ML12242A343: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 07/31/2012
| issue date = 07/31/2012
| title = Annual Summary of Changes, Tests and Experiments at Aerotest Radiography and Research Reactor (Arrr), for the Period of 1 July 2011 to 30 June 2012
| title = Annual Summary of Changes, Tests and Experiments at Aerotest Radiography and Research Reactor (Arrr), for the Period of 1 July 2011 to 30 June 2012
| author name = Meren A W
| author name = Meren A
| author affiliation = Aerotest Operations, Inc
| author affiliation = Aerotest Operations, Inc
| addressee name =  
| addressee name =  

Revision as of 17:48, 22 June 2019

Annual Summary of Changes, Tests and Experiments at Aerotest Radiography and Research Reactor (Arrr), for the Period of 1 July 2011 to 30 June 2012
ML12242A343
Person / Time
Site: Aerotest
Issue date: 07/31/2012
From: Meren A
Aerotest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML12242A343 (4)


Text

AEROTEST OPERATIONS, INC.3455 FOSTORIA WAY

  • SAN RAMON, CA 94583 -(925) 866-1212
  • FAX (925) 866-1716 31 July 2012 Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Annual Summary of Changes, Tests and Experiments at Aerotest Radiography and Research Reactor (ARRR), Docket no. 50-228, for the period of 1 July 2011 to 30 June 2012.Gentlemen:

The enclosed report summarizes the ARRR operations from July 1, 2011 through June 30, 2012. This submittal complies with the requirements set forth in 10 CFR 50.59,"Authorization of Changes, Tests and Experiments." In order to comply with NRC requirements to resolve foreign ownership issues, Aerotest Operations, Inc. voluntarily ceased reactor operations on Oct. 15, 2010 and remains shutdown pending a potential transfer of ownership to a US company. As such, summary forms of monthly operations and unscheduled power reductions are not applicable and are therefore not included in this report.During a 100% fuel element inspection performed from Dec. 5 to 7, 2011, one additional aluminum fuel element and 7 additional graphite elements could not be withdrawn through the reactor's upper grid plate, bringing the total to 27 aluminum fuel elements and 12 graphite elements that cannot be withdrawn through the upper grid plate. Also, 4 of these aluminum fuel elements were found to have developed cracks since they were last inspected.

These results were reported to the NRC. Plans have been developed to remove these 27 aluminum fuel elements and 12 graphite elements from the core and to canister all cracked fuel elements in July, 2012 under the observation of an NRC inspector.

(18 additional cracked aluminum fuel elements were discovered during this July, 2012 reactor fuel work).Sincerely,-vff -91te1ýAlfredo W. Meren Reactor Supervisor Aerotest Operations, Inc.A subsidiary of Autoliv ASP, INC. D 2 ,0 ANNUAL

SUMMARY

OF CHANGES, TESTS AND EXPERIMENTS PERFORMED AT THE AEROTEST RADIOGRAPHY AND RESEARCH REACTOR (ARRR)DOCKET NO. 50-228 FOR THE PERIOD ENDING JUNE 30, 2012 BY ALFREDO W. MEREN REACTOR SUPERVISOR APPROVED BY SANDRA L. WARREN GENERAL MANAGER AEROTEST OPERATIONS, INC.

SECTION 1 Part I -Changes 1. Updated Procedures and Safety Analysis Report have previously been submitted to the NRC as part of the facility's relicensing application package. No changes have been implemented.

Part 2 -Experiments No experiments were performed during the year while the reactor remained shutdown.