{{#Wiki_filter:March 28, 2011 Brian J. O'Grady, Vice President-Nuclear and Chief Nuclear Officer Nebraska Public Power District Cooper Nuclear Station 72676 648A Avenue
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION rch 28, 2011


Brownville, NE 68321 SUBJECT: ERRATA FOR NRC TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000298/2010006
==SUBJECT:==
, COOPER NUCLEAR STATION
ERRATA FOR NRC TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000298/2010006, COOPER NUCLEAR STATION


==Dear Mr. O'Grady:==
==Dear Mr. OGrady:==
This Errata corrects the tracking numbers and a title for the violations in the subject report issued by our letter (ML110760579) (A. Vegel to B. O'Grady, dated March 17, 2011).
This Errata corrects the tracking numbers and a title for the violations in the subject report issued by our letter (ML110760579) (A. Vegel to B. OGrady, dated March 17, 2011). Please replace Page 18 of the Enclosure and Page A-2 of Attachment 1 with the enclosed revised pages. We regret any inconvenience this may have caused.


Please replace Page 18 of the Enclosure and Page A-2 of Attachment 1 with the enclosed revised pages. We regret any inconvenience this may have caused.
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter, its enclosure(s), and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
 
In accordance with 10 CFR 2.390 of the NRC's  
"Rules of Practice," a copy of this letter, its enclosure(s), and your response, if you choose to provide one
, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
.  


Sincerely,
Sincerely,
/RA/ Neil F. O'Keefe, Chief Engineering Branch 2 Division of Reactor Safety Docket No.
/RA/
Neil F. OKeefe, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-298 License No. DPR-46 Enclosure: Inspection Report No. 05000298/2010006 w/Attachments: Supplemental Information Final Significance Determination Summary cc w/enclosure:
Distribution via ListServ for CNS


50-298 License No. DPR-46 Enclosure: Inspection Report No. 05000 298/2010006 w/Attachment s: Supplemental Information Final Significance Determination Summary cc w/enclosure: Distribution via ListServ for CNS U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V 6 12 EAST LAMAR BLVD
Nebraska Public Power District  -2-Electronic distribution by RIV:
, S U I T E 4 0 0 A R L I N G T O N , T E X A S 7 6 0 1 1-4125 Nebraska Public Power District
Regional Administrator (Elmo.Collins@nrc.gov)
  - 2 - Electronic distribution by RIV:
Deputy Regional Administrator (Art.Howell@nrc.gov)
Regional Administrator (Elmo.Collins@nrc.gov
DRP Director (Kriss.Kennedy@nrc.gov)
) Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov
DRP Deputy Director (Troy.Pruett@nrc.gov)
) DRP Deputy Director (Troy.Pruett@nrc.gov
DRS Director (Anton.Vegel@nrc.gov)
) DRS Director (Anton.Vegel@nrc.gov
DRS Deputy Director (Vacant)
) DRS Deputy Director (Vacant) Senior Resident Inspector (Jeffrey.Josey@nrc.gov
Senior Resident Inspector (Jeffrey.Josey@nrc.gov)
) Resident Inspector (Michael.Chambers@nrc.gov) Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov
Resident Inspector (Michael.Chambers@nrc.gov)
) Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov
Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)
) Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)
) CNS Administrative Assistant (Amy.Elam@nrc.gov
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)
) Public Affairs Officer (Victor.Dricks@nrc.gov
CNS Administrative Assistant (Amy.Elam@nrc.gov)
) Public Affairs Officer (Lara.Uselding@nrc.gov
Public Affairs Officer (Victor.Dricks@nrc.gov)
) Project Manager (Lynnea.Wilkins@nrc.gov
Public Affairs Officer (Lara.Uselding@nrc.gov)
) Branch Chief, DRS/TSB (Michael.Hay@nrc.gov
Project Manager (Lynnea.Wilkins@nrc.gov)
) RITS Coordinator (Marisa.Herrera@nrc.gov
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
) Regional Counsel (Karla.Fuller@nrc.gov
RITS Coordinator (Marisa.Herrera@nrc.gov)
) Congressional Affairs Officer (Jenny.Weil@nrc.gov
Regional Counsel (Karla.Fuller@nrc.gov)
) RES Branch Chief (MarkHenry.Salley@nrc.gov) OEMail Resource@nrc.gov OEWEB Resource OEDO RIV Coordinator (Nathan.Sanfilippo@nrc.gov
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
) DRS/TSB STA (Dale.Powers@nrc.gov
RES Branch Chief (MarkHenry.Salley@nrc.gov)
) R:\ ADAMS ML ADAMS: No Yes SUNSI Review Complete Reviewer Initials:
OEMail Resource@nrc.gov OEWEB Resource OEDO RIV Coordinator (Nathan.Sanfilippo@nrc.gov)
NFO Publicly Available Non-Sensitive Non-publicly Available Sensitive RIV/DRS/EB2 RIV/DRS/BC J.Mateychick N. O'Keefe
DRS/TSB STA (Dale.Powers@nrc.gov)
/RA/ /RA/ 3/23/11 3/26/11 OFFICIAL RECORD COPY  T=Telephone E=E-mail F=Fax
R:\   ADAMS ML ADAMS: No Yes SUNSI Review Complete Reviewer Initials: NFO Publicly Available Non-Sensitive Non-publicly Available Sensitive RIV/DRS/EB2 RIV/DRS/BC J.Mateychick N. OKeefe
/RA/ /RA/
3/23/11 3/26/11 OFFICIAL RECORD COPY  T=Telephone E=E-mail F=Fax


-18- Enclosure The licensee entered this issue into their corrective action program as Condition Reports CR-CNS-2010-08014 and CR-CNS-2010-08250. Because this violation was of very low safety significance and it was entered into the licensee's corrective action program, this violation is being treated as a noncited violation, consistent with the Enforcement Policy: NCV 05000298/2010006-0 2, Failure to Monitor the Performance of the Emergency Lights Against the Maintenance Rule Criteria.
The licensee entered this issue into their corrective action program as Condition Reports CR-CNS-2010-08014 and CR-CNS-2010-08250. Because this violation was of very low safety significance and it was entered into the licensees corrective action program, this violation is being treated as a noncited violation, consistent with the Enforcement Policy: NCV 05000298/2010006-02, Failure to Monitor the Performance of the Emergency Lights Against the Maintenance Rule Criteria.


.9 Cold Shutdown Repairs a. Inspection Scope
.9 Cold Shutdown Repairs a. Inspection Scope The team verified that the licensee identified repairs needed to reach and maintain cold shutdown and had dedicated repair procedures, equipment, and materials to accomplish these repairs. Using these procedures, the team evaluated whether these components could be repaired in time to bring the plant to cold shutdown within the time frames specified in the design and licensing bases. The team verified that the repair equipment, components, tools, and materials needed for the repairs were available and accessible on site.


The team verified that the licensee identified repairs needed to reach and maintain cold shutdown and had dedicated repair procedures, equipment, and materials to accomplish these repairs. Using these procedures, the team evaluated whether these component s could be repaired in time to bring the plant to cold shutdown within the time frames specified in the design and licensing bases. The team verified that the repair equipment, components, tools, and materials needed for the repairs were available and accessible on site. b. Findings No findings were identified.
b. Findings No findings were identified.


.10 Compensatory Measures a. Inspection Scope The team verified that compensatory measures were implemented for out-of-service, degraded, or inoperable fire protection and postfire safe shutdown equipment, systems, or features (e.g., detection and suppression systems and equipment; passive fire barriers; or pumps, valves, or electrical devices providing safe shutdown functions). The team also verified that the short-term compensatory measures compensated for the degraded function or feature until appropriate corrective action could be taken and that the licensee was effective in returning the equipment to service in a reasonable period of time. b. Findings A finding related to this review was documented in Section 1R05.01.
.10 Compensatory Measures a. Inspection Scope The team verified that compensatory measures were implemented for out-of-service, degraded, or inoperable fire protection and postfire safe shutdown equipment, systems, or features (e.g., detection and suppression systems and equipment; passive fire barriers; or pumps, valves, or electrical devices providing safe shutdown functions). The team also verified that the short-term compensatory measures compensated for the degraded function or feature until appropriate corrective action could be taken and that the licensee was effective in returning the equipment to service in a reasonable period of time.


No additional findings were identified.
b. Findings A finding related to this review was documented in Section 1R05.01. No additional findings were identified.


.11 B.5.b Inspection Activities a. Inspection Scope The team reviewed the licensee's implementation of guidance and strategies intended to maintain or restore core, containment, and spent fuel pool cooling capabilities under the circumstances associated with loss of large areas of the plant due to explosions or fire as required by Section B.5.b of the Interim Compensatory Measures Order, EA-02-026, dated February 25, 2002 and 10 CFR 50.54(hh)(2).
.11 B.5.b Inspection Activities a. Inspection Scope The team reviewed the licensees implementation of guidance and strategies intended to maintain or restore core, containment, and spent fuel pool cooling capabilities under the circumstances associated with loss of large areas of the plant due to explosions or fire as required by Section B.5.b of the Interim Compensatory Measures Order, EA-02-026, dated February 25, 2002 and 10 CFR 50.54(hh)(2).


- A-2 - Attachment 1 LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED Opened 05000298/20 1 0006-01 AV Inadequate Post-Fire Safe Shutdown Procedures (Section 1R05
-18-   Enclosure
.1) Opened and Closed


05000298/20 1 0006-02 NCV Failure to Monitor the Performance of the Emergency Lights Against the Maintenance Rule Criteria (Section 1R05.8) Closed None LIST OF ACRONYMS ADAMS Agencywide Documents Access and Management System BWR Boiling Water Reactor CR Condition Report CFR Code of Federal Regulations DRS Division of Reactor Safety FSA R Final Safety Analysis Report HPCI High Pressure Coolant Injection LPSI Low Pressure Safety Injection MOV Motor Operated Valve NCV Noncited Violation NFPA National Fire Protection Association NRC Nuclear Regulatory Commission PAR Publicly Available Records PRA Probabilistic Risk Assessment RCIC Reactor Core Isolation Cooling RHR Residual Heat Removal SDP Significance Determination Process SRV Safety/Relief Valve
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED Opened 05000298/2010006-01 AV Inadequate Post-Fire Safe Shutdown Procedures (Section 1R05.1)
Opened and Closed 05000298/2010006-02 NCV Failure to Monitor the Performance of the Emergency Lights Against the Maintenance Rule Criteria (Section 1R05.8)
Closed None LIST OF ACRONYMS ADAMS Agencywide Documents Access and Management System BWR Boiling Water Reactor CR Condition Report CFR Code of Federal Regulations DRS Division of Reactor Safety FSAR Final Safety Analysis Report HPCI High Pressure Coolant Injection LPSI Low Pressure Safety Injection MOV Motor Operated Valve NCV Noncited Violation NFPA National Fire Protection Association NRC Nuclear Regulatory Commission PAR Publicly Available Records PRA Probabilistic Risk Assessment RCIC Reactor Core Isolation Cooling RHR Residual Heat Removal SDP Significance Determination Process SRV Safety/Relief Valve
  - A-2 -  Attachment 1
}}
}}

Latest revision as of 01:29, 13 November 2019

IR 05000298-10-006, Cooper Nuclear Station Errata, Errata Triennial Fire Protection
ML110890962
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/28/2011
From: O'Keefe N
Division of Nuclear Materials Safety IV
To: O'Grady B
Nebraska Public Power District (NPPD)
References
IR-10-006
Download: ML110890962 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION rch 28, 2011

SUBJECT:

ERRATA FOR NRC TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000298/2010006, COOPER NUCLEAR STATION

Dear Mr. OGrady:

This Errata corrects the tracking numbers and a title for the violations in the subject report issued by our letter (ML110760579) (A. Vegel to B. OGrady, dated March 17, 2011). Please replace Page 18 of the Enclosure and Page A-2 of Attachment 1 with the enclosed revised pages. We regret any inconvenience this may have caused.

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter, its enclosure(s), and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Neil F. OKeefe, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-298 License No. DPR-46 Enclosure: Inspection Report No. 05000298/2010006 w/Attachments: Supplemental Information Final Significance Determination Summary cc w/enclosure:

Distribution via ListServ for CNS

Nebraska Public Power District -2-Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Vacant)

Senior Resident Inspector (Jeffrey.Josey@nrc.gov)

Resident Inspector (Michael.Chambers@nrc.gov)

Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)

Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)

Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)

CNS Administrative Assistant (Amy.Elam@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Lynnea.Wilkins@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RES Branch Chief (MarkHenry.Salley@nrc.gov)

OEMail Resource@nrc.gov OEWEB Resource OEDO RIV Coordinator (Nathan.Sanfilippo@nrc.gov)

DRS/TSB STA (Dale.Powers@nrc.gov)

R:\ ADAMS ML ADAMS: No Yes SUNSI Review Complete Reviewer Initials: NFO Publicly Available Non-Sensitive Non-publicly Available Sensitive RIV/DRS/EB2 RIV/DRS/BC J.Mateychick N. OKeefe

/RA/ /RA/

3/23/11 3/26/11 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

The licensee entered this issue into their corrective action program as Condition Reports CR-CNS-2010-08014 and CR-CNS-2010-08250. Because this violation was of very low safety significance and it was entered into the licensees corrective action program, this violation is being treated as a noncited violation, consistent with the Enforcement Policy: NCV 05000298/2010006-02, Failure to Monitor the Performance of the Emergency Lights Against the Maintenance Rule Criteria.

.9 Cold Shutdown Repairs a. Inspection Scope The team verified that the licensee identified repairs needed to reach and maintain cold shutdown and had dedicated repair procedures, equipment, and materials to accomplish these repairs. Using these procedures, the team evaluated whether these components could be repaired in time to bring the plant to cold shutdown within the time frames specified in the design and licensing bases. The team verified that the repair equipment, components, tools, and materials needed for the repairs were available and accessible on site.

b. Findings No findings were identified.

.10 Compensatory Measures a. Inspection Scope The team verified that compensatory measures were implemented for out-of-service, degraded, or inoperable fire protection and postfire safe shutdown equipment, systems, or features (e.g., detection and suppression systems and equipment; passive fire barriers; or pumps, valves, or electrical devices providing safe shutdown functions). The team also verified that the short-term compensatory measures compensated for the degraded function or feature until appropriate corrective action could be taken and that the licensee was effective in returning the equipment to service in a reasonable period of time.

b. Findings A finding related to this review was documented in Section 1R05.01. No additional findings were identified.

.11 B.5.b Inspection Activities a. Inspection Scope The team reviewed the licensees implementation of guidance and strategies intended to maintain or restore core, containment, and spent fuel pool cooling capabilities under the circumstances associated with loss of large areas of the plant due to explosions or fire as required by Section B.5.b of the Interim Compensatory Measures Order, EA-02-026, dated February 25, 2002 and 10 CFR 50.54(hh)(2).

-18- Enclosure

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED Opened 05000298/2010006-01 AV Inadequate Post-Fire Safe Shutdown Procedures (Section 1R05.1)

Opened and Closed 05000298/2010006-02 NCV Failure to Monitor the Performance of the Emergency Lights Against the Maintenance Rule Criteria (Section 1R05.8)

Closed None LIST OF ACRONYMS ADAMS Agencywide Documents Access and Management System BWR Boiling Water Reactor CR Condition Report CFR Code of Federal Regulations DRS Division of Reactor Safety FSAR Final Safety Analysis Report HPCI High Pressure Coolant Injection LPSI Low Pressure Safety Injection MOV Motor Operated Valve NCV Noncited Violation NFPA National Fire Protection Association NRC Nuclear Regulatory Commission PAR Publicly Available Records PRA Probabilistic Risk Assessment RCIC Reactor Core Isolation Cooling RHR Residual Heat Removal SDP Significance Determination Process SRV Safety/Relief Valve