|
|
Line 3: |
Line 3: |
| | issue date = 04/05/2010 | | | issue date = 04/05/2010 |
| | title = Meeting Summary of 3-31-10 Public Meeting with FENOC | | | title = Meeting Summary of 3-31-10 Public Meeting with FENOC |
| | author name = Bellamy R R | | | author name = Bellamy R |
| | author affiliation = NRC/RGN-I/DRP/PB6 | | | author affiliation = NRC/RGN-I/DRP/PB6 |
| | addressee name = | | | addressee name = |
Line 20: |
Line 20: |
| OF THE MARCH 31, 2010, PUBLIC MEETING TO DISCUSS FENOC FLEET PERFORMANCE On March 31, 2010, the Nuclear Regulatory Commission (NRC) | | OF THE MARCH 31, 2010, PUBLIC MEETING TO DISCUSS FENOC FLEET PERFORMANCE On March 31, 2010, the Nuclear Regulatory Commission (NRC) |
| Headquarters, Region I and Region III met with the FirstEnergy Nuclear Operating Company (FENOC) management to discuss fleet performance. | | Headquarters, Region I and Region III met with the FirstEnergy Nuclear Operating Company (FENOC) management to discuss fleet performance. |
| The public meeting was held at the Embassy Suites, Pittsburgh International Airport. The meeting notice, licensee presentation and list of attendees can be found in the Agencywide Documents Access and Management System (ADAMS) as ML 100600637, ML 100910266 and ML 100910315, respectively. | | The public meeting was held at the Embassy Suites, Pittsburgh International Airport. The meeting notice, licensee presentation and list of attendees can be found in the Agencywide Documents Access and Management System (ADAMS) as ML100600637, ML100910266 and ML100910315, respectively. |
| A list of principal NRC and licensee meeting participants is enclosed. | | A list of principal NRC and licensee meeting participants is enclosed. |
| The NRC began the meeting with a brief introduction, followed by FENOC management discussions of 2009 fleet performance, individual site overviews for Beaver Valley, Perry and Davis-Besse, fleet oversight and assessment updates and fleet project updates. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. | | The NRC began the meeting with a brief introduction, followed by FENOC management discussions of 2009 fleet performance, individual site overviews for Beaver Valley, Perry and Davis-Besse, fleet oversight and assessment updates and fleet project updates. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. |
|
---|
Category:Meeting Summary
MONTHYEARML24284A2342024-10-22022 October 2024 October 2024 Perry Draft EIS Public Meetings - Summary ML24248A2332024-09-0505 September 2024 Summary of the August 29, 2024, Public Outreach to Discuss the NRC 2023 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML24166A2122024-06-18018 June 2024 June 10, 2024, Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Perry Nuclear Power Plant ML24155A1992024-06-0303 June 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Meeting Summary ML24064A2212024-03-14014 March 2024 Letter to Rod L. Penfield-Perry Nuclear Power Plant Unit 1 - Summary of the Jan-Feb 2024 Environmental Audit Related to the Review of the License Renewal Application Environmental Report ML23303A0662023-11-0606 November 2023 October 2023 Environmental Scoping Meetings Re Perry Nuclear Power Plant License Renewal Application Meeting Summary Memo ML23187A4692023-07-0606 July 2023 Summary of the June 22, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Perry Nuclear Power Plant ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML23152A2552023-06-0505 June 2023 Summary of the May 17, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML23135A7872023-05-19019 May 2023 Summary of Conference Calls Regarding the Spring 2023 Steam Generator Tube Inspections ML23065A2192023-03-15015 March 2023 Second Safety Pre-Application Meeting Summary ML23026A3552023-01-31031 January 2023 Summary of Public Meeting with Energy Harbor Nuclear Corp. Regarding Beaver Valley Power Station License Amendment Request to Consolidate Fuel Decay Time TS Into New Limiting Condition for Operation ML22258A0632022-09-26026 September 2022 July 21, 2022, Perry Nuclear Plant, Unit 1 License Renewal Environmental Pre-Application Meeting Summary - Letter ML22213A0362022-08-29029 August 2022 Safety Pre-Application Meeting Summary ML22187A1462022-07-0606 July 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary ML22178A2312022-06-28028 June 2022 Summary of the June 22, 2022, Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Davis Besse Nuclear Power Station ML22147A0372022-05-31031 May 2022 Summary of the May 19, 2022, Public Outreach to Discuss the NRC 2021 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant ML22105A3932022-04-20020 April 2022 Summ. of March 17, 2022, Public Meeting with Ehnc Regarding Planned License Amendment Request to Consolidate Fuel Decay Time Requirements in a New Limiting Condition for Operation for Beaver Valley Power Station, Units 1 and 2 ML22088A1972022-03-30030 March 2022 Summary of March 11, 2022, Call Regarding the Spring 2022 Steam Generator Tube Inspections ML22084A1022022-03-27027 March 2022 Reissue Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory Commission ML22077A8062022-03-23023 March 2022 Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory Commission ML22053A2982022-02-25025 February 2022 Summary of the February 15, 2022, Meeting with Energy Harbor Nuclear Corp. Regarding the License Amendment Request Related to Revising TS 5.6.3 Core Operating Limits Report (COLR) ML21314A5362021-11-18018 November 2021 Summary of November 8, 2021, Meeting with Energy Harbor Nuclear Corp. Regarding Its Proposed Alternate for Examination of Steam Generator Welds at ML21308A0712021-11-0909 November 2021 Summary of Teleconference with Energy Harbor Nuclear Corp. Regarding Fall 2021 Steam Generator Inspections at Beaver Valley Power Station, Unit 2 ML21180A4632021-06-29029 June 2021 Summary of the June 22, 2021, Public Outreach to Discuss the NRC 2020 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant ML21055A2642021-03-0202 March 2021 Summary of February 16, 2021, Teleconference with Energy Harbor Nuclear Corp. to Discuss Potential License Amendment Request Related to Revising Flood Mitigation for Perry Nuclear Power Plant, Unit No. 1 ML20324A2192020-11-23023 November 2020 Summary of November 18, 2020, Teleconference with Energy Harbor Nuclear Corp. to Discuss Potential Changes to the Emergency Plan for Perry Nuclear Power Plant, Unit No. 1 ML20240A2942020-08-27027 August 2020 July 23, 2020 Summary of Public Webinar to Discuss the Nrc 2019 End-Of-Cycle Plant Performance Assessment of the Davis-Besse Nuclear Power Station and the Perry Nuclear Power Plant ML20197A2722020-07-15015 July 2020 2020 Beaver Valley, Calvert Cliffs, Limerick Peach Bottom, Susquehanna Annual Assessment Webinar Summary ML20163A6272020-06-15015 June 2020 Summary of Public Telecon with Energy Harbor on License Renewal for Perry Nuclear Plant ML20148M3852020-06-0101 June 2020 Summary of May 26, 2020, Public Meeting with Energy Harbor Nuclear Corp. Potential License Amendment Request Related to Steam Generator Tube Sleeve Inspections and Maintenance ML20122A0032020-05-19019 May 2020 Summary of April 22, 2020, Teleconference with Energy Harbor Nuclear Corp. Regarding Spring 2020 Steam Generator Inspections at Beaver Valley Power Station, Unit 2 ML20111A0142020-04-27027 April 2020 Summary of March 31, 2020, Public Meeting with Energy Harbor Nuclear Corp. to Discuss COVID-19 Potential Submittals of Regulatory Actions ML16125A5072019-10-22022 October 2019 Ti 191 Issue Matrix ML19280A0382019-10-22022 October 2019 Ti 2515-191 Summary of Findings ML19249C7652019-09-0404 September 2019 Summary of the July 17, 2019 Public Outreach/Open House to Discuss the NRC 2018 End-of-Cycle Plant Performance Assessment of the Perry Nuclear Power Plant ML19249C7112019-09-0404 September 2019 Summary of the July 18, 2019 Public Outreach/Open House to Discuss the NRC 2018 End-Of-Cycle Plant Performance Assessment of the Davis-Besse Nuclear Power Station ML19191A1882019-07-0909 July 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - Meeting Summary ML18332A4122018-12-0303 December 2018 Summary of Public Teleconference Call with Firstenergy Nuclear Operating Company Regarding Proposed Revisions to the Emergency Plan ML18325A0232018-11-28028 November 2018 Summary of Teleconference with Firstenergy Nuclear Operating Company Regarding Fall 2018 Steam Generator Inspections at Beaver Valley Power Station, Unit 2 ML18313A1982018-11-14014 November 2018 Summary of Meeting with Firstenergy Nuclear Operating Company Regarding Planned Submittal of Post-Shutdown Emergency Plan for Davis-Besse Nuclear Power Station ML18192A6522018-07-10010 July 2018 Summary of Public Meeting to Discuss the 2017 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML18117A1672018-04-25025 April 2018 Summary of Public Outreach/Open House to Discuss the NRC 2017 End-Of-Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 ML18099A0812018-04-0606 April 2018 Bv Annual Assessment Meeting Summary and Attendance List 2018 ML18065A1392018-03-15015 March 2018 Summary of February 21, 2018, Public Meeting with Firstenergy Nuclear Operating Company Regarding a Proposed Revision to the Perry Nuclear Power Plant, Unit 1, Fire Protection Program ML17347A8082017-12-20020 December 2017 December 5, 2017, Summary of Public Meeting with Firstenergy Nuclear Operating Company to Discuss a Proposed License Amendment Request Extending Sleeve Life on the Steam Generator at Beaver Valley Power Station, Unit 2 ML17258A1462017-09-20020 September 2017 Summary of September 12, 2017, Meeting with Firstenergy Nuclear Operating Company Regarding Its Licensing Amendment Request to Adopt National Fire Protection Association Standard 805 at Davis-Besse Nuclear Power Station, Unit No. 1 ML17234A5542017-08-24024 August 2017 Summary of Telephone Conference with Firstenergy Nuclear Operation Co., Regarding Verbal Authorization of Relief Request to Use Alternative for Perry Nuclear Plant, Unit 1 ML17229B1362017-08-16016 August 2017 Summary of July 19, 2017, Open House to Discuss the 2016 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML17205A0242017-07-19019 July 2017 Summary of July 11, 2017, Open House to Discuss the 2016 End-of-Cycle Plant Performance Assessment of Perry Nuclear Power Plant 2024-09-05
[Table view] |
Text
April 5, 2010 FirstEnergy Nuclear Operating Company Beaver Valley, Davis-Besse, and Perry Nuclear Power Plants
SUMMARY
OF THE MARCH 31, 2010, PUBLIC MEETING TO DISCUSS FENOC FLEET PERFORMANCE On March 31, 2010, the Nuclear Regulatory Commission (NRC)
Headquarters, Region I and Region III met with the FirstEnergy Nuclear Operating Company (FENOC) management to discuss fleet performance.
The public meeting was held at the Embassy Suites, Pittsburgh International Airport. The meeting notice, licensee presentation and list of attendees can be found in the Agencywide Documents Access and Management System (ADAMS) as ML100600637, ML100910266 and ML100910315, respectively.
A list of principal NRC and licensee meeting participants is enclosed.
The NRC began the meeting with a brief introduction, followed by FENOC management discussions of 2009 fleet performance, individual site overviews for Beaver Valley, Perry and Davis-Besse, fleet oversight and assessment updates and fleet project updates. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
The meeting provided a useful forum to discuss common themes at the FENOC plants with the NRC Regions I and III, the Office of Nuclear Reactor Regulation and the Office of Nuclear Security and Incident Response.
The meeting concluded with a discussion of plans to continue annual meetings involving the NRC regions and program offices and all plants in the FENOC fleet. I RAJ Ronald R. Bellamy, Ph.D., Chief Branch 6 Division of Reactor Projects Docket Nos. 50-334, 50-412, 50-346, and 50-440 License Nos. DPR-66, NPF-73, NPF-3, NPF-58 As Stated 2 Principal Meeting Participants S. Collins, Regional Administrator, RI M. Satorius, Regional Administrator, Rill E. Leeds, Director, Office of Nuclear Reactor Regulation (NRR) w. Dean, Deputy Director, Office of Nuclear Security and Incident Response (NSIR) A. Howe, Acting Director, Division of Operating Reactor Licensing, NRR R. Bellamy, Chief, Projects Branch, RI J. Cameron, Chief, Projects Branch, Rill FirstEnergy Nuclear Operating Company J. Hagan, President and Chief Nuclear OFFicer J. Lash, Senior Vice President FENOC Operations D. Pace, Senior Vice President, Engineering P. Sena, Vice President, FENOC Operations K. Fili, Vice President, Fleet Oversight B. Allen, Vice President, Davis-Besse P. Harden, Vice President, Beaver Valley M. Bezilla, Vice President, Perry Distribution Executive Director for Operations, OEDO (RIDSEDOMA1LCENTER)
Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
Director, Division of Inspection
& Regional Support, NRRlDIRS (RIDSNRRDIRS)
Director, Division of Operating Reactor Licensing, NRRIDORL (RIDSNRRDORL)
Asst. General Counsel Materials Litigation
& Enforcement, OGC (RI DSOGCMA1LCENTER)
S. Collins, ORA M. Dapas, ORA D. Lew, DRP J. Clifford, DRP D. Roberts, DRS P. Wilson, DRS R. Bellamy, DRP S. Barber, DRP C. Newport, DRP J. Greives, DRP D. Werkheiser, DRP, SRI E. Bonney, DRP, RI P. Garrett, DRP, Res OA L. Trocine, RI OEDO D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA N. McNamara, SLO D. Tifft, SLO J. Thompson, NRR G. Matakas, ORA C. O'Daniell, ORA D. Bearde, DRS K. Heater, DRP T. Haverkamp, DNMS M. Satorius, Rill W. Dean, NSIR J. Cameron, Rill V. Lewis, Rl Receptionist RidsNRRPMBeaver Valley Resource RidsNrrDirslpab@nrc.gov ROPreportsResource@nrc.gov SUNSI Review Complete:
RRB (Reviewer's Initials DOC NAME: G:\DRP\BRANCH6\Briefings, Site Visits, and Presentation\Site FENOC MTGs\FENOC Meeting Summary After declaring this document "An Official Agency Record" it will be released to the To receive a copy of this document, indicate in the box: "C" =Copy without attachment/enclosure "E" =Copy with attachment/enclosure
'N" =No OFFICE RI/DRP I RIIDRP I RI/DRP I NAME CNewportl cn SBarberl SB RBellamyl DATE 04/02/10 04/02/10 OFFICIAL RECORD COPY