{{#Wiki_filter:April 19, 2011  
{{#Wiki_filter:April 19, 2011 MEMORANDUM TO:           Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:                   Richard B. Ennis, Senior Project Manager /ra/
 
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
MEMORANDUM TO: Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:   Richard B. Ennis, Senior Project Manager /ra/ Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  


==SUBJECT:==
==SUBJECT:==
SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. ME4861 AND ME4862)  
SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. ME4861 AND ME4862)
 
The attached draft request for information (RAI) was transmitted on April 19, 2011, to Mr. Paul Duke of PSEG Nuclear LLC (PSEG, the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s relief requests for Salem Nuclear Generating Station (Salem), Unit Nos. 1 and 2, dated October 12, 2010. The proposed relief requests would allow PSEG to use an alternative examination for buried piping in the service water system in lieu of pressure tests required by American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code), Section XI, IWA-5244(b).
The attached draft request for information (RAI) was transmitted on April 19, 2011, to Mr. Paul Duke of PSEG Nuclear LLC (PSEG, the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee
This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensees request.
=s relief requests for Salem Nuclear Generating Station (Salem), Unit Nos. 1 and 2, dated October 12, 2010. The proposed relief requests would allow PSEG to use an alternative examination for buried piping in the service water system in lieu of pressure tests required by American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code), Section XI, IWA-5244(b).  
Docket Nos. 50-272 and 50-311
 
This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request.  
 
Docket Nos. 50-272 and 50-311  


==Attachment:==
==Attachment:==
Draft RAI  
Draft RAI


April 19, 2011  
April 19, 2011 MEMORANDUM TO:           Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:                   Richard B. Ennis, Senior Project Manager /ra/
 
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation S  
MEMORANDUM TO: Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:   Richard B. Ennis, Senior Project Manager /ra/ Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
 
S  


==SUBJECT:==
==SUBJECT:==
SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. ME4861 AND ME4862)  
SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. ME4861 AND ME4862)
 
The attached draft request for information (RAI) was transmitted on April 19, 2011, to Mr. Paul Duke of PSEG Nuclear LLC (PSEG, the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s relief requests for Salem Nuclear Generating Station (Salem), Unit Nos. 1 and 2, dated October 12, 2010. The proposed relief requests would allow PSEG to use an alternative examination for buried piping in the service water system in lieu of pressure tests required by American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code), Section XI, IWA-5244(b).
The attached draft request for information (RAI) was transmitted on April 19, 2011, to Mr. Paul Duke of PSEG Nuclear LLC (PSEG, the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee
This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request.
=s relief requests for Salem Nuclear Generating Station (Salem), Unit Nos. 1 and 2, dated October 12, 2010. The proposed relief requests would allow PSEG to use an alternative examination for buried piping in the service water system in lieu of pressure tests required by American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code), Section XI, IWA-5244(b).  
Docket Nos. 50-272 and 50-311
 
This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request.  
 
Docket Nos. 50-272 and 50-311  


==Attachment:==
==Attachment:==
Draft RAI  
Draft RAI DISTRIBUTION PUBLIC LPL1-2 Reading RidsNrrDorlLpl1-2 Resource RidsNrrDorlDpr Resource RidsNrrPMSalem Resource JWallace, NRR/DCI/CPNB ACCESSION NO.: ML111091118 OFFICE     LPL1-2/PM NAME       REnnis DATE       4/19/11 OFFICIAL RECORD COPY
 
DISTRIBUTION PUBLIC LPL1-2 Reading RidsNrrDorlLpl1-2 Resource RidsNrrDorlDpr Resource RidsNrrPMSalem Resource JWallace, NRR/DCI/CPNB  
 
ACCESSION NO.: ML111091118 OFFICE LPL1-2/PM NAME REnnis DATE 4/19/11 OFFICIAL RECORD COPY DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUESTS S1-I4R-102 AND S2-I3R-104 SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311
 
By letter dated October 12, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102920464), PSEG Nuclear LLC (PSEG, the licensee), submitted relief requests S1-I4R-102 and S2-I3R-104 for Salem Nuclear Generating Station (Salem), Unit Nos. 1 and 2. The proposed relief requests would allow PSEG to use an alternative examination for buried piping in the service water system in lieu of pressure tests required by American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code), Section XI, IWA-5244(b).


DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUESTS S1-I4R-102 AND S2-I3R-104 SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 By letter dated October 12, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102920464), PSEG Nuclear LLC (PSEG, the licensee), submitted relief requests S1-I4R-102 and S2-I3R-104 for Salem Nuclear Generating Station (Salem), Unit Nos. 1 and 2. The proposed relief requests would allow PSEG to use an alternative examination for buried piping in the service water system in lieu of pressure tests required by American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code), Section XI, IWA-5244(b).
The Nuclear Regulatory Commission (NRC) staff has reviewed the information the licensee provided that supports the proposed relief requests and would like to discuss the following issues to clarify the submittal.
The Nuclear Regulatory Commission (NRC) staff has reviewed the information the licensee provided that supports the proposed relief requests and would like to discuss the following issues to clarify the submittal.
: 1. Provide the following details about the buried service water prestressed concrete cylinder pipe (PCCP):
: 1.       Provide the following details about the buried service water prestressed concrete cylinder pipe (PCCP):
: a. Diameter and length
: a. Diameter and length
: b. Design and operating pressures
: b. Design and operating pressures
Line 68: Line 51:
: e. Manufacturer
: e. Manufacturer
: f. PCCP type - embedded-cylinder (EC-PCCP) or lined-cylinder (LC-PCCP)
: f. PCCP type - embedded-cylinder (EC-PCCP) or lined-cylinder (LC-PCCP)
: 2. Discuss the history of failures or degradation, if any, of the Salem, Unit Nos. 1 and 2, buried PCCP service water piping.
: 2.       Discuss the history of failures or degradation, if any, of the Salem, Unit Nos. 1 and 2, buried PCCP service water piping.
: 3. Concerning internal visual inspection:
: 3.       Concerning internal visual inspection:
: a. What fraction of the length can be internally inspected using the crawler?
: a. What fraction of the length can be internally inspected using the crawler?
: b. Will the pipe be cl eaned prior to internal visual inspection?
: b. Will the pipe be cleaned prior to internal visual inspection?
: c. What are the acceptance criteria for visual inspection?
: c. What are the acceptance criteria for visual inspection?
: 4. Discuss any corrosion controls (e.g., cathodic protection) or soil corrosivity evaluations (e.g., soil resistivity, pH, chloride, sulfate measurements) that have been performed to ensure the integrity of the subject piping.
: 4.       Discuss any corrosion controls (e.g., cathodic protection) or soil corrosivity evaluations (e.g., soil resistivity, pH, chloride, sulfate measurements) that have been performed to ensure the integrity of the subject piping.
 
Attachment
Attachment
: 5. A dominant PCCP failure mode is corrosion of the prestressing wires outside of the metal cylinder, resulting in fracture of the prestressing wires and catastrophic pipe rupture with little prior leakage (see References 1 - 3).
: 5. A dominant PCCP failure mode is corrosion of the prestressing wires outside of the metal cylinder, resulting in fracture of the prestressing wires and catastrophic pipe rupture with little prior leakage (see References 1 - 3).
: a. Explain how a visual examination of the pipe inside diameter can detect the degradation of the wires and ensure structural integrity of the pipe for the length of a period of the 10-year inservice inspection interval.
: a. Explain how a visual examination of the pipe inside diameter can detect the degradation of the wires and ensure structural integrity of the pipe for the length of a period of the 10-year inservice inspection interval.
: b. Other examination and monitoring techniques, such as remote field eddy current/transformer coupling (RFEC/TC) and acousti c emission moni toring (AE), have been used to identify wire breaking before catastrophic failure occurs. Justify the adequacy of visual examination of the inside diameter of the pipe to detect wire degradation prior to the point that structural integrity of the pipe is challenged.
: b. Other examination and monitoring techniques, such as remote field eddy current/transformer coupling (RFEC/TC) and acoustic emission monitoring (AE),
 
have been used to identify wire breaking before catastrophic failure occurs. Justify the adequacy of visual examination of the inside diameter of the pipe to detect wire degradation prior to the point that structural integrity of the pipe is challenged.
References
References
: 1. Failure of Prestressed Concrete Cylinder Pipe, A.
: 1. Failure of Prestressed Concrete Cylinder Pipe, A. E. Romer, D. Ellison, G.E.C. Bell, B. Clark, AWWA Research Foundation (2008)
E. Romer, D. E llison, G.E.C. Bell, B. Clark, AWWA Research Foundation (2008)
: 2. Inspecting systems for leaks, pits, and corrosion, J. M.Makar, N. Chagnon, Journal American Water Works Association, 91, 7, pp. 36-46 (1999)
: 2. Inspecting systems for leaks, pits, and corrosion, J. M.Makar, N. Chagnon, Journal American Water Works Association, 91, 7, pp. 36-46 (1999)
: 3. Condition assessment of prestressed concrete cylindrical water pipes, R . Al Wardany, 60th Annual WCWWA Conference and Trade Show, Regina, SK. September 23- 26, pp.
: 3. Condition assessment of prestressed concrete cylindrical water pipes, R . Al Wardany, 60th Annual WCWWA Conference and Trade Show, Regina, SK. September 23- 26, pp.
1-9 (2008)}}
1-9 (2008)}}

Latest revision as of 00:47, 13 November 2019

Draft Request for Additional Information
ML111091118
Person / Time
Site: Salem  PSEG icon.png
Issue date: 04/19/2011
From: Ennis B
Plant Licensing Branch 1
To: Chernoff H
Plant Licensing Branch 1
Ennis R, NRR/DORL, 415-1420
References
TAC ME4861, TAC ME4862
Download: ML111091118 (4)


Text

April 19, 2011 MEMORANDUM TO: Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Richard B. Ennis, Senior Project Manager /ra/

Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. ME4861 AND ME4862)

The attached draft request for information (RAI) was transmitted on April 19, 2011, to Mr. Paul Duke of PSEG Nuclear LLC (PSEG, the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s relief requests for Salem Nuclear Generating Station (Salem), Unit Nos. 1 and 2, dated October 12, 2010. The proposed relief requests would allow PSEG to use an alternative examination for buried piping in the service water system in lieu of pressure tests required by American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section XI, IWA-5244(b).

This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensees request.

Docket Nos. 50-272 and 50-311

Attachment:

Draft RAI

April 19, 2011 MEMORANDUM TO: Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Richard B. Ennis, Senior Project Manager /ra/

Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation S

SUBJECT:

SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. ME4861 AND ME4862)

The attached draft request for information (RAI) was transmitted on April 19, 2011, to Mr. Paul Duke of PSEG Nuclear LLC (PSEG, the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s relief requests for Salem Nuclear Generating Station (Salem), Unit Nos. 1 and 2, dated October 12, 2010. The proposed relief requests would allow PSEG to use an alternative examination for buried piping in the service water system in lieu of pressure tests required by American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section XI, IWA-5244(b).

This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request.

Docket Nos. 50-272 and 50-311

Attachment:

Draft RAI DISTRIBUTION PUBLIC LPL1-2 Reading RidsNrrDorlLpl1-2 Resource RidsNrrDorlDpr Resource RidsNrrPMSalem Resource JWallace, NRR/DCI/CPNB ACCESSION NO.: ML111091118 OFFICE LPL1-2/PM NAME REnnis DATE 4/19/11 OFFICIAL RECORD COPY

DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUESTS S1-I4R-102 AND S2-I3R-104 SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 By letter dated October 12, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102920464), PSEG Nuclear LLC (PSEG, the licensee), submitted relief requests S1-I4R-102 and S2-I3R-104 for Salem Nuclear Generating Station (Salem), Unit Nos. 1 and 2. The proposed relief requests would allow PSEG to use an alternative examination for buried piping in the service water system in lieu of pressure tests required by American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section XI, IWA-5244(b).

The Nuclear Regulatory Commission (NRC) staff has reviewed the information the licensee provided that supports the proposed relief requests and would like to discuss the following issues to clarify the submittal.

1. Provide the following details about the buried service water prestressed concrete cylinder pipe (PCCP):
a. Diameter and length
b. Design and operating pressures
c. Installation year
d. Pipe fabrication standard (e.g., AWWA C301-84)
e. Manufacturer
f. PCCP type - embedded-cylinder (EC-PCCP) or lined-cylinder (LC-PCCP)
2. Discuss the history of failures or degradation, if any, of the Salem, Unit Nos. 1 and 2, buried PCCP service water piping.
3. Concerning internal visual inspection:
a. What fraction of the length can be internally inspected using the crawler?
b. Will the pipe be cleaned prior to internal visual inspection?
c. What are the acceptance criteria for visual inspection?
4. Discuss any corrosion controls (e.g., cathodic protection) or soil corrosivity evaluations (e.g., soil resistivity, pH, chloride, sulfate measurements) that have been performed to ensure the integrity of the subject piping.

Attachment

5. A dominant PCCP failure mode is corrosion of the prestressing wires outside of the metal cylinder, resulting in fracture of the prestressing wires and catastrophic pipe rupture with little prior leakage (see References 1 - 3).
a. Explain how a visual examination of the pipe inside diameter can detect the degradation of the wires and ensure structural integrity of the pipe for the length of a period of the 10-year inservice inspection interval.
b. Other examination and monitoring techniques, such as remote field eddy current/transformer coupling (RFEC/TC) and acoustic emission monitoring (AE),

have been used to identify wire breaking before catastrophic failure occurs. Justify the adequacy of visual examination of the inside diameter of the pipe to detect wire degradation prior to the point that structural integrity of the pipe is challenged.

References

1. Failure of Prestressed Concrete Cylinder Pipe, A. E. Romer, D. Ellison, G.E.C. Bell, B. Clark, AWWA Research Foundation (2008)
2. Inspecting systems for leaks, pits, and corrosion, J. M.Makar, N. Chagnon, Journal American Water Works Association, 91, 7, pp. 36-46 (1999)
3. Condition assessment of prestressed concrete cylindrical water pipes, R . Al Wardany, 60th Annual WCWWA Conference and Trade Show, Regina, SK. September 23- 26, pp.

1-9 (2008)