IR 05000285/2014501: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:January 7, 2015
{{#Wiki_filter:ary 7, 2015


==SUBJECT:==
==SUBJECT:==

Revision as of 15:50, 14 July 2019

NRC Emergency Preparedness Annual Inspection Report 05000285/2014501
ML15009A452
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/07/2015
From: Mark Haire
Plant Support Branch-1
To: Cortopassi L
Omaha Public Power District
References
IR 2014501
Download: ML15009A452 (3)


Text

ary 7, 2015

SUBJECT:

FORT CALHOUN STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000285/2014501

Dear Mr. Cortopassi:

On December 31, 2014, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Fort Calhoun Station. This inspection began on January 1, 2014. Issuance of this letter closes NRC Inspection Report 05000285/2014501. The inspection results associated with the 2014-501 reports are documented in integrated Resident Inspector Reports 2014-002, 2014-003, 2014-004, and 2014-005.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety

Docket: 50-285 License: DPR-40

cc: Electronic Distribution UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511

ML15009A452 SUNSI Review By: PElkmann ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/ DATE 1/7/15 1/7/15 Letter to Lou Cortopassi from Mark S. Haire, dated January 7, 2015

SUBJECT: FORT CALHOUN STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000285/2014501

DISTRIBUTION

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Max.Schneider@nrc.gov)

Senior Project Engineer, DRP (Bob.Hagar@nrc.gov) Project Engineer, DRP (Jan.Tice@nrc.gov) FCS Administrative Assistant (Janise.Schwee@nrc.gov)

RIV Public Affairs Officer (Victor.Dricks@nrc.gov)

RIV Public Affairs Officer (Lara.Uselding@nrc.gov)

NRR Project Manager (Fred.Lyon@nrc.gov)

RIV Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) RIV RITS Coordinator (Marisa.Herrera@nrc.gov)

RIV Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

OEMail Resource OEWEB Resource (Sue.Bogle@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)

RIV/ETA: OEDO (Cayetano.Santos@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)