ML041890344: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 04/19/2004
| issue date = 04/19/2004
| title = Draft Section B Operating
| title = Draft Section B Operating
| author name = Hackenberg J D
| author name = Hackenberg J
| author affiliation = AmerGen Energy Co, LLC
| author affiliation = AmerGen Energy Co, LLC
| addressee name = Conte R J
| addressee name = Conte R
| addressee affiliation = NRC/RGN-I/DRS/OSB
| addressee affiliation = NRC/RGN-I/DRS/OSB
| docket = 05000219
| docket = 05000219
| license number = DPR-016
| license number = DPR-016
| contact person = Conte R J
| contact person = Conte R
| case reference number = -RFPFR, 50-219/04-301, ES-301, ES-301-2
| case reference number = -RFPFR, 50-219/04-301, ES-301, ES-301-2
| document report number = 50-219/04-301
| document report number = 50-219/04-301
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 c. Recirculation system / Respond to a tripped recirc pump with 5 operating (Alternate Path - Discharge Valve will not close) Last NRC Facility: Oyster Creek NRC Date of Examination:
{{#Wiki_filter:ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 c. Recirculation system / Respond to a tripped recirc pump with 5 operating (Alternate Path - Discharge Valve will not close) Last NRC Facility: Oyster Creek NRC Date of Examination:
Week of April 19, 2004 Exam Level (circle one): RO / SRO(I) / SRO(U) Control Room Systems (8 for RO, 7 for SRO-I, 2 or 3 for SRO-U) Operating Test No.: 2004NRC 202.1 0 D, s, A System / JPM Title  
Week of April 19, 2004 Exam Level (circle one): RO / SRO(I) / SRO(U) Control Room Systems (8 for RO, 7 for SRO-I, 2 or 3 for SRO-U) Operating Test No.: 2004NRC 202.1 0 D, s, A System / JPM Title
: d. Primary Containment  
: d. Primary Containment  
/ Bypass Isolation Interlock for Torus Vent valves and prepare to vent the Torus  
/ Bypass Isolation Interlock for Torus Vent valves and prepare to vent the Torus
: e. AC Electrical  
: e. AC Electrical  
/Transfer Bus 1A from Auxiliary Transformer to Start-up Transformer Type Code*
/Transfer Bus 1A from Auxiliary Transformer to Start-up Transformer Type Code*
Function I I Safety 223.01 5 D, s 262.07 6 D, s, L a. Stm&yTQu ia Gontrol (SLC) / 21 1.01 pump 0- b. ADS / Close a stuck open EMRV (Alternate Path - fail first step) 21 8.01 D. S. A g. Standby Gas Treatment system (SGTS)  
Function I I Safety 223.01 5 D, s 262.07 6 D, s, L a. Stm&yTQu ia Gontrol (SLC) / 21 1.01 pump 0- b. ADS / Close a stuck open EMRV (Alternate Path - fail first step) 21 8.01 D. S. A g. Standby Gas Treatment system (SGTS)  
/ Shutdown SGTS after Auto Initiation (Alternate Path - normal fan does not start) 1 261.03 N, S, A 3 h. For RO - Recirculation system / Conduct Recirc Pump Trip Logic functional test 202.1 1 D, S 4 a. Fire Water system  
/ Shutdown SGTS after Auto Initiation (Alternate Path - normal fan does not start) 1 261.03 N, S, A 3 h. For RO - Recirculation system / Conduct Recirc Pump Trip Logic functional test 202.1 1 D, S 4 a. Fire Water system  
/ Line-up Fire Water to the Core Spray System  
/ Line-up Fire Water to the Core Spray System
[PRA related] 286.04 2 M,R, L Emergency  
[PRA related] 286.04 2 M,R, L Emergency
: f. Control Room Ventilation  
: f. Control Room Ventilation  
/ Purge Control Room using Control Room HVAC System 308.01 D, R, L .PPI Emergency 9 c. TBCCW/Line-up TBCCW during SBO 274.01 8 D, R, L Abnormal b. CRD/lnitiate the Remote Shutdown Panel on Control Room Evacuation
/ Purge Control Room using Control Room HVAC System 308.01 D, R, L .PPI Emergency 9 c. TBCCW/Line-up TBCCW during SBO 274.01 8 D, R, L Abnormal b. CRD/lnitiate the Remote Shutdown Panel on Control Room Evacuation
Line 40: Line 40:
==REFERENCES:==
==REFERENCES:==
Procedure, ABN-40, Stuck Open EMRV, Rev. 1 TASK STANDARD: "A" EMRV NormaVDisable switch in "disable" , valve closed.
Procedure, ABN-40, Stuck Open EMRV, Rev. 1 TASK STANDARD: "A" EMRV NormaVDisable switch in "disable" , valve closed.
CRITICAL ELEMENTS:  
CRITICAL ELEMENTS:
(*) b 6 \-- Page 2 of 6 JPM 218.01 PERFORMANCE SECTION: TASK CONDITIONS: Reactor Power 1 OO%, all systems operating properly.
(*) b 6 \-- Page 2 of 6 JPM 218.01 PERFORMANCE SECTION: TASK CONDITIONS: Reactor Power 1 OO%, all systems operating properly.
INITIATING CUES: Your task will be associated withc n; you are expected to respond to any further alarms that are received.
INITIATING CUES: Your task will be associated withc n; you are expected to respond to any further alarms that are received.
START TIME - PERFORMANCE CHECKLIST STANDARD I INITIAL SATNNSAT I CI: When directed by the Floor Instructor, activate MAL-NSS025A, 100% I I 1. Obtain controlled copy of procedure Refers to RAP 8-3-9 and B-4-g Verifies "A EMRV is open. 2. Obtains controlled copy of ABN 40 as directed by RAP 3. Places Feed water Control in manual. 4. Attempts to close "A" EMRV Obtains ABN 40 Depresses MANUAL butt n on M ster On 1 F/2F, places "A" Auto Depress Valve switch in "Off" observes that valve is still open. Level Controller 6 44 4 &*hq Lcyl l! I 1' ' 0 using ADS switch /- 5. Cycles switch off to Manual to off 3 times. Cycles "A" EMRV control switch to Manual to OFF 3 times. Observes valve is still open. I I CUE: (Cf) Upon request discharge temperature is 300 *Fa Once the Disable Alarm comes in DELETE MAL-NSSO25A I I *6. Places "A" EMRV NormaVDisable switch in "Disable" Places "A" NormaVDisable switch in "Disable" at rear of 1 F/2F Observes that "A EMRV is closed.
START TIME - PERFORMANCE CHECKLIST STANDARD I INITIAL SATNNSAT I CI: When directed by the Floor Instructor, activate MAL-NSS025A, 100% I I 1. Obtain controlled copy of procedure Refers to RAP 8-3-9 and B-4-g Verifies "A EMRV is open. 2. Obtains controlled copy of ABN 40 as directed by RAP 3. Places Feed water Control in manual. 4. Attempts to close "A" EMRV Obtains ABN 40 Depresses MANUAL butt n on M ster On 1 F/2F, places "A" Auto Depress Valve switch in "Off" observes that valve is still open. Level Controller 6 44 4 &*hq Lcyl l! I 1' ' 0 using ADS switch /- 5. Cycles switch off to Manual to off 3 times. Cycles "A" EMRV control switch to Manual to OFF 3 times. Observes valve is still open. I I CUE: (Cf) Upon request discharge temperature is 300 *Fa Once the Disable Alarm comes in DELETE MAL-NSSO25A I I *6. Places "A" EMRV NormaVDisable switch in "Disable" Places "A" NormaVDisable switch in "Disable" at rear of 1 F/2F Observes that "A EMRV is closed.
I I CUE: (CI)
I I CUE: (CI)
Upon request discharge temperature is 290 QF and decreasing Page 3 of 6 COMPLETION TIME JPM 218.01 PERFORMANCE CHECKLIST  
Upon request discharge temperature is 290 QF and decreasing Page 3 of 6 COMPLETION TIME JPM 218.01 PERFORMANCE CHECKLIST
: 6. Used procedure properly.
: 6. Used procedure properly.
STANDARD Used procedure properly according to its level of usage. Page 4 of 6 JPM 218.01 SIMULATOR SETUP Initial Condition(s):
STANDARD Used procedure properly according to its level of usage. Page 4 of 6 JPM 218.01 SIMULATOR SETUP Initial Condition(s):
Line 58: Line 58:
u TASK CONDITIONS:
u TASK CONDITIONS:
A failure to fully scram from 100% Rx power has occurred Reactor power is  
A failure to fully scram from 100% Rx power has occurred Reactor power is  
-45% All recirc pumps have tripped All methods to insert control rods have failed Pressure is being maintained 850-1000 psig using Main Turbine Power oscillations are occurring GENERAL TOOLS AND EQUIPMENT: Key for SLC Keylock switch  
-45% All recirc pumps have tripped All methods to insert control rods have failed Pressure is being maintained 850-1000 psig using Main Turbine Power oscillations are occurring GENERAL TOOLS AND EQUIPMENT: Key for SLC Keylock switch
[PA22351 GENERAL  
[PA22351 GENERAL  


Line 64: Line 64:


EMG-3200.01 B, RPV Control with ATWS, Rev. 12 Support Procedure 22, Initiating the Liquid Poison System, u TASK STANDARD:
EMG-3200.01 B, RPV Control with ATWS, Rev. 12 Support Procedure 22, Initiating the Liquid Poison System, u TASK STANDARD:
Liquid poison entering reactor CRITICAL ELEMENTS:  
Liquid poison entering reactor CRITICAL ELEMENTS:
(*) 4 IN IT1 AT1 NG CUES: As Unit Supervisor, I am directing you to inject liquid poison into the reactor with Standby Liquid Control System 1,
(*) 4 IN IT1 AT1 NG CUES: As Unit Supervisor, I am directing you to inject liquid poison into the reactor with Standby Liquid Control System 1,
_____~~ JPM 21 1.01 5. Verify flow to reactor PERFORMANCE SECTION: Verifies the following for system #2: . "PUMP ON" light is lit (Panel 4F) (System 1 light goes out & System 2 light goes on) . Squib for Sys 2 light is lit (Panel 4F) . Pump Disch Press  
_____~~ JPM 21 1.01 5. Verify flow to reactor PERFORMANCE SECTION: Verifies the following for system #2: . "PUMP ON" light is lit (Panel 4F) (System 1 light goes out & System 2 light goes on) . Squib for Sys 2 light is lit (Panel 4F) . Pump Disch Press  
> Reactor Pressure (Panel 4F) . "FLOW ON" alarm lit (G-1-b) . "SQUIB VALVE OPEN" alarm lit (G-2-b) START TIME PERFORMANCE CHECKLIST STANDARD  
> Reactor Pressure (Panel 4F) . "FLOW ON" alarm lit (G-1-b) . "SQUIB VALVE OPEN" alarm lit (G-2-b) START TIME PERFORMANCE CHECKLIST STANDARD
: 1. Obtains controlled copy of Support Procedure 22 obtained procedure I NOTE: When the keylock switch is placed in Sys 1 in the following stel NPO2A will fail to start. [CLF PMP SLC1, shaft break, opt.
: 1. Obtains controlled copy of Support Procedure 22 obtained procedure I NOTE: When the keylock switch is placed in Sys 1 in the following stel NPO2A will fail to start. [CLF PMP SLC1, shaft break, opt.
11 2. Starts poison pump NP02A 3. Verify flow to reactor Rotates STANDBY LIQUID CONTROL keylock switch on 4F to Fire Sys 1 position Verifies the following for system #1: . "PUMP ON" light is lit (Panel 4F) . Squib for Sys 1 light is lit (Panel 4F) . Pump Disch Press  
11 2. Starts poison pump NP02A 3. Verify flow to reactor Rotates STANDBY LIQUID CONTROL keylock switch on 4F to Fire Sys 1 position Verifies the following for system #1: . "PUMP ON" light is lit (Panel 4F) . Squib for Sys 1 light is lit (Panel 4F) . Pump Disch Press  
Line 76: Line 76:
IC preset Local Operator Actions:
IC preset Local Operator Actions:
IC preset Computer Aided Exercises: None 11 TASK CONDITIONS:
IC preset Computer Aided Exercises: None 11 TASK CONDITIONS:
A failure to fully scram from 100% Rx power has occurred Reactor power is -45% All recirc pumps have tripped All methods to insert control rods have failed Pressure is being maintained 850-1 000 psig using Main Turbine Power oscillations are occurring 11 INITIATING CUES: As Unit Supervisor, I am directing you to inject liquid poison into the reactor with Standby Liquid Control System 1 using Support Procedure  
A failure to fully scram from 100% Rx power has occurred Reactor power is -45% All recirc pumps have tripped All methods to insert control rods have failed Pressure is being maintained 850-1 000 psig using Main Turbine Power oscillations are occurring 11 INITIATING CUES: As Unit Supervisor, I am directing you to inject liquid poison into the reactor with Standby Liquid Control System 1 using Support Procedure
: 22.
: 22.
AmerGen,, An Exelon/British Energy Company JOB PERFORMANCE MEASURE 202.1 0 Title: Respond to a Tripped Recirc Pump with 5 Recirc Pumps Operating (Alternate Path) Task: Respond to a Tripped Recirc Pump with 5 Recirc Pumps Operating I 2020401404 KA# 202001 A2.03 I RATING: RO - 3.6 SRO- 3.7 Validation Time - 15 min Alternate Path - Yes I Time 1 Critical NO I I I Name Social Security Number I I DIRECTIONS TO TRAINEE: Before you start, I will state the task conditions and initiating cues and fully answer any questions.
AmerGen,, An Exelon/British Energy Company JOB PERFORMANCE MEASURE 202.1 0 Title: Respond to a Tripped Recirc Pump with 5 Recirc Pumps Operating (Alternate Path) Task: Respond to a Tripped Recirc Pump with 5 Recirc Pumps Operating I 2020401404 KA# 202001 A2.03 I RATING: RO - 3.6 SRO- 3.7 Validation Time - 15 min Alternate Path - Yes I Time 1 Critical NO I I I Name Social Security Number I I DIRECTIONS TO TRAINEE: Before you start, I will state the task conditions and initiating cues and fully answer any questions.
Line 87: Line 87:
ABN-02, Recirculation System Failures, Rev. 0 TASK STANDARD:
ABN-02, Recirculation System Failures, Rev. 0 TASK STANDARD:
Four pumps running in automatic, the other loop idle.
Four pumps running in automatic, the other loop idle.
i, CRITICAL ELEMENTS:  
i, CRITICAL ELEMENTS:
(*) Page 2 of 7 JPM 202.10 Rev. 1 PERFORMANCE SECTION:
(*) Page 2 of 7 JPM 202.10 Rev. 1 PERFORMANCE SECTION:
b 4 4 L TASK CONDITIONS: Reactor power 1 OO%, all system operating properly.
b 4 4 L TASK CONDITIONS: Reactor power 1 OO%, all system operating properly.
n; you are now to respond to any f\ re received.
n; you are now to respond to any f\ re received.
1 START TIME n I U I PERFORMANCE CHECKLIST CI: PREINSERT CLF VL\ already done. INSERT MALF RFCO( 1. Confirms discharge bypass valve for "E" loop open CI: MONV R3754 to verii approx. 0.2. IF the conditions it fully closes using CLF VLV 2. Closes "E" pump discharge valve  
1 START TIME n I U I PERFORMANCE CHECKLIST CI: PREINSERT CLF VL\ already done. INSERT MALF RFCO( 1. Confirms discharge bypass valve for "E" loop open CI: MONV R3754 to verii approx. 0.2. IF the conditions it fully closes using CLF VLV 2. Closes "E" pump discharge valve
: 3. Obtains controlled copy of procedure 4 Determines Discharge Valve will not close STANDARD I NSS020 option 6 conditional on R3754.LE.0.2 if not E when instructed by the FI. I At Panel 3F, confirms discharge bypass valve for "E" loop open. that the discharge valve mechanically seizes at fails to take then go ahead and seize the wrlve before JSS020, Mech Siezure.
: 3. Obtains controlled copy of procedure 4 Determines Discharge Valve will not close STANDARD I NSS020 option 6 conditional on R3754.LE.0.2 if not E when instructed by the FI. I At Panel 3F, confirms discharge bypass valve for "E" loop open. that the discharge valve mechanically seizes at fails to take then go ahead and seize the wrlve before JSS020, Mech Siezure.
I At Panel 3F, takes "E" recirculation pump discharge valve control switch to close. Procedure ABN-2, Section 3.1.2 obtained.
I At Panel 3F, takes "E" recirculation pump discharge valve control switch to close. Procedure ABN-2, Section 3.1.2 obtained.
Line 99: Line 99:
*6. Dispatches Electrician. Dispatches/directs Electrician to attempt to close the discharge valve IAW attachment ABN-2-1. 7. Determines loop configuration Determines that the loop can either be placed in an "IDLE" or "ISOLATED" condition.
*6. Dispatches Electrician. Dispatches/directs Electrician to attempt to close the discharge valve IAW attachment ABN-2-1. 7. Determines loop configuration Determines that the loop can either be placed in an "IDLE" or "ISOLATED" condition.
I I CUE:(FI) As US, direct operator to place the loop in an "IDLE" configuration.
I I CUE:(FI) As US, direct operator to place the loop in an "IDLE" configuration.
I I *8. Opens the suction valve Re-opens the suction valve by taking its control switch to the OPEN position.  
I I *8. Opens the suction valve Re-opens the suction valve by taking its control switch to the OPEN position.
: 9. Maintain reactor power At Panels 3F and 4F, verifies below rod block on power operation curve. below rod block setpoint 10. Maintains RPV level 155 At Panel 5F/6F, ensures FWC system to 165" maintaining level. 11. Monitor Nls for indication of power oscillation At Panel 4F, monitors APRMs. At Panels 3F and 4F, monitors APRMs and total recirc flow; verifies not in exclusion region of power operation curve. 12. Verifies did not enter exclusion region of the power operation curve Page 4 of 7 Rev. 1 FORMANCE CHECKLIST  
: 9. Maintain reactor power At Panels 3F and 4F, verifies below rod block on power operation curve. below rod block setpoint 10. Maintains RPV level 155 At Panel 5F/6F, ensures FWC system to 165" maintaining level. 11. Monitor Nls for indication of power oscillation At Panel 4F, monitors APRMs. At Panels 3F and 4F, monitors APRMs and total recirc flow; verifies not in exclusion region of power operation curve. 12. Verifies did not enter exclusion region of the power operation curve Page 4 of 7 Rev. 1 FORMANCE CHECKLIST
: 13. Refer to Tech Spec for limitations on continued plant operations  
: 13. Refer to Tech Spec for limitations on continued plant operations
: 14. Confirms one of the recirc pump suction temp indicators on 3F is selected to an operating loop CUE: (FI) Acknowledge maintain power at 15. Monitors for Fuel Element Failure. 16. Notify system dispatcher of power limitations  
: 14. Confirms one of the recirc pump suction temp indicators on 3F is selected to an operating loop CUE: (FI) Acknowledge maintain power at 15. Monitors for Fuel Element Failure. 16. Notify system dispatcher of power limitations
: 17. Notifies Chemistry if power changed by 289.5 MWth. Notifies designated Rx engineer CUE: (FI) Another operi 18. Used procedure properly.
: 17. Notifies Chemistry if power changed by 289.5 MWth. Notifies designated Rx engineer CUE: (FI) Another operi 18. Used procedure properly.
STANDARD Uses Tech Spec Sections 3.3.F to determine no limitation or informs Shift Supervisor to refer to TS 3.3.F, 3.1 O.A. Selects an operating loop for one of the RECIRC PUMP SUCTION TEMPS. hat no limitations exist and that another 01 ts present level. Monitors Off-Gas, MSL Radiation  
STANDARD Uses Tech Spec Sections 3.3.F to determine no limitation or informs Shift Supervisor to refer to TS 3.3.F, 3.1 O.A. Selects an operating loop for one of the RECIRC PUMP SUCTION TEMPS. hat no limitations exist and that another 01 ts present level. Monitors Off-Gas, MSL Radiation  
Line 121: Line 121:
Station Procedure, ABN-37, STATION BLACKOUT, Rev 0 - TASK STANDARD:
Station Procedure, ABN-37, STATION BLACKOUT, Rev 0 - TASK STANDARD:
TBCCW valves lined up per ABN-37, Attachment  
TBCCW valves lined up per ABN-37, Attachment  
-3, step 4.0 CRITICAL ELEMENTS:  
-3, step 4.0 CRITICAL ELEMENTS:
(*) 2,3,4 & 5 INITIATING CUES: A Station Blackout has occurred, (total loss of off-site and on-site AC electrical power). The SM/US has directed you to line up TBCCW valves for TBCCW heat exchanger 1-1 per ABN 3200.37, Attachment  
(*) 2,3,4 & 5 INITIATING CUES: A Station Blackout has occurred, (total loss of off-site and on-site AC electrical power). The SM/US has directed you to line up TBCCW valves for TBCCW heat exchanger 1-1 per ABN 3200.37, Attachment  
-3, Step 4.0. Page 2 of 4
-3, Step 4.0. Page 2 of 4
____~ JPM 274.01 Rev. 1 START TIME - PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UNSAT  
____~ JPM 274.01 Rev. 1 START TIME - PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UNSAT
: 1. Obtain controlled copy of Obtain controlled copy of kBW'37 procedure. Attachment 444 5 "2. Close V-3-58. Closes V-3-58 in the Turbine Bldg. basement.
: 1. Obtain controlled copy of Obtain controlled copy of kBW'37 procedure. Attachment 444 5 "2. Close V-3-58. Closes V-3-58 in the Turbine Bldg. basement.
I I CUE: V-3-58 closed. I I "3. Open V-3-59. Opens V-3-59 in the Turbine Bldg. I basement . I I C!uE: V-3-59 open. I I "4. Close V-3-76 and V-3-77. Closes V-3-76 and V-3-77 in the Turbine Bldg. basement.
I I CUE: V-3-58 closed. I I "3. Open V-3-59. Opens V-3-59 in the Turbine Bldg. I basement . I I C!uE: V-3-59 open. I I "4. Close V-3-76 and V-3-77. Closes V-3-76 and V-3-77 in the Turbine Bldg. basement.
Line 138: Line 138:


==REFERENCES:==
==REFERENCES:==
EMG-3200.02, Primary Containment Control, Rev. 16 3~ppot-t Procedure 32 L TASK STANDARD: Isolation for V-28-18 and V-28-47 have been bypassed CRITICAL ELEMENTS:  
EMG-3200.02, Primary Containment Control, Rev. 16 3~ppot-t Procedure 32 L TASK STANDARD: Isolation for V-28-18 and V-28-47 have been bypassed CRITICAL ELEMENTS:
(*) 11, 12, 13, 14 2 of 7   
(*) 11, 12, 13, 14 2 of 7   
- JPM 223.01 f "ERFORMANCE SECTION:
- JPM 223.01 f "ERFORMANCE SECTION:
Lv 'g 4. Evacuates personnel from the Reactor Building TASK CONDITIONS: Reactor scrammed due to a LOCA CHRRMS reading greater than 20,000 WHR All automatic actions due to LOCA have occurred INITIATING CUES: As the US I am directing you to bypass lorus Vent Isolation-  
Lv 'g 4. Evacuates personnel from the Reactor Building TASK CONDITIONS: Reactor scrammed due to a LOCA CHRRMS reading greater than 20,000 WHR All automatic actions due to LOCA have occurred INITIATING CUES: As the US I am directing you to bypass lorus Vent Isolation-  
' r V-28-18 and V-28-47 using Support Procedure 32.
' r V-28-18 and V-28-47 using Support Procedure 32.
Inform me when ready to vent. START TIME PERFORMANCE CHECKLIST 1 Obtain controlled copy of procedure CUE: Prerequisites are c u 3. Verifies Torus level is I below 348 in. 5. Starts SGTS -$r STANDARD INITIAL SAT/ UNSAT 1 Support Procedure 32 obtained I Verifies prerequisites I At Panel 1 F/2F, verifies Torus water level is below 348 in. I - Sound the Reactor Building - Evacuation - Announces: "Primary Containment Alarm Venting will commence in approximately 5 minutes. All personnel evacuate the Reactor Building immediately." At Panel 11 R, selects a SGTS fan and places it control switch in HAND. 3 of 7 PERFORMANCE CHECKLIST y 6. Closes V-28-48 STANDARD At Panel 11 R, places the SGTS crosstie valve V-28-48 in the CLOSED position  
Inform me when ready to vent. START TIME PERFORMANCE CHECKLIST 1 Obtain controlled copy of procedure CUE: Prerequisites are c u 3. Verifies Torus level is I below 348 in. 5. Starts SGTS -$r STANDARD INITIAL SAT/ UNSAT 1 Support Procedure 32 obtained I Verifies prerequisites I At Panel 1 F/2F, verifies Torus water level is below 348 in. I - Sound the Reactor Building - Evacuation - Announces: "Primary Containment Alarm Venting will commence in approximately 5 minutes. All personnel evacuate the Reactor Building immediately." At Panel 11 R, selects a SGTS fan and places it control switch in HAND. 3 of 7 PERFORMANCE CHECKLIST y 6. Closes V-28-48 STANDARD At Panel 11 R, places the SGTS crosstie valve V-28-48 in the CLOSED position
: 7. Confirms Reactor Bldg. Supply Fans secured INITIAL SAT/ UNSAT 8. Confirms Reactor Bldg. Exhaust Fans secured 9. Confirm that the "Reactor Mode Selector Switch" is NOT in the "Run" position 1O.Obtains bypass plug *11 Inserts bypass plug in 1OXF. *12 Inserts bypass plug in 11R. "13 Places the TORUS/ DW ISOLATION VALVE BYPASS keylock switch in the TORUS position JPM 223.01 At Panel 11 R, confirms the Reactor Bldg. Supply fans are secured At Panel 11 R, confirms the Reactor Bldg. Exhaust fans are secured Verifies 4F "Reactor Mode Selector Switch" is NOT in "Run" Obtains one(1) bypass plug from the EOP station in the control room. Inserts bypass plug in 1OXF: * - Opens EOP BYPASS PLUGS panel (rear of 1 OXF) - Inserts bypass plug in position BP5. Inserts bypass plug in 1 1 R: - Opens EOP BYPASS PLUGS - Removes bypass plug in - panel (rear of 1 1 R) position BP4 Inserts bypass plug in position BP1. At Panel 11 F, places the TORUS/DRYWELL ISOLATION VALVE BYPASS PERMISSIVE keylock switch in the TORUS position.
: 7. Confirms Reactor Bldg. Supply Fans secured INITIAL SAT/ UNSAT 8. Confirms Reactor Bldg. Exhaust Fans secured 9. Confirm that the "Reactor Mode Selector Switch" is NOT in the "Run" position 1O.Obtains bypass plug *11 Inserts bypass plug in 1OXF. *12 Inserts bypass plug in 11R. "13 Places the TORUS/ DW ISOLATION VALVE BYPASS keylock switch in the TORUS position JPM 223.01 At Panel 11 R, confirms the Reactor Bldg. Supply fans are secured At Panel 11 R, confirms the Reactor Bldg. Exhaust fans are secured Verifies 4F "Reactor Mode Selector Switch" is NOT in "Run" Obtains one(1) bypass plug from the EOP station in the control room. Inserts bypass plug in 1OXF: * - Opens EOP BYPASS PLUGS panel (rear of 1 OXF) - Inserts bypass plug in position BP5. Inserts bypass plug in 1 1 R: - Opens EOP BYPASS PLUGS - Removes bypass plug in - panel (rear of 1 1 R) position BP4 Inserts bypass plug in position BP1. At Panel 11 F, places the TORUS/DRYWELL ISOLATION VALVE BYPASS PERMISSIVE keylock switch in the TORUS position.
4 of 7 PERFORMANCE CHECKLIST Y STANDARD *14 Places the DW/TORUS VENT & PURGE ISOL HI RAD BYPASS keylock switch channel 1 and 2 in BYPASS INITIAL SAT/ 15. Informs the US, Torus is ready to vent  
4 of 7 PERFORMANCE CHECKLIST Y STANDARD *14 Places the DW/TORUS VENT & PURGE ISOL HI RAD BYPASS keylock switch channel 1 and 2 in BYPASS INITIAL SAT/ 15. Informs the US, Torus is ready to vent
: 6. Used procedure properly.
: 6. Used procedure properly.
JPM 223.01 UNSAT At Panel 11 F , places the DRYWELL/TORUS VENT  
JPM 223.01 UNSAT At Panel 11 F , places the DRYWELL/TORUS VENT  
& PURGE ISOLATION HI RAD BYP Keylock switches in BYPASS Tells the US (Evaluator) that the torus is ready to vent via the torus vent valves. I 2 when informed that the Torus is ready for venting. Used procedure properly according to its level of usage. COMPLETION TIME 5 of 7 JPM 223.01 u SIMULATOR SETUP Initial Condition(s):
& PURGE ISOLATION HI RAD BYP Keylock switches in BYPASS Tells the US (Evaluator) that the torus is ready to vent via the torus vent valves. I 2 when informed that the Torus is ready for venting. Used procedure properly according to its level of usage. COMPLETION TIME 5 of 7 JPM 223.01 u SIMULATOR SETUP Initial Condition(s):
IC-65, 100% Rx PWR Setup 1. Digital Feed and Recirc Flow control 2. Set Master Recirc flow controller to 44.44 cycles  
IC-65, 100% Rx PWR Setup 1. Digital Feed and Recirc Flow control 2. Set Master Recirc flow controller to 44.44 cycles
: 3. Set Feedwater master controller to 163.5 inches, and in "Auto" 2. Initialize to IC 65 and perform switch check 3. Run SIMPROBxae  
: 3. Set Feedwater master controller to 163.5 inches, and in "Auto" 2. Initialize to IC 65 and perform switch check 3. Run SIMPROBxae
: 4. Go to "RUN" and execute MAL-NSS004A, 1 OO%, ACT 5. Run JPM22301 .CAE 6. Take mode switch to shutdown 7. Open all EMRV's 8. Turn on Fuel Zones  
: 4. Go to "RUN" and execute MAL-NSS004A, 1 OO%, ACT 5. Run JPM22301 .CAE 6. Take mode switch to shutdown 7. Open all EMRV's 8. Turn on Fuel Zones
: 9. "FREEZE" simulator when reactor pressure decreases to less than 130 psig Place the "A/B/C" MFRV and "NC LFRV in "AUTO" Malfunctions:
: 9. "FREEZE" simulator when reactor pressure decreases to less than 130 psig Place the "A/B/C" MFRV and "NC LFRV in "AUTO" Malfunctions:
MAL-NSS004A, 100% Overrides:
MAL-NSS004A, 100% Overrides:
SWI-NSS066V, ON SWI-NSS068V, ON Remotes: Computer Aided Exercises:
SWI-NSS066V, ON SWI-NSS068V, ON Remotes: Computer Aided Exercises:
SI M PROB.CAE JPM22301 .CAE 6 of 7 TASK CONDITIONS: Reactor scrammed due to a LOCA CHRRMS reading greater than 20,000 WHR All automatic actions due to LOCA have occurred INITIATING CUES: As the US I am directing you to bypass Torus Vent Isolation logic for V-28-18 and V-28-47 using Support Procedure  
SI M PROB.CAE JPM22301 .CAE 6 of 7 TASK CONDITIONS: Reactor scrammed due to a LOCA CHRRMS reading greater than 20,000 WHR All automatic actions due to LOCA have occurred INITIATING CUES: As the US I am directing you to bypass Torus Vent Isolation logic for V-28-18 and V-28-47 using Support Procedure
: 32. Inform me when ready to vent.
: 32. Inform me when ready to vent.
7 of 7 AmerGensM KA# 262001 A4.04 An Exelon/British Energy Company RATING: RO - 3.6 SRO - 3.7 JOB PERFORMANCE MEASURE 262.07 Validation Time 12 minutes Time Critical Title: Manual Transfer of the 4160 VAC Bus 1A from the Auxiliary Transformer to the Startup Transformer NO Task: Shift Station Loads between Aux. and S/U Transformers I 2620101002 Name Social Securiity Number I I DIRECTIONS TO TRAINEE: Before you start, I will state the task conditions and initiating cues and fully answer any questions.
7 of 7 AmerGensM KA# 262001 A4.04 An Exelon/British Energy Company RATING: RO - 3.6 SRO - 3.7 JOB PERFORMANCE MEASURE 262.07 Validation Time 12 minutes Time Critical Title: Manual Transfer of the 4160 VAC Bus 1A from the Auxiliary Transformer to the Startup Transformer NO Task: Shift Station Loads between Aux. and S/U Transformers I 2620101002 Name Social Securiity Number I I DIRECTIONS TO TRAINEE: Before you start, I will state the task conditions and initiating cues and fully answer any questions.
Line 168: Line 168:
Procedure 337, 41 60 Volt Electrical System, Section 3.4, Rev.
Procedure 337, 41 60 Volt Electrical System, Section 3.4, Rev.
57 L TASK STANDARD:
57 L TASK STANDARD:
1A 41 60-volt bus is energized from the startup transformer CRITICAL ELEMENTS:  
1A 41 60-volt bus is energized from the startup transformer CRITICAL ELEMENTS:
(*) 739 Page 2 of 6 PERFORMANCE SECTION: %u INITIATING CUES: I As the US I am directing you to transfer 4160-volt bus 1A to the startup I transformer in accordance with Ops Procedure 337. 6. Verifies that the 34.5 kV breaker feed to bank No. 5 is in the closed position.
(*) 739 Page 2 of 6 PERFORMANCE SECTION: %u INITIATING CUES: I As the US I am directing you to transfer 4160-volt bus 1A to the startup I transformer in accordance with Ops Procedure 337. 6. Verifies that the 34.5 kV breaker feed to bank No. 5 is in the closed position.
START TIME - Verifies red light for Bank No. 5 feed on 12F is energized. PERFORMANCE CHECKLIST STANDARD 1 INITIAL S AT/U NSAT 1. Obtains controlled copy of Procedure 337, section 3.4 obtained procedure  
START TIME - Verifies red light for Bank No. 5 feed on 12F is energized. PERFORMANCE CHECKLIST STANDARD 1 INITIAL S AT/U NSAT 1. Obtains controlled copy of Procedure 337, section 3.4 obtained procedure  
~~ 2. Verifies all prerequisites I Verifies prereqs met I CUE:(FI) As requested, individual prerequisites not verifiable in the Control Room can be verified met, Bank 5 voltage regulator is in service. I I 3. Reviews all applicable precautions and limitations Reviews all applicable precautions and limitations  
~~ 2. Verifies all prerequisites I Verifies prereqs met I CUE:(FI) As requested, individual prerequisites not verifiable in the Control Room can be verified met, Bank 5 voltage regulator is in service. I I 3. Reviews all applicable precautions and limitations Reviews all applicable precautions and limitations
: 4. Verifies 41 60 volt main breaker 1 A control switch is in the "Closed" position Verifies on panel 8F/9F red closed light is energized with red target for breaker 1 A. 5. Verifies that SU Breaker S1A racked in and open. Verifies that the S1A breaker "OPEN" light and "BREAKER UP" light located on panel 8F/9F are energized.
: 4. Verifies 41 60 volt main breaker 1 A control switch is in the "Closed" position Verifies on panel 8F/9F red closed light is energized with red target for breaker 1 A. 5. Verifies that SU Breaker S1A racked in and open. Verifies that the S1A breaker "OPEN" light and "BREAKER UP" light located on panel 8F/9F are energized.
Page 3 of 6 PERFORMANCE CHECKLIST  
Page 3 of 6 PERFORMANCE CHECKLIST  
*7. Puts synchroscope key into synchronizing switch for S1 A on 8F/9F and turns on. 8. Verifies power is synchronized across S1 A *9. Closes S1A 10. Turn synchronizing key from 8F/9F switch off and remove 11. Matches main breaker targets 12. Used procedure properly.
*7. Puts synchroscope key into synchronizing switch for S1 A on 8F/9F and turns on. 8. Verifies power is synchronized across S1 A *9. Closes S1A 10. Turn synchronizing key from 8F/9F switch off and remove 11. Matches main breaker targets 12. Used procedure properly.
JPM 262.07 STANDARD At panel 8F/9F places key in S1A synchronizing switch and turns to "On" At Panel 8F/9F, verifies synchroscope is stationary and pointing at 12 o'clock with both synch lights out. Place S1A control switch on 8F/9F to "Close" position. Checks the breaker closed light is energized and breaker 1A opens. On Panel 8F/9F, Places synchronizing switch in Off and removes key Operates main breaker 1A to the trip position to match mechanical indication Used procedure properly according to its level of usage. INITIAL SATNNSAT COMPLETION TIME Page 4 of 6 JPM 262.07 u SIMULATOR SETUP I nit ial Cond it ion (s) : I C-65 SET-UP ACTIONS: 1. Digital Feed and Recirc Flow control 9 9 9 2. Init to IC 65 and perform switch check  
JPM 262.07 STANDARD At panel 8F/9F places key in S1A synchronizing switch and turns to "On" At Panel 8F/9F, verifies synchroscope is stationary and pointing at 12 o'clock with both synch lights out. Place S1A control switch on 8F/9F to "Close" position. Checks the breaker closed light is energized and breaker 1A opens. On Panel 8F/9F, Places synchronizing switch in Off and removes key Operates main breaker 1A to the trip position to match mechanical indication Used procedure properly according to its level of usage. INITIAL SATNNSAT COMPLETION TIME Page 4 of 6 JPM 262.07 u SIMULATOR SETUP I nit ial Cond it ion (s) : I C-65 SET-UP ACTIONS: 1. Digital Feed and Recirc Flow control 9 9 9 2. Init to IC 65 and perform switch check
: 3. File SIMPROB 4. I' FR E EZ E" si m u I at o r Set Master Recirc flow controller to 44.44 cycles Set Feedwater master controller to 163.5 inches, and in "Auto" Place the "A/B/C" MFRV and "A/C LFRV in "AUTO" Malfunctions: Component Level Failures:
: 3. File SIMPROB 4. I' FR E EZ E" si m u I at o r Set Master Recirc flow controller to 44.44 cycles Set Feedwater master controller to 163.5 inches, and in "Auto" Place the "A/B/C" MFRV and "A/C LFRV in "AUTO" Malfunctions: Component Level Failures:
Instructor Overrides: Local Operator Actions: L Monitored Variables:
Instructor Overrides: Local Operator Actions: L Monitored Variables:
Line 195: Line 195:
9 TASK STANDARD:
9 TASK STANDARD:
u Division II Surveillance completed.
u Division II Surveillance completed.
CRITICAL ELEMENTS:  
CRITICAL ELEMENTS:
(*) 4, 5, 6, 7, 9, 10, 11, 13, 14, 15 2 of 7 JPM 202.1 1 PERFORMANCE SECTION: u PERFORMANCE CHECKLIST  
(*) 4, 5, 6, 7, 9, 10, 11, 13, 14, 15 2 of 7 JPM 202.1 1 PERFORMANCE SECTION: u PERFORMANCE CHECKLIST
: 1. Obtain controlled copy of procedure Rev. 1 STANDARD INITIAL SAT/UNSAT Obtains controlled copy of Proc. 603.4.001 L 2. Verifies all prerequisites are met // TASK CONDITIONS: - Plant is at 100% power - All system operable INITIATING CUES: - As US, I am directing you to complete the Recirculation Pumps Trip Circuitry Test Proc. 603.4.001 on Division II. Verifies prerequisites met START TIME  
: 1. Obtain controlled copy of procedure Rev. 1 STANDARD INITIAL SAT/UNSAT Obtains controlled copy of Proc. 603.4.001 L 2. Verifies all prerequisites are met // TASK CONDITIONS: - Plant is at 100% power - All system operable INITIATING CUES: - As US, I am directing you to complete the Recirculation Pumps Trip Circuitry Test Proc. 603.4.001 on Division II. Verifies prerequisites met START TIME
: 3. Reviews all applicable precautions and limitations Reviews precautions and limitations  
: 3. Reviews all applicable precautions and limitations Reviews precautions and limitations  
*4. Places Division II in test Places Division 2 Normal - Test Keylock switch to the test position. - Verifies TEST-II alarm (E-3-b) annunciates.  
*4. Places Division II in test Places Division 2 Normal - Test Keylock switch to the test position. - Verifies TEST-II alarm (E-3-b) annunciates.
: 4. Tests Channel A Momentarily depresses CHAN C TRIP pushbutton switch on 3F - Verifies ACTUATE C-Il alarm (E-1-b) annunciates.
: 4. Tests Channel A Momentarily depresses CHAN C TRIP pushbutton switch on 3F - Verifies ACTUATE C-Il alarm (E-1-b) annunciates.
3 of 7 L I PERFORMANCE CHECKLIST  
3 of 7 L I PERFORMANCE CHECKLIST  
Line 221: Line 221:
==REFERENCES:==
==REFERENCES:==
ABN-29, Response to Fire: Rev 0 TASK STANDARD: One complete purge has been performed and "B" 460 volt switchgear ventilation has been restarted.
ABN-29, Response to Fire: Rev 0 TASK STANDARD: One complete purge has been performed and "B" 460 volt switchgear ventilation has been restarted.
CRITICAL ELEMENTS:  
CRITICAL ELEMENTS:
(*) 2,3,4,5,7,8 Page 2 of 6 L PERFORMANCE SECTION: 11 TASK CONDITIONS: - Reactor Power 100% - "B" Control Room HVAC is tagged out of service - A fire has been recently extinguished in the Control Room, fumes are still present - All other plant systems are operating normally - Immediate actions of ABN-29 are complete.
(*) 2,3,4,5,7,8 Page 2 of 6 L PERFORMANCE SECTION: 11 TASK CONDITIONS: - Reactor Power 100% - "B" Control Room HVAC is tagged out of service - A fire has been recently extinguished in the Control Room, fumes are still present - All other plant systems are operating normally - Immediate actions of ABN-29 are complete.
INITIATING CUES: Control Room fire has been extinguished, with residual smoke existing., the Unit Supervisor has directed you to purge the Control Room and restore normal ventilation to the Control Room using HVAC System "A" per ABN-29 "1 START TIME PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UN SAT 1. Obtains controlled Procedure ABN-29, Section 3.4.8 copy of procedure  
INITIATING CUES: Control Room fire has been extinguished, with residual smoke existing., the Unit Supervisor has directed you to purge the Control Room and restore normal ventilation to the Control Room using HVAC System "A" per ABN-29 "1 START TIME PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UN SAT 1. Obtains controlled Procedure ABN-29, Section 3.4.8 copy of procedure  
Line 235: Line 235:
Component Level Failures:  
Component Level Failures:  
'nstructor Overrides:
'nstructor Overrides:
b SWI-TBS24A to "fail off" SWI-TBS28A to "fail off" Computer Aided Exercises: Simprob. CAE Page 5 of 6 I___ Error! Main Document Only. TASK CONDITIONS  
b SWI-TBS24A to "fail off" SWI-TBS28A to "fail off" Computer Aided Exercises: Simprob. CAE Page 5 of 6 I___ Error! Main Document Only. TASK CONDITIONS
: - Reactor Power 100% - "B" Control Room HVAC is tagged out of service - A fire has been recently extinguished in the Control Room, fumes are still present - - All other plant systems are operating normally Immediate actions of ABN-29 are complete.
: - Reactor Power 100% - "B" Control Room HVAC is tagged out of service - A fire has been recently extinguished in the Control Room, fumes are still present - - All other plant systems are operating normally Immediate actions of ABN-29 are complete.
INITIATING CUES: Control Room fire has been extinguished, with residual smoke existing., the US has directed you to purge the Control Room and restore normal ventilation to the Control Room using HVAC System "A" per ABN-29, section 3.4.8 I' Page 6 of 6 OYSTER CREEK GENERATING STATION PROCEDURE Number ABN-29 8. When the Control Room fire is extinguished, then PERFORM the following:
INITIATING CUES: Control Room fire has been extinguished, with residual smoke existing., the US has directed you to purge the Control Room and restore normal ventilation to the Control Room using HVAC System "A" per ABN-29, section 3.4.8 I' Page 6 of 6 OYSTER CREEK GENERATING STATION PROCEDURE Number ABN-29 8. When the Control Room fire is extinguished, then PERFORM the following:
Line 242: Line 242:
START the 'B" ("A) Control Room HVAC system. MONITOR B 480V switchgear room temperature.
START the 'B" ("A) Control Room HVAC system. MONITOR B 480V switchgear room temperature.
If temperature approaches 104'F, it may be necessary to secure Control Room HVAC and restart B 480V Switchgear Room Ventilation, per step 8-1 below. C. D. E. NOTE: Venting the Control Room for 15 minutes will allow for approximately 3 changes of air, which wifl normally provide adequate ventilation.
If temperature approaches 104'F, it may be necessary to secure Control Room HVAC and restart B 480V Switchgear Room Ventilation, per step 8-1 below. C. D. E. NOTE: Venting the Control Room for 15 minutes will allow for approximately 3 changes of air, which wifl normally provide adequate ventilation.
F. When smoke is cleared from the Control Room, then PERFORM the following:  
F. When smoke is cleared from the Control Room, then PERFORM the following:
: 1) RESET Fire Detection Alarms on Control Module 6 and FAMP.
: 1) RESET Fire Detection Alarms on Control Module 6 and FAMP.
I1 [I [I I1 [I 10.0 AmerGem An Exelon/British Energy Company JOB PERFORMANCE Title: Operate the Remote Shutdown Panel on Control RoodEvacuation.
I1 [I [I I1 [I 10.0 AmerGem An Exelon/British Energy Company JOB PERFORMANCE Title: Operate the Remote Shutdown Panel on Control RoodEvacuation.
Line 256: Line 256:
W Procedure 346, Remote Shutdown, Rev.
W Procedure 346, Remote Shutdown, Rev.
9, Section 7 TASK STANDARD:
9, Section 7 TASK STANDARD:
All controls and indications on the Remote Shutdown Panel are active CRITICAL ELEMENTS:  
All controls and indications on the Remote Shutdown Panel are active CRITICAL ELEMENTS:
(*) 5,7,8,9,11 INITIATING CUES: Toxic atmosphere has caused an evacuation of the control room. The US has directed you to place the Remote Shutdown Panel into operation in accordance with procedure 346, Section 7, Operation of the Remote and Local Shutdown Panels.
(*) 5,7,8,9,11 INITIATING CUES: Toxic atmosphere has caused an evacuation of the control room. The US has directed you to place the Remote Shutdown Panel into operation in accordance with procedure 346, Section 7, Operation of the Remote and Local Shutdown Panels.
Page 2 of 5 JPM 308.01 Rev. 1 START TIME u L PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UNSAT  
Page 2 of 5 JPM 308.01 Rev. 1 START TIME u L PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UNSAT
: 1. 2. Verifies prerequisites met. Verifies prereqs met.
: 1. 2. Verifies prerequisites met. Verifies prereqs met.
Obtain controlled copy of procedure.
Obtain controlled copy of procedure.
Procedure 346, section 7, obtained.
Procedure 346, section 7, obtained.
I I UPON REQUEST: Individual prereqs not verifiable at location, can be verified as met. I I 3. Reviews all applicable precautions and limitations. limitations.
I I UPON REQUEST: Individual prereqs not verifiable at location, can be verified as met. I I 3. Reviews all applicable precautions and limitations. limitations.
Reviews all applicable precautions and  
Reviews all applicable precautions and
: 4. Obtains keys for remote shutdown panel. Shutdown Panel.
: 4. Obtains keys for remote shutdown panel. Shutdown Panel.
Unlock key ring to right of Remote "5. Places the "CRD control transfer" keylock to the alternate position.
Unlock key ring to right of Remote "5. Places the "CRD control transfer" keylock to the alternate position.
Line 270: Line 270:
I I "7. Lines up IC "B" valve control.
I I "7. Lines up IC "B" valve control.
On Remote S/D panel, places control switch for V-14-35 in open and control switch for V-11-34 remains closed.
On Remote S/D panel, places control switch for V-14-35 in open and control switch for V-11-34 remains closed.
I I CUE: V-14-35 control switch is in open and V-11-34 control switch is in close. WON REQUEST: V-14-35 is open V-11-34 is closed I *8. Places bypass switch on the breaker at USS 1B2 for RBCCW pump 1-2 to the bypass position. Place the NormaVBypass switch for RBCCW pump 1-2 to bypass. __ I I CUE: RBCCW pump 1-2 normalhypass switch is in bypass. Page 3 of 5 PERFORMANCE CHECKLIST STANDARD 1 INITIAL SATKINSAT "9. Places train "A" and train "B" to the ll alternate position.  
I I CUE: V-14-35 control switch is in open and V-11-34 control switch is in close. WON REQUEST: V-14-35 is open V-11-34 is closed I *8. Places bypass switch on the breaker at USS 1B2 for RBCCW pump 1-2 to the bypass position. Place the NormaVBypass switch for RBCCW pump 1-2 to bypass. __ I I CUE: RBCCW pump 1-2 normalhypass switch is in bypass. Page 3 of 5 PERFORMANCE CHECKLIST STANDARD 1 INITIAL SATKINSAT "9. Places train "A" and train "B" to the ll alternate position.
: 10. Confirms all recirc pumps tripped. // Insert keys and rotate Train "A" and Train "B" transfer switches to "Alternate".
: 10. Confirms all recirc pumps tripped. // Insert keys and rotate Train "A" and Train "B" transfer switches to "Alternate".
Performance met by prereq of "All actions of ABN 3200.30 met". 1 I I CUE: Red "On" status lights lit for "B" 460V SWGR Room and "A/B" battery room fans after two seconds UPON REQUEST: V-14-35 indicates open (red) V-11-34 indicates closed (green) n I I CUE: If requested by operator, evaluator reports as EO all recirc pump breakers verified open in 4160V switchgear room. I I
Performance met by prereq of "All actions of ABN 3200.30 met". 1 I I CUE: Red "On" status lights lit for "B" 460V SWGR Room and "A/B" battery room fans after two seconds UPON REQUEST: V-14-35 indicates open (red) V-11-34 indicates closed (green) n I I CUE: If requested by operator, evaluator reports as EO all recirc pump breakers verified open in 4160V switchgear room. I I
Line 282: Line 282:
Before you start, I will state the task conditions and initiating cues and fully answer any questions.
Before you start, I will state the task conditions and initiating cues and fully answer any questions.
To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks.
To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks.
NOTE: Directions are only required once in a given JPM session. Comments I Page 1 of 5 JPM 286.04 REFERENCE SECTION TASK CONDITIONS  
NOTE: Directions are only required once in a given JPM session. Comments I Page 1 of 5 JPM 286.04 REFERENCE SECTION TASK CONDITIONS
: Reactor scrammed Both Core Spray Main pumps failed LOCA in progress RPV level 60" GENERAL TOOLS AND EQUIPMENT:
: Reactor scrammed Both Core Spray Main pumps failed LOCA in progress RPV level 60" GENERAL TOOLS AND EQUIPMENT:
None Optional: Plant radio GENERAL  
None Optional: Plant radio GENERAL  
Line 289: Line 289:


EMG 3200.01 B, RPV Control with ATWS, Rev.
EMG 3200.01 B, RPV Control with ATWS, Rev.
12 Support Proc. 20, Low Pressure Injection During An ATWS, Section 3.3, Rev. 12 L TASK STANDARD: Core spray system 1 injecting into the core with fire water CRITICAL ELEMENTS:  
12 Support Proc. 20, Low Pressure Injection During An ATWS, Section 3.3, Rev. 12 L TASK STANDARD: Core spray system 1 injecting into the core with fire water CRITICAL ELEMENTS:
(*) 4&9 INITIATING CUES: The FS/US has directed you to line up fire water to Core Spray System 1 per Support Procedure  
(*) 4&9 INITIATING CUES: The FS/US has directed you to line up fire water to Core Spray System 1 per Support Procedure
: 20. Page 2 of 5 JPM 286.04 PERFORMANCE SECTION L, STARTTIME PERFORMANCE CHECKLIST STANDARD INITIAL SAT/U NSAT 1. Obtain controlled copy of Obtain controlled copy of Support procedure.
: 20. Page 2 of 5 JPM 286.04 PERFORMANCE SECTION L, STARTTIME PERFORMANCE CHECKLIST STANDARD INITIAL SAT/U NSAT 1. Obtain controlled copy of Obtain controlled copy of Support procedure.
Procedure  
Procedure
: 20. 2. Confirms stopped the Core Communicates with Control Room to Spray Main and Booster Pumps in Core Spray System 1. confirm all Core Spray System 1 pumps stopped.
: 20. 2. Confirms stopped the Core Communicates with Control Room to Spray Main and Booster Pumps in Core Spray System 1. confirm all Core Spray System 1 pumps stopped.
I I CUE: Control Room reports Core Spray System 1 pumps stopped. I I 3. Place Core Spray System 1 Main Pump control switches in Pull-to-Lock position.
I I CUE: Control Room reports Core Spray System 1 pumps stopped. I I 3. Place Core Spray System 1 Main Pump control switches in Pull-to-Lock position.
Communicates with Control Room to confirm Core Spray System 1 Main Pumps in Pull-to Lock. I I CUE: Control Room reports Core Spray System 1 Main Pumps in Pull-to- Lock. I *4. Closes telltale drain valve Closes handwheel for V-20-91 located V-20-91. on North side of reactor building 23'. I I CUE: V-20-91 closed.
Communicates with Control Room to confirm Core Spray System 1 Main Pumps in Pull-to Lock. I I CUE: Control Room reports Core Spray System 1 Main Pumps in Pull-to- Lock. I *4. Closes telltale drain valve Closes handwheel for V-20-91 located V-20-91. on North side of reactor building 23'. I I CUE: V-20-91 closed.
I I 5. Confirm running all Diesel Communicates with Control Room to Fire Pumps by placing their control switches in MANUAL running. position (1 3R). confirm all Diesel Fire Pumps are I I CUE: Control Room reports that both Diesel Fire Pumps running. Page 3 of 5 PERFORMANCE CHECKLIST  
I I 5. Confirm running all Diesel Communicates with Control Room to Fire Pumps by placing their control switches in MANUAL running. position (1 3R). confirm all Diesel Fire Pumps are I I CUE: Control Room reports that both Diesel Fire Pumps running. Page 3 of 5 PERFORMANCE CHECKLIST
: 6. Confirms open Core Spray 1 discharge valves V-20-12 and either V-20-15 or V 40. CUE: Upon request the evaluator  
: 6. Confirms open Core Spray 1 discharge valves V-20-12 and either V-20-15 or V 40. CUE: Upon request the evaluator  
\n V-20-12 and V-20-15 (or V-2  
\n V-20-12 and V-20-15 (or V-2
: 7. Confirms closed test discharge valve V-20-27.
: 7. Confirms closed test discharge valve V-20-27.
CUE: Upon request the evaluator H V-20-27 closed. 8. Closes Core Spray 1 suction valve V-20-32 and V- 20-3 CUE: Control Room reports Green *9. Throttle open V-20-83, Fire Water Supply valve. CUE: Flow noise is heard from the (V-20-83 open) 10. Used procedure properly.
CUE: Upon request the evaluator H V-20-27 closed. 8. Closes Core Spray 1 suction valve V-20-32 and V- 20-3 CUE: Control Room reports Green *9. Throttle open V-20-83, Fire Water Supply valve. CUE: Flow noise is heard from the (V-20-83 open) 10. Used procedure properly.
JPM 286.04 STANDARD INITIAL SAT/UNSAT Confirms valves open locally, Rx Bldg. 75' elev. OR communicates with Control Room to confirm discharge valves V-20-12 and either V- 20-15 or V-20-40 are open. I provide the following:  
JPM 286.04 STANDARD INITIAL SAT/UNSAT Confirms valves open locally, Rx Bldg. 75' elev. OR communicates with Control Room to confirm discharge valves V-20-12 and either V- 20-15 or V-20-40 are open. I provide the following:  
.40) open. I Confirms valve closed locally, Rx Bldg. 75' elev. OR communcates with Control Room to confirm test discharge valve V-20-27 is closed. I I provide the following:
.40) open. I Confirms valve closed locally, Rx Bldg. 75' elev. OR communcates with Control Room to confirm test discharge valve V-20-27 is closed. I I provide the following:
I Communicates with Control Room to close suction valves V-20-32 and V 3. 2losed" indicating lights for V-20-32 and V-20-3. I Opens valve V-20-83 locally, adjacent to V-20-91, at the North side of reactor {stem. I Used procedure properly according to its level of usage. COMPLETION TIME L Page 4 of 5 TASK CON D IT10 NS: Reactor scrammed Both Core Spray Main pumps failed LOCA in progress RPV level 60" II INITIATING CUES: The FS/US has directed you to line up fire water to Core Spray System 1 per Support Procedure  
I Communicates with Control Room to close suction valves V-20-32 and V 3. 2losed" indicating lights for V-20-32 and V-20-3. I Opens valve V-20-83 locally, adjacent to V-20-91, at the North side of reactor {stem. I Used procedure properly according to its level of usage. COMPLETION TIME L Page 4 of 5 TASK CON D IT10 NS: Reactor scrammed Both Core Spray Main pumps failed LOCA in progress RPV level 60" II INITIATING CUES: The FS/US has directed you to line up fire water to Core Spray System 1 per Support Procedure
: 20. 1 I1 Page 5 of 5 AmerGen, An ExelontBnhsh Energy Company Title: TERMINATION AND PREVENTION OF INJECTION Task: ENTER AND CONTROL RPV LEVEL, PRESSURE AND CONTROL-With ATWS POWER AS DIRECTED BY EMG-3200.01 B, "RPV 2000501 441 KA# 295037 EA2.02 I RATING: SRO 4.2 RO 4.1 Validation Time:
: 20. 1 I1 Page 5 of 5 AmerGen, An ExelontBnhsh Energy Company Title: TERMINATION AND PREVENTION OF INJECTION Task: ENTER AND CONTROL RPV LEVEL, PRESSURE AND CONTROL-With ATWS POWER AS DIRECTED BY EMG-3200.01 B, "RPV 2000501 441 KA# 295037 EA2.02 I RATING: SRO 4.2 RO 4.1 Validation Time:
3 minutes I No Time Critical:
3 minutes I No Time Critical:
Line 315: Line 315:
3upport Procedure 17, "Termination and Prevention of Injection" - revision 12 b TASK STANDARD:
3upport Procedure 17, "Termination and Prevention of Injection" - revision 12 b TASK STANDARD:
All Core Spray Main Pumps in Pull-to-Lock, All FW pumps off, one (1) Condensate pump running, all Feed Reg. Valves closed.
All Core Spray Main Pumps in Pull-to-Lock, All FW pumps off, one (1) Condensate pump running, all Feed Reg. Valves closed.
CRITICAL ELEMENTS:  
CRITICAL ELEMENTS:
(*) 7, 8, 9, and 10. 2 of 5 JPM 200.00Q Rev. 00 TASK CONDITIONS:
(*) 7, 8, 9, and 10. 2 of 5 JPM 200.00Q Rev. 00 TASK CONDITIONS:
i/ 0 The plant is in an ATWOS condition at approximately 40% power. RPV Control w/ ATWOS has been entered. All efforts to insert control rods have been unsuccessful 0 Support Procedure 16 has been completed bypassing the LO-LO Water Level Interlocks.
i/ 0 The plant is in an ATWOS condition at approximately 40% power. RPV Control w/ ATWOS has been entered. All efforts to insert control rods have been unsuccessful 0 Support Procedure 16 has been completed bypassing the LO-LO Water Level Interlocks.
INITIATING CUES: As the US I am directing you to perform Support Procedure 17, Termination and Prevention of Injection.
INITIATING CUES: As the US I am directing you to perform Support Procedure 17, Termination and Prevention of Injection.
PERFORMANCE SECTION START TIME PERFORMANCE CHECKLIST STANDARD INITIAL 1. Obtain controlled copy of Obtains controlled copy of Support 2. Verifies all prerequisites are Verifies all prerequisites are met SATNNSAT procedure Procedure  
PERFORMANCE SECTION START TIME PERFORMANCE CHECKLIST STANDARD INITIAL 1. Obtain controlled copy of Obtains controlled copy of Support 2. Verifies all prerequisites are Verifies all prerequisites are met SATNNSAT procedure Procedure
: 17. 1 AI met I I Prerequisites have been met. -1 CUE: 3. Informs operator controlling Informs operator controlling pressure that reactor pressure of impending IC initiation. LO-LO level the IC's will initiate when level reaches Depresses OVERRIDE switches for all sensors that are lit or unlit and depresses all ACTUATED switches whether lit or unlit. 4. Overrides all core spray initiation logic. 5. Confirms all Core Spray Parallel Isolation Valves closed. Confirms all Core Spray Parallel Isolation Valves closed by observing GREEN "CLOSED" indicating lights for V-20-15, 40, 21 & 41 lit. 6. Confirms all Core Spray 1 Booster Pumps tripped. Confirms all Core Spray Booster Pumps tripped by observing the GREEN "OFF indicating lights lit. 3 of 5   
: 17. 1 AI met I I Prerequisites have been met. -1 CUE: 3. Informs operator controlling Informs operator controlling pressure that reactor pressure of impending IC initiation. LO-LO level the IC's will initiate when level reaches Depresses OVERRIDE switches for all sensors that are lit or unlit and depresses all ACTUATED switches whether lit or unlit. 4. Overrides all core spray initiation logic. 5. Confirms all Core Spray Parallel Isolation Valves closed. Confirms all Core Spray Parallel Isolation Valves closed by observing GREEN "CLOSED" indicating lights for V-20-15, 40, 21 & 41 lit. 6. Confirms all Core Spray 1 Booster Pumps tripped. Confirms all Core Spray Booster Pumps tripped by observing the GREEN "OFF indicating lights lit. 3 of 5   
' PERFORMANCE CHECKLIST  
' PERFORMANCE CHECKLIST  
Line 326: Line 326:
*9. Confirms one (1) Condensate pump running. *lo. Place all Individual FRV controllers in MAN position and closes all FRV's. 11. Reports to US that SP 17 is JPM 200.00Q Rev. 00 STANDARD Places the control switches for all Core Spray Main Pumps into the PULL-TO- LOCK position. Trips all operating Feedwater pumps by placing their respective control switches to the STOP position 23 returning to the NORMAL position. Trips two (2) of the running condensate pumps leaving one (1) running. Places all Individual FRV controllers in MAN position and closes all FRV's & LFRV's. Reports to US that SP 17 is complete.
*9. Confirms one (1) Condensate pump running. *lo. Place all Individual FRV controllers in MAN position and closes all FRV's. 11. Reports to US that SP 17 is JPM 200.00Q Rev. 00 STANDARD Places the control switches for all Core Spray Main Pumps into the PULL-TO- LOCK position. Trips all operating Feedwater pumps by placing their respective control switches to the STOP position 23 returning to the NORMAL position. Trips two (2) of the running condensate pumps leaving one (1) running. Places all Individual FRV controllers in MAN position and closes all FRV's & LFRV's. Reports to US that SP 17 is complete.
Used procedure properly according to its level of usage. INITIAL SATNNSAT COMPLETION TIME 4 of 5 JPM 200.00Q SIMULATOR SETUP Initial Condition(s):
Used procedure properly according to its level of usage. INITIAL SATNNSAT COMPLETION TIME 4 of 5 JPM 200.00Q SIMULATOR SETUP Initial Condition(s):
IC-65 SETUP 1. Run Simprob.cae and ATWS.CAE 2. Complete Support Procedure 16 to bypass Lo-Lo interlocks.  
IC-65 SETUP 1. Run Simprob.cae and ATWS.CAE 2. Complete Support Procedure 16 to bypass Lo-Lo interlocks.
: 3. Malfunctions:
: 3. Malfunctions:
NONE Command Files: SI MPROB.CAE ATW S .CAE Rev. 00 c 5 of 5 TASK CONDITIONS:  
NONE Command Files: SI MPROB.CAE ATW S .CAE Rev. 00 c 5 of 5 TASK CONDITIONS:  

Revision as of 03:23, 14 July 2019

Draft Section B Operating
ML041890344
Person / Time
Site: Oyster Creek
Issue date: 04/19/2004
From: Hackenberg J
AmerGen Energy Co
To: Conte R
NRC/RGN-I/DRS/OSB
Conte R
References
-RFPFR, 50-219/04-301, ES-301, ES-301-2 50-219/04-301
Download: ML041890344 (66)


Text

ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 c. Recirculation system / Respond to a tripped recirc pump with 5 operating (Alternate Path - Discharge Valve will not close) Last NRC Facility: Oyster Creek NRC Date of Examination:

Week of April 19, 2004 Exam Level (circle one): RO / SRO(I) / SRO(U) Control Room Systems (8 for RO, 7 for SRO-I, 2 or 3 for SRO-U) Operating Test No.: 2004NRC 202.1 0 D, s, A System / JPM Title

d. Primary Containment

/ Bypass Isolation Interlock for Torus Vent valves and prepare to vent the Torus

e. AC Electrical

/Transfer Bus 1A from Auxiliary Transformer to Start-up Transformer Type Code*

Function I I Safety 223.01 5 D, s 262.07 6 D, s, L a. Stm&yTQu ia Gontrol (SLC) / 21 1.01 pump 0- b. ADS / Close a stuck open EMRV (Alternate Path - fail first step) 21 8.01 D. S. A g. Standby Gas Treatment system (SGTS)

/ Shutdown SGTS after Auto Initiation (Alternate Path - normal fan does not start) 1 261.03 N, S, A 3 h. For RO - Recirculation system / Conduct Recirc Pump Trip Logic functional test 202.1 1 D, S 4 a. Fire Water system

/ Line-up Fire Water to the Core Spray System

[PRA related] 286.04 2 M,R, L Emergency

f. Control Room Ventilation

/ Purge Control Room using Control Room HVAC System 308.01 D, R, L .PPI Emergency 9 c. TBCCW/Line-up TBCCW during SBO 274.01 8 D, R, L Abnormal b. CRD/lnitiate the Remote Shutdown Panel on Control Room Evacuation

  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA AmerGen,.

JOB PERFORMANCE MEASURE 21 8.01 An ExelonlBritish Energy Company Title: Close a stuck open EMRV Task: Diagnose and recover from a stuck open EMRV 2 1 8040 1 00 1 KA# 218000 A4.01 RATING:

RO - 4.4 SRO - 4.4 Validation Time 13 minutes Time Critical NO I I I Name Social Security Number I DIRECTIONS TO TRAINEE: Before you start, I will state the task conditions and initiating cues and fully answer any questions.

To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks. NOTE: Directions are only required once in a given JPM session. Comments Date Page 1 of 6 REFERENCE SECTION:

b TASK CONDITIONS:

Reactor power loo%, all system operating properly.

I GENERAL TOOLS AND EQUIPMENT:

None GENERAL

REFERENCES:

Procedure, ABN-40, Stuck Open EMRV, Rev. 1 TASK STANDARD: "A" EMRV NormaVDisable switch in "disable" , valve closed.

CRITICAL ELEMENTS:

(*) b 6 \-- Page 2 of 6 JPM 218.01 PERFORMANCE SECTION: TASK CONDITIONS: Reactor Power 1 OO%, all systems operating properly.

INITIATING CUES: Your task will be associated withc n; you are expected to respond to any further alarms that are received.

START TIME - PERFORMANCE CHECKLIST STANDARD I INITIAL SATNNSAT I CI: When directed by the Floor Instructor, activate MAL-NSS025A, 100% I I 1. Obtain controlled copy of procedure Refers to RAP 8-3-9 and B-4-g Verifies "A EMRV is open. 2. Obtains controlled copy of ABN 40 as directed by RAP 3. Places Feed water Control in manual. 4. Attempts to close "A" EMRV Obtains ABN 40 Depresses MANUAL butt n on M ster On 1 F/2F, places "A" Auto Depress Valve switch in "Off" observes that valve is still open. Level Controller 6 44 4 &*hq Lcyl l! I 1' ' 0 using ADS switch /- 5. Cycles switch off to Manual to off 3 times. Cycles "A" EMRV control switch to Manual to OFF 3 times. Observes valve is still open. I I CUE: (Cf) Upon request discharge temperature is 300 *Fa Once the Disable Alarm comes in DELETE MAL-NSSO25A I I *6. Places "A" EMRV NormaVDisable switch in "Disable" Places "A" NormaVDisable switch in "Disable" at rear of 1 F/2F Observes that "A EMRV is closed.

I I CUE: (CI)

Upon request discharge temperature is 290 QF and decreasing Page 3 of 6 COMPLETION TIME JPM 218.01 PERFORMANCE CHECKLIST

6. Used procedure properly.

STANDARD Used procedure properly according to its level of usage. Page 4 of 6 JPM 218.01 SIMULATOR SETUP Initial Condition(s):

100% Reactor Power Setup: 1. initialize to any 100% power IC 2. RUN file SIMPROB.CAE Malfunctions:

None Remotes: None Overrides:

SWI-ADS001 C, ON Computer Aided Exercises:

SIMPROB-CAE Page 5 of 6 TASK CONDITIONS: Reactor Power 100% All systems operating satisfactory INITIATING CUES: Your task will be associated with ADS/EMRV System operation; you are expected to respond to any further alarms that are received.

Page 6 of 6 AmerGen,.

JOB PERFORMANCE MEASURE 21 1.01 An Exelon/British Energy Company Title: Manual Initiation of the Standby Liquid Control System Task: Inject liquid poison into the reactor vessel using the Liquid Poison 21 10501 401 System KA# 21 1000 A4.02 RATING:

RO - 4.2 SRO - 4.2 Validation Time 8 minutes I Time Critical I NO I I I Name Social Security Number I I DIRECTIONS TO TRAINEE: Before you start, I will state the task conditions and initiating cues and fully answer any questions.

To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks. NOTE: Directions are only required once in a given JPM session. Comments JPM 21 1.01 REFERENCE SECTION:

u TASK CONDITIONS:

A failure to fully scram from 100% Rx power has occurred Reactor power is

-45% All recirc pumps have tripped All methods to insert control rods have failed Pressure is being maintained 850-1000 psig using Main Turbine Power oscillations are occurring GENERAL TOOLS AND EQUIPMENT: Key for SLC Keylock switch

[PA22351 GENERAL

REFERENCES:

EMG-3200.01 B, RPV Control with ATWS, Rev. 12 Support Procedure 22, Initiating the Liquid Poison System, u TASK STANDARD:

Liquid poison entering reactor CRITICAL ELEMENTS:

(*) 4 IN IT1 AT1 NG CUES: As Unit Supervisor, I am directing you to inject liquid poison into the reactor with Standby Liquid Control System 1,

_____~~ JPM 21 1.01 5. Verify flow to reactor PERFORMANCE SECTION: Verifies the following for system #2: . "PUMP ON" light is lit (Panel 4F) (System 1 light goes out & System 2 light goes on) . Squib for Sys 2 light is lit (Panel 4F) . Pump Disch Press

> Reactor Pressure (Panel 4F) . "FLOW ON" alarm lit (G-1-b) . "SQUIB VALVE OPEN" alarm lit (G-2-b) START TIME PERFORMANCE CHECKLIST STANDARD

1. Obtains controlled copy of Support Procedure 22 obtained procedure I NOTE: When the keylock switch is placed in Sys 1 in the following stel NPO2A will fail to start. [CLF PMP SLC1, shaft break, opt.

11 2. Starts poison pump NP02A 3. Verify flow to reactor Rotates STANDBY LIQUID CONTROL keylock switch on 4F to Fire Sys 1 position Verifies the following for system #1: . "PUMP ON" light is lit (Panel 4F) . Squib for Sys 1 light is lit (Panel 4F) . Pump Disch Press

> Reactor Pressure ~ (Panel 4F) (pressure will not develop) . "FLOW ON" alarm NOT lit (G-1-b) . "SQUIB VALVE OPmalarm lit (G-2-b) *4. Responds to failure of pump NP02A to start Places STANDBY LIQUID CONTROL keylock switch on 4F to Fire Sys 2 position I COMPLETION TIME INITIAL SATNNSAT JPM 21 1.01 SIMULATOR SETUP Initial Condition(s):

IC-1 04 Includes the following: Init to IC 94 Not necessary to insert SIMPROB BYPASS Lo-Lo MSlV Closure using jumpers (IAW SP-16) [V-6-395 does not have to be byy Insert File JPM211 Notes: file will freeze the simulator after 140 seconds go back to run 0 reduce recirc flow to minimum (1 1.4), then trip all the recirc pumps place the mode switch to SHUTDOWN simulator is now ready for jpm use Malfunctions:

IC preset Component Level Failures:

IC Preset u CLF PMP SLC1, shaft break, Option 1 preinserted (Fails 'A' SLC Pump) Instructor Overrides:

IC preset Local Operator Actions:

IC preset Computer Aided Exercises: None 11 TASK CONDITIONS:

A failure to fully scram from 100% Rx power has occurred Reactor power is -45% All recirc pumps have tripped All methods to insert control rods have failed Pressure is being maintained 850-1 000 psig using Main Turbine Power oscillations are occurring 11 INITIATING CUES: As Unit Supervisor, I am directing you to inject liquid poison into the reactor with Standby Liquid Control System 1 using Support Procedure

22.

AmerGen,, An Exelon/British Energy Company JOB PERFORMANCE MEASURE 202.1 0 Title: Respond to a Tripped Recirc Pump with 5 Recirc Pumps Operating (Alternate Path) Task: Respond to a Tripped Recirc Pump with 5 Recirc Pumps Operating I 2020401404 KA# 202001 A2.03 I RATING: RO - 3.6 SRO- 3.7 Validation Time - 15 min Alternate Path - Yes I Time 1 Critical NO I I I Name Social Security Number I I DIRECTIONS TO TRAINEE: Before you start, I will state the task conditions and initiating cues and fully answer any questions.

To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks.

NOTE: Directions are only required once in a given JPM session. Comments I 1. .* Date JPM 202.10 Rev. 1 REFERENCE SECTION: i/ TASK CONDITIONS: Reactor power 1 OO%, all systems operating properly. GENERAL TOOLS AND EQUIPMENT:

None GENERAL

REFERENCES:

ABN-02, Recirculation System Failures, Rev. 0 TASK STANDARD:

Four pumps running in automatic, the other loop idle.

i, CRITICAL ELEMENTS:

(*) Page 2 of 7 JPM 202.10 Rev. 1 PERFORMANCE SECTION:

b 4 4 L TASK CONDITIONS: Reactor power 1 OO%, all system operating properly.

n; you are now to respond to any f\ re received.

1 START TIME n I U I PERFORMANCE CHECKLIST CI: PREINSERT CLF VL\ already done. INSERT MALF RFCO( 1. Confirms discharge bypass valve for "E" loop open CI: MONV R3754 to verii approx. 0.2. IF the conditions it fully closes using CLF VLV 2. Closes "E" pump discharge valve

3. Obtains controlled copy of procedure 4 Determines Discharge Valve will not close STANDARD I NSS020 option 6 conditional on R3754.LE.0.2 if not E when instructed by the FI. I At Panel 3F, confirms discharge bypass valve for "E" loop open. that the discharge valve mechanically seizes at fails to take then go ahead and seize the wrlve before JSS020, Mech Siezure.

I At Panel 3F, takes "E" recirculation pump discharge valve control switch to close. Procedure ABN-2, Section 3.1.2 obtained.

At Panel 3F, Determines Discharge Valve will not close.

Page 3 of 7 JPM 202.10 Rev. - PERFORMANCE CHECKLIST STANDARD I INITIAL SAT/U NS AT *5 Closes "E" pump suction valve At Panel 3F, takes "E" recirculation pump suction valve control switch to close.

I CUE: (FI) Acknowledge as the US that a plant shutdown is required.

  • 6. Dispatches Electrician. Dispatches/directs Electrician to attempt to close the discharge valve IAW attachment ABN-2-1. 7. Determines loop configuration Determines that the loop can either be placed in an "IDLE" or "ISOLATED" condition.

I I CUE:(FI) As US, direct operator to place the loop in an "IDLE" configuration.

I I *8. Opens the suction valve Re-opens the suction valve by taking its control switch to the OPEN position.

9. Maintain reactor power At Panels 3F and 4F, verifies below rod block on power operation curve. below rod block setpoint 10. Maintains RPV level 155 At Panel 5F/6F, ensures FWC system to 165" maintaining level. 11. Monitor Nls for indication of power oscillation At Panel 4F, monitors APRMs. At Panels 3F and 4F, monitors APRMs and total recirc flow; verifies not in exclusion region of power operation curve. 12. Verifies did not enter exclusion region of the power operation curve Page 4 of 7 Rev. 1 FORMANCE CHECKLIST
13. Refer to Tech Spec for limitations on continued plant operations
14. Confirms one of the recirc pump suction temp indicators on 3F is selected to an operating loop CUE: (FI) Acknowledge maintain power at 15. Monitors for Fuel Element Failure. 16. Notify system dispatcher of power limitations
17. Notifies Chemistry if power changed by 289.5 MWth. Notifies designated Rx engineer CUE: (FI) Another operi 18. Used procedure properly.

STANDARD Uses Tech Spec Sections 3.3.F to determine no limitation or informs Shift Supervisor to refer to TS 3.3.F, 3.1 O.A. Selects an operating loop for one of the RECIRC PUMP SUCTION TEMPS. hat no limitations exist and that another 01 ts present level. Monitors Off-Gas, MSL Radiation

& Rx Coolant Activity. (No notifications because no limitations) Notifies Chemistry if power changed by 289.5 MWth. Notifies Rx engineer.

or will perform diagnosis Used procedure properly according to its level of usaae. INITIAL SATNNSAT brator will COMPLETION TIME Page 5 of 7 JPM 202.10 u SIMULATOR SETUP Initial Condition(s):

IC-65, 100% Reactor Power 1. Initialize to IC 65 and perform switch check 2. Enter file SIMPROB 3. Execute VLV-NSS020, Mech Siezure. conditional on R3754 .LE. 0.2. Malfunctions:

MAL-RFCOO1 E Mech Siezure Component Level Failures:

VLV-NSS020, Mech Siezure. conditional on R3754.LE.0.2 Command Files: SIMPROB c Page 6 of 7 u TASK CONDITIONS:

Reactor power 1 OO%, all systems operating properly.

INITIATING CUE: Your task will be associated with Recirculation System operation; you are now to respond to any further alarms that are received.

Page 7 of 7 AmerGen - SM 274.01 An Exelon/British Energy Company JOB PERFORMANCE MEASURE Title: Line up the TBCCW Heat Exchangers to Service Water Following a Station Blackout Task: Perform Lineups of the TBCCW system 1 2740104001 KA# RATING: Validation Time 10 minutes Time Critical No Name Social Security Number I I DIRECTIONS TO TRANEE: Before you start, I will state the task conditions and initiating cues and fully answer any questions.

To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence.

Peer checking will not be provided during the performance of required tasks.

NOTE: Directions are only required once in a given JPM session. Comments Date Page 1 of 4 JPM 274.01 Rev. 1 TASK CONDITIONS: - Reactor Scram - Loss of all Off-site and On-site AC Electrical Power. - Breakers USlT and US2T are racked in. GENERAL TOOLS AND EQUIPMENT:

MB1 key Radio Flashlight GENERAL

REFERENCES:

Station Procedure, ABN-37, STATION BLACKOUT, Rev 0 - TASK STANDARD:

TBCCW valves lined up per ABN-37, Attachment

-3, step 4.0 CRITICAL ELEMENTS:

(*) 2,3,4 & 5 INITIATING CUES: A Station Blackout has occurred, (total loss of off-site and on-site AC electrical power). The SM/US has directed you to line up TBCCW valves for TBCCW heat exchanger 1-1 per ABN 3200.37, Attachment

-3, Step 4.0. Page 2 of 4

____~ JPM 274.01 Rev. 1 START TIME - PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UNSAT

1. Obtain controlled copy of Obtain controlled copy of kBW'37 procedure. Attachment 444 5 "2. Close V-3-58. Closes V-3-58 in the Turbine Bldg. basement.

I I CUE: V-3-58 closed. I I "3. Open V-3-59. Opens V-3-59 in the Turbine Bldg. I basement . I I C!uE: V-3-59 open. I I "4. Close V-3-76 and V-3-77. Closes V-3-76 and V-3-77 in the Turbine Bldg. basement.

I - I CUE: V-3-76 and V-3-77 are closed. I I "5. Open V-3-76 one turn open. Throttles V-3-76 to a position not fully closed in the Turbine Bldg. basement.

CUE: V-3-76 one turn open. I I 6. Confirm V-3-74 is fully open.

Opens V-3-74 in the Turbine Bldg. basement.

I I CUE: V-3-74 is full open. 7. Used procedure properly. Used procedure properly according to its level of usage. COMPLETION TIME Page 3 of 4 TASK CONDITIONS: - Reactor Scram - Loss of all Off-site and On-site AC Electrical Power. - Breakers USlT and US2T are racked in. INITIATING CUES: A Station Blackout has occurred, (total loss of off-site and on-site AC electrical power). The SM/US has directed you to line up TBCCW valves for TBCCW heat exchanger 1-1 per ABN- 37, Attachment 3, Step 4.0. Page 2 of 4 JOB PERFORMANCE MEASURE 223.01 AmerGen,, An Exelon/British Energy Company Title: Bypass Isolation Interlock for Torus Vent Valves Task: Bypass Isolation Interlock on Drywell and Torus Vent and Purge 2230501501 Valve KA# 295024 EA1.14 I RAT1 NG : RO - 3.4 SRO- 3.5 Validation Time 13 min I Alternate Path No I Time Critical I NO I I I Name Social Security Number 1 I DIRECTIONS TO TRAINEE:

Before you start, I will state the task conditions and initiating cues and fully answer any questions.

To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence.

Peer checking will not be provided during the performance of required tasks. NOTE: Directions are only required once in a given JPM session. Comments 1 Of7 JPM 223.01 'EFERENCE SECTION: b TASK CONDITIONS:

Reactor scrammed due to a LOCA CHRRMS reading greater than 20,000 WHR All automatic actions due to LOCA have occurred GENERAL TOOLS AND EQUIPMENT:

EOP BYPASS PLUGS GENERAL

REFERENCES:

EMG-3200.02, Primary Containment Control, Rev. 16 3~ppot-t Procedure 32 L TASK STANDARD: Isolation for V-28-18 and V-28-47 have been bypassed CRITICAL ELEMENTS:

(*) 11, 12, 13, 14 2 of 7

- JPM 223.01 f "ERFORMANCE SECTION:

Lv 'g 4. Evacuates personnel from the Reactor Building TASK CONDITIONS: Reactor scrammed due to a LOCA CHRRMS reading greater than 20,000 WHR All automatic actions due to LOCA have occurred INITIATING CUES: As the US I am directing you to bypass lorus Vent Isolation-

' r V-28-18 and V-28-47 using Support Procedure 32.

Inform me when ready to vent. START TIME PERFORMANCE CHECKLIST 1 Obtain controlled copy of procedure CUE: Prerequisites are c u 3. Verifies Torus level is I below 348 in. 5. Starts SGTS -$r STANDARD INITIAL SAT/ UNSAT 1 Support Procedure 32 obtained I Verifies prerequisites I At Panel 1 F/2F, verifies Torus water level is below 348 in. I - Sound the Reactor Building - Evacuation - Announces: "Primary Containment Alarm Venting will commence in approximately 5 minutes. All personnel evacuate the Reactor Building immediately." At Panel 11 R, selects a SGTS fan and places it control switch in HAND. 3 of 7 PERFORMANCE CHECKLIST y 6. Closes V-28-48 STANDARD At Panel 11 R, places the SGTS crosstie valve V-28-48 in the CLOSED position

7. Confirms Reactor Bldg. Supply Fans secured INITIAL SAT/ UNSAT 8. Confirms Reactor Bldg. Exhaust Fans secured 9. Confirm that the "Reactor Mode Selector Switch" is NOT in the "Run" position 1O.Obtains bypass plug *11 Inserts bypass plug in 1OXF. *12 Inserts bypass plug in 11R. "13 Places the TORUS/ DW ISOLATION VALVE BYPASS keylock switch in the TORUS position JPM 223.01 At Panel 11 R, confirms the Reactor Bldg. Supply fans are secured At Panel 11 R, confirms the Reactor Bldg. Exhaust fans are secured Verifies 4F "Reactor Mode Selector Switch" is NOT in "Run" Obtains one(1) bypass plug from the EOP station in the control room. Inserts bypass plug in 1OXF: * - Opens EOP BYPASS PLUGS panel (rear of 1 OXF) - Inserts bypass plug in position BP5. Inserts bypass plug in 1 1 R: - Opens EOP BYPASS PLUGS - Removes bypass plug in - panel (rear of 1 1 R) position BP4 Inserts bypass plug in position BP1. At Panel 11 F, places the TORUS/DRYWELL ISOLATION VALVE BYPASS PERMISSIVE keylock switch in the TORUS position.

4 of 7 PERFORMANCE CHECKLIST Y STANDARD *14 Places the DW/TORUS VENT & PURGE ISOL HI RAD BYPASS keylock switch channel 1 and 2 in BYPASS INITIAL SAT/ 15. Informs the US, Torus is ready to vent

6. Used procedure properly.

JPM 223.01 UNSAT At Panel 11 F , places the DRYWELL/TORUS VENT

& PURGE ISOLATION HI RAD BYP Keylock switches in BYPASS Tells the US (Evaluator) that the torus is ready to vent via the torus vent valves. I 2 when informed that the Torus is ready for venting. Used procedure properly according to its level of usage. COMPLETION TIME 5 of 7 JPM 223.01 u SIMULATOR SETUP Initial Condition(s):

IC-65, 100% Rx PWR Setup 1. Digital Feed and Recirc Flow control 2. Set Master Recirc flow controller to 44.44 cycles

3. Set Feedwater master controller to 163.5 inches, and in "Auto" 2. Initialize to IC 65 and perform switch check 3. Run SIMPROBxae
4. Go to "RUN" and execute MAL-NSS004A, 1 OO%, ACT 5. Run JPM22301 .CAE 6. Take mode switch to shutdown 7. Open all EMRV's 8. Turn on Fuel Zones
9. "FREEZE" simulator when reactor pressure decreases to less than 130 psig Place the "A/B/C" MFRV and "NC LFRV in "AUTO" Malfunctions:

MAL-NSS004A, 100% Overrides:

SWI-NSS066V, ON SWI-NSS068V, ON Remotes: Computer Aided Exercises:

SI M PROB.CAE JPM22301 .CAE 6 of 7 TASK CONDITIONS: Reactor scrammed due to a LOCA CHRRMS reading greater than 20,000 WHR All automatic actions due to LOCA have occurred INITIATING CUES: As the US I am directing you to bypass Torus Vent Isolation logic for V-28-18 and V-28-47 using Support Procedure

32. Inform me when ready to vent.

7 of 7 AmerGensM KA# 262001 A4.04 An Exelon/British Energy Company RATING: RO - 3.6 SRO - 3.7 JOB PERFORMANCE MEASURE 262.07 Validation Time 12 minutes Time Critical Title: Manual Transfer of the 4160 VAC Bus 1A from the Auxiliary Transformer to the Startup Transformer NO Task: Shift Station Loads between Aux. and S/U Transformers I 2620101002 Name Social Securiity Number I I DIRECTIONS TO TRAINEE: Before you start, I will state the task conditions and initiating cues and fully answer any questions.

To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks.

NOTE: Directions are only required once in a given JPM session. Comments .. . 4). Date

~~ JPM 262.07 REFERENCE SECTION:

ii TASK CONDITIONS:

Plant is at 100% Power 41 60V 1 A main breaker needs to be removed from service GENERAL TOOLS AND EQUIPMENT:

None GENERAL

REFERENCES:

Procedure 337, 41 60 Volt Electrical System, Section 3.4, Rev.

57 L TASK STANDARD:

1A 41 60-volt bus is energized from the startup transformer CRITICAL ELEMENTS:

(*) 739 Page 2 of 6 PERFORMANCE SECTION: %u INITIATING CUES: I As the US I am directing you to transfer 4160-volt bus 1A to the startup I transformer in accordance with Ops Procedure 337. 6. Verifies that the 34.5 kV breaker feed to bank No. 5 is in the closed position.

START TIME - Verifies red light for Bank No. 5 feed on 12F is energized. PERFORMANCE CHECKLIST STANDARD 1 INITIAL S AT/U NSAT 1. Obtains controlled copy of Procedure 337, section 3.4 obtained procedure

~~ 2. Verifies all prerequisites I Verifies prereqs met I CUE:(FI) As requested, individual prerequisites not verifiable in the Control Room can be verified met, Bank 5 voltage regulator is in service. I I 3. Reviews all applicable precautions and limitations Reviews all applicable precautions and limitations

4. Verifies 41 60 volt main breaker 1 A control switch is in the "Closed" position Verifies on panel 8F/9F red closed light is energized with red target for breaker 1 A. 5. Verifies that SU Breaker S1A racked in and open. Verifies that the S1A breaker "OPEN" light and "BREAKER UP" light located on panel 8F/9F are energized.

Page 3 of 6 PERFORMANCE CHECKLIST

  • 7. Puts synchroscope key into synchronizing switch for S1 A on 8F/9F and turns on. 8. Verifies power is synchronized across S1 A *9. Closes S1A 10. Turn synchronizing key from 8F/9F switch off and remove 11. Matches main breaker targets 12. Used procedure properly.

JPM 262.07 STANDARD At panel 8F/9F places key in S1A synchronizing switch and turns to "On" At Panel 8F/9F, verifies synchroscope is stationary and pointing at 12 o'clock with both synch lights out. Place S1A control switch on 8F/9F to "Close" position. Checks the breaker closed light is energized and breaker 1A opens. On Panel 8F/9F, Places synchronizing switch in Off and removes key Operates main breaker 1A to the trip position to match mechanical indication Used procedure properly according to its level of usage. INITIAL SATNNSAT COMPLETION TIME Page 4 of 6 JPM 262.07 u SIMULATOR SETUP I nit ial Cond it ion (s) : I C-65 SET-UP ACTIONS: 1. Digital Feed and Recirc Flow control 9 9 9 2. Init to IC 65 and perform switch check

3. File SIMPROB 4. I' FR E EZ E" si m u I at o r Set Master Recirc flow controller to 44.44 cycles Set Feedwater master controller to 163.5 inches, and in "Auto" Place the "A/B/C" MFRV and "A/C LFRV in "AUTO" Malfunctions: Component Level Failures:

Instructor Overrides: Local Operator Actions: L Monitored Variables:

Command Files: SIMPROB Computer Aided Exercises: Remote Control Assignments:

Page 5 of 6 TASK CONDITIONS:

Plant is 100% Power 4160V 1A main breaker needs to be removed from service INITIATING CUES: As the US I am directing you to transfer 4160-volt bus 1A to the startup transformer in accordance with Ops Procedure 337. Page 6 of 6 AmerGen,, An Exelon/British Enerqy Company JOB PERFORMANCE MEASURE -- .- 202.1 1 Title: CONDUCT RECIRC PUMP TRIP LOGIC SYS FUNCTIONAL TEST Task: CONDUCT RECIRC PUMP TRIP LOGIC SYS FUNCTIONAL TEST 2020201 004 KA#202001 K1.27 RATING: RO - 4.1 SRO - 4.3 Validation Time:

20 min I Faulted: NO Time Critical:

NO I Name Social Security Number 1 I DIRECTIONS TO TRAINEE: Before you start, I will state the task conditions and initiating cues and fully answer any questions.

To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence.

NOTE: Directions are only required once in a given JPM session. Comments:

Date: 1 Of7

~_______ JPM 202.1 1 Rev.1 REFERENCE SECTION:

_/I TASK CONDITIONS: - Plant is at 100% power - Division I test was complete on the last shift. - All system operable GENERAL TOOLS AND EQUIPMENT:

Key for Division Normal - Test Keylock switch Stopwatch - Student will be expected to record control number and calibration date. GENERAL

REFERENCES:

Recirculation Pumps Trip Circuitry Test Proc. 603.4.001, Rev.

9 TASK STANDARD:

u Division II Surveillance completed.

CRITICAL ELEMENTS:

(*) 4, 5, 6, 7, 9, 10, 11, 13, 14, 15 2 of 7 JPM 202.1 1 PERFORMANCE SECTION: u PERFORMANCE CHECKLIST

1. Obtain controlled copy of procedure Rev. 1 STANDARD INITIAL SAT/UNSAT Obtains controlled copy of Proc. 603.4.001 L 2. Verifies all prerequisites are met // TASK CONDITIONS: - Plant is at 100% power - All system operable INITIATING CUES: - As US, I am directing you to complete the Recirculation Pumps Trip Circuitry Test Proc. 603.4.001 on Division II. Verifies prerequisites met START TIME
3. Reviews all applicable precautions and limitations Reviews precautions and limitations
  • 4. Places Division II in test Places Division 2 Normal - Test Keylock switch to the test position. - Verifies TEST-II alarm (E-3-b) annunciates.
4. Tests Channel A Momentarily depresses CHAN C TRIP pushbutton switch on 3F - Verifies ACTUATE C-Il alarm (E-1-b) annunciates.

3 of 7 L I PERFORMANCE CHECKLIST

  • 6. Tests Relay 6K12AA

~~~ *7. Times trip 8. Relay a *9. Resets Channel C *lo. Tests Relay 6K1 OAA II *11. Times trip 112. JPM 202.11 Rev. 1 STANDARD Simultaneously momentarily depress CHAN D TRIP pushbutton switch on 3F and start stopwatch. - Verifies ACTUATE D-ll alarm (E-2-b) annunciates. - Verifies the Division II lamps for A, B, & E recirculation pumps light instantly. When Division II lamps for Recirc Pumps C & D light then stop the stopwatch and record As-Found value. If the As-Found value is not 10.5 +/- 0.5 seconds then adjust the relay 6K12AA.

ljustment will not be necessary.

Momentarily depresses CHAN C RESET pushbutton switch on 3F - Verifies ACTUATE C-ll alarm (E-1 -b) has cleared.

Verifies the Division II lamps for all five recirculation pumps are NOT lit. - Simultaneously momentarily depress CHAN C TRIP pushbutton switch on 3F and start stopwatch. - Verifies ACTUATE C-ll alarm (E-1-b) an nu nciates. - Verifies the Division II lamps for A, B, & E recirculation pumps light instantly. When Division II lamps for Recirc Pumps C & D light then stop the stopwatch and record As-Found value. If the As-Found value is not 10.5 +/- 0.5 seconds then adjust the relay 6K1 OAA. INITIAL SATAJNSAT 4 of 7 JPM 202.1 1 Rev.1 I PERFORMANCE CHECKLIST Relay i *13. Resets Channel C *14. Resets Channel B *15. Places Division II in Normal 16. Used procedure properly.

STANDARD INITIAL S AT/U NSAT I ljustment will not be necessary.

Momentarily depresses CHAN C RESET pushbutton switch on 3F - Verifies ACTUATE C-ll alarm (E-1-b) has cleared. - Verifies the Division II lamps for all five recirculation pumps are NOT lit. Momentarily depresses CHAN D RESET pushbutton switch on 3F - Verifies ACTUATE D-ll alarm (E-2-b) has cleared. Places Division II Normal - Test Keylock switch to the Normal position. - Verifies TEST II alarm (E-3-b) has cleared. Used procedure properly according to its level of usage. COMPLETION TIME 5 of 7

\/ Initial Condition(s):

100% Power Malfunctions:

NONE Computer Aided Exercises:

SI M P ROB .CA E JPM 202.11 SIMULATOR SETUP Rev.1 6 of 7 TASK CON D I TI 0 NS : - Plant is at 100% power - All system operable INITIATING CUES: - As US, I am directing you to perform Recirculation Pumps Trip Circuitry Test Proc. 603.4.001 7 of 7 JOB PERFORMANCE MEASURE An Exelon/British Energy Company 288.02 L/ Title: Purge Control Room Using Control Room HVAC System Task: Purge Control Room Using Control Room HVAC System 2880101403 KA# 2900003 A2.04 RATING: RO- 3.1 SRO- 3.3 Validation Time 15 min Alternate Path - No Time NO Critical I I I Name Social Security Number I I DIRECTIONS TO TRAINEE: ll Before you start, I will state the task conditions and initiating cues and fully answer any questions.

To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks. NOTE: Directions are only required once in a given JPM session. il Comments Page 1 of 6

_____ ~~ - ~~ JPM 288.02 Rev 1 b REFERENCE SECTION:

~~ I TASK CONDITIONS: - Reactor Power 100% - "B" Control Room HVAC is tagged out of service - A fire has been recently extinguished in the Control Room, fumes are still present - All other plant systems are operating normally - Immediate actions of ABN-29 are complete.

'"GENERAL TOOLS AND EQUIPMENT:

None GENERAL

REFERENCES:

ABN-29, Response to Fire: Rev 0 TASK STANDARD: One complete purge has been performed and "B" 460 volt switchgear ventilation has been restarted.

CRITICAL ELEMENTS:

(*) 2,3,4,5,7,8 Page 2 of 6 L PERFORMANCE SECTION: 11 TASK CONDITIONS: - Reactor Power 100% - "B" Control Room HVAC is tagged out of service - A fire has been recently extinguished in the Control Room, fumes are still present - All other plant systems are operating normally - Immediate actions of ABN-29 are complete.

INITIATING CUES: Control Room fire has been extinguished, with residual smoke existing., the Unit Supervisor has directed you to purge the Control Room and restore normal ventilation to the Control Room using HVAC System "A" per ABN-29 "1 START TIME PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UN SAT 1. Obtains controlled Procedure ABN-29, Section 3.4.8 copy of procedure

  • 2. Shuts down "B" 460 volt switchgear room ventilation OFF position.

system Places "Bl' 460V SWGR Room Supply and Exhaust Fans, SF-1 -21 and EF-1-21, in the I Page 3 of 6 JPM 288.02 Rev 1 PERFORMANCE CHECKLIST

  • 3. Lines up the Control Room HVAC system for purging
  • 4. Places the NormaVReseVBypa ss Switch in the "Bypass" position
  • 5. Start CR HVAC A system fan 6. Monitor "B" 460V Switchgear Room Temperature
  • 7. Reset fire alarms
  • 8. Reset Control Room HVACA 9. Return CR HVAC to I' Nor 1 1. Used procedure properly.

STANDARD INITIAL SAT/U N SAT Places the "A Control Rm HVAC Damper Control" switch in "Pur" on panel 11 R Places "HVAC A Bypass Switch" on 11 R in I I' B yp" For HVAC "A", places "System Initiation" switch in "on" on panel 1 I R In the "B" 460V switchgear room, have the EO monitor temperature and notify if it approaches 104' F. Resets fire detection alarms on Control Module 6 On Panel 11 R, take the Bypass switch to "Reset" and then to "Norm" Places Control RM HVAC A Damper Control switch in "Nor" on 11 R .' Used procedure properly according to its level of usage. COMPLETION TIME Page 4 of 6 JPM 288.02 Rev 1 SIMULATOR SETUP Initial Condition(s):

100% Power IC Turn off "B" Control Room HVAC Tag the "B" Control Room HVAC out of service Malfunctions: FPS3A,22 for Panel A, Zone 1 alarm on Master Fire alarm panel in the Control Room (NOTE: Remove Malfunction(s) when directed by the Evaluator)

Component Level Failures:

'nstructor Overrides:

b SWI-TBS24A to "fail off" SWI-TBS28A to "fail off" Computer Aided Exercises: Simprob. CAE Page 5 of 6 I___ Error! Main Document Only. TASK CONDITIONS

- Reactor Power 100% - "B" Control Room HVAC is tagged out of service - A fire has been recently extinguished in the Control Room, fumes are still present - - All other plant systems are operating normally Immediate actions of ABN-29 are complete.

INITIATING CUES: Control Room fire has been extinguished, with residual smoke existing., the US has directed you to purge the Control Room and restore normal ventilation to the Control Room using HVAC System "A" per ABN-29, section 3.4.8 I' Page 6 of 6 OYSTER CREEK GENERATING STATION PROCEDURE Number ABN-29 8. When the Control Room fire is extinguished, then PERFORM the following:

I L/ Title PLANT FIRES NOTE: Shutting down 480V switchgear room ventilation will prevent smoke and fumes from being sucked in when the Control Room is purged. Ensure Standing Order 51 is adhered to. Revision No. 0 A. SHUT DOWN the B 480V Switchgear Room ventilation system manually by placing the control switch for SF 1-21 and EF 1-21 in the OFF position on Panel 1 I R. I1 NOTE: Either Control Room HVAC System B or A may be used. Direction for System A is shown in parentheses.

B. PLACE CONT RM HVAC "B" ("A) DAMPER CONTROL switch on Panel 9XR (1 1 R) in PUR. PLACE HVAC "B" ("A) BYPASS switch in BYP.

START the 'B" ("A) Control Room HVAC system. MONITOR B 480V switchgear room temperature.

If temperature approaches 104'F, it may be necessary to secure Control Room HVAC and restart B 480V Switchgear Room Ventilation, per step 8-1 below. C. D. E. NOTE: Venting the Control Room for 15 minutes will allow for approximately 3 changes of air, which wifl normally provide adequate ventilation.

F. When smoke is cleared from the Control Room, then PERFORM the following:

1) RESET Fire Detection Alarms on Control Module 6 and FAMP.

I1 [I [I I1 [I 10.0 AmerGem An Exelon/British Energy Company JOB PERFORMANCE Title: Operate the Remote Shutdown Panel on Control RoodEvacuation.

Setup the Remote Shutdown Panel for operation upon Control Room dcuation.

I 3080401401 KA# 295016 AA1.07 I RATING: $0 - 4.2 SRO -4.3 Validation Time I 10 Minutes 1 TidCritical I No I I Name Social Security Number / DIRECTIONS TO TRAINEE: Before you start, I will state the task complete this task successfully, you demonstrate proper procedural and initiating cues and fully answer any questions.

To will not be provided during the performance or simulate each critical element correctly and of required tasks.

/ NOTE: Directions are only require once in a given JPM session. u' Page 1 of 5 JPM 308.01 Rev. 1 1 TASK CONDITIONS:

T = 0 minutes ; Reactor operating at 100% power T = 10 minutes ; Toxic atmosphere Control Room evacuated and all required and desired actions have been performed per ABN 3200.30 "B" Isolation condenser is in service "B" CRD pump operating V-11-34 is closed V-14-35 is open GENERAL TOOLS AND EQUIPMENT:

MB-1 key GENERAL

REFERENCES:

W Procedure 346, Remote Shutdown, Rev.

9, Section 7 TASK STANDARD:

All controls and indications on the Remote Shutdown Panel are active CRITICAL ELEMENTS:

(*) 5,7,8,9,11 INITIATING CUES: Toxic atmosphere has caused an evacuation of the control room. The US has directed you to place the Remote Shutdown Panel into operation in accordance with procedure 346, Section 7, Operation of the Remote and Local Shutdown Panels.

Page 2 of 5 JPM 308.01 Rev. 1 START TIME u L PERFORMANCE CHECKLIST STANDARD INITIAL SAT/UNSAT

1. 2. Verifies prerequisites met. Verifies prereqs met.

Obtain controlled copy of procedure.

Procedure 346, section 7, obtained.

I I UPON REQUEST: Individual prereqs not verifiable at location, can be verified as met. I I 3. Reviews all applicable precautions and limitations. limitations.

Reviews all applicable precautions and

4. Obtains keys for remote shutdown panel. Shutdown Panel.

Unlock key ring to right of Remote "5. Places the "CRD control transfer" keylock to the alternate position.

Inserts key and places CRD control transfer switch in "Alternate" position.

I I CUE: CRD Control transfer keylock is in alternate. I I 6. Confirms 1B2M closed. "Red" indicating light lit for breaker 1B2M at the RSP. I I CUE: 1B2M breaker indicates closed (E3 CRD pump operating, no action required.

I I "7. Lines up IC "B" valve control.

On Remote S/D panel, places control switch for V-14-35 in open and control switch for V-11-34 remains closed.

I I CUE: V-14-35 control switch is in open and V-11-34 control switch is in close. WON REQUEST: V-14-35 is open V-11-34 is closed I *8. Places bypass switch on the breaker at USS 1B2 for RBCCW pump 1-2 to the bypass position. Place the NormaVBypass switch for RBCCW pump 1-2 to bypass. __ I I CUE: RBCCW pump 1-2 normalhypass switch is in bypass. Page 3 of 5 PERFORMANCE CHECKLIST STANDARD 1 INITIAL SATKINSAT "9. Places train "A" and train "B" to the ll alternate position.

10. Confirms all recirc pumps tripped. // Insert keys and rotate Train "A" and Train "B" transfer switches to "Alternate".

Performance met by prereq of "All actions of ABN 3200.30 met". 1 I I CUE: Red "On" status lights lit for "B" 460V SWGR Room and "A/B" battery room fans after two seconds UPON REQUEST: V-14-35 indicates open (red) V-11-34 indicates closed (green) n I I CUE: If requested by operator, evaluator reports as EO all recirc pump breakers verified open in 4160V switchgear room. I I

  • 1 1. Activates RSP fuel zone level.

II Place both fuel zone level On/Off switches to "On".

CUE: A11 fuel zone meters at 155 TAF. I I I 11 12. Used procedure properly.

Used procedure properly according to its level of usage. COMPLETION TIME Page 4 of 5 TASK CONDITIONS:

T = 0 minutes ; Reactor operating at 100% power T = 10 minutes ; Toxic atmosphere 0 0 "B" CRD pump operating 0 V-11-34 is closed 0 V-14-35 is open Control Room evacuated and all required and desired actions have been performed per ABN 3200.30 "B" Isolation condenser is in service INITIATING CUES: Toxic atmosphere has caused an evacuation of the control room.

The US has directed you to place the Remote Shutdown Panel into operation in accordance with procedure 346, Section 7, Operation of the Remote and Local Shutdown Panels.

Page 5 of 5 AmerGem An ExelonlBritish Energy Company JOB PERFORMANCE MEASURE 286.04 Title: Lineup Fire Protection to the Core Spray System Task: Lineup Fire Protection to the Core Spray System 2860401 403 2860404404 KA# 209001 G 009 I RATING: RO - 3.9 SRO - 3.7 Validation Time 6 minutes I Time Critical No I I I Name Social Security Number DIRECTIONS TO TRAINEE:

Before you start, I will state the task conditions and initiating cues and fully answer any questions.

To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence. Peer checking will not be provided during the performance of required tasks.

NOTE: Directions are only required once in a given JPM session. Comments I Page 1 of 5 JPM 286.04 REFERENCE SECTION TASK CONDITIONS

Reactor scrammed Both Core Spray Main pumps failed LOCA in progress RPV level 60" GENERAL TOOLS AND EQUIPMENT:

None Optional: Plant radio GENERAL

REFERENCES:

EMG 3200.01 B, RPV Control with ATWS, Rev.

12 Support Proc. 20, Low Pressure Injection During An ATWS, Section 3.3, Rev. 12 L TASK STANDARD: Core spray system 1 injecting into the core with fire water CRITICAL ELEMENTS:

(*) 4&9 INITIATING CUES: The FS/US has directed you to line up fire water to Core Spray System 1 per Support Procedure

20. Page 2 of 5 JPM 286.04 PERFORMANCE SECTION L, STARTTIME PERFORMANCE CHECKLIST STANDARD INITIAL SAT/U NSAT 1. Obtain controlled copy of Obtain controlled copy of Support procedure.

Procedure

20. 2. Confirms stopped the Core Communicates with Control Room to Spray Main and Booster Pumps in Core Spray System 1. confirm all Core Spray System 1 pumps stopped.

I I CUE: Control Room reports Core Spray System 1 pumps stopped. I I 3. Place Core Spray System 1 Main Pump control switches in Pull-to-Lock position.

Communicates with Control Room to confirm Core Spray System 1 Main Pumps in Pull-to Lock. I I CUE: Control Room reports Core Spray System 1 Main Pumps in Pull-to- Lock. I *4. Closes telltale drain valve Closes handwheel for V-20-91 located V-20-91. on North side of reactor building 23'. I I CUE: V-20-91 closed.

I I 5. Confirm running all Diesel Communicates with Control Room to Fire Pumps by placing their control switches in MANUAL running. position (1 3R). confirm all Diesel Fire Pumps are I I CUE: Control Room reports that both Diesel Fire Pumps running. Page 3 of 5 PERFORMANCE CHECKLIST

6. Confirms open Core Spray 1 discharge valves V-20-12 and either V-20-15 or V 40. CUE: Upon request the evaluator

\n V-20-12 and V-20-15 (or V-2

7. Confirms closed test discharge valve V-20-27.

CUE: Upon request the evaluator H V-20-27 closed. 8. Closes Core Spray 1 suction valve V-20-32 and V- 20-3 CUE: Control Room reports Green *9. Throttle open V-20-83, Fire Water Supply valve. CUE: Flow noise is heard from the (V-20-83 open) 10. Used procedure properly.

JPM 286.04 STANDARD INITIAL SAT/UNSAT Confirms valves open locally, Rx Bldg. 75' elev. OR communicates with Control Room to confirm discharge valves V-20-12 and either V- 20-15 or V-20-40 are open. I provide the following:

.40) open. I Confirms valve closed locally, Rx Bldg. 75' elev. OR communcates with Control Room to confirm test discharge valve V-20-27 is closed. I I provide the following:

I Communicates with Control Room to close suction valves V-20-32 and V 3. 2losed" indicating lights for V-20-32 and V-20-3. I Opens valve V-20-83 locally, adjacent to V-20-91, at the North side of reactor {stem. I Used procedure properly according to its level of usage. COMPLETION TIME L Page 4 of 5 TASK CON D IT10 NS: Reactor scrammed Both Core Spray Main pumps failed LOCA in progress RPV level 60" II INITIATING CUES: The FS/US has directed you to line up fire water to Core Spray System 1 per Support Procedure

20. 1 I1 Page 5 of 5 AmerGen, An ExelontBnhsh Energy Company Title: TERMINATION AND PREVENTION OF INJECTION Task: ENTER AND CONTROL RPV LEVEL, PRESSURE AND CONTROL-With ATWS POWER AS DIRECTED BY EMG-3200.01 B, "RPV 2000501 441 KA# 295037 EA2.02 I RATING: SRO 4.2 RO 4.1 Validation Time:

3 minutes I No Time Critical:

No I I Name Social Security Number I DIRECTIONS TO TRAINEE: Before you start, I will state the task conditions and initiating cues and fully answer any questions. To complete this task successfully, you must perform or simulate each critical element correctly and demonstrate proper procedural adherence.

NOTE: Directions are only required once in a given JPM session. "II Comments 1 Of5 L JPM 200.00Q REFERENCE SECTION Rev. 00 TASK CONDITIONS: The plant is in an ATWOS condition at approximately 40% power. RPV Control w/ ATWOS has been entered. All efforts to insert control rods have been unsuccessful Support Procedure 16 has been completed bypassing the LO-LO Water Level Interlocks.

INITIATING CUES: As the US I am directing you to perform Support Procedure 17, Termination and Prevention of Injection.

GENERAL TOOLS AND EQUIPMENT: GENERAL

REFERENCES:

3upport Procedure 17, "Termination and Prevention of Injection" - revision 12 b TASK STANDARD:

All Core Spray Main Pumps in Pull-to-Lock, All FW pumps off, one (1) Condensate pump running, all Feed Reg. Valves closed.

CRITICAL ELEMENTS:

(*) 7, 8, 9, and 10. 2 of 5 JPM 200.00Q Rev. 00 TASK CONDITIONS:

i/ 0 The plant is in an ATWOS condition at approximately 40% power. RPV Control w/ ATWOS has been entered. All efforts to insert control rods have been unsuccessful 0 Support Procedure 16 has been completed bypassing the LO-LO Water Level Interlocks.

INITIATING CUES: As the US I am directing you to perform Support Procedure 17, Termination and Prevention of Injection.

PERFORMANCE SECTION START TIME PERFORMANCE CHECKLIST STANDARD INITIAL 1. Obtain controlled copy of Obtains controlled copy of Support 2. Verifies all prerequisites are Verifies all prerequisites are met SATNNSAT procedure Procedure

17. 1 AI met I I Prerequisites have been met. -1 CUE: 3. Informs operator controlling Informs operator controlling pressure that reactor pressure of impending IC initiation. LO-LO level the IC's will initiate when level reaches Depresses OVERRIDE switches for all sensors that are lit or unlit and depresses all ACTUATED switches whether lit or unlit. 4. Overrides all core spray initiation logic. 5. Confirms all Core Spray Parallel Isolation Valves closed. Confirms all Core Spray Parallel Isolation Valves closed by observing GREEN "CLOSED" indicating lights for V-20-15, 40, 21 & 41 lit. 6. Confirms all Core Spray 1 Booster Pumps tripped. Confirms all Core Spray Booster Pumps tripped by observing the GREEN "OFF indicating lights lit. 3 of 5

' PERFORMANCE CHECKLIST

  • 7. Confirms all Core spray Main Pump control switches tin PULL-TO-LOCK
  • 9. Confirms one (1) Condensate pump running. *lo. Place all Individual FRV controllers in MAN position and closes all FRV's. 11. Reports to US that SP 17 is JPM 200.00Q Rev. 00 STANDARD Places the control switches for all Core Spray Main Pumps into the PULL-TO- LOCK position. Trips all operating Feedwater pumps by placing their respective control switches to the STOP position 23 returning to the NORMAL position. Trips two (2) of the running condensate pumps leaving one (1) running. Places all Individual FRV controllers in MAN position and closes all FRV's & LFRV's. Reports to US that SP 17 is complete.

Used procedure properly according to its level of usage. INITIAL SATNNSAT COMPLETION TIME 4 of 5 JPM 200.00Q SIMULATOR SETUP Initial Condition(s):

IC-65 SETUP 1. Run Simprob.cae and ATWS.CAE 2. Complete Support Procedure 16 to bypass Lo-Lo interlocks.

3. Malfunctions:

NONE Command Files: SI MPROB.CAE ATW S .CAE Rev. 00 c 5 of 5 TASK CONDITIONS:

~ ~ 0 The plant is in an ATWOS condition at approximately 40% power. 0 RPV Control w/ ATWOS has been entered. 0 All efforts to insert control rods have been unsuccessful 0 Support Procedure 16 has been completed bypassing the LO-LO Water Level Interlocks.

INITIATING CUES: As the US I am directing you to perform Support Procedure 17, Termination and Prevention of Injection.

6 of 5