

PROM checksum and RAM tests)

Computer system instruction set (e.g., calculation tests)

Computer peripheral hardware tests (e.g.,

watchdog timers and keyboards)

Computer architecture support hardware (e.g.,

address lines and shared memory interfaces)

Communication link diagnostics (e.g., CRC checks)

Infrequent communication link failures that do not result in a system failure or a lack of system functionality do not require reporting.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N When self-diagnostics are applied, the following self-diagnostic features shall be incorporated into the system design:

a) Self-diagnostics during computer system startup b) Periodic self-diagnostics while the computer system is operating c) Self-diagnostic test failure reporting TVA Response: The requirements for fault detection and self diagnostics and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS)

Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:

107 error free download 202 self test 205 self diagnostics and watchdog timer 263 primary and backup communication 264 through 271, continuous on-line self checks 311 system status displays, 341 alarms, 344 on-line diagnostics 5.7 Capability for test and calibration No requirements beyond IEEE Std 603-1998 are necessary.

TVA Response: No response required.

Concurrence: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI 212 Response - Errors in the Contract Compliance Matrix, dated December 17, 2010 (Reference 14) 213 7.5.2 7/27/2010 Responder: WEC 23. N Open Open-NRC Review EICB RAI EICB (Carte)

ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated Conformance with IEEE 603 is documented in the revised Response is included in letter Due 12/31/10. No. 18 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system Common Q PAMS Licensing Technical Report and the dated 10/25/10 design specification and software requirements specification Common Q PAMS System Design Specification.

contain information to address the "Theory of Operation NNC to review and revise this Description." The staff has reviewed these documents, and it is Attachment 1 contains the proprietary version of question after LTR R2 is not clear how this is the case. The docketed material does not Westinghouse document Tennessee Valley Authority received.

appear to contain the design basis information that is required to (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring evaluate compliance with the Clause of IEEE 603. System (PAMS), Licensing Technical Report, Revision 1, (1) Please provide the design basis (as described in IEEE 604 WNA-LI-00058-WBT-P, Dated October 2010 Clause 4) of the Common Q PAMS.

(2) Please provide a regulatory evaluation of how the PAMs Attachment 8 contains the proprietary version of complies with the applicable regulatory requirements for the theory Westinghouse document Nuclear Automation Watts Bar 2 of operation. NSSS Completion Program I&C Projects Post Accident For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the Monitoring System - System Design Specification, WNA-manually controlled protective actions? (2) How do the documents DS-01667-WBT, Rev. 2 dated September 2010.

identified demonstrate compliance with this clause?

244 CB 8/3/2010 Responder: WEC 24. N Open Open-NRC Review EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4, (C

art ML102980066 Item provided in letter "Safety Evaluation" states: "the

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Section 8.2.2 of the Common Q SPM (ML050350234) states that The process related requirements have been removed from Revised response is included in Due 12/22/10 No. 14 dated 10/25/10. information relied upon in the SE must the Software Requirements Specification (SRS) shall be developed revision 2 of the Software Requirements Specification (SRS). letter dated 12/22/10 be docketed correspondence."

using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS Attachment 3 of letter dated 10/25/10 contains the Response is provided in letter LIC-101 Rev. 3 states: "The safety should address the software product, not the process of producing proprietary version of Westinghouse document Nuclear dated 10/25/10. analysis that supports the change the software. In addition Section 4.3.2.1 of the SPM states "Any Automation, Watts Bar 2 NSSS Completion Program, I&C requested should include technical alternatives to the SPM processes or additional project specific Projects, Software Requirements Specification for the Post NNC 11/18/10: SysRS Rev. 2 information in sufficient detail to enable information for the ...SCMP...shall be specified in the PQP. Accident Monitoring System, WNA-SD-00239-WBT, also contains process the NRC staff to make an independent Revision 2, Dated September 2010. requirements that are more assessment regarding the acceptability Contrary to these two statements in the SPM, the WBN2 PAMS appropriately incorporated into of the proposal in terms of regulatory SRS (ML101050202) contains many process related requirements, TVA Response to Follow-up NRC Request: process documentation. requirements and the protection of for example all seventeen requirements in Section 2.3.2, public health and safety."

"Configuration Control," address process requirements for As shown is the listed documents, process related configuration control. requirements have been deleted from the SRS and SysRS in Revision 3:

Please explain how the above meets the intent of the approved SPM. Attachment 1 contains proprietary version of WNA-DS-01617-WBT-P, Revision 3, Post Accident Monitoring System-System Requirements Specification, dated December 2010.

Attachment 7 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010.

Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17) 245 8/3/2010 Responder: WEC 25. N Open Open-NRC Review EICB RAI LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

ML102980066 Item "Safety Evaluation" states: "the Section 5.8 of the Common Q SPM (ML050350234) identifies the Relates to the commitment to provide the test plan and the Response included in letter Due 12/22/10 No. 119 information relied upon in the SE must required test documentation for systems developed using the SPM compliance matrix dated 12/3/10 be docketed correspondence."

Common Q SPM. Please provide sufficient information for the NRC staff to independently assess whether the test plan for WBN2 Attachment 9 contains the Westinghouse document Post LIC-101 Rev. 3 states: "The safety PAMS, is as described in the SPM (e.g., Section 5.8.1). Accident Monitoring System Test Plan, WNA-PT-00138- analysis that supports the change WBT, Revision 0, dated November 2010. Attachment 10 requested should include technical contains the Westinghouse Application for Withholding for information in sufficient detail to enable the Post Accident Monitoring System Test Plan, WNA-PT- the NRC staff to make an independent 00138-WBT, Revision 0, dated November 2010. assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

246 8/3/2010 Responder: WEC 26. N Open Open-NRC Review EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

ML102980066 Item provided in letter "Safety Evaluation" states: "the Section 4.3.2.1, "Initiation Phase" of the Common Q SPM As agreed ISG6 does not apply to the Common Q PAMS Response is provided in letter Due 10/22/10 No. 15 dated 10/25/10 information relied upon in the SE must (ML050350234) requires that a Project Quality Plan (PQP) be platform. The information required to address this question dated 10/25/10 be docketed correspondence."

developed. Many other section of the SPM identify that this PQP concerning the PQP and SPM has been added to NNC 11/18/10: NRC to should contain information required by ISG6. Please provide the compliance matrix in revision 1 of the Licensing Technical NNC 11/18/10: PQP has not go to WEC Rockville LIC-101 Rev. 3 states: "The safety PQP. If "PQP" is not the name of the documentation produced, Report. been provided and CQ PAMS Offices and look at analysis that supports the change please describe the documentation produced and provide the LTR Rev. 1 does not contain PQP to decide if it must requested should include technical information that the SPM states should be in the PQP. Attachment 1 of letter dated 10/25/10 contains the comparable information. docketed. information in sufficient detail to enable proprietary version of Westinghouse document Tennessee the NRC staff to make an independent Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post- assessment regarding the acceptability Accident Monitoring System (PAMS), Licensing Technical of the proposal in terms of regulatory Report, Revision 1, WNA-LI-00058-WBT-P, Dated October requirements and the protection of 2010 public health and safety."

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 250 8/8/2010 Responder: WEC 27. N Open Open-NRC Review LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

"Safety Evaluation" states: "the The SPM describes the software and documents that will be Westinghouse develops Software Release Reports/Records Revised response included in Due 12/22/10 information relied upon in the SE must created and placed under configuration control. The SCMP (e.g., and a Configuration Management Release Report. Describe letter dated 12/22/10 be docketed correspondence."

SPM Section 6, Software Configuration Management Plan) the documents and when they will be produced. Summarize 10/25/10 is a partial describes the implementation tasks that are to be carried out. The guidance on how to produce these records, focus on project Response included in letter response. Still waiting LIC-101 Rev. 3 states: "The safety acceptance criterion for software CM implementation is that the specific requirements in SPM etc. dated 10/25/10. on Software Test Plan analysis that supports the change tasks in the SCMP have been carried out in their entirety. and all other testing requested should include technical Documentation should exist that shows that the configuration TVA Response to Follow-up NRC Request: documentation. information in sufficient detail to enable management tasks for that activity group have been successfully the NRC staff to make an independent accomplished. Please provide information that shows that the CM The following documentation shows that the configuration assessment regarding the acceptability tasks have been successfully accomplished for each life cycle management tasks for that activity group have been of the proposal in terms of regulatory activity group. successfully accomplished. requirements and the protection of public health and safety."

1. WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:
a. Section 2.2.1 Hardware/Software Change Process has been added to describe the process of how changes are evaluated.
b. Section 2.2.2, Software has been expanded to include a table detailing evolutionary software changes that have occurred since the initial submittal and the change evaluation of the life cycle.
2. WNA-PT-00138-WBT, Revision 0, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, (Proprietary), dated November 2010 submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).

251 8/8/2010 Responder: WEC 28. N Open Open-NRC Review LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

"Safety Evaluation" states: "the The SPM describes the software testing and documents that will The software testing performed and documents created are Revised response included in Due 12/22/10. information relied upon in the SE must be created. The SPM also describes the testing tasks that are to addressed by the SPM Compliance matrix contained in letter dated 12/22/10 be docketed correspondence."

be carried out. The acceptance criterion for software test Revision 1 of the Licensing Technical Report. 10/25/10 is a partial implementation is that the tasks in the SPM have been carried out Partial response is provided in response. Still waiting LIC-101 Rev. 3 states: "The safety in their entirety. Please provide information that shows that Attachment 1 of the letter dated 10/25/10 contains the letter dated 10/25/10 on Software Test Plan analysis that supports the change testing been successfully accomplished. Proprietary version of Westinghouses document titled: and all other testing requested should include technical Tennessee Valley Authority (TVA), Watts Bar Unit 2 documentation. information in sufficient detail to enable (WBN2), Post-Accident Monitoring System (PAMS), the NRC staff to make an independent Licensing Technical Report, Revision 1, WNA-LI-00058- assessment regarding the acceptability WBT-P, Dated October 2010 of the proposal in terms of regulatory requirements and the protection of TVA Response to Follow-up NRC Request: public health and safety."

Please see the response to RAI item 21 in letter dated 12/22/10, NRC Matrix Item 250.

252 8/8/2010 Responder: WEC 29. N Open Open-NRC Review LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

"Safety Evaluation" states: "the The SPM contain requirements for software requirements Explain response to AP1000 audit report. Response included in letter Due 12/22/10 information relied upon in the SE must traceability analysis and associated documentation (see Section RTM docketed NRC awaiting V&V evaluation of RTM. dated 12/22/10 be docketed correspondence."

5.4.5.3, Requirements Traceability Analysis). Please provide information that demonstrates that requirements traceability The following responses are based on WBN Unit 2 Common Read ML091560352 Check on this Hilmes LIC-101 Rev. 3 states: "The safety

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N analysis has been successfully accomplished. Q PAMS traceability: analysis that supports the change requested should include technical Software requirements traceability analysis is described in information in sufficient detail to enable the following documents: the NRC staff to make an independent assessment regarding the acceptability

1. WNA-LI-00058-WBT-P, Revision 2, Post-Accident of the proposal in terms of regulatory Monitoring System (PAMS) Licensing Technical requirements and the protection of Report submitted in TVA Letter to NRC dated public health and safety."

December 3, 2010, (Reference 1) Section 11, TVA Contract Compliance Matrix

2. WNA-VR-00279-WBT, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office)
3. WNA-VR-00280-WBT, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office) This document addresses the RSEDs used in the WBN Unit 2 Common Q PAMS.

The V&V evaluation of the RTM is documented in section 2.2.2 of the following documents:

1. The Independent Verification & Validation (IV&V) report covering the Concept and Definition phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 1, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
2. The Independent Verification &Validation (IV&V) report covering the Design and Implementation phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 2, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
3. The integration phase is covered in Attachment 10, the proprietary version of IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-P, Revision 3, dated December 2010.

Attachment 11 contains the non-proprietary version of IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-NP, Revision 3, dated December 2010. Attachment 12 contains the Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283-WBT-P, Revision 3, IV &V Summary Report for the Post Accident Monitoring System (Proprietary), dated December 2010.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 327 Attachment 36 contains Foxboro proprietary drawings 08F802403- Responder: Webber 30. Y Open Open-NRC Review SC-2001 sheets 1 through 6. An affidavit for withholding and non-DORL (Poole) proprietary versions of the drawings will be submitted by January In accordance with correspondence from Foxboro, there is Response Included in letter Due 11/24/10 31, 2011. no proprietary information contained in the 08F802403-SC- dated 11/24/10 2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.

092 5/20/2010 Responder: Hilmes 1. Y Open Open-TVA Continuous review as items are added DORL (Poole) TVA to review Licensee Open Item list and determine which items This item will close when we are no longer using this Due: SER Issue are proprietary. document as a communications tool.

323 WCAP-13869 revision 1 was previously reviewed under WBN Unit Responder: Hilmes/Unit 1 1. Y Open Open-TVA Unit 1 TVA Letter dated 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An 10/29/10 analysis of the differences and their acceptability will be submitted Attachment 12 contains the WCAP 13869 Revision 1 to Response is included in letter Due: 12/22/10 Enclosure 1 Item to the NRC by November 15, 2010 Revision 2 Change Analysis. dated 10/29/10 No. 36 EICB(Garg)

The staff is confused with the response since both units have reference leg not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 281 7.6 7.6.8 8/27/2010 Responder: Webb 1. Y Open Open-TVA/Bechtel EICB RAI TVA Letter dated EICB (Garg)

ML102910008 10/29/10 For FSAR Section 7.6.8 in amendment 96, redline version has Attachment 5 contains the WBN Unit 2 FSAR markup for Response provided in letter Due 11/24/10 Item#65 Enclosure 1 Item completely rewritten this section of the FSAR, however, the staff is Section 7.6.8, Interlocks for RCS Pressure Control During dated 10/29/10 No. 16 not able to determine any changes made to the section. Explain Low Temperature Operation, showing what was changed Provide the basis for what changes have been made to this FSAR Section. between Amendments 95 and 96. the changes. Look at FSAR Amendment 101 did not Foxboro I/A impact.

TVA Response to Follow-up NRC Request: reflect the changes in 7.6.8 associated with implementation The interlock for the RCS Pressure Control for Unit 2 is of the DCS. Provide the basis implemented differently than Unit 1 implementation. There for acceptance to use Foxboro are no differences between Unit 1 and Unit 2 interlocks, I?A DCS inplace of analog operation of interlocks and operator interface for operation of instrumentation and relays.

the RCS Pressure Control. Primary sensing elements and final control elements are identical and operations of these devices are identical. For Unit 2, once signals are processed by the Eagle 21 system, interlock implementation is by software modules in the Foxboro I/A Distributed Control System (DCS). Hardware outputs, generated in the DCS, operate the PORVs. The Unit 2 DCS is implemented via EDCRs 52378 and 54504. Section 7.6.8 in Amendment 101 of the WBN Unit 2 FSAR reflects the Unit 2 changes associated with implementation of the DCS.

TVA Response to Second Follow-up NRC Request:

The highlighted text from FSAR Amendment 101 Section 7.6.8 reflects the installation of the Foxboro DCS.

7.6.8 Text from FSAR Amendment 101 The wide range temperature signals, as inputs to the Protection Sets I and II, continuously monitor RCS temperature conditions. In Protection Set I, the existing RCS wide range temperature channels on RCS loops 1 and 2

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N provide inputs to the Eagle 21 digital process protection system. Eagle 21 provides isolated analog signals to the digital process control system. An auctioneer function selects the lowest temperature signal which is then used to calculate an acceptable reference pressure limit (PORV setpoint) considering the plants allowable pressure and temperature Protection Set III. The calculated reference pressure is compared to the actual RCS pressure monitored by the wide range pressure channel. The auctioneered temperature signal will annunciate a main control room (MCR) alarm whenever the measured temperature approaches, within a predetermined amount, the reference temperature for arming the system. Similarly, whenever the measured pressure approaches within a predetermined amount of the programmed setpoint, another MCR alarm will be generated.

When the measured RCS pressure is equal to or above the programmed setpoint (nominal values), a PORV open signal is initiated and a MCR alarm is actuated. A manually armed permissive allows this actuation signal to control the Train A PORV (PCV-68-340A). The manually armed permissive also serves to block a spurious PORV opening due to potential instrument failure whenever the RCS temperature is above the arming reference temperature.

The monitored generating station variables that generate the actuation signal for the Train B PORV (PCV-68-334) are processed in a similar manner. The RCS loops 3 and 4 wide range temperature signals and the RCS pressure signal are provided from Protection Set II. Therefore, the generating station variables used for the Train B PORV are derived from a protection set that is independent of the sets from which generating station variables used for the Train A PORV are derived. The wide range temperature auctioneer function and the programmed pressure setpoint calculation for the Train B PORV are performed in a different group of the digital process control system than those for the Train A PORV. Each of these control groups has a fault tolerant, redundant processor pair and redundant power supplies with different power sources.

318 7.5.2.3 7.5 TVA has provided the following documents for RM-1000 Responder: Temples 2. N Open Open-TVA/Bechtel RAI No. 28 TVA Letter dated equipment qualification: ML102980005 10/29/10, Encl 1 Revised response is included in Due 12/22/10 10/26/2010 Item 34, and TVA (i) Qualification Test Report for RM-1000 Processor Module letter dated 12/22/10. letter 11/24/10, and Current-To-Frequency Converter 04508905-QR (i) Applicable to WBN Unit 2. 04508905-1QR is Response update Att. 2.

(January 2001) applicable only in regards to the RM-1000, with the Note check 04508905-1QR or required. It is clear that (ii) Qualification Test Report Supplement, RM-1000 Upgrades exception of re-qualification of certain RM-1000 QR. Staff version is QR only. 04508903-2SP and -

04508905-1SP (June 2006) equipment differences covered in the -1SP report. 3SP are not applicable.

EICB (Singh)

(iii) Qualification Test Report Supplement, RM-1000 Upgrades The Current-to-Frequency (I-F) converter module Response is included in letter The response for 04508905-2SP (June 2008) qualifications in the base report and the -1SP report dated 10/29/10 applicability of (iv) Qualification Test Report Supplement, RM-1000 Upgrades are not applicable to the RM-1000s, and will be used 04508905-QR and -

04508905-3SP (May 2008) later as references in the WBN Unit 2 specific 1SP to RM-1000 and IF qualification reports. converter is not clear.

Please clarify whether all of these are fully applicable to WBN2 or are they applicable with exceptions? If with exceptions, then (ii) Applicable to WBN Unit 2. Check page numbers of please clarify what those are. Appendix F (iii) Not applicable to WBN Unit 2 (missing/duplicate Supplement 3 was issued one month prior to supplement 2. (iv) Not applicable to WBN Unit 2 pages).

Please explain the reason for the same. Check applicability of

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N The 04508905-3SP report was prepared for another TVA Appendix C to RM1000 plant, as a monitor system-level report, where the system instead of RM2300?

included equipment mostly based on the base report See items 336 and 337.

equipment items. These two -2SP and -3SP supplement reports were essentially worked concurrently, but the -2SP All equipment document review/release process resulted in the release qualification reports time difference. including supplements 2SP and 3SP have TVA Response to Follow-up NRC Request: been reviewed as vendor drawings for NOTE: The response for the current to frequency (I to F) WBN-2. Please explain converter in item 1 below is a reversal of the the reason for response previously provided in TVA to NRC letter applicability of one dated October 29, 2010 (Reference 22). General report and not the Atomics Electronic Systems Inc. (GA-ESI) notified other.

TVA of this change on December 8, 2010 (Reference 20). Further all TVA/Bechtel reviews seems to be (1) The applicability of the qualification reports from GA- dispositioned as Code ESI e-mail dated December 10, 2010 (Reference 19) is 4, Review not required.

as follows: Work may proceed.

The applicable reports

a. 04508905-QR Qualification Test Report for RM-should have been 1000 Processor Module and Current-to-reviewed prior to Frequency Converter is applicable to the WBN dispositioning them.

Unit 2 RM-1000 and I to F converter modules.

Please explain the

b. 04508905-1SP Supplement to Qualification Test apparent lack of review Report for RM-1000 Processor Module and of WBN-2 applicable Current-to-Frequency Converter is applicable to documents. Was the WBN Unit 2 RM-1000 module. appropriate review guidance used?
c. 04508905-1SP is not applicable to the WBN Unit 2 I to F converter module. Further update required
d. 04508905-2SP Qualification Test Report Provide model Supplement, I-F Converter Upgrades is number/part number for applicable to the WBN Unit 2 I to F converter the RM-1000 and I/F module. converter used for WBN-2. This GA-ESI provided two other reports required to support information is needed qualification of the containment high range radiation to verify that the model monitors. The report descriptions are from GA-ESI e- or part number used is mail on December 8, 2010 (Reference 20). The the equipment that has reports are: been qualified for WBN-2.
e. GA-ESI report 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit Provide qualification 2 Replacement Radiation Monitors: The report is reports 04038903-QSR the principle report and the starting point for all and 04038903-7SP by the radiation monitors provided as part of the the dues date of replacement contract. The report describes each 1/22/11.

monitor; referenced to the technical manual for the physical and functional description and lists Submit a copy of any the major components of the monitor system. other relevant reviewed Report section 3 identifies the TVA Watts Bar Unit versions of the 2 Environmental, Seismic, Electromagnetic qualification reports.

Compatibility (EMC), and software requirements for each monitor. In section 4 a brief description Submit copies of the of GA-ESI generic qualification programs for all reviewed reports for

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N radiation monitoring equipment in each of the four 04508905-QR, above areas is provided. The qualification basis 04508905-1SP, for each monitor is provided in a separate 04508905-2SP.

supplement to the principle report and is identified in section 5. Clarification of applicability of existing

f. GA-ESI report 04038903-7SP, Qualification reports is acceptable.

Basis for 04034101-001 (2-RE-90-271, -272, -

273, & -274) [TVA Note: These are the containment post accident high range radiation monitors.]: GA-ESI report 04038903-7SP is divided into subsections to address the Environmental, Seismic, EMC, and Software qualification basis for the High Range Area Monitors. Within each subsection, the HRAM is compared to a tested or analyzed article to demonstrate similarity and/or evaluate differences, the tests that were performed, and evaluation to demonstrate qualification. In most cases, the qualification basis references other documents. In addition to qualification, a section is provided that lists the life of those replaceable components that have life expectancy less than 40 years.

(2) This is addressed by response to RAI Question 336 in TVA to NRC letter dated November 24, 2010 (Reference 8)

(3) This is addressed by response to RAI Question 337 in TVA to NRC letter dated November 24, 2010 (Reference 8)

(4) The 04508905-3SP Qualification Test Report Supplement, RM-1000 Upgrades is not applicable to WBN Unit 2 (Reference 19).

Please see Item 1, above, for applicability of the other reports.

(5) TVA provided the proprietary versions of the reports by letter dated March 12, 2010 (Reference 10). By letter dated July 15, 2010 (Reference 23), TVA provided the non-proprietary version of the reports and included a copy of the proprietary report which had been erroneously marked as having not been reviewed.

04508905-QR report has been reviewed by TVA. The review of the remaining reports is ongoing.

(6) See item 5.

338 7.5.2.3 7.5 In page 3-15 and appendix B of Qualification Test Report Responder: Civil EQB 3. N Open Open-TVA/Bechtel 04508905-QR, licensee described the selection of seismic EICB (Singh) required response spectra (RRS) and indicated Figure 3-2 (page Get date from Bob Brown Due: 12/22/10 3-17), Figure 3-3 (page 3-18) are the RRSs used. The RRS curves used for actual testing are lower than the RRS curves that are shown on Figures 3-2 and 3-3. The RRS curves used for testing are shown in Figure 4-5, 4-6, 4-7, 4-8, 4-11, 4-12, 4-13, and 4-14 (pages 4-25, 4-26, 4-28, 4-29, 4-37, 4-38, 4-40, 4-41).

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Please clarify and justify why the RRS curves used in actual tests are lower than the RRS curves determined in Figures 3-2 and 3-3.

In addition please justify that the RRS used for testing envelopes the RRS required for WBN-2 application specific seismic conditions.

339 7.5.2.3 7.5 In the Qualification Test Report 04508905-QR, the licensee Responder: Bob Brown 4. N Open Open-TVA/Bechtel provided only eight Safe Shutdown Earthquake (SSE) Test EICB Response Spectra (TRS) as mentioned in the previous open item Due: 12/22/10 (Singh) (OI-338). Please provide all SSE and Operating Basis Earthquake (OBE) TRS plots for NRC review.

340 7.5.2.3 7.5 Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 Responder: GA 5. Y Open Open-TVA/Bechtel (page 3-8) of the Qualification Test Report 04508905-QR. In addition, please provide the standards or the guidance documents The following responses are based on e-mail: GA-ESI to Response included in letter Provide the qual reports used as the source for ENV 50140, ENV 55011 Class A, and EN Bechtel, dated December 8, 2010 (Reference 20), dated 12/22/10. by 1/28/11 per TVA 55022 Class B. letter of 12/22/10.

(1) The EMI/RFI tests described in Table 3-2 are based on GA-ESI report 04509050 and are summarized in GA- Due:12/22/10 ESI report 04508905-QR. The independent laboratory report, with curves, is part of GA-ESI report 04509050.

Subsequent to issuing GA-ESI report 04508905-QR additional EMC testing was performed in accordance with TVA specific requirements. The results of the subsequent EMC testing are reported in GA-ESI report 04038800. GA-ESI report 04038800 includes the test curves and the report is used as the basis for EMC qualification of the Upper and Lower Inside Containment Post Accident Radiation Monitors (2-RE-EICB (Singh)90-271 through -274). The results of the testing and the acceptability of the RM-1000 monitors for use at WBN Unit 2 are addressed in GA-ESI report 04038903-7SP. This report will be submitted no later than January 28, 2010.

(2) ENV 50140, EN 55011, and EN 55022 are British Standard Institution (BSI) publications concerning equipment electromagnetic and radio frequency performance. The standard titles are shown below:

a. ENV 50140 - Electromagnetic Compatibility -

Basic Immunity Standard - Radiated Radio-Frequency Electromagnetic Field - Immunity Test

b. EN 55011 - Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurement
c. EN 55022 - Information technology equipment -

Radio disturbance characteristics - Limits and methods of measurement 341 7.5.2.3 7.5 FSAR Tables 3.10 list seismically qualified equipment. However, A review of WBN Unit 2 FSAR amendment 102 chapters 6. Y Open Open-TVA/Bechtel these tables do not list the containment high range radiation 3.10, 11 and 12 was performed. The reviewer was unable to monitors. Please add them to the appropriate FSAR table(s) or locate seismic qualification information for the radiation Will be closed on EICB (Singh) justify why they should not be included in the FSAR 3.10 series of monitoring system in those chapters. A review of chapter update of FSAR 3.10 tables. 3.11 confirmed that radiation monitoring is included in the series tables.

environmentally qualified systems.

It appears that seismic qualification of the radiation monitoring equipment was unintentionally omitted from

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N FSAR chapter 3.10. FSAR chapter 3.10 will be updated to include the qualified radiation monitoring equipment in a future FSAR amendment.

344 7.6.6  ? Unit 1 SE discussed in Section 7.6.5, Valve Power Lockout. The requested information is contained in FSAR Amendment 7. N Open Open-TVA/Bechtel There is no section in FSAR which provides discussion on this 102 as follows:

subject. SE section discusses compliance with PSB-18. Provide a discussion which can be used by the staff to determine similar 7.6.2.1 Description conclusion as Unit 1 and if the design is similar to Unit 1 then make a statement to that effect. Also provide the list of the valves where 5th paragraph: The motor-operated bypass valves are power lockout during normal reactor operation is utilized for valves located in bypass lines paralleling the normal RHR suction Eicg(Garg) whose inadvertent operation could affect plant safety. isolation valves FCV 74-1 and FCV 74-2 which are in series in the flowpath. Valves FCV 74-8 and FCV 74-9 are normally closed and remain closed with power locked out unless one of the two main isolation valves (FCV 74-1 or FCV 74-2) cannot be opened and the plant must be cooled down.

And:

7.6.6 Spurious Actuation Protection for Motor Operated Valves 345 7.5.2.3 7.5 Provide the normal temperatures and expected periods of high/low 8. N Open Open-TVA/Bechtel temperature excursions to assess aging requirements. TVA to further clarify if 86ºF for 40 years was used as the qualification EICB (Singh) requirement for aging tests. This has been stated in some of the subsections under section 4.2 of the 04508905-QR report but the rationale for using 86ºF (includes an internal temperature rise of 18ºF) for 40 years has not been justified in the 04508905-QR report or the supplement reports. TVA to provide the rationale for this acceptance criteria for WBN-2.

346 7.5.2.3 7.5 TVA has previously stated in response to open item 319 that RM- 9. N Open Open-TVA/Bechtel 1000 System Verification Test Results report, 04507007-1TR is not EICB applicable to WBN-2. However, TVA has not provided a WBN-2 (Singh) specific test results report. Please identify and provide the appropriate test results reports to complete the review.

347 7.5.2.3 7.5 Qualification report 04508905-1SP does not address EMI/RFI 10. N Open Open-TVA/Bechtel EICB qualification for the new RM-1000 modules. TVA to provide the (Singh) updated qualification or explain the basis for not addressing the EMI/RFI qualification.

348 7.5.2.3 7.5 Qualification report 04508905-2SP does not address EMI/RFI 11. N Open Open-TVA/Bechtel EICB qualification for the new I/F converters. TVA to provide the (Singh) updated qualification or explain the basis for not addressing the EMI/RFI qualification.

349 7.5.2.3 7.5 Radiation testing was not considered in any of the test reports as In response to aquestion about Common Q PAMS 12. N Open Open-TVA/Bechtel all the equipment has been assumed to be located in nuclear equipment qualification, TVA re-evaluated the Control and power plant areas with mild environments and radiation dosages Aux Instrument Room TID and concluded it to be less than less than 1 x 103 rads for total integrated dose (TID). However, 1x103 RAD.

the radiation monitors and the I/F converters are located in the EICB (Singh) main control room which is defined as mild environment. For WBN-2 mild environment is defined as room or building zone where (1) the temperature, pressure, or relative humidity resulting from the direct effects of a design basis event (DBE) (e.g.,

temperature rise due to steam release) are no more severe than those which would occur during an abnormal plant operational condition, (2) the temperature will not exceed 130ºF due to indirect effects of a DBE, (3) the event radiation dose is less than or equal to 1 x 104 rads, and (4) the total event plus the 40 year TID (total

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N integrated dose) is less than or equal to 5 x 104 rads (reference WB-DC-40-54). TVA to address lack of radiation qualification for WBN-2.

350 7.5.2.3 7.5 The seismic required response spectra (RRS) is shown in Figures 13. N Open Open-TVA/Bechtel 3-1 of 04508905-1SP and Figure 3-1 of 0458905-2SP report. The actual test response spectra are shown in Figures 4-5 and 4-6 of EICB (Singh) 04508905-QR report. The actual test response spectra does not seem to fully envelope the RRS. However, this statement is based on visual reading of unidentified numbers. TVA to provide clarification to the values at the inflection point of all lines on the RRS and the actual test response spectra. The seismic qualification issue is open till further clarification is received from TVA.

351 7.5.2.3 7.5 The replacement schedule for the components that have a 14. N Open Open-TVA/Bechtel qualified life of less than 40 years is noted in Table 6-1 of the supplemental qualification report 04508905-1SP. It is not clear if the components identified for replacement in this report are the EICB (Singh) only components or if the components which are in addition to the components previously identified in qualification report 04508905-QR.

Are there any age sensitive components for the I/F converter used for WBN-2? (Note: Report 04508905-2SP does not state any age sensitive components that require replacement during the qualified life).

352 7.5.2.3 7.5 Please calrify how many RM-1000 radaition monitors are being 15. N Open Open-TVA/Bechtel procured for WBN-2, is the quantity 2 or four. MR 25402-011-EICB MRA-HARA-00002, R4 under Item 1.6 indicates that the quantity is (Singh) 2. If so, is WBN-2 using dual channel indication on each RM-1000 unit. TVA to clarify.

334 7 7 FSAR Figure 7A-3 Mechanical Flow and Control Diagram Responder: Stockton 1. Y Open Open-TVA/Licensing RAI not required. N/A RAI not required because the figure is Symbols doesnt show the symbols for the first column of valves. not part of any SE section.

EICB (Darbali)

Please correct this in a future FSAR amendment. Figure will be corrected in FSAR Amendment 103.

Update:

Please fix symbols for Gate Valve, Globe Valve and Float operated valve.

069 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 1. N Open Open-TVA/WEC N/A - No question N/A EICB date for the "Watts Bar 2 PAMS Specific FAT Report" was October was asked. Item (Carte) 2010. Awaiting for document to be Due 2/18/11 was opened to track docketed by TVA. comm8ittment made by applicant.

074 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 2. N Open Open-TVA/WEC N/A - No question N/A EICB date for the Post FAT IV&V Phase Summary Report was was asked. Item (Carte) November 30, 2010. TVA to provide due date. Due 2/21/11 was opened to track commitment made by applicant.

081 7.5.2 7.5.1 5/6/2010 Responder: Merten/WEC 3. N Open Open-TVA/WEC EICB RAI TVA Letter dated NNC 1/5/11: See Also Open Item No.

EICB (Carte)

ML102910002 6/18/10 86 and 202.

The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. The codes and standards documents listed in Section 7 of ML101600092 Item No.1: There Due 12/22/10 Item No. 9 0, Dated April 2010), in Section 7, lists codes and standards the Common Q PAMS Licensing Technical Report are the are three sets of regulatory applicable to the Common Q PAMS. This list contains references documents that the Common Q platform was licensed to criteria that relate to a Common TVA to provide to old revisions of several regulatory documents, for example: when the NRC approved the original topical report and Q application (e.g. WBN2 requested information.

(1) RG 1.29 - September 1978 vs. March 2007 issued the approved SER. The WBN Unit 2 Common Q PAMS):

(2) RG 1.53 - June 1973 vs. November 2003 PAMS is designed in accordance with the approved (a) Common Q platform

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N (a) IEEE 379-1994 vs. -2000 Common Q topical report and approved SER and the codes components - Common Q TR (3) RG 1.75 - September 1975 vs. February 2005 and standards on which the SER was based. Since the (b) Application Development (a) IEEE 384-1992 vs. -1992 current versions referenced are not applicable to WBN Unit Processes - Common Q SPM (4) RG 1.100 - June 1988 vs. September 2009 2, there is no basis for a comparison review. (c) Application Specific - current (a) IEEE 344-1987 vs. -2004 regulatory criteria (5) RG 1.152 - January 1996 vs. January 2006 Bechtel to develop a matrix and work with Westinghouse to The Common Q Topical Report (a) IEEE 7-4.33.2-1993 vs. -2003 provide justification. and associated appendices (6) RG 1.168 - September 1997 vs. February 2004 primarily addressed (a) and (b).

(a) IEEE 1012-1986 vs. -1998 The Common Q SER states:

(b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991 Appendix 1, Post Accident (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 Monitoring Systems, provides endorses 323-1974) the functional requirements and However, LIC-110, "Watts Bar Unit 2 License Application Review," conceptual design approach for states: "Design features and administrative programs that are upgrading an existing PAMS unique to Unit 2 should then be reviewed in accordance with the based on Common Q current staff positions." Please identify all differences between the components (page 58, Section versions referenced and the current staff positions. Please provide 4.4.1.1, Description)On the a justification for the acceptability PAMS with respect to these basis of the above review, the differences. staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, PAMS Evaluation)

The NRC did not approve the proposed PAMS design.

Section 6, References, and Section 7, Codes and Standards Applicable to the Common Q PAMS, of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.

Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design. For example IEEE Std. 603-1991 Clause 5.6.3, Independence Between Safety Systems and Other Systems, and Clause 6.3, Interaction Between the Sense and Command Features and Other Systems, contain application specific requirements that must be addressed by a PAMS system.

Awaiting TVA Response.

086 7.5.2 7.5.1 CB 5/6/2010 Responder: WEC Date: 5/24/10 4. N Open Open-TVA/WEC EICB RAI TVA Letter dated NNC 1/6/11: See Also Open Item No.81 (C

art ML102910002 6/18/10 & 202

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. The regulatory documents listed in the Common Q PAMS TVA to address with item OI Due 12/22/10 Item No. 14 0, Dated April 2010), in Section 6, lists references applicable to the Licensing Technical Report are the documents that the 81.

Common Q PAMS. This list contains references to old revisions of Common Q platform was licensed to when the NRC several regulatory documents, for example: approved the original topical report and issued the approved (1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 SER. The WBN Unit 2 Common Q PAMS is designed in (ML083310185) accordance with the approved Common Q topical report and However, LIC-110, "Watts Bar Unit 2 License Application Review," approved SER and the regulatory documents on which the states: "Design features and administrative programs that are SER was based. Since the current versions referenced are unique to Unit 2 should then be reviewed in accordance with the not applicable to WBN Unit 2, there is no basis for a current staff positions." Please identify all differences between the comparison review.

versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these Rev 0 of the Licensing Technical Report references Rev. 1 of differences. ISG4 202 7.5.2 7/22/2010 Responder: WEC 5. N Open Open-TVA/WEC EICB RAI TVA Letter dated NNC 1/5/11: See Also Open Item No.

EICB (Carte)

Response included in letter ML102980066 Item 10/5/10 81 and 86.

The letter (ML0003740165) which transmitted the Safety Revision 1 of the Licensing Technical Report will provide dated 12/22/10 to provide information No. 4 Evaluation for the Common Q topical report to Westinghouse more detailed information on the changes to the platform. requested.

stated: "Should our criteria or regulations change so that our Partial Response provided in conclusions as to the acceptability of the report are invalidated, CE Rev. 2 of the Licensing Technical Report will include the letter dated 10/5/10 Due TBD Nuclear Power and/or the applicant referencing the topical report applicability of guidance.

will be expected to revise and resubmit their respective NNC 1/5/11: Summary provided documentation, or submit justification for continued applicability of TVA Response to Follow-up NRC Request: in Licensing Technical Report the topical report without revision of the respective WNA-LI-00058-WBT-P, Revision 2, Post-Accident R2 has been reviewed and documentation." Question No 81 identified many criteria changes; Monitoring System (PAMS) Licensing Technical Report found to be unacceptable.

please revise the respective documentation or submit justification (LTR) submitted in TVA Letter to NRC dated December 3, for continued applicability of the topical report. 2010, (Reference 1) contains the following change to LTR Section 9 evaluates the address the NRC request: compliance of the SRS to IEEE 830-1998. There are two issues Section 9, Compliance Evaluation of the Watts Bar 2 PAMS with this evaluiation:

Software Requirements Specification to IEEE Standard 830- (1) IEEE 830-1998 is not the 1998 and Regulatory Guide 1.172 to show the origin of the current SRP acceptance criteria.

requirements has been added. IEEE 830-1998 has not been formally endorsed by a The descriptions and commitments in the Topical Report regulatory guide.

(TR) still apply. The LTR provides compliance evidence to (2) Westinghouse committed to the new ISG-04 criteria. The statement in the SE means that evaluate the SRS against 830 the TR can be evaluated against later NRC criteria when it when the NRC identified several appears. inconsistencies.

Source: E-mail from Westinghouse (Matthew A. Shakun) to Yes ISG-4 is one new criteria, Bechtel (Mark S. Clark), RE: December 22 letter review, and an evaluation against it has dated December 17, 2010 (Reference 13) been provided.

In addition, LTR Rev. 2 Section 13 states: The applicable NRC regulatory guides, IEEE and EPRI industry standards fo the common Q PAMS are shown below. Compliance to these codes and standards are stated in Section 4 of Reference 1.

Reference 1 is the common Q topical report.

335 7.6.1 7.6.7 LPMS: Reference to OI-331, sub item 2. Responder: WEC 6. Y Open Open-TVA/WEC EICB Provide analysis, test, or combined analysis and test for normal TVA has reviewed the information provided by Partial Response included in Submit qual report by (Singh) operating radiation, temperature, and humidity environment per Westinghouse describing how the Loose Part Monitoring letter dated 12/22/10 3/11/11 as stated in regulatory position C.1.g of RG 1.133. As an alternate TVA may System (LPMS) sensor is qualified for normal operating TVA letter of 12/22/10,

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N confirm that the required equipment has been qualified for the conditions provided in Westinghouse letter WBT-D-2782, Encl 1, Item 28.

environments stated in RG 1.133, position C.1.g and that TVA has dated December 17, 2010 (Reference 11) as addressed in reviewed the test report and found it acceptable. regulatory position C.1.g of Reg. Guide 1.133 and found it Due 12/22/10 acceptable. The qualification information on the softline cable and charge converter/preamplifier is being assembled and will be submitted by March 11, 2011.