ML18192C070
| ML18192C070 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/21/1975 |
| From: | Arizona Nuclear Power Project |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| 13.2-1 | |
| Download: ML18192C070 (1) | |
Text
YEAR 6 YEAR 5 YEAR 4 YEAR 3 YEAR 2 YEAR 1
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 727170606867666564636261605958575655545352515049484746454443424140393837 363534333231302928272625242322212019181716151413121110 9
8 7
6 5
4 3
2 1
1 2
3 4
5 6
7 8 91011121314151617181920212223242526272829303132333435363738394041424344454647484950515253545556 PLANT MANAGER NUMBER OF PERSONNEL IN CL 55 F C TIDNS FOR INITIAL STAFF AND UN T STARTUP CONSTRUCTION PERMIT I
PERSONNEL CQUISITION 2
DESIGN FOLLOIN 3
NUCLEAR PLANT OBSERVATION NUCLEAR I
PLANT OBSER VATION NUCLEAR FUND 8 THEORY 2.
DESIGN IL CONSTR UCTION FOLLOIN CE TECH SUBMIT FEAR ESTABLISH ADMINISTRATIVE 8 PFIOCEOURE SYSTEM 2
STARTUP AND TESTING 3.
ASSUMES NORMAL FUNCTION COLD HYDRO UNIT I OPEeATING FUEL pERMIT LOADING UNIT I COMNIERC AL OPERATION UNIT I UNITS OPERATION NUMBER OF PERSONNEL IN CLASSIFICATIONS FOR TING COLD HYDRO UNIT 2 FUEL LOADING UNIT 2 COMMERCIAL OPERATION UNIT 2 NUMBER QF PERSONNEL IN CLASSIFIC4TIONS FOR THREE UNITS OPER ATION COLD HYDRO UNIT 3 FUEL LOADING UN I T 3 CDMMERCIAL OPERATION UNIT 3 ASSISTANT PLANT MANAGER SL I
I. PERSONNEL ACQUISITION 2.
DESIGN 8 CONSTRUCTION FOLLOW 3.
ESTABLISH TRAiNINGREQUIRE MENTS & SCHEDULES 5 M TRNG
- i. PERSONNEL ACQUISITION8 TRAINING 2
F NALMANUAL6 PROCEDURE PREPARATION 3.
STARTUP 6 TESTING 4
ASSUME NORMAL FU CTION STARTUP AND TESTING INTENSIVE ONSITE TRAINING FINALMANUALPREP4RATION ASSUME NORMAL FUNCTION NOTES NUMBER OF PERSONNEL IN CLASSIFICATION A
NUMBER OF ASSISTANTS IN CLASSIFICATION TECHNICALSUPERVISOR SL I
SAME AS ABOVE SAME AS ABOVE SIM TRNGI 5
EASABO E
CL OPERATIONS SUPERVISOR SL SAME AS ABOVE SAME AS ABDVE 5 I M
~ TRNG SAME AS A6OVE CL SL RO CL HL SENIOR REACTOR OPERATOR LICENSE REACTOR OPERATOR LICENSE COLD LICENSE HOT LICENSE MAINTENANCESUPERVISOR TECHNICALASSISTANT SL 1
sAME as aeovE FEAR & TECHNICAL SPECIFICATION PREPARATION 2
DESIGN & CONSTRUCTION FOLLOFI 3.
PERSONNEL ACQUISITION SAME AS A6OUE saME as Aeovc 5
I M TANG 5
E 5
E AS 48OVE 1A HEALTH, SAFETY AND CHEMISTR Y I
SUPERVISOR I
PEASONNEL ACQUISITION 2.
FSAe 8 TEC NICAL SPECIFICATION 3
ESTABLIS TRAINING REQUIREMENT5 B SCHEDULES SAME AS A6OVE NUCLEAR ENGINEER ORIENT FUEL MANAGEMENTTRA NING 2
COMPUTER TRAINING 3
CONSTRUCTION FOLLOIN 5
I M TRNG~
sAME As &BOYE IA IA MECHANICALENGINEER I
INSERVICE INSPECTION 2
STARTUPS TESTING
- 3. FINAL MANUALPREPARATION 4.
ASSUME NORMAL FUNCTION IA ELECTRICAL ENGINEER I
PERSONNEL ACQUISITION 2
FINAL MANUALPREPARATION 3.
STARTUP& TESTING 4
ASSUME NORMAL F UNCT ON IA IA INSTRUMENT AND CONTROLS ENGINEER 5
ME AS A6QVE SHIFT SUPERVISOR SL 6
I PERSONNEL ACQUISITION 2
PREPARAT ON OF TEST OPERATING PROCEDURES 3
CONSTRUCTION FOLLOW MULATOR RAINING 5
E 5A IOA QUALITYASSURANCE ENGINEER PREPARE OPERATIONALMANUAL 2
ASSUME NORMAL FUNCTION 8
HEALTHPHYSICS SUPERVISOR CHEMISTRY SUPERVISOR I. EMERGENCY PLANPREPARATION 2
PREPARATION OF TESTS OPERATI PROCEDURES 3
FINAL MANUALPREPARATION 4.
ASSUME NORMAL FUNCTIDN NG PREPARATION OF TESTS OPERATI PROCEDURES I
- 2. STARTUP6 TESTING 3
FINAL MANUALPREPARATION 4.
ASSUME NORMAL FUNCTION SENIOR CONTROL OPERATOR RD 5
NUCLEAR PLANT QBSERVATION~
I ORIENT I I I NUCLEAR FUND j
- THEORY 2
DESIGN 6 CONSTRUCTION FOLLOW C E TECH IEIM TRNG PREPARATION OF TEST 6 I
OPERATING PFIQCEDURES 4
2 CONSTRUCTION FOLLOW I
I INTENSIVE QNSITE TRAINING 2
STARTUP 8, TESTING 3
F NAL MANUALPFIEPARATION 4
ASSUME NORMAL FUNCTION CL 10 14 Arizona Nuclear Power Project Palo Verde Nuclear Generating Station Units 1, 2 & 3 CHANGE ADMINISTRATIVESUPERVISOR COMPUTER ENGINEER I
I ESTABLIS ADMINISTRATIVEPROCEDURES 2
ASSISTANT SUPERVISION 3
ASSUME NORMAL FUNCTIONS COMPUTER TRAIN NG 2
STARTUP 8 TESTING I
3 ASSUME NORMAL FUNCTION STAFFING AND TRAINING PROGRAIII (Stseet 1 of 2)
Figure 13.2-1 10407 I IA TQJLB 216 July 21, 1975 Amendment 9