ML15355A533: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
                              NUCLEAR REGULATORY COMMISSION
REGION III 2443 WARRENVILLE RD. SUIT
                                                  REGION III
E 210 LISLE, IL 60532
                                      2443 WARRENVILLE RD. SUITE 210
-4352 December 21, 2015
                                            LISLE, IL 60532-4352
EA-15-2 06  Mr. Peter A. Gardner
                                            December 21, 2015
Site Vice President
EA-15-206
Monticello Nuclear Generating Plant
Mr. Peter A. Gardner
Northern States Power Company, Minnesota
Site Vice President
2807 West County Road 75
Monticello Nuclear Generating Plant
Monticello, MN 55362
Northern States Power Company, Minnesota
-9637 SUBJECT: MONTICELLO
2807 West County Road 75
NUCLEAR GENERATING PLANT FOLLOW-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 050002
Monticello, MN 55362-9637
63/201500 7 Dear Mr. Gardner: This is a follow
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT FOLLOW-UP TO DISPUTED
-up letter to the U.S. Nuclear Regulatory Commission (NRC)
              VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
acknowledgement of disputed violation of NRC Inspection Report (IR) 05000263/2015007. Specifically, on October 28, 2015, the NRC acknowledged your letter
Dear Mr. Gardner:
sent to the NRC, dated October 2, 2015, that contested a Non
This is a follow-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement
-Cited Violation (NCV) documented in our  
of disputed violation of NRC Inspection Report (IR) 05000263/2015007. Specifically, on
IR issued on September 2, 2015. The contested NCV is "Failure to Review for Suitability of Application Safety
October 28, 2015, the NRC acknowledged your letter sent to the NRC, dated October 2, 2015,
-Related Relays Installed  
that contested a Non-Cited Violation (NCV) documented in our IR issued on September 2, 2015.
Beyond their Service Life."
The contested NCV is Failure to Review for Suitability of Application Safety-Related Relays
The NRC seeks to provide a
Installed Beyond their Service Life.
thorough response to disputed violations within 90 days of receipt of licensee's points of contention, as described in Section 2.2.8 of the NRC Enforcement Manual, Part I. However, the NRC review of this disputed violation is expected to take longer than 90 days because of ongoing activities related to the subject of th
The NRC seeks to provide a thorough response to disputed violations within 90 days of
is disputed violation.
receipt of licensees points of contention, as described in Section 2.2.8 of the NRC Enforcement
W e will inform you as soon as we complete our evaluation, which is expected to occur during the first quarter of calendar year 2016. In accordance with Title 10 of the Code of Federal Regulations
Manual, Part I. However, the NRC review of this disputed violation is expected to take longer
  (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy  
than 90 days because of ongoing activities related to the subject of this disputed violation. We
of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
will inform you as soon as we complete our evaluation, which is expected to occur during the
first quarter of calendar year 2016.
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
-rm/adams.html
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
(the Public Electronic Reading Room).
of this letter will be available electronically for public inspection in the NRCs Public Document
Sincerely, /RA Benny Jose Acting for/
Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
  Christine A. Lipa, Chief Engineering
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC
Branch 2 Division of Reactor Safety Docket No. 50
Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-263 License No. DPR
                                                  Sincerely,
-22 cc: Distribution via LISTSERV
                                                  /RA Benny Jose Acting for/
 
                                                  Christine A. Lipa, Chief
December 21, 2015
                                                  Engineering Branch 2
EA-15-206 Mr. Peter A. Gardner
                                                  Division of Reactor Safety
Site Vice President
Docket No. 50-263
Monticello Nuclear Generating Plant
License No. DPR-22
Northern States Power Company, Minnesota
cc: Distribution via LISTSERV
2807 West County Road 75
 
Monticello, MN 55362
                                                                  December 21, 2015
-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT FOLLOW
EA-15-206
-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
Mr. Peter A. Gardner
Dear Mr. Gardner:
Site Vice President
This is a follow
Monticello Nuclear Generating Plant
-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement of disputed violation of NRC Inspection Report (IR) 05000263/2015007. Specifically, on October 28, 2015, the NRC acknowledged your letter sent to the NRC, dated October 2, 2015, that contested a Non
Northern States Power Company, Minnesota
-Cited Violation (NCV) documented in our IR issued on September
2807 West County Road 75
2, 2015. The contested NCV is "Failure to Review for Suitability of Application Safety
Monticello, MN 55362-9637
-Related Relays Installed Beyond their Service Life."
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT FOLLOW-UP TO DISPUTED
The NRC seeks to provide a thorough response to disputed violations within 90 days of receipt
                  VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
of licensee's points of contention, as described in Section 2.2.8 of the NRC Enforcement Manual, Part I. However, the NRC review of this disputed violation is expected to take longer than 90 days because of ongoing activities related to the subject of this disputed violation. We will inform you
Dear Mr. Gardner:
as soon as we complete our evaluation, which is expected to occur during the first quarter of calendar year 2016.
This is a follow-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement of disputed
In accordance with Title 10 of the Code of Federal Regulations
violation of NRC Inspection Report (IR) 05000263/2015007. Specifically, on October 28, 2015, the NRC
  (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of
acknowledged your letter sent to the NRC, dated October 2, 2015, that contested a Non-Cited Violation
this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
(NCV) documented in our IR issued on September 2, 2015. The contested NCV is Failure to Review for
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
Suitability of Application Safety-Related Relays Installed Beyond their Service Life.
-rm/adams.html
The NRC seeks to provide a thorough response to disputed violations within 90 days of receipt of
(the Public Electronic Reading Room).
licensees points of contention, as described in Section 2.2.8 of the NRC Enforcement Manual, Part I.
Sincerely, /RA Benny Jose Acting for/
However, the NRC review of this disputed violation is expected to take longer than 90 days because of
Christine A. Lipa, Chief  
ongoing activities related to the subject of this disputed violation. We will inform you as soon as we
complete our evaluation, which is expected to occur during the first quarter of calendar year 2016.
Engineering
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections,
Branch 2 Division of Reactor Safety
Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be
Docket No. 50
available electronically for public inspection in the NRCs Public Document Room or from the Publicly
-263 License No. DPR
Available Records (PARS) component of the NRC's Agencywide Documents Access and Management
-22 cc: Distribution via LISTSERV
System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
DISTRIBUTION
rm/adams.html (the Public Electronic Reading Room).
: Janelle Jessie
                                                                          Sincerely,
RidsNrrDorlLpl3
                                                                          /RA Benny Jose Acting for/
-1 Resource
                                                                          Christine A. Lipa, Chief
  RidsNrrPMMonticello
                                                                          Engineering Branch 2
RidsNrrDirsIrib Resource
                                                                          Division of Reactor Safety
Cynthia Pederson
Docket No. 50-263
Darrell Roberts
License No. DPR-22
Richard Skokowski
cc: Distribution via LISTSERV
Allan Barker
DISTRIBUTION:
Carole Ariano
Janelle Jessie                                             Darrell Roberts                                          DRPIII
Linda Linn
RidsNrrDorlLpl3-1 Resource                                 Richard Skokowski                                       DRSIII
DRPIII DRSIII Jim Clay Carmen Olteanu
RidsNrrPMMonticello                                        Allan Barker                                             Jim Clay
ADAMS Accession Number ML15355A533
RidsNrrDirsIrib Resource                                  Carole Ariano                                           Carmen Olteanu
  Publicly Available
Cynthia Pederson                                          Linda Linn
  Non-Publicly Available
ADAMS Accession Number ML15355A533
  Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
    Publicly Available                           Non-Publicly Available                   Sensitive               Non-Sensitive
OFFICE RIII RIII RIII RIII NAME BJose for NFeliz-Adorno:cl BJose for CLipa   DATE 12/21/15 12/21/15   OFFICIAL RECORD COPY
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
  OFFICE             RIII                                       RIII                         RIII                         RIII
  NAME               BJose for NFeliz-Adorno:cl BJose for CLipa
  DATE               12/21/15                                   12/21/15
                                                            OFFICIAL RECORD COPY
}}
}}

Revision as of 03:51, 31 October 2019

Ltr 12/21/15 Monticello Nuclear Generating Plant Follow-Up to Disputed Violations of NRC Inspection Report 05000263/2015007 (Nja)
ML15355A533
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/21/2015
From: Christine Lipa
NRC/RGN-III/DRS/EB2
To: Gardner P
Northern States Power Co
References
EA-15-206 IR 2015007
Download: ML15355A533 (2)


See also: IR 05000263/2015007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

December 21, 2015

EA-15-206

Mr. Peter A. Gardner

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362-9637

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT FOLLOW-UP TO DISPUTED

VIOLATION OF NRC INSPECTION REPORT 05000263/2015007

Dear Mr. Gardner:

This is a follow-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement

of disputed violation of NRC Inspection Report (IR) 05000263/2015007. Specifically, on

October 28, 2015, the NRC acknowledged your letter sent to the NRC, dated October 2, 2015,

that contested a Non-Cited Violation (NCV) documented in our IR issued on September 2, 2015.

The contested NCV is Failure to Review for Suitability of Application Safety-Related Relays

Installed Beyond their Service Life.

The NRC seeks to provide a thorough response to disputed violations within 90 days of

receipt of licensees points of contention, as described in Section 2.2.8 of the NRC Enforcement

Manual, Part I. However, the NRC review of this disputed violation is expected to take longer

than 90 days because of ongoing activities related to the subject of this disputed violation. We

will inform you as soon as we complete our evaluation, which is expected to occur during the

first quarter of calendar year 2016.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC

Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA Benny Jose Acting for/

Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-263

License No. DPR-22

cc: Distribution via LISTSERV

December 21, 2015

EA-15-206

Mr. Peter A. Gardner

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362-9637

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT FOLLOW-UP TO DISPUTED

VIOLATION OF NRC INSPECTION REPORT 05000263/2015007

Dear Mr. Gardner:

This is a follow-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement of disputed

violation of NRC Inspection Report (IR) 05000263/2015007. Specifically, on October 28, 2015, the NRC

acknowledged your letter sent to the NRC, dated October 2, 2015, that contested a Non-Cited Violation

(NCV) documented in our IR issued on September 2, 2015. The contested NCV is Failure to Review for

Suitability of Application Safety-Related Relays Installed Beyond their Service Life.

The NRC seeks to provide a thorough response to disputed violations within 90 days of receipt of

licensees points of contention, as described in Section 2.2.8 of the NRC Enforcement Manual, Part I.

However, the NRC review of this disputed violation is expected to take longer than 90 days because of

ongoing activities related to the subject of this disputed violation. We will inform you as soon as we

complete our evaluation, which is expected to occur during the first quarter of calendar year 2016.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections,

Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records (PARS) component of the NRC's Agencywide Documents Access and Management

System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA Benny Jose Acting for/

Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-263

License No. DPR-22

cc: Distribution via LISTSERV

DISTRIBUTION:

Janelle Jessie Darrell Roberts DRPIII

RidsNrrDorlLpl3-1 Resource Richard Skokowski DRSIII

RidsNrrPMMonticello Allan Barker Jim Clay

RidsNrrDirsIrib Resource Carole Ariano Carmen Olteanu

Cynthia Pederson Linda Linn

ADAMS Accession Number ML15355A533

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII RIII RIII

NAME BJose for NFeliz-Adorno:cl BJose for CLipa

DATE 12/21/15 12/21/15

OFFICIAL RECORD COPY