{{#Wiki_filter:YEAR 6 YEAR 5 YEAR 4 YEAR 3 YEAR 2 YEAR 1 YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 727170606867666564636261605958575655545352515049484746454443424140393837 363534333231302928272625242322212019181716151413121110 9 8 7 6 5 4 3 2 1 1 2 3 4 5 6 7 8 91011121314151617181920212223242526272829303132333435363738394041424344454647484950515253545556 PLANT MANAGER NUMBER OF PERSONNEL IN CL 55 F C TIDNS FOR INITIAL STAFF AND UN T STARTUP CONSTRUCTION PERMIT I PERSONNEL CQUISITION 2 DESIGN FOLLOIN 3 NUCLEAR PLANT OBSERVATION NUCLEAR I PLANT OBSER VATION NUCLEAR FUND 8 THEORY 2.DESIGN IL CONSTR UCTION FOLLOIN CE TECH SUBMIT FEAR ESTABLISH ADMINISTRATIVE 8 PFIOCEOURE SYSTEM 2 STARTUP AND TESTING 3.ASSUMES NORMAL FUNCTION COLD HYDRO UNIT I OPEeATING FUEL pERMIT LOADING UNIT I COMNIERC AL OPERATION UNIT I UNITS OPERATION NUMBER OF PERSONNEL IN CLASSIFICATIONS FOR TING COLD HYDRO UNIT 2 FUEL LOADING UNIT 2 COMMERCIAL OPERATION UNIT 2 NUMBER QF PERSONNEL IN CLASSIFIC4TIONS FOR THREE UNITS OPER ATION COLD HYDRO UNIT 3 FUEL LOADING UN I T 3 CDMMERCIAL OPERATION UNIT 3 ASSISTANT PLANT MANAGER SL I I.PERSONNEL ACQUISITION 2.DESIGN 8 CONSTRUCTION FOLLOW 3.ESTABLISH TRAiNING REQUIRE MENTS&SCHEDULES 5 M TRNG i.PERSONNEL ACQUISITION 8 TRAINING 2 F NAL MANUAL 6 PROCEDURE PREPARATION 3.STARTUP 6 TESTING 4 ASSUME NORMAL FU CTION STARTUP AND TESTING INTENSIVE ONSITE TRAINING FINAL MANUAL PREP4RATION ASSUME NORMAL FUNCTION NOTES NUMBER OF PERSONNEL IN CLASSIFICATION A NUMBER OF ASSISTANTS IN CLASSIFICATION TECHNICAL SUPERVISOR SL I SAME AS ABOVE SAME AS ABOVE SIM TRNGI 5 EASABO E CL OPERATIONS SUPERVISOR SL SAME AS ABOVE SAME AS ABDVE 5 I M~TRNG SAME AS A6OVE CL SL RO CL HL SENIOR REACTOR OPERATOR LICENSE REACTOR OPERATOR LICENSE COLD LICENSE HOT LICENSE MAINTENANCE SUPERVISOR TECHNICAL ASSISTANT SL 1 sAME as aeovE FEAR&TECHNICAL SPECIFICATION PREPARATION 2 DESIGN&CONSTRUCTION FOLLOFI 3.PERSONNEL ACQUISITION SAME AS A6OUE saME as Aeovc 5 I M TANG 5 E 5 E AS 48OVE 1A HEALTH, SAFETY AND CHEMIST R Y I SUPERVISOR I PEASONNEL ACQUISITION 2.FSAe 8 TEC NICAL SPECIFICATION 3 ESTABLIS TRAINING REQUIREMENT5 B SCHEDULES SAME AS A6OVE NUCLEAR ENGINEER ORIENT FUEL MANAGEMENT TRA NING 2 COMPUTER TRAINING 3 CONSTRUCTION FOLLOIN 5 I M TRNG~sAME As&BOY E IA IA MECHANICAL ENGINEER I INSERVICE INSPECTION 2 STARTUPS TESTING 3.FINAL MANUAL PREPARATION 4.ASSUME NORMAL FUNCTION IA ELECTRICAL ENGINEER I PERSONNEL ACQUISITION 2 FINAL MANUALPREPARATION 3.STARTUP&TESTING 4 ASSUME NORMAL F UNCT ON IA IA INSTRUMENT AND CONTROLS ENGINEER 5 ME AS A6QVE SHIFT SUPERVISOR SL 6 I PERSONNEL ACQUISITION 2 PREPARAT ON OF TEST OPERATING PROCEDURES 3 CONSTRUCTION FOLLOW MULATOR RAINING 5 E 5A I OA QUALITY ASSURANCE ENGINEER PREPARE OPERATIONAL MANUAL 2 ASSUME NORMAL FUNCTION 8 HEALTH PHYSICS SUPERVISOR CHEMISTRY SUPERVISOR I.EMERGENCY PLANPREPARATION 2 PREPARATION OF TESTS OPERATI PROCEDURES 3 FINAL MANUAL PREPARATION 4.ASSUME NORMAL FUNCTIDN NG PREPARATION OF TESTS OPERATI PROCEDURES I 2.STARTUP6 TESTING 3 FINAL MANUAL PREPARATION 4.ASSUME NORMAL FUNCTION SENIOR CONTROL OPERATOR RD 5 NUCLEAR PLANT QBSERVA TION~I ORIENT I I I NUCLEAR FUND j*THEORY 2 DESIGN 6 CONSTRUCTION FOLLOW C E TECH IEIM TRNG PREPARATION OF TEST 6 I OPERATING PFIQCEDURES 4 2 CONSTRUCTION FOLLOW I I INTENSIVE QNSITE TRAINING 2 STARTUP 8, TESTING 3 F NAL MANUAL PFIEPARATION 4 ASSUME NORMAL FUNCTION CL 10 14 Arizona Nuclear Power Project Palo Verde Nuclear Generating Station Units 1, 2&3 CHANGE ADMINISTRATIVE SUPERVISOR COMPUTER ENGINEER I I ESTABLIS ADMINISTRATIVE PROCEDURES 2 ASSISTANT SUPERVISION 3 ASSUME NORMAL FUNCTIONS COMPUTER TRAIN NG 2 STARTUP 8 TESTING I 3 ASSUME NORMAL FUNCTION STAFFING AND TRAINING PROGRAIII (Stseet 1 of 2)Figure 13.2-1 10407 I IA TQJLB 216 July 21, 1975 Amendment 9}}
{{#Wiki_filter:YEAR 6                               YEAR 5                                 YEAR 4                                       YEAR 3                                     YEAR 2                         YEAR                                 YEAR                       YEAR 2                           YEAR 3           YEAR 4 1                                  1                                                                                                YEAR 5 727170606867666564636261605958575655545352515049484746454443424140393837                                                 363534333231302928272625242322212019181716151413121110                                 9 8 7 6 5 4 3   2 1   1 2 3 4 5 6 7     8 91011121314151617181920212223242526272829303132333435363738394041424344454647484950515253545556 CONSTRUCTION                                                                                                  SUBMIT                                                COLD      OPEeATING  FUEL            COMNIERC AL                    COLD        FUEL            COMMERCIAL              COLD        FUEL PERMIT                                                                                                                                                                                                                                                                                                                  CDMMERCIAL FEAR                                                  HYDRO    pERMIT      LOADING        OPERATION                      HYDRO        LOADING        OPERATION                HYDRO      LOADING    OPERATION UNIT I                UNIT I          UNIT I                          UNIT 2      UNIT 2          UNIT 2                  UNIT 3      UN IT 3    UNIT 3 NUMBER OF PERSONNEL IN                                    NUMBER QF PERSONNEL IN NUMBER OF PERSONNEL IN                                               NUCLEAR          I                                                                                                                                                      CLASSIFICATIONS FOR TING                                  CLASSIFIC4TIONS FOR THREE CL 55 F C TIDNS FOR INITIAL                                           PLANT OBSER                                                                                                                                                              UNITS OPERATION                                            UNITS OPER ATION STAFF AND UN T STARTUP                                               VATION                                        CE TECH I PERSONNEL CQUISITION                                                                                 ESTABLISH ADMINISTRATIVE 2 DESIGN FOLLOIN                                                 NUCLEAR FUND 8 PFIOCEOURE SYSTEM 3 NUCLEAR PLANT                                                 8 THEORY 2 STARTUP AND TESTING OBSERVATION                                                2. DESIGN IL CONSTR PLANT MANAGER                                                                                                                                                  3. ASSUMES NORMAL FUNCTION UCTION FOLLOIN I. PERSONNEL ACQUISITION                                                                                           5 M TRNG
: 2. DESIGN 8 CONSTRUCTION FOLLOW
: i. PERSONNEL ACQUISITION 8 TRAINING             STARTUP AND TESTING 2     F NAL MANUAL6 PROCEDURE                     INTENSIVE ONSITE TRAINING                                                                                                                                                                        NOTES
: 3. ESTABLISH TRAiNING REQUIRE                                                                                                    FINAL MANUALPREP4RATION                                                                                                                                                                                    NUMBER OF PERSONNEL IN CLASSIFICATION I                                                                                                                            PREPARATION MENTS & SCHEDULES                                                                                                            ASSUME NORMAL FUNCTION ASSISTANT PLANT MANAGER        SL                                                                                                                          3. STARTUP 6 TESTING 4 ASSUME NORMAL FU CTION                                                                                                                                                                                                                                   A   NUMBER OF ASSISTANTS IN CLASSIFICATION SAME AS ABOVE                                                     SAME AS ABOVE                                   5   EASABO   E                 CL I                                                                                                                                                SIM TECHNICAL SUPERVISOR           SL TRNGI SL     SENIOR REACTOR OPERATOR LICENSE SAME AS ABOVE                                                     SAME AS ABDVE                                   SAME AS A6OVE                 CL                                                                                                                                                                     RO     REACTOR OPERATOR LICENSE OPERATIONS SUPERVISOR        SL
                                                                                                                                                                                                  ~    5IM TRNG                                                                                                                                                                                                                            CL HL COLD LICENSE HOT LICENSE sAME as aeovE                                                     SAME AS A6OUE                                    5    E  5 MAINTENANCE SUPERVISOR                                                                                                                                                                                                                                                                                                                      1A FEAR & TECHNICAL SPECIFICATION PREPARATION 2   DESIGN & CONSTRUCTION                                                         saME as Aeovc                                         E AS 48OVE 1
TECHNICAL ASSISTANT            SL                                                FOLLOFI                                                                                              5 M I
: 3. PERSONNEL ACQUISITION                                                                                TANG I   PEASONNEL ACQUISITION
: 2. FSAe 8 TEC NICAL SPECIFICATION HEALTH, SAFETY AND CHEMIST R Y                                              3 ESTABLIS     TRAINING REQUIREMENT5                                               SAME AS A6OVE I                                          B SCHEDULES SUPERVISOR ORIENT                                               FUEL MANAGEMENT TRA NING 2   COMPUTER TRAINING NUCLEAR ENGINEER 3   CONSTRUCTION FOLLOIN 5 M I
TRNG   ~                   sAME As &BOYE IA                                                           IA I   INSERVICE INSPECTION 2   STARTUPS TESTING
: 3. FINAL MANUALPREPARATION MECHANICALENGINEER                                                                                                                                            4. ASSUME NORMAL FUNCTION                                                                                         IA I   PERSONNEL ACQUISITION 2 FINAL MANUALPREPARATION
: 3. STARTUP& TESTING ELECTRICAL ENGINEER                                                                                                                                          4     ASSUME NORMAL F UNCT ON                                                                                     IA                                                           IA INSTRUMENT AND CONTROLS                                                                                                                                       5   ME AS A6QVE ENGINEER MULATOR RAINING I   PERSONNEL ACQUISITION 2 PREPARAT ON OF TEST                             5  E 6                                                                                                                            OPERATING PROCEDURES SHIFT SUPERVISOR              SL                                                                                                                                                                                                                                                5A                                                          I OA 3 CONSTRUCTION FOLLOW PREPARE OPERATIONAL MANUAL 2     ASSUME NORMAL FUNCTION QUALITYASSURANCE ENGINEER                                                                                                                                                                  8 I. EMERGENCY PLANPREPARATION 2     PREPARATION OF TESTS OPERATI NG PROCEDURES HEALTH PHYSICS SUPERVISOR                                                                                                                                    3     FINAL MANUALPREPARATION
: 4. ASSUME NORMAL FUNCTIDN PREPARATION OF TESTS OPERATI PROCEDURES I       2. STARTUP6 TESTING CHEMISTRY SUPERVISOR                                                                                                                                        3 FINAL MANUALPREPARATION
                                                                                                                              ~
: 4. ASSUME NORMAL FUNCTION NUCLEAR PLANT QBSERVA TION                                               C E  TECH                            IEIM NUCLEAR FUND                                                      TRNG        I INTENSIVE QNSITE TRAINING I I 5
* THEORY                           PREPARATION OF TEST 6 OPERATING PFIQCEDURES         4 2 STARTUP 8, TESTING F NAL MANUALPFIEPARATION CL                               10                                                           14 Arizona Nuclear Power Project SENIOR CONTROL OPERATOR        RD                                                                    I ORIENT I  j 2    DESIGN 6 CONSTRUCTION    I                                                    3 FOLLOW                      2    CONSTRUCTION FOLLOW            I            4 ASSUME NORMAL FUNCTION                                                                                                                                                                                            Palo Verde Nuclear Generating Station I  ESTABLIS ADMINISTRATIVEPROCEDURES Units 1, 2 & 3 I     2   ASSISTANT SUPERVISION ADMINISTRATIVESUPERVISOR                                                                                              3   ASSUME NORMAL FUNCTIONS STAFFING AND TRAINING PROGRAIII COMPUTER TRAIN NG (Stseet 1 of 2) 2   STARTUP 8 TESTING CHANGE            COMPUTER ENGINEER                                                                                                                                                                        I     3   ASSUME NORMAL FUNCTION                                                                                                                                                                                                         Figure 13.2-1 10407 I IA                                                                                                                                                                                                                                                                                                                                                                                                                   July 21, 1975                                 Amendment 9 TQJLB 216}}

Latest revision as of 21:34, 20 October 2019

Figure 13.2-1, Amendment 9 Staff and Training Program. Sheet 1 of 2
ML18192C070
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/21/1975
From:
Arizona Nuclear Power Project
To:
Office of Nuclear Reactor Regulation
References
13.2-1
Download: ML18192C070 (1)


Text

YEAR 6 YEAR 5 YEAR 4 YEAR 3 YEAR 2 YEAR YEAR YEAR 2 YEAR 3 YEAR 4 1 1 YEAR 5 727170606867666564636261605958575655545352515049484746454443424140393837 363534333231302928272625242322212019181716151413121110 9 8 7 6 5 4 3 2 1 1 2 3 4 5 6 7 8 91011121314151617181920212223242526272829303132333435363738394041424344454647484950515253545556 CONSTRUCTION SUBMIT COLD OPEeATING FUEL COMNIERC AL COLD FUEL COMMERCIAL COLD FUEL PERMIT CDMMERCIAL FEAR HYDRO pERMIT LOADING OPERATION HYDRO LOADING OPERATION HYDRO LOADING OPERATION UNIT I UNIT I UNIT I UNIT 2 UNIT 2 UNIT 2 UNIT 3 UN IT 3 UNIT 3 NUMBER OF PERSONNEL IN NUMBER QF PERSONNEL IN NUMBER OF PERSONNEL IN NUCLEAR I CLASSIFICATIONS FOR TING CLASSIFIC4TIONS FOR THREE CL 55 F C TIDNS FOR INITIAL PLANT OBSER UNITS OPERATION UNITS OPER ATION STAFF AND UN T STARTUP VATION CE TECH I PERSONNEL CQUISITION ESTABLISH ADMINISTRATIVE 2 DESIGN FOLLOIN NUCLEAR FUND 8 PFIOCEOURE SYSTEM 3 NUCLEAR PLANT 8 THEORY 2 STARTUP AND TESTING OBSERVATION 2. DESIGN IL CONSTR PLANT MANAGER 3. ASSUMES NORMAL FUNCTION UCTION FOLLOIN I. PERSONNEL ACQUISITION 5 M TRNG

2. DESIGN 8 CONSTRUCTION FOLLOW
i. PERSONNEL ACQUISITION 8 TRAINING STARTUP AND TESTING 2 F NAL MANUAL6 PROCEDURE INTENSIVE ONSITE TRAINING NOTES
3. ESTABLISH TRAiNING REQUIRE FINAL MANUALPREP4RATION NUMBER OF PERSONNEL IN CLASSIFICATION I PREPARATION MENTS & SCHEDULES ASSUME NORMAL FUNCTION ASSISTANT PLANT MANAGER SL 3. STARTUP 6 TESTING 4 ASSUME NORMAL FU CTION A NUMBER OF ASSISTANTS IN CLASSIFICATION SAME AS ABOVE SAME AS ABOVE 5 EASABO E CL I SIM TECHNICAL SUPERVISOR SL TRNGI SL SENIOR REACTOR OPERATOR LICENSE SAME AS ABOVE SAME AS ABDVE SAME AS A6OVE CL RO REACTOR OPERATOR LICENSE OPERATIONS SUPERVISOR SL

~ 5IM TRNG CL HL COLD LICENSE HOT LICENSE sAME as aeovE SAME AS A6OUE 5 E 5 MAINTENANCE SUPERVISOR 1A FEAR & TECHNICAL SPECIFICATION PREPARATION 2 DESIGN & CONSTRUCTION saME as Aeovc E AS 48OVE 1

TECHNICAL ASSISTANT SL FOLLOFI 5 M I

3. PERSONNEL ACQUISITION TANG I PEASONNEL ACQUISITION
2. FSAe 8 TEC NICAL SPECIFICATION HEALTH, SAFETY AND CHEMIST R Y 3 ESTABLIS TRAINING REQUIREMENT5 SAME AS A6OVE I B SCHEDULES SUPERVISOR ORIENT FUEL MANAGEMENT TRA NING 2 COMPUTER TRAINING NUCLEAR ENGINEER 3 CONSTRUCTION FOLLOIN 5 M I

TRNG ~ sAME As &BOYE IA IA I INSERVICE INSPECTION 2 STARTUPS TESTING

3. FINAL MANUALPREPARATION MECHANICALENGINEER 4. ASSUME NORMAL FUNCTION IA I PERSONNEL ACQUISITION 2 FINAL MANUALPREPARATION
3. STARTUP& TESTING ELECTRICAL ENGINEER 4 ASSUME NORMAL F UNCT ON IA IA INSTRUMENT AND CONTROLS 5 ME AS A6QVE ENGINEER MULATOR RAINING I PERSONNEL ACQUISITION 2 PREPARAT ON OF TEST 5 E 6 OPERATING PROCEDURES SHIFT SUPERVISOR SL 5A I OA 3 CONSTRUCTION FOLLOW PREPARE OPERATIONAL MANUAL 2 ASSUME NORMAL FUNCTION QUALITYASSURANCE ENGINEER 8 I. EMERGENCY PLANPREPARATION 2 PREPARATION OF TESTS OPERATI NG PROCEDURES HEALTH PHYSICS SUPERVISOR 3 FINAL MANUALPREPARATION
4. ASSUME NORMAL FUNCTIDN PREPARATION OF TESTS OPERATI PROCEDURES I 2. STARTUP6 TESTING CHEMISTRY SUPERVISOR 3 FINAL MANUALPREPARATION

~

4. ASSUME NORMAL FUNCTION NUCLEAR PLANT QBSERVA TION C E TECH IEIM NUCLEAR FUND TRNG I INTENSIVE QNSITE TRAINING I I 5
  • THEORY PREPARATION OF TEST 6 OPERATING PFIQCEDURES 4 2 STARTUP 8, TESTING F NAL MANUALPFIEPARATION CL 10 14 Arizona Nuclear Power Project SENIOR CONTROL OPERATOR RD I ORIENT I j 2 DESIGN 6 CONSTRUCTION I 3 FOLLOW 2 CONSTRUCTION FOLLOW I 4 ASSUME NORMAL FUNCTION Palo Verde Nuclear Generating Station I ESTABLIS ADMINISTRATIVEPROCEDURES Units 1, 2 & 3 I 2 ASSISTANT SUPERVISION ADMINISTRATIVESUPERVISOR 3 ASSUME NORMAL FUNCTIONS STAFFING AND TRAINING PROGRAIII COMPUTER TRAIN NG (Stseet 1 of 2) 2 STARTUP 8 TESTING CHANGE COMPUTER ENGINEER I 3 ASSUME NORMAL FUNCTION Figure 13.2-1 10407 I IA July 21, 1975 Amendment 9 TQJLB 216