|
|
Line 26: |
Line 26: |
| On December 31, 2014, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Fort Calhoun Station. This inspection began on January 1, 2014. Issuance of this letter closes NRC Inspection Report 05000285/2014501. The inspection results associated with the 2014-501 reports are documented in integrated Resident Inspector Reports 2014-002, 2014-003, 2014-004, and 2014-005. | | On December 31, 2014, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Fort Calhoun Station. This inspection began on January 1, 2014. Issuance of this letter closes NRC Inspection Report 05000285/2014501. The inspection results associated with the 2014-501 reports are documented in integrated Resident Inspector Reports 2014-002, 2014-003, 2014-004, and 2014-005. |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
|
| |
|
| Sincerely, | | Sincerely, |
| /RA/ | | /RA/ |
| Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety | | Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket: 50-285 License: DPR-40 cc: Electronic Distribution |
|
| |
|
| Docket: 50-285 License: DPR-40
| | ML15009A452 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword: |
| | By: PElkmann Yes No Non-Publicly Available Sensitive NRC-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/ |
| | DATE 1/7/15 1/7/15 |
|
| |
|
| cc: Electronic Distribution UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511
| | Letter to Lou Cortopassi from Mark S. Haire, dated January 7, 2015 SUBJECT: FORT CALHOUN STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000285/2014501 DISTRIBUTION: |
| | | Regional Administrator (Marc.Dapas@nrc.gov) |
| ML15009A452 SUNSI Review By: PElkmann ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/ DATE 1/7/15 1/7/15 Letter to Lou Cortopassi from Mark S. Haire, dated January 7, 2015
| |
| | |
| SUBJECT: FORT CALHOUN STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000285/2014501 | |
| | |
| DISTRIBUTION | |
| : Regional Administrator (Marc.Dapas@nrc.gov)
| |
| Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | | Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) |
| Acting DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) | | Acting DRP Director (Troy.Pruett@nrc.gov) |
| | Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov) |
| | DRS Director (Anton.Vegel@nrc.gov) |
| DRS Deputy Director (Jeff.Clark@nrc.gov) | | DRS Deputy Director (Jeff.Clark@nrc.gov) |
| Senior Resident Inspector (Max.Schneider@nrc.gov) | | Senior Resident Inspector (Max.Schneider@nrc.gov) |
| Senior Project Engineer, DRP (Bob.Hagar@nrc.gov) Project Engineer, DRP (Jan.Tice@nrc.gov) FCS Administrative Assistant (Janise.Schwee@nrc.gov) | | Senior Project Engineer, DRP (Bob.Hagar@nrc.gov) |
| | Project Engineer, DRP (Jan.Tice@nrc.gov) |
| | FCS Administrative Assistant (Janise.Schwee@nrc.gov) |
| RIV Public Affairs Officer (Victor.Dricks@nrc.gov) | | RIV Public Affairs Officer (Victor.Dricks@nrc.gov) |
| RIV Public Affairs Officer (Lara.Uselding@nrc.gov) | | RIV Public Affairs Officer (Lara.Uselding@nrc.gov) |
| NRR Project Manager (Fred.Lyon@nrc.gov) | | NRR Project Manager (Fred.Lyon@nrc.gov) |
| RIV Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) RIV RITS Coordinator (Marisa.Herrera@nrc.gov) | | RIV Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) |
| | RIV RITS Coordinator (Marisa.Herrera@nrc.gov) |
| RIV Regional Counsel (Karla.Fuller@nrc.gov) | | RIV Regional Counsel (Karla.Fuller@nrc.gov) |
| Congressional Affairs Officer (Jenny.Weil@nrc.gov) | | Congressional Affairs Officer (Jenny.Weil@nrc.gov) |
| RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | | RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) |
| | | OEMail Resource OEWEB Resource (Sue.Bogle@nrc.gov) |
| OEMail Resource OEWEB Resource (Sue.Bogle@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) | | Technical Support Assistant (Loretta.Williams@nrc.gov) |
| RIV/ETA: OEDO (Cayetano.Santos@nrc.gov) | | RIV/ETA: OEDO (Cayetano.Santos@nrc.gov) |
| | | RIV RSLO (Bill.Maier@nrc.gov) |
| RIV RSLO (Bill.Maier@nrc.gov) | |
| | |
| ACES (R4Enforcement.Resource@nrc.gov) | | ACES (R4Enforcement.Resource@nrc.gov) |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARIR 05000285/20240032024-10-29029 October 2024 NRC Inspection Report 05000285/2024003 LIC-24-0012, Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information2024-10-0707 October 2024 Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information LIC-24-0011, Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-00952024-10-0202 October 2024 Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-0095 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24243A1042024-09-12012 September 2024 Proposed Revision to the OPPD FCS DQAP - Request for Additional Information (License No. DPR-40, Docket Nos. 50-285, 72-054, and 71-0256) ML24255A0962024-09-12012 September 2024 License Amendment Request to Revise the License Termination Plan - Request Supplemental Information (License No. DPR-40, Docket No. 50-285) IR 05000285/20240022024-08-21021 August 2024 NRC Inspection Report 05000285/2024002 ML24235A0822024-08-10010 August 2024 Response to Fort Calhoun Station, Unit No. 1 - Phase 1 Final Status Survey Report to Support Approved License Termination Plan - Request for Additional Information - Request for Additional Information (EPID L-2024-DFR-0002) July 8, 2024 ML24180A2082024-07-0808 July 2024 Phase 1 Final Status Survey Reports Request for Additional Information Letter ML24183A3222024-07-0808 July 2024 Proposed Revision to the Omaha Public Power District Fort Calhoun Station Decommissioning Quality Assurance Plan - Acceptance Review LIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) IR 05000285/20240012024-06-0505 June 2024 NRC Inspection Report 05000285/2024001 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan ML24079A1702024-03-10010 March 2024 ISFSI, Unit 1 - 10 CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, 10 CFR 71.106 Quality Assurance Program Approval, Aging Management Review, Commitment Revisions and Revision of Updated Safe LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report ML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements IR 05000285/20230062023-12-21021 December 2023 NRC Inspection Report 05000285/2023006 LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information IR 05000285/20230052023-11-0202 November 2023 NRC Inspection Room 05000285/2023005 ML23276A0042023-09-28028 September 2023 U.S. EPA Response Letter to NRC Letter on Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites MOU - Fort Calhoun Station, Unit 1 – (License No. DPR-40, Docket No. 50-285) IR 05000285/20230042023-09-13013 September 2023 NRC Inspection Report 05000285/2023-004 LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 ML23234A2412023-08-18018 August 2023 Email - Letter to M Porath Re Ft Calhoun Unit 1 LTP EA Section 7 Informal Consultation Request ML23234A2392023-08-18018 August 2023 Letter to B Harisis Re Ft Calhoun Unit 1 LTP EA State of Nebraska Comment Request.Pdf IR 05000285/20230032023-07-10010 July 2023 – NRC Inspection Report 05000285/2023003 ML23082A2202023-06-26026 June 2023 Consultation on the Decommissioning of the Fort Calhoun Station Unit 1 Pressurized Water Reactor in Fort Calhoun, Nebraska ML23151A0032023-06-0505 June 2023 – Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 IR 05000285/20230022023-06-0505 June 2023 NRC Inspection Report 05000285/2023002 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000285/20230012023-02-24024 February 2023 NRC Inspection Report 05000285/2023001 LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML23020A0462023-01-19019 January 2023 Threatened and Endangered Species List: Nebraska Ecological Services Field Office IR 05000285/20220062023-01-0505 January 2023 NRC Inspection Report 05000285/2022-006 ML22357A0662022-12-30030 December 2022 Technical RAI Submittal Letter on License Amendment Request for Approval of License Termination Plan IR 05000285/20220052022-10-26026 October 2022 NRC Inspection Report 05000285/2022-005 ML22276A1052022-09-30030 September 2022 Conclusion of Consultation Under Section 106 NHPA for Ft. Calhoun Station LTP ML22258A2732022-09-29029 September 2022 Letter to John Swigart, SHPO; Re., Conclusion of Consultation Under Section 106 Hnpa Fort Calhoun Station Unit 1 ML22265A0262022-09-26026 September 2022 U.S. Nuclear Regulatory Commissions Analysis of Omaha Public Power Districts Decommissioning Status Report (License No. DPR-40, Docket No. 50-285) IR 05000285/20220042022-09-14014 September 2022 NRC Inspection Report 05000285/2022004 ML22138A1252022-08-0303 August 2022 Letter to Mr. Timothy Rhodd, Chairperson, Iowa Tribe of Kansas and Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1222022-08-0303 August 2022 Letter to Mr. John Shotton, Chairman, Otoe-Missouria Tribe of Indians, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1302022-08-0303 August 2022 Letter to Justin Wood, Principal Chief, Sac and Fox Nation, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22214A0922022-08-0303 August 2022 Letter to Stacy Laravie, Thpo, Ponca Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 2024-09-18
[Table view] |
Text
ary 7, 2015
SUBJECT:
FORT CALHOUN STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000285/2014501
Dear Mr. Cortopassi:
On December 31, 2014, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Fort Calhoun Station. This inspection began on January 1, 2014. Issuance of this letter closes NRC Inspection Report 05000285/2014501. The inspection results associated with the 2014-501 reports are documented in integrated Resident Inspector Reports 2014-002, 2014-003, 2014-004, and 2014-005.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket: 50-285 License: DPR-40 cc: Electronic Distribution
ML15009A452 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: PElkmann Yes No Non-Publicly Available Sensitive NRC-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/
DATE 1/7/15 1/7/15
Letter to Lou Cortopassi from Mark S. Haire, dated January 7, 2015 SUBJECT: FORT CALHOUN STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000285/2014501 DISTRIBUTION:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Max.Schneider@nrc.gov)
Senior Project Engineer, DRP (Bob.Hagar@nrc.gov)
Project Engineer, DRP (Jan.Tice@nrc.gov)
FCS Administrative Assistant (Janise.Schwee@nrc.gov)
RIV Public Affairs Officer (Victor.Dricks@nrc.gov)
RIV Public Affairs Officer (Lara.Uselding@nrc.gov)
NRR Project Manager (Fred.Lyon@nrc.gov)
RIV Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RIV RITS Coordinator (Marisa.Herrera@nrc.gov)
RIV Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
OEMail Resource OEWEB Resource (Sue.Bogle@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
RIV/ETA: OEDO (Cayetano.Santos@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)