ML14262A329: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 September 19, 2014 Ms. Karen Fili Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637 | ||
-4352 | |||
-9637 | |||
==SUBJECT:== | ==SUBJECT:== | ||
MONTICELLO NUCLEAR GENERATING PLANT | MONTICELLO NUCLEAR GENERATING PLANT; REQUALIFICATION PROGRAM INSPECTION | ||
; | |||
==Dear | ==Dear Ms. Fili:== | ||
Ms. Karen Fili Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN | In a telephone conversation on September 17, 2014, Mr. G. Allex, General Supervisor Operations Training, and Mr. D. McNeil, Senior Operations Engineer, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect a portion of your Requalification Program at your Monticello Nuclear Generating Plant. Mr. McNeil will review the scenarios and Job Performance Measures to be administered the week of the inspection and observe the Training Departments administration of those requalification tests in accordance with Inspection Procedure 71111.11B. The inspection is planned for October 7 - 8, 2014, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved Requalification Program. | ||
-9637 | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. The NRC will review the operating test scheduled for the week of October 6, 2014, at the site. Therefore, it will not be necessary to provide any material in advance of this inspection. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. D. McNeil at 630-829-9737, or I can be reached at 630-829-9707. | |||
Sincerely, | |||
/RA/ | |||
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via LISTSERV | |||
Ms. Karen Fili Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Line 44: | Line 37: | ||
==Dear Ms. Fili:== | ==Dear Ms. Fili:== | ||
In a telephone conversation on September 17, 2014, Mr. G. Allex, General Supervisor Operations Training, and Mr. D. McNeil, Senior Operations Engineer, made arrangements for the U.S. | In a telephone conversation on September 17, 2014, Mr. G. Allex, General Supervisor Operations Training, and Mr. D. McNeil, Senior Operations Engineer, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect a portion of your Requalification Program at your Monticello Nuclear Generating Plant. Mr. McNeil will review the scenarios and Job Performance Measures to be administered the week of the inspection and observe the Training Departments administration of those requalification tests in accordance with Inspection Procedure 71111.11B. The inspection is planned for October 7 - 8, 2014, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved Requalification Program. | ||
Nuclear Regulatory Commission (NRC) to inspect a portion of your Requalification Program at your Monticello Nuclear Generating Plant. Mr. McNeil will review the scenarios and Job Performance Measures to be administered the week of the inspection and observe the Training | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. The NRC will review the operating test scheduled for the week of October 6, 2014, at the site. Therefore, it will not be necessary to provide any material in advance of this inspection. | ||
- 8, 2014, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved Requalification Program. | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. The NRC will review the operating test scheduled for the week of October 6, 2014, at the site. Therefore, it will not be necessary to provide any material in advance of this inspection | Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. D. McNeil at 630-829-9737, or I can be reached at 630-829-9707. | ||
Sincerely, | |||
-rm/adams.html (the Public Electronic Reading Room). | /RA/ | ||
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. D. McNeil at 630 | Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via LISTSERV DOCUMENT NAME: Ltr 091914 Monticello Requalification Program Inspection (DRM).docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME RKWalton for DMcNeil:bl HPeterson DATE 09/19/14 09/19/14 OFFICIAL RECORD COPY | ||
-829-9737, or I can be reached at 630 | |||
-829-9707. Sincerely, | Letter to Karen Fili from Hironori Peterson dated September 19, 2014 | ||
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR | |||
-22 cc: | |||
==SUBJECT:== | ==SUBJECT:== | ||
MONTICELLO NUCLEAR GENERATING PLANT | MONTICELLO NUCLEAR GENERATING PLANT; REQUALIFICATION PROGRAM INSPECTION DISTRIBUTION John Jandovitz RidsNrrDorlLpl3-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Carmen Olteanu Scott Sloan}} | ||
; | |||
-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano | |||
Linda Linn DRPIII DRSIII Patricia Buckley Carmen Olteanu Scott Sloan}} |
Revision as of 01:06, 4 November 2019
ML14262A329 | |
Person / Time | |
---|---|
Site: | Monticello ![]() |
Issue date: | 09/19/2014 |
From: | Hironori Peterson Division of Reactor Safety III |
To: | Fili K Northern States Power Co |
Dell McNeil | |
References | |
Download: ML14262A329 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 September 19, 2014 Ms. Karen Fili Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
MONTICELLO NUCLEAR GENERATING PLANT; REQUALIFICATION PROGRAM INSPECTION
Dear Ms. Fili:
In a telephone conversation on September 17, 2014, Mr. G. Allex, General Supervisor Operations Training, and Mr. D. McNeil, Senior Operations Engineer, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect a portion of your Requalification Program at your Monticello Nuclear Generating Plant. Mr. McNeil will review the scenarios and Job Performance Measures to be administered the week of the inspection and observe the Training Departments administration of those requalification tests in accordance with Inspection Procedure 71111.11B. The inspection is planned for October 7 - 8, 2014, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved Requalification Program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. The NRC will review the operating test scheduled for the week of October 6, 2014, at the site. Therefore, it will not be necessary to provide any material in advance of this inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. D. McNeil at 630-829-9737, or I can be reached at 630-829-9707.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via LISTSERV
Ms. Karen Fili Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
MONTICELLO NUCLEAR GENERATING PLANT; REQUALIFICATION PROGRAM INSPECTION
Dear Ms. Fili:
In a telephone conversation on September 17, 2014, Mr. G. Allex, General Supervisor Operations Training, and Mr. D. McNeil, Senior Operations Engineer, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect a portion of your Requalification Program at your Monticello Nuclear Generating Plant. Mr. McNeil will review the scenarios and Job Performance Measures to be administered the week of the inspection and observe the Training Departments administration of those requalification tests in accordance with Inspection Procedure 71111.11B. The inspection is planned for October 7 - 8, 2014, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved Requalification Program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. The NRC will review the operating test scheduled for the week of October 6, 2014, at the site. Therefore, it will not be necessary to provide any material in advance of this inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. D. McNeil at 630-829-9737, or I can be reached at 630-829-9707.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via LISTSERV DOCUMENT NAME: Ltr 091914 Monticello Requalification Program Inspection (DRM).docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME RKWalton for DMcNeil:bl HPeterson DATE 09/19/14 09/19/14 OFFICIAL RECORD COPY
Letter to Karen Fili from Hironori Peterson dated September 19, 2014
SUBJECT:
MONTICELLO NUCLEAR GENERATING PLANT; REQUALIFICATION PROGRAM INSPECTION DISTRIBUTION John Jandovitz RidsNrrDorlLpl3-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Carmen Olteanu Scott Sloan